Caper India Private Limited vs Satellite Cargo Connexion Private Limited

Court
Bombay High Court

CNR No : HCBM020208762026

carap470-2026-J.doc
Shabnoor
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
IN ITS COMMERCIAL DIVISION
COMM ARBITRATION APPLICATION NO.470 OF 2026
Caper India Private Limited
… Applicant
Vs.
SHABNOOR
AYUB
PATHAN
Satellite Cargo Connexion Private Limited
… Respondent
Digitally signed
by SHABNOOR
AYUB PATHAN
Date: 2026.11.26
11:54:28 +0530
Mr. Pratyush Ranjan for the Applicant.
Mr. Nikhil Waje with Mr. Pratik Thorat and Mr. Sumedh
Deshpande for the Respondent.
CORAM : AMIT BORKAR, J.
RESERVED ON : NOVEMBER 21, 2026.
PRONOUNCED ON : NOVEMBER 26, 2026
JUDGMENT:
1. The Applicant has filed the present Application under
Section 11 of the Arbitration and Conciliation Act, 1996, seeking
appointment of a Sole Arbitrator to decide the disputes which have
taken place between the Applicant and the Respondent in relation
to the Memorandum of Understanding dated 2 August 2025
(hereinafter referred to as "the said MoU").
2. The Respondent has opposed this Application. According to
the Respondent, the Applicant has come before this Court for
appointment of an arbitrator without following the procedure
which both parties had agreed under Clause 17 of the said MoU. It
1
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
is the case of the Respondent that, before going for arbitration, the
parties were first required to try to settle their differences by
mutual discussions within thirty days from the date of the dispute.
The Respondent says that, even after this period was over, the
Applicant was required to ask the Respondent to mutually appoint
a Sole Arbitrator. Only if the parties could not agree on the
appointment within fifteen days of such request, the matter could
be taken forward under the rules of the Mumbai Centre for
International Arbitration (MCIA).
3. The Applicant has a different case. According to the
Applicant, the parties had exchanged several communications in
January and February 2026 and these communications show that
attempts were made to settle the dispute. It is submitted that the
Respondent has denied the claim of the Applicant and is raising
objections only to avoid making payment. According to the
Applicant, when the Respondent has denied its liability, asking the
parties to again sit together for discussions will serve no purpose.
The Applicant therefore says that this Court should now appoint
an arbitrator.
4. The main question which arises for consideration is whether
the Applicant has followed the procedure agreed under Clause 17
of the MoU and whether the stage has now reached where this
Court can appoint an arbitrator under Section 11 of the Act.
5. Before considering the objections raised by the Respondent,
it is necessary to briefly see what was the transaction between the
parties and how the present dispute has come about. According to
2
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
the Applicant, the parties entered into the MoU dated 2 August
2025 for taking over the business of the Respondent. Under this
arrangement, the Applicant was to acquire the entire issued and
paid-up share capital of the Respondent, along with its assets and
liabilities, subject to the conditions mentioned in the MoU. The
purchase consideration indicated under the MoU was
Rs.4,25,00,000/-. The Applicant was given an opportunity to
examine the financial position of the Respondent Company. Under
Clause 4, the Applicant could examine the records of the Company
and ask the Respondent for necessary information and
explanations. The transaction was subject to fulfilment of the
conditions mentioned in Clause 5, under Clause 4.5, the Applicant
had the right to decide whether the result of the due diligence was
satisfactory and whether it wanted to continue with the
transaction or bring the MoU to an end.
6. The Applicant says that, relying upon the statements and
representations made by the Respondent, it transferred substantial
amounts through banking channels. In paragraph D of the
Application, the Applicant has stated that an amount of
Rs.4,76,00,000/- was transferred between May 2025 and
November 2025. In paragraph E, the Applicant has referred to
another amount of Rs.2,03,314/- paid towards Tally accounting
software and other operational expenses. Thus, according to the
Applicant, the total amount paid in relation to the proposed
transaction was Rs.4,78,03,314/-. The Applicant states that, after
examining the affairs of the Respondent Company, it prepared a
Financial Analysis Report dated 13 February 2026. According to
3
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
the Applicant, this report brought out several serious financial
irregularities and facts which were not disclosed by the
Respondent earlier. These included statutory liabilities, contingent
liabilities, defaults in payment of tax and GST, improper
accounting practices, related party transactions and diversion of
funds. The Applicant therefore says that, after these facts came to
its knowledge, it was not possible to proceed with the proposed
acquisition. It claims that it was entitled to terminate the MoU and
ask for return of the amounts paid. The Applicant has made
statements in paragraphs H to L of the Application. According to
the Applicant, after these financial irregularities came to light, the
Respondent accepted that the transaction could not be completed
and agreed to return the entire amount. It is stated that the parties
thereafter agreed to treat the amount of Rs.4,78,03,314/- as a loan
and that the Respondent handed over five signed but undated
cheques as security for repayment. The Applicant says that these
cheques were deposited in the bank for encashment but were
dishonoured.
7. The Respondent has denied these allegations. In its Affidavit
in Reply, the Respondent has disputed the amount claimed by the
Applicant and has denied that it is required to return the entire
amount. The Respondent points out that the purchase
consideration under the MoU was Rs.4,25,00,000/- and that
different payments and liabilities were separately dealt with under
Clauses 7, 14 and 15. According to the Respondent, some
payments were required to be made to the Respondent Company,
whereas other payments were to be made separately to the
4
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
promoters and shareholders towards purchase of their shares. The
Respondent says that the Applicant has not produced any material
to show that such payments were made to the concerned persons.
The Respondent has relied upon Annexures A and B to the MoU.
Annexure A gives details of secured loans of approximately
Rs.1,96,63,809/- and unsecured loans of approximately
Rs.1,35,49,080/-. The total amount of these loans is shown as
Rs.3,32,12,889/-. Annexure B gives details of vehicles and other
fixed assets of the Respondent Company. It refers to fixed deposits
of approximately Rs.34,06,436/-.
8. These documents show that the parties had made
arrangements regarding the existing loans, liabilities, deposits and
assets of the Respondent Company. Under Clause 7.1, certain
liabilities which were outstanding up to 30 June 2025 were to be
paid by the Respondent. Under Clause 7.3, certain identified bank
loans and other liabilities were to be taken care of by the
Applicant. Clause 7.4 dealt with payments and liabilities arising
after 1 July 2025. Therefore, whether the Applicant is entitled to
recover the entire amount claimed, what amounts were paid and
which party was required to meet particular liabilities are matters
which will have to be examined by looking at the MoU, the
accounts and the other supporting documents.
9. The Respondent has denied that it ever accepted that it was
liable to pay back Rs.4,78,03,314/-. It has denied that there was
any oral agreement between the parties to treat the amounts paid
under the MoU as a loan. The Respondent has denied that the five
cheques were given for repayment of Rs.4,78,03,314/-. According
5
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
to the Respondent, those cheques were given only as security for
another transaction of Rs.50,00,000/-.
10. At this stage, this Court is not required to decide whether the
Applicant has paid the entire amount claimed, whether the
Respondent accepted its liability, whether the five cheques were
given towards repayment of the amount claimed or whether the
Financial Analysis Report correctly shows the financial position of
the Respondent. These questions relate to the claims and liabilities
of the parties. The present proceedings are under Section 11 of the
Act and the Court is required to make a limited enquiry. The main
question at this stage is whether there is an arbitration agreement
between the parties and whether the procedure agreed by them for
appointment of an arbitrator has been followed.
11. There is no dispute that the Applicant and the Respondent
entered into the MoU dated 2 August 2025. The Respondent has
not disputed Clause 17 of the MoU. The claim for return of the
amounts paid towards the proposed acquisition and the allegations
regarding breach and termination of the MoU are, at least prima
facie, connected with the MoU. Merely because the Respondent
has denied its liability, it cannot be said that there is no dispute
between the parties. The pleadings and the correspondence show
that both sides have different stands regarding their rights and
liabilities. However, the mere fact that the MoU contains an
arbitration clause does not mean that either party can approach
the Court for appointment of an arbitrator. The parties have agreed
to follow certain steps before reaching that stage. The Applicant is
required to follow those steps. It is therefore necessary to consider
6
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
the entire Clause 17 and not only Clause 17.2, on which the
Applicant has mainly placed reliance. Clause 17 of the MoU reads
as follows:
“17. DISPUTE RESOLUTION
17.1. In the event of any dispute, controversy, or claim
arising out of or in relation to this MoU, including its
interpretation, performance, breach, termination, or validity,
the Parties shall first attempt to resolve the same amicably
through mutual discussions within a period of thirty (30)
days from the date such dispute arises.
17.2. If the dispute is not resolved amicably within the
aforementioned period, the same shall be finally resolved
through arbitration in accordance with the provisions of the
Arbitration and Conciliation Act, 1996 (as amended from
time to time).
17.3. The arbitration shall be conducted by a sole arbitrator
mutually appointed by the Parties. If the Parties are unable to
mutually agree on the appointment of an arbitrator within
fifteen (15) days from the date either Party calls upon the
other to appoint an arbitrator, the arbitrator shall be
appointed in accordance with the rules of the Mumbai
Centre for International Arbitration (MCIA).
17.4. The seat and venue of arbitration shall be Mumbai,
Maharashtra, India. The proceedings shall be conducted in
the English language.
17.5. The arbitral award shall be final and binding on the
Parties and may be enforced in any court of competent
jurisdiction.”
12. The above clauses must be read together. Clause 17.1
provides that whenever any dispute arises between the parties,
they must first try to settle it by mutual discussion within 30 days
7
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
from the date of such dispute. If they are unable to settle the
dispute within those 30 days, Clause 17.2 permits them to refer
the matter to arbitration. Clause 17.3 says that both parties must
first try to agree upon the name of a Sole Arbitrator. If they are
unable to agree within 15 days after one party calls upon the other
to appoint an arbitrator, the appointment will have to be made as
per the MCIA Rules. Clause 17.4 provides that Mumbai will be the
seat and venue of arbitration and that the proceedings will be
conducted in English.
13. There is no real dispute between the parties about the
execution of the MoU dated 2 August 2025. The Respondent has
not denied that its representative signed the MoU on its behalf.
The arbitration clause is in writing and is a part of the same MoU.
Thus, there is a written agreement between the parties to refer
their disputes to arbitration. The first requirement for considering
an Application under Section 11 of the Act is therefore satisfied.
However, it is necessary to point out that the Applicant has not
reproduced the whole of Clause 17 in its original Application. In
paragraph R and in its legal submissions, the Applicant has
referred only to Clause 17.2. It has not separately reproduced
Clauses 17.1 and 17.3. The Respondent is right in saying that the
entire clause relating to settlement of disputes must be considered
and not only Clause 17.2. The Applicant should have placed the
complete Clause 17 before this Court while explaining its right to
refer the dispute to arbitration. At the same time, the complete
MoU was annexed to the Application as Exhibit A. Therefore, the
whole of Clause 17 was before this Court. The Respondent has
8
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
reproduced the complete clause and relied upon it in its reply
dated 14 April 2026. In these circumstances, it cannot be said that
the Applicant deliberately kept the remaining part of the clause
away from this Court. The entire Clause 17 has now been
considered. The failure of the Applicant to reproduce the complete
clause is certainly a matter which has to be noticed while
considering its conduct. However, only because of this omission, it
cannot be said that there is no arbitration agreement between the
parties or that the agreement executed by them has become
invalid.
14. The next question is whether the Applicant has followed the
procedure provided under Clause 17.1. The Respondent submits
that, according to the Applicant's own case, the dispute arose on
11 March 2026, when the Respondent sent its interim reply. In
support of this submission, the Respondent relies upon paragraph
O of the Application, wherein it is stated that the Respondent
issued its interim reply dated 11 March 2026, "thereby giving rise
to disputes between the parties under the said MoU". According to
the Respondent, when the Applicant has stated that the dispute
arose on 11 March 2026, it cannot now rely upon the earlier
emails and contend that the dispute had arisen before that date.
15. This objection of the Respondent has to be considered by
looking at the entire Application and the correspondence
exchanged between the parties. Paragraph O does not state that
the dispute arose for the first time on 11 March 2026. It only states
that the interim reply sent by the Respondent gave rise to disputes
between the parties under the MoU. This paragraph refers to the
9
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
occasion when the Respondent formally disputed the Applicant's
demand under the MoU. It does not mean that there was no
disagreement between the parties before that date regarding the
amounts paid by the Applicant and their repayment. In fact, the
Respondent's own additional affidavit in reply refers to the emails
exchanged between the parties during January and February 2026.
In paragraph 9 of that affidavit, the Respondent has referred to the
Applicant's email dated 5 January 2026, having the subject "Final
Notice - Execution of Loan Agreement". According to the
Respondent, this email was regarding the alleged loan transaction
and referred to Section 138 of the Negotiable Instruments Act,
1881.
16. The Respondent has referred to its email dated 18 January
2026. According to the Respondent, through this email it disputed
the Applicant's attempt to treat the amounts paid as a loan. The
Respondent stated that the Applicant had sent a draft loan
agreement and was putting pressure upon it to sign the same. It
stated that the five cheques were given only as security for the
alleged amount of Rs. 50,00,000. The Respondent denied that it
was required to pay any amount to the Applicant. The Respondent
has referred to the Applicant's email dated 22 January 2026,
having the subject “Notice for refund of payment received from
Caper Pvt Ltd”. Thereafter, the Respondent has referred to its email
dated 2 February 2026. The said email was sent without prejudice
and the Respondent denied the claim made by the Applicant.
These emails are important for deciding the objection raised by the
Respondent. They show that the Applicant was asking the
10
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
Respondent to return the amounts paid by it, whereas the
Respondent was denying that demand. There was a clear
difference between the parties about the nature of the payments.
They were not agreeing on whether the amounts had been treated
as a loan, whether the Respondent had agreed to return the money
and whether the five cheques were given as security for the
amount claimed by the Applicant. Both parties were taking
different stands. Therefore, it is clear that a dispute between them
had arisen by that time.
17. The Respondent says that these emails were about a separate
loan transaction and were not connected with the MoU. At this
stage, I am unable to accept this objection. According to the
Applicant, the amounts were paid in connection with the proposed
acquisition under the MoU. When that transaction could not be
completed, the parties discussed return of the amounts and the
possibility of treating them as a loan. The Respondent does not
accept this version. But only because the Respondent describes the
transaction as a separate loan transaction, it cannot be said that
the dispute has no connection with the MoU.
18. Clause 17.1 covers any dispute, controversy or claim "arising
out of or in relation to this MoU". It covers disputes relating to
interpretation, performance, breach, termination or validity of the
MoU. The words "in relation to" include disputes which have some
connection with the MoU. In the present case, the question
whether the amounts paid for the proposed acquisition were
required to be returned, whether those amounts were later treated
as a loan and whether the Respondent is liable to repay them is
11
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
directly connected with the proposed transaction under the MoU.
Therefore, prima facie, these disputes come within Clause 17. The
Respondent's argument that the claim is independent of the MoU is
not enough to stop the matter from being referred to arbitration.
19. The question as to when a dispute can be said to have arisen
was considered by the Supreme Court in M/s. Arif Azim Co. Ltd. v.
M/s. Aptech Ltd., 2024 INSC 155. In paragraph 78, the Supreme
Court explained that “a dispute arises only when there is a claim
by one side and its denial/repudiation by the other”. The Supreme
Court has explained that a party cannot keep delaying the cause of
action by sending repeated letters or reminders. What is important
is the date when one party makes a claim and the other party
denies or refuses to accept that claim.
20. Applying this principle to the present case, it can be seen
that the Applicant, by its email dated 5 January 2026, demanded
execution of a loan agreement. The Respondent, by its email dated
18 January 2026, disputed that demand and denied the alleged
liability. Thereafter, by its email dated 22 January 2026, the
Applicant demanded return of the amounts paid. The Respondent
again denied the claim by its email dated 2 February 2026. Thus,
the disagreement between the parties regarding repayment of the
amounts had started by that time. It is true that the Respondent
says that the emails exchanged during January and February 2026
were relating to a separate loan transaction. However, the
Applicant has throughout maintained that the money which it
wanted to treat as a loan was the same money which had been
paid in connection with the proposed acquisition under the MoU.
12
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
The Respondent disputes this. This difference between the parties
shows that the nature of the transaction and the effect of the
payments will have to be decided by the arbitrator. For the limited
purpose of deciding whether Clause 17.1 has been followed, it is
clear that the dispute regarding repayment had arisen even before
11 March 2026.
21. The Respondent has relied upon the notice dated 17
February 2026 issued under Section 138 of the Negotiable
Instruments Act. To this extent, the Respondent's submission is
correct. A statutory notice under Section 138, which threatens
criminal action if payment is not made, cannot be treated as an
attempt to settle the dispute amicably under Clause 17.1. Such a
notice is issued for a particular purpose under the law. It cannot be
treated as mutual discussion between the parties. However, the
Applicant is not relying only upon this statutory notice. The earlier
emails regarding execution of the loan agreement and return of
the amounts, along with the Respondent's replies denying the
claim, must be taken into account.
22. The Respondent has submitted that the Applicant did not
give it the financial analysis report or the documents on the basis
of which that report was prepared. According to the Respondent,
this shows that the Applicant was not genuinely interested in
settling the dispute. In this regard, the interim reply dated 11
March 2026 is important. In that reply, the Respondent stated that
it was not aware of the financial analysis report dated 13 February
2026. It, therefore, asked the Applicant to give a copy of the
report, the names of the persons who prepared it, the documents
13
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
used for preparing it, the period covered by the report and the
basis on which the observations in the report were made. The
Respondent stated in that reply that without receiving these
documents, it was not possible for it to give a proper reply to the
demand notice. It requested the Applicant not to take any steps
until the requested material was supplied. The Applicant has not
shown that it supplied the financial analysis report and all the
documents asked for by the Respondent before issuing the
arbitration notice dated 6 April 2026. In my view, the Applicant
should have replied to this request. When a party relies upon a
report for terminating an agreement and demanding such a large
amount, it is expected to give the other party a fair opportunity to
understand the reasons and material on which the demand is
based.
23. I, therefore, find that the Applicant did not answer the
request made by the Respondent in its interim reply dated 11
March 2026. This is a circumstance which goes against the
Applicant. It may have some effect while considering the conduct
of both parties and the merits of their claims. However, this
circumstance alone does not decide the question which is before
this Court. Clause 17.1 says that the parties should try to settle the
dispute by mutual discussion within 30 days from the date the
dispute arises. It does not say that every later reply or denial will
again start a fresh period of 30 days. It does not say that the
Applicant must first give every document demanded by the
Respondent before it can refer the dispute to arbitration. The
earlier emails show that the parties had exchanged their views
14
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
about the payments, the proposed loan agreement and the demand
for return of the money. The Respondent had denied the
Applicant's claim. Only because the Respondent thereafter asked
for some more documents, it cannot be said that the earlier dispute
had come to an end or that a fresh dispute arose only on 11 March
2026. The Respondent's request for documents was relevant and
the Applicant should have considered it. However, that request
does not start the period of 30 days all over again under Clause
17.1.
24. There is a difference in the dates stated by the Respondent
regarding receipt of the legal notice dated 2 March 2026. In its
interim reply dated 11 March 2026, the Respondent stated that the
notice dated 2 March 2026 "was received by my Clients on
04.03.2026". However, in its later reply dated 14 April 2026, the
Respondent stated that the notice was served on 9 March 2026.
The additional affidavit relies upon 9 March 2026 for calculating
the period of 28 days. The statement made in the interim reply
dated 11 March 2026 is closer to the date on which the notice was
actually received. In that reply, the Respondent stated that it had
received the notice on 4 March 2026. The later reply dated 14
April 2026 does not explain why a different date, that is 9 March
2026, was mentioned. Therefore, for the limited purpose of
deciding this Application, I find the earlier statement to be more
reliable. If the period is counted from 4 March 2026, the
arbitration notice dated 6 April 2026 was issued after more than
30 days had passed. In any event, as discussed, the emails
exchanged during January and February 2026 show that the
15
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
dispute regarding repayment had arisen much earlier. The
Respondent's calculation of 26 days is based on the assumption
that the dispute arose for the first time on 11 March 2026.
However, the entire correspondence, including the emails referred
to by the Respondent, does not support this assumption. It is not
the Applicant's case that all communications between the parties
were friendly or that both parties were always making efforts to
settle the dispute peacefully. Some communications were legal
notices and some contained serious allegations against each other.
However, Clause 17.1 does not prescribe any particular way in
which the discussion must take place. It does not say that the
parties must hold a formal meeting, appoint a mediator or
approach any outside institution. It only requires them to make an
attempt to settle the dispute amicably through mutual discussions
within 30 days.
25. In the present case, the Applicant first asked for execution of
a loan agreement and thereafter demanded return of the money
paid. The Respondent replied by disputing the alleged loan and
denying its liability. The Applicant again demanded return of the
money and the Respondent denied that claim. The Applicant says
that even before these emails, the parties had discussions and
agreed that the amounts would be treated as a loan. The
Respondent disputes this statement. Even if this claim of the
Applicant is not accepted at this stage, the correspondence shows
that both parties had exchanged their views on the same subject.
But they were unable to settle the dispute. It would not be proper
to say that mutual discussion can take place only when both
16
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
parties sit together across the table or send a letter stating that
they are trying to settle the dispute. The agreement does not
provide for any such requirement. Whether the parties have made
an attempt at mutual discussion will depend upon the words of the
agreement and the facts of each case. In the present case, both
parties exchanged their claims and replies regarding repayment of
the amounts. This shows that the matter was discussed between
them, though they could not reach any settlement.
26. The Applicant has relied upon the decision in Kunwar
Narayan v. Ozone Overseas Private Limited, 2021 (1) HCC (Del)
372. In paragraphs 5 and 7 of that judgment, the Delhi High Court
considered a clause which required the parties to try for an
amicable settlement but did not provide any detailed procedure or
particular steps for doing so. The Court considered the efforts
made by the parties and found that sending them back once again
for another attempt at settlement would not serve any useful
purpose. The Court observed that even after an arbitrator is
appointed, the parties can continue their efforts to settle the
dispute. The principle considered in Kunwar Narayan has to be
applied by looking at the facts of each case. It does not mean that
a party can avoid a clear procedure for settlement which it has
agreed to follow under the contract. However, where the
agreement does not provide any particular manner of discussion
and the material shows that the parties have exchanged their
claims and replies but could not settle the dispute, the Court need
not insist that they should repeat the same process once again only
to complete a formality.
17
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
27. In Demerara Distilleries Private Limited v. Demerara
Distillers Limited, (2015) 13 SCC 610 , the Supreme Court
considered the correspondence between the parties and observed
that "any attempt, at this stage to resolve the disputes by mutual
discussions and mediation would be an empty formality". This
judgment does not say that every dispute involving a clause for
negotiation must be referred to arbitration without looking at the
agreement. It shows that the Court can consider the
correspondence and the actual efforts made by the parties. If the
material shows that the parties have tried to settle the dispute and
there is no real chance of settlement by repeating the same
process, the Court need not insist that they should make another
similar attempt.
28. The Respondent has relied upon the judgment of the
Supreme Court in Standard Corrosion Controls (P) Ltd. v. Sarku
Engineering Services Sdn Bhd, (2009) 1 SCC 303. In that case, the
parties had agreed that their disputes would be referred to
arbitration under the Rules of the International Chamber of
Commerce. However, the party seeking appointment of an
arbitrator approached the Court without first following the
procedure agreed between the parties. It had not made any
request to the ICC Secretariat, although such a request was
required under the agreed rules. The Supreme Court held that the
procedure agreed between the parties for appointment of an
arbitrator must be followed. Since the applicant had not
approached the ICC Secretariat as required under the agreement,
the application filed before the Court for appointment of an
18
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
arbitrator was held to be not maintainable. The Supreme Court
made it clear that when parties have agreed to follow a particular
procedure for appointment of an arbitrator, one party cannot
ignore that procedure and directly approach the Court for
appointment.
29. This judgment is relevant to the present case. In the present
case, the parties have not only agreed that their disputes will be
decided through arbitration. They have agreed about the manner
in which the Sole Arbitrator will be appointed. Clause 17.3
provides that the parties must first try to appoint the Sole
Arbitrator by mutual agreement. If they are unable to agree within
fifteen days from the date one party asks the other to appoint an
arbitrator, the appointment will then be made under the MCIA
Rules. The Respondent has therefore raised a separate objection
that the Applicant has not followed the procedure under Clause
17.3. According to the Respondent, the notice dated 6 April 2026
does not ask the Respondent to mutually appoint a Sole Arbitrator.
The notice only informs the Respondent that the Applicant will
approach the Court for appointment of an arbitrator. Therefore,
according to the Respondent, the period of fifteen days provided
under Clause 17.3 never started.
30. I find that there is substance in this objection. Clause 17.3
says that the Sole Arbitrator must first be appointed by mutual
agreement between the parties. It says that if the parties are
unable to agree within fifteen days from the date one party asks
the other to appoint an arbitrator, the appointment will be made
under the MCIA Rules. Thus, the first step under this clause is that
19
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
one party must ask the other party to appoint an arbitrator. The
notice dated 6 April 2026 does not contain any such request. The
relevant part of the notice reads as under:
"As per the said MOU clause 17.4 the seat and venue of
arbitration is Mumbai, hence my client shall be filing
appropriate proceedings before Hon'ble Court for
appointment of Arbitrator, which you shall please note."
31. The above words show that the Applicant only informed the
Respondent that it intended to approach the Court for
appointment of an arbitrator. The notice does not ask the
Respondent to mutually appoint a Sole Arbitrator. It does not ask
the Respondent to agree upon the name of any particular
arbitrator or to take steps for appointment of an arbitrator by
mutual agreement within fifteen days. One aspect needs to be
made clear. Clause 17.3 does not say that the party making the
request must suggest the name of a particular arbitrator.
Therefore, the Respondent's objection that the notice is invalid
only because the Applicant did not suggest the name of an
individual arbitrator cannot be accepted. However, Clause 17.3
does require one party to ask the other party to appoint a Sole
Arbitrator. In the present case, no such request has been made.
32. The Application filed by the Applicant before this Court does
not remove this defect. The Applicant has asked this Court to
appoint any retired High Court Judge or any other person as an
arbitrator. Thus, instead of first following the procedure of mutual
appointment agreed under Clause 17.3, the Applicant has directly
approached this Court and asked it to appoint an arbitrator. The
20
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
Respondent has submitted that the parties had consciously selected
MCIA as the institution whose rules would apply if they were
unable to appoint an arbitrator by mutual agreement. The
Respondent has relied upon the MCIA Rules annexed to its
Affidavit in Reply. According to the Respondent, these rules
provide the procedure for appointment of a Sole Arbitrator
through the institution. It is therefore submitted that the Applicant
cannot ignore this procedure and directly ask this Court to appoint
an arbitrator.
33. I find substance in this submission. The words used in Clause
17.3 show that the parties wanted to first give an opportunity to
appoint the arbitrator by mutual agreement. If they were unable to
do so within fifteen days after one party made a request, the next
step was to be taken under the MCIA Rules. The Applicant has not
shown that either of these steps has been completed. There is
nothing on record to show that the Applicant approached the
MCIA by following the agreed procedure before filing the present
Application. In Standard Corrosion Controls , the Supreme Court
has held that a party must follow the procedure for appointment of
an arbitrator which it has agreed to under the arbitration
agreement. The parties are free to decide such a procedure for. The
Court should not replace the procedure agreed upon by the parties
with some other procedure merely because one party wants the
Court to appoint the arbitrator. In the present case, the Applicant
has approached this Court without first following the procedure
under Clause 17.3. The objection raised by the Respondent on this
ground therefore deserves to be accepted.
21
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
34. In Era International v. Aditya Birla Global Trading India
Private Limited, 2024 SCC OnLine Bom 835, this Court considered
the powers of the Court in relation to an arbitrator appointed
through MCIA. This Court held that merely because the parties
have chosen institutional arbitration, the powers given to the
Court under the Arbitration and Conciliation Act, 1996,
particularly under Section 14, are not taken away.
35. There is no dispute about the principle that the Court does
not lose its powers under the Act merely because the parties have
chosen institutional arbitration. However, the issue considered in
Era International was whether the Court could examine the
continuation of the mandate of an arbitrator under Section 14 of
the Act. It was not a case where a party had ignored the initial
procedure for appointment of an arbitrator agreed under the
arbitration clause.
36. The judgment in India Household and Healthcare Limited v.
LG Household and Healthcare Limited, (2007) 5 SCC 510, has
been relied upon before this Court. In that case, the Supreme
Court considered what amounts to an arbitration agreement and
what effect allegations of fraud may have upon such an
agreement. The Supreme Court observed that an arbitration
agreement must be valid and enforceable in law. It considered the
circumstances in which allegations of fraud may affect the
arbitration agreement.
37. In the present case, there is no serious dispute about the
execution of the MoU or the existence of Clause 17. The
22
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
allegations regarding financial irregularities relate to the proposed
transaction and the financial position of the Respondent. From the
material presently available, these allegations do not show that the
arbitration agreement was obtained by fraud or that it is otherwise
invalid. Therefore, the existence of the arbitration agreement
cannot be rejected on this ground. However, this is a different
question from whether the parties have followed the procedure for
appointment of an arbitrator agreed between them.
38. After considering the entire material placed before this
Court, I find that the Applicant has established that there is an
arbitration agreement under Clause 17 of the MoU. The Applicant
has shown that disputes have arisen between the parties in relation
to the proposed transaction. The Respondent has denied its
liability and has raised objections about the Financial Analysis
Report, the amounts paid and the alleged loan agreement. These
objections do not take away the existence of the arbitration
agreement between the parties. However, the Applicant has not
followed the separate procedure for appointment of an arbitrator
under Clause 17.3. There is no material to show that the
procedure for appointment under the MCIA Rules was followed.
Instead, the Applicant directly approached this Court and asked it
to appoint an arbitrator. This is not the procedure which the
parties had agreed upon in their MoU. The Court cannot appoint
an arbitrator under Section 11 by ignoring the procedure agreed
upon by the parties in their arbitration agreement. Section 11 gives
the Court power to intervene in the situations provided under the
law. But it does not give one party a right to ignore the agreed
23
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
procedure and directly ask the Court to appoint an arbitrator. The
Court has to respect the procedure agreed upon by the parties,
particularly when both parties are commercial entities and have
consciously included such a procedure in their MoU.
39. I am, therefore, of the view that the present Application has
been filed prematurely. The Applicant has not shown that it
followed the requirements of Clause 17.3 of the MoU. The
objections raised by the Respondent on these grounds therefore
deserve to be accepted.
40. It is necessary to make one thing clear. This finding does not
mean that the Applicant is not entitled to recover Rs.4,78,03,314/-
or that the Respondent has no liability to pay this amount. It does
not mean that the Financial Analysis Report dated 13 February
2026 is incorrect or that the Applicant was not entitled to
terminate the MoU. Similarly, this Court is not giving any final
finding about the alleged oral loan agreement, the five cheques,
the alleged admission of liability or the actual amount paid by the
Applicant. These issues have not been finally examined in the
present proceedings. The present Application is being dismissed
only because the Applicant has not followed the procedure for
appointment of an arbitrator agreed between the parties. The
Applicant will be free to take such steps as may be available to it
under the MoU and the provisions of the Arbitration and
Conciliation Act, 1996. However, while taking such steps, the
Applicant will have to follow Clause 17.3, including the agreed
procedure for appointment under the MCIA Rules. All objections
which may be available to the Respondent under law, including
24
Uploaded on - 26/11/2026 Downloaded on - 26/11/2026 12:01:37

carap470-2026-J.doc
those relating to the scope of the arbitration agreement, the nature
of the claims, limitation and liability, will remain open.
41. In view of the above discussion, the following order is
passed:
(i) The present Commercial Arbitration Application filed
under Section 11 of the Arbitration and Conciliation Act,
1996 is dismissed as premature;
(ii) It is made clear that dismissal of this Application shall
not be treated as any finding on the merits of the money
claims made by the Applicant or the defences raised by the
Respondent;
(iii) All questions relating to the actual amounts paid, the
liability to refund the amount, the Financial Analysis Report
dated 13 February 2026, the alleged oral loan arrangement,
the cheques and the scope of the arbitration agreement are
kept open to be decided in accordance with law;
(iv) The dismissal of this Application shall not prevent the
Applicant from taking such steps as may be available to it
under the MoU and the Arbitration and Conciliation Act,
1996, after following the procedure agreed between the
parties;
(v) There shall be no order as to costs.
(AMIT BORKAR, J.)