M/s.VP TEX PVT LTD vs THE TAMIL NADU POWER DISTRIBUTION CORPORATION LIMT

Court
Madras High Court

WP No. 45562 of 2026
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATED: 10-11-2026
CORAM
THE HON'BLE MS. JUSTICE P.T. ASHA
WP No. 45562 of 2026
CNR: {HCMA012689642026}
and
WMP.No.51149 of 2026
M/s.VP TEX Pvt. Ltd.,
451/1 VP Building, Vediyarasanpalayam,
Pallipalayam, Namakkal,
Rep. by its Authorised Signatory, Mr.K.Arumugam
..Petitioner
Vs
1. The Tamil Nadu Power Distribution Corporation
Limited (TNPDCL)
Rep. by its Chairman and Managing Director
10th Floor, 144 Anna Salai, Chennai-600 002.
2. The Tamil Nadu Green Energy Corporation Limited
(TNGECL)
Rep. by its Managing Director
10thFloor, 144, Anna Salai,
Chennai-600 002.
3. The Director (Technical)
Tamil Nadu Green Energy Corporation Limited
10th Floor, 144 Anna Salai, Chennai-02.
4. The Chief Engineer /NCES (FAC)
Tamil Nadu Green Energy Corporation Limited,
10th Floor, Western Wing, NPKRR Maaligai,
144 Anna Salai, Chennai-02
5. The Superintending Engineer
Karur Electricity Distribution Circle, TNPDCL,
Karur.
..Respondents
__________
Page1 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )

WP No. 45562 of 2026
PRAYER : Writ Petition filed under Article 226 of the Constitution of India
praying to issue a Writ of Mandamus directing the 3rd and 4th respondents to
effect name transfer of the 3.3 MW Wind Mill (Regn. No.004(U.W)/25-26) at
S.F. No.1233/1A, 1233/2A, 1233/2B, 1233/1B, 1233/1C1 and 1233/1C2 of
Alambad Village, Gujiliamparai Taluk, Dindigul District to the petitioner, as
per the petitioner's application dated 26.06.2026 and consequently to issue the
Noted for -Record approval for energising the said Wind Mill to the 110/33 KV
Renfra Malaikovilur Pooling Sub-Station and pass orders.
For Petitioner: Mr.T.Mohan, Senior Counsel
for Mr.S.P.Parthasarathy
For Respondents: Mr.D.R.Raghunath
Standing Counsel for R1 to R5
ORDER
The writ petition is filed for the following relief :
" To direct the 3rd and 4th respondents to effect name transfer of
the 3.3 MW Wind Mill (Regn. No.004(U.W)/25-26) at S.F. No.1233/1A,
1233/2A, 1233/2B, 1233/1B, 1233/1C1 and 1233/1C2 of Alambad
Village, Gujiliamparai Taluk, Dindigul District to the petitioner, as per
the petitioner's application dated 26.06.2026 and consequently to issue
the Noted for -Record approval for energising the said Wind Mill to the
110/33 KV Renfra Malaikovilur Pooling Sub-Station."
2. The petitioner would submit that its renewable energy developer
namely M/s.Renfra Energy India Pvt. Ltd., (hereinafter referred to as
'Developer') had applied for establishment of new 110/33 KV Pooling Sub
Station on 03.03.2025, with connectivity to the existing Malaikovilur 110/33
__________
Page2 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )

WP No. 45562 of 2026
KV TANTRANSCO Sub-Station for evacuation of 49.5 MW of wind power.
The fifth respondent had passed an award on 04.07.2025. The Developer had
successfully commissioned and energised the new Pooling Sub Station on
11.09.2026. Thereafter, the Developer had applied for 3.3 MW wind mill at
S.F.No. 1233/1A, 1233/2A, 1233/2B, 1233/1B, 1233/1C1 and 1233/1C2 of Alambad
Village, Gujiliyamparalli Taluk, Dindigul District with connectivity to the said
110/33 KV Renfra Malaikovilur Pooling Sub Station. Necessary registration
charges was made to the fourth respondent and the application was registered on
13.04.2026 vide Registration No.004(U-W)/25-26. Thereafter, the Developer
had approached the fourth respondent to split and transfer the allotted capacity
wind-mill wise to its clients, and one such client is the petitioner. The
arrangement relating to name transfer approval and commissioning of wind /
solar mill are devised in such a manner that upon payment of charges, the fourth
respondent would issue the name transfer approval to the developer's clients and
consequently the respondent-Board would issue a Noted-for-Record letter,
fixing a period of 12 months, within which the individual wind or solar power
has to be energized and the evacuation of power through the pooling sub station
to the respondent's grid should commence.
3. The petitioner would submit that it had purchased the land and wind
mill commissioned in the aforementioned property at Alambad Village from its
developer. Thereafter, on 02.02.2026, the petitioner had applied for name
__________
Page3 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )

WP No. 45562 of 2026
transfer in its favour before the fourth respondent and had also paid the
necessary charges. The Developer had also issued a consent letter on the same
day i.e., 02.02.2026. While so, on 27.05.2026, the fourth respondent issued a
circular-memo to the field officers directing them not to accord any approval
relating to solar and wind connectivity. Therefore, no further action was taken
on the petitioner's application and the same was kept in abeyance.
4. The petitioner would also submit that several generators and
developers had challenged the circular memo of the fourth respondent dated
27.05.2026 in W.P.No.21524 of 2026, and this Court by order dated 19.08.2026
had disposed of the writ petition.
th
5. The petitioner would submit that the office of the 5 respondent had
inspected the site of petitioner's wind mill on 30.08.2026 and had confirmed that
the petitioner's wind mill is fit for commissioning. Thereafter, the petitioner had
approached the respondents 3 and 4 requesting them to effect name transfer and
to issue the Noted-for-Record letter. However, no orders have been passed to
date nor any reason was communicated to the petitioner for the delay. The
petitioner would also submit that upon issuance of Noted-for-Record letter by
the respondents, they have to enter into the Energy Wheeling Agreement with
the fifth respondent to wheel the energy generated under the open access
__________
Page4 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )

WP No. 45562 of 2026
scheme for captive use/to its consumers. Since their application is kept in
abeyance without any progress, the petitioner is constrained to approach this
Court seeking a mandamus.

6. Heard the learned Senior Counsel appearing for the petitioner and the
learned Standing Counsel appearing for the respondent-Board.
7. The learned counsel representing the respondent-Board would submit
that as and when the petitioner submits a consolidated application :
(a) for effecting name transfer of the 3.3 MW Wind Mill (Regn.
No.004(U.W)/25-26) at S.F. No.1233/1A, 1233/2A, 1233/2B, 1233/1B,
1233/1C1 and 1233/1C2 of Alambad Village, Gujiliamparai Taluk,
Dindigul District, in the name of the petitioner
(b) for the issue of Noted-for-Record approval for energising the said wind
mill to the 110/33 KV Renfra Malaikovilur Pooling Sub Station; and
(c) for executing the Energy Wheeling Agreement, the same shall be
considered.
8. In the light of the above submission, the petitioner is directed to submit
a consolidated application forthwith, and within three weeks from the date of
the receipt of the said application, all the three stages shall be completed by the
fourth respondent in consultation with the third respondent.
__________
Page5 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )

WP No. 45562 of 2026
9. With the above direction, the writ petition is disposed of. No costs.
Consequently, connected miscellaneous petition is closed.
10-11-2026
Index: Yes/No
Speaking/Non-speaking order
Neutral Citation: Yes/No
DS
__________
Page6 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )

WP No. 45562 of 2026
To:
1. The Chairman and Managing Director
Tamil Nadu Power Distribution Corporation Limited (TNPDCL)
10th Floor, 144 Anna Salai, Chennai-600 002.
2. The Managing Director
Tamil Nadu Green Energy Corporation Limited (TNGECL)
10th Floor, 144, Anna Salai,
Chennai-600 002.
3. The Director (Technical)
Tamil Nadu Green Energy Corporation Limited
10th Floor, 144 Anna Salai, Chennai-02.
4. The Chief Engineer /NCES (FAC)
Tamil Nadu Green Energy Corporation Limited,
10th Floor, Western Wing, NPKRR Maaligai,
144 Anna Salai, Chennai-02
5. The Superintending Engineer
Karur Electricity Distribution Circle, TNPDCL,
Karur.
__________
Page7 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )

WP No. 45562 of 2026
P.T.ASHA, J.
DS
WP No. 45562 of 2026
and
WMP.No.51149 of 2026
10-11-2026

__________
Page8 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )