Nitin Enterprises Through Nitin Lodwal vs Urban Administration And Development Department

Court
Madhya Pradesh High Court

1


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021

GH COURT OF MADHYA PRAD
IN THE HIG
DESH,
BENCH AT INDORE

BEFORE
LE SHRI JUSTICE VIVEK RUSIA,
HON'BL
ACTING CHIEF JUSTICE
&
E SHRI JUSTICE VIVEK AGARWAL
HON'BLE

&
HRI JUSTICE SUBODH ABHYANKA
HON'BLE SH
AR
&
LE SHRI JUSTICE VINAY SARAF
HON'BL
&
E SHRI JUSTICE ALOK AWASTHI
HON'BLE

RIT PETITION No. 9623 of 2021
WR

ERPRISES THROUGH NITIN LODWA
NITIN ENTE
AL
Versus
RATION AND DEVELOPMENT DEPA
URBAN ADMINISTR
ARTMENT
AND OTHERS

Appearance:
Shri Amit Mish
Shri A.K. Sethi
Sethi and Ms. Astha Na
hra , Advocate for the petitioner through V
V.C.
h Shri Rahul
i , Senior Advocate as Amicus Curiae with
agori, Advocates.
athur , Senior Advocate as Amicus Curia
Shri Piyush Ma
Madhusudan Dwivedi
ae with Shri
and Shri Abhishek Bajpai, Advocates.
awal , Senior Advocate as Amicus Curia
ri Savil Parashar and Shri Garvit Singh, A
mar Jain , Senior Advocate as Amicus C
Shri Amit Agra
Arjun A. Agrawal, Shr
ae with Shri
Advocates.
Shri Veer Kum
Shri Vaibhav Jain and
Curiae with
Shri Devashish Dubey, Advocates.
abra , Senior Advocate as Amicus Curia
d Shri Raghav Raj Singhand, Advocates.
Shri R.S. Chha
Mudit Maheshwari and
ae with Shri
Shri Naman Na
and Ms.Yashika Bondw
agrath , Senior Advocate with Shri Har
wal Advocate.
sh Parashar
Shri Shekhar S
and Ms. Amrita Joshi, A
harma , Senior Advocate with Shri Shub
Advocates through V.C.
n Singh , Advocate with Shri Anuj Shriv
ham Verma
Shri Anshuman
Ms. Darshana Baghel,
vastava and
Advocates.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

2


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Shri Piyush Shr
Shri Suyash M
Shri Akshat Agrawal, A
rivastava , Advocate.
Mohan Guru , Advocate with Shri Hinde
esh Pal and
Advocates.
mar Singh , Advocate.
Shri Amit Kum
Shri Prashant
Additional Advocate G
General, Shri Neelesh
Raj Saxena, Deputy Ad
Advocate General, Sh
Mrinal Elkar and Shri
Lawyer and Shri V. S.
Singh , Advocate General with Shri So
General, Shri Ashish Yadav, Additiona
h Yadav, Additional Advocate General,
onal Gupta,
al Advocate
Shri Shrey
ava, Deputy
ral and Ms.
dvocate General and Shri Sudeep Bharga
hri B.D.Singh, Deputy Advocate Gener
Shreshth Suryavanshi, Shri Sahil Sonku
Jha, Advocate,for respondents No.1 and
unshi , Senior Advocate with Shri Lucky
hri Mayank Munshi, Advocates for respo
h Sharma Advocate with Shri Shantan
usale, Panel
2/State.
y Jain, Shri
Shri Manoj Mu
Chinmay Mehta and Sh
ndent No.3.
nu Sharma,
Shri Siddharth
Advocate for the respo
ndent Nos.4 to 6.
ema , Senior Advocate with Shri Arun
Shri Sumit Ne
Advocate.
n Dwivedi,
Shri Aniket Ab
Advocate.
bhay Naik , Advocate with Shri Pradyu
umna Kibe,
Shri Ajay Mish
Shri Navneesh J
Shri H.Y. Meht
Shri Rohit Ma
Somesh Gobhuj, Advo
ra , Advocate
Johri , Advocate
ta , Advocate
angal , Advocate with Shri Achal Patha
ak and Shri
cates.
rma , Advocate.
Ranjan Pandey , Advocate with Ms
Shri Parth Shar
Shri Vivek R
Shrivastava, Advocate.
.Shambhavi
.

Res
Pro
Whether approved
reporting :
Law laid down :
served on : 07.07.2026
onounced on : 07.08.2026
for Yes
(i)Article 298 of the Constitution of I
India - Power
to blacklist/debar a contractor in additio
on to a clause
of contract emerges from the inherent
power of the
State and its instrumentalities flowin
ng from the
power to carry on the trade or busin
ness provided
under Article 298 of the Constitution
of India and
blacklisting is essentially an administ
trative act in
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

3


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
nature.
(Para nos. 292 to 308)
(ii) Blacklisting order can only be pas
ssed by Chief
Engineer and/or any authority equiva
alent to Chief
Engineer - Blacklisting or debarment or
rder can only
be passed by the Chief Engineer or
r any officer
equivalent to his rank on the strength o
of the circular
issued by Public Works Department o
on 24.03.2015
and the Competent Authority and/o
or Appellate
Authority defined under the contra
ct can only
recommend for blacklisting or debarring
g a contractor
to the Chief Engineer and cannot pass
s the order of
blacklisting or debarment despite a c
clause in the
contract.
(Para 292 to 308)
(iii)Blacklisting is civil and commerci
ial death of a
person or entity – Blacklisting is havin
ng severe civil
consequences, loss of business o
opportunities,
goodwill and amounts to a civil and
d commercial
death of a person or entity, who is pr
revented from
participation in future tenders. It is a st
tigma and the
loss caused due to the order of bl
lacklisting or
debarment is not a monetary los
ss, thus not
computable / quantifiable / ascertainable
e.
(Para nos. 309 to 335)
(iv) Section 2(1)(d) of Madhy
ya Pradesh
Madhyastham Adhikaran Adhiniyam
m, 1983 - The
challenge to the order of blacklistin
ng does not
amount to a dispute defined under Secti
ion 2(1)(d) of
the Adhiniyam, 1983 and thus not ref
ferable to the
statutory arbitration tribunal.
(Para nos. 336 to 365)
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

4


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
(v) The judgment delivered in the mat
tter of Gouri
Ganesh Shri Balaji Constructions
“C” Class
Contractor Vs. Executive Engin
neer, PWD
reported in 2018(3) MPLJ 163 a
and Awasthi
Brothers Construction Company v/s
The State of
Madhya Pradesh & Others reported
in 2019 SCC
OnLine 4298 have not held that the loss
s due to order
of blacklisting is an ascertainable loss
and the Full
Bench and Division Bench in these ca
ases held that
the relief for blacklisting is a consequen
ntial relief and
may be sought from the statutory arb
bitral tribunal
with the main monetary claim.
(Para nos. 336 to 365)
19
others have
1
(vi) Gouri Ganesh and Awasthi Bro
not laid down the correct law in hol
ding that the
relief of blacklisting is a consequenti
ial relief and
referable to the Arbitral Tribunal cons
stituted under
the Adhiniyam, 1983.
(Para nos. 336 to 365)
(vii) Fulll Bench of this Court in Viv
va Highways
Ltd. Vs. M.P. Road Development
Corporation
Ltd reported in 2017(2) MPLJ 681
has correctly
held that the loss due to blacklisting
order is not
ascertainable in money.
(Para nos. 336 to 365)
(viii) Section 20 of Madhy
a Pradesh
Madhyastham Adhikaran Adhiniyam
m, 1983 - As
the challenge to the blacklisting order
does not fall
under the definition of dispute given u
under Section
2(1)(d) of Madhya Pradesh Madhyastha
am Adhikaran
Adhiniyam, 1983, the bar created unde
er Section 20
of the Adhiniyam, 1983 is not applicable
e.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

5


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
(ix) Article 226 of the Constitution o
f India - Writ
petition under Article 226/227 of the C
Constitution of
India is maintainable, even in a case
of composite
order of blacklisting and termination
of contract,if
any fundamental right of any citizen is
s infringed or
any order is passed in violation of the
principles of
natural justice and thus, the writ peti
ition may be
entertained by the constitutional court
s challenging
the order of blacklisting depending up
pon the facts
and circumstances of each case.
(Para nos. 373 to 379)
(x) T heMadhya Pradesh Madhyastham
m Adhikaran
Sanshodhan Adhiniyam, 2025 - The
e amendment
incorporated in the Adhiniyam, 1983 a
re not having
any effect on the maintainability of the
e dispute, qua
blacklisting.
(Para nos. 276 to 290)
(xi) Section 17A and 17AB of theMad
dhya Pradesh
Madhyastham Adhikaran Adhiniya
am, 1983 –
Amended Section 17A and newly ins
erted Section
17AB empowers the tribunal to gran
nt the interim
relief to the parties in appropriate cases.
(Para nos. 276 to 290)







Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

6


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021


ORDER

Per : Vinay Saraf J.-
(for Shri Justice Vivek R
and himself)
Rusia, Acting Chief Justice, Shri Justice A
Alok Awasthi
1. The present ref
ference was originally made to a Full Ben
nch by order
dated 20.7.202
1, whereby the Division Bench of this C
Court was of
the view that a
a Full Bench of this Court in Gouri Ga
anesh Shri
Balaji Constr
ructions “C” Class Contractor Vs.
Executive
1
WD did not correctly appreciated the
Engineer, PW
decision of
earlier full be
ench in Viva Highways Ltd. Vs. M
M.P. Road
2
Corporation Ltd. and accordingly req
Development
quested the
Chief Justice f
for constitution of a larger bench to c
consider the
questions frame
ed by the Division Bench by order dated
20.7.2021.
2. Thereafter the m
matter was referred to a Full Bench and o
on 9.9.2024,
the Full Bench
h of this Court after examining the deci
ision in the
2 1
Highways Ltd. and Gouri Ganesh was
case of Viva H
of the view
that the matter
requires consideration by larger bench
as both the
judgments have
e been delivered by the Full Benches, h
aving equal
strength of Jud
dges and accordingly the matter was pu
ut up before
the Chief Justi
ce for constitution of a larger bench an
nd the Chief
Justice constitu
uted a larger bench. The bench heard the
e arguments
on several hea
arings and thereafter the judgment wa
as reserved,
however, the sa
ame could not be delivered awaiting the
notification
of the amend
dment in the Madhya Pradesh Ma
dhyastham
Adhikaran Ad
dhiniyam, 1983 (herein-after referred to
as the ‘Act

1
Gouri Ganesh Shri Balaji Cons
MPLJ 163.
2
Viva Highways Ltd. Vs. M.P. R

structions “C” Class Contractor Vs. Executive Engineer, P
PWD, 2018(3)
Road Development Corporation Ltd, 2017(2) MPLJ 681.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

7


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
1983’) and the
case was fixed for further hearing. On
30.04.2026,
the notification
n to implement the Amendment Act, 202
25 has been
published and o
once again the matter was put up before
e the Acting
Chief Justice an
nd theLarger Bench was reconstituted an
nd the larger
bench heard th
he matter and concluded the hearing o
of the case
finally.
3. The learned Di
ivision Bench at the time of referring th
he matter to
the Hon’ble Ch
hief Justice for constituting a larger benc
ch requested
to consider the
following questions:-
(i)Whethe
ascertaina
of Section
Bench in
Awasthi
correctly
contractor
under the

(ii) If a
blacklistin
remedy is
order befo
composite
remedy ag
Adhiniyam
er the loss arising out of blacklisting or
rder can be
n the ambit
her the Full
n Bench in
able/ascertained and hence falls within
n 2(1)(d) of the Adhiniyam. If not, wheth
n Gouri Ganesh (supra) and Division
Brother Construction Company (su
upra) have
opined that against blacklisting o
r has a remedy before the Tribunal
order also
constituted
Adhiniyam ?
composite order of termination of co
ng is called in question in a writ petiti
ontract and
ion and no
blacklisting
available to the contractor against the b
fore the Tribunal, whether a writ petitio
n against a
ailability of
e order is entertainable despite ava
gainst the termination of works contrac
m ?.
ct under the
FACTUAL MATRIX O
OF THE CASE
4. Petitioner Nitin
n Enterprises is a proprietorship firm and
d registered
contractor with
h PWD since 2007 for 10 years i.e. upto
2027. Shri
Nitin Lodhwal
l is the proprietor of the petitioner fi
firm. Indore
Municipal C
Corporation invited the tender
r bearing
No.125/SE/BIL
LLS/18-19/G-03 dated 15.2.2019 fo
or cement
concrete work
at Amrapuri road in Ward Number 21
under Zone
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

8


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
No.5, Indore. T
The petitioner firm participated in the ten
nder process
and as the offe
er submitted by the petitioner firm was
lowest, the
tender submitte
ed by the petitioner was accepted and a
approved by
the corporation
n on 23.3.2020. The petitioner thereafte
er furnished
the performanc
ce bank guarantee worth Rs.2,64,300/-
and signed
memo of agree
ement and submitted the same. Accordi
ingly, work
order was issue
ed on 23.3.2020 with a stipulation that the
e contractor
will complete
the work within 240 days including ra
ainy season
from the date o
of letter of intent with no encumbrances.
5. As the petitione
er failed to complete the work within the
e prescribed
period, on 30.1
10.2020,the Superintending Engineer, Pub
blic Works,
Indore Municip
pal Corporation issued an order of termin
nation of the
agreement date
ed 23.3.2020 stating that the model code
e of conduct
rules has been
n violated by the petitioner.By the said
d composite
order dated 30
0.10.2020 the petitioner was blackliste
d for three
years. A subse
equent order dated 17.11.2020 was issu
ued and the
Municipal Corp
poration forfeited all original FDRs furni
ished by the
petitioner towa
ards performance bank guarantee. Imm
mediately on
18.11.2020 th
he petitioner submitted a represen
ntation for
reconsideration
n and revocation of the agreement by re
ecalling the
cancellation or
rder submitting various reasons for not
completing
the work within
n time and also requested for recalling t
the order of
blacklisting.
6. On 10.3.2021,
the petitioner again issued a reminder t
to the Chief
Engineer, Indo
ore Municipal Corporation, Urban Adm
ministration
and Developm
ment Department, Bhopal complaining
g that the
Commissioner,
, Indore Municipal Corporation has not
decided the
representation s
submitted by the petitioner.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

9


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
7. As the represe
entation of the petitioner was not decid
ded and the
Indore Municip
pal Corporation floated fresh NIT on 9
9.2.2021 for
the same work,
, the petitioner filed the subject writ petit
tion seeking
quashment of t
the order of termination of contract and
blacklisting
the petitioner.
8. Indore Municip
pal Corporation submitted preliminary o
objection of
maintainability
y of writ petition stating that the subject co
ontract falls
within the cate
egory of works contract as per the defin
nition clause
prescribed U/S
.2(i) of the Act, 1983 and, therefore, the
e petition is
not maintainab
ble in view of the judgment delivered
by the full
1
Court in the matter of Gouri Ganesh .
bench of this C
9. The Division B
Bench of this Court heard the arguments a
advanced by
the counsel fo
or the parties on the question of maint
tainability /
entertainability
y of this petition in view of the objection
ns raised by
the Indore Mun
nicipal Corporation and passed the order o
of reference
on 20.7.2021. T
The relevant paragraphs of the order dated
d 20.7.2021
reads as under:
-
“02 . Part
maintainab
petitioner
blacklisted
is that i
opportunity
principles
impugned o
commenced
elections c
illegal. Th
business an
necessary i
can be ente
remedy are
Supreme C
Others v/s
ties are at loggerheads on the quest
bility. By impugned order dated 30.10.20
tion of
020, the
Firm’s contract was terminated, and the
d for a period of three years. The stand of pe
firm is
etitioner
impugned order is passed without aff
ffording
ation of
d in the
y of hearing and is issued in utter viola
of natural justice. The reasons assigned
order are factually incorrect. The petitioner
d much before model code of conduct rela
came into being. Thus, the order is arbitra
he petitioner's fundamental right to carry
r's work
ating to
ary and
out his
, all the
nd complete the contract is infringed. Thus,
ingredients on the strength of which a writ p
ertained despite availability of statutory alte
petition
ernative
e available and hence in the light of judgm
Court in ( 2011) 5 SCC 697, (Union of In
ment of
India &
Tantia Construction Private Limited) this p
petition
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

10


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
can be ent
Technolog
another)
interferenc
were gross
tertained. Recently in 2021 (2) M.P.L.J. 44
gies Pvt. Ltd. Vs. Food Corporation of In
4 (UMC
India &
in a case of blacklisting of 'works co
ce was made because principles of natural
sly violated.
ontract',
l justice
03. Shri Am
submitted
petitioner
contract' a
1983 (Adh
contract”,
relegated
under the A
in 2018 (
Constructi
PWD) do
deprivation
mit Mishra, learned counsel for the petitione
er fairly
that nature of work / contract given
certainly falls within the definition of
as per Madhya Pradesh Madhyastham Adh
to the
'works
hiniyam,
hiniyam). Despite the fact that it is a
“works
nnot be
nstituted
in a case of this nature the petitioner can
to avail remedy before the Tribunal con
Adhiniyam because (i) the judgment of Full
(3) M.P.L.J. 163, (Gouri Ganesh Shri
ions “C” Class Contractor vs/ Executive En
oes not help the respondents. The los
l Bench
Balaji
ngineer,
ss and
able.
n arising out of blacklisting is not ascertaina
04. Per c
respondent
in Gouri G
that in a c
terms of m
the petition
the Adhiniy
ontra, Shri Manoj Munshi, learned coun
ts No.3 to 6 urged that the judgment of Full
Ganesh (supra) in no uncertain terms makes
nsel for
l Bench
it clear
table in
medy for
case of blacklisting also, the loss is comput
oney and in that event, the appropriate rem
ner is to approach the Tribunal constituted
yam.
d under
05 . In vie
conundrum
of this natu
terminated
tenable / m
be relegate
ew of aforesaid stand of parties, an inte
m arose for our consideration is whether in
eresting
n a case
ure where petitioner’s “works contract” ha
d and he is also blacklisted, a writ peti
as been
ition is
maintainable or not and whether petitioner
should
ed to avail remedy under the Adhiniyam.
06. We ha
Bench of t
(Awasthi B
Madhya P
judgment
Division Be
lay before
constituted
ave noticed another pronouncement by a D
Division
this Court reported in 2019 SCC OnLine
Brother Construction Company v/s The S
Pradesh & Others) , wherein after consider
e 4298,
State of
ring the
ra) , the
will also
of Full Bench in Gouri Ganesh (supr
ench opined that dispute as to blacklisting w
the same forum. The same forum means the
d under the Adhiniyam of 1983.
e forum
07. Sectio
reproduced
on 2(1)(d) and Section 7(1) of Adhiniya
am are
d as under:-
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

11


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
“2(1
valu
diffe
exec
“7.
wor
the
refe
(emp
1)(d) “dispute” means claim of ascertained
ued at Rupees 50,000 or more relating
ference arising out of the execution o
d money
to any
r non-
cution of a works contract or part thereof.”
Reference to Tribunal. – (1) Either par
rks contract shall irrespective of the fact w
ty to a
whether
agreement contains an arbitration clause
er in writing the dispute to the Tribunal.”
or not,
phasis supplied)
08. These
case of Go
provisions were considered by full bench
uri Ganesh (supra) which reads as under:-
5. Thus, we hold that the expression “asce
h in the
“55
amo
inclu
part
aggr
othe
The
cont
of
cons
com
of th
(emp
ertained
ount” appearing in Section 2(1)(d) of the St
tate Act
ef. If a
med, the
udes the amount of consequential relief
ticular consequential relief can be claim
rieved person must claim that relief in a ref
erwise the reference would not be mainta
eference
ainable.
ation of
consequential relief in a case of termina
tract can be the value of the remaining work
k; value
be the
of loss
revenue recovery certificate would b
sequential relief and the amount of
mputable in terms of money in case of black
k-listing
he Firm would be the consequential relief” .
.
phasis supplied)
09. Para
Constructi
– 9 of the judgment of Awasthi B
ion Company (supra) reads as under:-
Brothers
“9.
term
of S
Clas
40,4
lay b
(emp
As the petitioner has already raise the disp
mination of his contract; therefore, as per d
ute qua
decision
Shri Gouri Ganesh Shri Balaji Constructio
on “C”
raphs –
will also
ss Contractor (supra) (as held in paragr
41 and 55) the dispute as to blacklisting w
before the the same forum. ”
phasis supplied)
10. In Gour
amount of l
blacklisting
bench, in Aw
division ben
will also l
Adhiniyam.
ri Ganesh (supra), the Full Bench observ
loss is computable in terms of money in
ved that
case of
of the Firm. Following this observation
wasthi Brothers Construction Co . (supra) a
of full
another
cklisting
der the
ch opined that the dispute relating to blac
lay before the tribunal constituted und
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

12


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
11. We are i
taken by ful
bench in Aw
considered v
is certainly
out of black
When a cont
bid for futur
the present c
Supreme Co
State of W.B
in respectful disagreement with the aforesa
aid view
ll bench in Gouri Ganesh (supra) and d
wasthi Brothers Construction Co. (supra).
division
In our
contract
view, the loss arising out of termination of c
computable/ascertainable. However, loss
klisting cannot be computed in terms of
arising
money.
bmit his
years in
tractor is blacklisted, he is deprived to sub
re contracts for a particular period (three y
case). The concept of blacklisting is expla
ourt in Erusian Equipment & Chemicals
B. (1975) 1 SCC 70 as under:-
0. Blacklisting has the effect of preventing a
ined by
Ltd. V.
“20
from
lawf
gain
(emp
person
ng into
rpose of
m the privilege and advantage of enterin
ful relationship with the Government for pur
ns.”
phasis supplied)
12. In Gor
Delhi) and
about black
rkha Security Services. Vs. government (N
d others (2014) 9 SCC 105 it was held as
NCT of
s under
klisting:-
“It
foist
stigm
part
prec
cont
(emp
is described as “civil death” of a person
ted with the order of blacklisting. Such an o
matic in nature and debars such a perso
ticipating in government tenders which
cluding him from the award of gove
who is
order is
on from
means
ernment
tracts.”
phasis supplied)
13. At pr
ascertained
three year
involved th
any guess
The black
preventing
contractor
out of such
Adhiniyam
Constructi
contractor
another fu
Pradesh R
681 consid
detail. Rele
resent, by no process of reasoning it c
can be
ing next
d as to how many NITs will be issued duri
rs. The nature of future contracts and
herein cannot be ascertained at this point of
amount
f time by
work or mathematical or astrological calcu
klisting of a contractor has a drastic ef
ulation.
ffect of
sent the
him to submit his bid for future and at pres
cannot assess what will be the future loss
h contracts. In view of Sec.2(1)(d) and Sec.
arising
7 of the
Brothers
, the division bench in Awasthi B
ion Co. (supra) opined that the reme
edy for
is to approach the tribunal. It is notewort
ull bench in Viva Highways Ltd. Vs. M
Road Development Corporation Ltd 2017(2)
thy that
Madhya
2)MPLJ
dered the aspect of ascertainability in su
evant paragraphs reads as under:-
ufficient
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

13


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
“ 73
“cla
of “
defin
. The Legislature has chosen to use the
aim of ascertained money” and not the word
“ascertainable” money. The word “ascert
e words
ds claim
tain” is
ned in Black's Law Dictionary as under:
“As
estim
To i
U.S.
L.Ed
“hea
scertain. To fix; to render certain or defin
nite: to
bscurity.
mate and determine; to clear of doubt or ob
insure as a certainty. To find out by invest
igation.
. v. Carver, 260 U.S. 482 : 43 S.Ct. 181, 1
d. 361. Sometimes it means to “assess”
82 : 67
” or to
ar, try and determine
In
“asc
Webster's Dictionary, the meaning of
certain” reads as under:
f word
“As
Obs
syno
a-to
adj.
cert
scertain 1 To learn with certainty about; find
d out. 2
s. To make certain; determine; defin
e. See
ertener,
onyms under DISCOVER. KNOW [OF ace
o (L ad-) + certain. See CERTAIN]-ascer-ta
in'a-ble
adv. as-
as-cer-tain'a-ble-nessn. as-cer-tain'ably a
tain'ment n.”
In S
Seve
wor
(2)
mon
way
asce
like
Brau
P.
Ency
Lati
199
Stroud's Judicial Dictionary of Words and P
Phrases,
enth Edition, Volume 1, it is mentioned t
rd “ascertained” has two meanings, (1) “k
that the
known”,
“made certain”. It is further expressed tha
ney to be paid, has “to be ascertained” in a
y. It is further observed that the words
t where
certain
“to be
ook very
pton J.
B. 24. In
ertained” are very strong words, and they lo
a condition precedent” (per Cromp
unstein v. Accidential Insurance, 31 L.J.Q.B
Ramanatha Aiyar's the Law Lexicon
cyclopaedic Law Dictionary with Legal M
n, The
Maxims
Edition,
in Terms and Words and Phrases, 2nd E
7, same meaning is given.
In
Ame
‘asc
“asc
dete
cond
gain
sens
prec
‘Corpus Juris Secundum’, Vol. VI publis
erican Law Book Company, it is mention
certained’ preterit and past participle of th
shed by
ned that
he verb
meaning
certain”. It has been defined as m
ermined; made certain; and, under
certain
dge and
ditions, has been held to imply knowled
ned from evidence rather than from exercise
e of the
ondition
ration.
ses. It is further observed that it is a co
cedent rather than a submission to the arbitr
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

14


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
74.
vari
it is
mad
cert
Stro
“asc
to b
“To
and
The meaning of ‘ascertain’/ascertained g
ious dictionaries mentioned hereinabove sho
given in
ows that
an activity undertaken by which a claim is f
de definite. In other words, claim is lear
fixed or
rnt with
tainty or it is made definite or determine
oud's Dictionary makes it clear that
ed. The
where
f money
lar way.
certained” is used in relation to a claim of
e paid, it has to be ascertained in a particul
o be ascertained” were held to be very strong
d were treated to be a condition precedent.
g words
75.
Nag
agre
will
betw
defin
We find substantial force in the arguments
grath and Shri Savla that even if the p
of Shri
present
Tribunal
eement is treated as a works contract, the T
have no jurisdiction to decide the diff
ween the parties unless it falls within the st
fference
tatutory
nition of “dispute” under the Act of 1983.
78.
Ban
“asc
Ben
In AIR 1964 Madras 108, Thanjavur Per
nk Ltd. v. Dharmasamvardhani Ammal, the
rmanent
e words
Division
certained claim” were considered. The D
ch opined as under:
“As
been
appe
misa
bank
quan
any,
asce
appe
scertained sum” clearly means a sum whi
ich has
not the
n determined and quantified. It is n
ellant's case that its claim on account of
appropriation by the respondent's husband
alleged
d of the
k's money has been established, and,
ntified or ascertained. So long as the liab
, of the respondent's husband is not establish
ertained in a precise sum, we do not see h
if so,
bility, if
hed and
how the
”
ellant could be permitted to claim a set off.”
82.
sum
(v)
defin
aris
cont
natu
Adh
(emp
On the basis of foregoing analysis, w
mmarize our conclusions as under:
we may
The words “claim of ascertained money”
nite connotation and therefore only such diff
sing out of execution or non-execution of a
have a
fference
‘works
f above
tract’ which are related with claims of
ure will be covered under section 2(1)(d)
hiniyam of 1983.”
of the
phasis supplied)
14. In the j
bench agre
judgment of Gouri Ganesh (supra), althou
eed with the ratio decidendi of the previo
ugh full
ous full
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

15


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
bench judg
further and
computable
view taken
of such dis
blacklisting
relating to
“dispute”
case, petiti
the Adhiniy
dgment of Viva Highways (supra), went
a step
isting is
with the
orollary
g out of
d observed that loss arising out of blackli
e. To this extent, we respectfully disagree w
in Gouri Ganesh (supra). The necessary co
sagreement would be that if amount arising
g is not ascertainable/ascertained, the
o blacklisting will not fall within the am
dispute
mbit of
as defined in Sec.2(1)(d) of Adhiniyam.
ioner cannot be relegated to avail the remedy
In that
dy under
yam.
15. Anothe
amount of
ascertainab
and writ pe
relegated t
composite
aspects i.e.
er ancillary question needs consideration is
s that if
f loss arising out of blacklisting order
is not
dispute”
d still be
ble and does not fall within the ambit of “d
etition is tenable, whether petitioner should
to avail the remedy under the Adhiniyam b
because
negative
order under challenge contains both the n
. (i) termination of contract (ii) blacklisting.

16. In view
previous b
Chief Just
following q
w of above disagreement with the view ta
aken by
enches, we deem it proper to request Hon’
tice for constituting a larger bench to c
questions:-
ble The
consider
- ----
-----xxx------xxx-------xxx-------”
THE M. P. MADHYAS
STHAM ADHIKARAN ADHINIYAM, 19
983
10. The Madhya
Pradesh Madhyastham Adhikaran A
Adhiniyam,
th
the assent of the President on 07 Oct
1983 received
tober, 1983.
This Act was
enacted with an object to establish a
tribunal to
arbitrate any d
dispute to which the State Government
or a public
undertaking is
s a party and for matters incidental
thereto or
connected there
ewith. The Act classifies works contracts
s from other
contracts and p
provides for arbitration by statutory trib
bunal of the
disputes arisin
g out of such contracts with an objec
ct to ensure
speedy imparti
ial trial by the independent tribunal.Sup
preme Court
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

16


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
3
an Shukla ,
in State of Ma
adhya Pradesh &another Vs. Anshuma
while referring
to the Act, 1983 and dealing with the n
nature of the
arbitral tribuna
al constituted under the said Act held th
hat the said
Act is a Spec
cial Act and provides compulsory arb
bitration. It
provides for ref
ference and the tribunal has been given th
he power of
rejecting the re
eference at the threshold. The Act provid
des a special
procedure, lim
mitation and the time limit for passing
an award,
which attains f
finality. The Supreme Court while refer
rring to the
provisions of th
he Act 1983, held as under:-
“28. The p
postulate t
separate fo
arising inte
one which c
of the Tr
disputants
Tribunal m
power to su
Its function
Tribunal ca
final. It can
the decision
Award a de
a Civil Cou
to the pr
Arbitration
said Acts h
provisions of the Act referred to hereinbefor
re clearly
created a
f disputes
that the State of Madhya Pradesh has c
forum for the purpose of determination of
er alia out of the works contract.The Tribun
nal is not
can be said to be a Domestic Tribunal. The M
ribunal are not nominated by the part
Members
ties. The
ment. The
do not have any control over their appointm
may reject a reference at the threshold. It
t has the
ummon records. It has the power to record e
ns are not limited to one Bench. The Chairm
evidence.
man of the
an refer the disputes to another Bench. Its de
ecision is
finality of
making an
n award costs. It can award interests. The f
n is fortified by a legal fiction created by m
ecree of a Civil Court. It is executable as a d
urt. The Award of the Arbitral Tribunal is no
decree of
ot subject
ovisions of the Arbitration Act, 1940
n and Conciliation Act, 1996. The provisio
and the
ns of the
ave no application.”
11. Division bench
h of this High Court in M/s.Spedra Engi
Engineers and Contractors, Bhopal Vs
ineering
4
s. State ,
Corporation E
has observed as
s under :-


esh & another Vs. Anshuman Shukla, (2008) 1 SCC 487.
3
State of Madhya Prade
4
M/s. Spedra Engineering C
111).

Corporation Engineers and Contractors, Bhopal Vs. State
e (AIR 1988 MP
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

17


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
“ 9. M.P.Ma
enacted to
arbitrate in
undertaking
party. ‘Disp
any differe
more, arisi
contract or
which has
expressions
Arbitration
that Act. Th
Tribunal u
differences
State Gove
mergers to
person sha
a Judge of
appointmen
Judge of no
been a Rev
less than 5
the service
years. Sect
for a perio
Governmen
further term
of cases pe
such salar
prescribed
either party
whether th
refer in wri
the Chairm
uneven num
the Tribuna
before it. S
procedure
Tribunal sh
under the C
give award
under secti
Court unde
to the High
provided u
adhyastham Adhikaran Adhiniyam, 1983, h
o provide for the establishment of a tri
has been
bunal to
r a public
n disputes to which the State Government or
g owned or controlled by the State Governm
spute’ has been defined under section 2(d)
ence relating to any claim valued at Rs, 50
ment is a
meaning
0,000/- or
ing out of the execution or non-execution of
r part thereof. Section 2(i) defines ‘works
f a works
contract’
ords and
ed in the
o them in
been quoted earlier. Under section 2(2) w
s used but not defined in this Act but defin
n Act shall have the meanings assigned to
he State Government has to constitute an Ar
under section 3 for resolving all such disp
rbitration
putes and
pertaining to works contract. Under sectio
ernment has to appoint a chairman and
o the Tribunal as it may consider necess
on 4, the
as many
sary. No
ll be appointed as Chairman unless he is or
f a High Court. No person shall be qual
nt as a member unless (i) he is or has been a
ot less than seven years standing, or (ii) he
has been
lified for
a District
is or has
k for not
venue Commissioner or of equivalent rank
years, or (hi) he is or has been a Chief Eng
gineer in
ess than 5
of the State Government for a period not le
tion 5 fixes the tenure of the Chairman and
members
the State
od for a
od of 3 years but under sub-section (3) t
nt may in its discretion extend the perio
m not exceeding 3 years having regard to the
ending. The Chairman and the members shal
e number
ll be paid
ries, allowances and other perquisites as
may be
ction 7(1)
under the rules as per section 6. Under sec
ty to a works contract shall irrespective of
f the fact
e agreement contains an arbitration claus
iting the dispute to the Tribunal. Section 9 e
man to constitute one or more Benches of one
e or not,
empowers
e or more
mber of members as he thinks fit. Under se
ection 10
f business
al may make regulations for transaction of
Section 11 empowers the Tribunal to regulat
te its own
on 12 the
n a Court
as it may think just and fair. Under sectio
hall have the same power as are vested in
Code of Civil Procedure. The Tribunal is re
d under section 16. Finality is attached to th
quired to
he award
e by civil
ion 17 which can be executed as a decree
er section 18. Revision is provided against th
h Court under section 19 on grounds similar
he award
r to those
tained in
under section 115, CPC and those cont
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

18


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
section 30
notwithstan
civil Court
dispute of
However, u
apply to an
arbitrator
Chairman
provides th
deemed to
offence aff
documents
inspection
section 28
Tribunal to
information
Governmen
1984, presc
Chairman
exercise o
Madhyasth
followed by
and the ru
enacted to
claim valu
contract wi
or controlle
not to be re

10 . Here th
and provid
dispute ari
reasonable
impartial tr
of any disc
which are
classified d
Mostly in
undertaking
an arbitrat
given to the
submitted w
the State G

of the Indian Arbitration Act. Under sec
nding anything contained in the Arbitration
t shall have jurisdiction to entertain or de
ction 20,
n Act, no
ecide any
which cognizance can be taken by the T
under sub-section (2) nothing in sub-section
ny arbitration proceedings either pending be
Tribunal.
(1) shall
efore any
or umpire or before any Court or autho
and members are public servants u/s 22. Se
hat the proceedings before the Tribunal
rity. The
ection 24
shall be
s of any
ords and
be judicial proceedings for the purposes
ffecting administration of justice. Reco
forming part of such records shall be
of all parties or their agents under section 2
8 the State Government has power to d
open to
27. Under
direct the
o munition records, registers etc. and to
n and statistics. Under section 29 th
nt has framed M.P.Madhyastham Adhikaran
o furnish
he State
n Niyam,
ons of the
cribing the salary and other service conditio
and members of the Tribunal. The Tri
of powers under section 10 has fram
ham Regulation, 1985 regulating the proced
bunal in
ed M.P.
dure to be
y it. From the narration of the provisions of
ules hereinabove, it is clear that the Act h
of the Act
has been
ng to any
provide for arbitration of disputes relatin
ued at Rs. 50,000/- or more arising out
of works
ng owned
ith the Government or any public undertakin
ed by it. Therefore, the claims below Rs. 50,
eferred to the Tribunal for adjudication.
000/- are
he Act classifies works contract from other c
des for arbitration by a statutory tribuna
contracts
al of the
here is a
ising out of such contracts. Evidently, th
e classification with the object to ensure sp
eedy and
rial by an independent tribunal. There is no
crimination simply because other types of c
question
contracts
eparately
nactment.
clearly distinguishable and could be se
do not come within the purview of this en
the works contracts with the Governmen
gs, invariably there is a provision for arbitr
tor to be appointed by the Government with a
nt or its
ration by
an option
rbitrators
ired from
e contractor to select one out of the list of ar
who are mostly Engineers working or reti
Government service.”
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

19


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
12. The State Legi
islature enacted the Act, 1983 to establis
sh a special
statutory mech
hanism for adjudication of disputes ari
sing out of
works contra
act involving the State Governmen
nt or its
instrumentalitie
es including public sector under
rtakings.The
definition of di
ispute is described in Section 2(1)(d) of
f Act, 1983
and the definiti
ion of Works Contract in Section 2(1)(i)
), Section 3
provides for co
onstitution of Tribunal and Section 7(A) fo
for reference
petition, Sectio
on 7(B) prescribed the limitations, Sectio
on 16 deals
with the award
d, Section 17 provides for finality of awa
ard, Section
17(A) confers
inherent powers and Section 20 creates
a bar to the
jurisdiction of
f Civil Court.For better appreciation, t
the relevant
provisions of th
he Act, 1983 are extracted below:
“Section 2
ascertainab
to any diffe
of a works

Section 2(
writing or
execution
maintenanc
canal, rese
work-shop,
State Gov
Corporatio
notification
into by the
Governmen
any official
Corporatio
agreement f
relating to
includes th
works and
entered into
Corporatio
2(1)(d) : "dispute" means claim of ascert
tained or
e relating
ble money valued at Rupees 50,000 or more
erence arising out of the execution or non-e
execution
contract or part thereof;
(1)(i) : "works-contract" means an agree
ement in
d for the
repair or
am, weir,
a letter of intent or work order issued
of any work relating to construction, r
ce of any building or superstructure, da
ervoir, tank, lake, road, well, bridge, culvert
t, factory,
powerhouse, transformer or such other wor
vernment or Public Undertakings or
ons of the State as the State Government
rks of the
of the
may, by
s, entered
n, specify in this behalf at any of its stages
e State Government or by an official of t
nt or by Public Undertakings or Corporati
the State
ion or by
lf of such
udes an
l of the State Government for and on behalf
on or Public Undertakings and inclu
for supply of goods or material and all othe
o the execution of any of the said works
r matters
and also
aforesaid
ement, so
he services so hired for carrying out the a
d shall also include all concession agree
o by the State Government or public underta
on, wherein a State support is involved or no
akings or
t."
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

20


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
The agree
relating to
water supp
"works con
ements in writing for the execution of t
the work
construction, repair or maintenance of elect
ply and sewerage/drainage system shall
ntract"
tric lines,
also be
After Amen
ndment :
(As per Am
means an
order issue
repair or m
weir, cana
factory, w
water supp
works of th
corporation
notification
into by the
Governmen
or corpora
and on beh
includes an
all other m
works and
aforesaid
agreement
agreement,
Governmen
State supp
works assi
undertaking
Madhya Pr
mendment, 2025) Section 2(1)(i) : "works-c
contract"
agreement in writing or a letter of intent
ed for execution of any work relating to cons
maintenance of any building or superstructu
or work
struction,
ure, dam,
l, reservoir, tank, lake, road, well, bridge,
workshop, powerhouse, transformers, elect
, culvert,
tric line,
ply and sewerage/drainage system or su
he State Government or public undertakings
ch other
or of the
ns of the State as the State Government
n, specify in this behalf at any of its stages
may, by
s, entered
e State Government or by an official of t
nt or public undertakings or by public unde
ation or bay any official of the State Govern
the State
ertakings
nment for
kings and
half of such corporation or public undertak
n agreement for the supply of goods or mat
matters relating to the execution of any of
erial and
f the said
also includes services so hired for carrying
g out the
oncession
g escrow
works and shall also include all co
and all ancillary agreements including
substitution agreement, so entered into by
nt or public undertakings or corporation, w
the State
wherein a
ort is involved or not, and may also inc
igned by the Central Government or it
g to the State Government, wherein the
radesh or its undertaking is an executing age
clude the
ts public
State of
ency."

Section 7-A
shall includ
make in re
reference p
contract sh
(2) Where
any claim o
be entitled
so omitted
(3) Notwith
sub-section
arise after f
A . Reference Petition.-(1) Every reference
de whole of the claim which the party is en
espect of the works contract till the filin
petition but no claims arising out of any oth
hall be joined in such a reference petition.
e petition
ntitled to
ng of the
her works
a party omits to refer or intentionally reli
or any portion of his claim, he shall not af
inquishes
fterwards
n of claim
to refer in respect of such claim or portion
or relinquished.
hstanding anything contained in sub-sectio
n (2) disputes relating to works contract wh
on (1) or
hich may
rtained as
filing of the reference petition may be enter
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

21


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
and when
prescribed.
they arise, subject to such conditions as
.
s may be

Section 7-B
reference p
(a) the dis
authority u
(b) the pet
the date of
Provided th
within a pe
the petition
expiry of th
(2) Notwit
where no p
Court prec
such comm
Madhya P
Adhiniyam,
within one
Pradesh M
1990 irresp
been made
(2-A) Notw
the Tribun
made with
contract is
end in any
pendency of
Provided t
Governmen
B. Limitation.- (1) The Tribunal shall not
petition unless-
t admit a
spute is first referred for the decision of
under the terms of the works contract; and
the final
tition to the Tribunal is made within one y
f communication of the decision of the final a
year from
authority:
e disputes
hat if the final authority fails to decide the
eriod of six months from the date of referen
n to the Tribunal shall be made within one ye
he said period of six months.]
nce to it,
ear of the
thstanding anything contained in sub-sec
ction (1),
proceeding has been commenced at all be
ceding the date of commencement of this Ac
efore any
t or after
nt of the
mencement but before the commencemen
Pradesh Madhyastham Adhikaran (Sans
shodhan)
, 1990, a reference petition shall be en
e year of the date of commencement of
Madhyastham Adhikaran (Sanshodhan) Ad
tertained
Madhya
dhiniyam,
pective of the fact whether a decision has o
r has not
]
ction (1),
nless it is
by the final authority under the agreement.]
withstanding anything contained in sub-sec
al shall not admit a reference petition un
in three years from the date, on which th
terminated, foreclosed, abandoned or com
y other manner or when a dispute arises du
he works
mes to an
uring the
of the works contract:
that if a reference petition is filed by t
nt, such period shall be thirty years.
the State
By way of
"intentiona
in sub-secti
added "Pro
the State G
be 3 years.

ARGUMENTS ON BE

f amendment, 2025 , in sub-Section (2), t
ally" has been omitted.
the word
ion (1) in the proviso, the following words h
ovided further that is a reference petition is
Government or public undertaking, such per
have been
s filed by
riod shall
Sub-section (2) and 2(a) have been deleted.

HALF OF THE PETITIONER :
13. Shri Amit Mi
ishra , learned counsel appearing on be
ehalf of the
petitioner cont
tended that blacklisting in its very char
racter is an
administrative
and discretionary measure rooted in
n executive
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

22


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
power intended
d to protect the sanctity and probity of go
overnmental
contracts. Blac
cklisting does not emanate from the co
ntract itself
nor does it b
bear any determinable or ascertainable
e monetary
character that c
could convert it into a “dispute” within t
the meaning
of Section 2(1)
) (d) of the Act of 1983. Definitionof S
Section 2(1)
(d), provides th
hat the term “dispute” means “a claim of
f ascertained
or ascertainabl
le money valued at fifty thousand rupe
ees or more
relating to the e
execution or non-execution of a works co
ontract.
14. A claim that is
capable of being computed in monetary t
terms either
ascertained or a
ascertainable can be entertained by the T
Tribunal and
administrative
or declaratory grievances such as ch
hallenges to
blacklisting or
rders do not fall within this fold. By
y the 1990,
Amendments th
he legislature consciously narrowed the s
scope of the
term by deletin
ng the broader expression “any dispute
relating to
any claim” and
d restricting it solely to claims of a mone
etary nature.
This deliberate
legislative omission is a decisive indicat
tor that non-
pecuniary adm
ministrative acts, such as blacklisting or
debarring a
contractor from
m future tenders were never intended to
be brought
within the dom
main of the tribunal.
15. Referring to th
he structural provisions of the Act, learn
ned counsel
pointed out tha
at Section 7-A mandates that every refe
erence must
include “the wh
hole of the claim arising from the works
contract up
to the date of
f filing.” Sub-sections (2) and (3) of S
Section 7-A
further bar the
e splitting of claims or inclusion of c
claims from
different contr
racts. This statutory prescription ensur
res that the
Tribunal is con
nfined to adjudicate specific, quantifiabl
le, contract-
bound monetar
ry disputes and not to entertain vague
e, future or
speculative cla
aims. Blacklisting, being neither a quant
tifiable loss
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

23


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
nor an event a
arising directly from the execution of a
contract is
therefore outsid
de the purview of the Tribunal.

16. Section 8(3) o
of the Act, requires that the Chairman
n to assign
matters to a Be
ench “having regard to the nature of the
dispute, the
amount involv
ved, and other relevant factors.” This
s provision
reinforces that
t the jurisdiction of tribunal is esse
entially and
exclusively pec
cuniary hinging upon the monetary quant
tification of
a claim. Unles
ss the dispute involves an amount deter
rminable in
terms of mone
ey there exists no jurisdictional foundat
tion for the
Tribunal to act.
.
17. Blacklisting is
s not a contractual penalty or a cons
equence of
breach, but an
n independent administrative act falling
within the
domain of pub
blic law. The authority to blacklist ema
anates from
executive ins
structions, departmental manuals o
or clauses
incorporated in
n tender conditions empowering the Stat
te to ensure
integrity in pu
ublic procurement. However, the exerci
ise of such
power must co
onform to the principles of natural justic
ce, fairness,
and non-arbitra
ariness as enshrined under Articles 14 an
nd 21 of the
Constitution. T
The challenge to such administrative
orders lies
within the writ
t jurisdiction of constitutional courts un
nder Article
226 and not be
efore a statutory arbitral tribunal, whose c
competence
is confined to
contractual claims. Reliance has been p
placed upon
the judgment
of the Apex Court in Kulja Industri
ies Ltd. v.
5
ar Nigam Limited .
Bharat Sancha
18. The learned cou
unsel also draws support from Anilma A
Associates v.
6
dia , wherein the Delhi High Court a
Union of Ind
applied the

5
Kulja Industries Ltd. v. Bharat
6
Anilma Associates v. Union of

Sanchar Nigam Limited, (2014) 14 SCC 731.
f India, 106 (2003) DLT 262.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

24


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
doctrine of dou
uble jeopardy to administrative blacklisti
ing, holding
that the impos
ition of multiple bans or debarments o
on the same
contractor for t
the same cause violates fairness and the p
principles of
natural justice.
Blacklisting is punitive and administrativ
ve in nature
thereby falling
g outside the legislative intent and ju
urisdictional
contour of a sta
atutory tribunal.
19. Explaining on
Section 7-A (2) and (3) of the Adhin
niyam, Shri
Mishra submitt
ted that even if a contractor suffers allege
ed losses on
account of blac
cklisting such losses would be speculativ
ve or remote
within the mean
ning of Section 73 of the Indian Contract
t Act, 1872.
Only losses tha
at are direct, proximate, and capable of c
computation
are compensab
ble. Since the deprivation caused by bla
acklisting is
indeterminate a
affecting future business prospects and r
reputation it
is neither capa
able of precise calculation nor legally co
ompensable
under the Act o
of 1983. Hence, even if the Tribunal wer
e to assume
jurisdiction it
would lack statutory competence to
quantify or
adjudicate suc
ch speculative claims. Learned coun
nsel further
pointed out tha
at the Tribunal under the Act of 1983 is a
a creation of
statute and the
erefore enjoys no inherent or equitable j
jurisdiction.
Its powers are
e circumscribed strictly by the text of
the Act. It
cannot assume
declaratory jurisdiction akin to a civil co
ourt nor can
it examine ad
dministrative actions that do not give
e rise to a
monetary claim
m.
20. In continuation
n, Shri Mishra distinguishes the scheme o
of the Act of
1983 from tha
at of the Arbitration and Conciliation
Act, 1996.
Under Section
16 of the latter enactment an arbitral tr
ribunal may
determine its o
own jurisdiction including issues as to a
arbitrability.




Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

25


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
However, the s
statutory Tribunal under the Act of 198
83 functions
within a confin
ned legal framework and does not posses
s the power
to decide upon
its own jurisdiction beyond the paramete
ers set forth
in Section 2(1
1)(d) and Section 7-A. Learned coun
nsel further
emphasized tha
at arbitrators whether private or statutory
derive their
authority from
the arbitration agreement and cannot exe
ercise public
law powers. Si
ince blacklisting is an executive act ari
ising out of
public law con
nsiderations it cannot be subjected to ar
rbitration or
statutory adjudi
ication.
21. Learned counse
el in conclusion submitted that blacklist
ting is not a
“dispute” with
hin the meaning of Section 2(1)(d) as
it does not
involve any a
ascertainable monetary claim and that
grievances
arising from b
blacklisting must be agitated before
appropriate
constitutional
forums through writ petitions as th
he tribunal
constituted und
der the Act of 1983 have no jurisdiction to
o declare or
annul blacklisti
ing nor to grant any relief founded upon
speculative
future losses or
r reputational harm.

ARNED :
Amicus Curiae
ARGUMENTSBY LEA

ed Shri Ashok Sethi, Piyush Mathur, Am
22. Bench appointe
mit Agrawal,
V. K. Jain and
d Ravindra Singh Chhabra, learned senio
or advocates
as amicus curia
ae to assist the bench.
23. Shri Amit Ag
grawal , learned amicus curiae and senio
or advocate
opened his sub
bmissions by submitting that the princip
pal question
before this Ben
nch is whether an order of blacklisting
g would fall
within the defi
finition of “dispute” under Section 2(1)
) (d) of the
Adhiniyam and
d if so whether the loss alleged to arise t
therefrom is
an “ascertaine
ed or ascertainable sum of money”
within the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

26


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
jurisdiction of
f the Arbitral Tribunal constituted und
der the said
enactment.

24. Learned senior
r counsel at the outset submitted that t
this precise
question did no
ot arise for determination before the Fu
ull Bench in
1
h . The learned counsel drew the attent
Gouri Ganesh
tion of this
1
, which all
court to the thr
ree questions referred in Gouri Ganesh
pertained to t
the maintainability of disputes arising
g from the
termination of
f a works contract and the scope of co
onsequential
reliefs flowing
g therefrom. Blacklisting learned seni
ior counsel
urged was not
one of the referred issues. While the B
Bench made
passing referen
nce to blacklisting those observations w
was neither
part of the refe
erence nor of the ratio decidendi. More si
ignificantly,
learned senior
r counsel pointed out that at the ti
ime Gouri
1
Ganesh was de
ecided on 03.05.2018, the expression “asc
certainable”
had not yet be
en inserted in Section 2(1)(d), the said
amendment
having come
into force only on 28.04.2019. H
Hence, any
interpretation r
regarding ascertainability of loss in the
e context of
blacklisting cou
uld not have arisen from the statutory tex
xt as it then
1
h cannot be
stood. Consequ
uently, the observations in Gouri Ganesh
read as confer
rring jurisdiction upon the Tribunal t
to entertain
challenges to bl
lacklisting orders.
25. Proceeding fur
rther, learned senior counsel submitted t
that Section
2(1)(d) when r
read in conjunction with Section 3 of the
e 1983 Act,
confines the jur
risdiction of the Tribunal to disputes “ar
rising out of
a works contra
act” where the claim relates to an asc
certained or
ascertainable su
um of money not less than ₹50,000/-. Th
he sine qua
non for invoki
ing the jurisdiction of the Tribunal there
efore is that
the claim mus
t emanate directly from the contract an
nd must be
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

27


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
capable of mon
netary quantification. The act of blacklis
sting, on the
other hand, is a
an exercise of the State’s sovereign execu
utive power
under Article 2
298 of the Constitution of India, which th
hough often
triggered by co
ontractual disputes has an independent
public-law
character gover
rned by Article 14 of the Constitution. Th
he power to
blacklist is inh
herent in the State as an incident of it
ts executive
authority and d
does not emanate from the contract itself.
Thus, even
if a contract or
r tender document incidentally refers to
blacklisting
the source of th
hat power is not contractual but constitutio
onal.
26. In support of th
his submission, reliance is placed on a l
long line of
decisions of
the Supreme Court beginning with
h Erusian
7
Chemicals Ltd. V. State of W.B. , R
Equipment &
Raghunath
8
ate of Bihar , Patel Engineering Ltd. v
Thakur v. Sta
v. Union of
9
India and Gor
rkha Security Services v. Governmen
nt (NCT of
10
Delhi) , wher
rein the Apex Court further empha
asized that
blacklisting, be
eing a measure having severe civil con
nsequences,
must be preced
ded by a clear and specific show-cause no
otice and an
opportunity of
f hearing. These judgments learned sen
nior counsel
submitted that
makes it abundantly clear that blacklist
ing is not a
mere contractu
ual remedy but an administrative act to b
be tested on
public-law prin
nciples of fairness and non-arbitrariness.
27. Addressing the
e question of ascertainability of loss, lea
arned senior
counsel submi
itted that while damages arising from
m wrongful
termination of
f a works contract can, in appropriate
e cases, be
quantified by
settled measures, the same cannot b
be said of

7
Erusian Equipment & Chemica
8
Raghunath Thakur Vs. State of
9
Patel Engineering Ltd. Vs. Uni
10
Gorkha Security Services Vs.

als Ltd. Vs. State of W.P., (1975) 1 SCC 70.
f Bihar, (1989) 1 SCC 229.
ion of India, (2012) 11 SCC 257.
Government (NCT of Delhi), (2014) 9 SCC 105.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

28


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
blacklisting. Fo
or termination-related claims, the law is
well settled
11
at wherein
by A.T. Brij P
Paul Singh and Bros. v. State of Gujara
the Apex Cour
rt held that a contractor wrongfully prev
vented from
completing a co
ontract is entitled to damages for loss of p
profit, often
calculated as a
reasonable percentage of the unexecuted
d portion of
the work, usua
ally around 15%, provided breach on the
e part of the
employer is est
tablished. This principle was subsequentl
ly approved
12
. Progressive Constructions Ltd. . S
in HUDCO v
imilarly, in
13
la v. K. Bhaskaran , the Apex Court
State of Keral
recognized
loss of profit as
s a recoverable head of damages, where t
the contract
was illegally re
escinded. However, the same measure, lea
arned senior
counsel conte
ended cannot apply to blacklistin
ng. Unlike
termination, bl
lacklisting does not deprive the contrac
ctor of any
existing contra
actual right or quantifiable claim; it mer
rely renders
him ineligible
for future contracts. Whether the contra
actor would
have participat
ted in, qualified for, or been awarded
d any such
contracts is pur
rely speculative. There is thus no ascerta
ainable sum
of money capab
ble of determination, nor any established
d formula to
compute the no
otional loss resulting from blacklisting.
28. The learned sen
nior counsel distinguished the decision o
of Gangotri
14
rporation ,
Enterprises L
Ltd. v. M.P. Road Development Cor
wherein the
Supreme Court observed that the
expression
“ascertainable”
” includes amounts that may be determi
ined during
the course of
f proceedings based on pleadings and
d evidence.
Learned sen
nior counsel submitted that
Gangotri

11
A.T. Brij Paul Singh and Bros
12
HUDCO Vs. Progressive Con
13
State of Kerala Vs. K. Bhaska
14
Gangotri Enterprises Ltd. Vs.

s. Vs. State of Gujarat, (1984) 4 SCC 59.
nstructions Ltd., (2011) 2 SCC 241.
aran, (1985) 4 SCC 119.
M.P. Road Development Corporation, (2018) 16 SCC 29
96.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

29


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
14
Enterprises d
dealt with the quantification of contractua
al claims for
work done and
cannot be extended to encompass specul
lative losses
arising from an
n executive disability such as blacklisting.
.
29. Learned senior
r counsel also referred to Section 7-A o
of the 1983,
Act, which man
ndates that a claimant include the whole o
of his claim
in one referenc
e petition and provides for accrual of cou
unter-claims
during pendenc
cy of proceedings. Learned senior counse
el submitted
that this provis
ion, being procedural, cannot enlarge the
e Tribunal’s
substantive jur
risdiction. If the subject matter itself
f is outside
Section 2(1) (d
d) labeling it as “consequential relief” ca
annot confer
jurisdiction. Th
he procedural provisions cannot cure a f
foundational
defect of compe
etence.
30. Turning to the
e question of arbitrability, counsel rel
lied on the
trilogy of judgm
ments Booz Allen & Hamilton Inc. v.
SBI Home
15
Finance Ltd.
5 16
, A. Ayyaswamy v. A. Paramasivam ,
, and Vidya
17
rga Trading Corporation . In Booz
15
Allen the
Drolia v. Dur
Supreme Court
t held that disputes relating to rights in pe
ersonam are
generally arbit
trable, while those involving rights in
rem, which
15
d at large are not. In Booz Allen some e
affect the world
examples of
non-arbitrable
matters inter alia criminal proceedings, m
matrimonial
and guardiansh
hip cases, insolvency and winding-up, te
estamentary
matters, and t
tenancy disputes under rent control sta
atutes were
explained. The
rationale lies in the fact that arbitral trib
bunals being
private fora ba
ased on party autonomy, cannot adjud
dicate upon
matters requirin
ng collective adjudication or public enfor
rcement.

15
Booz Allen & Hamilton Inc. V
16
A. Ayyaswamy Vs. A. Param
17
Vidya Drolia Vs. Durga Tradi

Vs. SBI Home Finance Ltd., (2011) 5 SCC 532.
masivam, (2016) 10 SCC 386.
ing Corporation, (2021) 2 SCC 1.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

30


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
16
ciple was elaborated in A. Ayyaswamy
31. The same princ
wherein the
Apex Court ob
bserved that disputes falling within th
e exclusive
domain of spe
ecial public fora, or involving public
policy and
17
dya Drolia
statutory rights
s are not amenable to arbitration. In Vid
the Apex Cour
rt reaffirmed that sovereign functions o
of the State,
public-law acti
ions, and matters involving erga omnes
s effects are
non-arbitrable b
by their very nature and it was specifical
lly held that
even where the
e dispute appears inter parties, if its effec
t extends to
third parties or
to public law arbitration is excluded. Lea
arned senior
counsel submi
itted that blacklisting clearly falls w
within this
category. Altho
ough the order is addressed to a single co
ontractor its
effect extends t
to all public authorities, which as a matt
er of policy
and practice re
efrain from engaging blacklisted entities
s. The order
thus operates i
in rem altering the status of the contra
actor in the
public domain
and cannot be adjudicated by a private
or statutory
arbitral tribunal
l.
32. In this connect
tion, learned senior counsel relied on th
e dictum in
Dwarkadas M
Marfatia & Sons v. Board of Trustees o
of the Port
18
of Bombay , w
wherein the Apex Court observed that e
every action
of the State or
its instrumentalities even in the contrac
ctual sphere
must be inform
med by reason and is subject to judicial re
eview under
Articles 226 a
and 32. The arbitral tribunal under the
e 1983, Act
though a creatu
ure of statute, functions within a limited
d domain of
private-law ad
djudication and does not exercise the
e power of
judicial review
. It cannot test the vires, mala fides, or co
onstitutional
validity of an
n administrative order. These are quin
ntessentially
functions of the
e constitutional courts.

18
Dwarkadas Marfatia & Sons V

Vs. Board of Trustees of the Port of Bombay, (1989) 3 SC
CC 293.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

31


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
33. Learned couns
el then delineated three recurring factua
al situations
in government
contracts:

(i) where bla
without termi
challengeable
(ii) where term
actions the te
Tribunal, but
tested under A
acklisting occurs during subsistence of th
he contract,
nt and only
ination such blacklisting is independen
in writ jurisdiction;
mination and blacklisting are separate bu
ut sequential
o before the
rmination and monetary claims may go
blacklisting being public-law in charact
Article 226; and
ter must be
(iii) Where te
composite or
contractual, th
ermination and blacklisting are embo
odied in a
nt may be
rbitrable.
rder while the termination componen
he blacklisting component remains non-ar

34. In such compo
osite cases, counsel submits, the writ
petition is
maintainable n
notwithstanding the availability of a rem
medy before
the Tribunal as
s relegation would lead to conflicting fi
findings and
practical futilit
ty. The rule of alternative remedy is d
iscretionary
and yields, wh
here the statutory remedy is neither effi
cacious nor
capable of aff
ffording the relief sought particularly,
when the
challenge is on
constitutional grounds .
35. Summarizing h
his arguments, learned senior counsel sub
bmitted that
blacklisting wh
hether standalone or composite with ter
rmination is
an executive ac
ct with public-law implications. The Trib
bunal under
the 1983 Act h
has no jurisdiction to examine the legal
lity of such
orders nor ca
an it award compensation for specul
ative, non-
quantifiable los
sses alleged to arise therefrom. The jur
risdiction of
the High Court
t under Article 226, being part of the basi
ic structure,
remains intact
and cannot be excluded by a state en
nactment. If
1
h or Awasthi Brothers Construction Co
Gouri Ganesh
ompany v/s
19
f Madhya Pradesh & Others ar
The State of
re read as

19
Awasthi Brothers Constructio

on Company Vs. The State of M.P. and others, 2019 SCC
OnLine 4298.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

32


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
recognizing a t
tribunal remedy against blacklisting, the
e same it is
respectfully sub
bmitted does not correctly state the law.

36. Learned senior
r counsel, therefore urged that the fir
rst question
referred to this
Bench be answered in the negative holdi
ing that loss
alleged to aris
se out of blacklisting is not an “asc
certained or
ascertainable su
um of money” within the meaning of Sec
ction 2(1)(b)
of the 1983 Ac
ct, and that blacklisting being a public-la
aw measure
with erga omn
nes effect, is non-arbitrable. As regards
the second
question, learne
ed senior counsel submitted that where a
a composite
order of termin
nation and blacklisting is challenged, the w
writ petition
is maintainable
e despite the existence of an alternative
remedy for
termination, as
the tribunal lacks jurisdiction over the
blacklisting
component an
nd the alternative remedy is not
efficacious.
Accordingly, th
he learned senior counsel prayed that this
s Court hold
that challenge
es to blacklisting lie exclusively w
within the
constitutional w
writ jurisdiction of this Court and not
before the
Tribunal consti
ituted under the 1983, Act.
37. Shri V.K. Jain
n , learned amicus curiae and senior advoc
cate divided
the reference in
nto four principal questions and two anc
cillary ones.
The first questi
ion learned senior counsel submitted is w
whether the
loss arising fro
om blacklisting is ascertainable or unas
scertainable.
The second qu
uestion concerns, whether such loss falls
s within the
ambit of Secti
ion 2(1)(d) of the Adhiniyam.The thir
rd question
relates to whet
ther a remedy against an order of black
klisting lies
before the Tr
ribunal and whether the view taken
in Gouri
1
Ganesh or Aw
19
wasthi Brothers correctly represents th
he law. The
fourth question
n is whether a composite order of term
mination and
blacklisting ca
an be challenged in a writ petition, an
nd whether
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

33


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
reference to the
e Tribunal constitutes an alternative and
efficacious
remedy. The t
two ancillary aspects according to lear
rned Senior
Counsel are: (1
1) even assuming that an alternative rem
medy exists,
whether such r
remedy can be regarded as efficacious a
and speedy;
and (2) whethe
er an order of blacklisting affects the f
fundamental
rights of a co
ontractor under Articles 19(1) (g) and
21 of the
Constitution so
o as to sustain recourse to Article 226.
38. Developing the
ese propositions, Shri Jain submitted that
blacklisting
has a practical
effect of permanently disabling the cont
tractor from
future participa
ation in public tenders, thereby amountin
ng to a civil
and commerci
al death. The loss resulting therefrom
m is neither
certain nor cap
pable of being quantified within the m
meaning of
Section 73 of t
the Contract Act. It is a reputational loss
s, incapable
of being comp
pensated in money. The stigma persi
sts even if
damages are aw
warded. Hence, the Tribunal, whose powe
er is limited
to awarding c
compensation or damages, cannot gran
nt effective
relief; it cannot
t remove the stigma, restore the reputati
on, or undo
the disqualifica
ation.
39. According to th
he learned Senior Counsel, the power of
blacklisting
does not arise
e out of a works contract. It is a so
overeign or
administrative
power of the State to protect public i
interest and
ensure probity
in public dealings. Even when the tender
r or contract
incorporates a
clause referring to blacklisting, such cla
ause merely
recognizes that
t inherent executive power; it does not tra
ansform the
issue into a co
ontractual dispute. Where no such clause
e exists, the
authority can n
nevertheless exercise its public-law powe
er, but such
exercise remai
ns subject to constitutional scrutiny un
nder Article
226. Thus, blac
cklisting is not a “dispute arising out of o
or connected
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

34


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
with a works c
contract” within Section 2(1) (d) of the A
Adhiniyam.
The Tribunal’
’s jurisdiction extends only to disp
putes of a
contractual natu
ure involving monetary claims. It cannot
t declare an
administrative
act void, cannot restore a contract,
and cannot
adjudicate on p
proportionality, fairness, or violation of f
fundamental
rights.
40. Shri Jain emph
hasized that termination of contract and
blacklisting
are conceptua
ally distinct.Termination flows from
breach of
contractual term
ms; blacklisting, on the other hand, is a
a penal and
preventive mea
asure resting on considerations of pub
lic interest,
fraud, or dishon
nesty. A breach of contract however gra
ave does not
automatically
entail blacklisting.The Apex Court
in Kulja
5
Industries and
7
d earlier in Eurasian has held that black
klisting is a
drastic step an
nd can be justified only on strong, i
independent
material. There
efore, even when both termination and
blacklisting
are contained i
in one Composite order, the two must b
e treated as
severable. The
termination part may, if the contractor
so chooses
be referred to
the Tribunal for monetary relief; the
blacklisting
component, bei
ing a matter of public law must be challen
nged before
the High Court
under Article 226.
41. On the ancilla
ary questions, Shri Jain submitted that
even if the
Tribunal is trea
ated as an alternative forum, it cannot be
e said to be
efficacious or
speedy.The Tribunal has no powe
r to grant
immediate inte
erim relief. Blacklisting takes effect in
nstantly and
prevents partic
cipation in all subsequent contracts. Onl
ly the High
Court in exerci
ise of its writ jurisdiction, can grant urg
gent stay or
interim suspens
sion of such order. The writ jurisdiction
is thus both
efficacious and
d necessary. The process of Tribunal bein
ng confined
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

35


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
to quantificatio
on of loss would not meet the exigency of
f immediate
protection.

42. Learned senior
r counsel urged that blacklisting directl
ly impinges
upon fundamen
ntal rights guaranteed under Articles 19
9(1) (g) and
21 of the Cons
stitution. It affects a citizen’s right to live
elihood and
to carry on trad
de or business. The power of judicial rev
view to test
such action for
arbitrariness, proportionality, or violatio
on of natural
justice lies exc
lusively with the High Court. Hence, a w
writ petition
is maintainabl
le even in the face of an alternativ
ve remedy.
Reference was
made to Whirlpool Corporation v. R
Registrar of
20
Trademarks w
wherein it was held that the bar of
alternative
remedy does n
not apply when the action complained of
f is without
jurisdiction, vio
olates natural justice or infringes fundame
ental rights.
43. The learned Se
enior Counsel further submitted that the
e Tribunal’s
powers under th
he Adhiniyam are confined to the award
of damages
or compensatio
on. It has no power to declare an administ
trative order
invalid or to res
store a contract. The power to review adm
ministrative
decisions, to
quash blacklisting orders or to test
t them on
constitutional g
grounds vests only in the High Court. Th
he Tribunal
can at best d
determine monetary loss suffered from
m wrongful
termination, bu
ut not the legality of the blacklisting itself
f.
44. Learned senio
or counsel submitted that blacklisting
g is not a
consequential r
relief. Section 34 of the Specific Relief
f Act makes
clear that whe
en declaratory relief cannot be grant
ted without
consequential r
relief, it becomes consequential. But b
blacklisting,
being independ
dent of any declaration regarding cont
tract, is not
consequential.
If served with a blacklisting order, the
person can

20
Whirlpool Corporation Vs. Re

egistrar of Trademarks, (1998) 8 SCC 1.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

36


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
directly approa
ach the High Court. The High Court m
may stay the
order and once
e the matter becomes sub-judice the black
klisting will
not operate. Im
mmediate relief is necessary where only
blacklisting
is in issue wi
ithout monetary claim; the only remed
dy is under
Article 226.Ev
ven where termination is challenged
along with
blacklisting, the
e Tribunal has no power to restore a contr
ract.
45. Reliance is p
placed on the Techno Prints v. Ch
hhattisgarh
21
rporation wherein it held that writ pet
Textbook Cor
tition is the
only remedy an
nd blacklisting is stigmatic challenge to
which will
lie only under
Article 226. Reference is also made to
o the Apex
Court judgmen
nt in Blue Dreamz Advertising (P) Ltd.
v. Kolkata
22
orporation , wherein blacklisting was
Municipal Co
challenged
during pendenc
cy of arbitration proceedings In N. Radh
hakrishnan
23
Engineers the Apex Court held th
v. Maestro E
hat disputes
involving elem
ments of cheating or fraud are not ar
rbitrable as
detailed eviden
nce is required and since blacklisting alwa
ays involves
elements akin t
to fraud or criminal misconduct and there
efore cannot
be referred to a
arbitration or the statutory Tribunal.
46. Learned Senio
r Counsel summarized his submissions
s by stating
that even if an
n alternative remedy exists before the
Tribunal, it
would not be ef
fficacious or speedy. Blacklisting directly
y affects the
fundamental rig
ghts of a person under Articles 19(1) (g) a
and 21. The
power of the T
Tribunal is only to award damages or com
mpensation,
not to remove
stigma or grant restoration. The power t
to restore or
quash blacklisti
ing lies exclusively with the High Court.

21
Techno Prints Vs. Chhattisgar
22
Blue Dreamz Advertising (P)
23
N. Radhakrishnan Vs. Maestr

rh Textbook Corporation, 2025 SCC OnLine SC 343.
Ltd. Vs. Kolkata Municipal Corporation, 2024 SCC OnL
o Engineers, (2010) 1 SCC 72.
Line SC 1896.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

37


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
47. Learned senior
r counsel concluded that writ jurisdiction
n is the only
efficacious rem
medy against blacklisting and that blackli
isting is not
arbitrable and d
does not fall under Section 2(1)(d) of the
Adhiniyam
and the Tribun
nal has no jurisdiction to adjudicate black
klisting and
since terminati
on and blacklisting are distinct only the
High Court
can test the leg
gality, proportionality, and validity of a
blacklisting
order.
48. Shri Ashok S
Sethi , learned amicus curiae and senio
or advocate
submitted that
Section 2(1)(b) restricts the expression “
“dispute” to
a claim of an a
ascertained sum of money arising from th
he execution
or non-executio
on of a works contract or part thereof. A
blacklisting
order does not
entail any ascertainable monetary claim
m and is not
founded on ex
ecution or non-execution of the contrac
ct, but is an
administrative
act having the effect of debarment f
from future
dealings. Conse
equently, such action does not amount to
a “dispute”
as statutorily d
defined and cannot be made the subjec
ct matter of
reference befor
re the Tribunal.
49. Learned senior
r counsel further submitted that Sectio
on 7 of the
Adhiniyam doe
es not confer any independent or wider
jurisdiction
upon the Tribu
unal, but merely provides for referenc
ce of those
disputes, which
h fall within the ambit of Section 2(1
) (b). As a
result, the Trib
bunal is incompetent to examine or adjud
dicate upon
the legality or p
propriety of an order of blacklisting. Suc
ch an order,
being an admin
nistrative or quasi-judicial act of the Stat
te, can only
be tested unde
er Article 226 of the Constitution befor
re the High
Court, as has b
been settled by a catena of judgments of t
the Hon’ble
Supreme Cou
urt dealing with blacklisting in the
realm of
administrative l
law.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

38


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
50. In regard to c
cases where the impugned order com
mbines both
termination of
f the contract and blacklisting of the
contractor,
learned senior
counsel urged that the two components
are legally
distinct. Termin
nation of the contract is a contractual m
matter giving
rise to a quan
ntifiable claim and hence may be refe
erred to the
Tribunal. Blac
cklisting, on the other hand, is an adm
ministrative
measure not g
generating any ascertained monetary co
onsequence,
and therefore, i
its legality can only be examined in writ j
jurisdiction.
If both are tre
eated as a single composite cause of a
action there
would arise a
possibility of conflicting findings by tw
wo different
fora on the sam
me factual matrix one before the Tribunal
concerning
termination, a
and another before the High Court
concerning
blacklisting, w
which would lead to procedural con
nfusion and
multiplicity of p
proceedings.
51. Learned senior
counsel further contended that any alleg
ged loss said
to arise from bl
lacklisting would in any event be purely
speculative
in nature. The c
consequences of blacklisting depend upo
on uncertain
future events su
uch as participation in tenders that may
or may not
be floated and h
hence such loss cannot be computed with
h reasonable
certainty. Refer
rence was made to Section 73 of the Indi
ian Contract
Act, 1872, wh
hich permits compensation only for suc
ch losses as
naturally arise
in the usual course of things or wh
hich can be
reasonably fore
eseen at the time of contract. Losses conti
ingent upon
uncertain future
e tenders according to the learned senior
counsel are
hypothetical an
nd therefore not compensable.
52. Shri Piyush M
Mathur ,learned amicus curiae and Senio
or Advocate
opened his sub
missions by setting out the interpretative
e foundation
upon which the
e Adhiniyam (“the 1983 Act”) must be
understood.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

39


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Learned senior
r counsel submitted that while interpretin
ng a statute,
three primary
y principles guide the Courts that
are strict
construction, l
liberal construction and harmonious co
onstruction.
According to th
he learned senior counsel, the Adhiniyam
m when read
as a whole rep
presents a self-contained, comprehensive
e, and well-
designed legisl
lative code. It provides for the consti
itution of a
special tribun
nal, the Madhyastham Adhikaran, in
ntended to
adjudicate disp
putes that arise from works contracts to
o which the
State Governm
ment or its public undertakings are parties.
53. Shri Mathur em
mphasized that the Act is a “perfect an
nd complete
code” capable
of dealing with all contingencies and e
eventualities
that can emerg
ge from contractual relationships betwee
en the State
and contractor
rs.The Adhiniyam prescribes the manne
er of filing
references, def
fines the nature of disputes that can be
entertained,
outlines the pr
ocedure to be followed and provides ap
ppellate and
revisional rem
medies. Learned senior counsel submitte
ed that the
Adhiniyam is
“a complete legislative ecosystem” for
contractual
disputes involv
ving the State.
54. To explain the
scope of the Act, Shri Mathur invited atte
ention to its
Preamble. Acc
cording to the learned Senior counsel thi
is Preamble
is of great imp
portance, because it shows that the legisl
lative intent
was not mere
ely to provide a forum for claiming
g monetary
compensation,
but to create a mechanism for resolu
ution of all
disputes “incid
dental to or connected with” works con
ntracts. The
language “and
d for matters incidental thereto or
connected
therewith” mus
st in his submission be construed libera
ally so as to
include every d
difference or dispute that flows from the
contractual
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

40


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
relationship,
whether it relates to execution,
discharge,
performance, o
or satisfaction of the contract.

55. Learned senior
r counsel submitted that the spirit of the
e act is not
confined to mo
onetary claims alone. Rather, it seeks to
o establish a
comprehensive
e dispute resolution mechanism for all
contractual
disagreements
between the State and contractors. The
e legislative
intention, ther
refore, is expansive, not restrictive.
Proceeding
further, Shri M
Mathur read Section 3 which provid
des for the
constitution of
the Tribunal. The language used therein
n authorizes
the State Gove
ernment to constitute the Tribunal “for r
esolving all
such disputes o
or differences pertaining to works contr
racts arising
out of or conn
nected with execution, discharge, or sat
tisfaction of
any such works
s contract.”
56. Learned senior
r counsel submitted that the use of
the phrase
“arising out of
f or connected with” gives the Tribunal
l the widest
possible jurisdi
iction. The words “connected with” are o
of particular
significance, a
as they include not only direct dispute
es, but also
consequential
matters arising indirectly from the
contractual
relationship. T
Thus, the learned Senior counsel sub
mitted that
termination of
a contract, recovery of dues, or even co
onsequential
issues flowing
g from contractual relations could fall
within the
ambit of the
Tribunal’s jurisdiction, subject to th
he statutory
limitations.
57. Having explain
ned the structure, Shri Mathur then tur
rned to the
definitions whi
ich he termed the “key determinants” of j
jurisdiction.
Under Section
2(1)(d), “dispute” has been defined to m
mean “claim
of ascertained o
or ascertainable money valued at Rs.50,0
000 or more
relating to any
y difference arising out of the executi
on or non-
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

41


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
execution of a
a works contract or part thereof.” This
s definition,
according to hi
im, places two conditions for maintainab
bility before
the Tribunal t
that are the claim must be of an asc
certained or
ascertainable m
money value of ₹50,000 or more and the
claim must
arise out of the
execution or non-execution of a works c
ontract.
58. Learned Senior
r counsel further referred to Section 2(1)
)(i) defining
“works contrac
ct,” which includes agreements, letters o
of intent, or
work orders rel
lating to construction, maintenance, supp
ply of goods
or materials,
or any such work undertaken for
the State
Government o
or its undertakings. It even includes
concession
agreements an
d services hired for carrying out work
ks. Learned
senior counsel
submitted that this wide definition sho
ows that the
legislature del
iberately used expansive terminology
to include
within its fold e
every form of contractual work or service
e performed
for the State.
59. Accordingly, S
Shri Mathur submitted that while the d
definition of
“dispute” may
appear restrictive, the definition of “work
ks contract”
broadens the
Act’s operation. Both must be rea
ad together
harmoniously.
To illustrate the completeness of the act
the learned
senior counsel
relied heavily on Section 7-A which g
governs the
reference petiti
ion. Sub-section (1) of section 7-A requ
uires that all
claims that ha
ave arisen till the filing of the referenc
ce must be
included in a
single petition, and that claims arising
from other
works contracts
s cannot be joined. However, Sub-section
n (3) creates
a further catego
ory by providing that disputes arising aft
er the filing
of the referenc
ce petition may also be entertained su
ubsequently,
subject to presc
cribed conditions.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

42


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
60. According to th
he learned senior counsel this statutory a
arrangement
ensures that ev
very conceivable dispute whether arisin
g before or
after filing the
reference can find its remedy before th
he Tribunal.
Thus, even if
a blacklisting order is issued subsequ
uent to the
termination of
a contract and after filing of the refere
ence, such a
grievance can
still be brought before the Tribunal b
by invoking
Section 7-A(3)
.
61. Shri Mathur th
en elaborated on how the Tribunal has th
he power to
protect parties’
’ interim rights. Under Section 16, the
Tribunal is
authorized to
pass an interim award. Learned seni
ior counsel
pointed out tha
at this provision does not restrict the Trib
bunal to act
only after rec
cording evidence. The phrase “after
r recording
evidence, if n
necessary” makes it clear that evidenc
ce may not
always be requ
uired, if the matter can be decided on t
the basis of
pleadings and d
documents. Therefore, where a contractor
r challenges
blacklisting du
uring pendency of the reference, the T
ribunal can
decide that issu
ue as an interim award under Section 16
6. The only
statutory requir
rement is that reasons must be given.
62. Learned senior
r counsel then connected this with Sectio
on 19 of the
Adhiniyam, wh
hich empowers the High Court to exercis
se revisional
jurisdiction ove
er the Tribunal’s award, including an inte
erim award.
The Explanatio
on to Section 19 specifically clarifies that
an “award”
includes an “i
interim award.” Thus, if the Tribunal
l passes an
interim award r
refusing or granting relief in relation to b
blacklisting,
the aggrieved p
party can approach the High Court under
r Section 19
for revision.
63. Learned senior
r counsel also emphasized on Sub-sectio
ons (2) and
(3) of Section
19. Under Sub-section (2), revision lie
es when the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

43


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Tribunal has ei
ither exercised jurisdiction not vested in
it, failed to
exercise jurisd
diction vested in it, acted illegally, or
committed
material irregul
larity or misconduct. Sub-section(3) furth
her declares
that the High C
Court’s powers in revision are equivale
ent to those
under Section
115 of the Code of Civil Procedure, 19
908, thereby
ensuring judici
ial supervision. In his submission, this
mechanism
provides suffic
cient safeguards for aggrieved parties, p
proving that
the Act is indee
ed a complete self-contained code.
64. Shri Mathur n
next dealt with Section 17-A, which pr
reserves the
Tribunal’s inh
erent powers, but imposes a restrictio
on that “no
interim order
by way of injunction, stay or attachm
ment before
award shall be
granted.” He clarified that this provisio
on concerns
interim orders,
, not interim awards. According to lea
arned senior
counsel, an in
nterim award is a formal adjudication
that finally
determines a sp
pecific issue, whereas an interim order
is merely a
temporary arran
ngement. Therefore, while Section 17-A
restricts the
Tribunal from
granting injunctions or stays, it does no
t prohibit it
from deciding
an issue like blacklisting on merits
through an
interim award.
65. Learned senior
r counsel maintained that such an award
d would be
appealable and
revisable under Section 19 and could sa
afeguard the
contractor’s rig
ghts even during pendency of the main
n reference.
Having shown
the comprehensiveness of the act, Shri M
Mathur then
turned to its l
limitations. Learned senior counsel sub
bmitted that
although the 19
983 Act is a complete code for contractu
ual disputes,
it does not con
nfer on the Tribunal any jurisdiction to e
examine the
legality or val
lidity of administrative orders, such as
s orders of
termination or b
blacklisting.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

44


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
66. Learned senior
r counsel explained that the Tribunal’s jur
risdiction is
confined to ad
djudicating contractual claims for mone
y damages,
compensation,
or payments arising from executio
n or non-
execution of a
contract. It cannot go into questions like
e whether a
termination ord
der was passed by a competent authority
y, whether it
violated princip
ples of natural justice, or whether it was m
mala fide or
ultra vires. Th
hose are questions of legality and adm
ministrative
propriety, whic
ch can only be examined by the High C
Court in its
writ jurisdiction
n under Article 226 of the Constitution.
67. Learned senio
r counsel clarified that a contractor
may claim
compensation b
before the Tribunal, but if he wishes to ch
hallenge the
legality of the t
termination or blacklisting itself, the cont
tractor must
approach the c
constitutional court. The Tribunal by de
esign is not
empowered to
“quash” or “set aside” administrative ord
ders. On the
specific questio
on of blacklisting, Shri Mathur describ
bed it as an
administrative
order rather than a contractual or sta
atutory one.
According to
him, blacklisting is a decision of the
e executive
authority decla
aring that the government or public bo
ody will no
longer deal wit
th a particular contractor in future. It is n
ot a penalty
arising out of
contract, but a preventive measure ta
aken on the
administrative s
side.
68. Learned senior
r counsel submitted that while blacklistin
ng may have
been triggered
by contractual conduct, it is not emanatin
ng from the
contract. It is
an independent executive act that se
evers future
commercial rel
lations and thereby restricts the person
n’s right to
carry on trade
e or business. Hence, it squarely affe
ects Article
19(1)(g) of the
Constitution, which guarantees the right
t to carry on
business.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

45


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
69. Learned senior
r counsel elaborated that once a person is
s blacklisted
by one governm
ment department, the effect often travels
beyond that
department, be
cause other departments, as a matter of p
policy, may
also avoid dea
aling with that person. Thus, blacklist
ting causes
severe civil con
nsequences that go beyond the contract a
and amount
to restriction o
of fundamental rights. Therefore, in his
submission,
challenges to b
blacklisting must be made before the High
h Court, not
before the Trib
bunal, because the Tribunal lacks the co
onstitutional
authority to dec
cide issues relating to fundamental rights.
.
70. Addressing the
e Court’s query on whether the restrictio
on imposed
by blacklisting
g could be justified as a “reasonable
restriction”
under Article 1
9(6), Shri Mathur agreed that all fundam
mental rights
are subject to
reasonable restrictions. However, lear
rned senior
counsel clarifi
fied that the authority to determine
whether a
restriction is “r
reasonable” lies with the constitutional c
ourts alone.
The Tribunal,
being a statutory forum, has no com
mpetence to
adjudicate con
stitutional validity. Learned senior coun
nsel further
explained that b
blacklisting though preventive in characte
er must still
conform to the
principles of natural justice and fair pla
ay. Where it
does not, it is
s liable to be set aside by the High C
Court. Only
thereafter, once
e the blacklisting order is quashed, can th
e contractor
claim losses or
damages before the Tribunal.
71. To illustrate t
the distinction between preventive an
nd punitive
measures, Shri
Mathur offered an analogy: when a pers
on commits
certain offence
s and is convicted, it is a punitive conse
equence; but
if the same per
rson is detained under the National Secu
urity Act to
prevent future
disturbances, it is preventive. Similarly,
termination
of a contract m
may be punitive, while blacklisting is prev
ventive as it
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

46


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
prevents future
e dealings. The two are distinct both in
nature and
legal consequen
nce.

72. Learned senior
r counsel emphasized that while the T
Tribunal can
examine contra
actual breaches and compensatory aspect
ts, it cannot
test preventive
e administrative orders like blacklist
ting, which
involve the ex
xercise of executive discretion and t
touch upon
constitutional f
freedoms. In cases where the order of
termination
and the order o
of blacklisting are composite, Shri Mathu
ur suggested
a dual-remedy
approach. The contractor may challenge
the legality
of both orders
in writ proceedings before the High C
Court, while
reserving the r
right to claim consequential monetary re
eliefs before
the Tribunal on
nce the orders are quashed.
73. Learned senior
r counsel cautioned that approaching th
he Tribunal
directly against
t blacklisting would be misconceived as t
the Tribunal
cannot declare
such an administrative act illegal. The
e Tribunal’s
jurisdiction is c
confined to evaluating contractual conseq
quences not
administrative v
validity.
74. Shri Piyush Ma
athur summarized his submissions that th
he 1983 Act
is a complete
and self-contained code governing all
claims and
disputes arising
g from works contracts involving the
State or its
undertakings. I
It provides for filing of references, coun
nter-claims,
interim awards
, and revisionary supervision by the High
h Court.
75. Sections 3, 7-
-A, 16, 17-A, and 19 collectively en
sure a full
mechanism for
r adjudication of contractual claims. The
e Tribunal’s
jurisdiction is
s limited to contractual disputes
involving
ascertainable m
monetary claims. It cannot adjudicate
e upon the
legality or cons
stitutionality of termination or blacklistin
ng orders, as
these are adm
ministrative actions and not contractu
ual matters.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

47


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Blacklisting af
ffects the fundamental right to trade o
or business
under Article 1
19(1) (g) and therefore falls within the
supervisory
jurisdiction of t
the High Court. Any claim for damages
or loss due
to blacklisting
can arise only after such an order is decla
ared illegal;
till then, no “a
ascertained or ascertainable” claim exists
s within the
meaning of Sec
ction 2(1)(d).
76. Learned couns
el in conclusion thus submitted that “th
he Act is a
complete code
for its subject, but not a cure for all prob
blems.” The
Adhiniyam gov
verns all matters that flow from the contr
ract, but not
those that aris
se independently of it such as blacklist
ting, which
being an admi
inistrative act affecting fundamental ri
ghts stands
beyond the Tri
ibunal’s competence and within the exclu
usive realm
of constitutiona
al adjudication.
77. Shri Ravindra
a Singh Chhabra , learned amicus curiae
e and Senior
Advocate subm
mitted that the losses arising out of a
an order of
blacklisting can
nnot be said to be ascertainable or asser
rtive within
the meaning of
f Section 2(1) (d) of the Adhiniyam. Lea
arned Senior
Counsel conten
nded that such loss is in essence, spec
culative and
hypothetical i
in character being based not on e
existing or
quantifiable da
amages, but on uncertain future events
such as the
possibility of se
ecuring government contracts.
78. Drawing suppo
ort from Black’s Law Dictionary (11t
th Edition)
learned Senior
Counsel submitted that the term “asce
ertainable”
denotes the sus
sceptibility of something to a definitive a
and assured
determination.
Since losses stemming from blacklisting
hinge upon
indeterminate
factors such as future bidding, adm
ministrative
discretion and
the competitive environment, they are in
ncapable of
being definitive
ely assessed. These losses do not arise
naturally in
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

48


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
the usual cours
se of events and are therefore outside th
he statutory
scope of claim
mable damages under the Adhiniyam.
Reliance is
11
.T. Brij Paul Singh .
placed upon A.
79. In aid of this pr
roposition, reliance is placed upon Sectio
on 73 of the
Indian Contr
act Act, 1872 and particularly Illus
stration (i)
appended there
eto. The illustration makes it manifest th
hat where a
mill owner lose
es a government contract due to delayed
delivery of
a machine, com
mpensation may be awarded only for
the loss of
profits from th
he mill and not for the loss of the
prospective
government co
ntract, which is treated as remote and too
o uncertain.
In the same
manner, Shri Chhabra argued that a
a contractor
aggrieved by b
blacklisting cannot claim damages for in
determinate
future opportu
unities foregone. Such damages are in
ncapable of
precise comput
tation and are inherently speculative. The
refore, such
disputes do n
not qualify as “disputes” involving as
scertainable
pecuniary claim
ms within the jurisdiction of the Tribuna
al under the
1983 Adhiniyam
m.
80. Shri Chhabra fu
further submitted that the issue of blacklis
sting travels
far beyond the
e scope of mere contractual breach an
nd engages
constitutional d
dimensions. The act of blacklisting, bein
ng penal in
nature, carries
s severe civil consequences and a
affects the
fundamental rig
ghts guaranteed under Articles 14, 19(1)
)(g), and 21
of the Constitu
ution of India. The grounds on which a
blacklisting
order may be
challenge such as bias, arbitrariness, v
violation of
natural justice
e and disproportionality are matters,
which the
Tribunal being
a creature of statute with limited jurisdi
iction is not
competent to ad
djudicate upon.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

49


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
81. The remedy fo
or such grievances lies only before the w
writ court in
exercise of po
owers under Article 226. This position
n is further
buttressed by th
he fact that under Section 17A of the Adh
hiniyam, the
Tribunal is st
tatutorily barred from granting interim
m relief. In
matters of blac
cklisting, where urgent relief may be n
necessary to
prevent irrepar
rable harm to the reputation and livel
lihood of a
contractor, the
e absence of such power renders the T
Tribunal an
inefficacious fo
orum. Reliance is placed on Alok Kuma
ar Choubey
24
P. , wherein it was held that the Tribuna
v. State of M.P
al by reason
of such statuto
ory restriction cannot be treated as an
efficacious
alternative rem
medy.
82. Addressing th
he second part of the reference, Shr
ri Chhabra
submitted that
a composite order comprising both term
mination of
contract and bl
lacklisting cannot be bifurcated for the
purpose of
remedies. Emp
phasizing the lexical difference between
“common”
and “composit
te” learned Senior Counsel urged that a
a composite
order is one, in
n which the elements of termination and
blacklisting
are so interwov
ven that they lose their distinct character
and form a
new unified ent
tity. He likens such an order to a compos
site product,
formed by com
mbining elements A and B to create a new
w product X
with entirely di
ifferent properties.
83. Therefore, wh
here an order contains both termin
nation and
blacklisting, it i
is inseverable and cannot be split to conf
fine one part
to the jurisdicti
ion of the Tribunal and the other to writ j
jurisdiction.
The presence o
of blacklisting taints the entire order and th
he matter in
its entirety fal
ls within the supervisory jurisdiction o
of the High
Court. The writ
t court thus retains jurisdiction to entertai
in a petition

24
Alok Kumar Choubey Vs. Sta

ate of M.P., 2021 SCC OnLine MP 1375.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

50


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
against a com
mposite order even though a remedy
against the
termination co
omponent may exist before the Tribuna
al. To hold
otherwise woul
ld result in a fractured remedy and denial
of justice.
84. Learned Senio
or Counsel submitted that in matters
s involving
blacklisting, t
the doctrines of fairness, proportio
onality and
Wednesbury re
easonableness come into play. These prin
nciples have
been repeatedly
y invoked by the Hon’ble Apex Court t
o safeguard
against arbitrar
ry state action. In Jagdish Mandal v
v. State of
25
Orissa , the
Apex Court cautioned that while
commercial
decisions merit
t limited interference, cases involving bla
acklisting or
imposition of
penal consequences stand on a differe
ent footing,
requiring a high
her degree of fairness in action.
85. Similarly, in N
Noida Toll Bridge Co. Ltd. v. Federatio
on of Noida
26
lfare Association , the Apex Court emph
Residents Wel
hasized that
judicial review
over state contracts is justified, where co
onstitutional
principles of n
non-arbitrariness and public interest ar
re at stake.
These authorit
ties underscore that judicial review is
not ousted
merely becaus
e the dispute arises from a contract,
particularly
when the action
n complained of is punitive or stigmatic in
n nature.
86. The law is wel
ll settled that availability of an alternativ
e remedy is
a rule of discr
retion, not compulsion. In Harbanslal
l Sahnia v.
27
Corporation , the Apex Court held
Indian Oil C
d that writ
jurisdiction ma
ay be exercised despite alternate remed
dies, where
fundamental ri
ights are violated, principles of natural
justice are
breached or th
he impugned action is wholly without j
jurisdiction.

25
Jagdish Mandal Vs. State of O
26
Noida Toll Bridge Co. Ltd. V
717.
27
Harbanslal Sahnia Vs. Indian

Orissa, (2007) 14 SCC 517.
s. Federation of Noida Residents Welfare Association, (2
025) 6 SCC
Oil Corporation, (2003) 2 SCC 107.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

51


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Subsequent pro
onouncements, including Patliputra Ent
ertainment
28
rporation ,
Pvt. Ltd. v. B
Bihar State Tourism Development Cor
Muthupandee
swari v. Tamil Nadu Civil
Supplies
29
Corporation
and M.S. Actech Information Syste
em Ltd. v.
30
ers Agribusiness Consortium reite
Small Farme
erated that
blacklisting, be
eing punitive and having civil consequen
nces may be
directly challen
nged under Article 226 notwithstanding
g arbitration
or statutory fo
orums. Thus, the remedies under the
Adhiniyam
cannot eclipse
constitutional oversight in cases, wher
re the state
action of black
klisting is arbitrary, disproportionate or
violative of
fundamental rig
ghts.
87. Shri Chhabra f
further submitted that if the governmen
nt wishes to
avoid writ scru
utiny, it must issue separate orders for
termination
and blacklistin
ng. The moment the two are conjoined
d, the entire
order attracts
constitutional review. Asserting that
blacklisting
disputes lie wh
holly outside the Adhiniyam learned Sen
ior Counsel
concluded that
t the Tribunal has no jurisdiction to ent
tertain such
claims. The wr
rit court alone possesses the necessary au
uthority and
constitutional m
mandate to test such action on the tou
uchstone of
fairness, reason
nableness, proportionality, and legality.

SUBMISSIONS BY
Y OTHER ADVOCATES :
88. This bench has
s permitted all the lawyers to appear an
nd assist the
bench on the le
egal issues involved in the matter, irrespe
ective to the
fact that they ha

28
Patliputra Entertainment Pvt.
OnLine Pat 5373.
29
Muthupandeeswari Vs. Tamil
30
M.S. Actech Information Syst
MANU/DEOR/27250/2025.
ave not been appointed by any party to th
he lis .

Ltd. Vs. Bihar State Tourism Development Corporation, 2
2022 SCC
l Nadu Civil Supplies Corporation, MANU/TN/1826/2025
5.
tem Ltd. Vs. Small Farmers Agribusiness Consortium,
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

52


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
89. Shri Naman N
Nagrath , learned Senior counsel advance
ed elaborate
submissions ad
ddressing both the conceptual and ju
urisdictional
aspects of blac
cklisting and its relationship with the A
Adhiniyam.
Learned Senior
r counsel submitted that blacklisting by
y its nature,
scope and lega
l consequence is an act penal in characte
er, public in
nature, and pun
nitive in effect and therefore cannot be
treated as a
mere contractu
ual dispute or as a “quantifiable or asc
certainable”
claim within th
he meaning of Section 2(1)(d) of the Adhi
iniyam.
90. Learned senior
r counsel submitted that any attempt to b
bring such a
dispute within
the adjudicatory domain of the Tribu
unal would
offend both t
the legislative intent and the basic
tenets of
administrative l
law, which demand that punitive actions
of the State
be subjected on
nly to judicial review before a constitution
nal court.At
the threshold,
the learned Senior Counsel classified
blacklisting
orders into thre
ee categories, each distinguishable by it
ts source of
power and cha
aracter. The first category learned Sen
nior counsel
submitted that b
blacklisting is imposed by the State in ex
xercise of its
executive powe
ers under Article 298 of the Constitutio
on of India,
independently
of any contractual framework. Such
orders are
manifestations
of sovereign administrative power d
directed not
merely against
a particular contract but against particip
pation of the
contractor in f
future governmental activities. These de
ecisions are
public in natur
re, rooted in considerations of probity a
and trust in
public adminis
tration and therefore fall squarely within
n the realm
of public law.
91. The second cat
tegory is where blacklisting is carried out
pursuant to
a statutory rul
le or a formal policy framed by the S
State or its
instrumentalitie
es, prescribing the manner, conditions and
d procedure
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

53


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
for such disqua
alification. In both these situations, the
decision of
blacklisting is d
detached from the contractual relationship
p and hence
the only appro
opriate forum of redressal is the writ c
court under
Article 226, wh
here such action can be tested on grounds
s of legality,
procedural fairn
ness, proportionality and reasonableness.
92. The third cate
egory learned senior counsel submitted
d is, where
blacklisting is
undertaken by invoking a contractual
clause for
instance, wher
re a tender condition empowers the e
employer to
blacklist a con
ntractor for alleged breach or miscondu
uct. Even in
such cases Shri
i Nagrath contended the act of blacklistin
ng cannot be
reduced to a pr
rivate contractual matter for its effect tra
anscends the
four corners of
f the contract: it affects the contractors ri
ght to carry
on business wit
th the State, it carries a public stigma and
d it visits the
contractor with
h civil consequences of the highest o
order often
amounting to “
civil death” in the commercial domain.
93. Consequently,
even contractual blacklisting partakes o
f the nature
of administrati
ive action by the State, subject to co
onstitutional
limitations.The
e writ court therefore retains jurisdiction t
to judicially
review such ac
ction even if a parallel arbitral proceeding
g may exist
with respect t
to other contractual disputes like term
mination or
payment.
94. The learned Se
enior Counsel next submitted that the sta
ge at which
blacklisting is
imposed does not alter its character. It
may occur
prior to the fo
ormation of a contract, as when the reg
gistration or
enlistment of a
contractor is cancelled upon discovery o
f fraudulent
antecedents; it
may arise during the subsistence of t
the contract
either through a
a composite order of termination and bla
acklisting or
by way of two
separate orders or it may even be impos
sed after the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

54


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
conclusion of a
a contract, upon later revelation that the c
contract had
been obtained b
by fraud or misrepresentation.

95. In all such cas
es, the punitive and stigmatic consequen
nce remains
identical. What
t varies is only the timing not the nature
e of the act.
Therefore, irre
spective of the stage a blacklisting orde
er being an
administrative
penalty cannot be relegated to an arbitr
ral tribunal.
The writ court
remains the only efficacious forum for
r examining
the validity and
d propriety of such orders.
96. Proceeding to
the question of remedies, Shri Nagrath
h submitted
that where blac
cklisting is issued in exercise of sovereign
n or policy-
based powers,
the remedy lies exclusively before the
writ court.
Even in cases w
where blacklisting is contractual, the jur
risdiction of
the High Cour
rt under Article 226 remains available
to test the
action on publi
ic law parameters, including the principle
es of natural
justice, non-arb
bitrariness, and proportionality.
97. Learned senior
r counsel urged that the writ court may
y expressly
clarify that its
adjudication on the legality of blacklistin
ng shall not
prejudice the m
merits of contractual disputes pending
before the
Tribunal; never
rtheless the availability of a contractual
l arbitration
clause cannot
t displace the constitutional remed
dy.Only in
exceptional cas
ses, where the facts disclose that the wri
it petition is
not maintainab
ble due to disputed questions requirin
ng detailed
evidence may t
the High Court in its discretion relegate th
he parties to
an alternate fo
orum. But such cases are rare, as judi
icial review
remains availab
ble even when some factual controversi
ies exist, so
long as they do
o not require elaborate evidence.
98. The learned Se
enior Counsel then turned to the core
question of
quantification
of losses and damages arising from b
blacklisting.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

55


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Learned Senio
or Counsel submitted that the decision
n in Gouri
1
Ganesh holdi
ing such losses to be “ascertainable” w
was legally
unsustainable.
Learned Senior Counsel elaborated
that under
Section 73 of t
the Indian Contract Act, 1872, compensa
ation can be
awarded only f
for losses, which have actually occurred
d and which
naturally arose
e in the ordinary course of events from
m a proven
breach.
99. The statutory la
anguage using the expressions “caused”
and “arose”
clearly contem
mplates past events, not speculat
tive future
contingencies.
A contractor cannot claim damages mere
ely because,
during the pen
ndency of a blacklisting order, he was
s unable to
secure future c
contracts, since such inability is hypot
thetical and
contingent upo
on multiple independent factors. Furt
ther, if the
blacklisting is
ultimately found to be justified, there
can be no
compensable l
loss at all. Thus, a claim for damage
s based on
blacklisting ari
ses only after the order has been adjudge
ed illegal by
a competent
forum. Prior to such declaration, n
no right to
compensation a
accrues.
100. Shri Nagrath
therefore contended that the cause of
f action for
claiming dama
ages crystallizes only upon judicial dec
claration of
illegality not o
n the date of blacklisting itself. Until th
hen, the loss
remains indeter
rminate and unascertainable. Moreover,
Section 73
expressly exclu
udes compensation for “remote or ind
direct loss”.
Loss of future
business opportunities arising incident
ally from a
blacklisting ord
der is not only remote but also relates to t
transactions
with third parti
ies which fall entirely outside the contrac
ctual matrix.
Hence, any su
uch claim would be barred by the seco
ond limb of
1
h that losses
Section 73. Acc
cordingly, the assertion in Gouri Ganesh
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

56


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
arising from b
blacklisting are quantifiable or ascertain
nable at the
time of claim
filing is inconsistent with both statuto
ry text and
principle.
101. In continuation
n, the learned senior counsel examined th
he effect of
the 2019 amend
dment to Section 2(1)(d) of the Adhiniyam
m, whereby
the word “as
certainable” was added to the exist
ting phrase
“ascertained cl
laim.” Learned Senior Counsel submitte
ed that this
amendment wa
as merely clarificatory and procedural,
designed to
include claims
that were accrued but not yet comput
ed, such as
pending bills, r
renewal fees, or commission charges ari
ising during
the pendency
of an existing claim. It cannot be int
terpreted to
extend jurisdic
ction over claims, which had not yet ari
isen in law,
such as those d
dependent upon a future declaration of ille
egality.
102. The amendmen
nt learned senior counsel argued was nev
ver intended
to transform sp
peculative grievances into arbitrable di
sputes. The
term “ascertain
nable” refers to claims that are capabl
le of being
measured or cry
ystallized within the same proceeding, no
ot to claims,
which depend u
upon a future contingency like the outcom
me of a writ
petition declar
ring blacklisting to be illegal. Thus, i
in cases of
blacklisting, si
ince the compensatory right arises on
nly after a
subsequent ad
djudication such disputes cannot be
treated as
“ascertainable”
” within the meaning of the amended prov
vision.
2
hways and
103. With respect to
o the Full Bench decisions in Viva High
1
h , Shri Nagrath urged that Viva Highw
Gouri Ganesh
ways, which
attained finality
y as its findings were not disturbed by th
he Supreme
1
er Full Bench in Gouri Ganesh while pu
Court. The late
urporting to
expand the Trib
bunal’s jurisdiction failed to notice the b
inding ratio
2
hways and proceeded without exam
of Viva Hig
mining the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

57


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
substantive law
w under Section 73 of the Contract Act.
. Therefore,
1
h to the extent it implies otherwise canno
Gouri Ganesh
ot be treated
as laying down
n good law and must yield to the earlier pr
recedent.
1
i Ganesh ’s
104. Learned Senior
r Counsel further contended that Gouri
reliance on Sec
ction 34 of the Specific Relief Act, 1963
to hold that
a declaration
of illegality of blacklisting must nec
cessarily be
accompanied
by a claim for consequential d
damages is
fundamentally
misplaced. Section 34 applies o
only when
consequential r
relief is available and capable of being so
ought at the
time of filing.
Since, in the context of blacklisting, n
no cause of
action for dam
mages arises until the order is declared
illegal, the
ability to seek
such consequential relief does not exist
at the time
of filing.
105. Therefore, the b
bar of Section 34 does not apply. In fact
t, Section 7-
A (2) of the A
Adhiniyam expressly allows a claimant to
o relinquish
monetary claim
ms, thereby recognising the right of a part
ty to restrict
its challenge to
o declaratory relief alone. To hold other
rwise would
result in an abs
surdity and even writ courts, which rout
tinely quash
blacklisting or
rders without any monetary claim,wou
uld then be
rendered incom
mpetent to entertain such challenges.
Thus Shri
Nagrath demo
onstrates the fallacy of the reasoning
g in Gouri
1
Ganesh .
106. The learned Sen
nior Counsel then emphasized that blackl
listing in all
its forms is p
punitive and entails serious civil and r
reputational
consequences.
Drawing analogy from cases relating to
o imposition
of monetary
penalties or recoveries learned Senio
or Counsel
submitted that
it is settled law that when a contractor di
isputes such
penalties and i
initiates legal proceedings, the recovery
must await
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

58


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
the outcome o
of adjudication. The same principle ap
pplies with
greater force to
o blacklisting, which imposes an embarg
go on future
business and
destroys the entity’s commercial
existence.
Consequently,
any order of blacklisting must ei
ither await
adjudication or
r remain in suspension pending the outc
come of the
contractor’s cha
allenge.
107. Finally, addre
essing the efficacy of remedies, Sh
hri Nagrath
submitted that e
even assuming that claims of damages ar
rising out of
blacklisting we
ere theoretically maintainable before th
he Tribunal,
the procedural
precondition under Section 7-B of the
Adhiniyam
requiring an
approach to the departmental autho
rity before
invoking the Tr
ribunal’s jurisdiction renders such a reme
edy illusory
and ineffective
.
108. In matters invo
olving immediate civil and commercial d
disablement
such as blackli
isting or encashment of bank guarantees
only a writ
petition affords
s an immediate, efficacious and preventi
ive remedy.
The Tribunal p
rocedure being sequential and delayed of
ffers no real
relief against t
the operative force of blacklisting. Thu
us, the only
efficacious and
d constitutionally consistent forum remain
ns the High
Court exercisin
ng writ jurisdiction.
109. In summation,
the learned Senior Counsel urged that
blacklisting
irrespective of
its source or form is not an arbitrable di
spute under
the Adhiniyam
m; that damages therefrom arise only u
upon a later
judicial declara
ation of illegality; that the 2019 amendm
ment of the
Adhiniyam add
ding the word “ascertainable” does not
enlarge the
1
anesh is per
Tribunal’s juris
sdiction; that the decision in Gouri Ga
2
far as it deviates from Viva Highways
incuriam in so
; as Section
34 of the Spec
cific Relief Act has no application to a
declaratory
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

59


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
challenge to bl
acklisting; and that such punitive orders,
, having the
effect of civil d
death, can be subjected only to judicial re
eview by the
constitutional
courts. Therefore, the learned Senio
or Counsel
concluded that
t the remedy under Article 226 is
not merely
available, but
exclusive and the Tribunal constituted
d under the
Adhiniyam has
s no jurisdiction to entertain or determi
ine disputes
arising out of o
or consequent upon an order of blacklistin
ng.
110. Learned Senio
or counsel further submitted that the
State had
wrongly tried
d to treat the expressions “a
scertained,”
“ascertainable,”
” and “quantified” as meaning the same
thing under
Section 2(1)(d
d) of the Adhiniyam. Learned Senio
or Counsel
explained that
these words refer to different stages of a
a claim. An
ascertained cla
aim is one that is already determined a
and fixed in
amount when t
the case is filed. An ascertainable claim
is one that,
though not yet
t calculated, can be determined from t
the existing
evidence or re
ecord. But a claim for loss due to bla
acklisting is
neither ascertai
ined nor ascertainable at the time of fili
ing because
such loss has n
not yet happened. It may arise only if, late
er, the order
of blacklisting
is declared illegal. Till then, there is n
no actual or
measurable loss
s.
111. The learned Se
enior Counsel further pointed out that lo
osses caused
by blacklisting
g are completely different from losses
caused by
termination of
contract. In termination cases, the caus
se of action
and the amoun
nt of loss are generally known, when t
the contract
ends for exam
mple, unpaid bills or damages for del
lay. But in
blacklisting, th
he alleged loss depends on future even
nts, like the
contractor’s di
isqualification from future tenders, whi
ich may or
may not happe
en. In some cases, no tender may even
n be issued
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

60


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
while the contr
ractor is blacklisted. Hence, the loss at
the time of
filing is zero o
or nil, and such a claim cannot fall un
nder Section
2(1)(d) of the A
Adhiniyam, which requires a claim to be b
based on an
ascertained or a
ascertainable monetary dispute.
112. Learned Sen
nior Counsel submitted that
in Gangotri
14
Enterprises d
dealt with losses that had already occurred
d and could
be determined
during the proceedings. Those rulings d
do not apply
here because
blacklisting losses arise only after a
adjudication
declaring the
order to be illegal not before. Thus
s, they are
speculative and
d outside the Tribunal’s jurisdiction.
113. The learned Se
enior Counsel emphasized that the jurisdi
iction of the
Tribunal is lim
mited to disputes arising out of executi
ion or non-
execution of
a works contract. Losses claimed b
because of
blacklisting, ho
owever, often relate to other contract
s or future
tenders, which
h are beyond the particular works
contract in
question. If the
e State’s argument were to be accepted, t
the Tribunal
would have to
examine tenders and contracts to which
h it is not a
party, which is
not permitted under the Adhiniyam.
114. Learned Senior
r Counsel cited decisions of the High Cou
urt in MBL
31
velopment Co. v. MPRDC and M/s
Highway Dev
s Aryavrat
32
t. Ltd. v. MPRDC wherein arbitr
Tollways Pvt
rators were
appointed unde
er the Arbitration and Conciliation Act, 1
996 instead
of the Tribuna
al, because the disputes involved multip
ple or third-
party agreemen
nts beyond the scope of the Adhiniyam. T
The Hon’ble
Apex Court h
has affirmed these decisions showin
g that the
Tribunal’s pow
wers are strictly confined to works contrac
cts.

31
MBL Highway Development
32
M/s Aryavrat Tollways Pvt. L

Co. Vs. MPRDC, AC No.50/2021.
Ltd. Vs. MPRDC, ARB P 107/2024.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

61


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
2
Highways
115. Shri Nagrath s
submits that the Full Bench in Viva
correctly held t
that losses arising due to order of blacklis
sting are not
quantifiable. Th
hat judgment has been upheld by the Sup
preme Court
by dismissal of
f SLP (C) No. 17070/2017 and has also
o been cited
with approval
in Umri Pooph Pratappur (UPP) Tol
llways Pvt.
33
Road Development Corporation . Ther
Ltd. v. M.P. R
refore, Viva
2
Highways rem
mains binding law and the later judgmen
nt in Gouri
1
Ganesh cannot
t overrule or dilute it.
116. He submits tha
at blacklisting cannot be treated as a “
“difference”
rather than a “d
dispute”.Section 2(1)(d) clearly defines “
“dispute” as
a claim relating
g to any “difference” arising out of a wor
rks contract.
Thus, a “differe
ence” becomes a “dispute” only when it
results in a
monetary claim
m that is ascertained or ascertainable.
117. The learned Se
enior Counsel submitted that considering
blacklisting
separately from
m termination would amount to splitting
g a cause of
action. Learne
d Senior Counsel submitted that termi
ination and
blacklisting are
e two separate and independent action
ns, wherein
termination aris
ses out of contract while blacklisting is a
an executive
action having p
public law elements. The principle again
nst splitting
cause of action
n does not apply to such distinct remedi
es. Learned
Senior Counse
el referred to the judgments of the Ho
n’ble Apex
34
Biyani v. State of M.P. and Blue
22
e dreams .
Court in B.C.
Likewise, the D
Division Bench of this Court in M/S.G
ulshan Rai
35
Municipal Corporation Bhopal set
Jain II v. M
aside the

33
Umri Pooph Pratappur (UPP)
OnLine SC 1569.
34
B.C. Biyani Vs. State of M.P.
35
M/s. Gulshan Rai Jain II Vs. M

Tollways Pvt. Ltd. Vs. M.P. Road Development Corpora
ation, 2025 SCC
, 2016 SCC OnLine SC 2070.
Municipal Corporation Bhopal, WP No.26679/2024.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

62


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
blacklisting po
rtion of a composite order and left the
termination
dispute to the T
Tribunal.

118. On the claim o
of the State that speculative or conseque
ential losses
can still be qua
antified, the learned Senior Counsel sub
bmitted that
this view ignor
res the plain language of Section 73, whic
ch expressly
bars recovery o
of remote or indirect losses. The State it
tself accepts
this in its ow
wn written submissions, where it con
ncedes that
speculative los
sses cannot be awarded. Similarly, the
Delhi High
36
i Paper Products v. Union of India
6
rejected a
Court in Delhi
claim based
on blacklisting as being “too re
emote and
fundamentally
flawed.”
119. As to the arg
gument that the Tribunal may at lea
ast grant a
declaratory reli
ief against blacklisting, Shri Nagrath sub
bmitted that
this question d
does not arise at all because the Trib
bunal lacks
jurisdiction to e
entertain such matters in the first place. A
A reference
petition cannot
t be maintainable when the monetary c
claim at its
inception is ni
il or unquantified. Allowing such petit
tions would
mean that the
Tribunal could entertain disputes base
ed on mere
possibilities or
future contingencies, which is contrary to
o law.
120. Learned senior
r counsel submitted that the Full Bench
h in Gouri
1
Ganesh whil
le expanding the scope of Section
2(1)(d) by
importing Sect
tion 34 of the Specific Relief Act and
reading in
declaratory an
nd consequential reliefs virtually over
rruled Viva
2
Highways wit
thout reference although both benches we
ere of equal
strength. Acco
ording to learned senior counsel such e
enlargement
amounts to jud
dicial legislation, impermissible even i
n reference
jurisdiction.

36
Delhi Paper Products Vs. Uni

on of India, 2023 SCC OnLine Del 154.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

63


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
121. In conclusion,
the learned Senior Counsel submitted th
hat the State
seeks to shield
d its administrative actions from judicial
l review by
forcing contrac
ctors to approach the Tribunal even i
in cases of
blacklisting. L
Learned Senior Counsel submitted that
this would
have serious a
and unjust results as it would allow
speculative
damage claims
against the State while denying immedi
iate judicial
scrutiny of its
punitive orders. Learned Senior Couns
el therefore
urged to hold t
that challenges to blacklisting are not arb
bitrable and
not maintainab
ble before the Tribunal and lie only befo
re the High
Court under A
Article 226 of the Constitution as matter
rs of public
law and admini
istrative fairness.
122. Shri Shekhar
Sharma , learned Senior Advocate at
t the outset
submitted that b
blacklisting in the State of Madhya Prade
esh operates
under the regi
istration policy of the State Governm
ment and is
entirely diverg
ed from any contractual clause thus a c
challenge to
blacklisting lie
s only under Article 226 of the Constitu
ution, and a
writ petition is
the sole efficacious remedy.
123. Elaborating Sh
hri Sharma traced the evolution of
the State’s
framework beg
ginning with the policy of 1999 under
which each
department mai
intained its own registration and disciplin
nary panels.
th
r dated 17
This decentrali
ized system was replaced by the order
August 2011
which introduced centralized registrat
tion and a
comprehensive
e mechanism governing suspension, c
cancellation,
demotion and b
blacklisting.
124. The 2011 orde
er designated the Chief Engineer as the
e competent
authority to ini
itiate action requiring a reasoned order
after notice
hearing and al
so provided an appeal to the Engineer-
-in-Chief or
equivalent who
ose decision was declared final and bi
inding. The
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

64


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
2015 amendme
ent retained only suspension and blacklist
ting thereby
codifying a se
elf-contained system applicable to all d
departments,
boards and cor
rporations of the State. According to lea
arned senior
counsel this fr
ramework constitutes a complete and i
independent
code supersedi
ing any inconsistent provisions in indivi
idual works
contracts and le
eaving no scope for arbitral adjudication.
37
ate of Orissa v. Bhagyadhar Das lea
125. Relying on Sta
arned senior
counsel submit
tted that where an instrument declares
a decision
final the matter
r becomes an exceptional matter outside
arbitration.
Since the 2011
1 policy confers finality on the appella
ate decision
blacklisting und
der it cannot be referred to arbitration. T
The learned
Senior Couns
el also cited State of Orissa vs
Damodar
38
Das ,wherein
the Apex Court held that a clause
making an
engineer’s dec
cision “final and binding” such a fina
ality clause
merely exclude
es arbitral recourse. Hence, when the p
policy itself
provides an app
pellate hierarchy culminating in finality,
the subject-
matter is exclu
uded from the Tribunal’s jurisdiction a
and can be
examined only
in writ proceedings.
126. Learned senior
r counsel further classified blacklistin
g into two
distinct catego
ories: (i) pre-contractual, where misrep
presentation,
forgery at the
bidding stage leads to debarment and
d (ii) post-
contractual, wh
here fraudulent acts such as misuse of
advance or
embezzlement
during performance trigger
disciplinary
proceedings. I
In both situations learned senior counsel
l contended
that the power
of blacklisting emanates from the statu
utory policy
and not from th
he contract. The authority passing the ord
der typically

37
State of Orissa Vs. Bhagyadha
38
State of Orissa Vs. Damodar D

ar Das, (2011) 7 SCC 406.
Das, (1996) 2 SCC 216.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

65


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
the Chief Engin
neer or registering authority is not even a
contracting
party. Consequ
uently, the dispute does not arise “
“out of the
execution or n
non-execution of a works contract” as r
required by
Section 2(1) (d
) of the Adhiniyam.
127. Shri Sharma a
also drew attention to the statutory sch
heme of the
Adhiniyam an
nd the Madhyastham Adhikaran Ru
ules, 1984,
submitting tha
at Rule 10(2) of the said Rules prescr
ribes an ad
valorem fee b
based on the amount claimed which
necessarily
confines the Tr
ribunal’s jurisdiction to monetary claims
s capable of
computation. D
Declaratory, injunctive or administrative
e reliefs are
by implication
excluded. Shri Sharma stressed that blac
cklisting has
grave constitut
tional implications, resulting in civil d
eath of the
contractor. It
directly infringes Articles 14, 19(1) (g
g), and 21,
destroying pro
fessional reputation and livelihood. An
y monetary
loss alleged to a
arise therefrom such as future tender opp
ortunities is
inherently spec
culative and unascertainable. The Tribun
nal which is
confined to
quantified monetary claims cannot
grant any
efficacious reli
ief in such cases therefore, the remed
dy lies only
under the writ j
jurisdiction of this Court.
128. Regarding com
mposite orders, learned senior counsel sub
bmitted that
termination a
and blacklisting are distinct and
severable.
Termination be
eing a contractual action, may be refe
erred to the
Tribunal but
blacklisting, being policy-based rem
mains non-
arbitrable. Eve
en if both are contained in one order, the
blacklisting
part must be te
ested in a writ petition as judicial review
w cannot be
ousted where
constitutional rights are affected. Imp
posing both
termination and
d blacklisting for the same act amount
s to double
jeopardy offend
ding Article 20(2) of the Constitution.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

66


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
129. Adverting to t
the definition of “dispute” in Section 2
2(1)(d), the
learned Senior
r Counsel maintained that the Adhiniya
am restricts
jurisdiction to
claims of ascertained or ascertainable m
money. Only
such claims as
s can be scientifically quantified under
Sections 73
and 74 of the
Indian Contract Act, 1872 fall within
n its scope.
Learned senior
r counsel further relied on Tulsi Naraya
an Garg v.
39
. to show that only quantified claim
State of M.P
ms may be
recovered pursu
uant to an award and on Devendra Kum
mar Patel v.
4
State of M.P.
40
to illustrate that suspension or blackl
listing is an
immediate ad
dministrative measure independent o
of arbitral
adjudication.
130. Shri Sharma co
oncluded that blacklisting in Madhya Pr
radesh is an
action under st
tatutory policy not under a works contra
act and that
the finality clau
use in the 2011 policy excludes arbitrati
ion and that
writ jurisdictio
on is the sole remedy and hence the ju
dgement of
2
ys lays down the correct restrictive interp
Viva Highway
pretation of
1
Ganesh .
“dispute”, whic
ch has been erroneously diluted in Gouri
131. He further subm
mitted that no reply has been placed on re
ecord by the
learned Advoca
ate General clarifying the stand of the Sta
ate in regard
to the policy go
overning blacklisting. Despite repeated re
eferences to
the orders of 1
1999, 2011 and 2015 and the binding na
ature of the
centralized reg
gistration policy, the State has not stat
ted whether
blacklisting is i
indeed exercised under that policy or ind
dependently
under the cont
tract. This omission learned senior cou
unsel urged
assumes signifi
ficance because the existence of the polic
cy as a self-

39
Tulsi Narayan Garg Vs. State
40
Devendra Kumar Patel Vs. St

of M.P., (2009) 10 SCC 648.
ate of M.P., WP No.4316/2022.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

67


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
contained code
would by itself take the subject outside t
the ambit of
the Adhiniyam
.

132. Learned sen
nior counsel submitted that t
the Viva
2
Highways con
fines the Tribunal’s jurisdiction
strictly to
ascertained or
ascertainable monetary claims arising
g from the
1
reas Gouri Ganesh impermissibly exp
contract, wher
pands it to
cover even de
eclaratory and consequential reliefs. Ac
ccording to
learned senior c
counsel Clause 2(1) (d) of the Adhiniyam
m is explicit
that only dispu
utes concerning ascertained sums are cog
gnisable and
speculative los
s cannot be equated with a “dispute” und
der the Act.
1
Ganesh travels far beyond the jurisdictio
Hence, Gouri G
n.
133. Shri Anshum
man Singh, learned counsel comm
menced his
submissions by
y stating that the power of blacklisting e
exercised by
the State or its
instrumentalities does not stem from any
y clause of a
works contract,
, but flows from the inherent executive p
power of the
State under Art
ticle 298 of the Constitution of India.
134. Learned counse
el submitted that the decision of the State
e to debar or
blacklist a co
ontractor is an exercise of executive
e discretion
grounded in pu
ublic policy and administrative necessity
and is not a
contractual rig
ght arising out of mutual consent.T
The act of
blacklisting lea
arned counsel submitted is prospective in
n nature and
is intended to r
regulate the future conduct of the Govern
nment in its
dealings with c
contractors and therefore cannot be des
scribed as a
“dispute arisin
ng out of or in relation to the executi
on or non-
execution of a
works contract” within the meaning of S
Section 2(1)
(d) of the Adh
hiniyam. It is, in essence, an executive
and policy
measure having
g civil consequences that affect a perso
on’s right to
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

68


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
trade and carry
y on business thereby attracting the pr
rotection of
Articles 14, 19(
(1) (g) and Article 21 of the Constitution.
.

135. Learned counse
el then referred to authoritative legal de
efinitions to
explain the co
oncept and nature of blacklisting. Learn
ned counsel
cited Black’s L
Law Dictionary (5th Edition, 1979) , wh
hich defines
a blacklist as “
“a list of persons marked out for special
l avoidance,
antagonism, or
enmity by those who prepare it” and also
o referred to
P. Ramanatha
a Aiyar’s Law Lexicon (1997 Edition) ,w
wherein it is
defined as “a l
list of persons or firms unworthy of cre
edit, or with
whom it is not
advisable to enter into contracts.”
136. These definitio
ons learned counsel pointed out have bee
en judicially
noticed and qu
uoted with approval by the Hon’ble Ape
ex Court in
41
of India v. Rajesh Agarwal ,wherein
State Bank o
n the Court
observed that b
blacklisting has serious reputational and
d economic
implications th
hat go beyond ordinary contractual disput
tes. Relying
9
Engineering , learned counsel submitte
on M/S Patel
ed that even
in the absence
of any contractual clause providing for b
blacklisting,
the Governmen
nt retains the inherent power under Art
ticle 298 to
decide with wh
hom it shall enter into contractual relat
tions in the
future. The Ap
pex Court in this decision had held that
the right of
the State to b
lacklist is an executive function distin
nct from its
contractual righ
hts, but that such power must be exerc
cised fairly,
reasonably and
d in conformity with constitutional princip
ples.
137. Developing thi
is argument further, Shri Singh referred
to Gorkha
10
Security and
5
Kulja Industries to emphasise that bla
acklisting is
an administrati
ive act having civil and penal consequen
nces, which
affect a contra
actor’s reputation and right to carry o
on business.

41
State Bank of India Vs. Rajesh

h Agarwal, (2023) 6 SCC 1.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

69


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Hence, such o
orders are required to satisfy the tests
of fairness,
proportionality
and reasonableness under Article 14.

138. Learned couns
sel also referred to the recent judgme
ents of the
21
t in Techno Prints and Blue Dreamz
22
z , wherein
Supreme Court
the Court reaff
ffirmed that the power of State to black
klist though
inherent must
conform to the principles of natural
justice and
cannot be exerc
cised arbitrarily. Learned counsel stresse
ed that these
authorities colle
ectively establish that blacklisting is a pu
ublic law act
subject to con
nstitutional review and not a contrac
ctual claim
determinable by
y a statutory tribunal confined to money d
disputes.
139. Shri Singh the
en traced the legislative history and purp
rpose of the
Adhiniyam and
d submitted that the enactment was a resp
ponse to the
growing backlo
og of civil suits and private arbitrations i
n the 1970s
and 1980s rela
ating to public works contracts, which
h frequently
resulted in inju
unctions that stalled essential public pr
rojects. The
Legislature in o
order to ensure continuity of developmen
nt works and
prevent disrupt
tion of public infrastructure created a
specialized
statutory tribun
nal to adjudicate limited disputes of mone
etary nature
between contra
actors and the State. The focus of the ena
actment was
not to create an
n alternate system of general civil adjud
dication, but
to restrict the
jurisdiction of the Tribunal to quantifia
able money
claims arising
directly from the execution or non-ex
xecution of
works contracts
s.
140. Learned couns
sel referred to M.P. Rural Road De
evelopment
42
L.G. Chaudhary - I and to L.G Chaud
43
dhary - II
Authority v. L
to show that
the jurisdiction of the Tribunal is ex
xclusive in

42
M.P. Rural Road Developmen
43
L.G. Chaudhary-II, (2018) 10

nt Authority Vs. L.G. Chaudhary-I, (2012) 3 SCC 495.
SCC 826.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

70


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
form,but narrow
w in substance as it is confined only to m
matters that
can be translate
ed into ascertained or ascertainable money
y claims.

141. He further relie
ed on the text of Section 2(1) (d) of the
Adhiniyam
and emphasize
d that this definition restricts the jurisdi
ction of the
Tribunal to m
money claims only and excludes adm
ministrative,
declaratory or
constitutional issues. The Tribunal can
nnot declare
rights, set asid
de executive orders, or grant injunction
ns. Reliance
was placed on
n Progressive Construction Pvt. Ltd. v
v. Madhya
44
ricity Board , wherein the High Court h
Pradesh Electr
held that the
Tribunals thoug
gh vested with certain powers of a civil
l court, is a
limited forum
empowered only to decide monetary d
disputes and
cannot issue de
eclaratory or injunctive reliefs. Learned c
counsel also
cited Upper
Doab Sugar Mills Ltd. v. Shahda
ara (Delhi)
45
Light Railway Co. Ltd. , wherein the A
Saharanpur L
Apex Court
held that statut
tory tribunals cannot exercise powers be
eyond those
conferred upon
n them by law and that questions of
f equity or
convenience ca
annot expand their jurisdiction.
142. Learned couns
sel then further submitted that the F
Full Bench
1
ouri Ganesh and the Division Bench
decision in Go
decision in
19
thers have misconstrued the scop
Awasthi Bro
pe of the
Adhiniyam by
y conflating contractual disputes with
h executive
decisions. Lear
rned counsel submitted that the Full Benc
ch in Gouri
1
Ganesh held in
nter alia that a contractor challenging ter
rmination of
contract is in
effect seeking specific performance an
nd therefore
must approach
h the Tribunal and that a mere declar
ratory relief
against termina
ation is meaningless without a claim for d
damages.

44
Progressive Construction Pvt.
45
Upper Doab Sugar Mills Ltd.
217.

Ltd. Vs. Madhya Pradesh Electricity Board, 1996 SCC O
OnLine MP 779.
Vs. Shahdara (Delhi) Saharanpur Light Railway Co. Ltd.
., AIR 1963 SC
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

71


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
143. Learned coun
nsel respectfully disagreed with this
reasoning
submitting tha
at it is legally unsustainable, becau
se specific
performance is
a remedy exclusively within the jurisdic
tion of civil
courts under S
Sections 10 to 14 of the Specific Relief
f Act, 1963.
The Tribunal b
being a statutory body cannot grant such
a relief nor
can it restore a
a terminated contract.Its function is limi
ited only to
awarding comp
pensation for monetary loss resulting from
m breach.
144. Shri Singh furt
ther submitted that the Division Bench
in Awasthi
19
Brothers co
ommitted a similar error by holding
that when
termination of
f contract is already before the Tr
ibunal, the
blacklisting asp
pect must also be raised before the same
e forum as a
“consequential
relief” under Section 7-A of the A
Adhiniyam.
According to
him, such reasoning reflects a categor
ry mistake,
because termin
nation and blacklisting are two differen
nt causes of
action. Termina
ation concerns the rights and obligations
s arising out
of a specific w
works contract, whereas blacklisting is a
prospective
administrative
action excluding the contractor from
m all future
contracts. The
analogy to Order II Rule 2 of the Co
ode of Civil
Procedure was
therefore, in his view, wholly inappropr
riate, as the
proceedings be
efore the Tribunal are not civil suits
and a writ
petition under
r Article 226 cannot be equated wi
ith a civil
proceeding so a
as to attract such procedural bars.
145. Learned counse
el next addressed the question, whether
loss arising
out of blacklis
sting could ever be described as “asc
certained or
ascertainable m
money” within the meaning of Section 2(1
1) (d) of the
Adhiniyam. Le
earned counsel submitted that such loss,
by its very
nature, is specu
ulative and incapable of precise calculatio
on. In a case
of termination,
damages are ascertainable, because they
y are linked
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

72


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
to the contract
itself such as unpaid bills, cost of mater
rials, or loss
of profit on
the unexecuted portion of work.The
ese can be
determined on
the basis of tender rates, records or estab
blished legal
principles.
146. However, in a
a case of blacklisting, the alleged loss
arises from
exclusion from
m all future contracts, the occurrence and p
profitability
of which are i
inherently uncertain. It depends upon h
hypothetical
events, whether
r tenders will be issued, whether the con
ntractor will
participate, wh
hether it will succeed and what profit it
might have
made. Therefo
ore, such loss cannot be termed as “as
scertainable
46
dia Radio
money.” Learn
ned counsel relied on Unibros v. All Ind
and Batliboi
Environmental Engineers Ltd. v.
Hindustan
47
rporation Ltd. .
Petroleum Cor
147. Learned couns
sel further submitted that the remedy
before the
Tribunal is n
neither adequate nor efficacious. Alt
though the
Adhiniyam wa
as intended to provide a speedy forum,
in practice
matters remain
n pending for years together. Learn
ned counsel
referred to W.P
P. No. 292 of 2021, where documentar
ry evidence
was placed on
record to show that claims filed as ear
rly as 2005
remain undecid
ded. Such inordinate delay defeats the
e legislative
purpose and lea
aves parties remediless.
148. Learned coun
nsel therefore submitted that even
assuming
jurisdiction exi
isted, the Tribunal does not provide an “e
efficacious”
remedy as un
nderstood in law. Relying on the d
decision in
48
State of M.P. learned counsel a
Dhulabhai v.
argued that
exclusion of ci
vil court’s jurisdiction is permissible onl
ly when the

46
Unibros Vs. All India Radio, 2
47
Batliboi Environmental Engin
48
Dhulabhai Vs. State of M.P., A

2023 SCC OnLine SC 1366.
neers Ltd. Vs. Hindustan Petroleum Corporation Ltd., (202
24) 2 SCC 375.
AIR 1969 SC 78.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

73


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
special statute
provides a complete, adequate, and
efficacious
remedy. Since
e the Tribunal cannot quash blacklist
ting orders,
cannot issue d
declaratory reliefs, and cannot act pro
omptly, the
constitutional r
remedy under Article 226 only remains
open to the
aggrieved party
y.
149. Addressing the
e second point of reference, Shri Singh
h submitted
that such an
n order consists of two distinct c
components.
Termination of
f a works contract may fall within the s
scope of the
Tribunal, but
blacklisting, being an executive act,
does not.
Learned couns
sel contended that compelling the co
ontractor to
approach two
separate forums would cause mult
tiplicity of
proceedings an
nd inconsistent decisions. Since the Tribu
unal cannot
grant relief ag
gainst blacklisting, a writ petition befor
re the High
Court is mainta
ainable against the composite order in its
entirety.
150. In support o
of this,learned counsel referred to
Whirlpool
20
Corporation
, wherein the Supreme Court held that th
he existence
of an alternativ
ve remedy does not bar writ jurisdiction
n, where the
impugned acti
on is violative of natural justice or f
fundamental
rights. As blac
cklisting directly affects the contractor
r’s right to
livelihood und
der Article 19(1) (g), the writ Court’s
jurisdiction
under Article
226 is both appropriate and necessary
y to ensure
complete justic
ce. In summation, learned counsel sub
bmitted that
blacklisting is
s an independent administrative act
ion not a
contractual disp
pute and that the loss arising from such a
action is not
ascertainable in
n terms of Section 2(1)(d) of the Adh
hiniyam and
since the Trib
bunal lacks jurisdiction to grant dec
claratory or
injunctive relie
efs and the statutory remedy before it
t is neither
adequate nor ef
fficacious.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

74


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
151. Learned coun
nsel contended that the decisions
in Gouri
1
Ganesh and A
19
Awasthi Brothers have wrongly ex
xtended the
jurisdiction of t
the Tribunal to matters of executive poli
icy contrary
to legislative
intent. Learned counsel therefore urge
ed that the
reference be an
nswered by holding that blacklisting do
oes not fall
within the jur
risdiction of the Tribunal constituted
under the
Adhiniyam and
d that a writ petition against a composi
ite order of
termination and
d blacklisting is only maintainable befor
re the High
Court as the app
propriate and effective forum.
152. In rejoinder,
learned counsel contended that t
the State’s
submissions se
eeking to enlarge the jurisdiction of th
he Madhya
Pradesh Arbitr
ration Tribunal under the Adhiniyam w
were legally
unsustainable a
and contrary to both the text and intent of
f the statute.
153. Learned counse
el on the State’s contention that Sections
16 and 17A
of the Adhiniy
yam conferred upon the Tribunal broad
d and open-
ended powers
to grant declaratory or equitable reliefs
s, including
annulment of b
blacklisting orders submitted that the l
language of
Section 16 is
confined to the making of “awards,”
” which by
statutory defin
nition relate only to monetary claims t
that can be
ascertained or
r quantified. Section 17-A, which pr
rovides the
Tribunal with
inherent powers to make such orders
as may be
necessary to m
meet the ends of justice is procedural and
d cannot be
interpreted as a
a source of substantive jurisdiction.
154. The inherent p
power of a statutory tribunal cannot be
invoked to
create jurisdict
tion where none exists. The Tribunal is
not a civil
court of plenary
y jurisdiction; it is a creature of the statut
te, bound by
the four corne
ers of the Adhiniyam, therefore, the
exercise of
declaratory pow
wers or the setting aside of an executive
e order like
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

75


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
blacklisting, w
which does not constitute a money cl
laim would
amount to ju
udicial overreach and violate the pri
inciple that
jurisdiction can
nnot be assumed by implication or necess
ity.
155. Learned counse
el clarified that the State’s reliance on Se
ection 17-A
to justify expan
nsive powers ignores the structural logic
of the Act.
The definition
of “dispute” in Section 2(1)(d) oper
rates as the
foundation and
d the limit of the Tribunal’s jurisdiction. E
Every relief,
whether princip
pal or incidental, must fall within the bo
oundaries of
that definition
. A declaration annulling a blacklistin
ng order is
neither a claim
m of ascertained money nor an ascertainab
ble financial
liability arising
g from the execution or non-execution
of a works
contract. It is,
rather, a public-law remedy intended to
o correct an
administrative
wrong. The Tribunal being confined
to money
disputes canno
ot convert itself into a constitutional
forum for
judicial review
of executive orders. Learned counsel sub
bmitted that
if a declaration
n is required to remove a legal disability
imposed by
the State such
as blacklisting the proper remedy is a w
writ petition
under Article 2
26 and not a reference before the Tribuna
al.
156. Expanding on
this point, learned counsel stressed that
declaratory
relief in black
klisting matters serves a distinct and
substantive
purpose. Black
klisting extinguishes a contractor’s legal
status as an
eligible partic
cipant in government tenders, amo
ounting, in
commercial ter
rms, to a form of “civil death.” The
declaration
sought in such
cases is not ancillary or symbolic, but t
the primary
remedy itself on
ne that restores legal capacity and reputat
tion.
157. Learned counse
el next addressed that an arbitral tribunal
l constituted
under the Act,
1996 can grant declarations, because th
he 1996 Act
and the 1983 A
Adhiniyam operate in completely distinc
t legislative
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

76


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
domains. The 1
1996 Act is a general law of consensual
l arbitration
based on part
ty autonomy and the UNCITRAL M
Model Law,
whereas the 1
1983, Adhiniyam is a special statute
enacted to
regulate a spe
cific class of disputes, those arising o
out of State
works contracts
s and to establish a compulsory statutory
forum with
limited jurisdic
ction.
158. Under the 199
96 Act, arbitral tribunals are vested
with broad
remedial power
rs including the authority to grant declara
atory reliefs,
apply equitabl
le principles and issue interim injunct
tions under
Sections 16, 1
7, 28, and 31. In contrast, the Adhiniy
yam neither
incorporates n
nor mirrors any such provisions.The
Adhiniyam
restricts the Tr
ribunal to adjudicate only monetary di
isputes that
meet the statut
tory definition. Therefore, precedents rel
lating to the
1996 Act cann
not be transposed to enlarge the jurisdic
ction of the
Madhyastham A
Adhikaran Tribunal.
159. To further clar
rify this distinction, learned counsel re
elied on the
15
e Hon’ble Apex Court in Booz Allen , w
judgment of th
wherein the
Court drew a
clear line between arbitrable and no
on-arbitrable
disputes. The C
Court held that disputes involving rights i
in personam
are arbitrable,
whereas those involving rights in re
em such as
matters of stat
tus, guardianship, or insolvency are re
eserved for
courts and trib
bunals exercising public jurisdiction. Ap
pplying that
principle learn
ned counsel submitted that blacklisting
affects the
public status o
of a contractor in its dealings with the
e State and
therefore falls
in the realm of public law, not private
contractual
law. It is thus i
inherently non-arbitrable and outside the
e domain of
any arbitral or s
statutory tribunal functioning under the A
Adhiniyam.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

77


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
160. Learned couns
sel then placed reliance on Nahar
Industrial
Enterprises L
Ltd. v. Hong Kong & Shanghai
i Banking
49
Corporation
, wherein the Apex Court held tha
at statutory
tribunals canno
ot be equated with civil courts of general
jurisdiction
and that they c
can only exercise powers expressly conf
ferred upon
50
y, in Balawa v. Hasanabi , it was h
them. Similarl
held that a
Tribunal’s juris
sdiction is confined within the four cor
rners of the
enabling Act a
and cannot be expanded by analogy or i
implication.
Drawing from
these principles, learned counsel submit
tted that the
Madhyastham A
Adhikaran Tribunal cannot, under any in
nterpretation
assume powers
s to issue declaratory or injunctive re
lief against
blacklisting o
rders. To do so would transform
it into a
constitutional f
forum, which was never the legislative in
ntent behind
its creation.
161. Turning to the
e definition of “dispute” under Sectio
n 2(1) (d),
learned counse
el argued that the monetary threshold of
f ₹50,000 is
not just a proce
edural filter, but an essential element of j
jurisdiction.
The Legislatur
re intended that the Tribunal should ent
tertain only
substantial mon
netary disagreements and that each cla
aim referred
must independ
dently satisfy this threshold. The State’s
s contention
that once any
one claim qualifies the Tribunal may e
examine all
related issues,
, including non-monetary ones, is c
contrary to
statutory langua
age and principle.
162. Learned couns
sel submitted that the legislative design
n makes the
existence of a
money claim of ₹50,000 or more the sin
ne qua non
of a valid refe
erence and in absence of such a claim,
there is no

49
Nahar Industrial Enterprises L
646.
50
Balawa Vs. Hasanabi, (2000)

Ltd. Vs. Hong Kong & Shanghai Banking Corporation, (2
009) 8 SCC
9 SCC 272.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

78


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
“dispute” and h
hence no jurisdiction. Consequently, a cl
laim arising
purely from bl
lacklisting, unaccompanied by a specifi
ic monetary
component also
o cannot be said to constitute a “dispute”
” within the
meaning of the
Adhiniyam.
163. Learned counse
el further contended that the attempt of
the State to
read the term “
“differences” in Section 3 as an indepen
ndent source
of jurisdiction
is misplaced. The Preamble and Sectio
on 3 merely
state that the
Tribunal shall adjudicate disputes and
differences
relating to wo
orks contracts, but the operative limit
tation is in
Section 2(1) (d
d). The specific definition must prevail o
over general
expressions. Th
he phrase “differences connected there
ewith” must
therefore be
understood in the limited sense of
f monetary
disagreements
incidental to the contract and not as a
a licence to
entertain non-m
monetary administrative matters.
164. Learned counse
el drew attention to the doctrine of ejusd
dem generis
as explained in
n Maharashtra University of Health
Sciences v.
51
rasarak Mandal ,wherein the Court hel
Satchikitsa Pr
d that when
a general term
m follows specific terms, the general ter
rm must be
construed in th
he same class as the specific ones. Ap
pplying this
principle, “diff
ferences” must be confined to the sam
me genus as
“disputes,” i.e
e., monetary disputes arising from
m contract
performance or
r breach, and not executive actions like bl
lacklisting.
165. On the State’s
stand that losses from blacklisting are as
scertainable
using economic
c models such as the “but-for,” Emden,
or Hudson
formulas learn
ned counsel submitted that such formu
ulations are
theoretical and
have no statutory foundation under the A
Adhiniyam.
These method
ds are occasionally employed in
commercial

51
Maharashtra University of He

ealth Sciences Vs. Satchikitsa Prasarak Mandal, (2010) 3 S
SCC 786.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

79


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
arbitration to q
quantify loss of profit on existing proje
ects, not to
estimate indefi
inite and hypothetical losses resulting f
from future
disqualification
n.
166. The term “asce
ertainable” in Section 2(1) (d) refers to
claims that
can be determi
ined with reasonable certainty based on
contractual
records or mea
asurable evidence not to speculative pro
ojections of
lost opportuniti
ies or reputation. The Act provides no me
echanism to
compute such i
indeterminate losses and extending its jur
risdiction to
cover speculati
ive claims would convert the Tribunal in
nto an open-
ended forum de
efeating the legislative intent of providin
ng a focused
and limited rem
medy for monetary disputes.
167. Learned counse
el also clarified that the mere existence o
of a pending
monetary claim
m before the Tribunal does not trans
form every
related grievan
nce into a statutory dispute. Each caus
e of action
must independe
ently meet the statutory requirements. Th
hus, even if
termination-rel
ated claims are validly referred to the T
Tribunal, the
blacklisting com
mponent being an independent executive
act must be
challenged sep
parately before the High Court thr
rough writ
jurisdiction.
168. In summation
, learned counsel maintained that th
he Tribunal
constituted und
der the Adhiniyam is a special statutor
ry forum of
narrow jurisdi
iction, confined exclusively to adjud
dication of
monetary dispu
utes of ascertained or ascertainable va
alue arising
from execution
n or non-execution of works contracts. It
neither has
the competence
e to declare administrative orders void n
nor to grant
equitable relief
f. The remedy before it even if avail
lable is not
efficacious for
r grievances such as blacklisting, which
h implicate
constitutional r
rights and executive discretion. Black
listing is a
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

80


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
public-law act
affecting legal status, and the appropri
iate remedy
lies before the
High Court in its writ jurisdiction to ch
hallenge the
blacklisting ord
der irrespective whether it is independent
t or is a part
of a composite
order involving contract termination.
169. Shri Piyush Sh
hrivastava , learned counsel submitted th
hat the term
“claim” in Sect
tion 2(1)(d) is not defined and should be
understood
as an assertion
of a legal right, not necessarily confine
ed to money
claims. Learne
ed counsel submitted that the contract
tor has the
choice to seek
declaratory relief before the writ court
rather than
being compelle
ed to pursue a monetary claim before the T
Tribunal.
170. Learned couns
sel further submitted that even assu
uming such
disputes could b
be entertained, the remedy before the Tri
ibunal is not
efficacious, as
Section 17-A of the Adhiniyam express
sly bars the
grant of int
erim relief. Reliance was placed
on Alok
24
Kumar , wher
ein it was held that a statutory remedy th
hat does not
allow urgent pr
rotection cannot be deemed effective and
d in cases of
blacklisting, w
where immediate stay is vital to prevent
irreversible
damage only th
he writ jurisdiction of the High Court un
nder Article
226 can afford
effective relief.
171. In conclusion l
learned counsel urged that the loss from
blacklisting
is neither ascer
rtained nor ascertainable, it is not conse
equential to
termination and
d the statutory remedy under the Adhin
niyam is not
efficacious. Th
herefore, such disputes are not arbitrab
ble and the
validity of blac
cklisting orders can only be tested befo
ore the writ
court in its cons
stitutional jurisdiction under Article 226.
172. Shri Suyash
Mohan Guru, learned counsel subm
mitted that
blacklisting is
a purely executive act arising from th
he inherent
power of the
State to decideto whom engage in
contractual
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

81


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
relations with.
The learned counsel pointed to the Gov
vernment of
Madhya Prades
sh’s letter dated 24.03.2015 (No. F 17-1/2
2010/19/B/)
issued by the
e Public Works Department to illu
ustrate that
blacklisting is
not carried out in pursuance of any
contractual
mechanism, bu
ut by an executive order. This executive
character is
9
g Ltd. and
also supported
by the judgments in Patel Engineering
52
hakur v. State of Bihar .
Raghunath Th
173. Expounding fu
urther on the limited jurisdiction conferre
ed upon the
Tribunal by th
he 1983 Adhiniyam, the learned couns
el refers to
Section 2(1)(d)
), which defines “dispute” to assert that
blacklisting
does not resul
lt in such a claim and is not suscept
tible to the
adjudicatory m
mechanism of the Tribunal. The Tribuna
al lacks the
competence to
grant declaratory or injunctive relief, par
rticularly of
the kind neces
ssary to annul a blacklisting order. Mo
oreover, the
Tribunal is no
ot empowered to adjudicate claims inv
volving the
violation of fun
ndamental rights or administrative fairn
ness both of
which are centr
ral to the challenge against blacklisting.
174. The learned cou
unsel further submitted that where a comp
posite order
includes both
termination of contract and blacklistin
ng, and the
contractor chal
llenges the Composite order in entirety
y, the High
Court’s jurisdic
ction under Article 226 remains invocab
ble. Learned
counsel conten
nded that even though termination may be
e preferable
to the Tribun
nal under the 1983 Adhiniyam, the
blacklisting
component bei
ing outside the Tribunal’s jurisdiction c
can only be
challenged bef
fore the High Court. Reliance is plac
ced on the
decision of the
e Madras High Court in Community
Action for

52
Raghunath Thakur Vs. State o

of Bihar, (1989) Supp (1) SCC 229.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

82


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
53
pment v. The Secretary , wherein it w
Rural Develop
as held that
the availability
y of an alternative remedy does not p
preclude the
exercise of writ
t jurisdiction, particularly when the order
r challenged
is stigmatic, aff
ffects fundamental rights or violates the p
principles of
natural justice.
175. Learned counse
el further refers to Shree Construction C
Co. v. State
54
of M.P. to a
argue that the Tribunal is not empower
red to issue
declaratory rel
lief. Hence even if one were to co
oncede that
termination of
contract may fall within the Tribunal’s j
jurisdiction,
the blacklisting
g order by its very nature requires adju
udication by
the constitution
nal courts. In conclusion, learned coun
nsel submits
1
ments in Gouri Ganesh and Awasthi
19
Brothers
that the judgm
erred in treat
ting blacklisting as a dispute amena
able to the
jurisdiction of
the Tribunal under the 1983 Adhiniya
am and the
appropriate for
rum for challenge is the High Court un
nder its writ
jurisdiction.
176. Shri Amit Ku
umar Singh , learned counsel submitte
ed that the
Tribunal lacks
declaratory jurisdiction. The use of the
e expression
“arbitrate” rath
her than “decide” in the Preamble and in S
Section 3 of
the Adhiniyam
m clearly manifests the legislative intent
to create a
body for arbitr
ration of monetary disputes and not for a
adjudication
of administrativ
ve or constitutional issues.
177. Learned couns
sel further contended that the Tribunal
l cannot be
considered an
efficacious forum for redressal against b
blacklisting.
Firstly, it is
devoid of power to decide questions
s involving
violation of fun
ndamental or constitutional rights. Second
dly, Section

53
Community Action for Rural
54
Shree Construction Co. Vs. St

Development Vs. The Secretary, 2015(3) LW 90.
tate of M.P., Civil Revision No.198/1990.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

83


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
17-A of the Ad
dhiniyam expressly bars the Tribunal fro
om granting
interim relief in
n the nature of injunction or stay, thereb
by depriving
litigants of im
mmediate protection against punitive adm
ministrative
action. Thirdly
y, the scheme under Section 7 requ
uiring prior
reference to th
he final authority under the contract r
renders the
process cumbe
ersome and ill-suited for matters deman
ding urgent
judicial interve
ntion.
178. Learned couns
sel then referred to Section 20 of the
Adhiniyam
which bars th
he jurisdiction of civil courts only in
respect of
disputes cogniz
zable by the Tribunal. Learned counse
el submitted
that since the T
Tribunal is not empowered to declare rig
ghts or civil
status, the bar
r of jurisdiction does not extend to m
matters like
blacklisting, w
which determine the legal status of a co
ontractor in
public law. Lea
arned counsel submitted that the blacklis
sting affects
the civil and c
ommercial standing of the contractor an
nd therefore
cannot be subj
ected to the Tribunal’s limited arbitral p
process. To
allow the Trib
bunal to entertain such issues would
amount to
conferring upon
n it powers it does not possess under the s
statute.
179. Learned counse
el further invited the Court’s attention to
the broader
jurisprudential
dimension of the issue, invoking the
capability-
based and cont
text-sensitive approach to justice. Learn
ned counsel
argued that wh
hen the alternate remedy is burdened
with delay,
procedural rigid
dity, and lacks preventive jurisdiction ins
sisting upon
its exhaustion d
defeats the very object of ensuring effec
ctive access
to justice. Refe
erring to Abdul Sammad v. Executive
Committee
55
Mahkuma Parishad learned counse
of Marigaon
l submitted
that the term “e
efficacious” connotes a remedy capable o
of producing

55
Abdul Sammad Vs. Executive

e Committee of Marigaon Mahkuma Parishad, AIR 1981
Gau 15.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

84


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
the intended r
result. The Tribunal with its severe b
backlog and
limited powers
s cannot be said to provide such a remed
dy. Learned
counsel thus ur
rged the Court to assess the efficacy of th
he statutory
remedy not in
n abstract terms, but through a capab
bility-based
framework that
t considers the real and timely accessibilit
ty of justice
to affected part
ties.
180. In conclusion,
, Shri Amit Kumar Singh submitted
that since
blacklisting en
ntails serious civil and constitutional co
onsequences
affecting the
right to livelihood and trade such
matters lie
exclusively wit
thin the writ jurisdiction of this Court a
and that the
1
in Gouri Ganesh to the contrary
view taken i
y deserves
reconsideration
n and overruling to that extent.
181. Shri Ajay Mi
ishra , learned counsel submitted that a
although an
order of black
klisting may originate in the backdrop
of a works
contract, the n
nature, effect, and remedy concerning
blacklisting
stand on a d
distinct legal footing and are not am
menable to
adjudication by
y the Madhyastham Adhikaran under the A
Adhiniyam.
Learned couns
el contended that blacklisting by its ver
ry character
transcends the
boundaries of a single contractual a
arrangement
especially whe
en its consequences extend prospectively
y impacting
the ability of
contractors to participate in future t
tenders and
procurements.
Such consequences are not confined to
o the rights
and obligation
s under the terminated contract, but o
perate as a
disqualification
n from future potential business opportu
unities with
the State and its
s instrumentalities.
182. Learned counse
el further invited attention to the statutor
ry definition
of “works con
ntract” under the Adhiniyam, which r
requires an
agreement in w
writing or a letter of intent or work or
rder for the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

85


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
execution or n
on-execution of defined categories of p
ublic work.
Learned coun
nsel submitted that blacklisting is n
not an act
contemplated w
within this definition especially, when it
is imposed
after the cessat
tion of the contract and not as a measure
e relating to
its execution. L
Learned counsel submitted that the blackl
listing order
even if traceab
ble to an earlier contract assumes the n
nature of an
administrative
decision with prospective applicability a
nd does not
fall within the
e adjudicatory domain of the Tribunal
constituted
under the Adhin
niyam.
183. Learned counse
el submitted that the loss arising out of
blacklisting
is speculative a
and futuristic in nature involving eleme
ents such as
loss of reputati
ion and exclusion from future tenders, wh
hich are not
specifically qu
uantifiable. Learned counsel submitted
d that such
losses cannot b
be computed in monetary terms with certa
ainty and as
such are outsid
de the scope of a tribunal that can on
ly entertain
claims of “a cer
rtain sum of money.” Furthermore, under
r Section 14
of the Specific
Relief Act a contract that is determinab
ble in nature
cannot be spec
cifically enforced and therefore the Tribu
unal having
no power to en
nforce a contract likewise cannot grant an
ny effective
relief with resp
pect to an order of blacklisting arising
g from such
termination.
184. Learned couns
sel emphasized that Section 19 of the
Adhiniyam
expressly bars
the Tribunal from issuing declaratory o
r injunctive
relief. Learned
counsel argued that any claim for comp
pensation on
account of blac
cklisting presupposes a finding that the
blacklisting
was illegal, wh
hich in turn necessitates a declaration to
that effect.
Since the Tribu
unal cannot issue such a declaration it c
cannot grant
consequential
damages either. Learned counsel sub
mitted that
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

86


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
without a findin
ng that the termination or blacklisting wa
as wrongful
there can be no
o legitimate monetary claim and thus the
jurisdiction
of the Tribunal
is excluded.
185. Learned counse
el also pointed out the procedural hardsh
hip involved
and submitted
that the standard works contracts provid
de for multi-
tiered internal
l mechanisms requiring the contracto
or to first
approach the E
Engineer or Superintending Engineer befo
ore invoking
the jurisdiction
n of Tribunal. In cases of blacklist
ting where
immediate rest
traint is required against a disabling adm
ministrative
action such pr
rocedures are inadequate and ineffectiv
ve. Learned
counsel submi
itted that the urgency and breadth of
f impact of
blacklisting req
quire a forum that can grant immediate
declaratory
and injunctive
relief, which only the writ court under
Article 226
can provide.
186. Learned counse
el further submitted that compelling the c
contractor to
split remedies
approaching the High Court for declar
ratory relief
and the Tribu
unal for monetary compensation wou
uld lead to
multiple proce
eedings on the same cause of action, i
ncrease the
burden on the
State and potentially result in conflictin
ng findings.
The principle
of complete justice requires that such
disputes be
adjudicated in
one forum which can fully and effectiv
vely address
all facets of the
e grievance.
187. In conclusion,
Shri Ajay Mishra submitted that blacklis
sting even if
flowing from
a works contract constitutes an i
independent
administrative
action with wide-ranging and
prospective
consequences.
The Tribunal under the Adhiniyam la
acking both
declaratory pow
wers and the capacity to assess specul
lative, non-
quantifiable los
sses cannot entertain such matters. Learn
ned counsel
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

87


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
thus prayed tha
at this larger bench be held that disputes
s pertaining
to blacklisting
g do not fall within the jurisdicti
on of the
Madhyastham
Adhikaran and the appropriate remedy
y lies under
Article 226 of t
the Constitution.
188. Learned counse
el Shri Vivek Ranjan Pandey appearin
ng on behalf
of the Interve
enor commenced his elaborate subm
missions by
submitting that
t the central question before this Large
er Bench is
essentially juri
sdictional concerning the limits of statu
utory power
under the Adhi
iniyam. Learned counsel contended that
jurisdiction
is not a matt
ter of inference or assumption, but o
of statutory
conferment, an
nd no court, by interpretative expansion,
can enlarge
the scope of
a statutory forum beyond the legisla
ative intent.
Learned couns
sel submitted that the Adhiniyam being
g a special
enactment gov
verning disputes strictly arising out
of works
contracts confi
fines the authority of the Tribunal to
adjudicate
money claims
that are ascertained or ascertainable,
within the
meaning of Se
ection 2(1) (d). Any attempt to include
e within its
ambit challeng
ges to blacklisting orders learned coun
nsel argued
amounts to j
judicial legislation, which is imperm
missible in
constitutional ju
urisprudence.
189. Learned couns
sel urged that the Full Bench decision
n in Gouri
1
Ganesh is per
r incuriam as it travelled beyond the pla
ain language
of the statute by
y treating blacklisting and termination of
f contract as
composite and
arbitrable disputes. Shri Pandey submitte
ed that such
a view overloo
oks the express bar contained in Section
7-A, which
limits reference
e petitions to claims arising out of a si
ingle works
contract and e
excludes all claims of a distinct or no
on-monetary
nature. By read
ding into the Adhiniyam powers of dec
claratory or
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

88


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
1
isdiction, the Gouri Ganesh ruling
injunctive juri
effectively
enlarged the d
domain of Tribunal, thereby conferring
g upon it a
jurisdiction tha
at the legislature never intended to g
grant. Such
enlargement L
Learned counsel argued stands contrary
y to settled
56
down in A.R. Antulay v. R.S. Nayak ,
principles laid d
Chiranjilal
57
asjit Singh and Rites Ltd. v. Railw
Goenka v. Ja
way Claims
58
Tribunal .
190. Proceeding furt
ther, Shri Pandey submitted that blacklist
ting is not a
contractual con
nsequence, but a constitutional and admin
nistrative act
traceable to Art
ticle 298 of the Constitution of India, wh
hich vests in
the executive t
the power to enter into or to refrain fro
om entering
into contracts.
The source of power for blacklisting thu
s lies not in
any contract, b
but in the inherent executive authority o
of the State
and consequent
tly the challenge thereto partakes of the c
character of
a constitutiona
al claim. Such a claim learned counsel
emphasized
cannot be releg
gated to a statutory tribunal of limited j
jurisdiction,
but must be te
ested on the touchstone of constitutional
l guarantees
before the writ
court. The act of blacklisting learned co
ounsel urged
has civil conse
equences of the most severe nature it c
casts a slur,
inflicts a stigm
ma and leads to what has been described b
by the Apex
Court as “civil
l death” of the contractor. It affects the c
contractors’
right to livelih
ood, reputation, and trade protected und
der Articles
14, 19(1) (g), 2
21, and 300-A of the Constitution.
191. In support of th
hese submissions, learned counsel drew th
he attention
of this court t
to a consistent line of authorities begi
inning with
7
Erusian , Pate
9 10
el Engineering and Gorkha Security , w
wherein the

56
A.R. Antulay Vs. R.S. Nayak,
57
Chiranjilal Goenka Vs. Jasjit
58
Rites Ltd. Vs. Railway Claim

, (1988) 2 SCC 602.
Singh, (1993) 2 SCC 507.
s Tribunal, (2013) 16 SCC 283.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

89


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Supreme Cour
rt held that the absence of a specific
show-cause
notice mentio
oning the proposed penalty vitiates
the entire
proceeding. L
Learned counsel further referred to
Vet India
59
als Ltd. v. State of U.P. and Blue
22
Dreamz ,
Pharmaceutica
wherein it was
s reiterated that blacklisting entails grav
ve civil and
reputational c
consequences and cannot be impose
ed without
adherence to pr
rinciples of natural justice and proportion
nality.
192. Shri Pandey s
submitted that blacklisting is a public
law act of
exclusion that
transcends the contractual matrix as it
is forward-
looking, operat
ting across future tenders and dealings
and has an
erga omnes im
mpact on the contractors reputation and
commercial
standing. Such
h action, being administrative and reg
gulatory in
nature cannot
be subjected to arbitration or to the a
adjudicatory
process of a
statutory tribunal designed solely fo
or bilateral
monetary dispu
utes. In this regard, learned counsel invok
ked the tests
17
bility laid down in Vidya Drolia and
of non-arbitrab
developing
his argument
further, Shri Pandey submitted that
even if a
contractor claim
ms monetary loss as a consequence of
blacklisting
such loss is inc
capable of precise ascertainment. The all
leged injury
comprises not
only pecuniary deprivation, but loss o
of goodwill,
brand equity, f
future opportunities, and personal repute
e, which are
all intangible a
and incapable of computation through an
ny judicially
recognized for
rmula. Invoking the maxim “ lex non
n cogit ad
impossibilia ”
learned counsel submitted that the law
w does not
compel the pe
erformance of impossibilities conseque
ently, when
quantification i
is inherently speculative, it cannot be for
ced into the

59
Vet India Pharmaceuticals Ltd

d. Vs. State of U.P., (2021) 1 SCC 804.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

90


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
mound of a “
“claim of ascertained or ascertainable
money” as
required by Sec
ction 2(1)(d) of the Adhiniyam.

193. Learned coun
nsel then addressed the question of
f remedies
emphasizing th
hat the Tribunal constituted under the
Adhiniyam
lacks the powe
er to grant injunctive or declaratory relie
efs. Learned
counsel pointe
ed out that in a matter involving black
klisting, the
immediate nec
cessity is to seek a stay of the opera
ation of the
impugned orde
er to prevent irreparable harm to the
contractors
reputation and
d livelihood. Therefore, to compel an
n aggrieved
contractor to a
approach such a forum would amount t
to denial of
effective access
s to justice.
1
sh failed to
194. Learned couns
sel further submitted that Gouri Ganes
consider that
declaratory relief unaccompanied by
y injunctive
protection is m
meaningless and that justice cannot be don
ne unless the
adjudicating fo
orum has authority to grant complete
relief. He
1
esh between
described the
e analogy drawn in Gouri Gane
declaratory reli
ief under the Specific Relief Act and p
proceedings
before the Trib
bunal as constitutionally unsound. To i
import such
provisions lear
rned counsel argued would amount to re
ewriting the
statute.
195. Shri Pandey a
also addressed the conceptual interpla
ay between
Articles 21 an
nd 300-A of the Constitution contendin
ng that the
contractors’ go
oodwill is an intangible form of propert
ty protected
under Article 3
300-A, and its arbitrary destruction by
blacklisting
amounts to dep
privation of property without authority of
f law. Citing
60
rinivasa Setty , K.T. Plantation Pvt. L
CIT v. B.C. Sr
Ltd. v. State

60
CIT Vs. B.C. Srinivasa Setty,

(1981) 2 SCC 460.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

91


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
6
of Karnataka
61
and Lucknow Nagar Nigam v. Kohl
li Brothers
62
vt. Ltd. learned counsel maintained th
Colour Lab Pv
hat goodwill
is a property
right having both commercial and co
onstitutional
protection. The
e deprivation of such an asset through
blacklisting
absent of statu
utory sanction constitutes not merely
contractual
injury, but cons
stitutional infraction.
196. Learned counse
el submitted that the power of judicial re
eview under
Article 226 form
ms part of the basic structure of the Cons
stitution and
cannot be ous
sted by implication or by conferral of
f alternative
statutory remed
dies. Even where an arbitration clause or
r a statutory
forum exists
learned counsel urged that the writ
jurisdiction
remains availa
able to correct manifest illegality, arbit
trariness, or
violation of nat
tural justice. Reliance is placed on Union
n of India v.
63
ruction Co. and M.P. Power Manag
Tantia Constr
gement Co.
64
wer Southeast Solar India (P) Ltd. .
Ltd. v. Sky Po
197. In conclusion,
Shri Pandey earnestly submitted that bla
acklisting is
a non-arbitrab
ble, non-statutory and constitutionally
y governed
1
sh is per
subject-matter
that the judgment of Gouri Gane
incuriam and th
hat challenges to blacklisting orders or
r composite
orders of term
mination and blacklisting fall squarely
within the
supervisory and
d constitutional jurisdiction of the High C
Court under
Article 226.
198. Learned coun
sel Shri Navneesh Johari submitted
d that the
controversy su
urrounding the arbitrability of blacklistin
ng must be
understood in
light of the administrative circulars th
hat regulate

61
K.T. Plantation Pvt. Ltd. Vs. S
62
Lucknow Nagar Nigam Vs. K
63
Union of India Vs. Tantia Con
64
M.P. Power Management Co.

State of Karnataka, (2011) 9 SCC 1.
Kohli Brothers Colour Lab Pvt. Ltd., (2025) 6 SCC 628.
nstruction Co., (2011) 5 SCC 697.
Ltd. Vs. Sky Power Southeast Solar India (P) Ltd., (2023
3) 2 SCC 703.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

92


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
registration, s
suspension and debarment of contra
actors read
conjointly wit
th the statutory framework of the
Adhiniyam
(hereinafter, “t
the Adhiniyam”). Learned counsel urg
ed that the
authority to bl
lacklist emanates not from the terms o
of a works
contract but fr
from an independent statutory and adm
ministrative
power exercise
ed by the State to uphold transparency, fa
fairness, and
probity in pub
blic contracting. The jurisdiction of the
Arbitration
Tribunal on the
e other hand is confined to disputes arisin
ng out of the
execution or n
non-execution of a works contract as p
per Section
2(1)(d) of the
e Adhiniyam. Consequently, blacklistin
ng being a
regulatory and
disciplinary action does not constitute
a “dispute”
within the Tribu
unal’s competence.
199. Learned couns
el invited the attention of this court to
a series of
departmental
circulars dated 19.11.1999,
17.08.2011,
24.03.2015, 28
8.01.2005 and 29.03.2011, which codify
the process
of registration,
renewal, suspension, cancellation and
blacklisting
of contractors u
under the Public Works Department (PWD
D).
200. A cumulative
reading of these circulars he contende
d reveals a
four-tier frame
work governing a contractors engageme
ent with the
State namely:
(i) the initial registration of a contra
actor in the
approved list; (
(ii) the tender and bid stage governed by
y the Notice
Inviting Tender
r (NIT); (iii) the stage of contract format
tion through
acceptance and
d execution of the agreement and (iv) t
the stage of
execution, per
rformance and completion of work.
Each stage
learned counse
el submitted that carries distinct legal co
onsequences
and the power t
to suspend, cancel or blacklist may be in
nvoked even
at the very firs
st stage before any works contract is exe
ecuted. This
feature learned
d counsel argued conclusively establish
hes that the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

93


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
power of black
klisting is administrative in origin and not
t contingent
upon a contract
tual nexus.

201. Developing the
e distinction between administrative and
contractual
actions Shri J
Johari submitted that the nature of
blacklisting
depends upon
its source and purpose. When a co
ontractor is
blacklisted for
r reasons such as submission of false
documents,
failure to ren
new securities, mis-utilization of a
advance or
abandonment o
of work, which all are enumerated grou
unds in the
PWD circulars,
, the Government acts as an administrativ
ve authority,
safeguarding th
he integrity of public works. Such decisi
ions learned
counsel urged
are not taken in the capacity of a contra
acting party,
but as a publi
c authority entrusted with ensuring dis
scipline and
honesty in con
ntractual dealings. Even where blacklist
ting follows
termination of
a contract the act retains its administrativ
ve character
being a meas
sure of public policy to prevent rec
currence of
misconduct rath
her than a contractual remedy.
202. Addressing the
e scenario of pre-contractual blacklisting
the learned
counsel submit
tted that when a bidder during the ten
der process
submits forged
d or fabricated documents and the bid
d document
provides that
such misconduct shall invite black
klisting, no
arbitrable dispu
ute can arise, because no concluded contr
ract exists at
that stage. The
e Notice Inviting Tender and the bid
submission
amounts only t
to an invitation and an offer respectively,
, there is no
concluded cont
tract until acceptance is communicated.
203. Hence, any ord
der of blacklisting at this stage cannot
t be said to
“arise out of” t
the execution or non-execution of a wor
rks contract.
Even where th
he bid document contains a clause for
r arbitration
under the Arb
itration and Conciliation Act, 1996 suc
ch a clause
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

94


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
cannot operate
absent a concluded agreement. The sam
me rationale
learned counse
el contended governs the Adhiniyam
m, therefore
jurisdiction of t
the Tribunal cannot be extended to such p
pre-contract
disputes.
204. On the question
n of ascertainability of loss, learned cou
unsel placed
strong reliance
upon Section 73 of the Indian Contract
t Act, 1872,
which confines
s the award of compensation to losses
s that arise
naturally in the
e usual course of events or those, which w
were within
the contemplat
tion of the parties at the time of contr
racting. The
Section express
sly excludes remote and indirect losses.
205. Applying this
principle, learned counsel submitted th
hat any loss
alleged to hav
ve been suffered on account of blac
cklisting is
speculative, rem
mote, and hypothetical. The alleged inju
ury pertains
to loss of repu
utation or prospective business opportuni
ities factors
that depend on
n future contingencies and cannot be qua
antified with
precision. Such
h damages neither arise in the usual cour
rse of things
nor admit of de
efinite computation. Therefore, even if bla
acklisting is
unlawful or arb
bitrary, the resultant loss is not ascertain
nable within
the meaning of
f Section 2(1)(d) of the Adhiniyam and ca
annot be the
subject matter o
of an arbitral claim before the Tribunal.
206. Elaborating fu
urther learned counsel stated that a
contractor
claiming such l
loss must produce clear, objective evide
nce such as
balance sheets
for preceding years, average yearly prof
fits, number
of tenders lost
due to blacklisting and exact pecuniary
y detriment
caused thereby
y. A mere assertion that “I have lost futur
re business”
or “my reputati
ion has been harmed” is wholly inadequa
ate. The loss
in such cases
is of an intangible and opportunity-ba
ased nature
incapable of d
definite valuation. Hence, the Tribuna
al which is
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

95


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
constituted to
odetermine claims of ascertainable
monetary
consequence ar
rising out of works contracts cannot adju
udicate upon
such conjectura
al grievances.
207. Learned couns
sel submitted that a contractor cannot
disguise an
administrative
grievance against blacklisting as a mon
netary claim
to invoke the T
Tribunal’s jurisdiction. The true nature o
of the claim,
not its form,
determines jurisdiction. As blacklis
ting is an
administrative
and disciplinary act the only competen
t forum for
redressal is the
e writ jurisdiction of this Court under Ar
rticle 226 of
the Constitution
n. On the issue of composite orders, learn
ned counsel
submitted that
where an order combines termination
of contract,
recovery of am
mounts and blacklisting, the challenge m
must address
the order as an
n integrated whole. A contractor cannot
t isolate the
blacklisting co
omponent and seek declaratory relief
in respect
thereof before
the Tribunal. A claim before the Tri
ibunal must
necessarily in
nvolve a definite and quantifiable
monetary
component dire
ectly arising from execution or non-exec
ution of the
works contract.
.
208. A standalone c
challenge to blacklisting devoid of ascerta
ainable loss
would not satis
sfy the statutory requirement of a “dispute
e” under the
Adhiniyam. Th
hus, according to the learned counsel,
the act of
blacklisting, w
whether occurring before or after the con
ntract, does
not constitute a
a “dispute” within the meaning of Section
n 2(1) (d) of
the Adhiniyam
m, and any challenge thereto must be
e addressed
through constit
tutional rather than arbitral remedies.
209. Shri H. Y. Me
ehta , learned counsel urged with empha
asis that the
Adhiniyam is n
not a comprehensive or exhaustive code,
and that its
ambit does n
not extend to administrative measure
es such as
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

96


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
blacklisting. L
Learned counsel contended that unlike the
Arbitration
and Conciliatio
on Act, 1996, which makes express pr
rovision for
pre-arbitral, pen
ndent lite, and post-award proceedings, th
he 1983 Act
is a restricted st
tatute confined solely to monetary claims
s arising out
of the executi
ion or non-execution of a works cont
tract. The
Tribunal consti
ituted under the Adhiniyam has not bee
en conferred
with any powe
er to grant declaratory relief demonstra
ates that the
Act contemplat
tes adjudication of money claims alone
and cannot
be invoked for
declaratory or preventive relief against bl
lacklisting.
210. Shri Mehta fu
urther contended that blacklisting is a
public-law
measure and no
ot a contractual consequence. Learned co
ounsel relied
7
uipment to
upon the decis
sion of the Apex Court in Erusian Equ
submit that bla
acklisting does not relate to any particul
lar contract,
but is an admi
ministrative act, punitive and prospective
e in nature,
whereby the S
State exercises its inherent right to dete
ermine with
whom it will d
deal in the future.The act of blacklistin
ng therefore
cannot be eq
quated with the contractual act of t
termination.
According to S
Shri Mehta while termination arises out o
of a contract
and requires ad
djudication upon its terms blacklisting
flows from
the sovereign o
or administrative power of the State affec
cts the right
of livelihood o
of the contractor and thus engages the co
onstitutional
guarantees und
der Articles 14, 19(1)(g), and 21 of the C
Constitution
of India.
211. Learned counse
el submitted that termination and blackl
listing stand
on entirely dist
tinct footings and neither is a necessary c
corollary of
the other. Term
mination simpliciter may occur without b
blacklisting,
and vice versa
; both may also coexist in different circ
cumstances.
Learned counse
el submitted that blacklisting is not mere
ely a sequel
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

97


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
to contractual b
breach, but an independent punitive act,
the validity
of which must
t be tested on the touchstone of constit
tutional and
administrative l
law rather than contract law. Judicial inte
ervention in
cases of termin
nation concerns the terms of the contra
act, whereas
intervention in
n blacklisting concerns violation of co
onstitutional
safeguards.
212. With regard to
the maintainability of a claim before th
he Tribunal,
Shri Mehta sub
bmitted that the Adhiniyam envisages
a reference
only when the
ere exists a claim of ascertained or as
scertainable
money value ar
rising out of execution or non-execution
n of a works
contract. The
order of blacklisting however eman
nates from
governmental c
circulars or administrative directions, an
nd not from
the contract its
self. Consequently, such an order cannot
t be said to
“arise out of” a
a works contract so as to attract the jurisdi
iction of the
Tribunal. The c
cause of action in cases of blacklisting a
accrues on a
different footin
ng and at a different time since the “fina
al authority”
under Section
7-B for contractual disputes is distinc
ct from the
authority com
mpetent to issue or decide appea
als against
blacklisting.No
o time-frame for such administrative
appeals is
prescribed lea
ading to procedural anomalies that
make the
Adhiniyam inap
pplicable to such situations.
213. On the question
n of ascertain ability of loss, Shri Mehta
a referred to
the etymologic
cal and legal meaning of the term “asc
certainable.”
Drawing from
Latin and Old French origins of the word
d as well as
from Webster’s
s, Chambers and the Advanced Law Lexi
icon learned
counsel submi
tted that “to ascertain” means to dete
ermine with
certainty. An “
“ascertainable sum” must therefore be
one that is
fixed, definite,
, and known at the time of reference.
The losses
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

98


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
alleged to flow
w from blacklisting are indeterminate and
speculative
depending on
future contingencies such as success o
or failure in
tenders yet to b
be floated and cannot be said to be quant
tifiable with
certainty. Hen
ce, they do not constitute “ascertaina
able” losses
within the mean
ning of Section 2(d) of the Adhiniyam.
214. In conclusion, l
learned counsel submitted that blacklistin
ng, being an
administrative
and punitive act with uncertain
monetary
implications i
s alien to the statutory scheme of
f the 1983
Adhiniyam.The
e Madhyastham Adhikaran theref
fore lacks
jurisdiction to
entertain such matters and the only
efficacious
remedy lies in
invoking the constitutional jurisdiction o
of this Court
under Article 2
26 of the Constitution of India.
215. Learned couns
sel Shri Rohit Mangal , submitted that
the central
question referr
red to this Hon’ble Court is whether a
blacklisting
order passed b
y the State Government can be said to
constitute a
“dispute” fallin
ng within the ambit of Section 2(1)(d) o
of the M.P.
Madhyastham A
Adhikaran Adhiniyam, 1983so as to be a
amenable to
the jurisdiction
n of the Arbitration Tribunal constituted
d under the
said enactment
t. At the outset, counsel submitted that b
blacklisting,
though arising
g incidentally from a contractual relat
tionship, is
essentially an
act of administrative censure. It is a
a unilateral
exercise of the
e State’s sovereign power to determine,
, whether a
particular contr
ractor is fit to be entrusted with future g
government
contracts. As s
such it cannot be equated with contractu
ual disputes
concerning exe
ecution, non-execution or breach of spe
ecific terms,
which are capab
ble of being adjudicated upon by the Trib
bunal.
216. Learned counse
el emphasized that the legislative intent
t behind the
Adhiniyam is t
to provide a specialized forum for adju
udication of
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

99


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
contractual dis
putes involving claims for recovery of
a specified
sum of money,
which are ascertainable in monetary ter
ms. Section
2(1) (d) defines
s “dispute” narrowly and restrictively, as
a claim for
the recovery of
f an amount of Rs. 50,000 or more arisin
ng out of the
execution or n
non-execution of a works contract. The
element of
quantifiable mo
onetary demand is therefore foundationa
al to invoke
the jurisdiction
n of the Tribunal.
217. Blacklisting, on
n the contrary, is not a claim for money.
It is a penal
and stigmatic
order with wide-ranging civil con
nsequences,
including impa
airment of the right to livelihood under A
Article 19(1)
(g) and the righ
ht to reputation under Article 21 of the C
Constitution
of India. The l
oss that may be suffered on account of
blacklisting
such as being
g ineligible for future contracts is
speculative,
hypothetical an
nd incapable of definite ascertainment.
It is not a
direct monetar
ry consequence, but collateral fallout a
and as such
cannot form the
e subject matter of a reference under the A
Adhiniyam.
218. Learned counse
el submitted that the power to blacklist is
s essentially
discretionary a
and administrative in nature. Its legalit
ty must be
tested on groun
nds of arbitrariness, proportionality, and
violation of
natural justice
for which the appropriate remedy lies
before the
High Court un
nder Article 226 of the Constitution. It
was further
submitted that
even if the contractor chooses to see
ek damages
arising out of
blacklisting such a claim would be inc
cidental and
derivative not o
one for a sum certain or falling within t
he scope of
Section 2(1)(d)
). In terms of Section 73 of the Indian Co
ontract Act,
damages must
flow directly from the breach and must
t be capable
of being ascert
tained. Loss arising from blacklisting fa
ails on both
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

100


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
counts, it is n
neither direct nor capable of specific co
omputation.
Thus, such a cl
aim is legally untenable before the Tribun
nal.

219. In conclusion,
Shri Mangal urged that the blacklisting o
order, being
in the nature of
f an executive action having independent
t and severe
consequences
beyond the contract, cannot be cons
strued as a
“dispute” withi
in the meaning of the Adhiniyam. To d
do so would
stretch the lang
guage of the statute beyond its plain m
meaning and
undermine th
he constitutional safeguards attached
d to such
administrative
decisions. Therefore, the only efficacio
ous remedy
against blacklis
sting lies before the High Court and not
t before the
arbitral tribunal
l constituted under the 1983 Act.
SUBMISSIONS ON BE

EHALF OF RESPONDENT/STATE:
220. Shri Prashant
Singh , Learned Advocate General appea
aring for the
State Governm
ment commenced submission by drawing
attention to
the statutory s
scheme of the Adhiniyam. It was urg
ed that the
Adhiniyam wa
as enacted with a conscious legislativ
ve purpose
namely to pro
ovide a specialized, efficacious and sel
lf-contained
mechanism for
r adjudicating disputes and differences ar
rising out of
works contract
ts executed with the State and its instru
umentalities.
The preamble
to the enactment makes this intent m
manifest by
employing wid
de expressions such as “for adjudication
of disputes
and matters in
ncidental thereto,”, which clearly sho
w that the
Legislature con
ntemplated not only direct monetary claim
ms, but also
collateral, conn
nected and consequential issues that may
arise in the
performance o
or termination of such contracts. Lea
arned A.G.
therefore conte
ended that any construction of the A
ct must be
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

101


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
guided by the
purposive object of channeling all co
ontroversies
arising out of w
works contracts into one statutory forum.

221. Turning to the
genesis of the reference learned A.G.
pointed out
that the contro
oversy arose because the Division Be
ench, while
considering the
e maintainability of a contractors’ claim
m relating to
blacklisting ex
xpressed doubt about the correctness
of earlier
1
nesh and the
pronouncement
ts namely, the Full Bench in Gouri Gan
19
ch in Awasthi Brothers in conseq
Division Benc
quence, this
reference was m
made to a Larger Bench, and formulated t
two specific
questions for
authoritative determination: first, whe
ether losses
occasioned by
y blacklisting can be treated as asce
ertained or
ascertainable a
and therefore arbitrable before the Tri
ibunal; and
second, whethe
er, in the event of a composite order of
termination
of contract and
d blacklisting, a writ petition is maintaina
able in spite
of the statuto
ory remedy available under the 198
83 Act for
termination dis
putes.
222. On the first que
estion, the learned A.G. categorically sub
bmitted that
the Division Be
ench adopted an unduly restrictive under
rstanding of
the expression
“ascertained.” Learned A.G. submitted th
hat equating
the term “asc
ertained” with “pre-fixed” or “liquida
ated” sums,
thereby exclud
ding from the Tribunal’s jurisdiction
any claim,
which required
d investigation, assessment, or judicial c
computation
is directly contr
rary to binding pronouncements of the Ap
pex court in
14
erprises , wherein the Apex court clarif
Gangotri Ente
fied that the
term “ascertain
ned money” includes not only amounts,
which have
been pre-deter
rmined, but also those which can be
determined
during the cou
urse of adjudication through evidence,
accounting
33
Pooph the
formula, or ju
udicial reasoning. Similarly, in Umri
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

102


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Apex Court co
onstruing the very same Act held that aft
ter the 2019
Amendment, w
which inserted the expression “ascertai
inable,” the
jurisdiction of t
the Tribunal extends to all claims which,
, though not
pre-quantified,
can be judicially worked out and went on
n to include
even unascertai
ined.
223. Learned A.G. f
further submitted that the legislative inse
ertion of the
word “ascertain
nable” by way of the 2019 Amendment i
is of pivotal
significance. T
he insertion was not casual but deliberat
te, intended
to address the
e narrow interpretation placed by certa
ain benches
2
Viva Highways decision, which had c
following the V
confined the
Tribunal’s juris
sdiction to claims of already ascertained
d sums. By
broadening the
definition of “dispute” in Section 2(1)(d
d) to include
“ascertainable”
” claims, the Legislature sought to clar
ify that the
Tribunal’s juri
isdiction covers all claims, which are
capable of
determination
through adjudicatory processes,
including
assessments of
f damages, compensation for wrongful t
termination,
or losses result
ting from blacklisting. Learned A.G. con
ntended that
the principle
of contemporanea expositio supports
this view,
which is that th
he Legislature being aware of judicial int
erpretations
consciously am
mended the statute to correct the mischief
and enlarge
the Tribunal’s r
reach.
224. Learned A.G.
then addressed the statutory architecture
e in greater
detail. Learned
d A.G. submitted that Section 3 of the
Act is the
primary vestin
ng provision contains the language of
the widest
amplitude. Th
e section provides that the Tribunal
shall have
jurisdiction ov
er “all disputes or differences pertainin
ng to works
contracts or a
arising out of or connected with the
execution,
discharge or s
satisfaction of any such contract.” Re
eliance was
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

103


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
placed upon R
Renusagar Power Co. Ltd. v. Gener
ral Electric
65
Co. wherein
the Supreme Court held that expre
essions like
“arising out of
f” and “in connection with” are of bro
oad import,
intended to cov
ver even incidental or collateral issues. S
Similarly, in
66
n (India) ,
Union of Ind
dia v. Salween Timber Construction
wherein it was
s held that any matter requiring refere
ence to the
contract terms f
falls within the arbitral scope.
225. Learned A.G.
argued that the phrase “disputes or diff
ferences” is
not to be co
onstrued synonymously rather“dispute”
” refers to
crystallized m
monetary claims, while “difference” is
a broader
genus, encomp
passing any controversy between the part
ties whether
monetary, decl
laratory, or consequential. This constru
uction finds
67
er Singh Rekhi v. DDA ,wherein it was
support in Inde
s held that a
dispute arises
upon assertion and denial and in Ghu
ulam Qadir
68
e of J&K wherein the High Court di
Baksh v. Stat
istinguished
between the tw
wo terms that “difference” is the genu
us of which
“dispute” is a s
species. The same view is found in Gar
ry B. Born,
International
Commercial Arbitration (3rd Ed., 202
21) wherein
it is noted tha
at “differences” include disagreements o
over rights,
obligations, or
conduct even before crystallization into
o quantified
claims. Therefo
ore, once the contractor contests a blackli
isting order,
a “difference”
arises within the statutory meaning
bringing it
within Section
3.
226. Learned A.G.
submitted that the pecuniary threshold
of ₹50,000
prescribed in S
Section 2(1) (d) operates only as an entr
ry filter and

65
Renusagar Power Co. Ltd. Vs
66
Union of India Vs. Salween T
67
Inder Singh Rekhi Vs. DDA,
68
Ghulam Qadir Baksh Vs. Stat

s. General Electric Co., (1984) 4 SCC 679.
Timber Construction (India), AIR 1969 SC 488.
(1988) 2 SCC 338.
te of J&K, AIR 1972 J&K 44.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

104


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
not as a jurisd
dictional limiter. The purpose of this t
threshold is
merely to exclu
ude trifling or frivolous claims from bu
urdening the
Tribunal. Once
e that threshold is crossed under any
head most
commonly term
mination-related claims or forfeiture of d
deposits the
Tribunal becom
mes seized of jurisdiction over the entire
e bundle of
connected cont
troversies including blacklisting.To treat t
the ₹50,000
requirement as
mandating independent quantification of
f every head
of claim would
d lead to fragmentation, multiplicity an
nd defeat of
legislative inte
nt. In this regard, reliance was also pla
aced on the
maxim “de m
minimis non curat lex” to emphasiz
ze that the
Legislature inte
ended only to exclude petty disputes not
t to truncate
the Tribunal’s p
plenary jurisdiction once the threshold wa
as satisfied.
227. Expanding upo
on this submission learned A.G. pointe
ed out that
blacklisting los
sses, though prospective in nature, are
not too or
totally speculat
tive in law. They can be quantified using
established
methods of asse
essment recognized both in Indian jurispr
rudence and
international a
arbitral practice. For instance, the “bu
ut for” test,
which compare
es the contractor’s expected position had
blacklisting
not occurred
with the actual position yields a
computable
differential. Re
eliance was placed on P.C. Markanda’
’s Building
and Engineeri
ing Contracts (6th Ed.) and Hudson’
’s Building
and Engineer
ing Contracts (13th Ed.) both of wh
hich outline
recognized form
mulae including the Emden, Hudson an
nd Eichleay
formulae for a
assessing loss of profit and overheads res
sulting from
termination o
or disqualification from future cont
tracts.These
methods ensur
e that losses are capable of judicial as
certainment
and fall square
ly within the enlarged definition of “disp
pute” under
the Act.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

105


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
228. Learned A.G. p
pointed out that the principles of damages
s for loss of
commercial op
portunity and reputation have long been
n recognized
69
Hicks , the
in Anglo-Ame
erican jurisprudence. In Chaplin v. H
Court of Appe
al (Fletcher Moulton L.J.) held that eve
en when the
exact quantum
of opportunity loss cannot be precisely
y calculated
the plaintiff is
entitled to substantial compensation on a
a reasonable
assessment. Th
he principle was affirmed in Story Parc
chment Co.
70
archment Paper Co., 282 and Bigelo
v. Paterson Pa
ow v. RKO
7
Pictures Inc.
1
wherein the U.S. Supreme Court de
eclared that
while damages
cannot rest on speculation, they may be
determined
through reason
nable approximation where wrongful c
conduct has
rendered preci
ise computation impossible. The same
e reasoning
72
helle O’Neill v. John Carson , and
underlies Mich
the ICSID
73
ph Charles Lemire v. Ukraine where
award in Josep
ein damages
for reputational
l harm and future opportunity were quan
ntified based
on economic a
analysis and comparators. The Learned
d A.G. also
referred to t
the UNIDROIT Principles of In
ternational
Commercial C
Contracts (2016) - Article 7.4.3 which
h recognizes
that damages m
may be established by “reasonable appro
oximation.”
Learned A.G.
thus submitted that these authorit
ties clearly
demonstrate th
hat the law does not require mathematic
cal certainty
but only rationa
al estimation.
229. To show that I
Indian law mirrors this position reliance
was placed
7
an Equipment , Rashtriya Ispat Niga
on M/s Erusia
am Ltd. v.

69
Chaplin Vs. Hicks, (1911) 2 K
70
Story Parchment Co. Vs. Pate
71
Bigelow Vs. RKO Pictures In
72
Michelle O’Neill Vs. John Ca
73
Joseph Charles Lemire Vs. Uk

KB 786.
erson Parchment Paper Co. 282, U.S. 555 (1931).
nc., 327 U.S. 251 (1946).
arson, (2023) NIMaster 9 (Northern Ireland).
kraine in ICSID Case No. ARB/06/18 in Award of 28 Ma
arch, 2011.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

106


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
74
nd Ram Saran , Deep Industries
Dewan Chan
s Ltd. v.
75
ONGC and S
ai Consulting Engineers Pvt. Ltd. v.
Rail Vikas
76
Nigam Ltd.
and likewise relied on the Delhi H
High Court
decisions in P
Prabhatam Advertisement Pvt. Ltd
. v. MCD
7
(South Zone)
77
, Satish Chand Rajesh Kumar Pv
vt. Ltd. v.
78
NDMC and C
Cobra Instalaciones y Servicios S.A. v
v. Haryana
79
ran Nigam Ltd. and the Madras High
Vidyut Prasar
h Court in
80
Company Ltd. v. Union of India .
Sundresh Oil C
230. Learned A.G.
then highlighted the provisions of the
e Tribunal’s
powers and s
submitted that Section 16 which emp
powers the
Tribunal to mak
ke “awards and orders,” is not confined t
to monetary
reliefs read wit
th Section 17-A, it confers inherent powe
ers to secure
the ends of jus
stice and Section 18 which accords the
e award the
status of a civ
vil decree, this scheme shows that the
Tribunal is
competent to
grant declaratory, consequential and
injunctive
reliefs. Thus,
the Tribunal can not only award da
amages for
wrongful term
mination, but also declare a blacklisting
g illegal or
disproportionat
te. In this regard, reliance was placed on
Anshuman
3
Shukla where
ein this Court recognized the Tribunal’s c
competence
to grant broad
remedies, as well as on Olympus Super
rstructures
81
Meena Vijay Khetan and others and
Pvt. Ltd. Vs.
d NTPC v.
82
rs Builders & Engineers , Vidya
17
a Drolia ,
Wig Brother

74
Rashtriya Ispat Nigam Ltd. V
75
Deep Industries Ltd. Vs. ONG
76
Sai Consulting Engineers Pvt.
77
Prabhatam Advertisement Pvt
78
Satish Chand Rajesh Kumar P
79
Cobra Instalaciones Servicios
2755.
80
Madras High Court in Sundre
dated 20.1.2023.
81
Olympus Superstructures Pvt.
82
NTPC Vs. Wig Brothers Build

s. Dewan Chand Ram Saran, (2012) 5 SCC 306.
GC, (2020) 15 SCC 706.
. Ltd. Vs. Rail Vikas Nigam Limited, (2021) 10 SCC 530
t. Ltd. Vs. MCD (South Zone), 2015 SCC OnLine Del 14
Pvt. Ltd. Vs. NDMC, 2022 SCC OnLine Del 1220.
.
501.
S.A. Vs. Haryana Vidyut Prasaran Nigam Ltd., 2024 SC
C OnLine Del
sh Oil Company Ltd. Vs. Union of India, WP No.12007 o
of 2022 order
. Ltd. Vs. Meena Vijay Khetan and others, AIR 1999 SC 2
2102.
ders & Engineers, (2016) 13 SCC 70.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

107


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Fertilizer Cor
rporation of India Ltd. v. Raja Bahad
dur Motilal
83
& Sons and Deccan Paper Mills Co
Poonjabhoy &
o. Ltd. Vs.
84
avir Properties .
Regency Maha
231. On the second
reference question concerning composit
te orders of
termination and
d blacklisting, the learned A.G. submitte
ed that such
orders form a s
single transactional matrix and cannot be
e artificially
bifurcated. Term
mination-related losses are usually ascert
tainable and
exceed the sta
atutory pecuniary threshold. Once jur
isdiction is
attracted on t
this account, the Tribunal must adju
udicate the
connected issu
e of blacklisting as well. To permit a w
writ petition
under Article
226 merely because blacklisting is ap
ppended to
termination wo
ould amount to splitting causes of acti
ion, risking
conflicting fin
ndings, and undermining the coheren
nce of the
statutory mech
hanism. Learned A.G. urged this is cont
trary to the
doctrine of re
es judicata and the principle against
splitting of
claims. It also o
offends the larger doctrine of institutional
l coherence,
whereby specia
alized statutory fora must be respected
to maintain
consistency and
d expertise in adjudication. Reliance wa
as placed on
85
v. Gujarat Ambuja Cement which he
State of H.P. v
eld that writ
jurisdiction sh
hould not be invoked when efficaciou
us statutory
8
and on Union of India v. T.R. Varma
6
reiterating
remedies exist
the discretionar
ry and residual nature of writ power.
232. Learned A.G.
. contended that the doctrine of h
harmonious
construction re
equires that Section 2(1)(d), Section 3,
Section 7,
Section 16 an
nd Section 17-A be read conjointly
so that no

83
Fertilizer Corporation of India
84
Deccan Paper Mills Co. Ltd. V
85
State of H.P. Vs. Gujarat Amb
86
Union of India Vs. T.R. Varm

a Ltd. Vs. Raja Bahadur Motilal Poonjabhoy & Sons, AIR
Vs. Regency Mahavir Properties, AIR 2020 SC 4047.
buja Cement, (2005) 6 SCC 499.
ma, AIR 1957 SC 882.
R 1980 SC 1031.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

108


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
provision is r
rendered otiose and the legislative
purpose is
advanced. The
doctrine of purposive interpretation rec
cognized in
87
of India
Indian Admin
nistrative Services Assn. v. Union
mandates that s
statutes be interpreted to further their obje
ect and here
the object is to
provide a complete, efficacious forum fo
or resolving
all works contr
ract disputes. The maxim “ ut res magis v
valeat quam
pereat ” was al
lso submitted emphasizing that statutor
y provision
must be constru
ued to make them workable rather than in
neffective.
233. In summation,
learned A.G. submitted that the losses fl
owing from
blacklisting are
e ascertainable both in principle and in
practice by
recognized jud
dicial and economic methods and thus
fall within
Section 2(1) (d
d). The Madhyastham Tribunal has full
jurisdiction
under Sections
s 3, 16, and 17-A to adjudicate both mo
onetary and
declaratory cla
aims including those concerning the l
egality and
proportionality
of blacklisting.
234. The pecuniary
threshold is merely procedural, and once
e any claim
in any head e
xceeds ₹50,000 the entire contractual
controversy
falls within th
he Tribunal’s competence. Composite
e orders of
termination and
d blacklisting cannot be bifurcated for se
eparate writ
adjudication. T
The Act of 1983, constitutes a com
mplete and
exclusive code
designed to serve as a single, efficaciou
us, and final
adjudicatory m
mechanism for all disputes and differences
s arising out
of works contra
acts with the State Government. Thus, the
e composite
orders of termi
ination and blacklisting must therefore b
be carried in
their entirety b
before the Tribunal and writ petitions un
nder Article
226 are not m
maintainable in the presence of availab
le statutory
remedy.

87
Indian Administrative Service

es Assn. Vs. Union of India, 1993 Supp(1) SCC 730.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

109


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
SUBMISSIONS ON

N BEHALF OF RESPONDENT/CORPOR
RATION :
235. Shri Manoj M
Munshi, learned Senior Counsel appear
ring for the
respondents sub
bmitted that the pivotal question before
this Larger
Bench concern
ns the scope of the expression “asc
ertained or
ascertainable m
money” under Section 2(1)(d) of the Adh
hiniyam and
the proper fo
orum for adjudicating grievances ar
rising from
blacklisting ord
ders. Learned Senior Counsel opened hi
is argument
by submitting
that before the Tribunal can assume ju
urisdiction a
duty lies upon
n the contractor or litigant to make a
categorical
declaration t ha
at whether because of blacklisting he has
s suffered a
loss, which is e
either already ascertained or is ascertainab
ble in terms
of money. If s
uch a declaration is absent, it cannot b
e presumed
that a “dispute”
” exists under Section 2(1) (d) conversely
y once such
a claim is ple
eaded Section 7-A obliges inclusion of
f the whole
bundle of claim
ms monetary as well as declaratory with
in the same
reference.
236. Learned senior
r counsel explained that the Legislature b
by the 2019
amendment ad
dding the phrase “ascertained or asc
certainable,”
intended to wi
iden the jurisdiction of the Tribunal be
eyond fixed
sums to those c
capable of quantification through evidenc
ce. He relied
14 33
Enterprises and Umri Pooph which
on Gangotri E
h recognize
that ascertainm
ment may occur during adjudication. The
e provision,
learned senior
Counsel submitted must be read alongsi
ide Sections
3 and 7-A. Sec
ction 3 envisages that the Tribunal shal
ll decide all
disputes or di
ifferences “arising out of or connecte
ed with the
execution, disc
charge or satisfaction” of a works contr
ract thereby
extending juris
sdiction even after completion when sat
tisfaction of
the employer is
s in question; Section 7-A(1) embodies t
the “whole-
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

110


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
claim rule” ana
alogous to Order II Rule 2 CPC; Section
7-A(2) bars
subsequent litig
gation of omitted claims and Section 7-A
A(3) allows
inclusion of cla
aims that accrue later.
237. Distinguishing
between ascertained and ascertainable
e loss, Shri
Munshi argued
d that the statute covers only a loss that h
has actually
occurred and c
an be quantified, not a speculative or pro
obable loss.
Learned Senior
r Counsel submitted that the blacklisting
g may have
two kinds of c
consequences. The first category is whe
ere loss has
already occurre
ed; for example, when a tenderer is disqu
alified from
a bid or loses
s profits on a terminated contract. Su
uch loss is
ascertainable an
nd therefore triable by the Tribunal. The
second is a
prospective or
r hypothetical loss; for instance, wher
re during a
period such as
the pandemic no tenders were issued an
nd therefore
no real monetar
ry prejudice was suffered. In that situatio
n, the claim
is neither ascert
tained nor ascertainable on the date of fil
ling, and the
Tribunal canno
ot assume jurisdiction. However, if suc
h loss later
materializes it m
may be added by amendment under Secti
ion 7-A (3).
The filing date
therefore, is crucial for determining juris
sdiction.
238. Turning to the
e question whether declaratory relief is
permissible
before the Tri
ibunal, Shri Munshi drew an analogy
y from the
Arbitration and
d Conciliation Act 1996 and the Specific
c Relief Act
81
senior counsel relied on Olympus a
1963. Learned
and Deccan
84
Paper Mills .
Since the Madhyastham Adhikaran tribu
unal acts as
a substitute fo
or civil courts in the domain of wor
rks-contract
disputes, learn
ed senior counsel argued that the same
e reasoning
applies to the
Tribunal and therefore it can issue d
declarations
integral to suc
ch disputes.Section 16 of the Adhiniy
yam, which
parallels Sectio
on 31 of the 1996 Act empowers it to pa
ass reasoned
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

111


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
awards, interim
m or final and should be interpreted
to include
declaratory aw
wards. The absence of express words
conferring
declaratory pow
wer does not amount to a prohibition.
239. Learned senior
r counsel then referred to Section 34 of t
the Specific
Relief Act, wh
ose proviso forbids bare declarations, wh
here further
1
ble. The Full Bench in Gouri Ganesh
relief is possib
has already
applied this pri
inciple to the Adhiniyam holding that ch
hallenges to
termination or
blacklisting must include consequential
reliefs such
as monetary c
compensation, omission would bar late
er litigation
under Section
7-A (2). Hence, a contractor, who app
roaches the
Tribunal mus
st include every relief whether
declaratory,
consequential,
and monetary within the same proceeding
g.
240. Discussing alte
ernative forum learned senior counsel sub
bmitted that
when a contrac
ctor expressly pleads that he has no mon
netary claim
of ₹50,000 or m
more, or that his grievance is limited to
blacklisting
simpliciter, the
Tribunal’s jurisdiction is ousted and the
remedy lies
before the civil
l court under Section 9 CPC. The jurisdi
iction of the
civil court has
s not been expressly barred.Conversely
y, where a
qualifying mon
netary claim exists, the Tribunal’s jur
risdiction is
exclusive and th
he entire cause of action must be pursued
d there.
241. On the mainta
ainability of writ petitions, learned Seni
ior Counsel
64
y Power Ltd , Joshi Technologies In
referred to Sky
ternational
88
of India , Tata Cellular v. Union
89
of India ,
Inc. v. Union
25
ndal and Michigan Rubber v.
Jagdish Man
State of
90
Karnataka .
These decisions collectively hold th
hat judicial
review in contr
ractual matters is confined to correcting
g public-law

88
Joshi Technologies Internation
89
Tata Cellular Vs. Union of Ind
90
Michigan Rubber Vs. State of

nal Inc. Vs. Union of India, 2015(7) SCC 728.
dia, 1994(6) SCC 651.
f Karnataka, (2012) 8 SCC 216.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

112


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
infirmities such
h as want of notice, absence of reasons
or manifest
disproportional
lity, but does not extend to re-a
adjudicating
contractual dis
sputes. Hence, a writ is maintainable
only where
blacklisting is
tainted by procedural or constitutiona
al illegality.
Where such de
efects are absent, the contractor must se
eek remedy
under the Adhin
niyam.
242. Summarizing h
his propositions, Shri Munshi submitted
d that three
distinct situati
ions arise. First, if the contractor
asserts an
ascertained or a
ascertainable claim exceeding ₹50,000, th
he exclusive
forum is the T
Tribunal, which can adjudicate both the
declaratory
and consequen
ntial monetary reliefs. Second, if the
e contractor
disclaims such
a claim and confines his grievance to
blacklisting
without pecuni
iary impact, the civil court’s jurisdictio
on survives
under Section 9
9 CPC. Third, where blacklisting suffers
from patent
illegality or v
violation of natural justice, a writ pet
tition under
Article 226
remains maintainable notwithstanding
g alternate
remedies. In e
every case, however the contractor mus
st make an
initial declarati
ion of his claim’s nature and quantum f
for only on
that basis can ju
urisdiction be determined.
243. Concluding, th
he learned Senior Counsel urged tha
at the term
“dispute” in
Section 2(1)(d) be interpreted purpo
osively and
harmoniously w
with constitutional and arbitral jurispru
udence. The
Tribunal is com
mpetent to adjudicate all claims arising o
out of works
contracts mon
netary as well as declaratory once th
he statutory
threshold is
met.Post-2019, the monetary conseq
quences of
blacklisting if d
demonstrably ascertainable are within the
e Tribunal’s
ambit and Writ
t jurisdiction subsists solely to correct pr
rocedural or
constitutional d
defects. The legislative intent of Section
n 7-A is to
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

113


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
compel parties
s to bring the whole claim at once,
precluding
fragmentation a
across multiple forums. Thus, learned sen
nior counsel
prayed that wh
hile affirming the State’s inherent power
to blacklist
subject to natu
ural-justice safeguards this larger bench
should also
hold that all
consequential monetary and declarato
ry disputes
belong to the
statutory forum leaving Article 226 jur
risdiction to
operate only as
a narrow constitutional safety-valve.
244. According to
Shri Sumit Nema, learned Senior C
Counsel, the
jurisdiction con
nferred upon the Tribunal under the Adhi
iniyam is of
the widest am
mplitude and is intended to cover any
dispute or
difference arisi
ing out of, or connected with, the execut
tion or non-
execution of a
works contract. Learned senior counse
el submitted
that the Preamb
ble, Section 3, and Section 2(1) (d) togeth
her depict a
legislative des
sign to create a self-contained mech
hanism for
adjudicating al
ll disputes having their genesis in the
contractual
relationship wi
ith the State. The term “dispute” as de
fined under
Section 2(1) (d
d) includes claims of “ascertained or as
scertainable
money” and, t
therefore, does not mandate prior quant
tification or
actual loss; it su
uffices that the claim is capable of being
valued with
reference to the
e contract from which it arises.
245. Learned senio
or counsel further submitted that an
n order of
blacklisting is
never an independent administrative
act, but an
offshoot of the
e contractual terms since every such orde
er emanates
from the allege
ed breach or non-performance of the wor
rks contract.
The show-caus
se notice, the reply thereto, and the co
onsequential
order are all r
referable to contractual clauses particu
ularly those
stipulating the
e grounds of default or misconduct
warranting
blacklisting. H
Hence, even if the contract has been ex
xecuted and
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

114


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
fully discharge
ed, the blacklisting, being predicated upo
on the terms
of that very co
ntract draws its legal colour and valuatio
on from the
contract itself.
246. The learned Se
enior Counsel illustrates that even where
e there is no
termination, no
o recovery and no immediate financial r
repercussion
such as in case
es where the only consequence is debar
rment for a
period of yea
ars, the dispute remains maintainable
before the
Tribunal, for th
he valuation at the threshold must be rela
atable to the
contract value
and not to speculative future loss.
The words
“ascertained or
r ascertainable money valued at ₹50,000 o
or more,” in
his submission
n refer to the potential monetary dimens
sion derived
from the cont
tract and not to the actual quantified
d claim at
inception. The
erefore, the test of maintainability und
der Section
2(1)(d) is sati
sfied whenever the dispute arises from
m a works
contract exceed
ding the prescribed monetary threshold.
247. Developing the
e argument further, Shri Nema submitt
ted that the
power of the T
Tribunal to grant interim relief is prese
erved under
Section 16, wh
hich expressly authorises the making of
f an interim
award on any m
matter capable of final adjudication.
248. A harmonious
construction of Sections 16 and 17-A lea
arned senior
counsel conclu
uded his argument by submitting that
t while the
Tribunal is res
strained from staying monetary recove
eries before
award it nevert
theless retains the inherent power to ren
nder interim
awards protect
ting substantive rights including, in
appropriate
cases, permitti
ing a contractor to participate in futu
ure tenders
pending final
adjudication. To hold otherwise wo
ould render
Section 16 otio
ose, contrary to the rule of interpretation e
embodied in
the maxim “ ut
t res magis valeat quam pereat” as affir
rmed by the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

115


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
9
t in CIT v. Hindustan Bulk Carriers
91
and East
Supreme Court
92
. Union of India .
India Hotels v

249. The learned Sen
nior Counsel also pointed out that the leg
gislature has
consciously e
employed both the expressions “d
disputes or
differences” in
Section 3 and “dispute.…relating to any
difference”
in Section 2(1)
(d) thereby indicating that not all “differe
ences” need
be translated i
into quantified monetary disputes. A di
ifference in
interpretation o
or application of contractual clauses woul
ld suffice to
invoke the Trib
bunal’s jurisdiction. The term “difference
e” has been
deliberately ins
serted to encompass disagreements, wh
hich though
not immediatel
ly measurable in monetary terms nevert
theless arise
out of the execu
ution, discharge or satisfaction of a works
s contract.
250. Addressing th
he issue of maintainability vis-à-vis
s the writ
jurisdiction of
this Court Shri Nema argued that the
jurisdiction
under Article 2
226 is supervisory and not intended for a
appreciation
of evidence or
resolution of disputed questions of fact,
particularly
in contractual
l matters such as blacklisting, whi
ich require
examination o
of the contract, compliance with its
terms, and
determination
of breach. Reliance is placed on
Whirlpool
20
Corporation ,
93
, Union of India v. Puna Hinda
3
and Sky
64
Power . Learn
ned senior counsel submitted that even
n if interim
protection is
sought under Article 226 in aid o
of pending
proceedings, th
he final adjudication of the legality an
nd effect of
blacklisting mu
ust rest with the Tribunal, which alone is
s competent
to examine evid
dence and render findings thereon.

91
CIT Vs. Hindustan Bulk Carri
92
East India Hotels Vs. Union o
93
Union of India Vs. Puna Hind

iers, (2003) 3 SCC 57.
of India, (2001) 1 SCC 284.
da, (2021) 10 SCC 691.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

116


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
251. In summation,
Shri Nema asserts that the question
before this
Larger Bench p
pertains only to maintainability and not
to efficacy.
Once it is acce
epted that the blacklisting emanates fro
om a works
contract and th
hat the claim is capable of valuation by r
reference to
that contract,
the dispute becomes maintainable
under the
Adhiniyam. Th
he efficacy of the relief or the nature
of interim
protection may
y vary from case to case, but the ju
urisdictional
competence of
f the Tribunal to entertain such disputes
s cannot be
doubted.
252. Thus, accordin
ng to the learned Senior Counsel, the c
orrect legal
position is that
challenges to blacklisting orders having
their origin
in works cont
tracts are maintainable before the Tr
ribunal, the
valuation of th
he dispute being relatable to the contrac
ct value and
that the Tribun
nal possesses adequate statutory and inher
rent powers
to secure sub
bstantive justice, while the High C
ourt’s writ
jurisdiction und
der Article 226 is confined to supervisory
y or interim
oversight and
not to the final adjudication of such
contractual
controversies.
SUBMISSIONS BY O
OTHER ADVOCATES IN SUPPORT
T OF THE
STAND OF RESPOND
DENTS :
253. Learned Deput
ty A.G. Shri Sudeep Bhargava submitt
ted that the
first reference
question naturally bifurcates into two lim
mbs; firstly,
whether loss ar
rising from a blacklisting order is “asce
ertained” or
“ascertainable”
” within the meaning of Section 2(1)
)(d) of the
Adhiniyam and
d secondly, if not, whether the Full Benc
ch in Gouri
1
Ganesh and t
19
ers rightly
the Division Bench in Awasthi Brothe
held that a cont
tractor aggrieved by blacklisting has reco
ourse before
the Tribunal co
onstituted under the Adhiniyam. On the
e first limb
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

117


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
learned Deputy
y A.G. submitted that the legislative am
mendment to
2
Highways ,
Section 2(1)(d
) brought after the decision in Viva H
whereby the te
erm “ascertainable” was consciously ad
dded to the
existing phrase
e “ascertained”, thereby expanding the s
scope of the
definition of “d
dispute.”
254. According to l
earned Deputy A.G. this statutory enlarg
gement was
intended to ove
erride any restrictive judicial interpretatio
on and bring
within the Trib
bunal’s jurisdiction even such monetary
claims that
may not be
presently quantified, but are capable
e of being
established by
oral and documentary evidence. In th
his context,
reliance was p
placed on the authoritative pronouncem
ment of the
33
me Court in Umri Pooph , wherein it w
Hon’ble Suprem
was held that
claims which a
are determinable through quantification
fall within
the ambit of “a
ascertained” and the scope of dispute inc
cludes even
“unascertained”
” monetary claims. Learned Deputy
A.G. thus
submitted that
post-amendment, the Tribunal’s jurisdict
tion is wide
enough to cove
er both “ascertained” and “ascertainable
e” monetary
disputes and t
that claims arising from blacklisting
are clearly
included withi
in this ambit as they are somewhat
capable of
valuation once
evidence is led.
255. On the second
limb of the first reference question, lear
rned Deputy
1
sh and the
A.G. contende
d that the Full Bench in Gouri Ganes
19
ch in Awasthi Brothers correctly
Division Benc
held that
blacklisting is
an action often flowing from or in
ncidental to
termination of
contract, and therefore falls within the sw
weep of the
Adhiniyam. Le
earned Deputy A.G. relied on the pream
mble of the
Act, which exp
pressly includes “matters incidental to or
r connected
therewith” and
further relied on the decision of the Fu
ull Bench in
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

118


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Birla Corporat
tion, wherein it was held that all such
h incidental
questions are w
within the Tribunal’s domain.

256. Blacklisting, in
n his submission, cannot be segregate
d from the
main contractu
ual dispute, particularly when termin
nation and
blacklisting ari
ise from a common factual matrix. Wh
here such a
composite orde
er results in financial consequences, pa
articularly a
claim exceedin
ng ₹50,000/-, the remedy lies before th
he Tribunal
constituted und
der the Adhiniyam. Where the claim i
is less than
₹50,000/-, reco
ourse may lie to arbitration, if the contra
act provides
so, and where
e the contractor seeks to challenge bla
cklisting in
isolation and w
without pressing a monetary claim, the d
epartmental
appellate forum
m would be appropriate. At all events,
, where the
grievance invo
lves questions of fact such as notional l
loss, or loss
of future oppor
rtunities, evidence will necessarily have to
o be led and
hence writ juris
sdiction should ordinarily not be invoked
.
257. On the issue
of writ petitions against composite
orders of
termination an
nd blacklisting,learned Deputy A.G. sub
bmitted that
the nature of
such orders must be properly appre
eciated. He
classified comp
posite orders into three categories: inte
erdependent
orders (where b
blacklisting and termination are causally
connected),
consequential
orders (where blacklisting follows dir
rectly from
termination) an
nd independent orders (where blacklisti
ng rests on
distinct ground
ds such as fraud or misrepresentation).
258. In cases falling
g under the first two categories, where
the factual
foundations an
nd legal consequences are intertwine
ed and the
contractor seek
ks monetary relief, the proper forum is th
he Tribunal
provided the cl
laim meets the statutory threshold. In rar
re instances
of independent
t blacklisting, where procedural illegality
y is evident
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

119


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
such as breach
h of natural justice or lack of jurisd
iction, writ
jurisdiction ma
ay still lie, though as an exception and n
not the rule.
Learned Deput
ty A.G. cautioned that a bifurcated challe
enge before
different fora
would amount to impermissible forum
m shopping,
which has been
n frowned upon by the Supreme Court i
in Union of
94
a Ltd. and Chetak Construction L
India v. Cipla
Ltd. v. Om
95
Prakash .
259. To the const
titutional objections raised by the c
counsel for
petitioners and
d amicus curies learned Deputy A.G. sub
bmitted that
the plea of vio
olation of Article 19(1)(g) was wholly
misplaced.
Learned Deput
ty A.G. asserted that a blacklisting ord
der operates
only inter parti
ies i.e., between the contractor and the
department
issuing the ord
der. It does not create a blanket disq
qualification
against doing b
business with other departments or priv
vate entities.
He therefore a
argued that the right to trade or pra
actice one’s
profession is n
ot taken away by a departmental blackli
isting order.
On the issue o
of whether such orders are in personam
m or in rem
learned Deputy
y A.G. submitted that blacklisting is und
doubtedly in
personam its
effect is limited to the relationship b
between the
department and
d the contractor. If another department
voluntarily
incorporates a
clause to exclude blacklisted contractor
rs that self-
imposed restric
ction does not convert the original blackl
listing order
into one in rem
m .
260. Learned Depu
uty A.G. similarly rejected the argu
ument that
Tribunals con
nstituted under Article 323-B are in
ncapable of
safeguarding f
fundamental rights and submitted tha
at all such

94
Union of India Vs. Cipla Ltd.,
95
Chetak Construction Ltd. Vs.

, (2022) 7 SCC 124.
Om Prakash, (1998) 4 SCC 577.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

120


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Tribunals are b
bound by principles of natural justice and
d in cases of
violation they
are competent to record evidence
and render
decisions acco
ordingly. Placing reliance on Section 7
7-A of the
Adhiniyam, lea
arned Deputy A.G. submitted that all cla
aims arising
out of a works
contract must be brought before the Trib
bunal in one
proceeding. Su
ub-section (2) of Section 7-A stipulate
es that if a
claimant omits
to raise a claim in the original reference,
, such claim
shall be deemed
d to have been waived.
261. Learned Deput
ty A.G. illustrated this principle with a
an example:
where a contra
actor seeks possession, but omits a claim
m for mesne
profits that was
s within his knowledge, such claim would
d be barred.
Applying the s
same analogy here, if a contractor chal
lenges only
termination bef
fore the Tribunal, while reserving blackl
listing for a
writ petition, it
would amount to a split in claims, which
h is contrary
to the letter an
nd spirit of the Act. Such bifurcation
is not only
procedurally im
mproper, but also encourages forum shopp
ping, which
has been held to
o be a disreputable practice in law.
262. To answer the
e criticism that losses arising from blac
cklisting are
speculative and
d not capable of quantification, learned D
Deputy A.G.
submitted meth
hodologies for computing unliquidated da
amages and
suggested that
the contractor’s previous balance sheets
may reveal
a projected gro
owth trajectory from which loss of opport
tunity could
be deduced. A
comparative analysis of similarly placed
d contractors
not subjected to
o blacklisting could yield benchmarks for
r estimating
notional loss.
263. Learned Depu
uty A.G. also proposed a general f
formula for
quantification:
ULD = TDL (as EI or RI) – MLD – R
RIL , where
ULD is Unliqu
uidated Damages, TDL is Total Direct
Loss, EI is
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

121


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
Expectation Int
terest, RI is Reliance Interest, MLD is M
Mitigation of
Loss Due to D
Default, and RIL is Remote or Indirect
Loss. Thus
losses arising o
out of blacklisting though not liquidated a
are certainly
ascertainable a
and the Tribunal is the proper forum to
o determine
them. In conc
clusion, learned Deputy A.G. submitte
ed that the
Tribunal is a co
omplete and effective forum, equipped to
o adjudicate
such disputes b
both in law and on facts.
264. Shri Parth Sh
harma, learned counsel submitted tha
at the 2019
amendment intr
roducing the term “ascertainable” in Sect
tion 2(1) (d)
manifests the le
egislature’s clear intention to expand the
e Tribunal’s
jurisdiction so
as to encompass all contractual disputes
s, including
those arising fr
rom blacklisting orders. Learned counsel
brought the
attention of thi
is court to the Statement of Objects and
Reasons of
the Amendmen
nt Act, which indicates that exclusion
n of claims
involving unce
rtain monetary value would defeat the ve
ery purpose
of the statute.
Hence, the phrase “ascertainable mone
ey” must be
interpreted bro
oadly to include claims, where loss thou
ugh not yet
quantified is
capable of being computed through
contractual
analysis.
265. Learned Coun
sel submitted that in light of the Pre
eamble, the
legislative pur
rpose was always to bring every ci
ivil dispute
emanating from
m a works contract, including blacklisting
g, within the
Tribunal’s fold
d. Reliance is placed on R.M.D. Chamar
rbaugwalla
96
ndia and Delhi Airtech Services (P) L
v. Union of In
td. v. State
97
of U.P. , wher
rein it was held that the statute must be c
construed as

96
R.M.D. Chamarbaugwalla Vs
97
Delhi Airtech Services (P) Ltd

s. Union of India, 1957 SCR 930.
d. Vs. State of U.P., (2011) 9 SCC 354.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

122


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
a whole, consi
idering its object, history, and preamble
e to discern
legislative inten
nt.

266. Learned counse
el submitted that the writ jurisdiction un
nder Article
226 is not barr
red, but is to be exercised sparingly and
d that High
Courts may in
ntervene only where (i) fundamental
rights are
violated, (ii) pr
rinciples of natural justice are breached
d or (iii) the
order is witho
out jurisdiction. In all other cases, the
alternative
statutory remed
dy must be exhausted first. Learned cou
unsel further
98
f India v. T.R. Verma and Venkate
cites Union of
eswaran v.
99
Wadhwani to
o emphasize that when a statute both cre
eates a right
and provides t
the mode of enforcement, parties must
follow that
procedure. Acc
cordingly, since the Adhiniyam provides
a complete
mechanism for
r redressal before the Tribunal to resor
rt to Article
226, without
availing that remedy is impermissi
ible unless
exceptional gro
ounds exist.
267. In conclusion,
Shri Sharma submits that blacklisting c
causes civil
consequences a
and falls squarely within the Tribunal’s
jurisdiction
under Section
2(1) (d), especially after the 2019 ame
endment. A
writ petition ch
hallenging such orders is maintainable on
nly in cases
involving breac
ch of natural justice or fundamental rights
s otherwise;
the contractor
must seek redressal before the Tribuna
al under the
Adhiniyam.
268. Shri Aniket N
Naik , learned counsel submitted that the
e essence of
his argument re
ests on the proposition that a challenge to
o an order of
blacklisting i
s maintainable before the Madhy
ya Pradesh
Madhyastham
Adhikaran Adhiniyam of 1983, wh
hen such a

98
Union of India Vs. T.R. Verm
99
Venkateswaran Vs. Wadhwan

ma, AIR 1954 SC 207.
ni, AIR 1961 SC 1506.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

123


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
challenge is art
ticulated as a claim for loss of opportunit
ty or loss of
chance. Learne
ed counsel submitted that the term “disp
pute” under
Section 2(1)(d)
) of the Adhiniyam is broad enough to
encompass
such claims, pr
rovided they are ascertainable and base
ed on a real
and substantia
al possibility rather than upon con
njecture or
speculative pro
ospects. Even if there is no independen
nt claim for
loss of profit ar
rising from a terminated contract, a stand
dalone claim
for damages
caused by the loss of opportunity
during the
blacklisting per
riod is maintainable before the Tribunal.
269. Expanding on
this submission, learned counsel state
ed that the
crucial question
n is not whether damages can be precisel
y computed
but whether t
they are capable of assessment throu
ugh judicial
estimation. Lea
arned counsel referred to the established
principle of
contract law th
hat difficulty in assessment is no bar t
to recovery
relying on the e
exposition in Anson on Contract under
the chapter
“Damages – D
Difficulty of Assessment No Bar.” Learn
ned counsel
submitted that
so long as the claimant demonstrates
a real and
substantial loss
s of chance, the Tribunal can and shou
uld evaluate
such loss witho
out denying jurisdiction merely because
e its precise
quantification
is complex. Reliance is placed on d
decisions of
Simpson v. Lo
ondon & North Western Railway Co. an
nd Chaplin
100
v. Hicks in
which courts awarded compensation fo
or loss of a
valuable opport
tunity despite the inherent difficulty in es
stimating its
worth.
270. Addressing the
e Court’s concern that blacklisting ma
ay relate to
indefinite futu
ure possibilities such as unknown
tenders or
indeterminate p
procurements, Shri Naik clarified that no
ot every lost

100
Simpson Vs. London & Nort

th Western Railway Co. and Chaplin Vs. Hicks (1911).
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

124


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
possibility qua
alifies for compensation. The law recog
gnizes only
those chances
that are real, probable, and measurabl
le. Learned
counsel conced
ded that claims resting on unknown fu
uture events
across unspecif
fied authorities or tenders for which the
e contractor
had not demon
strated eligibility or intent would be spec
culative and
thus excluded.
However, when the period of blacklisting
g is definite
for example, th
hree years and the contractor can show t
that tenders
were actually f
floated during that period within his us
sual area of
operation and f
for which he was qualified and ready to b
bid, the loss
becomes an asc
certainable head of claim.
271. In order to dem
marcate the boundary between compensab
ble and non-
compensable lo
osses, learned counsel relied upon the
Singapore
101
up which
High Court j
judgment in Global Switch v. Aru
distinguishes a
a loss of profits claim from a loss of
opportunity
claim. Learned
d counsel submitted that in a loss of profi
it claim, the
claimant must
prove on a balance of probabilities
that profits
would indeed h
have been earned, but for the breach, w
whereas in a
loss of chance
claim the claimant must only show that
t the breach
caused the los
ss of a real and substantial chance l
leaving the
valuation of t
that chance to judicial estimation by
applying a
probability-bas
sed discount. To reinforce the above
the learned
counsel cited t
the decision of the English Court of
Appeal in
102
Group Ltd. v. Simmons & Simmons
2
which was
Allied Maples
approved by th
he House of Lords in Gregg v. Scott,
, where the
courts laid dow
wn that matters within the claimant’s o
own control
must be proved
d conclusively, while matters depending
on external

101
Global Switch Vs. Arup.
102
Allied Maples Group Ltd. Vs

s. Simmons & Simmons.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

125


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
factors may be
e valued as a percentage probability. In
n effect, the
Tribunal is not
required to conduct a full-scale “trial wi
ithin a trial”
but to value the
e lost chance proportionally, provided it
is shown to
be genuine and
d not merely theoretical.
272. Applying thes
se principles to blacklisting disputes,
Shri Naik
formulated a t
two-stage framework. Under Stage I, th
he claimant
must establish
that the blacklisting was unlawful or un
nsustainable,
that it covered
d a specific period and that during that
time, there
existed tangible
e tenders within his operational scope, wh
here he was
eligible and cap
pable of bidding. Further, it must be sho
own that the
contractor genu
uinely intended to participate, which can
n be verified
by his past bid
dding history, availability of financial res
sources and
business record
ds. Under Stage II, once the existence
e of a real
chance is estab
blished, the Tribunal must determine the q
quantum by
identifying the
e tenders the contractor could reason
nably have
pursued applyin
ng a realistic success rate derived from h
his historical
record and mu
ultiplying the expected awards by an
appropriate
profit margin.
Any exaggerated or geographically inf
flated claim
must be rejecte
ed.
273. When confront
ted with the concern that such an appr
roach might
open the floodg
gates to indeterminate claims, Shri Naik
k responded
that the eviden
ntiary discipline of Stage I effectively
y filters out
unfounded ass
ertions. Eligibility, capacity, and bona
fide intent
operate as juris
sdictional gates and a contractor who has
historically
executed a lim
mited number of projects cannot plausib
bly claim to
have lost hundr
reds of unrelated tenders across the natio
on. Learned
counsel submit
tted that the Tribunal is fully competent
to correlate
claims with
objective evidence such as financia
l turnover,
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

126


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
manpower, equ
uipment and bidding capacity thereby en
nsuring that
speculative exa
aggeration is curbed.

274. Learned counse
el submitted that the claim should be con
nfined to the
duration of the
e blacklisting order and although in pra
actice, other
procuring enti
ities may adopt exclusion clauses r
referring to
previous blackl
listing, any extended stigma effect after
the order is
set aside becom
mes too remote and cannot be compen
nsated. The
Tribunal shoul
ld therefore confine compensation stri
ictly to the
blacklisting per
riod ensuring that causation remains pro
oximate and
that the claim
m does not transform into an unendin
ng chain of
speculative con
nsequences.
275. Shri Naik subm
mitted that a refusal to grant temporary
y protection
does not itself b
bar final adjudication on merits. If, at the
e end of the
proceedings, t
the Tribunal finds the blacklisting
illegal the
consequent clai
im for damages assessed through the los
ss-of-chance
framework ade
equately compensates the contractor. In
conclusion,
learned counse
el prayed that this larger bench rec
cognize the
arbitrability an
nd assessability of claims arising from
blacklisting
when framed a
as loss of opportunity or loss of chanc
ce and that
compensation b
be limited to the actual duration of the
blacklisting
and that the cl
laimant bear a strict burden of proving
g eligibility,
capacity, genu
uine intent and that valuation be cond
ducted on a
probability wei
ighted basis anchored in empirical perform
mance data.
This learned co
ounsel contended that achieves harmony b
between the
statutory requir
rement of “ascertainability” under Secti
ion 2(1) (d)
and the long sta
anding legal principle that difficulty of as
ssessment is
no bar to the gr
rant of just compensation.

Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

127


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
EFFECT OF THE A
AMENDMENT, 2025 :
276. The matter was
s finally heard on 19.9.2025 and reserved
d for orders,
thereafter oral r
request was made to the bench on behalf
of the State
that the Amend
dment of 2025 in Adhiniyam, 1983 may
y be notified
shortly and con
nsequently the order may not be passed
. Thereafter
on 30.4.2026
the amendment was notified and b
by way of
amendment Se
ctions 2,4, 5,7(A), 7(B), 10, 16, 17(A),
20, 29 and
32 have been a
amended and Section 4A, 5A, 13A and
17-AB was
inserted in the A
Act.
277. One limb of th
he argument on behalf of the petitione
r and other
lawyers was th
at the statutory arbitration tribunal is not
having any
power to exte
end any interim protection or issue a
any interim
injunction in t
the matter and, therefore, the alternate
remedy to
approach to th
he Arbitration Tribunal is not efficaci
ous in any
manner. The a
amendment in Section 17-A and by i
insertion of
Section 17-AB
in the Adhiniyam, the Tribunal has bee
en conferred
powers to pass
the interim orders.
Amended Sect
tion 17-A reads as under:
“17-A. Inh
deemed to
the Tribun
the ends of
Tribunal :
further tha
award incl
herent powers .— Nothing in this Act sha
all be
limit or otherwise affect the inherent powe
al to make such order as may be necessary
f justice or to prevent abuse of the process o
ers of
ry for
of the

at the Tribunal shall have no power to review
w the
luding the interim award”.


Newly inserted
d Section 17-AB of Amended Act reads
s as under:-
" 17AB. (1
proceeding
before it is
to a Tribun
1) A party may, before or during arb
gs or at any time after making of the award
bitral
d but
apply
s enforced in accordance with Section 18, a
nal,-
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

128


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
(1) for the
person of
proceeding
(ii) for an
of the follo
(a) the pre
guarantee
matter of th
(b) the pre
which is th
as to which
for any of
any land o
authorising
be made,
necessary
information
(c) order of

278. Learned Advo
e appointment of a guardian for a mino
f unsound mind for the purposes of arb
or or
bitral
gs; or
interim measure of protection in respect of
owing matters, namely: -
f any
eservation, interim custody, encashment of
bank
bject-
or sale of any goods which are the sub
he arbitration agreement;
eservation or inspection of any property or
he subject-matter of the dispute in arbitratio
thing
on, or
h any question may arise therein and author
rising
the aforesaid purposes any person to enter
or building in the possession of any party
g any samples to be taken or any observatio
upon
y, or
on to
y be
g full
or experiment to be tried, which may
or expedient for the purpose of obtaining
n or evidence;
of restitution.
ocate General submits that by way of
insertion of
Section 17-AB
B in the Adhiniyam, 1983, the Statutory
Arbitration
Tribunal has be
een conferred power to grant interim mea
asures in the
appropriate ca
ases and after insertion of Section
17-AB the
apprehension o
of the contractors are misplaced that
if they are
directed to chal
llenge the blacklisting order before the T
Tribunal, the
Tribunal would
d not be competent to grant the interim r
relief and if
the matter rem
mains pending for years together even
n after the
completion of t
the period of blacklisting, their attempt f
for redressal
of the dispute
will render infructuous. He further subm
mits that by
conferring pow
wers to the Tribunal, now a party may
y before or
during arbitral
proceedings or at any time after makin
ng of award
but before its e
enforced in accordance with Section 18
8, applies to
the tribunal s
eeking interim measures including th
he order of
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

129


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
restitution and
order for preservation, interim custody
y, deferment
of encashment
of bank guarantee or sale of any goods
s, which are
the subject ma
atter of arbitration agreement and to p
preserve the
subject matter o
of the arbitration.
279. Learned Advo
ocate General submits that Section
17-A vests
inherent power
rs, over reaching the other provisions, t
to make all
order necessar
ry for the ends of justice or to preven
nt abuse of
process and by
way of amendment the first proviso to S
ection 17-A
has been delete
ed and now the powers have been made a
absolute and
unfettered. Bef
fore the amendment the first proviso re
estricted the
powers from g
granting the injunction, stay or attachm
ment before
award, but that
t proviso has been deleted and the inher
rent powers
have been exte
ended to the Tribunal, which are akin to t
the inherent
jurisdiction of
civil courts U/S.151 of the Code of Civi
il Procedure
and the Tribuna
al may also pass the order of temporary in
njunction in
the appropriate
e circumstances. He submits that the po
ower is now
made absolute
and unfettered and the tribunal may stay
y deferment
or grant any o
other relief in accordance with law in
blacklisting
disputes. The t
tribunal may make all orders necessary f
for the ends
of justice and to
o prevent abuse of process.
280. Learned Advo
cate General further submits that by i
insertion of
Section 17-AB
the powers have been conferred to the
Tribunal to
grant the inte
erim relief even before initiation of
arbitration
proceedings, du
uring proceedings or post award, pre-en
nforcement.
These powers a
are akin to the powers of the civil courts U
U/S.9 of the
Arbitration and
d Conciliation Act, 1996. Section 17-A
AB(1)(ii)(c)
provides for o
rders of restitution and restitution mean
ns that any
action which h
has been taken against any person may
be restored
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

130


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
back to the ea
arlier original position. As per learned
d Advocate
General by ex
xercising these powers in appropriate
cases, the
Tribunal by wa
ay of interim measure, may restore the s
status of the
contractor back
k to the stage prior to the passing of the
blacklisting
order, meaning
g thereby the effect of blacklisting could
be deferred
by the Tribunal
l till final redressal of the dispute.
281. Learned Advoc
cate General referred to the definition o
f restitution
th
lack’s Law Dictionary (6 Edition) , w
given in the Bl
wherein it is
described that
restitution means restoration to origin
nal position
prior to loss –
– injury (legal injury also) or the positi
ion had the
th
curred. Law of Lexicon (5 Edition) p
breach not occ
provides the
definition that
act of restoring; restoration of a person
n to former
position or statu
ute; of a thing to its original state or for.
He referred
the judgment o
of the Supreme Court in Dr. Poornima A
Advani Vs.
103
of NCT and another wherein the Sup
Government o
preme Court
has held that th
he restitution may be in three senses; (i)
) restoration
of a thing to its
s rightful owner - status;(ii) compensation
n for benefit
from wrong doi
ing; and (iii) compensation reparation for
r loss.
282. The Supreme
Court has further held that the restitu
ution as an
interim measur
re puts a stop to continuing loss pendin
ng the final
award. With th
he aid of the aforesaid pronouncement,
the learned
AdvocateGener
ral submits that blacklisting being a c
concomitant
injury in work
s contract disputes, falls squarely within
n the ambit
and causes the
injury as the loss of status as eligible bid
dder, loss of
property (good
dwill), loss of eligibility to participate in
n commerce
with the State
and all its agencies or loss of entitle
ement to be
trusted with pub
blic funds. He further submits that goodw
will is also a

103
Dr. Poornima Advani Vs. Go

overnment of NCT and another, (2025) 7 SCC 269.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

131


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
property and co
onferring the power to the Tribunal for
passing the
interim order t
to preserve of any property or thing, w
which is the
subject matter o
of the dispute, the Tribunal can pass an in
nterim order
to prevent the
loss of the goodwill.He submits that
the powers
conferred to th
he Tribunal U/S.17-AB is in addition to t
the inherent
powers granted
d U/S.17-A and not in qualification of Se
ection 17-A.
Both the sectio
ons are independent and in addition to
each other.
The only requi
rement for exercising the powers by the
Tribunal is
that the Tribun
nal should be satisfied that grant of inter
rim measure
would meet the
e ends of justice.
283. Learned Advo
ocate General submits that the ame
endment in
Adhiniyam in
n 1983 caters all eventualities.The T
Tribunal is
competent to
grant all necessary relief, interimor
r final, in
blacklisting dis
sputes and thus approaching to the Tr
ribunal is a
wholly efficac
cious remedy for all work contract di
isputes. He
submits that th
he apprehension of the contractors is mis
splaced that
the remedy to a
approach the Tribunal is not efficacious.
284. Shri Naman
Nagrath , learned Sr. Advocate submi
its that the
insertion of Se
ection 17-AB in the Adhiniyam 1983 wi
ill be of no
use in the mat
tters of blacklisting as the Tribunal is
not having
jurisdiction to
entertain the disputes arising out of th
he order of
blacklisting and
d if the forum is not having jurisdiction to
o decide the
dispute finally,
, the forum cannot exercise the powers t
to grant the
interim relief i
in the matter. He further submits that th
he power to
grant interim r
relief will depend upon the maintainab
bility of the
main dispute be
efore the Tribunal and as the order of bla
acklisting is
not quantifiable
e or ascertainable, the dispute will not fa
all under the
definition of d
dispute provided U/S.2(1)(d) of Adhini
iyam, 1983
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

132


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
and, therefore,
no interim relief can be granted by the T
Tribunal. He
submits that th
he amendment has no relevancy to th
e questions
referred to the
larger bench for consideration and the s
stand of the
State that in re
esult of the amendment in the Adhiniyam
m 1983, the
remedy to appr
roach the Tribunal assailing the order of
blacklisting
will become eff
fficacious, is not acceptable at all. He furt
ther submits
that the jurisdi
ction of Tribunal remains unaltered and
d by way of
amendment the
e definition of dispute provided U/S.2(1)
)(d) has not
been touched a
and consequently even after the amendme
ent only the
ascertained or
ascertainable dispute in money arising
out of the
works contract
t of Rs.50,000/- or morewill be refera
able to the
Tribunal and
as the loss of blacklisting is not as
scertainable,
therefore, desp
ite the amendment, the dispute will not b
be referable
to the Tribuna
al and the Tribunal still possesses jurisd
diction only
over the dispute
es falling within the statutory definition.
285. Shri Nagrath f
further submits that in Section 17-AB,
there is no
reference what
soever to the events of blacklisting, deba
arment, any
executive order
r or cancellation of empanelment and thus
s no interim
relief can be g
granted by the Tribunal by exercising
the powers
conferred U/S.
17-AB in respect of these issues. The T
Tribunal can
grant the interi
im measures in respect of preservation o
of property,
interim custod
dy, encashment of bank guarantee, in
nception of
property, appoi
intment of guardians and restitution. He s
submits that
the Advocate G
General has incorrectly interpreted the new
wly inserted
provision of Se
ection 17-AB that the Tribunal may grant
t the interim
relief in respect
t of blacklisting or debarment orders.
286. Shri Nagrath
submits that the powers conferred
u/S.17-AB
substantially re
esemble to those available U/S.9 of the
Arbitration
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

133


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
and Conciliatio
on Act, 1996, but even by exercising pow
wers u/S.9 of
the Act, the com
mpetent court cannot grant any relief in
respect of a
matter, which i
is not arbitrable. Firstly, it is essential to
decide that
whether the su
ubject matter is arbitrable or not and if
the subject
matter is not a
arbitrable, then conferment of the pow
wer to grant
interim relief h
as no relevance.
287. Shri Nagrath,
Sr. Counsel submits that the amendm
ment in the
Adhiniyam, 19
83 has no relevance to the present Refere
ence and the
larger bench
has been called upon to determin
ne whether
blacklisting dis
sputes fall within Section 2(1)(d) and the
amendment
incorporated d
during the pendency of the Reference
e have not
amended the
provisionsof Sec.2(1)(d) and the
legislature
consciously ref
frain from expanding the scope of Secti
ion 2(1)(d),
meaning thereb
by blacklisting, debarment are not inte
ended to be
covered by the
e legislature in the scope of dispute refe
rable to the
statutory arbitr
ral Tribunal. In short he submits that T
The Madhya
Pradesh Madhy
ystham Adhikaran (Sanshodhan) Adhiniy
yam, 2025 is
far from the q
questions of reference and the legislativ
ve intent is
unmistakable, w
while the issue of blacklisting is not cov
vered under
the definition o
of dispute.
288. Shri Anshuma
an Singh , Advocate submits that the Am
mendment of
2025 does not
touch Section 2(1)(d), which remains
unamended
and, therefore,
, the amendment has no effect on the
e points of
Reference. He
further submits that rather the amendm
ment deletes
the first provis
sion to Section 17(A) which had restric
cted interim
injunctions, sta
ays or attachment before award and repl
aces it with
the measures
enumerated in Section 17-AB mode
eled almost
verbatim to Sec
ction 9 of the Act 1996. He supported the
e arguments
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

134


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
of senior Advo
ocate Shri Nagrath to the extent that the re
eal question
is not that the T
Tribunal is having power to extend the int
terim reliefs
or not, but the
real question is whether the forum can
n deal with
the dispute at a
all and until and unless it is decided that t
the Tribunal
is having juris
diction to entertain the dispute of black
klisting and
can deal with t
the dispute, the conferment of the power
s of interim
relief U/S.17-A
AB would not be relevant to decide the ma
ain issue.
289. If the larger be
ench comes to the conclusion that black
klisting falls
within the juri
sdiction of the Tribunal, then the secon
nd question
would arise th
hat whether the alternate remedy to ap
pproach the
Tribunal is ef
fficacious or not. He submits that t
the forums
empowered to e
entertain a dispute is never regulated by i
its power to
grant interim re
elief. The power U/S.9 of the 1996 Act to
o the Courts
to grant interim
m relief itself confined to arbitrable disput
tes, where a
dispute involve
es rights in rem or exercise of sovereig
gn or public
powers or no in
nterim relief can be granted U/S.9 of the
Act 1996 at
all.To support
his arguments, he relied on the judgm
ment of the
15
n , wherein
Supreme Court
t delivered in the matter of Booz Allen
the Supreme C
ourt held that no interim relief can be gra
anted U/S.9
at all, however
r pressing the need for protection, for th
he power to
protect a right
pre-supposes a forum competent to adju
udicate that
right. He submi
its that the similar logic will be applicabl
e to Section
17-AB and mer
re existence of an interim power thereund
der does not
mean that the T
Tribunal has jurisdiction U/S.2(1)(d). The
e power can
only be exerci
ised in aid of a dispute over which th
he Tribunal
already has juri
isdiction, not a source of the jurisdiction,
, it does not
otherwise posse
esses. He submits that the amendment 20
025 have no
relevance to the
e subject Reference.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

135


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
290. Shri Navneesh
h Johri , Advocate submits that the in
nclusion of
Section 17-AB
B is a massive relief for managing
day-to-day
contractual disp
putes such as staying the invocation of p
performance
bank guarante
e, stopping to recover of disputed a
amounts, or
keeping termin
nation in abeyance pending final award
, but is not
having any imp
pact on the order of blacklisting as inten
ntionally the
blacklisting ord
der is not included in Section17-AB and
deliberately
the same is not
t referred in the inserted Section and kep
t out of this
amended Sectio
on. He submits that despite insertion of
Section 17-
AB, the jurisdi
iction of Tribunal conferred U/S.2(1)(d)
) cannot be
enlarged as the
e definition of dispute remains confined to
o claims for
an ascertained
or ascertainable money arising out of e
execution of
performance o
of a works contract. He submits that a
an order of
blacklisting is
not a claim for ascertained money, nor
it is a mere
breach of a co
ontract condition but it is a punitive adm
ministrative
action by the S
State carrying civil consequence, therefo
re, by mere
conferring the
power of interim measures, the same w
ould not be
referrable to th
he Tribunal and consequently the Tribu
unal cannot
grant any inter
rim relief in respect of the order of black
klisting. He
submits that t
the amendment has no relevance to
the subject
Reference.
DISCUSSIONS AND F
FINDINGS :
291. We have hea
ard the arguments on behalf of the
petitioner,
respondents an
nd also the arguments advanced by lear
rned amicus
curiae appoint
ted by this Court and other advocates,
those were
permitted to as
ssist the bench. We examined the record
of the case,
the judgments
of Supreme Court and High Courts re
elied by the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

136


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
learned arguing
g counsels and after examining the same
, in view of
this bench, for
the purpose of answering the questions
referred by
the learned Div
vision Bench, the following issues are req
quired to be
considered:-
(i) POWER OF BL
LACKLISTING / DEBARMENT :
292. Blacklisting or
rders may be classified into three categ
gories, each
distinguishable
e by its source of power and character
r. The first
category is wh
here blacklisting is imposed by the State
in exercise
of its executiv
e powers under Article 298 of the Con
nstitution of
India, independ
dently of any contractual framework. Such
h orders are
manifestations
of sovereign administrative power d
directed not
merely against
a particular contractor, but against part
ticipation of
the contractor
in future governmental activities. Thes
se decisions
are public in na
ature, rooted in considerations of probity
and trust in
public administ
tration and, therefore, fall squarely withi
in the realm
of public law.
293. The second cat
tegory is where blacklisting is carried out
pursuant to
a statutory rul
le or a formal policy framed by the S
State or its
instrumentalitie
es, prescribing the manner, conditions and
d procedure
for such disqua
alification.
294. The third catego
ry is, where blacklisting is undertaken by
y invoking a
contractual claus
se; for instance, where a tender condition
n empowers
the employer t
to blacklist a contractor for alleged
breach or
misconduct. Eve
en in such cases the act of blacklisting
g cannot be
reduced to a pri
ivate contractual matter for its effect tran
nscends the
four corners of t
the contract, it affects the contractors rig
ght to carry
on business with
h the State, it carries a public stigma and
it visits the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

137


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
contractor with
civil consequences of the highest o
order often
amounting to “ci
ivil death” in the commercial domain.

295. Blacklisting/deb
arment may be ordered at several stage
es inter-alia
pre-contractual
blacklisting or debarment due
to any
misrepresentatio
on, forgery in the bidding process, failu
ure to enter
into a contract d
despite successful in bidding process o
r any other
eventuality o
occurs before execution of
contract.
Blacklisting/deb
arment may be ordered even during curr
rency of the
contract and the
e employer may continue with the contra
actor with a
direction to com
mplete the work. Thirdly, blacklisting/deba
arment may
be ordered post
contractual stage, where the work has a
lready been
completed, com
mpletion certificate issued, all payme
ents made,
performance gua
arantee released and thereafter it discove
ered that the
contractor acted
d fraudulently, such as misuse of a
advance or
embezzlement d
during performance and in that situatio
on also the
contractor may b
be blacklisted or debarred.
296. For the purpose
of passing the order of blacklisting or de
ebarment, it
is not essential
that there should be a condition or cl
ause in the
contract itself an
nd debarment is permissible even in the
absence of
any specific cla
ause or condition mentioned in the cont
tract, in the
event of any eve
entuality, which empowers the employer
to blacklist
or debar the cont
tractor.
297. The power to bl
lacklist flows from the power to do busi
iness by the
government and
d its instrumentalities. The power to do
business is
flows from Arti
icle 298 of the Constitution of India, w
whereby the
government and
d its instrumentalities have been permitte
ed to do the
business. Article
e 298 of the Constitution reads as under:-
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

138


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
“ 298. Pow
of the Un
carrying o
acquisition
making of c
Provided th
(a) the said
as such tra
with respe
subject in e
(b) the said
as such tra
with respe
laws, be su

wer to carry on trade, etc. -The executive pow
wer
nion and of each State shall extend to th
the
the
the
on of any trade or business and to th
n, holding and disposal of property and th
contracts for any purpose:
hat-
d executive power of the Union shall, in so f
far
ade or business or such purpose is not on
ect to which Parliament may make laws,
ne
be
each State to legislation by the State; and
d executive power of each State shall, in so f
far
ade or business or such purpose is not on
ect to which the State Legislature may ma
ubject to legislation by Parliament.”
ne
ake
298. Power to carry on t
trade or business also provides the power
r to deny the
business with any
person or entity. Article 298 of the C
Constitution
provides the power
r to carry on any trade to the Union and th
he State and
to the acquisition,
holding and disposal of property and
making of
contracts for any p
purpose. The State can carry on executiv
ve functions
by making a law o
or without making a law. The State ha
s a right to
trade, however the
State should deal with equality with allth
he person or
entity and gover
rnment cannot choose to exclude p
persons by
discrimination, ho
owever at the same time the Union
or State is
empowered to deny
y the business with any particular person
n. The State
may deregister any
y contractor, debar any contractor and
blacklist in
case he found guilty
y of malpractices and/or any other reason
ns.

299. The Supreme Cour
7
rt in the matter of Erusian Equipment h
held that the
executive power un
nder Article 298 of the Constitution to ca
arry on trade
and to acquire, hol
ld and dispose property and make contr
ract for any
purpose by Union
and the State or any instrumentalities.
Article 298
provides the power
r to restrict the trade with any person or bo
ody, but the
State should act co
onsidering the provisions of Article 14, 1
9 and 21 of
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

139


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
the Constitution. N
No one can compel the State to negotiate o
or enter into
a contract and the
duty to act fairly applies to both, the St
tate and the
contractor. The rele
evant paras of the judgment reads as unde
er:-
“12. Unde
power of th
on of any t
of property
State can
without ma
functions i
Constitutio
equal, prot
apply to m
to trade. T
ordinary in
The Gove
discrimina
depriving a
public con
unable to
Governmen
who has be
sale and p
expectation
it has to be

13. But fo
have been
Similarly th
entitled but
rates.

14. The S
chooses. N
Governmen
has a righ
citizen has
contract wh
lawful calli

15. The bla
contract. T
er Article 298 of the Constitution the Ex
xecutive
he Union and the State shall extend to the ca
arrying
disposal
trade and to the acquisition, holding and d
y and the making of contracts forany purpos
se. The
carry on executive function by making a
aking a law. The exercise of such powe
in trade by the State is subject to Part III
on. Article 14 speaks of equality before the la
law or
ers and
I of the
aw and
tection of the laws. Equality of opportunity
matters of public contracts. The State has th
The State has there the duty to observe equal
should
he right
lity. An
person.
ons by
ndividual can choose not to deal with any p
ernment cannot choose to exclude perso
tion. The order of black- listing, has the ef
a person of equality of opportunity in the ma
ntract. A person who is on the approved
ffect of
atter of
list is
ith the
enter into advantageous relations wi
nt because of the order of black- listing. A
person
atter of
erest or
een dealing with the Government in the ma
purchase of materials has a legitimate inte
n. When the State acts to the prejudice of a
e supported by legality.
person
or the order of blacklisting, the petitioner
would
nchona.
entitled to participate in the purchase of cin
he respondent in the appeal would also hav
t for the order of blacklisting to tender comp
ve been
petitive
State can enter into contract with any pe
No person has a fundamental right to insist t
rson it
that the
nt must enter into a contract with him. A
ht to earn livelihood and to pursue any tr
citizen
rade. A
r into a
al to his
s a right to claim equal treatment to enter
hich may be proper, necessary and essentia
ing.
acklisting order does not pertain to any par
The blacklisting order involves civil consequ
rticular
uences.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

140


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
It casts a
blacklisted
The blackli

16. In pas
departmen
Code. Th
Governmen
maintain li
the financi
past perfo
various rea
ordered ar
of law or
strong jus
employee o
bribery, co
to return
Governmen
corruption
servant. T
justification
malpractic
petitioners
proceeding
violation
Regulation

17. The Go
It is true t
any right
equal treat
for the pur
is the Gov
democratic
absence o
transaction
opposed to
public elem
equality. T
anyone bu
discrimina
part of p
tarnishes o

slur. It creates a barrier between the p
d and the Government in the matter of transa
persons
actions.
ists are "instruments of coercion".
ssing an order of blacklisting the Gove
t acts under what is described as a standa
is is a Code for internal instruction
nt departments make regular purchases
ist of approved suppliers after takings into a
ial standard of the firm, their capacity an
ernment
ardised
n. The
. They
account
nd their
rmance. The removal from the list is ma
asons. The grounds on which blacklisting m
re if the proprietor of the firm is convicted by
ade for
may be
by court
security considerations so warrant or if t
stification for believing that the proprie
of the firm, has been guilty of malpractices s
orruption, fraud. or if the firm continuously
there is
etor or
such as
refuses
ploys a
Government dues or if the firm emp
nt servant, dismissed or removed on acco
ount of
ernment
ound of
in a position where he could corrupt Gove
The petitioner was blacklisted on the gro
n for believing that the firm has been gu
ces such as bribery, corruption, fraud
uilty of
d. The
re were
were blacklisted on the ground that ther
gs pending against the petitioners for a
alleged
change
of provisions under the Foreign Ex
ns Act.
overnment is a government of laws and not o
that neither the petitioner nor the responde
of men.
ent has
itled to
otations
to enter into a contract but they are enti
tment with others who offer tender or quo
rchase of the goods. This privilege arises bec
vernment which is trading with the public a
cause it
and the
c form of Government demands equalit
ty and
n such
of arbitrariness and discrimination in
ns. Hohfeld treats privileges as a form of lib
o a duty. The activities of the Government
berty as
have a
ess and
ment and, therefore, there should be fairne
The State need not enter into any contrac
ut 'if it does so, it must do as fairly w
ct with
without
ion is a
tion and without unfair procedure. Reputati
erson's character and personality. Black
one's reputation.
klisting
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

141


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
18. Exclusi
State in sa
from purch
discrimina
State can i
and accept
exclusion
exclusion
participatin
aspect of a

19. Wher
transaction
important f
with the G
and equal
interpreted
rules of na
fair consi
representa
information
can also b
oral hearin
be affected
the nature

20. Blackli
privilege a
with the G
disability is
the relevan
Fundamen
should be
he is put on

ion of. a member of the public from dealing
ales transactions has the effect of preventin
g with a
ng him
oods by
hasing and doing a lawful trade in the go
ting against him in favour of other peopl
impose reasonable conditions regarding rej
tance of bids or qualifications of bidders. J
le. The
ejection
Just as
imilarly
of the lowest tender will be arbitrary si
of a person who offers the highest pric
ng at a public auction would also have, th
arbitrariness.
e from
e same
re the State is dealing with individu
uals in
ns of sales and purchase of goods, th
he two
factors are that an individual is entitled to
Government and an individual is entitled to
o trade
o a fair
treatment with others. A duty to act fairly
d as meaning a duty to observe certain asp
atural justice. A body may 'be under a duty
can be
pects of
to give
er the
etails of
ideration to the facts and to conside
tions but not to disclose to those persons de
n in its possession. Sometimes duty to ac
be sustained without providing opportunity
t fairly
for an
erest to
ng. It win depend upon the nature of the inte
d, the circumstances in which a power is ex
ercised
of sanctions involved therein.
isting has the effect of preventing a person fr
and advantage of entering into lawful relati
Government for purposes of gains. The fact
rom the
ionship
t that a
s created by the order of blacklisting indicat
nt authority is to have an objective satisf
tes that
faction.
ncerned
tals of fair play require that the person con
given an opportunity to represent his case
n the blacklist.”
before
9
g Ltd. held
300. The Supreme C
Court in the matter of Patel Engineering
that authority
to contract conferred power to debar o
or blacklist.
However, the d
decision of State or its instrumentalities
not to deal
with certain
persons or class of persons on a
account of
undesirability o
of entering into contractual relationship
p with such
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

142


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
person should
be taken in a fair and transparent m
manner. The
relevant paras o
of the judgment reads as under:-
“14. The
persons w
abovement
provision (
India and t
to carry o
acquisition
also took n
includes th
said right
into a contr
to enter in
constitution
14. Though
into a cont
when State
effect of
contractua
such perso
engaged in

nature of the authority of State to blac
was considered by this Court in
tioned case and took note of the constitut
(Article 298), which authorises both the Unio
cklist
the
ional
on of
e and
the States to make contracts for any purpose
n any trade or business. It also authorises
n, holding and disposal of property. This C
s the
Court
ntract
note of the fact that the right to make a con
he right not to make a contract. By definition
n, the
is inherent in every person capable of ente
tract. However, such a right either to enter o
nto a contract with any person is subject
ering
or not
to a
rticle
nal obligation to obey the command of Ar
h nobody has any right to compel State to e
tract, everybody has a right to be treated eq
e seeks to establish contractual relationships
enter
ually
. The
to a
prive
e also
excluding a person from entering int
al relationship with State would be to dep
on to be treated equally with those, who are
n similar activity.
15. It follow
State or i
persons or
of entering
is called b
contractua
persons for
blacklist a
executive p
business a
There need
only legal
is that Stat
way being
for some
purposetha
case can va

ws from the above Judgment that the decisio
its instrumentalities not to deal with ce
on of
ertain
class of persons on account of the undesirab
g into contractual relationship with such per
bility
rsons
nto a
blacklisting. State can decline to enter in
al relationship with a person or a clas
ss of
ate to
o the
r a legitimate purpose. The authority of Sta
a person is a necessary concomitant to
power of the State to carry on the trade o
and making of contracts for any purpose,
r the
etc.
. The
hority
d not be any statutory grant of such power.
limitation upon the exercise of such an auth
te is to act fairly and rationally without in
n any
arbitrary – thereby such a decision can be t
taken
imate
legitimate purpose. What is the legiti
at is sought to be achieved by the State in a g
given
ary depending upon various factors.
------xxx-------xxx-------xxx------

Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

143


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
22. These t
second sub
petitioner
blacklist is
any or som
agents, etc
bidder dec
as a succ
expressly d
corrupt pr
participate
for a perio
that a cor
express stip
in the con
execute the
In our opin
the 2nd re
petitioner
documents
made by th

two Clauses become relevant in the context o
of the
bmission made by the learned counsel for
r the
er to
that as per the bid document, the powe
s available only in the cases of the commissio
me of unacceptable practices by the bidder o
on of
or his
c., but not in the case, where the succe
clines to enter into a contract on being decl
essful
lared
ument
n of a
ble to
cessful bidder. No doubt, the bid docu
declares that in the case of the commission
ractice, etc., the bidder shall not be eligib
e in any tender issued by the second respon
ndent
found
d of two years from the date on which it is f
rrupt practice has been committed. Such
h an
ment,
pulation is not to be found in the bid docum
ntext of the failure of the successful bidde
er to
tract.
e necessary documents to conclude the cont
nion, that is not determinative of the authori
ity of
espondent to blacklist a bidder, such as,
, the
ssary
herein, who declines to execute the neces
for creating a concluded contract after the
he bidder, is accepted by the second responde
offer
ent.
23. The au
contracts,
enter into
flow from
authority
authority o
with all th
Section 3 (
Act, 1988.
nature of
Constitutio

uthority of the second respondent to enter
r into
consequently, the concomitant power no
a contract with a particular person, does
Article 298, as Article 298 deals with only
of the Union of India and the States.
of the second respondent to enter into a con
ot to
s not
y the
The
ntract
e incidental and concomitant powers flow f
(1) and (2) of the National Highways Auth
from
hority
The nature of the said power is similar to
the power flowing from Article 298 of
on, though it is not identical.
o the
f the
24. The sec
is equally
bind the St
time, the v
under Sect
confers th
appropriat
neither con
the second
which are
by necessa
cond respondent, being a statutory Corpora
ation,
which
subject to all constitutional limitations, w
tate in its dealings with the subjects. At the s
very authority to enter into contracts confe
tion 3 of the NHA Act, by necessary implica
he authority not to enter into a contrac
same
ferred
ation,
ct in
te cases (blacklist). The ‘bid document’
can
w on
wers,
on or
nfer powers, which are not conferred by la
d respondent, nor can it substract the pow
conferred by law either by express provisio
ry implication.”
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

144


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021

5
Court in the matter of Kulja Industries
5
considered
301. The Supreme C
the power of b
blacklisting and held that the power to
blacklist a
contract, where
e the contract for the supply of material or
r equipment
or for the execu
ution of any other work whatsoever is inh
herent in the
party allotting t
the contract and there is no need for any
such power
being specifica
ally conferred by statute or reserved by
y contractor.
The relevant pa
aras of the judgment reads as under:-
“17. That
the contrac
execution
inherent in
for any suc
reserved by
signifies a
the breach
relationship
two privat
absolute a
The freedo
the case of
judicial rev
its instrum
be open t
principles
proportion
thus becom
of the powe
thereto. T
proportion
examinable
apart the power to blacklist a contractor w
ct be for supply of material or equipment or
whether
for the
opinion
no need
atute or
of any other work whatsoever is in our o
n the party allotting the contract. There is n
ch power being specifically conferred by sta
y contractor. That is because ‘blacklisting’
simply
cted by
tractual
Between
business decision by which the party affec
h decides not to enter into any contr
ip with the party committing the breach. B
te parties the right to take any such deci
and untrammelled by any constraints what
ision is
tsoever.
om to contract or not to contract is unqual
ified in
bject to
r any of
f private parties. But any such decision is sub
view when the same is taken by the State or
entalities. This implies that any such decisi
to scrutiny not only on the touchstone
ion will
of the
rine of
cklisted
exercise
of natural justice but also on the doctr
nality. A fair hearing to the party being blac
mes an essential pre-condition for a proper e
er and a valid order of blacklisting made pu
The order itself being reasonable, fai
nate to the gravity of the offence is si
ursuant
ir and
milarly
e by a writ Court.

----xxx------xxx-----xxx------

it to say that ‘debarment’ is recognised an
an effective method for disciplining d
contractors who may have committed a
25. Suffice
used as
suppliers/c
omission
misreprese
breaches of
nd often
deviant
acts of
and commission or frauds inc
entations, falsification of records and
of the regulations under which such contrac
cluding
other
ts were
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

145


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
allotted. W
permanent
depend up
erring cont

What is notable is that the ‘debarment’ is
s never
t and the period of debarment would inva
pon the nature of the offence committed
ariably
by the
tractor.
26. In the
the appella
money whi
with the of
permanent
come may
considered
supplying
respondent
has already

302. The Public Wo
case at hand according to the respondent-
ant had fraudulently withdrawn a huge amo
-BSNL,
ount of
spiracy
Even so
ich was not due to it in collusion and cons
officials of the respondent- corporation. E
t debarment from future contracts for all ti
imes to
sound too harsh and heavy a punishmen
d reasonable especially when (a) the appel
t to be
llant is
to the
ed by it
bulk of its manufactured products
t-BSNL and (b) The excess amount receive
y been paid back.”
orks Department of State of Madhya P
Pradesh has
issued several
directions to regulate, restriction, susp
pension and
debarment of c
contractors and the authority to blacklis
st emanates
from the circula
ars and not from the terms of a works con
ntract and it
is an independe
ent statutory and administrative power e
exercised by
the State to up
phold transparency, fairness and probit
ty in public
contract as blac
cklisting being a regulatory and disciplina
ary action.
303. The Public Wo
orks Department has issued an order, w
whereby the
direction has b
been issued for blacklisting of a contr
ractor dated
24.3.2015 and
the power to blacklist a contractor flow
ws from the
said circular, w
which reads as under:-
e/;izns’k 'kklu
yksd fuekZ.k foHkkx
ea=ky;
9@ch@ vkns’k fnukad @03
%%vkns’k%%
;d vkns’k fnukad 29-08-2011 }kjk e-iz- 'kkl
dzekad ,Q 17&1@2010@19
3@2015
1- bl foHkkx ds lela[;
lu ds fuekZ.k
foHkkx@[email protected]@c
dsUnzh;d`r O;oLFkk ykxw
ds fy, dk;Z foHkkx fu;e
izk:Ik ^^v izfrLFkkfir fd
fuekZ.k foHkkx ds vkns’
cksMksZ esa Bsdsnkjksa ds iath;u dh foHkkxokj O;oLFkk
k ds LFkku ij
varxZr iath;u
2½ ds LFkku ij
iz- 'kklu] yksd
djus dk fu.kZ; fy;k x;k FkkA bl O;oLFkk ds v
ekoyh 1983 ds psIVj 2 lsD’ku 16 ¼2-095 ls 2-102
fd;k x;k gSA izk:Ik ^^v ds fcUnq dzekad 7 esa e-iz
’k dzekad 7882@9671@19@;ks fnukad 19-11-19
999 ¼Nk;kizfr
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

146


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
( Demotion ) ]
layXu½ ds vuqlkj Bsdsn
jn~n djus ( Cancellatio
lwph esa Mkyus ( Black li
gS fd vc ek= Suspens
2- lacaf/kr foHkkx@midze d
nkj ds iath;u dk fupyh Js.kh esa vour djrs
on ) ] fuyafcr djus ( Suspension ) ,oa Bsdsnkj ds
uke dks dkyh
u.kZ; fy;k x;k
xhA
sting ) dh dk;Zokgh ds funsZ’k fn;s x;s gSA ;g fu
ion vFkok Black Listing dh dk;Zokgh dh tk,xh
dk eq[; vfHk;ark vFkok led{k vf/kdkjh fuEu
Black Listing
lwph es Mkyus ( ) vFkok mldk iat
ifjfLFkfr;ksa esa
th;u fuyEcu
Bsdsnkj dk uke dkyh lw
( Suspension )
djus d

The affidavit/Self decl
1.
dh dk;Zokgh dj ldsaxs ;fn%&
laration contains any false information or su
uppresses any
material information
Such bidder whose
2.
bid is accepted fails to execute the agre
eement. The
suspension will be in
penalty imposed as per
3. Contractor fails to use
addition to forfeiture of his earnest money
r the tender condition.
or any other
mobilization advance given to him for the pu
urpose it was
meant.
4. Contractor fails to rene
5. If documents submitted
6. The contractor is found
ew the securities deposited to the department.
d are found to be false.
d to be non-serious in executing the agreemen
nted works or
leaves the agreemente
contract period.
7. The contractor fails to
d work incomplete, irrespective of the expir
ry of the full
o rectify any lapse(s) in quality of the work d
done within a
reasonable time.
Contractor fails to mai
8.
intain/repair/redo the work upto the expiry of
n it is specifically brought to his notice.
which is considered reasonable after recording
f performance
guarantee period, when
On any other ground w
9.
reason.
Note:-
i During the period of su
uspension neither his registration will be renew
ued.
wed nor fresh
registration will be issu
Ii Black listed contractor
r will not be allowed fresh registration or re
enewal of his
registration till order of
iii Contractor or firms bl
f black listing is revoked or cancelled.
ack listed or suspended or any of it’s partne
ther name.
er will not be
registered under any ot
iv Period of suspension sh

3- Bsdsnkj dk iath;u fuy
hould be for a definite period.
yafcr djus vFkok uke dkyh lwph esa j[kus dk
Hkhjrk ds vk/kkj ij djsaxsA
k fu.kZ; l{ke
vf/kdkjh vipkj dh xaH



¼lh-ih-vxzoky½
lfpo
e/;izns’k 'kklu
yksd fuekZ.k foHk
Hkksiky fnukad 24@03
½
u
kkx
3@2015


Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

147


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
304. The exercise o
of State’s sovereign executive power un
nder Article
298 of the Co
onstitution of India is an independent
public law
character gover
rned by Article 14 of the Constitution. Th
he power to
blacklist is inh
herent in the State as an incident of it
ts executive
authority and d
does not emanate from the contract itself.
Thus, even
if a contract or
r tender document incidentally refers to b
blacklisting,
the source of th
hat power is not contractual, but constituti
ional.

305. Power of black
klisting is an administrative power of the
e State to be
exercised to pr
rotect public interest and ensure probit
ty in public
dealings, even
when the tender or contract does not in
ncorporate a
clause referring
g to debarment or blacklisting. Such clau
uses merely
recognize that
inherent executive power may be exerc
cised by the
employer in th
e event of occurrence of some eventuali
ities. Where
no such clause
e exists, the authority can nevertheless
exercise its
public law pow
wer.

306. Debarment or b
blacklisting of contractor is an exercise o
of executive
discretion and d
does not solely based on contractual right
t arising out
of mutual cons
sent. The act of blacklisting is prospectiv
ve in nature
and is intended
d to regulate the future conduct of the
contractors,
while dealing w
with the government and are not always
arising out
of or in relatio
on to the execution or non-execution
of a works
contract. Black
klisting is not a contractual conseque
ence, but a
constitutional a
and administrative act traceable to Article
e 298 of the
Constitution of
f India, which vests in the executive pow
wer to enter
into or to refra
ain from entering into works contract. Th
he source of
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

148


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
power for blac
cklisting thus lies not in any contract
but in the
inherent execut
tive authority of the State.

307. Even if a contr
ract provides a clause for debarment or
blacklisting
but the exercis
se of that clause is always an act of adm
ministrative
and thus, the po
ower may be exercised at any stage.
308. The power to
blacklist/debar a contractor not only
y generated
from the term
s and conditions of the contract, but it
is inherent
power of the
State and its instrumentalities flowing
g from the
power to carry
y on the trade or business provided un
nder Article
298 of the C
Constitution of India and blacklist
ting is an
administrative
e act in nature.
(ii) LOSSES AND EFFE
ECT OF THE ORDER OF BLACKLIST
ING :

309. Order of black
klisting or debarment restrains a contr
ractor from
participating in
n the future public tenders and thereby am
mounting to
a civil and com
mmercial losses to the contractor. It is a r
reputational
loss, stigma and
d punitive in nature. The effect of blackli
isting is that
once a person
n or entity is blacklisted by any G
Government
department, th
he same travels beyond the department
t and other
departmentsand
d as a matter of policy may also refrain fr
from dealing
with such per
rson or entity. Blacklisting causes s
severe civil
consequences
that go beyond that contract and a
amounts to
restriction of fu
undamental right to do business. It is a re
estriction on
the Governmen
nt and its instrumentalities to deal with
a person or
entity, who ha
as been blacklisted or debarred. The
blacklisting
travels far bey
yond the scope of mere contractual
breach and
engages seriou
us consequences. The act of blacklis
sting being
punitive in natu
ure, affects the fundamental rights of a pe
erson.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

149


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
10
s Services
310. The Supreme C
Court in the matter of Gorkha Securities
has held that b
lacklisting is having very serious conseq
quences and
it amounts to a
a civil death of a contractor or entity. T
The relevant
Para of the judg
gment reads as under:
“ 14 . It is
blacklisting
Law in this
demand
compliance
giving the
action of b
and solid
civil and/o
"civil death
blacklisting
debars suc
tenders wh
governmen
s a common case of the parties that t
the
g has to be preceded by a show-cause notic
s regard is firmly grounded and does not ev
ce.
en
much amplification. The necessity
e with the principles of natural justice
e opportunity to the person against who
of
by
om
blacklisting is sought to be taken has a val
lid
rationale behind it. With blacklisting, ma
r evil consequences follow. It is described
h" of a person who is foisted with the order
g. Such an order is stigmatic in nature an
ch a person from participating in governme
hich means precluding him from the award
nt contracts.”
ny
as
of
nd
ent
of

311. The Supreme C
Court in the matter of UMC Technolog
gies Private
104
has held
Limited v. Fo
od Corporation of India and another
that the black
klisting is having serious consequenc
ces on the
reputation and
business of a person. The relevant Pa
ara reads as
under:
“ 16 . Spec
person or a
the requi
unambiguo
due to the
stigmatisat
blacklisted
concept of
consequenc
effect of d
opportunity
privilege a
counterpar

104
UMC Technologies Pvt. Ltd.
ifically, in the context of blacklisting of
an entity by the State or a State Corporatio
irement of a valid, particularised an
ous show-cause notice is particularly cruci
f a
on,
nd
ial
the
severe consequences of blacklisting and th
tion that accrues to the person/entity bein
d. Here, it may be gainful to describe th
ng
the
the
the
ged
of blacklisting and the graveness of t
ces occasioned by it. Blacklisting has t
denying a person or an entity the privileg
y of entering into government contracts. Th
arises because it is the State who is t
rty in government contracts and as such, eve
his
the
ery

. Vs. Food Corporation of India and Another, (2021) 2 SC
CC 551.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

150


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
eligible per
participate
discrimina
privilege,
reputation
question.
consequenc
blacklisted

rson is to be afforded an equal opportunity
e in such contracts, without arbitrariness an
to
nd
his
tion. Not only does blacklisting take away th
it also tarnishes the blacklisted person
n's
nto
and brings the person's character in
Blacklisting also has long-lasting civ
ces for the future business prospects of th
d person.”
vil
the
312. The order of bl
lacklisting has the effect of debarring a p
person from
equality of opp
portunity in the matter of public contrac
ct. A person
who is on the
list is unable to enter into advantageou
us relations
with the Gover
rnment because of the order of blacklistin
ng. A person
who has been
dealing with the Government in the ma
atter of sale
and purchase o
of material has a legitimate interest or e
expectation.
Blacklisting or
rder involves civil consequences. It cast
ts a slur. It
creates a bar
rrier between the person blacklisted
d and the
Government in
n the matter of transactions. The bla
acklists are
instruments of
coercion. The blacklist has the effect of p
preventing a
person from th
he privilege and advantage of entering
into lawful
relationship wit
th the Government for the purpose of gain
n.

313. The Supreme C
8
ur has held
Court in the matter of Raghunath Thaku
that the order
of blacklisting is having civil conseq
quences and
restricts a bus
siness venture from the future busines
ss with the
Government an
nd its instrumentalities with blacklisting
g civil and /
or evil consequ
uences. It is an order stigmatic in nature a
and debars a
person from pa
articipating in Government contracts.
21
Court in the matter of Techno Prints h
314. The Supreme C
held that the
order of blackli
isting is punitive in nature and while part
ticipating in
a tender, the bi
idder is required to furnish a statement / u
undertaking
that he has not
t been blacklisted by any institute so far
r and if the
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

151


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
bidder has bee
en previously debarred or blacklisted,
he will be
precluded from
m participating in the tender process, resu
ultantly, the
blacklisting is h
having serious consequences.
315. The Supreme C
Court in the matter of Blue Dreams Adve
ertising (P)
22
Ltd. conside
ered the effect and losses of the bla
acklisting /
debarment ord
der and held that blacklisting is ha
aving civil
consequence th
hough it debars the dishonest business or
rganizations
or irresponsibl
e or erring business integrity to partici
ipate in the
Government
contracts, but the same is havin
ng serious
consequences
and thus, should be exercised in a
transparent
manner and bl
lacklisting ought not to have been mad
de until and
unless it requir
res to prevent the bidder to participate in
n the further
contracts.
316. The issue of b
blacklisting travels far beyond the scop
pe of mere
contractual bre
each and engages constitutional dimensio
ons. The act
of blacklisting
being penal in nature carries civil conseq
quences and
affects the fun
ndamental rights of a contractor and it
affects the
contractor’s rig
ght to carry on the business with the State
. It carries a
public stigma a
and it leads to the conduct of civil conse
equences of
the highest or
rder amounting to civil death in the
commercial
domain. The o
order of blacklisting is punitive and i
imposes an
embargo on fut
ture business and destroys the commerci
al existence
of the entities.
The losses caused by blacklisting are
completely
different from
the losses caused by termination of c
contract. In
termination cas
ses, the cause of action and the amount
of loss are
generally know
wn, but in blacklisting, the alleged loss is
s having far
reaching conse
quences and, therefore, the alleged injury
y comprises
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

152


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
not only pecun
niary deprivation, but also loss of good
dwill, brand
equity, future o
opportunities and personal repute.

317. The effect of
blacklisting or debarment order is fa
ar reaching
and a person
or entity against which the order is
s passed is
prohibited fr
rom dealing with the Governmen
nt or its
instrumentalit
ties and thus, the blacklisting is hav
ving severe
civil conseque
nces, loss of business opportunities an
nd amounts
to a civil and c
commercial death of a person or entity.
.

318. The order of
blacklisting is a stigma and the sam
me is in the
nature of pe
enalty or punitive. Losses due to
order of
blacklisting or
r debarment is not only monetaryin th
he contract
in hand, but i
it is having a far reaching effect of p
prohibition
from doing bu
usiness not only with the concerned d
department,
but beyond th
at department, as the blacklisted perso
on or entity
is not permitte
ed to deal with any Government or pub
blic body in
future.

ESS CAUSED BY ORDER OF BLACKL
(iii) WHETHER LOSE
LISTING /
DEBARMENT ARE A
SCERTAINABLE :
319. The order of b
lacklisting/debarment is having far reach
hing impact
and the same n
not only debars the contractor from deali
ing with the
concerned depa
artment, but debars to deal with other d
departments
also and havin
ng serious civil consequences, howeve
er, the core
question is whe
ether the losses caused due to blacklistin
ng a person
or entity, who
suffers loss of goodwill, business and o
opportunity,
are ascertainabl
le or quantifiable.
2
h of this Court in Viva Highways con
320. The Full Bench
nsidered the
issue that whet
ther the losses caused due to blacklistin
ng order are
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

153


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
ascertainable o
or not and after considering the provis
ions of the
Adhiniyam, 19
83 has held as under:-
“74. The
various dic
an activity
definite. In
made defin
it clear tha
claim of m
particular
strong wor

75. We fin
Nagrath an
treated as
jurisdiction
unless it f
under the A

76. Shri Am
on the basi
or on the b
return (FIR
do not se
applicants
a specified
get extra d
Concession
he will get
terms of
During ext
will be the
collected c
process of
complex, h
determined
the claim o
operate the
meaning of ‘ascertain’/ascertained giv
ctionaries mentioned hereinabove shows tha
y undertaken by which a claim is fixed or
n other words, claim is learnt with certainty o
ven in
at it is
made
or it is
nite or determined. The Stroud's Dictionary
makes
n to a
d in a
at where “ascertained” is used in relation
money to be paid, it has to be ascertained
way. “To be ascertained” were held to b
rds and were treated to be a condition preced
e very
dent.
nd substantial force in the arguments of
nd Shri Savla that even if the present agreem
of Shri
ment is
ave no
a works contract, the Tribunal will ha
n to decide the difference between the p
falls within the statutory definition of “dis
parties
spute”
Act of 1983.
mit Seth submitted that money can be ascer
rtained
is of average toll collection for a specified p
basis of cash flow chart, financial identical r
period
rate of
S). We
As the
RR) and yearly cash flow statement (YCFS
ee much merit in the said contention. A
have based their claim to operate the proje
d period, if they succeed in their claim, the
ect for
ey will
le, if a
s, what
days for operating the project. For exampl
naire who is operating a toll plaza succeeds
t will be in terms of extension of days and
not in
tained.
w much
money which is ascertainable or ascert
tended period of operation of projects, how
e vehicular movement and how much toll w
cannot be ascertained at this point of time b
will be
by any
f reasoning. Similarly, while operating a
how much the Concessionaire will earn can
sports
not be
eason,
days to
d/ascertained by any guess work. For this r
of the applicants is in terms of extension of d
e project and they are unable to putforth a
claim
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

154


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
of ascertai
made clear
concession
wriggle ou
different an
be the Trib
case needs

77. The res
Indore Ben
v. State of
relevant p
Committee
shows that
days where
days. For
days where
the extent o
taken into
view, no p
shows that
when claim
number of

78. In AIR
Ltd. v. Dha
claim” we
under:
ined money. However, at this stage, it m
r that when a claim is ascertainable and y
naire has not ascertained the claim in ord
ut of definition of “dispute”, the matter wo
ust be
yet the
der to
uld be
nd in such cases the forum for adjudication
bunal under the Adhiniyam of 1983. Hence
would
e, each
to be examined in this regard.
spondents have placed reliance on the judgm
nch in W.P. No. 3057/2016, Ashoka Infraway
f M.P. In this judgment, the Court has repro
ment of
ys Ltd.
oduced
parts of minutes of Additional Work App
e dated 5-6-2006. The said reproduced p
proval
portion
claim of the Concessionaire was in terms of
eas the approval was given for lesser num
f more
mber of
example, the Concessionaire claimed 1542
eas the Committee decided to give extra d
of 1194 days. In para 8, this Court calculate
2 extra
days to
ed and
account extended number of days. Thus,
principle of law is laid down in this order
in our
which
rtained
t the amount in terms of money can be ascer
m of the concessionaire is regarding grant of
f extra
days to operate the project.
R 1964 Madras 108, Thanjavur Permanent
t Bank
rtained
ned as
armasamvardhani Ammal, the words “ascer
ere considered. The Division Bench opin
“As
has
appe
alleg
husb
esta
asce
the
asce
the
off.”
scertained sum” clearly means a sum which
h
e
of
been determined and quantified. It is not the
ellant's case that its claim on account of
ged misappropriation by the respondent's
band of the bank's money has been
ablished, and, if so, quantified o
ertained. So long as the liability, if any, of
's
n
r
of
respondent's husband is not established and
ertained in a precise sum, we do not see how
d
w
et
appellant could be permitted to claim a se
”
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

155


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
In 1973 M
Prasad v.
meaning of
to be asce
Till this wa
within sect
judgments
thing is c
amount/goo
in absence
applicants,
dispute as p
M.P.L.J. Note No. 20 : (1971) 3 SCC 23,
Badri
ed the
“it has
State of M.P., the Apex Court considere
f words ‘ascertained goods’. It is held that “
ertained which trees fall within that descr
iption.
goods’
as ascertained, they were not ‘ascertained g
tion 19 of the Sale of Goods Act”. No doubt,
, these
ill one
ns the
r view,
are arising out of different Statutes. Sti
clear that the word “ascertained” mean
od is quantified, fixed or determined. In our
e of any such claim of ascertained money
by the
mbit of
, their claim does not fall within the am
per section 2(1)(d) of the Adhiniyam of 1983
3.
79. In C.R
Ltd. v. MP
its view th
particular
other meth
in Satish K
word “dis
Tribunal c
by this def
be for “as
“known” o
“quantified
relating to
relating to
respectful
Satish Kum
ascertained
fall within
cannot be
the Adhin
agreements
before the
The parties
the applica
Act of 1996

R. No. 136/1988, Progressive Construction
PSEB decided on 24-6-1996, this Court exp
n Pvt.
ressed
e in a
hat if a law prescribes a thing to be done
manner, it has to be done in the same mann
hods are forbidden. Following the said prin
Kumar Raizada (supra), this Court consider
er and
nciples
red the
spute” in the Adhiniyam and opined tha
can decide only such disputes which are co
at the
overed
n must
hich is
finition. The “dispute” under this definition
scertained money”. It means the sum wh
or “made certain” or “fixed” or “determine
ed” or
d”. Since in the said case, the referenc
o fixing the rates of work it was held to b
e was
be not
are in
ourt in
aim of
o any “ascertained sum of money”. We a
agreement with the view taken by this Co
mar Raizada (supra). In absence of cla
d money, the cases of present applicants d
do not
the ambit of dispute and for this reason
n they
relegated before the Tribunal constituted
iyam of 1983. Thus, even if the conc
s are works contract, in our view, the r
under
cession
remedy
ailable.
ur view
Tribunal under the Act of 1983 is not ava
s cannot be left remedyless and hence in ou
ants'/appellant may pursue their remedy und
der the
6.”
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

156


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
321. The subsequen
nt Full Bench of this Court in the matte
er of Gouri
1
Ganesh exam
mined the issue and held that the losses oc
ccurred due
to the order of
blacklisting or debarment are consequen
tial relief to
the order of term
mination of contract and held as under:-
“52. It ap
Tribunal is
mechanism
ascertained
substance,
mechanism
avoid the
disputes m
Tribunal. T
seek resolu
termination
under the
other foru
declining s
perfectly re
the reason
consequent
7-A(1) of t
Section 7-A
the referen

53. In view
plaint/refer
termination
relief wou
consequent
must claim
reference w
relief will
termination
termination
petitioner,
remaining
be the bala
ppears that the process of statutory Arbi
itral
g to
s being sought to be avoided by resorting
m that the contractor is not claiming
the
h in
Such
as to
d money of more than Rs. 50,000/- though
the claim is for ascertained money. S
m cannot be permitted to be resorted to, so a
intention of the State Legislature that
must be resolved by a statutory Arbi
There cannot be multiple forums for a party
ution of disputes such as to seek declaration
all
itral
y to
n of
unal
from
d in
n of the contract from an Arbitral Tribu
Central Act and the consequential relief fr
ums. The department would be justified
such claim, if not included in the reference. I
It is
easonable to resist the reference or dispute
for
the
tion
that an aggrieved person has not included
tial relief though available in terms of Sect
the State Act, as in terms of Sub-section (2)
A of the State Act, if the claim is not included
nce, such claim cannot be sought subsequentl
) of
d in
ly.
w of the above, mere astuteness in drafting o
of a
citer
ntial
rence of a petition to seek simplic
n of agreement without seeking consequen
uld not be maintainable. If a particu
ular
rson
tial relief can be claimed, the aggrieved per
m that relief in a reference otherwise
the
ntial
would not be maintainable. The consequen
l differ from case to case. In a case
of
f the
n of contract, as argued by the petitioner, if
n of contract is held to be bad as argued by
the
the
ould
the petitioner would be entitled to complete
work; therefore, the consequential relief wo
ance amount of the work to be done. The va
alue
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

157


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
of the bala
also includ
consequent
such reve
consequent
claim in a
listing of th
listing has
computable
ascertained
provisions
exhaustive
in each ca
contract, r
person. In
Act, if the a
available o
from claim
means that
reference,
keeping in
in one petit
has to inc
reference w
that it is
ascertained
person thou
omitted to
maintainab
ance work would be ascertained amount. It
can
cate
e of
de challenge to revenue recovery certific
t to the termination of contract. The value
enue recovery certificate would be
the
s to
ack-
ack-
ss is
o be
tial relief, which an aggrieved person has
reference. There can be a situation of bla
he Firm prior to seeking reference. Since bla
a civil consequences and the amount of los
e in terms of money, such damages have to
d and claimed in a reference under
the
not
elief
of the State Act. The above situations are
but only illustrative. The consequential re
ase would dependent upon the nature of
relief which can be claimed by an aggrie
the
eved
State
terms of Clause (2) of Section 7-A of the S
aggrieved person omits to claim a relief thou
on the date of seeking reference; he is debar
ming such relief in a subsequent action. It o
ugh
rred
only
t for consequential relief, if not claimed in
the
fore,
cannot be claimed subsequently. Therefo
view the rule that all claims must be inclu
tion, as may be arising on the date of referen
clude the consequential reliefs otherwise
ded
nce,
the
ason
would be not maintainable, not for the rea
not a works contract or it involves not
d money but for the reason that the aggrie
an
eved
ugh could claim ascertained amount but hav
o claim so, the reference would not
ble and would be liable to be declined.
ving
be
54. The ju
of this Cou
the Single
Raizada-I
have litera
but have
consequent
person, if o
be maintain
udgment of the Division Bench of Indore Be
ench
urt in Shree Construction Company (supra)
e Benches of this Court in Satish Kum
and
mar
pra)
unt”
(supra) and Satish Kumar Raizada-II (sup
ally explained the words “ascertained amou
not taken into consideration that
tial relief which accrues to an aggrie
omitted to do so, the reference itself would
the
eved
not
nable.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

158


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
55. Thus,
amount” a
includes t
particular
aggrieved
otherwise
consequent
can be the
recovery ce
the amount
of black-lis
relief. Suc
exhaustive.
dependent
can be cla
Clause (2)
person om
date of see
such relief
view the r
petition, as
include the
would be n
not a work
money but
though co
omitted to
maintainab

322. The losses a
we hold that the expression “ascertai
appearing in Section 2(1)(d) of the State
ined
Act
f a
the amount of consequential relief. If
consequential relief can be claimed,
person must claim that relief in a refere
the reference would not be maintainable.
tial relief in a case of termination of contr
the
ence
The
ract
enue
value of the remaining work; value of reve
ertificate would be the consequential relief
t of loss computable in terms of money in c
sting of the Firm would be the consequen
h instances are only illustrative and are
. The consequential relief in each case wo
and
case
ntial
not
ould
hich
s of
eved
upon the nature of the contract, relief wh
aimed by an aggrieved person. In terms
of Section 7-A of the State Act, if the aggrie
mits to claim a relief though available on
the
ming
eking reference; he is debarred from claim
f in a subsequent action. Therefore, keeping
rule that all claims must be included in
s may be arising on the date of reference, ha
e consequential reliefs otherwise the refere
g in
one
as to
ence
not maintainable, not for the reason that i
it is
ined
rson
ks contract or it involves not an ascertai
t for the reason that the aggrieved per
ould claim ascertained amount but hav
ving
o claim so, the reference would not
ble and would be liable to be declined.”
be
arise from blacklisting are not com
mputable as
blacklisting di
sables the contractor from future parti
icipation in
public tender.
The losses which can be quantified,
have been
enumerated in
n Section 73 of the Indian Contract A
Act, which
provides that th
he damages must flow directly from the
breach and
must be capa
able of being ascertained. The loss
ses due to
blacklisting or
rder are loss of reputation, opportunit
ty, itcauses
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

159


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
stigma and the
ere is no formula to compute the loss o
or damages,
however reputa
ation can be restored, stigma can be re
emoved and
disqualification
n can be undo, but the same cannot be c
computed in
money.
323. In any event th
the alleged loss said to be arises from
blacklisting
would be pure
ely speculative in nature as the conse
equences of
blacklisting eff
fects uncertain future events, such as part
ticipation in
tenders,those m
may be or may not be floated and henc
ce such loss
cannot be comp
puted with reasonable certainty. The Indi
ian Contract
Act 1872 provi
ides the provisions for computation of l
loss U/S.73,
which reads as
under:-
“73.Compe
ensation for loss or damage caused by
y breach of
contract.—
—When a contract has been broken, the party
y who suffers
by such b
reach is entitled to receive, from the par
rty who has
broken the
contract, compensation for any loss or dam
mage caused
to him ther
reby, which naturally arose in the usual cou
urse of things
from such
breach, or which the parties knew, when th
hey made the
contract, t
to be likely to result from the breach
of it. Such
compensat
tion is not to be given for any remote and ind
direct loss or
damage su
ustained by reason of the breach. Comp
ensation for
failure to
discharge obligation resembling those
created by
contract.—
—When an obligation resembling those
created by
contract h
has been incurred and has not been disc
charged, any
person inju
ured by the failure to discharge it is entitle
ed to receive
the same c
ompensation from the party in default, as if
f such person
tract.
had contra
acted to discharge it and had broken his cont
Exp
aris
exis
planation.—In estimating the loss or dam
age
hich
d by
sing from a breach of contract, the means wh
ted of remedying the inconvenience caused
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

160


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
the
into

324. The illustration
non-performance of the contract must be ta
account.”

aken
n (i) and (p) of Section 73 are relevant to
o understand
the intention of
f the Legislature which reads as under:-
“(i) A deliv
vers to B, a common carrier, a machine, to b
be conveyed,
without de
lay, to A’s mill informing B that his mill is
s stopped for
want of th
he machine. B unreasonably delays the del
livery of the
machine, a
and A, in consequence, loses a profitable c
contract with
the Gover
rnment. A is entitled to receive from B,
by way of
compensat
tion, the average amount of profit which
would have
been made
e by the working of the mill during the time
that delivery
of it was de
elayed, but not the loss sustained through th
he loss of the
Governmen
nt contract.
(p)A contr
racts to sell and deliver 500 bales of cotto
on to B on a
fixed day.
A knows nothing of B’s mode of con
nducting his
business. A
A breaks his promise, and B, having no cotto
on, is obliged
to close his
s mill. A is not responsible to B for the loss
caused to B
ing of the mill.”
by the clos
325. Section 73 of th
he Contract Act permits compensation on
nly for such
losses as natur
rally arose in the usual course of thing
gs from the
breach of contr
ract for which the parties knew, when the
ey made the
contract, to be
e likely to result from the breach of it.
Section 73
provides that su
uch compensation is not to be given for
any remote
or indirect los
ss or damage sustained by reason of b
breach. For
ascertaining the
e loss or damages arising from a breach
of contract,
the means, whi
ich existed of remedying the inconvenie
ence caused
by the nonperfo
formance of the contract, may be taken in
nto account.
As per Section
73 of the Contract Act, only the compu
utable losses
can be claimed
d as damages for the breach of contract
t and losses
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

161


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
occurred due to
o order of blacklisting are uncertain and
d contingent
upon uncertain
future tenders, which are hypothetical an
nd therefore
not computable
e.
326. Under Section
73 of the Indian Contract Act, 1872, co
ompensation
can be awarded
d only for losses, which have actually oc
ccurred and
which naturall
y arose in the ordinary course of eve
ents from a
proven breac
ch. The loss remains indetermi
inate and
unascertainable
e. Moreover, Section 73 expressly
y excludes
compensation f
for “remote or indirect loss”. Loss of futu
ure business
opportunities a
arising incidentally from a blacklisting o
order is not
only remote, b
but also relates to transactions with th
hird parties
which fall entir
rely outside the contractual matrix. Henc
ce, any such
claim would be
e barred by the second limb of Section 73
.

327. Definition of ‘a
ascertainable’ described in Blacks’ Law
Dictionary
th
11 Edition de
enotes the susceptibility of something to
a definitive
and assured d
determination. Losses stemming from
blacklisting
hinge upon
indeterminate factors such as futur
re bidding,
administrative
description, and the competitive en
nvironment,
therefore, they
y are incapable of being definitely asses
ssed. These
losses do not a
arise naturally in the usual course of eve
ents and are
therefore outsid
de the statutory scope of claimable dama
ages U/S.73
of the Contract
t Act. A Contractor aggrieved by blacklis
sting cannot
claim damages
s for indeterminate future opportunitie
s foregone.
Such damages
s are incapable precise computation
n and are
inherently spec
culative. Therefore, the computation of
f such loss
travels far beyo
ond the scope of Section 73 of the Contr
ract Act and
in India, the c
compensation or loss or damages due to
o breach of
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

162


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
contract can be
e awarded only as per the provisions of S
ec.73 of the
Contract Act.

328. As in India the
e losses can be computed only as per Se
ection 73 of
the Indian Cont
tract Act, the method of computation of l
loss and the
judgments relie
ed by the learned A.G delivered by foreig
gn courts are
not relevant and
d in India the speculative losses cannot b
be computed
and claimed. T
Thus no finding is being recorded in res
spect of the
method of com
mputation of speculated losses. The statut
tory arbitral
tribunal is not
having any additional power to assess t
the loss and
award the dam
mages or compensation. It has to act
as per the
provisions of
the Contract Act and the Contract Ac
ct does not
provide any m
method for computation of uncertain loss
ses. In the
event of blackl
listing the alleged losses depends on fut
ture events,
like the contrac
ctors disqualification from future tenders,
which may
or may not happ
pen.
329. In some cases n
no tender may even be issued, while the c
contractor is
blacklisted, and
d they are speculative and depends upon
the floating
of future tende
er by the different departments, the eligib
bility of the
contractor to p
participate in them and the expectation
to become
successful in th
he tender process. These all are uncertain
. The losses
arise for exclu
usion from all future contracts, the occu
urrence and
profitability of
f which are inherently uncertain, therefo
re, depends
upon hypotheti
ical events, whether tenders will be iss
sued or not,
whether the c
ontractor will participate or not, whet
ther it will
succeed or not
and what profit it might have made in t
the event of
successful bid.
Therefore, such losses cannot be asce
ertained and
termed as ascer
rtainable money.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

163


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
330. The Supreme
Court in the matter of Mcdermott In
ternational
105
Standard Co.Ltd & Ors. considered t
Inc. Vs. Burn
the scope of
computation of
f losses and held that a Court of law ma
ay insist on
some proof of
f actual damages, and may not allow th
he parties to
take recourse to
o one formula or the other. There should
d be a claim
of ascertained m
money and no damages can be awarded
d in case the
actual loss is no
ot proved.
331. The Supreme C
Court in the matter of Karsandas H. T
Thacker Vs.
106
ngineering Co.Ltd. considered the sco
The Saran En
ope of grant
of damages and
d held that to receive the compensation f
for any loss
by way of the
e damage caused to the claimant, it is
essential to
prove that the
party to the contract knew, when enteri
ing into the
contract that du
ue to result of breach of it, it may cause
e the loss to
the opposite si
de. U/S.73 of the Contract Act, compen
nsation may
not be awarded
d for any remote or indirect loss or damag
ge sustained
by the reason o
of the breach.
332. Even if a cont
tractor claims monetary loss as a cons
sequence of
blacklisting, su
uch loss is incapable of precise ascertainm
ment and the
alleged injury c
comprises not only pecuniary deprivation
n, but loss of
goodwill or bra
and equity, future opportunities and perso
onal repute,
which are all in
ntangible and incapable of computation t
through any
judicially recog
gnised formula accepted in India.
333. The lossesaris
se from blacklisting are neither ascer
rtained nor
ascertainable.It
t is neither consequential to termin
nation nor
quantifiable an
nd based on hypothetical events, specula
ations. Such
damages neithe
er arise in the usual course of things no
or admit of

105
Mcdermott International Inc.
106
Karsandas H. Thacker Vs. Th

Vs. Burn Standard Co. Ltd. And others, (2006) 11 SCC 1
he Saran Engineering Co. Ltd., 1969 SCC OnLine SC 120
181.
0.
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

164


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
definite compu
utation. Blacklisting does not deprive the
e contractor
of any existing
g contractual rights or quantifiable claim
m, it merely
renders in ine
eligible for future contracts and there
e is neither
ascertainable s
sum in money capable of determinatio
on nor any
established for
rmula to compute the notional loss resu
ulting from
blacklisting. Th
he compensation can be awarded only
for losses,
which have ac
ctually occurred and which naturally a
arose in the
ordinary course
e of events from a proven approach.
334. The Division
Bench of Delhi High Court in De
elhi Paper
36
Products con
nsidering the issue of compensation and lo
osses due to
blacklisting or
rder held that the loss due to blacklis
sting is not
computable and
d the claim of damages was disallowed b
by the Delhi
High Court.
335. In conclusion
as the losses occurred due to blac
cklisting or
debarment ord
der are completely in speculation and
imaginary,
thus are not q
quantifiable as the same depends upon
the several
uncertain con
ntingencies, which cannot be consider
red for the
purpose of co
omputation of losses and there is no
recognized
formula in Ind
dian Law to compute the uncertain fu
uture losses
depending on
n uncertain contingencies and thus
the losses
occurred due
e to blacklisting such as loss of
f goodwill,
opportunity,
stigma, prevention from participati
ing in the
future tenders
s, loss of business etc. are not compu
utable and,
therefore, not
ascertainable.


Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

165


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
(iv) WHETHER, DISP
THE ARBITRATION T
PUTE OF BLACKLISTING IS REFER
RABLE TO
TRIBUNAL:
336. Definition of d
dispute has been prescribed in Section 2(
1)(d) of the
Adhiniyam, 198
83 and as per the definition the dispute mea
ans claim of
ascertained and
d or ascertainable money valued at Rs.50,0
000 or more
relating to any
y difference arising out of the executi
on or non-
execution of a w
works contract or part thereof. The referen
nce has been
made in respec
ct of a dispute arising out of a works co
ontract, and,
therefore, firstly
y it is essential to consider the situation
wherein the
contract is a w
works contract and it contains a dispute
e resolution
mechanism in a
accordance with Adhiniyam, 1983.
107
ny has held
337. The Indore Ben
nch in M/s. Shree Construction Compan
as under:-
“15. The a
either befor
Engineer.
claimant ha
authorities
which coul
Tribunal to
the Adhiniy
amount of Rs. 96,041.96 p. was never menti
ioned
re the Superintending Engineer or before the
Chief
Thus, it can reasonably be presumed tha
ad not claimed ascertained amount before the
t the
e said
earlier. It is indeed necessary to have a dis
ld be referred to the Tribunal so as to enabl
o resolve the same. The dispute has been defin
spute
le the
ned in
yam which reads as under:—
“D. Dispu
valued at R
non-executi
tes means any difference relating to any c
Rs. 50.000/- or more, arising out of the executio
claim
on or
ion of a works contract or part thereof.”
Connotatio
with by this
of M.P., 19
judgment th
one side an
so as to cal
the word di
n of the word ‘dispute’ has been elaborately
s Bench in the case reported in P.C. Rajput v.
994 MP LJ 387). It has been held in the afor
dealt
State
resaid
hat the dispute would mean assertion of clai
nd denial by other and it is an essential cond
im by
dition
efines
ll it a dispute. Black's Law Dictionary also de
ispute in the following manner:
“Dispute : A
A conflict or controversy-

107
M/s. Shree Constructions Co
No.198/1990 decided on 30.6.19

mpany Vs. State of Madhya Pradesh and others, Civil Re
995.
vision
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

166


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
A conflict o
or demand
allegations
for which
and in rela
examined.”
of claims or rights an assertion of a right, c
claim
d of one side, met by contrary claim
s on the other. The subject of litigation; ma
s or
ay be
a suit is brought and open which issue is
ation to which powers are called and witne
”
joint
esses
16. In the
itself was n
did not aris
aforesaid case when the assertion of the c
not made the question of any denial of the s
claim
same
se.
17. Thus, i
ascertained
should be d
would not
Tribunal.
power or
Adhiniyam
it is clearly indicative of the fact that fixed
d amounts have got to be claimed and
d and
there
ation
y the
as no
denial of it. But seeking the relief of declara
be a dispute which could be granted by
We accordingly hold that the Tribunal ha
jurisdiction as per the provisions of
to grant the relief of declaration.
f the
18. A refer
be made b
ready refe
herein belo
rence to the Tribunal for resolving a dispute
by filing a petition u/s 7 of the Adhiniyam.
erence sec. 7 of the Adhiniyam is reprod
e can
For
duced
ow:
“7. Referen
nce to Tribunal-
(1) Either
the fact w
clause or n
party to a works contract shall irrespectiv
whether the agreement contains an arbitra
ve of
ation
not, refer in writing the dispute to the Tribun
al.
(2) Such re
be prescri
verifying th
eference shall be drawn up in such form as
ibed and shall be supported by an affi
he averments.
s may
idavit
(3) The ref
be prescrib
ference shall be accompanied by such fee as
bed.”
s may
The said A
coming in
proceeding
saved; but
shall have j
which cogn
Adhiniyam
Adhiniyam came into force w.e.f. 1.3.1985. A
After
ertain
nto force of the said Adhiniyam. Ce
gs under sec. 20(2) of the Adhiniyam have
been
court
ute of
under sec. 20(1) of the Adhiniyam, no civil c
jurisdiction to entertain or decide any dispu
nizance can be taken by the Tribunal under
r this
.”
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

167


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
338. If the dispute is
s arising out of a works contract, wherein
n a clause of
blacklisting is a
available whether it will fall within the d
definition of
the ‘dispute’ de
escribed in Section 2(1)(d) or not was co
onsidered by
the Indore Ben
nch of this Court in Rajesh Agrawal Vs
. Executive
108
blic Works Department the Court held
Engineer, Pub
d as under:-
“……. Sinc
dispute rel
at Rs. 50,
referred un
Counsel fo
judgments
a works c
relevant an
matter sinc
contract bu
Section 2
Madhyasth
ce in the present case the applicant is not ra
lating to the claim of ascertained money va
aising
alued
ot be
,000/- or more, hence the matter canno
nder Section 7 to the Madhyastham Trib
for both the parties have referred to var
unal.
rious
r it is
e not
of the
works
in support of their respective plea; whether
contract or not, but those judgments are
nd this Court need not go into that aspect o
ce even if the contract is held to be a w
ut since the dispute itself is not covered u
(d), hence it is not arbitrable under
ham Act.
under
the
Thus, 1 am
approached
Conciliatio
not in dispu
m of the opinion that the applicant has ri
ightly
d this Court under the Arbitration
on Act, 1996. The arbitration agreement is
and
also
ute.
In the afo
Arbitration
attracted in
between t
independen
resolve the
foresaid circumstances, the provisions of
f the
n and Conciliation Act, 1996 are cle
early
spute
t an
ed to
n the matter, therefore, considering the dis
the parties, I am of the opinion that
nt Arbitration is required to be appointe
e same.”
2
ter of Viva Highways was referred to a
339. Thereafter matt
a full bench
for consideratio
on of the issue and full bench after cons
sidering the
earlier judgmen
nts delivered by High Court in different m
matters held
as under:-
“72. The
serious co
aforesaid point raised by the parties r
nsideration. For ready reference, the una
requires
mended

108
Rajesh Agrawal Vs. Executiv
21.4.2025.

ve Engineer, Public Works Department, AC No.9/2013 de
ecided on
Signature Not Verified
Signed by: VARGHESE
MATHEW
Signing time: 8/7/2026
4:31:33 PM

168


NEUTRAL CITATION NO. 20
26:MPHC-IND:21986

WP-9623-2021
and amen
juxtapositio
ded definition of “dispute” are reprodu
on.
uced in
Amended [
(Sanshodha
under the
Adhiniyam
[as by Madhya Pradesh Madhyastham Ad
dhikaran
an) Adhiniyam, 1990], definition of “d
e Madhya Pradesh Madhyastham Ad
dispute”
dhikaran
, 1983—
Unamended
1983
2(1)(d)
means any
relating to
valued a
50,000 or m
out of the
non-executi
works cont
thereof.
d w.e.f. 7-10- Amended w.e.f. 2
1990
“dispute”
y difference
o any claim
21-4-
2(1)(d) “disp
means claim
ascertained mo
valued at Rup
50,000 or more rela
to any differ
arising out of
execution or
execution of a w
contract or part ther
pute”
of
oney
upees
at Rupees
more, arising
ating
execution or
ion of a
tract or part