Delhi Development Authority vs B.G.Shirke Constructions Technology Private Limited
- Court
- Delhi High Court
$~
* IN THE HIGH COURT OF DELHI AT NEW DELHI
Judgment reserved on: 24.09.2026
Judgment pronounced on:23.11.2026
# CNR No. DLHC013591952017
+ O.M.P. (COMM) 361/2017 & I.A. 11448/2017
DELHI DEVELOPMENT AUTHORITY .....Petitioner
Through: Ms. Chand Chopra and Mr.
Punishk Handa, Advocates for
Mr. Sanjay Katyal, Standing
Counsel.
versus
B.G.SHIRKE CONSTRUCTIONS TECHNOLOGY PRIVATE
LIMITED .....Respondent
Through: Mr. Rajiv Kapoor and Mr.
Ashit Kapoor, Advocates with
Mr. Ashok Patil in person.
O.M.P. (COMM) 362/2017 & I.A. 11451/2017
DELHI DEVELOPMENT AUTHORITY .....Petitioner
Through: Ms. Chand Chopra and Mr.
Punishk Handa, Advocates for
Mr. Sanjay Katyal, Standing
Counsel.
versus
B.G.SHIRKE CONSTRUCTIONS TECHNOLOGY PRIVATE
LIMITED .....Respondent
Through: Mr. Rajiv Kapoor and Mr.
Ashit Kapoor, Advocates with
Mr. Ashok Patil in person.
CORAM:
HON'BLE MR. JUSTICE OM PRAKASH SHUKLA
JUDGMENT
% 23.11.2026
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 1 of 27
1. The present petitions under Section 34 of the Arbitration and
1
Conciliation Act, 1996 have been filed by the Delhi Development
2
Authority challenging two Arbitral Awards, both dated 22.05.2017
passed by the Arbitral Tribunal, comprising Shri S.R. Pandey,
Presiding Arbitrator, Shri P.S. Chadha, Arbitrator, and Shri K.K.
Varma, Arbitrator, in Arbitration Case Nos. ARB/SRP/201 and
ARB/SRP/202 respectively. Since both of these petitions arise out of
similar Agreements and involve the same dispute regarding the use of,
and payment for, excess cement in M-30 grade concrete, they are
being disposed of by this common judgment.
FACTUAL MATRIX
2. It emerges from the records that DDA invited tenders for the
construction of 24,660 LIG and 7,130 EWS houses in Narela and
Rohini, Delhi, using prefabricated technology, with RCC columns,
beams and slabs. The work was divided into two groups. Group-I
comprised the construction of 11,566 LIG and 2,275 EWS houses,
along with internal development and electrification works in Sectors
G-7 and G-8, Narela, and Sectors 34 and 35, Rohini. Group-II
comprised the construction of 13,094 LIG and 4,855 EWS houses,
along with internal development and electrification works in Sectors
G-2, G-6, G-3 and G-4, Narela.
3. DDA issued two separate letters of award, both dated
18.04.2013 in favour of the Respondent for Group-I and Group-II
works, bearing Nos. F-56(28)/A/c’s/ND-12/DDA/2011-12/264 and F-
1
“Act” hereinafter
2
“DDA/Petitioner” hereinafter
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 2 of 27
56(28)/A/c’s/ND-12/DDA/2011-12/265 respectively. The Respondent
accepted the letters of award by letter dated 23.04.2013, and the
3
agreements for the respective works were executed on 25.04.2013 .
4. The Agreement had clauses relating to the specifications to be
followed in execution of the works and also contained the quantity of
cement to be used in RCC. Clause 8 prescribed the order of preference
in the event of any inconsistency between the contractual documents.
5. Insofar as cement consumption is concerned, Clause 9.1.2 of the
Agreement provided that the minimum cement content would be as
4
prescribed under the CPWD Specifications, 2009 , and IS:456. Clause
9.1.3, however, stipulated a minimum cement content of 360 kg per
cubic metre for “any grade of RCC”. It further specified quantities of
410 kg and 428 kg per cubic metre for M-25 and M-35 grade concrete,
respectively. Additionally, in respect to M-25 and M-35, the terms
provided that if the actual quantities used fell below the benchmark
specified in the Agreement, the Petitioner would be entitled to effect
recovery from the Respondent.
6. Apparently, CPWD Specifications prescribed a minimum
cement content of 330 kg and a maximum of 500 kg per cubic metre,
with the actual quantity to be determined through the design mix.
Clause 9.1.3, however, prescribed a minimum of 360 kg per cubic
metre for any grade of RCC. Thus, the Agreement contained two
conflicting minimum quantities, and this discrepancy gave rise to the
dispute between the parties.
3
“Agreement” hereinafter
4
“CPWD Specifications” hereinafter
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 3 of 27
7. It also emerges from the records that the aforesaid issue was
also raised by the Respondent at the pre-bid stage. During the first pre-
bid meeting, the Respondent pointed out the apparent conflict between
Clauses 9.1.2 and 9.1.3 and sought clarification as to whether cement
consumption would be governed by the CPWD Specifications or by
the higher quantities mentioned in Clause 9.1.3. DDA responded that
the “NIT provision shall prevail”. The Respondent raised the same
issue in the second pre-bid meeting, but the response remained the
same by DDA.
8. During execution of the works, DDA instructed the Respondent
to prepare design mixes with a cement content higher than 330 kg per
cubic metre. According to the Respondent, its quoted rates were based
on a cement content of 330 kg per cubic metre, whereas it was
technically forced to use a higher quantity of cement pursuant to the
DDA’s directions. The Respondent, therefore, claimed that it had
incurred additional expenditure on account of the higher cement
consumption. However, DDA rejected the claim and declined to make
payment.
9. The dispute was therefore referred to arbitration. The
Respondent invoked arbitration by letter dated 23.01.2015, and the
Arbitral Tribunal was constituted on 28.06.2015. Before the Tribunal,
the Respondent claimed additional payment for excess cement
consumption in the works up to 30.06.2015 and also sought a
declaration that it would be entitled to payment for any further excess
cement used until completion of the works. It also claimed pre-
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 4 of 27
reference, pendente lite and future interest, along with the costs of
arbitration.
10. DDA resisted the claim in its entirety. On merits, it contended
that the parties were bound by the terms of the Agreement, which
prescribed a minimum cement content of 360 kg per cubic metre, and
that this requirement could not be displaced by the CPWD
Specifications. The DDA also raised a preliminary objection to the
maintainability of the arbitration proceedings, relying on Clause 8.2 of
the Conditions of Contract. It was its case that, under the said clause,
the Conditions of Contract were to prevail over other clauses, terms
and conditions of the contract, and any alleged discrepancy therein
could be resolved only by the Work Advisory Board. On this basis,
the DDA contended that the Arbitral Tribunal lacked jurisdiction to
adjudicate the claims or pass an award thereon.
11. By way of the impugned Awards, the Arbitral Tribunal rejected
the DDA’s objection to its jurisdiction, holding that the dispute was
arbitrable and that the requirement to approach the Work Advisory
Board did not bar reference of the dispute to arbitration. The Tribunal
thereafter proceeded to examine the dispute on merits.
12. Upon considering Clauses 9.1.2 and 9.1.3 and the pre-
contractual correspondence between the parties, the Tribunal found
that there was a contradiction between the two provisions. Therefore,
applying the principle of contra proferentem , it held that the minimum
cement content prescribed under the CPWD Specifications, i.e., 330
kg per cubic metre, would apply to all grades of RCC. The Tribunal
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 5 of 27
further held that Clause 9.1.3 did not prescribe a specific recovery
threshold for M-30 grade concrete and, accordingly, directed the DDA
to make payment to the Respondent for cement consumed in excess of
330 kg per cubic metre.
13. Accordingly, the Tribunal awarded Rs. 3,16,78,614 for the
alleged excess cement consumption in M-30 grade concrete up to
30.06.2015. It also directed DDA to refund the amounts already
recovered towards cement consumption in M-30 grade concrete and to
pay the Respondent at the rate of Rs. 6 per kg for excess cement
consumed from 01.07.2015 onwards. The relevant directions in the
impugned Awards are reproduced below:
“23.7 Award:
On the basis of findings above, AT makes the award as
under.
a) A sum of Rs.3,16,78,614 is awarded on account of use of
excess cement for M30 grade concrete for the work done up
to 30.06.2015.
b) The amount already recovered on account of use of
cement less than 410 kg per cum for M30 grade concrete
shall be refunded by the respondent to the claimant.
c) Respondent shall make payment to the claimant for use
of cement in excess of 330 kg per cum for M30 grade
concrete for the work done from 01.07.2015 onwards, at
the rate of Rs.6.00 per kg.
d) Claim for excess use of cement for M25 grade concrete
is rejected.”
PROCEEDINGS BEFORE THIS COURT
14. Learned Counsel for the Petitioner submitted that the Arbitral
Tribunal had fundamentally misread the contractual provisions,
particularly Clause 9.1.3, which expressly stipulated that the minimum
quantity of cement for “any grade of RCC” would be 360 kg per cubic
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 6 of 27
metre, and that the subsequent reference to M-25 and M-35 grade
concrete for the purposes of recovery did not dilute the opening
stipulation, which was equally applicable to M-30 grade concrete.
15. It was further submitted that Clause 9.1.2 could not be read in
isolation, as the reference to the CPWD Specifications merely
incorporated the technical specifications governing execution of the
work and did not prevent the parties from prescribing a higher
minimum cement content under the Agreement, particularly when
paragraphs 5.8.4.1 and 5.8.4.2 of the CPWD Specifications prescribed
a permissible range of 330 to 500 kg per cubic metre within which the
cement content was to be determined through the design mix.
16. Learned Counsel further submitted that the Respondent had
raised queries regarding cement consumption in the pre-bid meetings,
and was informed on both occasions that the “NIT provision shall
prevail”. Despite this, the Respondent proceeded with the bid and
executed the Agreement and therefore, the Respondent could not
subsequently claim that the cement requirement amounted to an
employer-imposed variation entitling it to additional payment.
17. It was further submitted that the Tribunal had awarded
compensation without identifying any contractual provision conferring
such entitlement, recording a breach of the Agreement by DDA, or
determining any loss arising from such breach under Section 73 of the
Indian Contract Act, 1872, and that an arbitral tribunal, being a
creature of the contract, could neither travel beyond its terms nor
substitute, supplement or modify the parties’ bargain. Reliance in this
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 7 of 27
regard was placed on Associated Engineering Co. v. Government of
5
Andhra Pradesh , Rajasthan State Mines & Minerals Ltd. v. Eastern
6 7
Engineering Enterprises , DDA v. R.S. Sharma and Co. , Indian Oil
8
Corporation Ltd. v. Shree Ganesh Petroleum , Pulin Comtrade Ltd.
v. Handicrafts & Handlooms Exports Corporation of India
9 10
Ltd. , Jindal Rail Infrastructure Ltd. v. Union of India ,
Technology Information Forecasting & Assessment Council v.
11
Strategic Engineering (P) Ltd and Export Credit Guarantee
12
Corporation of India Ltd. v. Garg Sons International , Galaxy
13
Transport Agencies v. New J.K. Roadways , and Agmatel India (P)
14
Ltd. v. Resoursys Telecom .
18. Learned Counsel further contended that the principle of contra
proferentem had been wrongly applied, as the contractual provisions,
when read together, disclosed no ambiguity warranting recourse to
that rule, and that the tendering authority’s interpretation of its own
tender conditions ought to be given due weight, particularly where the
issue had been raised by the Respondent before submission of its bid
and answered by DDA.
19. Per contra , learned Counsel for the Respondent submitted that
the Petitioner was seeking to raise a new ground by contending that
the AT could not have granted anything for the quantity of cement to
5
(1991) 4 SCC 93
6
(1999) 9 SCC 283
7
(2008) 13 SCC 80
8
(2022) 4 SCC 463
9
2024 SCC OnLine Del 5630
10
2024 SCC OnLine Del 3065
11
2025 SCC OnLine Del 9486
12
(2014) 1 SCC 686
13
(2021) 16 SCC 808
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 8 of 27
be used for Concrete grade of M-30, although no such objection had
been raised before the Arbitral Tribunal. It was submitted that the
Tribunal had considered the claims for both M-25 and M-30 concrete,
rejected the claim relating to M-25, and allowed only a partial claim in
respect of M-30, as the Agreement did not prescribe for any recovery
threshold for M-30 grade.
20. It was also submitted that the Respondent had specifically
raised the discrepancy between Clauses 9.1.2 and 9.1.3 during both
pre-bid meetings, but the DDA had failed to clarify the same. On the
contrary, the DDA had itself directed the Respondent to prepare a
design mix with a cement content of 410 kg per cubic metre. The
Respondent could not, therefore, be denied payment for the additional
cement consumed pursuant to the Petitioner’s own directions.
21. Learned Counsel also submitted that the Tribunal had
considered the rival interpretations and, upon finding an inconsistency
between Clauses 9.1.2 and 9.1.3, held that Clause 9.1.2 would prevail.
It was contended that this was an interpretation of the contractual
provisions and not a rewriting of the Agreement as the Tribunal had
also dealt with the issue of recovery under Clause 9.1.3 and had
allowed the Respondent’s claim only to the extent it found justified,
while permitting recovery in respect of M-30 concrete. It was,
therefore, submitted that the Tribunal’s interpretation disclosed no
patent illegality or other ground warranting interference under Section
34 of the Act.
14
(2022) 5 SCC 362
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 9 of 27
22. In rejoinder, learned Counsel for DDA submitted that the
Tribunal had misread Clause 9.1.2 by treating the reference to the
CPWD Specifications as prescribing a minimum cement content of
330 kg per cubic metre for all grades. It was vehemently argued that
Clause 9.1.2 had to be read along with Clause 9.1.3, which
specifically prescribed the minimum cement content and could not be
ignored by relying on the general provisions of the CPWD
Specifications.
23. Learned Counsel further submitted that the Respondent could
not rely on quantum meruit principle under Section 70 of the Indian
Contract Act, 1872, as no such plea had been raised before the
Tribunal and the Award was not based on it. It was further reiterated
that Section 73 could also not come to the Respondent’s aid, as a
claim for damages would require proof of breach of contract, which
could not be assumed merely because additional cement had been
consumed in the works.
ANALYSIS
24. The first principle to be kept in mind by this Court while
considering the present petitions is that this Court does not exercise
appellate jurisdiction over an arbitral award. While exercising
jurisdiction under Section 34 of the Act, the Court is not required to
examine whether it would have arrived at the same conclusion as the
Arbitral Tribunal. The Arbitral Tribunal is entitled to interpret the
terms of the contract, and its award cannot be interfered with merely
because another interpretation is possible.
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 10 of 27
25. This does not, however, mean that an award is immune from
interference where its findings run contrary to the express terms of the
contract. In South East Asia Marine Engg. & Constructions Ltd.
15
(SEAMEC LTD.) v. Oil India Ltd. , the Supreme Court set aside the
award after finding that the interpretation adopted by the Tribunal
could not be sustained on a reading of the contract as a whole. The
Supreme Court reiterated that a written contract must be construed as
a whole and its provisions must be read harmoniously, so far as
possible. It further held that an interpretation which defeats the
express wording of the contract cannot be regarded as a possible
interpretation. The relevant observations are as follows:
“28. In this context, the interpretation of Clause 23 of the Contract
by the Arbitral Tribunal, to provide a wide interpretation cannot
be accepted, as the thumb rule of interpretation is that the
document forming a written contract should be read as a whole
and so far as possible as mutually explanatory. In the case at hand,
this basic rule was ignored by the Tribunal while interpreting the
clause.
29. The contract was entered into between the parties in
furtherance of a tender issued by the Respondent herein. After
considering the tender bids, the Appellant issued a Letter of Intent.
In furtherance of the Letter of Intent, the contract (Contract No.
CCO/FC/0040/95) was for drilling oil wells and auxiliary
operations. It is important to note that the contract price was
payable to the ‘contractor’ for full and proper performance of its
contractual obligations. Further, Clauses 14.7 and 14.11 of the
Contract states that the rates, terms and conditions were to be in
force until the completion or abandonment of the last well being
drilled.
30. From the aforesaid discussion, it can be said that the contract
was based on a fixed rate. The party, before entering the tender
process, entered the contract after mitigating the risk of such an
increase. If the purpose of the tender was to limit the risks of price
15
(2020) 5 SCC 164
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 11 of 27
variations, then the interpretation placed by the Arbitral Tribunal
cannot be said to be possible one, as it would completely defeat the
explicit wordings and purpose of the contract. There is no
gainsaying that there will be price fluctuations which a prudent
contractor would have taken into margin, while bidding in the
tender. Such price fluctuations cannot be brought under Clause 23
unless specific language points to the inclusion.
31. The interpretation of the Arbitral Tribunal to expand the
meaning of Clause 23 to include change in rate of HSD is not a
possible interpretation of this contract, as the appellant did not
introduce any evidence which proves the same.”
Emphasis supplied
26. A similar principle was reiterated by this Court in GMR
Ambala Chandigarh Expressways Pvt. Ltd. v. National Highways
16
Authority of India , wherein it was held that neither a Court nor an
Arbitral Tribunal can add or subtract from the terms of a commercial
contract, or introduce considerations which do not find place in the
agreement. The contract must be construed in accordance with the
bargain struck between the parties. The relevant observations are as
follows:
“ 27.1.2 It is well settled that, in interpreting contracts, especially
commercial contracts, the Court cannot add to or subtract from
covenants of or considerations in the contracts on its own accord.
Specifications and stipulations, which are not to be found in
commercial contracts, cannot be read into such contracts by a
Court - or, for that matter, by an Arbitral Tribunal. The principle
governing interpretation of the terms of commercial contracts is
that the contractual terms are to be treated as manifesting, in
their entirety, the intent of the parties to the contract. There is a
presumption, in law, that commercial contracts, especially
contracts involving large projects, are executed after minutest and
most precise circumspection. Every term of such a contract is
expected to reflect the intent of the parties. A consideration which
does not find place in such a contract, therefore, it is expected, was
a consideration which the parties did not intend to be part thereof.
A Court or an Arbitral Tribunal cannot presume the existence of
16
O.M.P. (COMM) 480/2020
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 12 of 27
such a consideration. Casus omissus cannot be provided by a
Court or by an Arbitral Tribunal, into the covenants in a
commercial contract.
Emphasis supplied
27. Thus, the permissible latitude in construing a contract cannot be
stretched to the point of rewriting it. The inquiry before this Court,
while exercising jurisdiction under Section 34 of the Act, is limited to
examining whether the interpretation adopted by the Tribunal finds
reasonable sustenance in the contractual language and whether the
relief granted is borne out by the Agreement or is otherwise supported
by an independent legal entitlement.
28. It is against this backdrop that the controversy concerning
Clauses 9.1.2 and 9.1.3 of the Agreement falls for consideration
before this Court. After considering the record, there is no doubt that
there is an apparent tension between Clauses 9.1.2 and 9.1.3 of the
Agreement. Clause 9.1.2 requires the minimum cement content to be
governed by the CPWD Specifications and IS 456, which prescribe a
minimum cement content of 330 kg per cubic metre and a maximum
of 500 kg per cubic metre. Clause 9.1.3, on the other hand, stipulates
that the minimum quantity of cement for “any grade of RCC” shall be
360 kg per cubic metre. Therefore, the apparent conflict on the face of
the Agreement is as to whether the minimum quantity of cement for
RCC ought to be 330kg or 360kg.
29. The Respondent had raised queries regarding this apparent
inconsistency even at the pre-bid stage, to which the DDA had
responded that the “NIT provision shall prevail”. This shows that the
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 13 of 27
issue of cement content was not raised for the first time after
execution of the contract as an afterthought. In these circumstances,
the Tribunal was justified in examining whether the two clauses were
at variance with each other and/or inconsistent. The relevant findings
of the Tribunal are reproduced below:
“23.6.1 The contention of the respondent that 'even if any
ambiguity existed, the claimant could not invoke the arbitration
clause because as per clause 6.1. (Page 696 of the agreement), the
ambiguity in regard to interpretation of specification(s), the
decision of the Executive Engineer shall be final and binding' is
held as misplaced and misconceived as there is no dispute that the
Design Mix of the concrete of various grades as well as the work
was to be carried out as per CPWD Specifications 2009 nor there
is any dispute over the interpretation of CPWD Specifications 2009
in regard to minimum cement content which, as specified in para
5.8.4.1 of CPWD Specifications 2009 is 330 Kg per cum for all
grades of concrete. The dispute involves three issues (i) Whether
the minimum cement content should be taken as 330 Kg per cum
for all grades of concrete as per clause 9.1.2 which refers to
CPWD Specifications 2009 or 360 Kg per cum as mentioned in
clause 9.1.3 (ii) Whether the claimant is liable for recovery if
cement used is less than 410 Kg per cum for M25 grade concrete
and less than 428 Kg per cum for M35 grade concrete as
mentioned in clause 9.1.3 and (iii) Whether the claimant is entitled
to be compensated for use of cement in excess of 330 Kg per cum
as claimed by the claimant. The contention of the respondent is
therefore, rejected and it is held that the claim is arbitrable.
23.6.2 As regards the issue of contra proferentum raised by the
claimant and objected by the respondent, the AT is of the view that
there is clear contradiction between clause 9.1.2 and 9.1.3 in
regard to minimum cement content as according to clause 9.1.2,
the minimum cement content shall be. as per CPWD Specifications
2009 which means 330 Kg per cum for all grades of concrete as
specified in para 5.8.4.1 of the said Specifications. whereas, in
clause 9.1.3, it has been mentioned that minimum cement content
for any grade of concrete will be 360 Kg per cum. As the tender
document was drafted by the respondent, the contradictory
provision has to be held against the respondent. Accordingly, para
9.1.2 would prevail, that is, the minimum cement content has to be
taken as 330 Kg per cum for all grades of concrete as specified in
CPWD Specifications 2009. In fact, the respondent too, has
admitted this position as stated in para24.5 (e) hereinabove, albeit
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 14 of 27
with a qualifying statement that if the work had been executed by
the claimant with 330 Kg of cement per cum, the same could not be
rejected but given the provision of clause 9.1.3, the claimant
cannot say that nothing would be deducted if it uses the cement
below 410 Kg per cum for M25 grade concrete and below 428 kg
per cum for M35 grade concrete. AT is therefore of the view that
unless specified otherwise, the claimant's quoted price has to be
considered as based on use of cement at the rate of 330 kg per cum
for all grades of concrete.
23.6.3 As regards the provision as per clause 9.1.3 that recovery
shall be made in case cement used is less than 410 kg per cum for
M25 grade and less than 428 kg per cum for M-35 grade concrete,
AT is of the view that this stipulation is independent of the
requirement of minimum quantity of cement to be used for any
grade of concrete and there is no contradiction in this regard as
contended by the claimant. In fact, it is obvious from the query
raised by the claimant in the second pre-bid meeting as
reproduced, in para19.5 supra, that the claimant was conscious of
the fact that irrespective of minimum cement content specified in
clause 9.1.2 or 9.1.3, recovery would be made if the cement used is
less than 410 kg per cum for M25 grade concrete and less than 428
Kg per cum for M35 grade concrete. AT is therefore of the view
that the claimant must have quoted its price accordingly. it is
therefore, held that the claimant is not entitled to be compensated
for using cement in excess of 330 kg per cum for M25 and M35
grade concrete, whereas, the respondent would be well within its
rights to make recovery if cement used is less than 410 kg per cum
for M25 grade concrete and less than 428 Kg per cum for M35
grade concrete.
23.6.4 It is also held that in view of the respondent's rebuttal vide
letter dated 20.09.2014 (Ex. C-7), what had been stated in para4
by the claimant in its letter dated 03.09.2014 (Ex. C-6) cannot be
construed as acceptance of its contention by the respondent
Engineer Member that it had quoted its price for both M25 and
M35 grade concrete considering clause 9.1.2 and hence it is
entitled to be compensated for use of cement in excess of 330 Kg
per cum for M25 and M35 grade concrete.
23.6.5 The claim relates to use of cement in excess of 330 Kg per
cum for M25 and M30 grade concrete which has been admittedly
used as per instruction of the respondent.
23.6.6 As per finding recorded in para 23.6.3 hereinabove, the
claimant is not entitled to be compensated for using cement in
excess of 330 Kg per cum for M25 and M35 grade concrete.
Hence, the component of the claim relating to use of cement in
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 15 of 27
excess of 330 Kg per cum for M25 grade concrete is held as
untenable.
23.6.7 As regards the component of the claim relating to use of
cement in excess of 330 Kg per cum for M30 grade concrete, it is
noticed that clause 9.1.3 on which the respondent has relied to
deny the claim, is silent on M3U grade concrete. Hence, no
recovery is to be made if the cement used for M30 grade concrete
is less than 428 kg per cum or even less than 410 kg per cum.
Further to this, the AT has recorded a finding in para23.6.2
hereinabove that unless specified otherwise, the claimant's quoted
price has to be considered as based on the use of cement at the rate
of 330 kg per cum for all grades of concrete. As unlike M25 and
M35 grade concrete, nothing otherwise has been specified in
clause 9.1.3 or anywhere else in the agreement in regard to M30
grade concrete, it is held that the claimant is entitled to be
compensated for use of cement in excess of 330 Kg per cum for
M30 grade concrete as the same has been admittedly used as per
instruction of the respondent.
23.6.8 The claim as stated in para 23.3 (a) hereinabove is on
account of use of cement in excess of 330 kg per cum for both M25
and M30 grade concrete for the work done up to 30.06.2015. As
held in para 23.6.6 hereinabove, the component of the claim
relating to use of cement in excess of 330 kg per cum for M25
grade concrete is not tenable. However, as regards use of cement
in excess of 330 kg per cum for M30 grade concrete, it has been
held in para 23.6.7 above that the claimant is entitled to be
compensated for use of cement in excess of 330 kg per cum. The
amount payable to the claimant on this account is worked out in
the paras that follow.
23.6.9 Admittedly, for the M30 grade concrete in the RCC work,
executed up to 30.06.2015, the cement has been used at the rate of
410 Kg per cum, that is, 80 Kg in excess of 330 Kg per cum.
24.6.10 As per the SOC (ref. page 22), the claimant has raised its
claim for cement used in excess of 330 Kg per cum, that is, 80 Kg
per cum, on the basis that a quantity of 76195.584 cum of M30
grade concrete has been used in ACC work executed up to
30.06.2015.
24.6.11 As per directions of the AT, the respondent, vide letter
dated 04.06.2016 filed a statement jointly signed by the parties,
which, inter alia, shows quantity of M30 grade concrete used in
various RCC members up to 30.06.2015 and as per this statement,
the quantity of M30 grade concrete used up to 30.06.2015 is
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 16 of 27
69,827.84 cum. Based on this quantity, the claimant filed its
modified claim as per its letter dated 09.06.2016.
24.6.12 The same quantity (i.e. 69,827.84 cum) as mentioned in
para above was indicated in the statement filed by the respondent
as per letter dated 02.09.2016 and the claimant reiterated its
modified claim on the basis of this quantity as per its letter dated
21.09.2016.
24.6.13 The claimant, as per its written synopsis dated 25.11.2016
(ref. page 12), which is its final submission, has amended the claim
taking the quantity of M30 grade concrete as 65,997.11 cum.
Hence, the quantity of M30 grade concrete involving excess
quantity of cement which would qualify for payment has to be taken
as 65,997.11 cum. Accordingly, the quantity of cement used in
excess of 330 Kg per cum for which the claimant is entitled to be
paid = 52,79,769 Kg (=65,997.11 X 80).
24.6.14 The rate claimed for excess use of cement is Rs.6.62 per
kg. As per clause 1.12 of special conditions (page 577), recovery
rate for less use of cement is Rs.6000 per MT (Rs.6.00 per kg). The
AT is of the view that the rate for payment for excess use of cement
should be the same as recovery rate for less use of cement, that is,
Rs.6.00 per kg. Accordingly. the amount payable for the quantity of
52,79,769 kg as stated in para 24.6.13 above = 52,79,769 x 6 =
Rs.3,16,78,614.”
30. Since the primary contention of the Petitioner is that there was
no contractual inconsistency, both clauses are reproduced hereinbelow
for reference:
“9. CONDITIONS FOR RCC WORK:-
9.1 The following special conditions for RCC work shall be
followed:-
9.1.1 The cement concrete mix design shall be got done by the
contractor through approved organization/ testing labs mentioned
in para 10.2.
9.1.2 The maximum water cement ratio and minimum cement
content of various Grade concrete mix shall be as under:-
Grade of
Mix
Maxi. W/C
Ratio
Mini. Cement Content (in Kg.)
M-25 0.50 Minimum cement contents in Kg.
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 17 of 27
M-35 0.45 shall be as per CPWD
specification 2009 for cement,
mortar, cement concrete and
reinforce cement concrete work
and IS:456 (latest.)
However, in RCC works in piles minimum cement content shall be
as per IS: 2911.
9.1.3 The minimum quantity of cement for any grade RCC will
be 360 Kg Ordinary Portland Cement per cum. In case cement
used is more than 410 Kg. And 428 Kg per cum of M-25 and M-35
grade RCC respectively nothing extra shall be payable whereas
recovery shall be effected, for cement is used less than above
quantities i.e. 410 Kg and 428 Kg per cum of M-25 and M-35
grade RCC respectively at market rates to be decided by Engineer-
in-Charge whose decision shall be final and binding on the
contractor.”
Emphasis supplied
31. A careful reading of the said clauses indicates that Clause 9.1.2
provides that the minimum cement content for M-25 and M-35 grade
concrete shall be governed by the CPWD Specifications and IS 456.
The relevant CPWD Specifications prescribe a minimum of 330 kg
and a maximum of 500 kg of cement per cubic metre. Clause 9.1.3, on
the other hand, has two distinct components. The first prescribes a
minimum quantity of 360 kg per cubic metre for “any grade of RCC”.
The second specifies the quantities of 410 kg and 428 kg per cubic
metre for M-25 and M-35, respectively, for the purpose of
determining recovery in case of deficient cement consumption.
32. The Tribunal considered these clauses and found an
inconsistency between them as Clause 9.1.2 prescribed a minimum of
330 kg per cubic metre, whereas Clause 9.1.3 prescribed a minimum
of 360 kg per cubic metre. Applying the principle of contra
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 18 of 27
proferentem , the Tribunal held that the minimum cement content
would be 330 kg per cubic metre for all grades.
33. It further treated the specific recovery thresholds for M-25 and
M-35 as operating independently of the general minimum requirement
and held that the respective thresholds of 410 kg and 428 kg per cubic
metre would continue to apply, as the Respondent was aware of those
conditions when submitting its bid. On this basis, the Tribunal rejected
the Respondent’s claim for additional payment for excess cement used
in M-25 grade concrete.
34. In the considered view of this Court, the figure of 360 kg per
cubic metre prescribed in Clause 9.1.3 falls within the range of 330 kg
to 500 kg stipulated under the CPWD Specifications, and the two
clauses could have been read harmoniously. The Tribunal, however,
found those clauses inconsistent and applied the principle of contra
proferentem in favour of the Respondent.
35. However, the mere fact that the clauses could have been read
harmoniously does not render the Tribunal’s interpretation
unsustainable or implausible. The Tribunal considered the relevant
provisions and took the view that they were ambiguous which is a
plausible view after a reading of Clause 9.1.2 and 9.1.3. This court
need not burden this judgment with a catena of authorities that have
consistently held that the interpretation of a contract lies within the
exclusive domain of the Arbitral Tribunal, and this Court, while
exercising jurisdiction under Section 34 of the Act cannot interfere
merely because another interpretation is more plausible. Accordingly,
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 19 of 27
this Court finds no ground to interfere with the Tribunal’s
interpretation of Clauses 9.1.2 and 9.1.3 in relation to M-25 and M-35.
36. The position concerning M-30, however, stands on a different
footing and warrants a separate examination by this Court. In respect
of the M-30 grade as well, the Petitioner argued before the Tribunal
that there was no ambiguity between the clauses. However, the
Tribunal concluded that for the M-30 grade also, the minimum
stipulated quantity is 330 kg per cubic metre, principally on the basis
of its earlier finding that there is a contradiction between 9.1.2 and
9.1.3, and that since the Petitioner drafted the contract, it ought to be
construed against the Petitioner. In arriving at this conclusion, the
Tribunal confined its consideration solely to only these two clauses.
37. However, while arriving at this conclusion, the Tribunal
overlooked the fact that Clause 9.1.2 specifically refers only to M-25
and M-35, whereas Clause 9.1.3 expressly stipulates a minimum
cement content of 360 kg per cubic metre for “any grade of RCC”,
which necessarily includes M-30. The Tribunal failed to appreciate
this distinction. Without examining the specific expression “any grade
of RCC” used in Clause 9.1.3, it treated the divergence between the
two clauses as an inconsistency even in relation to M-30, although
Clause 9.1.2 does not refer to that grade at all.
38. In the absence of any ambiguity between Clauses 9.1.2 and
9.1.3 with respect to M-30, there was no occasion for the Tribunal to
resort to the principle of contra proferentem . By doing so, the Arbitral
Tribunal has, in effect, overridden the specific and unambiguous
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 20 of 27
requirement of 360 kg per cubic metre expressly stipulated under
Clause 9.1.3 for “any grade of RCC”, which encompasses M-30. The
conclusion that 330 kg per cubic metre is the minimum cement
content for M-30 is, therefore, not a plausible interpretation of the
contractual terms, as it fails to give effect to the express language of
Clause 9.1.3. Without examining the M-30 grade separately, the
Tribunal has travelled beyond the realms of contractual interpretation,
ignored an express stipulation and arrived at a finding contrary to the
terms of the Agreement as the Tribunal failed to address the specific
requirement applicable to M-30 and mechanically extended its finding
of inconsistency to that grade. Such a finding cannot be sustained and
is accordingly set aside.
39. A separate question arises as to whether, even if 330 kg per
cubic metre is taken to be the basis on which the Respondent quoted
its rates, the Respondent was entitled to payment for every kilogram
of cement used beyond the stipulated minimum quantity for M-30
concrete.
40. To examine the said issue, it is relevant to note that the
Agreement was a lump-sum contract, under which the Respondent
was entitled to the agreed contract price. The CPWD Specifications
prescribe a range of 330 kg to 500 kg per cubic metre, and the
requirement of 410 kg per cubic metre imposed by the Petitioner falls
within that range. DDA has also raised before the learned Arbitrator
that the use of the word ‘minimum’ in Clause 9.1.3 makes it
abundantly clear that, under all circumstances, the cement content for
all grades of concrete executed under the Agreement was required to
be more than 360 kg per cubic metre, and any quantity below the said
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 21 of 27
threshold was liable to be rejected. In such circumstances, the
impugned Award does not explain how the requirement to use 410 kg
per cubic metre, in itself, created a separate liability on the DDA.
41. The only relevant reasoning given by the Tribunal is that Clause
9.1.3 specifies recovery thresholds for M-25 and M-35 but does not
prescribe a corresponding threshold for M-30 and therefore, the
Respondent is entitled to the payment for the quantity admittedly used
in excess. However, the absence of a specific threshold for M-30 may
mean that the DDA could not recover amounts by applying the
thresholds prescribed for M-25 and M-35 to M-30. It does not,
however, follow that the Petitioner was liable to pay for every
kilogram of cement consumed beyond 330 kg or 360 kg per cubic
metre. It is to be noted that the absence of a right to recover an amount
from the Contractor does not, by itself, create a corresponding right in
the Contractor to claim payment.
42. This assumes significant importance in the present case because
the Respondent’s claim was not based on quantum meruit , nor was
any such case was pleaded before the Tribunal. The Tribunal was,
therefore, required to identify a contractual provision or some other
legal basis for awarding additional payment but none of it was relied
upon by the learned Tribunal.
43. Even if the additional cement was used on the Petitioner’s
instructions, the Tribunal was required to examine whether those
instructions entitled the Respondent to additional payment under the
Agreement or amounted to a variation of the contracted work carrying
such an entitlement. The Award does not identify any such clause or
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 22 of 27
explain how the additional consumption became separately payable
under the lump-sum contract. It appears that, although not stated
expressly, the Tribunal awarded the amount on the basis of fairness or
equity which is impermissible in the absence of express authorisation
by the parties under Section 28(2) of the Act.
44. The clauses in relation to the design mix also assumes
importance. Paragraph 5.8.4.2 of the CPWD Specifications provides
that the actual cement content for each grade of concrete shall be
established through design mixes within the limits specified in
paragraph 5.8.4.1. In the present case, the requirement to use 410 kg
of cement per cubic metre fell within the prescribed range of 330 kg to
500 kg given in 5.8.4.1.
45. This further supports the Petitioner’s case that its requirement
was in accordance with the contract. If the Respondent failed to
account for this requirement while quoting its rates, the Petitioner
cannot be made liable for the Respondent’s failure to do so. The
Respondent was expected to exercise prudence while quoting its rates,
keeping in mind that the Petitioner might instruct it to use cement
beyond the prescribed minimum quantity, and to account for the same
in its rates.
46. Further, the Tribunal also adopted the rate of Rs.6 per kg
prescribed under Clause 1.12 for recovery in cases of deficient cement
consumption and applied it to the excess quantity used in M-30.
However, while the clause provides for recovery in specified
circumstances, it does not stipulate that the same rate must be paid to
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 23 of 27
the Contractor when consumption exceeds the prescribed quantity.
The Tribunal has actually applied the recovery rate in reverse without
identifying any contractual clause permitting it to do so.
47. It is a settled position of law that an Arbitral Tribunal is a
creature of the contract and must operate strictly within its four
corners. While the construction of contractual terms falls within the
domain of the Tribunal, it cannot, under the guise of interpretation,
rewrite the contract or invent a payment mechanism where none
exists. It is well settled an award that ignores express contractual
stipulations or re-writes the contract suffers from patent illegality
under Section 34 of the Act. In the present case, the Tribunal imported
a penalty/recovery rate meant solely for deficient consumption and
converted it into a positive payment entitlement for excess
consumption, and therefore, effectively rewritten the Agreement.
48. By adopting this approach, the Tribunal has also imposed a
financial liability on the DDA without tracing it to any terms of the
Agreement. In a lump-sum contract, the parties are bound by the
bargain they have stuck. The mere fact that additional material was
used, or that the Agreement does not provide for recovery in a
particular contingency, cannot by itself justify imposing a reciprocal
payment obligation upon the Petitioner, particularly when the
Respondent’s claim was not founded on quantum meruit .
49. Thus, even if the Tribunal’s conclusion that 330 kg per cubic
metre was the relevant baseline for M-30 is accepted, it does not by
itself entitle the Respondent to additional payment. The Tribunal was
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 24 of 27
required to establish both the Respondent’s entitlement to payment for
the excess cement and the basis for calculating that amount. Neither
could be inferred merely from the DDA’s instruction to use 410 kg per
cubic metre or from the absence of a specific recovery threshold for
M-30.
50. Furthermore, the DDA’s hands were not tied by the stipulated
baseline of 330 kg or 360 kg per cubic metre, as the contract permitted
the cement content to be determined through a design mix within the
prescribed limits, which included both these minimum quantities. The
Tribunal nevertheless awarded payment at the rate of Rs. 6 per kg
without recording a finding of any independent breach of the agreed
contractual conditions.
51. Ultimately, the Tribunal awarded Rs. 3,16,78,614 towards
excess cement consumed in M-30 grade concrete, without establishing
any contractual basis for the same. Therefore, this no longer remains a
case of merely adopting one plausible interpretation over another,
rather, the Tribunal has travelled beyond the four corners of the
Agreement and created an entitlement in favour of the Respondent
that is devoid of any contractual or legal foundation. Such an approach
renders the impugned Awards patently illegal to that extent, and the
findings on this issue are accordingly set aside.
52. As far as consequential direction for payment towards M-30
cement consumption from 01.07.2015 onwards is concerned, once the
underlying entitlement itself is found to be unsupported by the
contractual terms or any other legal basis, such a consequential
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 25 of 27
monetary direction cannot be sustained on the same reasoning and is
also set aside.
53. In view of the findings recorded above, both the impugned
Awards dated 22.05.2017 are set aside to the extent that they:
a) Hold that the minimum cement content for M-30 grade
concrete is 330 kg per cubic metre;
b) award Rs.3,16,78,614/- to the Respondent towards alleged
excess cement consumption in M-30 grade concrete up to
30.06.2015;
c) directs payment for excess cement consumption in M-30
grade concrete from 01.07.2015 onwards at Rs.6 per
kilogram;
d) directs the refund of amounts recovered on account of
cement consumption in M-30 grade concrete, to the extent
that such refund is founded upon the same erroneous
creation of a reciprocal payment entitlement; and
e) awards consequential interest on the aforesaid
monetary/declaratory relief.
54. In view of the foregoing, both petitions are allowed in the
aforesaid terms, while leaving the remaining findings of the impugned
Awards undisturbed. Pending applications, if any, stand disposed of.
Signature Not Verified
Signed By:GUNN
Signing Date:23.11.2026
19:07:16
O.M.P. (COMM) 361/2017 and other connected matter Page 26 of 27
55. No order as to cost.