Toshiba JSW Power Systems P Ltd vs Commissioner of GST&CCE(Chennai outer)

Court
Customs, Excise and Service Tax Appellate Tribunal

CUSTOMS, EXCISE AND SERVICE TAX APPELLATE TRIBUNAL
CHENNAI
REGIONAL BENCH – COURT No. I

Excise Appeal No. 40612 of 2018
(Arising out of Order-in-Appeal No. 428 & 429/2017 (CTA-I) dated 04.12.2017
passed by Commissioner of GST & Central Excise, (Appeals-I), 26/1, Mahatma
Gandhi Marg, Nungambakkam, Chennai-600 034.


M/s. Toshiba JSW Power Systems (P) Ltd. ...Appellant
S.No.74-95, Vaikkadu Village
Andarkuppam Check Post
Manali New Town, Chennai 600 103

Versus

Commissioner of GST and Central Excise ...Respondent
Newry Towers, No.2054, I Block, II Avenue
th
12 Main Road, Anna Nagar, Chennai 600 040

AND
Excise Appeal No. 40613 of 2018
(Arising out of Order-in-Appeal No. 428 & 429/2017 (CTA-I) dated 04.12.2017
passed by Commissioner of GST & Central Excise, (Appeals-I), 26/1, Mahatma
Gandhi Marg, Nungambakkam, Chennai-600 034.


M/s. Toshiba JSW Power Systems (P) Ltd. ...Appellant
S.No.74-95, Vaikkadu Village
Andarkuppam Check Post
Manali New Town, Chennai 600 103

Versus

Commissioner of GST and Central Excise ...Respondent
Newry Towers, No.2054, I Block, II Avenue
th
12 Main Road, Anna Nagar, Chennai 600 040

APPEARANCE:
For the Appellant : Shri Raghavan Ramabhadran, Advocate
For the Respondent : Shri M. Selvakumar, Authorised Representative
CORAM:
HON’BLE MR. VASA SESHAGIRI RAO, MEMBER (TECHNICAL)
HON’BLE MR. AJAYAN T.V., MEMBER (JUDICIAL)

FINAL ORDER Nos.41071-41072/2026



2

DATE OF HEARING : 22.04.2026
DATE OF DECISION : 09.10.2026

Per Mr. AJAYAN T.V.

These two appeals are filed by M/s. Toshiba
JSW Power Systems (P) Ltd. (the appellant) against the common
Order in Appeal Nos. 428 & 429/2017 (CTA I) dated 04.12.2017 (the
impugned order) passed by the Commissioner of GST and Central
Excise (Appeals I), Chennai. As both appeals arise from one order and
turn on the same questions, they were heard together and are
disposed of by this common order.
2. The relevant facts are that the appellant is a joint venture of
M/s. Toshiba Corporation, Japan, M/s. JSW Steel Ltd. and M/s. JSW
Energy Ltd. It is registered as a manufacturer of super critical
turbines, electric motors, electric generating sets and rotary
converters for the power sector, falling under Chapters 84 and 85 of
the First Schedule to the Central Excise Tariff Act, 1985, and clears
them on payment of duty. During the period in dispute it was setting
up, within its factory at Manali, a new plant for the manufacture of
steam turbines and generators. For that purpose it engaged M/s. Blue
Star Ltd., M/s. ETA Engineering Pvt. Ltd., M/s. Metec Design &
Construction Engineers India Pvt. Ltd. and M/s. Shakthi Electricals
Chennai Pvt. Ltd. (the contractors) for the design, detailed
engineering, supply, construction or installation, testing and
commissioning of systems and sub systems of that plant, namely the
heating, ventilation and air conditioning system, the stator coil shop,
air handling units for the A and B bay expansion, HT, LT and HUP
transformers and electrical works, the fire detection and protection
system, the industrial water system, the process cooling water
system, and street lighting and UPS.
3. A letter of intent was issued to each contractor, followed by
two purchase orders, one for the supply of the equipment and the
other for its installation, testing and commissioning. The goods were
procured by the contractors from manufacturers and dealers whose
duty paying invoices named the contractor as the buyer and the
appellant as the consignee at its factory. The contractors billed the

3

appellant separately for erection and commissioning, on which they
charged service tax. The appellant took credit of the excise duty
shown on the manufacturers’ and dealers’ invoices as credit on capital
goods, and also took credit of the service tax charged on the erection
bills.
4. Acting on intelligence, the Department investigated the matter
and issued Show Cause Notice No.24/2015 dated 25.09.2015 (the
Notice) proposing to recover Rs.1,93,97,137/- as credit wrongly
availed during September 2010 to March 2015, under Rule 14 of the
Cenvat Credit Rules, 2004 (CCR) read with the proviso to Section
11A(1) of the Central Excise Act, 1944 (the Act) for the period up to
07.04.2011 and with Section 11A(4) of the Act thereafter, together
with interest and a penalty under Rule 15(2) of the CCR read with
Section 11AC of the Act.

5. Paragraph 6 of the show cause notice extracts the general
conditions of contract on which the Revenue rests its case. The scope
of work includes all labour, material, tools, plant, equipment and
transport required for the full and entire execution and completion of
the works. Fluctuations in the price of materials, equipment or labour
are not compensated. Watch and ward of all plant and machinery at
site for use in the work is the contractor’s sole responsibility. The PMC
may reject materials or work with which it is not satisfied and direct
the contractor to procure supplies from agencies it deems fit. The
quoted rates are all inclusive and cover the cost of materials, labour,
freight, insurance, all taxes and duties, erection, construction and
testing, and any other expenditure incurred for completion of the
work as per drawings and specification. The Notice proceeded on
three lines. The first was that under the EPCC contracts the
contractors were obliged to design, procure, construct, install, test,
commission and hand over each system; that the goods were their
inputs, consumed and subsumed irreversibly in a plant which, by the
Board’s Order No.58/1/2002-CX dated 15.01.2002 issued under
Section 37B of the Act, is immovable and not excisable; that payment
was made for the plant as a whole; and that the appellant, named

4

only as consignee, had taken credit on non excisable inputs in the
guise of capital goods. The second was that the contracts were works
contracts taxable under Section 65(105)(zzzza) of the Finance Act,
1994; that the value of the goods stood exempted or excluded from
service tax under Notification No.12/2003-ST dated 20.06.2003 or
Rule 2A of the Service Tax (Determination of Value) Rules, 2006 (the
Valuation Rules), with an attendant bar on credit; and that by the
Explanation appended to Rule 3 of the CCR that bar prevails over the
Rules, so that the recipient has no locus to take the credit denied to
the works contractor and the benefit would otherwise be enjoyed
twice. The third was that the appellant had deliberately split
composite contracts into supply and service orders, and that the
manufacturers had shown the appellant as consignee, in order to
facilitate the credit. The Notice relied on Gujarat State Petronet Ltd. v.
CCE, Ahmedabad, 2013 (32) S.T.R. 510 (Tri.-Ahmd.), Ramky
Infrastructure Ltd. v. CST, Hyderabad, 2013 (29) S.T.R. 33 (Tri.-
Bang.), the Board’s Circular No.98/1/2008-ST dated 04.01.2008
(reference code 097.02) , and, for the extended period, on a
statement dated 27.10.2014 of Shri V. Srinivasan, General Manager
(Finance and Accounts) of M/s. Metec, who is stated to have admitted
that the materials were procured by the works contractor, that the
contractor did not take credit on them, and that their value was not
included in the value on which service tax was paid.
6. In reply the appellant maintained that the goods were capital
goods within Rule 2(a) of the CCR, received and used in its factory;
that ownership is not a condition of credit; that it had in any case
procured the goods, as shown by the contractors’ sale invoices and its
own books; that the Board’s Order concerns excisability and not
credit; that separate orders for supply and service are an industry
practice; that the contractors paid service tax on the full value of
erection; that any restriction under Notification No.12/2003-ST or
Rule 2A binds only the service provider; that Rule 2A is a valuation
provision and not an exemption; and that Gujarat State Petronet is
distinguishable because there the recipient was a service provider and
the contractor had availed Notification No.12/2003-ST under a lump

5

sum contract, whereas here supply and service were under different
contracts and the contractors therefore did not avail that notification.
7. By Order in Original No.68/2016 dated 15.12.2016 the
Adjudicating Authority recorded, as facts which the appellant did not
deny, that EPC contracts had been awarded, that the contractors were
to procure, install, commission and hand over each system, that the
systems were immovable, that the contractors had paid service tax
under works contract service, and that they were not entitled to credit
on the machinery and components. It held that what was handed over
was part of an immovable plant, that the value of the items
transferred never formed part of the value on which service tax was
paid, and that Rule 2A of the Valuation Rules, Explanation 2 thereto
and the Explanation to Rule 3 of the CCR barred the credit, relying on
Gujarat State Petronet. The authorities cited by the appellant were set
aside in a sentence as not exactly identical. Holding that the
Department was never in a position to know of the two sets of
purchase orders and that the appellant had given no valid reason for
them, the Adjudicating Authority confirmed the demand under Section
11A(4) of the Act with interest and imposed an equal penalty under
Rule 15(2) of the CCR read with Section 11AC(c) of the Act. A
statement of demand No.18/2016 dated 02.05.2016, raising the same
demand on the same grounds for April 2015 to March 2016, was
confirmed by Order in Original No.4/2017 (S) dated 07.02.2017.
8. The Commissioner (Appeals) rejected the appeals against both
orders by the impugned order. He held that the goods were
purchased by the contractors under their own orders, received and
used by them, and sold to the appellant as a whole plant which, under
the Board’s Order, is not excisable; that the contracted work was
composite, as was evident from the common letters of intent followed
by separate supply and service orders; that the contracts were
classifiable as works contract service; that under Rule 2A credit on the
goods was not allowed to the works contractor; that “in the present
case the EPC Contractors have availed Notification No.12/2003-ST”,
so that by the Explanation to Rule 3 no credit was available to the
appellant; and that, since the appellant could not demonstrate a valid

6

reason for placing two orders and the facts came to light only on
investigation, the extended period and the penalties under Rules
15(2) and 15(1) of the CCR were justified.
Submissions on behalf of the appellant
9. Shri Raghavan Ramabhadran, learned counsel for the
appellant, contended that the goods are capital goods within Rule 2(a)
of the CCR, that they were received and installed in the appellant’s
factory and are used there in the manufacture of dutiable final
products, and that Rule 3(1) requires nothing more. Ownership is not
a condition of credit, as held in CCE, Ludhiana v. Pepsi Foods Ltd.,
2010 (254) E.L.T. 284 (P&H) and CCE v. Sunrise Chemical Industries,
2010 (262) E.L.T. 110 (Guj.) . In any event, it was urged, property in
the goods passed to the appellant under the contractors’ supply
invoices, which preceded the erection invoices, and the contractors
thereafter acted, in counsel’s words, as bailors holding and using the
goods on behalf of and for the benefit of the appellant. Reliance was
placed, inter-alia, on CCE v. International Tractors Ltd., 2010 (255)
E.L.T. 196 (P&H) , and on the Board’s Circular No.1003/10/2015-CX
dated 05.05.2015 . The Board’s Order No.58/1/2002-CX deals with
excisability and not with credit, and immovability after installation is
irrelevant to credit on capital goods, as held in CCE v. The India
Cements Ltd., 2020 (9) TMI 1158- Madras High Court, Dalmia
Cements (Bharat) Ltd. v. CESTAT, 2021 (3) TMI 179 -Madras High
Court, Tamilnadu Newsprint and Papers Ltd. v. CCE, 2021 (3) TMI
179 -Madras High Court and Bannari Amman Sugars Ltd. v. CCE,
Mysore, 2010 (250) E.L.T. 326 (Kar.) .
10. On the second ground, Ld. Counsel argued that the contractors
never classified their services as works contract. They paid service tax
under the head of erection, commissioning or installation service, as
the ST 3 returns of M/s. Shakthi Electricals for October 2014 to March
2015 show, and did not avail Notification No.12/2003-ST during
September 2010 to June 2012. It was contended that a classification
adopted at the supplier’s end cannot be disturbed at the recipient’s
end, relying on the decision in Sarvesh Refractories (P) Ltd. v. CCE &
C, 2007 (218) E.L.T. 488 (S.C.) , and the Revenue could not recast the

7

services as works contracts in order to import a restriction that does
not apply. Without prejudice, it was maintained that Rule 2A, framed
under Section 94(2)(aa) of the Finance Act, 1994, is a valuation
provision and not an exemption granted under Section 93, and cannot
attract the Explanation to Rule 3 of the CCR.
11. On limitation it was contended that the demand of
Rs.1,64,22,439/- for September 2010 to August 2014 is time barred.
Separate purchase orders for supply and service are an industry
practice. The appellant withheld nothing that the law required it to
disclose, and non disclosure of what need not be disclosed is not
suppression, as held in Tamil Nadu Petro Products Ltd. v. CESTAT, TS-
160-HC-2017 (Mad)-EXC, Prolite Engineering Co. v. Union of India,
1995 (75) E.L.T. 257 (Guj.) and Apex Electricals Pvt. Ltd. v. Union of
India, 1992 (61) E.L.T. 413 (Guj.) . The credit was reflected in the ER
1 returns, and reliance was placed on CCE, Raipur v. Orion Ferro
Alloys (P) Ltd., 2010 (259) E.L.T. 84 . It was further argued that the
burden of proving suppression lies on the Revenue, as held in
Uniworth Textiles Ltd. v. CCE, Raipur, 2013 (288) E.L.T. 161 (S.C.) ,
and a dispute on the interpretation of law does not warrant the
extended period, as held in Ispat Industries Ltd. v. CCE, 2006 (199)
E.L.T. 509 (Tri.-Mum.), NIRC Ltd. v. CCE, 2007 (209) E.L.T. 22 (Tri.-
Del.) and Chemicals & Fibres of India Ltd. v. CCE, 1988 (33) E.L.T.
551 (Tri.) . Reliance was also placed on Indian Oil Petronas v.
Commissioner of GST & Central Excise, Chennai, 2025 (12) TMI 944
(CESTAT Chennai) . Penalty and interest, Ld. Counsel urged, fall with
the demand, on the authority of Collector of Central Excise v. H.M.M.
Ltd., 1995 (76) E.L.T. 497 (S.C.), Commissioner v. Nakoda Textile
Industries Ltd., 2009 (240) E.L.T. 199 (Bom.) and Union of India v.
Rajasthan Spinning and Weaving Mills Ltd., 2009 (238) E.L.T. 3
(S.C.) .
Submissions on behalf of the Revenue
12. Shri M. Selvakumar, learned Authorised Representative,
reiterated the findings of the authorities below and supported the
characterisation of the contracts as composite EPCC contracts split
into two sets of orders to facilitate the credit.

8

Discussion and Analysis
13. We have heard both sides and perused the record, including
the letters of intent, the purchase orders, the illustrative invoices of
the manufacturers and the illustrative bills of the contractors placed
before us. The issues that arise for our consideration are:
i.What is the true nature of the contracts between the appellant and
the contractors, whether the issue of separate supply and erection
orders amounts to an artificial splitting of a works contract, and when
property in the goods passed to the appellant?
ii.Whether, in the light of that answer, the goods are capital goods
received and used in the appellant’s factory so as to entitle it to credit
under Rules 2(a) and 3(1) of the CCR?
iii.Whether that credit is nonetheless barred by treating the contractor’s
services as works contracts and invoking Rule 2A of the Valuation
Rules, and the Explanation to Rule 3 read with Notification
No.12/2003-ST?
iv.Whether the extended period of limitation was validly invoked? And
v.Whether interest and penalty are sustainable?
The first three issues govern both demands. The fourth arises
only in the demand raised under the Notice, the statement of demand
for 2015-16 having been issued within the normal period.
14. We begin by dealing with the nature of the contracts and their
alleged splitting and when the property in goods would have passed
on to the appellant. Both grounds on which the demand rests begin
from one premise, that the appellant did not buy goods but procured
from each contractor a functioning system under a single contract for
engineering, procurement, construction and commissioning. The
appellant’s answer is that there were two contracts, one of sale and
one of service, which the Revenue may not recast. As the remaining
issues depend in part on which description is correct in law, we take
up the nature of the contracts first.
15. In State of Madras v. Gannon Dunkerley & Co. (Madras) Ltd.,
AIR 1958 SC 560 , the Constitution Bench held that a building contract
is one entire and indivisible contract in which there is no agreement to
sell materials as movables, the title to the materials passing to the

9

owner of the land as an accretion. The Forty Sixth Amendment
inserted Article 366(29A)(b), and the Constitution Bench in Builders’
Association of India v. Union of India, (1989) 2 SCC 645 upheld the
power of the States to tax the transfer of property in goods involved
in the execution of a works contract. In Larsen & Toubro Ltd. v. State
of Karnataka, (2014) 1 SCC 708 = 2014 (34) S.T.R. 481 (S.C.) , a
Bench of three Judges explained, at paragraphs 60 and 63, that goods
“in some other form” are goods which have ceased to be chattels and
have by incorporation become part of immovable property, and that it
is “open to the States to divide the works contract into two separate
contracts by legal fiction”, one for the sale of the goods involved and
the other for the supply of labour and service. At paragraph 82 the
Hon’ble Supreme Court, following State of Punjab v. Associated Hotels
of India Ltd., (1972) 1 SCC 472 , recognised that parties may enter
into separate agreements, one of work or service and the other of
sale of the materials to be used in executing the work, and that the
transaction will then fall into two separate agreements and not be one
and indivisible. In Kone Elevator India Pvt. Ltd. v. State of Tamil
Nadu, (2014) 7 SCC 1:2014 (304) E.L.T. 161 (S.C.) , the Constitution
Bench distilled, at paragraph 42, four propositions. A works contract is
an indivisible contract divided by legal fiction into a sale of goods and
a supply of labour and services. The dominant nature test does not
apply. The term takes in its sweep all genres of works contract. And
once the characteristics of a works contract are met, any additional
obligation does not change its nature. At paragraph 64 the Hon’ble
Apex Court drew the very distinction which arises here. It observed
that “ if there are two contracts, namely, purchase of the components
of the lift from a dealer, it would be a contract for sale and similarly, if
separate contract is entered into for installation, that would be a
contract for labour and service. But, a pregnant one, once there is a
composite contract for supply and installation, it has to be treated as
a works contract, for it is not a sale of goods/chattel simpliciter .” The
Court noted that the price there was a composite one for both. These
principles were reaffirmed in State of Karnataka v. Pro Lab, (2015) 8
SCC 557 : 2015 (321) E.L.T. 366 (S.C.) , at paragraph 21, and
summarised in Aristo Printers Pvt. Ltd. v. Commissioner of Trade Tax,

10

Lucknow, 2025 INSC 1188 : 2025 (10) TMI 387-Supreme Court:
(2025) 35 Centax 89 (S.C.) , decided on 07.10.2025, at paragraph 33.
For the purposes of service tax, the Explanation to Section
65(105)(zzzza) of the Finance Act, 1994 defined a works contract as
one in which the transfer of property in goods involved in its
execution is leviable to tax as a sale of goods and which is for, among
other things, the erection, commissioning or installation of plant,
machinery or equipment, or for turnkey projects including
engineering, procurement and construction or commissioning
projects. In Ramky Infrastructure Ltd. v. CST, Hyderabad, 2013 (29)
S.T.R. 33 (Tri.-Bang.) , on which the Notice relies, the Tribunal held at
paragraph 10.1 that whether a contract is a works contract has to be
determined from the nature of the contract as understood by the
parties and the scope of the works executed under it, and at
paragraph 10.11 that lump sum payments against running account
bills indicated the composite and indivisible nature of the contracts. In
CCE v. Larsen & Toubro Ltd., 2015 (39) STR 913 (SC) , decided on
20.08.2015, the Supreme Court described the works contract as a
separate species of contract, distinct from a contract for services
simpliciter.
16. On examination of the documents annexed to the appeal, we
find that the contracts were documented in a uniform manner. A
letter of intent was first issued to each contractor. The letter of intent
dated 27.05.2010 issued to M/s. Blue Star Ltd. is typical. It accepted
a single price of Rs.10,85,00,000/- for the supply, installation, testing
and commissioning of the air conditioning system and spares, stated
that the price included excise duty, countervailing duty, VAT and
service tax, the break up of which would be indicated in the purchase
order, and asked the contractor to proceed with the work while the
detailed purchase order was being prepared. Two purchase orders
then followed, one for the design, engineering, manufacture, quality
control, testing at works and supply of the equipment, and the other
for its installation, testing and commissioning. Both orders list among
their enclosures, as forming part of the order, the letter of intent, the
contractor’s bill of quantities, the technical specification and the
tender document comprising the general terms and special conditions.

11

The supply order No.4855 and the erection order No.4856, both dated
03.12.2012 and placed on M/s. Shakthi Electricals Chennai Pvt. Ltd.,
carry a common Appendix A. That Appendix fixes the total duration
for supply and erection of all works, declares the contract value to be
inclusive of the basic prices for supply and erection, and requires a
performance security of 5% of the combined value of supply and
erection. Under it only 55% of the basic supply value is payable
against delivery of materials. A further 10% is payable against
progressive completion of erection, and the balance 10% on formal
handing over after the Project Management Consultant (PMC) issues
its completion certificate. The supply orders placed on the other
contractors are to the same effect. A part of the supply price is
withheld until installation and commissioning, and in the case of the
fire detection and protection system until the statutory approval of
the system for the entire plant. The defects liability period runs from
completion or commissioning as certified by the PMC, and the
Appendices to both orders placed on M/s. Metec provide for works
contract tax as applicable.
17. We further find from the records that the duty paying invoices
name the contractor as the buyer and the appellant as the consignee
at its factory. The invoice of M/s. OHM Energy Management Systems
Pvt. Ltd. dated 02.07.2013, naming M/s. Shakthi Electricals as
purchaser and the appellant as consignee, and the first stage dealer’s
invoice of M/s. Amman Traders dated 11.01.2011, naming M/s. Blue
Star Ltd. as buyer and the appellant as consignee, illustrate the
pattern. The contractors’ bills on the appellant against the supply
orders are running account bills. They state the total contract value
and the part of the supply value claimed under the payment terms,
and they recover excise duty or its reimbursement together with VAT
or CST. The bill of M/s. ETA Engineering dated 30.11.2010 recovers
excise duty at 10.3% and a reimbursement of countervailing duty.
The fourteenth running bill of M/s. Shakthi Electricals dated
15.07.2013 recovers excise duty at 12.36% and VAT. The bill of M/s.
Blue Star Ltd. dated 02.02.2011 claims 65% of the basic value with
all taxes and states that the goods are subject to its rights of lien and
resale as unpaid vendor and that the customer, on taking delivery,

12

shall hold them in trust for and on its behalf. The fifth running bill of
M/s. Metec dated 04.12.2010 describes the supply as one of fire
detection and protection system works and charges VAT on 75% of
the base value.
18. Whether a given transaction is a works contract is determined
by reading the contract documents together and as a whole. Neither
the label the parties give the transaction nor the number of
instruments in which they record it is decisive. The appellant’s case is
that it entered into two separate agreements, one of sale and one of
service, of the kind recognised in paragraph 82 of Larsen & Toubro ,
2014 (34) STR 481 (SC) and in paragraph 64 of Kone Elevator, 2014
(304) ELT 161 (SC) . That recognition extends to agreements which
are in truth separate. It does not extend to a single bargain recorded
in two instruments. The documents we have examined admit of only
one answer. The letter of intent issued to each contractor accepted a
single price for supply, installation, testing and commissioning,
inclusive of excise duty, VAT and service tax, and directed the
contractor to proceed with the work. Each of the two purchase orders
that followed incorporated that letter of intent, the same bill of
quantities and the same tender document containing the general and
special conditions. The supply orders do not stand on their own. They
fix a completion schedule for supply and erection together. They take
security on the combined value. They withhold part of the supply price
until erection, commissioning, statutory approval or the PMC’s
completion certificate, and they run the defects liability period from
commissioning. The general conditions extracted in paragraph 6 of
the Notice cast on the contractor the full and entire execution and
completion of the works, the custody of plant and machinery at site
for use in the work, and the risk of the PMC’s rejection of materials.
M/s. Metec itself described its supply bill as one for fire detection and
protection system works, and the orders placed on it provided for
works contract tax. What each contractor undertook was to bring into
existence a working system in the appellant’s factory, supplying the
goods for it and erecting and commissioning them. That is a
composite contract for supply and installation, which Kone Elevator
holds has to be treated as a works contract, and it falls squarely

13

within clauses (a) and (e) of the Explanation to Section
65(105)(zzzza).
19. We are cognizant that a letter of intent ordinarily records no
more than an intention to contract, and that a construction treating it
as binding requires a clear and unambiguous intention, as the
Supreme Court explained in South Eastern Coalfields Ltd. v. S.
Kumar’s Associates AKM (JV), AIR 2021 SC 3540 . That intention is
evident here. The letters accepted the contractors’ prices and asked
them to commence work, and the purchase orders then made the
letters part of themselves. The purchase orders are not two
independent bargains. They are two instruments implementing a
single bargain whose scope, price and terms were settled in the letter
of intent and the tender.
20. Be that as it may, it does not follow that the split was artificial
in the sense of a sham or a colourable device. Recording the price of
the goods and the price of their erection in separate instruments
reproduces in the parties’ paperwork the very division which Article
366(29A)(b) effects by legal fiction, as Larsen & Toubro , 2014 (34)
STR 481 (SC) explains. Nothing on record suggests that the
documents were not acted upon as written. Excise duty was paid on
the goods by their manufacturers, VAT or CST was paid on the supply
portion, and service tax was paid on the erection portion. The split
does not of itself establish that the goods were not received by the
appellant, or that any exemption was claimed on them. The
consequences of the composite character of the contracts, if any,
must be found in the provisions considered on the contractors’
assessments’, and not in the mere fact of the split, an exercise that is
for the jurisdictional authorities of the contractors.
21. The appellant’s argument that property in the goods passed to
it on delivery, and the Revenue’s argument that the appellant
received only a plant, call for a finding on when property passed. In a
works contract the transfer of property in the goods involved takes
place when the goods are incorporated in the works. That was the
holding of the Constitution Bench in Gannon Dunkerley and Co. v.
State of Rajasthan, (1993) 1 SCC 364 , as extracted and applied at

14

paragraph 30 of Aristo Printers , where the Supreme Court added, at
paragraph 60, that incorporation is to be understood contextually, by
reference to the specific nature of the works contracted for. Larsen &
Toubro , 2014 (34) STR 481 (SC) at paragraph 80, reiterated that the
true effect of an accretion made pursuant to a contract is to be judged
from the intention of the parties and not by an artificial rule. Under an
ordinary contract of sale, property passes when the parties intend it
to pass, subject to any reservation of the right of disposal, under
Sections 19 to 25 of the Sale of Goods Act, 1930. The PMC’s
completion certificate under these contracts marks completion and
acceptance of the works. It triggers the final payment and the defects
liability period. Nothing in the documents makes the passing of
property in the goods await that certificate, and it is not the point at
which property passed.
22. The documents do not speak with one voice on the point. On
one side, the contractors billed the supply portion on delivery,
charged VAT or CST on it, and the appellant states that it accounted
the goods as purchases. On the other, the goods at site were in the
contractors’ watch and ward for use in their work and at their risk, the
PMC retained the right to reject them, a part of the supply price was
withheld until erection and commissioning, and M/s. Blue Star Ltd.
stipulated that the customer would hold the goods in trust for and on
its behalf. The charge of VAT on the supply portion is equally
consistent with the deemed sale of goods involved in a works
contract, and does not by itself fix the moment of transfer. The full
general conditions of contract are not before us. Reading what is
before us together with the composite character of the contracts, the
better view is that the contractors held the goods at site for the
purpose of executing their own contracted work, and that property in
the goods vested in the appellant, at the latest, as they were
incorporated into the systems erected in its factory.
23. The appellant’s alternative footing, that the contractors held
and used the goods as its bailees, is not made out. The submission
describes the contractor as a bailor. A person who holds the goods of
another for a purpose is a bailee, and under Section 148 of the Indian

15

Contract Act, 1872 a bailment presupposes delivery of the goods by
the bailor. To succeed on this footing the appellant had to show that it
received the goods as owner and then delivered them to the
contractors for installation. There is no record of goods received into
the appellant’s stores and issued to the contractors, of the kind which
the Tribunal found in Gujarat State Petronet , and the custody and risk
at site lay with the contractors. Equally untenable is the Revenue’s
converse proposition that the appellant received nothing but a plant.
On the Revenue’s own characterisation, property in the goods passed
to the appellant on their incorporation, as goods in some other form
in the words of the Apex Court in Larsen & Toubro , 2014 (34) STR
481 (SC) . What the appellant acquired were the very duty paid goods,
as components of its plant.
24. We accordingly hold, on the first issue, that the contract with
each contractor is in substance a single works contract for the design,
supply, erection and commissioning of a system; that its
documentation in separate supply and erection orders does not make
it two contracts in substance, but is not shown to be a sham; that
property in the goods passed to the appellant, at the latest, on their
incorporation into the systems in its factory and not on the PMC’s
certification; and that the appellant’s case of bailment fails. Whether
these conclusions defeat the credit is addressed in the issues dealt
with hereinafter.
25. We now address the issue whether the goods are capital goods
received and used in the appellant’s factory. Rule 3(1) of the CCR
allows a manufacturer of final products to take credit of the duty of
excise paid on any input or capital goods received in the factory of
manufacture of the final product. Rule 2(a)(A) defines capital goods to
include goods falling under Chapters 82, 84, 85 and 90 of the First
Schedule, pollution control equipment, and components, spares and
accessories of such goods, used in the factory of the manufacturer of
the final products, but not any equipment or appliance used in an
office. Rule 4(2)(a) allows credit of up to half the duty on capital
goods received in a factory in the year of receipt, and Rule 4(2)(b)
allows the balance in a subsequent year if the capital goods, other

16

than components, spares and accessories, are in the possession of the
manufacturer. Rule 9(1)(a) recognises, as a document for taking
credit, an invoice issued by a manufacturer for clearance of capital
goods from his factory, and Rule 9(1)(a)(iv) an invoice issued by a
first or second stage dealer. The conditions of entitlement are thus
the description of the goods, payment of duty evidenced by a
prescribed document, receipt in the factory and use in the factory.
None of them speaks of ownership at the point of receipt, of the
person from whom the manufacturer bought the goods, or of the
person who installs them. Possession is relevant only to the second
instalment under Rule 4(2)(b), and the systems are in the appellant’s
possession.
26. The Notice does not dispute that the goods answer the
description in Rule 2(a)(A), and neither authority below found
otherwise. The appellant’s reply stated that most of the goods fall
under Chapters 84, 85 and 90 and the rest are their components,
spares or accessories, or pipes and fittings. Some of the invoices
placed before us, such as the dealer’s invoice for steel channels, may
raise a question whether every item answers that description. That
question was not raised in the Notice, and the Revenue cannot now
travel beyond it. Commissioner of Customs v. Toyo Engineering India
Ltd., (2006) 7 SCC 592:2006 (201) ELT 513 (S.C) and CCE v. Shital
International, 2010 (259) ELT 165 (S.C) forbid it. Paragraph 21 of the
Notice alleged that the appellant had not discharged its burden under
Rule 9(5) of showing use in or in relation to manufacture. Neither
authority below pursued that allegation, and paragraph 3 of the
Notice itself records that the entire plant was assembled and installed
at the appellant’s site and handed over to it as a functioning system.
We therefore proceed on the footing on which the case was laid.
27. The goods were received in the factory. Each duty paying
invoice names the appellant’s factory as the consignee, and
paragraph 22 of the Notice itself records that the goods were
consigned to the factory premises. Rule 3(1) speaks of goods received
in the factory, which is a requirement of place and not of person. The
finding of the Commissioner (Appeals) that the goods were received

17

by the contractors and not by the appellant answers a question the
Rule does not ask.
28. Ownership is not a condition of the credit. The authorities
which so hold must, however, be read against the provisions in force
during the period in dispute, which runs from September 2010 to
March 2016. Within that period the definition of input in Rule 2(k) was
substituted with effect from 01.04.2011 by Notification No.3/2011-CE
(NT) dated 01.03.2011. The provisions which govern the present
claim did not change in any respect material to it. Throughout the
period Rule 3(1) allowed credit of the duty paid on capital goods
received in the factory of manufacture of the final product.
Throughout the period clause (1) of Rule 2(a)(A) described capital
goods as the specified goods used in the factory of the manufacturer
of the final products, other than equipment or appliances used in an
office. The amendment of 01.04.2011 inserted clause (1A), which
extends the definition to goods used outside the factory for
generating electricity for captive use within it, and left clause (1)
untouched. The appellant claims the goods as capital goods and not
as inputs. The decisions to which we now refer were rendered under
Rule 57Q of the Central Excise Rules, 1944, under the Cenvat Credit
Rules, 2002, or under the 2004 Rules as they stood at the relevant
time, but each of them construes the same two requirements of
receipt in the factory and use in the factory, which the CCR carried
unchanged through the whole of the period before us. In CCE v.
Sunrise Chemical Industries, 2010 (262) E.L.T. 110 (Guj.) the High
Court, construing the corresponding Rule 3 of the Cenvat Credit
Rules, 2002, held that the Rule “ nowhere prescribes installation of the
capital goods, nor does the Rule refer to ownership of the capital
goods. The only requirement prescribed by the Rule is use of capital
goods received in the factory after the prescribed date and used in
the manufacture or production of final products .” In CCE, Jalandhar v.
International Tractors Ltd., 2010 (255) E.L.T. 196 (P&H) , parts of a
chassis painting plant ordered from a contractor were received in the
assessee’s factory under duty paid invoices naming the contractor
together with the assessee as consignee. The High Court upheld the
credit because duty had been paid, one of the two parties was entitled

18

to it, the contractor had not taken it, and the Revenue suffered no
loss since the credit was taken only once. The decision is seen
reported as affirmed in CCE, Chandigarh v. Ambuja Cement Ltd.,
2022 (382) E.L.T. 166 (S.C.) . There the Supreme Court upheld credit
on parts and components of diesel generating power plant sets
because, on the evidence, the plant was “part and parcel of the
factory” and was “ultimately used in the manufacture of end product”.
The ratio of the Supreme Court’s order is that test of integration into
the factory and use in manufacture, and it is satisfied here. In Bharti
Airtel Ltd. v. Commissioner of Central Excise, Pune, 2024 INSC 880:
(2024) 24 Centax 266 (S.C) , the Supreme Court was concerned with
providers of output service, for whom capital goods had to be used for
providing the output service. It treated mobile towers and shelters as
accessories of capital goods within clause (iii) of Rule 2(a)(A), a
clause which remained unchanged throughout the period before us,
and allowed credit on them. It also upheld the judgment of the Delhi
High Court in Vodafone, which had held that eligibility is assessed
with reference to the goods as received and that their later fastening
to the earth is of no consequence. The Board’s own Order
No.58/1/2002-CX , on which the authorities below placed decisive
reliance, states in paragraphs 4(vii) and 5(i) that though a turnkey
plant erected at site is not excisable, its components remain dutiable
in the normal course. It is precisely the duty paid on such components
that the appellant has taken as credit. The Order says nothing about
credit, and from a clarification that no further duty is leviable on the
plant as a whole, nothing follows as to the duty actually paid on its
components.
29. These principles hold good on the characterisation we have
adopted under the first issue. Even if property in the goods vested in
the appellant only on their incorporation, the goods were received in
its factory and are used there as components of a plant which it owns
and operates for manufacturing dutiable goods. At the point of use
the goods are indisputably the appellant’s. The definition of capital
goods speaks of goods used in the factory of the manufacturer, and
not of goods used by him. The contrast with the substituted definition
of input is telling. From 01.04.2011 Rule 2(k)(i) described inputs as

19

goods used in the factory by the manufacturer of the final product.
When the Parliament in its wisdom revised the definition of inputs
during the very period before us and chose to speak of use by the
manufacturer, while leaving the definition of capital goods to speak
only of use in the factory, the difference must be taken to be
deliberate. Handling by an erector, i.e. the contractor, in the course
of installation is the ordinary prelude to the use of capital goods,
which are almost invariably installed, and often on foundations, before
they can be used.
30. The reasoning of the authorities below calls for closer
examination, for it is the foundation of the impugned order. It runs
thus. The Board’s Order treats a plant assembled and erected at site
as immovable and not excisable. The goods were consumed by the
contractors in bringing that plant into existence. They were therefore
inputs of a non excisable product, and no credit can be taken on them
by anyone. The flaw lies in the second and third steps, which put the
right question to the wrong person. Whether the product into which
goods are worked is excisable is decisive when credit is claimed on
inputs by the person who makes that product. Under Rule 2(k), both
as it stood until 31.03.2011, when inputs were goods used in or in
relation to the manufacture of final products, and as substituted from
01.04.2011, when inputs were goods used in the factory by the
manufacturer of the final product, credit on inputs is tied to the final
product. Rule 2(h), which was not amended during the period, defines
final products as excisable goods manufactured or produced from
input or using input service. A person who fabricates or erects an
immovable plant as his own output therefore cannot take credit on
the goods so used, because his output is not a final product. That
disability, if it existed at all, lay with the contractors, who erected the
plant as their contracted output. It does not travel to the appellant.
The plant is not the appellant’s final product. The appellant’s final
products are turbines, generators, motors and converters, which are
excisable goods cleared on payment of duty. For the appellant the
plant is the means by which those products are made, and the goods
incorporated in it are claimed not as inputs of the plant but as capital
goods used in the factory. For capital goods the Rules do not ask

20

whether the plant or system of which the goods form part is itself
excisable. They ask whether the goods answer the description in Rule
2(a)(A), whether duty was paid on them, and whether they were
received and are used in the factory of a manufacturer of final
products. The question of excisability is asked of the appellant’s
output, and the answer to it is in the appellant’s favour. By
transposing to the appellant a question that could be put only to the
maker of the plant, the authorities below mistook the means of
manufacture for its product.
31. Our conclusion if bolstered by the following additional reasons,
and they hold for each part of the period. First, the Rules themselves,
in both versions of Rule 2(k), treat machinery assembled into a plant
within the factory as eligible and withhold credit only on goods of a
different kind. Until 31.03.2011, Explanation 2 to Rule 2(k), as
amended by Notification No.16/2009-CE (NT) dated 07.07.2009,
provided that inputs include goods used in the manufacture of capital
goods which are further used in the factory of the manufacturer, but
excluded cement, angles, channels, CTD or TMT bars and other items
used for construction of a factory shed or building or for laying of
foundations or making of structures for support of capital goods. The
Supreme Court noticed this Explanation in Bharti Airtel at paragraph
11.12.5. Until that date, therefore, even on the Revenue’s description
of the goods as material worked into a plant, the Rules continued the
chain of credit, save for civil and structural items. From 01.04.2011,
the substituted Rule 2(k) covered all goods used in the factory by the
manufacturer of the final product. It excluded, in clause (B), goods
used for construction of a building or civil structure or for laying of
foundations or making of structures for support of capital goods, and,
in clause (C), capital goods except when used as parts or components
in the manufacture of a final product. The exclusion in clause (C)
confirms that goods which are themselves capital goods are to be
dealt with under Rule 2(a)(A), which is the footing on which the
appellant has claimed them. Under neither version did the Parliament
deny credit on machinery under Chapters 84 and 85, or on its
components, merely because it is erected and integrated into a plant.
Both versions single out civil and structural items used for buildings,

21

foundations and supporting structures. When the Parliament has
specified what is to be excluded, the authorities below could not add
to the exclusion the very machinery that forms the plant. Whether
any individual item in the present claim is a structural item of that
kind is a question the Notice did not raise, as we have noted in
paragraph 26. Second, the Board’s Order itself states that the
components of a turnkey plant remain dutiable in the normal course.
Duty was charged on them at clearance precisely because the plant as
a whole is not a taxable event. If that duty is not credited to the
manufacturer who uses the plant to make dutiable goods, it stays
embedded in the cost of those goods and is borne again when duty is
paid on them. That is the cascading of tax which the scheme of credit
exists to remove. Third, almost all heavy machinery falling under
Chapters 84 and 85 is installed on foundations and becomes fixed
before it is used. If the immovability of an installed plant defeated
credit on its components, capital goods credit would be unavailable for
most of the goods for which the definition was framed. A construction
which empties the definition of most of its content cannot possibly be
the correct one.
32. We have not overlooked the recent decision of this Bench in
The India Cements Ltd. v. Commissioner of GST and Central Excise,
Tirunelveli, Final Order No.41010/2026 dated 08.09.2026, 2026 (9)
TMI 653 -CESTAT Chennai , where credit was denied to a
manufacturer on capital goods imported by a distinct company. That
decision turned on the fact that the importer, a separate juristic
entity, paid the duty, held the Bills of Entry in its own name and
owned the power plant. The statutory entitlement therefore resided in
that entity and could not migrate to another merely on account of
shareholding or captive use. Here the goods were consigned to the
appellant’s own factory, became part of its own plant and are used in
its own manufacture, and no other person has claimed or could claim
the credit. The principle that credit cannot be transferred between
entities is untouched by what we decide.
31. Gujarat State Petronet does not assist the Revenue on this
issue. The assessee there was a provider of the service of transport of

22

gas through pipelines, and the question was whether pipes laid into a
pipeline were used for providing its output service. In answering that
question against the assessee the Tribunal expressly distinguished, at
paragraph 4.3, the case of plant or equipment brought into existence
within a factory by assembling components and bought out parts,
observing that “in such a situation capital goods used within the
factory have been allowed for the purpose of CENVAT credit”. The
present case lies on the side of that line which the Tribunal itself
recognised as admitting credit.
32. The facts on which entitlement depends, namely the
description of the goods, the payment of duty, receipt in the factory
and use in the factory, are not in doubt. The only uncertainty
concerns the moment at which property passed, and that is a fact the
Rules do not make relevant. We therefore hold, on the second issue,
that the goods satisfy the definition of capital goods in the appellant’s
hands and that the appellant is entitled to the credit under Rule 3(1),
unless that entitlement is hit by the Explanation to Rule 3, to which
we now turn.
33. The Explanation appended to Rule 3 of the CCR provides that
where the provisions of any other rule or notification provide for grant
of whole or part exemption on condition of non availability of credit of
duty paid on any input or capital goods, the provisions of such rule or
notification shall prevail over the provisions of the CCR. For this
provision to defeat the appellant’s credit, the Revenue had to show a
rule or notification granting an exemption, a condition of non
availability of credit annexed to it, a claim to that exemption in
respect of these very goods, and a condition capable of operating
against the person now claiming credit. The appellant answers that
the Revenue cannot reach that result by reclassifying the contractors’
services. That answer needs to be stated precisely.
34. In Sarvesh Refractories (P) Ltd. v. CCE & C, 2007 (218) E.L.T.
488 (S.C.) , the Supreme Court held that a consumer claiming credit
could not have the classification declared by the manufacturer, and
accepted by the officer having jurisdiction over the manufacturer,
altered at its end. In CCE & C v. MDS Switchgear Ltd., 2008 (229)

23

E.L.T. 485 (S.C.) , decided on 07.08.2008, the Supreme Court, at
paragraphs 7 and 9, agreed with the view of the Tribunal that the
rules entitle the recipient manufacturer to the benefit of the duty paid
by the supplier, and that a quantum of duty already determined by
the jurisdictional officers of the supplier unit cannot be contested or
challenged by the officers in charge of the recipient unit. The principle
is essential to prevent the cascading effect in the credit chain, and it
binds the Revenue as much as the assessee. It does not however
prevent an adjudicating authority from construing the recipient’s own
contracts to determine what the recipient received. That is what we
have done under the first issue, and it involves no reclassification of
anyone’s service. Nor does Sarvesh Refractories support the converse
proposition, urged for the appellant, that the head under which the
contractors chose to pay tax fixes the character of the contract. In
Commissioner of Customs, Central Excise and Service Tax, Noida v.
Interarch Building Products Pvt. Ltd., 2023 (73) G.S.T.L. 433
(S.C.):(2023) 6 Centax 40 (S.C.), the Hon’ble Supreme Court held, at
paragraphs 8.8 and 8.9, that a provider of works contract service has
no option to discharge tax on the gross contract value outside Rule 2A
or the composition scheme, since such a reading would render Rule
2A and the scheme otiose. The legal character of a works contract
thus binds the provider whatever head it adopts, and any departure
from Rule 2A is a matter to be corrected in the provider’s own
assessment. The principle does, however, forbid the Revenue from
attributing to a service provider, in proceedings against the recipient,
a classification or a valuation that the provider did not adopt and that
has not been determined in its own assessment, and then importing a
condition attached to that classification. The Explanation is attracted
only by an exemption in law, actually claimed. We must therefore
examine both what the law treats as an exemption in a works
contract and what the contractors in fact did.
35. The first of these questions is answered by the very
characterisation on which the Revenue’s case rests. In CCE v. Larsen
& Toubro Ltd ., 2015 (39) S.T.R. 913 (S.C.), the Supreme Court held

that the taxable services in Section 65(105) referred to service
contracts simpliciter and not to composite works contracts, and that a

24

charge on an indivisible works contract which did not exclude its non
service elements would transgress into forbidden territory. The goods
element of a works contract is a deemed sale which Article
366(29A)(b), as construed in Builders’ Association and Larsen &
Toubro v. State of Karnataka , places within the taxing power of the
States. The Apex Court then dealt with the exemption notifications
pressed by the Revenue in these words. “ Since the levy itself of
service tax has been found to be non-existent, no question of any
exemption would arise .” The same logic governs the present case.
From 01.06.2007 Parliament levied service tax on works contracts,
but only on the service element, valued under Rule 2A of the
Valuation Rules by deducting the value of the property in goods
transferred. That is how the Supreme Court read the scheme in
Interarch Building Products . Relying on Larsen & Toubro and Gannon
Dunkerley and Co. , it held, at paragraph 8.4, that in a works contract
the assessee is liable to service tax on the service element and to
sales tax on the element of goods transferred, and, at paragraph 8.9,
that the value of the service portion is to be determined under Rule
2A unless the contractor opts for the composition scheme. Rule 2A is
thus the statutory measure of the service element, and not a
concession carved out of a wider levy. The value of the goods
transferred in a works contract was never within the levy. An
exemption under Section 93 of the Finance Act, 1994 presupposes a
levy that would otherwise attach. A notification exempting the value
of goods, if claimed by a works contractor in respect of goods whose
value lay outside the levy, would exempt nothing. It cannot be a
grant of whole or part exemption on condition of non availability of
credit within the meaning of the Explanation to Rule 3. It follows that,
once the contracts are held to be works contracts, the question
whether any contractor availed Notification No.12/2003-ST on these
goods is not relevant to the appellant’s credit. That is so for every
part of the period in dispute. For the same reason, the deduction of
the value of goods under Rule 2A is not an exemption. Rule 2A is a
valuation provision framed under Section 94(2)(aa) of the Finance
Act, 1994, and the appellant’s contention to that effect must be
accepted.

25

36. The provisions in force in each period confirm this conclusion.
From 01.07.2012, Notification No.12/2003-ST was no longer in force,
having been rescinded by Notification No.34/2012-ST dated
20.06.2012 with effect from that date. The only provision invoked for
that period is Rule 2A of the Valuation Rules, as substituted with
effect from 01.07.2012, and its Explanation 2, which declares that
“the provider of taxable service shall not take CENVAT credit of duties
or cess paid on any inputs, used in or in relation to the said works
contract”. Explanation 2 is enacted for the removal of doubts and is
addressed in terms to the provider of the taxable service. It says
nothing of the recipient. Whether or not any contractor valued its
service under Rule 2A after 01.07.2012, the Explanation to Rule 3
does not therefore operate to deny the appellant credit for that
period.
37. For September 2010 to June 2012 the position is no more
favourable to the Revenue. Rule 2A as it then stood, having been
inserted with effect from 01.06.2007, contained no restriction on
credit at all. A restriction on credit on inputs was found in Rule 3(2) of
the Works Contract (Composition Scheme for Payment of Service Tax)
Rules, 2007, as the Tribunal noted in Ramky Infrastructure at
paragraph 11.4, but those Rules are not invoked here. The only other
source was reference code 097.02 of the Board’s Circular
No.98/1/2008-ST, which clarifies that the works contract service
provider is not eligible to take credit on goods involved in the
execution of the works contract. A circular is not a rule or notification
granting an exemption, and it is addressed in any case to the
provider. The Notice, at paragraph 12, quoted the substituted Rule
2A, which refers to Section 66E(h) of the Finance Act, 1994, a
provision which came into force only on 01.07.2012, as the law
“during the relevant time”. For this earlier period that is a plain
misstatement of the law. Notification No.12/2003-ST, with the proviso
inserted by Notification No.12/2004-ST dated 10.09.2004, is the only
provision the Revenue could invoke for this period, and for the
reasons given in paragraph 35 its availment, if any, by a works
contractor in respect of goods transferred in a works contract does
not attract the Explanation.

26

38. Even if the question of availment had been relevant, the
Revenue did not establish it. The Commissioner (Appeals) said that
the contractors had availed Notification No.12/2003-ST in one
sentence, without reference to any return, assessment or document.
The Notice put the matter in the alternative, as an exemption or
exclusion under Notification No.12/2003-ST or Rule 2A. The
statement of the General Manager of M/s. Metec, as summarised in
paragraph 23 of the Notice, goes no further than that the contractor
did not take credit on the goods and did not include their value in the
value on which it paid service tax. No return of any contractor for
2010 to 2012, no assessment, and no statement of the other three
contractors is on record. The facts that attract a statutory
disentitlement must be established by the Revenue which alleges
them. The Revenue had investigated the contractors and recorded the
statement of one of them, and it had the onus to establish the
allegation made. It did not.
39. In Gujarat State Petronet the Tribunal, acknowledging that two
views were possible, held that the Explanation to Rule 3 denied credit
to a recipient where the contractor had availed Notification
No.12/2003-ST. That decision is of a coordinate Bench, and judicial
discipline requires that we follow it where it applies or refer the
question to a larger Bench if we cannot agree with it. The occasion for
either course does not arise. The decision is distinguishable on its
facts. The contractors there had admittedly availed the notification on
the very pipes, and the recipient was a service provider whose claim
failed independently because the pipes were not used for providing its
output service. The decision was also rendered before the Judgement
of the Supreme Court in CCE v. Larsen & Toubro Ltd . 2015 (39)
S.T.R. 913 (S.C.) held that no question of exemption arises where
there is no levy, and it did not consider the consequence of that
principle for the goods element of a works contract. Our conclusion
rests on that principle and on the composite character of the present
contracts. Whether the Explanation would deny credit to a recipient
where the provider has availed a conditional exemption on goods sold
under a contract which is not a works contract is a question that does
not arise here, and we express no opinion on it.

27

40. The charge of a double benefit fares no better. The duty on the
goods was paid once, by their manufacturers. It has been credited
once, by the appellant. The contractors took none. The exclusion of
the value of goods from service tax is not a benefit conferred on
anyone, but the consequence of the constitutional division of taxing
power, and the Tribunal in Gujarat State Petronet itself found, at
paragraph 3.8, that it made no difference to the revenue whether the
credit on the goods was taken by the contractor or by the recipient.
Rule 6 of the CCR, invoked in paragraph 14 of the Notice, regulates
the credit of a provider of exempted services on its own inputs, and
has no application to the appellant. Ramky Infrastructure , cited in the
Notice, supports the characterisation of turnkey EPC contracts as
works contracts, but on the question of credit it held only that a works
contractor opting for the composition scheme is barred by Rule 3(2)
of the Composition Rules from credit on its own inputs. It added, at
paragraph 11.4, that there is no embargo even on such a contractor
taking credit on capital goods or input services. It says nothing that
would deny credit to the recipient of the works. Interarch Building
Products is also to the same effect. The restriction it upheld, that a
works contractor may take credit only in conformity with Rule 2A or
the composition scheme, concerned the contractor’s own credit on its
inputs, and the Hon’ble Supreme Court said nothing of the credit of
the person for whom the works were executed.
41. Of the authorities relied on by the appellant, International
Tractors , as affirmed, address the receipt of goods in the factory
through a contractor and the ownership of such goods. None of them
considered the Explanation to Rule 3 in the context of a works
contract. The appellant’s reliance on them for the proposition that it
bought the goods under a contract of sale separate from the erection
contract cannot be accepted, for the reasons given in paragraph 18,
but they support its entitlement on the footing on which we have
decided it. The decisions on immovability, and the decisions of the
Madras High Court cited before us, address only the effect of
installation on credit. Sarvesh Refractories concerned the classification
of goods. We have applied its principle by parity only to restrain the
Revenue from attributing to the contractors a classification or

28

valuation not shown to have been adopted. It does not prevent the
construction of the appellant’s own contracts. The Board’s Circular
No.1003/10/2015-CX concerns dealers and has no direct application,
though the Tribunal in Gujarat State Petronet , at paragraph 3.14,
treated the taking of credit by a consignee on the manufacturer’s
invoice in such circumstances as at most a procedural matter curable
under Rule 9(2).
42. We are constrained to observe that the authorities below
converted a Board Order on excisability and a valuation rule for works
contracts into a disentitlement to credit, without first finding the facts
on which either could operate. They applied the text of Rule 2A as it
stood from 01.07.2012 to a period beginning in September 2010. The
Commissioner (Appeals) recorded that the contractors had availed
Notification No.12/2003-ST without referring to a single document
that showed it, while at the same time treating their services as works
contracts valued under Rule 2A. The Adjudicating Authority dismissed
a substantial body of authority cited by the appellant in one sentence
as not exactly identical, without saying in what respect any of it
differed. An adjudicating authority which declines to follow a binding
or persuasive decision cited before it owes the assessee, and the
appellate forum, the reason. The Commissioner (Appeals) went
further and faulted the appellant for failing to demonstrate a valid
reason for placing two sets of orders. That approach inverts the
burden. A taxpayer who holds duty paying documents and has used
the goods as the Rules contemplate need not justify the commercial
form of its contracts. It is for the Revenue to establish the facts that
attract a statutory bar.
43. We hold, on the third issue, that the Explanation to Rule 3 does
not bar the appellant’s credit for either period. In a works contract the
value of the goods transferred lies outside the levy of service tax, and
no exemption in respect of it, whether claimed under Notification
No.12/2003-ST or said to arise under Rule 2A, can attract the
Explanation. Treating the contracts as works contracts, as we have
done, does not by itself amount to a reclassification of the
contractors’ services. But the denial of credit by attributing to the

29

contractors an exemption or valuation not shown to have been
claimed does amount to one, and it is impermissible. Nothing in this
order concludes the contractors’ own assessments to service tax.
Extended period of limitation
44. Our findings on the first three issues dispose of both demands
on merits. The question of limitation was, however, fully argued, and
the manner in which the extended period was invoked calls for
comment. We therefore record our finding on it. The Notice was
issued on 25.09.2015. The demand for September 2010 to August
2014, stated by the appellant to be Rs.1,64,22,439/-, could be
sustained only under the proviso to Section 11A(1) of the Act, as it
then stood, or under Section 11A(4). The foundation for suppression,
in the Notice and in the orders below, is that the Department learnt of
the separate purchase orders only on investigation, that the appellant
gave no valid reason for them, and, in the Notice, that the statement
of the General Manager of M/s. Metec shows the appellant to have
been aware that the contractors had excluded the value of the goods
from their taxable value.
45. Suppression, as the Supreme Court explained in Anand
Nishikawa Co. Ltd. v. CCE, Meerut, 2005 (188) E.L.T. 149 (S.C.) ,
means that correct information was not disclosed deliberately to
evade payment of duty. Where facts are known to both parties, the
omission by one to do what it might have done, and not what it must
have done, is not suppression, and there must be some positive act
on the part of the assessee. The Gujarat High Court in Prolite
Engineering Co. v. Union of India, 1995 (75) E.L.T. 257 (Guj.) and
Apex Electricals Pvt. Ltd. v. Union of India, 1992 (61) E.L.T. 413
(Guj.) held that non disclosure of information which the law does not
require to be disclosed is not suppression. In CCE v. Zee Media
Corporation Ltd., 2018 (18) G.S.T.L. 32 (All.) , the High Court affirmed
that where the notice itself shows that every detail was maintained by
the assessee in its records in the ordinary course, there is no
suppression. In G.R. Infra Projects Ltd. v. State of Madhya Pradesh,
Civil Appeal No.11277 of 2026 decided on 19.08.2026 , 2026 (8) TMI
1497 –Supreme Court, a case under the Central Goods and Services

30

Tax Act, 2017, the Supreme Court held that the requirements which
make a notice valid must be found in the notice itself, and that a bare
invocation of fraud or suppression, without the material from which it
is inferred, cannot sustain the extended period.
46. Tested on the anvil of these principles, the invocation cannot
stand. The appellant took credit on duty paying invoices which named
it as consignee, entered the credit in its statutory records and
reflected it in its returns. The investigation consisted in reading the
appellant’s own contracts and invoices, which were in its records
throughout. No provision of law required the appellant to report the
manner in which it had structured its contracts. The statement of the
General Manager of M/s. Metec shows, at most, what that contractor
did. It is no evidence of any concealment by the appellant. The Notice
points to no false declaration and to no positive act of concealment.
The Revenue’s own authority furnishes a further answer. In Gujarat
State Petronet the Tribunal, while deciding the question of credit
against the assessee, recognised that the issue was not free from
doubt and declined to permit the extended period. The Gujarat High
Court declined to interfere with that view in CCE, Ahmedabad III v.
Gujarat State Petronet Ltd., 2014 (34) S.T.R. 321 (Guj.) . The analysis
we have had to undertake under the first three issues confirms that
the questions were genuinely debatable. The Revenue cannot rely on
that decision to deny the credit and, in the same breath, treat the
appellant’s contrary view of the law as a deliberate device to evade
duty. We hold that the extended period was not validly invoked. The
demand for the period beyond the normal period of limitation is
independently time barred.
Interest and penalty
47. Once the credit is held admissible, there is no amount
recoverable under Rule 14 of the CCR, and the demand of interest
consequently fails. Penalty under Rule 15(2) of the CCR read with
Section 11AC of the Act presupposes both a wrongful availment of
credit and the element of fraud, collusion, wilful misstatement,
suppression of facts or contravention with intent to evade duty, and
penalty under Rule 15(1) presupposes a wrongful availment of credit.

31

These preconditions being absent here, the penalties imposed cannot
survive.
48. In sum, we have accepted the Revenue’s characterisation of
the contracts as composite works contracts, documented but not
divided in substance by the issue of separate supply and erection
orders. We have also held that property in the goods passed to the
appellant, at the latest, on their incorporation into its plant, and we
have rejected the appellant’s case of bailment. Those conclusions do
not, however, lead to the denial of credit. The appellant received duty
paid capital goods in its factory under duty paying invoices naming it
as consignee, and the goods are used there, as components of its own
plant, in the manufacture of dutiable final products. That satisfies
Rules 2(a) and 3(1) of the CCR, which make neither ownership at the
point of receipt nor the identity of the erector a condition. The Board’s
Order No.58/1/2002-CX concerns excisability and itself affirms that
components remain dutiable. The Explanation to Rule 3 is not
attracted for any part of the period. In a works contract the value of
the goods transferred lies outside the levy of service tax, so that no
exemption of it, under Notification No.12/2003-ST or Rule 2A, can be
an exemption on condition within that Explanation. Explanation 2 to
Rule 2A, which applies from 01.07.2012, binds only the provider. In
any event the Revenue has not shown that any contractor availed
Notification No.12/2003-ST on these goods. The extended period was
in any event unsustainable. The impugned order, which confirms both
orders in original, cannot therefore be sustained.
49. In the result, the impugned Order in Appeal Nos. 428 &
429/2017 (CTA I) dated 04.12.2017 is set aside. The appeals are
allowed with consequential relief, in law, if any.
(Order pronounced in the open court on 09.10.2026)


(AJAYAN T.V.) (VASA SESHAGIRI RAO)
MEMBER (JUDICIAL) MEMBER (TECHNICAL)

ra