Delhi Metro Rail Corporation Ltd. vs Consortium Of M/S Crown Steels And M/S Sunrise Industries & Ors.

Court
National Company Law Appellate Tribunal
Case type
Company Appeal(AT)(Ins)
Decided on
27-03-2026
<div> <b>NATIONAL COMPANY LAW APPELLATE TRIBUNAL, </b><br /> <b>PRINCIPAL BENCH, NEW DELHI </b><br /> <b>Company Appeal (AT) (Insolvency) No. 1683 of 2025 </b><br /> <br /> (Arising out of Order dated 11.09.2025 passed by the Adjudicating Authority <br /> (National Company Law Tribunal), New Delhi Bench, Court III in I.A. <br /> No.2851 of 2025 in Company Petition IB-1084(ND)/2019) <br /> <b> </b><br /> <b>IN THE MATTER OF: </b><br /> <b>Delhi Metro Rail Corporation Ltd. </b><br /> Through its authorized signatory, <br /> Having its registered office at, <br /> Fire Brigade Lane, Barakhamba Road, <br /> New Delhi - 110001 <br /> Email: [email protected] <br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> …Appellant </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b>Versus </b><br /> <b> </b><br /> <b>1. Consortium of M/s Crown Steels and M/s Sunrise </b><br /> <b>Industries </b><br /> Through its authorised representatives <br /> Successful Resolution Applicant <br /> Having Office at: <br /> 412, B-08, GDITL Tower, Netaji Subash Palace, <br /> Pitampura, Delhi - 110035 <br /> <b> </b><br /> Email: [email protected]<br /> <b> </b><br /> <b>2. Mr. Santanu Kumar Samanta </b><br /> Chairman of Monitoring Committee &amp; <br /> Erstwhile Resolution Professional qua the Corporate <br /> Debtor <br /> Having Office at: <br /> Maker Tower F, 13th Floor, <br /> Cuff Parade, Mumbai - 400005 <br /> Email: [email protected] <b> </b><br /> <b> </b><br /> <b>3. LIC Housing Finance Limited </b><br /> Member of COC <br /> Having Office at: <br /> Maker Tower F, 13th Floor, <br /> Cuff Parade, Mumbai - 400005 <br /> Email: [email protected] <br /> <br /> <br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <i>Cont’d…/ </i><br /><br /> 2 <br /> <br /> <br /> <br /> <b>4. JC Flower Arc Ltd. </b><br /> Member of COC <br /> Having Office at: <br /> 2nd Floor, Adani Building, Bandra Kurla Complex, <br /> Mumbai - 400051 <br /> Email: raiat.lahoty(g)icfarc.com <br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> …Respondents </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>Present: </b><br /> <b>For Appellant: </b> <b>Mr. R. Venkataramani, AG of India with Mr. </b><br /> <b>Tarun Johri, Mr. A. Gupta, Mr. Vishwajeet Tyagi, </b><br /> <b>Advocates. </b><br /> <b>For Respondents: </b> <b>Mr. Abhishek Anand, Mr. Karan Kohli, Ms. Palak </b><br /> <b>Kalra, Advocates for R-1. </b><br /> <b>Mr. </b> <b>Kunal </b> <b>Godhwani, </b> <b>Ms. </b> <b>Kinjal </b> <b>Chadha, </b><br /> <b>Advocates for R-2. </b><br /> <b>Mr. Siddharth Praveen Archrya, Mr. P. Singh, </b><br /> <b>Advocates for R-3. </b><br /> <b>Ms. Anannya Gosh, Ms. Deol Bose, Mr. Sabeeh </b><br /> <b>Akhtar, Advocates for R-4. </b><br /> <b> </b><br /> <b> </b><br /> <b>J U D G M E N T </b><br /> <b> </b><br /> <b>ASHOK BHUSHAN, J. </b><br /> <b> </b><br /> This appeal has been filed challenging the order dated 11.09.2025 <br /> passed by the Adjudicating Authority (National Company Law Tribunal) New <br /> Delhi Bench, Court – III in I.A. No.2851 of 2025 filed by the Respondent <br /> No.1, the Successful Resolution Applicant praying for various reliefs. The <br /> Adjudicating Authority by the impugned order has disposed of the <br /> application. Aggrieved by which order this appeal has been filed. Brief facts <br /> of the case necessary to be noticed for deciding this appeal are: <br /> <br /> (i) Delhi Metro Rail Corporation (DMRC) has issued a LOA dated <br /> 16.10.2009 in favour of M/s Pratibha Industries Ltd. (PIL) for <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 3 <br /> <br /> <br /> <br /> construction of Multi-level parking with commercial development at <br /> New Delhi Railway Station-cum-Airport Terminal of Airport Express <br /> Line. For development of the project M/s PIL entered into a <br /> Concession Agreement dated 01.04.2010. A special purpose vehicle <br /> for performance of obligation under the Concession Agreement was <br /> constituted namely M/s Prime Infrapark Pvt. Ltd. (PIPL). The <br /> Concession Agreement contains clauses for ‘Termination by DMRC’, <br /> ‘Consequences of termination’, ‘Arbitration’. DMRC approved <br /> assignment of all the rights and liabilities by PIL to PIPL i.e. <br /> Corporate Debtor. <br /> (ii) DMRC issued thirty days’ notice to cure cum termination notice as <br /> per Article 11.2 of the Concession Agreement for payment of <br /> outstanding dues of Rs.36.78 Crores. The Corporate Debtor having <br /> not been able to pay the amount, the Concession Agreement was <br /> terminated on 01.09.2017. The Appellant took possession of the <br /> project facility on 02.09.2017. The Corporate Debtor admitted its <br /> breach and proposed a payment mechanism and request was made <br /> by the corporate Debtor for revocation of termination of the <br /> Concession Agreement on 22.10.2018. Corporate Debtor also <br /> submitted a claim for Rs.340.44 Crore. <br /> <br /> (iii) Corporate Debtor invoked arbitration clause 12 and sought <br /> reference of disputes to arbitration. A proposal was submitted by <br /> PIL to the Appellant for reinstatement of Concession Agreement. A <br /> letter dated 08.04.2022 was sent by the Appellant to PIL <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 4 <br /> <br /> <br /> <br /> communicating some terms and conditions, to which letter, PIL <br /> never gave its consent. <br /> (iv) On 12.08.2022, the CIRP against the Corporate Debtor commenced <br /> on an application under Section 9 of the I&amp;B Code in C.P IB-<br /> 1084(ND)/2019. IRP issued information memorandum which <br /> recorded the fact of termination of the Concession Agreement. <br /> Information Memorandum also recorded invocation of Article clause <br /> 12.2 by PIL by notice dated 21.12.2021. <br /> <br /> (v) In the CIRP of the Corporate Debtor, the resolution plan submitted <br /> by Respondent No.1 was approved on 14.05.2024 where in Para <br /> 10.11, the plan contemplated that DMRC shall revive the <br /> Concession Agreement in favour of the Corporate Debtor as <br /> assigned by PIL to the Corporate Debtor in full force and effect <br /> without any additional liability towards Corporate Debtor/ <br /> Resolution Applicant. <br /> (vi) Resolution Plan was approved on 30.07.2024 and an I.A. No.445 of <br /> 2025 was filed by the SRA where certain direction was sought <br /> against the Appellant which I.A. was disposed of on 24.01.2025, the <br /> where the Adjudicating Authority observed that the SRA was at <br /> liberty to approach the Appellant for appropriate relief. Appellant <br /> has further confirmed that Concession Agreement has already been <br /> terminated. <br /> (vii) The SRA filed another I.A. No.2851 of 2025 seeking direction to the <br /> Appellant, in which Appellant also filed its reply raising various <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 5 <br /> <br /> <br /> <br /> objections including jurisdiction of the Adjudicating Authority to <br /> entertain I.A. No.2851 of 2025. The Adjudicating Authority by the <br /> impugned order dated 11.09.2025 disposed of the application. <br /> Aggrieved by which order this appeal has been filed. <br /> 2. We have heard Shri R. Venkataramani, learned Attorney General of <br /> India with Shri Tarun Johri, Advocate for the Appellant and Shri Abhishek <br /> Anand, learned counsel appearing for the Respondent No.1. <br /> 3. Learned counsel for the Appellant submitted that the Concession <br /> Agreement in favour of the Corporate Debtor was terminated on 01.09.2017 <br /> much prior to initiation of the CIRP against the Corporate Debtor. The <br /> Concession Agreement having been terminated, no issue pertaining to the <br /> Concession Agreement could have been agitated before the Adjudicating <br /> Authority and the Adjudicating Authority had no jurisdiction to entertain <br /> I.A. No.2851 of 2025, which sought direction to the Appellant to revive the <br /> Concession Agreement. The reliefs which were sought by the IA were <br /> beyond the jurisdiction of the NCLT. Learned Attorney General however <br /> submitted that the Appellant is still ready to consider request by the <br /> Respondent No.1 for any conciliation or arbitration in accordance with the <br /> Concession Agreement with liberty to the parties to raise all available pleas <br /> in law. It is submitted that the Adjudicating Authority has no jurisdiction to <br /> issue direction to revive the Concession Agreement. Appellant has not <br /> participated in the CIRP process, hence, was not a stakeholder in the CIRP <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 6 <br /> <br /> <br /> <br /> process. Direction of the Adjudicating Authority in the impugned order is <br /> beyond the jurisdiction of the Adjudicating Authority. <br /> 4. Learned counsel appearing for the Respondent submitted that the <br /> Adjudicating Authority has never granted the prayer to revive the <br /> Concession Agreement. No order has been passed by the NCLT to revive the <br /> Concession Agreement and Respondent’s pleading was for the Appellant to <br /> consider the request submitted by the SRA in terms of the letter dated <br /> 08.04.2022 sent by the Appellant to the Respondent. It is submitted by the <br /> Respondent that Appellant may revive the conciliation process which was <br /> initiated by the Corporate Debtor and may consider the request for revival <br /> as it may deed fit and proper by the Appellant. <br /> 5. When the appeal was heard by this Tribunal on 19.11.2025, we had <br /> noted the submission of learned Attorney General and learned counsel <br /> appearing for the Respondent. It is useful to notice the submission which <br /> were recorded in Para 2 to 6 of the order dated 19.11.2025: <br /> <i>“2. Shri R. Venkataramani, Learned Attorney General </i><br /> <i>submits that the Adjudicating Authority by impugned </i><br /> <i>order has allowed the application IA No.1084 of 2019 </i><br /> <i>filed by the Respondent No.1 SRA who has filed the </i><br /> <i>application seeking a direction that under the order of </i><br /> <i>the </i> <i>NCLT </i> <i>dated </i> <i>30.07.2024 </i> <i>the </i> <i>revival </i> <i>and </i><br /> <i>reinstatement of the Concession Agreement is to be </i><br /> <i>done by the Appellant. Adjudicating Authority has no </i><br /> <i>jurisdiction to issue any direction to revive the </i><br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 7 <br /> <br /> <br /> <br /> <i>Concession Agreement which was terminated on </i><br /> <i>01.09.2017. </i><br /> <i>3. Shri Krishnendu Datta, Learned Senior Counsel </i><br /> <i>appearing for the Respondent submits that the </i><br /> <i>Adjudicating Authority has never granted the prayer </i><br /> <i>which was asked in the reliefs and concessions </i><br /> <i>seeking direction to revive the Concession Agreement </i><br /> <i>and NCLT never passed any order for reviving the </i><br /> <i>concession agreement. </i><br /> <i>4. Shri Dutta prays for and is allowed a week’s time </i><br /> <i>to file short-affidavit. Let one-week further time is </i><br /> <i>allowed to the Appellant to file reply to the Affidavit. </i><br /> <i>We make it clear that neither the order of the </i><br /> <i>Adjudicating Authority approving the plan nor the </i><br /> <i>order dated 07.09.2025 issued any direction to the </i><br /> <i>Appellant to revive the Concession Agreement. </i><br /> <i>5. Counsel for the Respondent submits that the </i><br /> <i>contempt proceeding which has been initiated shall </i><br /> <i>be requested to be adjourned. We direct that the </i><br /> <i>contempt proceeding be not proceeded any further. </i><br /> <i>6. Counsel appearing for the Respondent submits that </i><br /> <i>the limited prayer which Respondent No.1 has prayed </i><br /> <i>was that conciliation proceeding which where prior to </i><br /> <i>initiation of insolvency in relation to the Concession </i><br /> <i>Agreement should be revived.” </i><br /> 6. There is no dispute between the parties that Concession Agreement <br /> under which the PIL/PIPL were granted for development of the project stood <br /> terminated by the Appellant on 01.09.2017. It is also on the record that the <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 8 <br /> <br /> <br /> <br /> Corporate Debtor has invoked Clause 12 of the Concession Agreement i.e. <br /> Arbitration Clause and a request proposal was submitted by PIL to the <br /> Appellant for reinstatement of the Concession Agreement. A letter dated <br /> 08.04.2022 was written by the Appellant, which letter is annexed as <br /> Annexure 11 to the record. It is useful to notice clause 12.2 of the <br /> Concession Agreement which deals with Arbitration: <br /> <i>“</i> <b><i>12.2 Arbitration</i></b> <i> </i><br /> <b><i>12.2.1</i></b> <i> Procedure Subject to the provisions of Clause </i><br /> <i>11.1, any Dispute, which is not resolved amicably, </i><br /> <i>shall be referred to a panel of three (3) arbitrators in </i><br /> <i>terms of the Arbitration &amp; Conciliation Act, 1996. For </i><br /> <i>this purpose, DMRC will make out a panel of five (5) </i><br /> <i>possible arbitrators. Each party shall nominate an </i><br /> <i>arbitrator out of this panel submitted by DMRC and </i><br /> <i>these two arbitrators will appoint the third arbitrator </i><br /> <i>in writing and also inform the concerned parties about </i><br /> <i>such appointment and call upon the other party to </i><br /> <i>appoint its arbitrator. If within 15 days of receipt of </i><br /> <i>such intimation the other party fails to appoint its </i><br /> <i>arbitrator, the Party seeking appointment of arbitrator </i><br /> <i>may take further steps in accordance with Arbitration </i><br /> <i>&amp; Conciliation Act, 1996. The arbitrator shall give </i><br /> <i>item-wise and reasoned award. Where three (3) </i><br /> <i>arbitrators have been appointed, the award of the </i><br /> <i>majority will prevail.” </i><br /> 7. The Resolution Plan submitted by the SRA was approved on <br /> 30.07.2024. After approval of the plan the SRA file I.A. No.445 of 2025, <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 9 <br /> <br /> <br /> <br /> which was disposed of by the Adjudicating Authority on 24.01.2025. <br /> Relevant prayers made in the I.A. No.445 of 2025 are as follows: <br /> <i>“a. Direct the Respondent DMRC to resume the </i><br /> <i>proceedings in respect of concession cum license </i><br /> <i>agreement from the stage where it was left during the </i><br /> <i>CIRP i.e. working on the process and the modalities </i><br /> <i>for the reinstatement of Concession cum License </i><br /> <i>agreement with the applicant AND </i><br /> <i>b. Direct Respondent No 2 to issue its consent to </i><br /> <i>Respondent No 1 clarifying that all their rights into </i><br /> <i>the concession cum license agreement have been </i><br /> <i>transferred to the new management as a part of </i><br /> <i>resolution process and PIPL and the applicant /SRA </i><br /> <i>are the only entities to engage with DMRC for </i><br /> <i>resolution of matters related to concession agreement </i><br /> <i>cum license agreement. </i><br /> <i>c. By way of interim directions Respondent No.1 and </i><br /> <i>the Respondent No 2, be directed to file copies of all </i><br /> <i>the </i> <i>correspondence </i> <i>available </i> <i>with </i> <i>DMRC </i> <i>and </i><br /> <i>Respondent No 2 in the matter of PIPL, Concession </i><br /> <i>Agreement, its attempt at unilateral termination and </i><br /> <i>the </i> <i>ongoing </i> <i>dispute </i> <i>resolution </i> <i>including </i> <i>the </i><br /> <i>correspondence for reinstatement of concession cum </i><br /> <i>license agreement and further proceedings in respect </i><br /> <i>of dispute resolution as also the records of the COC </i><br /> <i>meetings. </i><br /> <i>d. By way of interim directions DMRC be directed to </i><br /> <i>file copies of all accounts &amp; transaction data in </i><br /> <i>relation to the &quot;Project Konnectus Tower&quot; post 2018 </i><br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 10 <br /> <br /> <br /> <br /> <i>including the particulars of the rental receipts &amp; all </i><br /> <i>expenses including revenue and capital expenditure </i><br /> <i>till date including the revenue or capital expenditure </i><br /> <i>incurred in the project and the details of vacant </i><br /> <i>space. </i><br /> <i>e. By way of ad-interim, ex-parte order the payments </i><br /> <i>as proposed under the resolution plan/schedule of </i><br /> <i>payment be stayed during the pendency of the </i><br /> <i>present application including the demand raised by </i><br /> <i>way of email dated 15.01.2025 by Respondent No 4 </i><br /> <i>demanding the payment of Rs. 4,00,00,000 be </i><br /> <i>stayed.; </i><br /> <i>f. By way of ad-interim, ex-parte orders the </i><br /> <i>adjustment of the amount of Rs.3,06,25,000 vide UTR </i><br /> <i>nos. SCBLR12024053100806744 dated 31.05.2024 </i><br /> <i>and </i> <i>Rs.193,75,000/- </i> <i>vide </i> <i>UTR </i> <i>no. </i><br /> <i>HDFCr52024053162007608 dated 31.05.2025 as </i><br /> <i>part of performance guarantee deposited by way of </i><br /> <i>RTGS be stayed; </i><br /> <i>g. Direct DMRC to act upon the resolution plan and </i><br /> <i>the order of NCLT dated 30/7/2024 approving that </i><br /> <i>resolution plan in &quot;letter and spirit&quot; and reinstate the </i><br /> <i>Concession cum License Agreement dated 01.04.2010 </i><br /> <i>in favour of PIPL. </i><br /> <i>h. In the event of the Hon&#x27;ble Tribunal finding that the </i><br /> <i>concession </i> <i>agreement </i> <i>cannot </i> <i>be </i> <i>revived, </i> <i>the </i><br /> <i>Respondent No. 2 to 4 be directed to refund the </i><br /> <i>amount of Rs. 5,00,00,000/- deposited by the </i><br /> <i>applicant by way of RTGS on account of Performance </i><br /> <i>Guarantee and amount of Rs. 1,63,02,004/- and any </i><br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 11 <br /> <br /> <br /> <br /> <i>further amounts paid as part of the Resolution </i><br /> <i>process to Respondent No. 2 to 4. </i><br /> <i>i. Pass such other further order / order(s) as may be </i><br /> <i>deemed fit and proper in the facts and circumstances </i><br /> <i>of the present case.” </i><br /> 8. The said application I.A. No.445 of 2025 was disposed of by the <br /> Adjudicating Authority by order dated 24.01.2025. While disposing of the <br /> application, the Adjudicating Authority made following observations: <br /> <i>“In view of the same, the Successful Resolution </i><br /> <i>Applicant (SRA) is at liberty to approach before the </i><br /> <i>M/s. Delhi Metro Rail Corporation Limited (DMRC) for </i><br /> <i>appropriate </i> <i>relief </i> <i>and </i> <i>M/s. </i> <i>Delhi </i> <i>Metro </i> <i>Rail </i><br /> <i>Corporation Limited (DMRC) may consider the request </i><br /> <i>of Successful Resolution Applicant (SRA). </i><br /> <i>This order is passed without prejudice to the </i><br /> <i>rights of the parties. </i><br /> <i>IA-445/2025 disposed of, accordingly.” </i><br /> 9. The order impugned has arisen out of an IA subsequently filed by the <br /> Respondent No.1 being I.A. No.2851 of 2025. In the I.A. No.2851 of 2025 <br /> following prayers have been made by the Respondent No.1: <br /> <i>“a. Allow the present Application; </i><br /> <i>b. Issue appropriate directions to the Respondent No. </i><br /> <i>1 i.e., Delhi Metro Rail Corporation Ltd. to comply with </i><br /> <i>and implement the binding terms of the Resolution </i><br /> <i>Plan approved by this Hon’ble Adjudicating Authority </i><br /> <i>vide Order dated 30.07.2024, including but not </i><br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 12 <br /> <br /> <br /> <br /> <i>limited to, the revival and reinstatement of the </i><br /> <i>Concession Agreement in favour of the Corporate </i><br /> <i>Debtor, and to provide all necessary cooperation, </i><br /> <i>approvals, and documentation required for such </i><br /> <i>implementation; </i><br /> <i>c. Issue necessary directions to Respondent No. 2 </i><br /> <i>(the Resolution Professional and Chairman of the </i><br /> <i>Monitoring Committee) and Respondents No. 3 &amp; 4 </i><br /> <i>(the CoC members) to discharge their duties in </i><br /> <i>accordance with the provisions of the Code, and to </i><br /> <i>extend all necessary support and cooperation for the </i><br /> <i>full and effective implementation of the approved </i><br /> <i>Resolution Plan; </i><br /> <i>d. During the pendency of the instant application </i><br /> <i>grant an exclusion of time from the date of the filing of </i><br /> <i>the present Application i.e., 04.06.2025 to make any </i><br /> <i>further payments under the Resolution Plan, including </i><br /> <i>but not limited to the next tranche of payment, until </i><br /> <i>the present Application is finally decided by this </i><br /> <i>Hon’ble Adjudicating Authority; </i><br /> <i>e. Pass such other further order/ order(s) as may be </i><br /> <i>deemed fit and proper in the facts and circumstances </i><br /> <i>of the case. </i><br /> 10. As noted above, the application was objected by filing a reply. In the <br /> reply, the Appellant has relied on judgment of the Hon’ble Supreme Court in <br /> <b><i>“Tata Consultancy Services Ltd Vs. Vishal Ghisulal Jain; (2022) 2 SCC </i></b><br /> <b><i>583”</i></b> to contend that prayers made before the NCLT could not be considered <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 13 <br /> <br /> <br /> <br /> which touches the terminated Concession Agreement by the Appellant, <br /> which was made on 01.09.2017 much prior to initiation of CIRP. <br /> 11. As noted above, when this appeal was heard, clear submission was <br /> made by learned counsel for the Respondent that by the impugned order the <br /> NCLT has not directed for revival of the Concession Agreement. There can <br /> be no quarrel to the proposition that Concession Agreement which was <br /> terminated on 01.09.2017 much prior to initiation of CIRP of the Corporate <br /> Debtor cannot be subject matter of the CIRP process and no direction could <br /> have been issued to the Appellant either in the Resolution Plan or order <br /> impugned for revival of the Concession Agreement which stood terminated. <br /> 12. What has been submitted before us by learned counsel for the <br /> Respondent No.1 is that Respondent No.1 is only praying for revival of the <br /> conciliation process to which the Appellant is also agreeable. Learned <br /> Attorney General has however submitted that the conciliation process/ <br /> arbitration proceeds which may be permitted to be initiated has to be in <br /> accordance with law and parties may be at liberty to raise all relevant <br /> pleadings available to them. Considering the submission of learned counsel <br /> for the Respondent that neither the Resolution Plan nor the impugned order <br /> can be treated to be order directing the Appellant to revive the Concession <br /> Agreement, which stood terminated on 01.09.2017, we are of the view that <br /> the Adjudicating Authority could not have issued any direction for revival of <br /> the Concession Agreement. We may notice Para xxvii of the impugned order <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 14 <br /> <br /> <br /> <br /> in which directions have been issued to the Appellant. Para xxvii of the <br /> impugned order is as follows: <br /> <i>“xxvii. In view of the foregoing discussions, we </i><br /> <i>reiterate that, as per the settled law, all the </i><br /> <i>stakeholders are bound by the resolution plan </i><br /> <i>approved by the CoC as well as by the </i><br /> <i>Adjudicating Authority. We therefore direct the </i><br /> <i>Applicant/SRA as well as the Respondent No. </i><br /> <i>1/DMRC to take all the necessary steps in </i><br /> <i>terms of the approved Resolution Plan for the </i><br /> <i>effective implementation of the resolution plan </i><br /> <i>in question.” </i><br /> 13. The application I.A. No.2851 of 2025 was disposed of with above <br /> direction. The Appellant being not part of the CIRP process, we are of the <br /> view that the Adjudicating Authority could not have issued any direction <br /> regarding Concession Agreement whereas Concession Agreement dated <br /> 01.04.2010 was admittedly terminated on 01.09.2017 and had not been <br /> revived as on date. What is pressed by the Respondent is only for initiation <br /> of the conciliation / arbitration process between the parties to which learned <br /> counsel for the Appellant has raised no objection provided the said process <br /> is undertaken in accordance with law. <br /> 14. In view of the foregoing discussion, we dispose of this appeal in <br /> following manner: <br /> (i) The order dated 11.09.2025 is modified by holding that by the <br /> approval of Resolution Plan or by the impugned order no <br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> <br /><br /> 15 <br /> <br /> <br /> <br /> direction can be issued to the Appellant to revive the Concession <br /> Agreement terminated on 01.09.2017. <br /> (ii) The parties are free to take steps towards conciliation of their <br /> issues including request for revival of Concession Agreement <br /> dated 01.04.2010, which was terminated on 01.09.2017, in <br /> accordance with law. Appellant shall consider the prayer for <br /> conciliation/ arbitration made by the Respondent No.1 in <br /> accordance with law. <br /> Parties shall bear their own costs. <br /> <br /> <b> </b><br /> <b> </b><br /> <b>[Justice Ashok Bhushan] </b><br /> <b>Chairperson </b><br /> <b> </b> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> [Barun Mitra] </b><br /> <b>Member (Technical) </b><br /> <b>NEW DELHI </b><br /> <b> </b><br /> <b>th</b><br /> <b>27</b> <b> March, 2026 </b><br /> <i> </i><br /> <i> </i><br /> <i> </i><br /> <i>Archana</i> <i> </i><br /> <i>Company Appeal (AT) (Insolvency) No.1683 of 2025 </i><br /> </div>