Nilay Colour Industries Through Its Proprietor Nilay Jitendra Kapasi Legar Heir Of Jitendra Kapasi vs The Assistant Commissioner (K/E Ward) Bmc
- Court
- Bombay High Court
CNR No : HCBM020212432026
2026:BHC-OS:24388-DB
WPL-21242-2026-J.doc
PANCHAL
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
Digitally
signed by
BALAJI
GOVINDRAO
PANCHAL
Date:
2026.11.18
19:14:58
+0530
WRIT PETITION (L) NO. 21242 OF 2026
BALAJI
GOVINDRAO
PANCHAL
M/s. Nilay Colour Industries
Through Its Proprietor
Mr. Nilay Jitendra Kapasi
Legal Heir of Jitendra Kapasi ...Petitioner
Versus
The Assistant Commissioner (K/East Ward)
Brihanmumbai Municipal Corporation
Azad Road, Gundavali, Andheri (E),
Mumbai-400069 & Ors. ...Respondents
WITH
WRIT PETITION (L) NO. 21468 OF 2026
M/s. Dharmesh Book Mfg. Co. Pvt. Ltd.
through Director
Jayesh Champshi Shah ...Petitioner
Versus
The Assistant Commissioner (K/East Ward)
Brihanmumbai Municipal Corporation
Azad Road, Gundavali, Andheri (E),
Mumbai-400069 & Ors. ...Respondents
WITH
WRIT PETITION (L) NO. 21527 OF 2026
M/s. Super Plast,
Through Its Proprietor
Vijay Tatoji Rane & Anr. ...Petitioners
Versus
The Assistant Commissioner (K/East Ward)
Brihanmumbai Municipal Corporation
Azad Road, Gundavali, Andheri (E),
Mumbai-400069 & Ors. ...Respondents
...
1
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
Mr. Anoshak Davar a/w Mr. Dhaval Sethiya & Ms. Lalita L. Rajguru, for
the Petitioners.
Ms. Shweta Patankar, for the Respondent-BMC.
Mr. Sanjeev Singh a/w Mr. Shivam P. Joshi i/by Mr. Ritesh A. Singh, for
the Respondent No. 6.
...
CORAM : MAHESH CHANDRA TRIPATHI, CJ. &
ADVAIT M. SETHNA, J.
th
RESERVED ON : 27 OCTOBER, 2026.
th
PRONOUNCED ON : 18 NOVEMBER, 2026
JUDGMENT (Per, Mahesh Chandra Tripathi, CJ.)
1. Heard Ld. Counsel for the Petitioner and Ld. Counsel for
the Respondents. Rule. Rule is made returnable forthwith. With the
consent of the parties, heard finally.
2. In all of the Writ Petitions, common question of fact and
law is involved, i.e. validity and legality of Technical Advisory
th
Committee Report/Order dated 20 May 2026. Hence, all these Writ
Petitions, with the consent of parties, have been taken up together to
be heard and decided by this common judgment, taking Writ Petition
(L) No. 21242 of 2026, as the lead Writ Petition. For ease of reference,
the facts of the lead Writ Petition (L) No. 21242 of 2026, are taken
into consideration.
2
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
3. The instant Writ Petition is preferred under Article 226 of
the Constitution of India, inter-alia for the following substantive
reliefs:-
“ a. That this Hon’ble Court may be pleased to issue a Writ of
Certiorari or any other appropriate writ, order or direction
under Article 226 of the Constitution of India, thereby calling for
records and proceedings pertaining to the impugned Technical
Advisory Committee Order dated 20/05/2026 and the
minutes/proceedings of the TAC meeting held on 17/02/2026
passed by Respondent No. 6 and after examining the legality,
validity and propriety thereof, be pleased to quash and set aside
the same;
b. That this Hon’ble Court may be pleased to issue a Writ of
Certiorari or any other appropriate writ, order or direction
under Article 226 of the Constitution of India, thereby quashing
and setting the impugned Notice dated 29/05/2026 issued by
Respondent Nos. 1 and 3 pursuant to the impugned TAC Order
dated 20/05/2026 directing evacuation and demolition of the
suit property;
c. That this Hon’ble Court may be pleased to issue a Writ of
Mandamus or any other appropriate writ, order or direction
directing Respondent No. 5 to reconsider the structural
condition and categorization of the suit property after taking
into consideration all structural audit reports, including the
reports of M/s. Tech-Resurgo Civil Engineering Consultancy,
M/s. Aarch Consultants Pvt. Ltd. and M/s. B. J. Mehta
Architectural and Structural Consultants Pvt. Ltd.;
d. That this Hon’ble Court may be pleased to direct Respondent
No. 5 to conduct a fresh hearing after furnishing all structural
audit reports and granting an effective opportunity of hearing to
the Petitioner;
e. That this Hon’ble Court may be pleased and to direct
Respondent Nos. 4, 5 and 7 to furnish copies of all structural
audit reports inspection notes, TAC proceedings, minutes,
technical reports and all documents relied upon while passing
the impugned TAC Order dated 20/05/2026.”
4. The Petitioner, in these proceedings have assailed the
th
Order dated 20 May, 2026 passed by the Technical Advisory
3
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
Committee (for short “Impugned Order”) and the consequential Notice
th
dated 29 May, 2026 (for short “Impugned Notice”) issued under
Section 354 of the Mumbai Municipal Corporation Act, 1888 (for short
“MMC Act”), directing immediate evacuation and demolition of the
Petitioner’s premises being Commercial Unit No. 16, in an Industrial
Estate known as “Krishna Dyeing & Printing Works”, situated on the
property bearing Sector Nos. 46 and 47, City Survey Nos. 160 and
160/1 to 160/10, Old Nagardas Road, Taluka Andheri (East),
Mumbai-400069 (for short “Subject Property”).
FACTUAL MATRIX
5. The Petitioner claims to be the lawful tenant and
occupier/legal heir of the said Subject Property. The Respondent No. 1
is the Assistant Commissioner (K/East Ward), Brihanmumbai
Municipal Corporation (for short “BMC”), who had issued the
th
Impugned Notice dated 29 May, 2026. The Respondent No. 5 is the
Technical Advisory Committee (for short “TAC”), which passed the
th
Impugned Order dated 20 May, 2026 categorizing the Subject
Property as a “C-1” structure (i.e. unsafe/dangerous/uninhabitable
structure, need to be vacated and demolished).
rd
6. It appears that pursuant to the Order dated 23 June 2014
passed by a Co-ordinate Bench of this Court in Municipal Corporation
4
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
1
of Greater Mumbai vs State of Maharashtra and Others , the respective
Zonal Technical Committee has been constituted to decide the
conflicting matters, as per policy guidelines duly accepted by the High
Court in the said Writ Petition for declaring private and municipal
buildings as “C-1” category. Accordingly, the guidelines were prepared
th
and subsequently, the same were modified on 5 November, 2018,
which highlights the jurisdiction of “K/E Ward”. Accordingly, TAC
constituted consisting of the following:-
“Dy. Ch. E(B.P.)WS-I – TAC Chairman
Ward Executive Engineer K/West – Member Secretary
Executive Engineer (B.P.) K/East – Member
Asstt. Law Officer, K/East Ward – Member”
7. In the instant case, K/E Ward issued a Notice under
Section 353(B) of the MMC Act vide no. ACKE/Dila/80/714/BF dated
th
24 September, 2024 to RCC structure of Subject Property having 6
units from 16 to 21. It appears that in response to the said Notice, K/E
Ward office received Structure Audit Report (for short “SAR”)
th
submitted on 26 March, 2025 by Structural Consultant M/s. Avon
Consulting Engineers appointed by the owner M/s. Abrol Enterprises
of four units under their possession having unit no. 18, 19, 20 and 21
in the Subject Property, wherein the said building is categorized as “C-
1” category. Later on, K/East Ward office received the SAR submitted
rd
1
Writ Petition (L) No. 1135 of 2014, Order dated 23 June 2014
5
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
th
by M/s. Aarch Consultants Pvt. Ltd. on 17 April, 2025 for the unit no.
16, 20 and 21 on behalf tenants/occupants therein and in the the said
SAR, the Subject Property was categorized as “C-3” category (i.e. not
for eviction, needs minor repairs only).
8. Furthermore, yet again the office of K/East Ward received
another SAR submitted by M/s. Tech-Resurgo Civil Engineering
th
Consultancy on 30 May, 2025 of unit no. 17 on behalf of one of the
tenant Shri. Jayesh Shah by attaching photograph of units no. 17, 18
and 19 (RCC building) and thereby, categorizing unit nos. 17, 18 and
19 in “C-2A” category (i.e. to be evacuated and/or partial demolition
requiring major structural repairs). It also appears from record that
another tenant had appointed S. D. Thakare - M/s. Arch Consultants
rd
Pvt. Ltd. who submitted its SAR on 3 June, 2025 of unit 16 and 20
(RCC Building) only categorizing these two units (16 & 20) in “C-3”
category (i.e. no eviction, needs minor repairs only).
9. It is also reflected from the record that as the owner/tenants had
carried out structural audit of individual unit separately, instead of
entire structure as a whole, the Respondent-BMC had issued a Letter
rd
to the owner/tenants under no. ACKE/379/B&F/Gen on 3 May, 2025
th
and a reminder Letter on 29 July, 2025 requesting them to carry out
a structural audit by a licensed engineer of entire ground floor
6
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
structure with beam and slab (except A.C. Sheet roofing structure).
rd
10. In response to the said Letter dated 3 May, 2025, it
appears that the owner, i.e., M/s. Abrol Enterprises had carried out a
th
structural audit dated 7 July, 2025 of the entire structure of the
building having unit no. 16 to 21 including adjacent toilet (in RCC)
through structural consultant M/s. Avon Consulting Engineers and the
said report categorized the Subject Property in “C-1” category. In light
of the above, upon receiving four contradictory reports (SARs) for the
Subject Property, by owners as well as tenants, the Respondent-BMC
referred the matter to TAC of K/East Ward under no.
th
ACKE/527/Gen/B&F on 25 August, 2025 for further Orders.
th
11. Thereafter, on 29 October 2025, the TAC members
unanimously concluded that a third party structural audit of the
Subject Property shall be carried out from the structural consultant
empannelled with BMC or through reputed agency VJTI/IIT/Sardar
Patel College of Engineering (for short “SPCE”) college so that the TAC
can take a decision in the matter.
12. Subsequently, M/s. Abrol Enterprises submitted a SAR
th
dated 18 December 2025, carried out by SPCE appointed by
Respondent No. 6, in which the Subject Property was classified in “C-
1” category. The tenants/occupiers of Gala No. 16,17,20 and 21 herein
7
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
of the Subject Property also got the Structural Audit carried out by
M/s. B.J. Mehta Architectural and Structural Consultancy Pvt. Ltd.,
th
appointed by the Petitioners herein, who submitted its SAR dated 18
December 2025, categorizing the Subject Property “C-2A” category.
13. In view of the aforesaid contradictory reports including the
ones submitted through the structural auditors appointed by the
nd
Petitioner, the file was once again submitted to TAC on 2 February
th
2026. Thereafter, the TAC passed the Impugned Order dated 20 May
2026, where it was unanimously concluded that the SAR submitted by
third party consultant, i.e. SPCE declaring the Subject Property as “C-
1” category is accepted and that the said building should be vacated
and pulled down immediately following due process of law.
th
Consequently, the Impugned Notice dated 29 May 2026 has been
issued by the Respondent-BMC which is also challenged in the instant
proceeding.
SUBMISSIONS ON BEHALF OF THE PETITIONER:
14. Ld. Counsel for the Petitioner would vehemently submit
that the Impugned Notice is per se unsustainable and needs to be set
th
aside on the ground that the SAR dated 18 December 2025, which
was submitted by Respondent No. 7-SPCE was never supplied to the
th
Petitioner prior to passing the Impugned Order dated 20 May, 2026.
8
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
He submits that the Petitioner had even submitted an Application on
th
20 February, 2026 seeking a certified copy of the said SAR and as
such he tried to impress to the Court that in absence of the said report
for perusal, the Petitioner was deprived of an effective opportunity to
examine its contents and submit an objection thereto. In view thereof,
he would urge that the same is in violation of the principles of natural
justice.
15. Ld. Counsel for the Petitioner further submits that there is
no such plausible reason given while rejecting and discarding the
findings/suggestions by the structural consultant appointed by the
Petitioner, namely, M/s. B. J. Mehta Architectural and Structural
Consultants Pvt. Ltd. and in view of the said report, the Subject
Property was repairable, i.e., “C-2A” category.
16. Ld. Counsel for the Petitioner would contend that
moreover, in the instant matter, five structural audit reports were
submitted before the TAC, out of which, three SARs stated in
categorical terms that the Subject Property was repairable, i.e., “C-3”
and “C-2A” whilst the minority (remaining two) SARs categorized the
Subject Property “C-1” category. In such situation, reliance of the
Committee on the minority opinion also creates doubt qua the
genuineness and fairness of the Impugned Order passed by TAC and
9
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
the Impugned Notice issued thereafter. Whereas, the Petitioner since
day one had insisted that the Petitioner is inclined and willing to
undertake all the necessary repairs mentioned in the “C-3” and “C-2A”
SAR at its own costs.
17. Ld. Counsel for the Petitioner contends that the Impugned
Order is non-speaking Order passed in arbitrary manner and does not
disclose any such reason of rejecting the finding of M/s. B. J. Mehta
Architectural and Structural Consultants Pvt. Ltd. and other
consultants who had opined the Subject Property falls under “C-2A”
and “C-3” category and is capable of repairs.
18. Ld. Counsel for the Petitioner has also vehemently
contended that without admitting that certain portion of the structure
require urgent attention, the Respondent Authorities failed to
segregate the entire building as to whether the structure could be
rendered safe through structural repair, strengthening measures of
partial restoration before directing a complete evacuation and
demolition of the same. Moreover, the Petitioner has also urged that
th
the TAC is subjected to the BMC Policy Guidelines dated 25 May,
2018 governing the audit cases. Accordingly, the entire action of the
Respondents is contrary to the statutory policy framed for
classification of dilapidated buildings.
10
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
19. He further urged that the Impugned Order and
consequential Notice issued by the Respondent-BMC suffers from non
application of mind, arbitrariness and is liable to be set aside.
20. The Ld. Counsel for the Petitioner would thus insist that
the Impugned Order and Notice be set aside and the Petition be
Allowed.
SUBMISSION ON BEHALF OF THE RESPONDENTS
21. Per contra , Ld. Counsel for the Respondent-BMC has
vehemently resisted the relief as prayed by the Petitioner and submits
that in the instant matter, admittedly, four contrary structural audit
reports of the Subject Property had been received by the Respondent-
BMC either by the owners or by the tenants of the said property. Later
th
on, the file was submitted to TAC on 25 August, 2025 and with due
notice to the parties, a site visit of Subject Property by TAC was held
th
on 7 October, 2025 at 11:30 a.m. and subsequently a TAC meeting
was held on the same day.
22. Ld. Counsel for the Respondent-BMC submits that
considering various observations and discussions on the aforesaid
SARs that were submitted by all the consultants, the TAC members
th
unanimously resolved on 29 October, 2025 that a third party
structural audit of entire building with all requisite test shall be
11
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
carried out through a structural consultant empanelled with BMC or
through a reputed agency i.e. VJITI/IIT/SPCE and submit its SAR
before it so that the TAC shall take appropriate decision in the said
matter.
23. Ld. Counsel for the Respondent-BMC submits that BMC
th
through an office email dated 11 November, 2025 addressed various
structural consultants empaneled with BMC and reputed agency such
as VJTI/IIT/SPCE for their consent to carry out such structural audit of
the Subject Property. In response to the office email, the BMC had
received consent of fourteen empaneled structural consultants and one
reputed agency i.e. Respondent No.7-SPCE. She further submits that
the Respondent-BMC had also sent a letter to the
owners/occupiers/tenants to submit consent letter for appointing any
consultant from the list attached for carrying out ND Test and SAR of
all the units i.e. from 16 to 21 of the Subject Property within three
days from the receipt of the said letter.
24. Ld. Counsel for the Respondent-BMC submits that in
rd
response to the said email, a consent letter was received on 3
December, 2025 from M/s. Abrol Enterprises, i.e., owner of the Subject
Property mentioning that they have appointed SPCE college to carry
th
out said test. Later on, a SAR was received on 18 December, 2025
12
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
from M/s. Abrol Enterprises carried out by Respondent No.7-SPCE in
which the Subject Property is classified in “C-1” category.
25. Ld. Counsel for the Respondent-BMC further submits that
M/s. B. J. Mehta Architectural and Structural Consultants Pvt. Ltd., a
structural consultant appointed by the Petitioner has also submitted a
th
SAR on 18 December, 2025 and has categorized the Subject Property
under “C-2A” category. On receipt of two conflicting reports submitted
by owners as well as tenants, Respondent Authority in its meeting and
in view of the aforesaid SARs of the Subject Property were of the
nd
opinion that the matter was again to be referred to the TAC on 2
February, 2026.
26. Ld. Counsel for the Respondent-BMC further submitted
that later on, all the members of the TAC had unanimously preferred
the opinion of the SAR submitted by third party consultant, i.e., SPCE
for Subject Property declaring it as “C-1” category and accordingly, the
same was duly informed to the respective concerned parties. She
submits that thereafter the Respondent-BMC had issued a Notice to
the owners/ landlords to submit an up-to-date list of the owners/
occupiers/tenants of the said building and further under the statutory
claim in question, a Notice under Section 354 of the MMC Act had
been issued, which is just, valid and sustainable.
13
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
27. Ld. Counsel for the Respondent-BMC further submits that
the TAC is a technical expert body and its constitution is drawn from
the Municipal Corporation itself and there is hardly any scope to
dispute the findings as returned by the TAC. She further placed
reliance on a catena of judgments to submit that it is well settled that
no interference is ordinarily warranted with respect to the
recommendations of the TAC, being an expert body.
28. The Ld. Counsel for Respondent No. 6 i.e. owner/landlord
of the Subject Property has also vehemently opposed the instant Writ
Petition and submitted that the TAC is constituted under the 2018
guidelines and its technical experts’ body is constituted by MCGM
whose findings are based on factual assessment carried out by on site
inspections and after considering all structural audit reports before it.
29. He further submits that in the instant matter, considering
the rival SARs, the matter was referred to TAC and moreover the TAC
th
Order dated 20 May, 2026 which can be seen from the relief claimed
by the Petitioner has been passed after considering all the rival reports
of the structural consultants and moreover even in case of demolition
of the building, it neither affects nor extinguishes the tenancy/
occupancy rights of the Petitioner. Such right has been independently
and adequately safeguarded under Section 354(5) of the MMC Act,
14
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
1888 read with provisions of the Maharashtra Rent Control Act, 1999
in regard to tenanted premises in the State of Maharashtra.
30. In order to substantiate their arguments, the Ld. Counsel
for Respondents have placed reliance upon the judgment passed by
the Apex Court in Shaha Ratanshi Khimji & Sons v. Kumbhar Sons
2
Hotel Pvt. Ltd. which is also reiterated by this Court in Khimjibhai
Harjivanbhai Patadia v. Municipal Corporation of Greater Mumbai &
3
Ors.
31. At this stage, Ld. Counsel for Respondent No. 6 submits
that in view of the TAC report, it is not in dispute that the building is
in dilapidated condition, i.e., “C-1” and moreover after considering the
rival SARs, the TAC had opined that the building is not habitable and
immediately efforts are to be made for evacuation. He further submits
that the Petitioner in most casual manner has assailed the TAC report
in the instant proceeding. Even though the High Court cannot
substitute its own findings and only on very limited grounds, such
findings can be interfered with as has been observed in various
judgments.
32. Accordingly, Ld. Counsel for the Respondents would
submit that there is no such plausible reason/justification to interfere
2
(2014) 14 SCC 1.
3
2024 SCC OnLine Bom 3709.
15
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
with the Impugned Order and Notice. In view thereof, the Writ
Petition is devoid of merits and deserves to be dismissed.
ANALYSIS & CONCLUSION:
33. We have heard the Ld Counsel for the parties and with
their assistance perused the record before us. At the outset, we may
observe that, considering the Non Destructive Testing (NDT) test
results, joint site inspection and submission of consultants in meeting,
the TAC members have unanimously concluded that the SAR
rd
submitted by 3 party Consultant i.e. SPCE for the Subject Property,
declaring it as “C-1” category (i.e. to be evacuated & demolished
immediately) is accepted. Consequently, the Subject Property / said
Building should be vacated & pulled down/demolished immediately
following due process of law. This for the reason that the same is
unsafe for habitation & may collapse without any warning, there-by
endangering the life and property of residents as also the passersby.
The relevant portion from the Impugned Order in this regard, is
reproduced below for ready reference:
“CONCLUSION:
In this case, five structural audit reports received from five
structural consultants M/s. Avon Consulting Engineers, M/s. Aarch
Consultants Pvt. Ltd., M/s. Tech-Resurgo Civil Engineering
Consultancy, M/s. B.J. Mehta Architectural & Structural
Consultants Pvt. Ltd. & Sardar Patel College of Engineering
categorizing the building in C-1, C-3, C-2A, C-2A & C-1 category
16
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
respectively.
Considering the Structural Audit Reports submitted by both the
consultants, NDT test results, joint site inspection and submission
of consultants in meeting, TAC members have unanimously
rd
concluded that the structural audit report submitted by 3 party
Consultant M/s. Sardar Patel College of Engineering or building
known “Krishna Dyeing & Printing Works”, situated at Sector 46 &
47, City Survey 160, 160/1 to 10 of Village Mogra, Taluka Andheri,
Andheri (East), Mumbai 400 069, K/East Ward is declared as "C-1"
category (i.e. To be evacuated & demolished immediately) is
accepted & said Building should be vacated & pulled down
immediately following due process of law as the said building is
unsafe for habitation & may collapse without going any warning
there by endangering the life and property of residents and
Passerby.
Designated officer, K/East ward shall therefore take necessary
action as per the policy guidelines dated 25.05.2018, following due
process of law.”
34. In order to appreciate the claims set up by the parties, it
would be necessary to delve into the earlier TAC opinion and Order
th
dated 29 October, 2025. For reference, the relevant portion as
th
recorded in the Impugned Order dated 20 May 2026 in the context of
th
the earlier order dated 29 October 2025, passed by TAC is
reproduced hereunder :-
“Earlier TAC opinion & order dated 29.10.2025
the various technical observation and discussion on, Structural,
Audit Report submitted by all the consultant, the TAC members
rd
unanimously concluded that "3 party Structural Audit of the entire
building with all requisite test shall be carried out from empanelled
Structural Consultant with BMC or through reputed agency such as
VJTI/IIT/SPCE college and submit the report before the committee so
as to take decision in the matter."
As per the TAC order dated 29.10.2025, K East Ward has sent
email on dated 11.11.2025 to various empanelled Structural
Consultant with BMC and reputed agency such as VJTI/IIT/SPCE for
their consent to carry out the Structural Audit of building under
reference. In response to the email sent, K East Ward has received the
17
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
consent of 14 numbers of empanelled structural consultants and 01
reputed agency i.e. SPCE college. Further, K East Ward has sent letter
to owner/occupier to submit consent letter for appointing any
consultant from the list attached for carrying out ND Test of all the
units i.e. from 16 to 21 of Krishna Dying & Printing Works within 03
days from receipt of this letter. Further consent letter has been received
dated 03.12.2025 from M/s.Abrol Enterprises mentioning that they
have appointed SPCE College to carry out ND Test.
Also structure audit report has been received dated 18.12.2025
from M/s.Abrol Enterprises carried out by SPCE College in which the
structure are classified in "C-1" category (i.e. To be evacuated and
demolition immediately).
Also, structure Audit report received dated 18.12.2025 from
tenants/occupiers Gala no. 16, 17, 20 & 21 of Krishna Dying & Printing
Works Carried out by B. J. Mehta M/s B. J. Mehta Architectural &
Structural Consultants Pvt. Ltd. having license no. STR/M/65 as per
report the structure under "C-2A" category (i.e. To be evacuated and/or
partial demolition requiring major structural repairs).
Accordingly, the matter was referred to TAC by K/East Ward
u/No. ACKE/933/Gen/BAF dated 02.02.2026 for further orders.”
35. We find that pursuant to the above, the matter was again
referred back to TAC by K/East Ward under no. ACKE/933/Gen/B&F
nd
dated 2 February, 2026 for further Orders. The TAC observation
during site inspection are as under :-
“TAC Observation during site Inspection:
Accordingly, site was once again, inspected on 17.02.2026 by Dy.
Ch. E.(BP) W.S.-1 when the Exe. Eng (BP) K/East Ward, Ward
Executive Engineer "K/East Ward, A.E-II (BAF) K/East Ward and
representative of Structural Consultant of M/s Avon Consulting
Engineers, M/s. Aarch Consultants Pvt. Ltd. & M/s Tech-Resurgo
Civil Engineering Consultancy, M/s. SPCE College, M/s. B.J. Mehta
Architectural & Structural Consultants Pvt. Ltd. were present.
Following observations were made during the site visited by TAC
members and K/East ward staff:-
1. The structure is load bearing single storey structure, with
RCC slab over existing brick masonry walls.
2. The slab is in deteriorating condition, corrosion of steel
reinforcement, leakages and seepages through the walls &
18
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
terrace slab and growth of trees.
3. External brick pillars are cracked, walls are cracked at
many places.
4. On the backside portion of the building there are multiple
trees grown on walls and penetrating deeply inside the
building
5. From inside, the condition of the RCC beams/slabs is also
found poor.
6. Beams developed longitudinal cracks. Many places cover
of slab concrete is fallen, reinforcement area is reduced
significantly.
7. The terrace waterproofing is in very poor condition
showing cracks.
8. The extended portion of slab serving as chhajjas over
openings below has excessively cracked & sagged, cover
concrete of bottom portion is fallen reinforcement is
exposed.
th
In the TAC hearing/meeting held on the same day i.e. on 17
February, 2026 at 05:30 p.m. under the chairmanship of Dy. Ch. Eng.
(B.P.) W.S.-I along with other members.
The following Officers/Consultants were present for the meeting:-
Sr. Name of Designation
No. Officers/Consultants
1. Mr. Bajirao L. Patil Dy. Ch. Eng. (BP) WS-1-Chairman
(TAC)
2. Mr. Bhupesh M. Rane Ward Exe. Eng. ‘K/East’ ward
Member Secretary (TAC)
3. Mr. Jayesh Dusane Exe. Eng. (B.P.) W.S. ‘K/E’ ward
Member (TAC)
4. Mr. Sanket S. Nandole Asst. Engineer (B&F) K/East
Ward
5. Mr. Munir Khan & Structural Engineer
Omkar (M/s Avon Consulting Engineers)
6. Mr. Salil Thakare Structural Consulting Engineer
(M/s. SPCE College)
7. Mr. Prasad Gharat Structural Consulting Engineer
(M/s. SPCE College)
8. Mr. Nihar Mody Structural Consulting Engineer
19
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
(M/s. B. J. Mehta Architectural &
Structural Consultants Pvt. Ltd.)
36. In the aforementioned backdrop, we have considered the
thrust of the Petitioner’s submission that the Petitioners have been
deprived of principles of natural justice which has caused grave and
irreparable prejudice to them. This in as much as the Petitioners were
never accorded an opportunity of dealing with and/or objecting the
th
SAR dated 18 December 2025 submitted by the Respondent No.7-
SPCE, which categorizes the Subject Property as “C-1”. Moreover, the
SAR of the structural consultant appointed by the Petitioner i.e. M/s.
B. J. Mehta Architectural and Structural Consultants Pvt. Ltd.
categorizing the Subject Property as “C-2A”, was never considered.
37. However, a careful perusal of the Impugned Order passed
by the TAC would demonstrate that such submissions/allegations of
the Petitioners are misconceived. There is a detailed discussion in the
Impugned Order in this regard, where the TAC has perused the SARs
received from five structural consultants, namely, M/s. Avon
Consulting Engineers, M/s. Arch Consultants Pvt. Ltd., M/s. Tech-
Resurgo Civil Engineering Consultancy, M/s. B. J. Mehta Architectural
& Structural Consultants Pvt. Ltd. & Sardar Patel College of
Engineering categorizing the building in C-1, C-3, C-2A, C-2A and C-1
20
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
category respectively. While considering the SARs submitted by five
different consultants in detail, the committee consisting of eight
Officers/Consultants (supra) made critical observations/conclusions as
per SAR/Representation of Consultant, which are reproduced below
for ready reference :-
“ Critical Observations / Conclusions as per SAR / Representation
of Consultant as below:
The Structural Auditor, M/s. Avon Consulting Engineers, stated
that they had nothing add anything new. They wanted to proceed
as per the first report.
The Structural Auditor, M/s. Avon Consulting Engineers, stated
that they have appointed by the owner M/s. Abrol Enterprises and
they inspected the site on March 2025 of four units under their
possession having unit no. 18, 19, 20 & 21 and they still stand on
the said report. The structure is approximately more than 50 years
old. The said building is load bearing single story structure, with
R.C.C. slab over existing brick masonry walls.
They further stated that major damage is observed on the
external and internal plaster. Leakage/Seepage observed at many
locations. Plumbing Damages are observed at many places.
Columns & Steel are exposed at many locations. Doors & Windows
don't close at some locations. Cracks are seen in the beam and
column. Deflections/Sagging are observed at some locations.
Staircase steps are majorly damaged. Terrace & Waterproofing are
Bad Condition leakages and damages observed at many locations.
They further stated that all NDT tests were carried out by them.
Ultrasonic pulse velocity and Rebound hammer test results were
average and The results shows the probable strength of the
structure. Carbonation depth test result shows bad. Half cell
potential test is indicating a 90% probability of corrosion in the
reinforcement.
Classified the buildings' category is C-1 (to be evacuated and
demolished immediately).
The Structural Auditor, M/s. Aarch Consultants Pvt. Ltd., stated
that they had nothing add anything new. They wanted to proceed
as per the first report.
Also, other tenants/occupants had submitted the structural audit
report date 17.04.2025 of unit no. 16, 20 & 21 through M/s. Aarch
Consultants Pvt. Ltd.
They further stated that the external walls of the building are
observed to be in good condition. The steel components are
21
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
observed in a painted and maintained state and are considered safe
and stable. There are no signs of structural distress in any of the
structural members. The Asbestos cement/metal steel sheet rod
material has no major crack or any major damage observed. The
checking of the foundation's plinth found it satisfactory, with no
signs of settlement at present.
They mentioned the structural repair cost is 1000/- per sq.ft. the
building enhancement in life of structure after repairs may be
about 30 more years. The structure is considered safe and stable
with a healthy future habitable life.
Categorizing building in C-3 category (l.e. No eviction needs
minor repairs)
Structural Auditor, Ms. Akshata Deshpande, M/s. Tech-Resurgo
Civil Engineering Consultancy appointed by one of the tenant Shri
Jayesh Shah carried out structural audit of only one unit no. 17
and submitted structural audit report dated 30.05.2025.
They further stated that slabs and beams are cracked at many
places with concrete cover fallen, reinforcement exposed and
corroded. Severe seepage is observed and dense vegetation growth
with roots penetrating deeply into the masonry is present at the
back of the building, contributing to decay. Further stated that the
staircase leading to the terrace is in poor condition with cracked
steps. The terrace slab is cracked and the waterproofing layer is
deteriorated.
On the basis of their test finding, the consultant M/s. Tech-
Resurgo Civil Engineering Consultancy had concluded that,
Rebound Hammer Test indicate condition of concrete is average at
most locations. Ultrasonic Pulse Velocity Test indicate quality of
concrete in all the RCC elements tested is poor. The compressive
strength of the brickwork is observed satisfactory.
They mentioned the structural repair cost is Rs 700 to 800 per
sq. ft. Classified the buildings' category is C-2A (i.e. To be
evacuated and/or partial demolition requiring major structural
repairs).
The Structural Auditor, M/s. Sardar Patel College of
Engineering, stated that they have appointed by the owner M/s
Abrol Enterprises and they inspected the site on 05.12.2025. The
structure is approximately more than 50 years old.
They further stated that many external brick pillars are cracked
at the junction of beam and pillar. At many places, plaster is fallen,
brickwork is exposed. The plaster on the beams on external faces is
in poor condition. The peripheral beams of the structure are sounds
hollow. At many places the cover of the concrete of beams is fallen,
reinforcement is exposed, excessively corroded, broken. The walls
are cracked at many places. On the backside portion, there are
multiple trees grown on the walls of the building with roots
penetrating deeply inside the building and into the junction of the
compound wall and external backside wall of the building. The
22
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
roots of these trees are also penetrating deep in the wall and
structural members. There were some units not in use. The
condition of walls and RCC beams and slabs is extremely
dangerous in these units. The extended portion of the terrace slab
is serving the purpose of RCC Chajja for the openings on the
ground floor. These extended portion of terrace slab have
excessively cracked and sagged and are in extremely dangerous
condition. The cover concrete of the bottom portion of these
extended terrace slabs is fallen and reinforcement is exposed,
severely corroded, area of steel reinforcement is reduced
significantly and at many locations the reinforcement is also
broken.
The external open staircase is in poor condition. The steps are
broken at almost all places. There is a huge tree located very close
to the staircase entry. The roots of this tree have damaged the steps
of this staircase. The terrace waterproofing is in poor condition
because of non-maintenance and non-cleanliness. There are cracks
observed on top surface of the waterproofing and terrace
waterproofing is in poor condition. The parapet walls and on the
terrace are also cracked at many places. There is a huge tree
located very close to the staircase entry. The branches of this tree
have damaged the parapet wall of the building. At many places on
the backside portion, there are multiple trees grown on the walls of
the building with roots penetrating deeply inside the building and
into the junction of the compound wall and external backside wall
of the building. The roots of these trees are also penetrating deep
in the wall and structural members.
They further stated that all NDT tests were carried out by them.
Ultrasonic pulse velocity results were poor and the quality of
concrete is shows doubtful at all the locations tested. Rebound
hammer text results reveal the strength of concrete is poor and
high due to carbonation. Half cell potential test is indicating 90%
probability of corrosion.
Classified the buildings category is C-1 (to be evacuated and
demolished Immediately).
The Structural Auditor, M/s B. J. Mehta Architectural &
Structure Consultants Pvt. Ltd., stated that they have appointed by
the tenants/occupier and they inspected the site on 03.12.2025
and they still stand on the said report. The structure is
approximately more than 55 years old.
They further stated that cracked concrete in R.C.C Beams,
Chajjas & projection slabs were observed. Spalled concrete with
exposed and corroded reinforcement in RCC Beams, Chajjas &
Projection slabs were observed. Load bearing walls were found
cracked at few places. Seepages marks were observed through
Chajjas bottom. Plant growth & fungus formation was observed.
Horizontal separation cracks at the junction of RCC Beam &
Masonry walls were observed at many places. Existing Rain Water
23
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
pipes were found damaged at few places. Parapet walls exhibited
discolored and cracked plaster at many places.
They further mention that A.C. sheet roofing was found cracked
& Damaged at few places. Dried up Seepages through walls & slabs
were noted at many places. Floorings were found cracked at few
places. Internal Paint was found discoloured & peeling of paint
noted. Load bearing walls were found cracked at few places. They
further stated that all NDT tests were carried out by them and the
result shows poor.
Classified the buildings' category is C-2A (ie. To be evacuated
and/or partial demolition requiring major structural repairs).”
38. The above would unequivocally establish that the TAC has
duly considered the matter holistically including the SAR submitted by
the Respondent No.7-SPCE, which categorizes the Subject Property as
“C-1”, as also the SAR of the structural auditor /consultant appointed
by the Petitioner i.e. M/s. B. J. Mehta Architectural and Structural
Consultants Pvt. Ltd. which classified the Subject Property as “C-2A”.
The TAC, as an expert body, after having perused all such SARs has
returned reasoned findings to conclude that the Subject Property does
fall in “C-1” category and not in “C-2A” category. In view thereof, we
are not persuaded to accept the submission of the Petitioner qua
alleged violation of principles of natural justice, considering the
comprehensive findings of the TAC as noted ( supra ).
39. At this juncture, it would be apposite to refer to the order
rd
dated 23 June 2014 passed by the Co-ordinate Bench of this Court in
Municipal Corporation of Greater Mumbai (supra). In the said case,
24
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
the Co-ordinate Bench of this Court was confronted with a situation
dealing with the difficulties faced by the MCGM in implementation of
Notices issued under Section 354 of the MMC Act. This, more
particularly in the absence of any specific provisions in the said Act for
removal/evacuation of occupants of dilapidated buildings. To make
this effective and workable and considering the human problems, the
Court felt it just and proper to issue certain guidelines. It is in such
context that came about the genesis of reference to TAC, particularly
when the buildings are highly dilapidated, dangerous and/or classified
under “C-1” category.
40. The Co-ordinate Bench of this Court held that in such
event, if the owners and/or occupants bring conflicting reports on the
status of the building, the Corporation shall refer the matter to TAC
under the Chairmanship of Director (ES & P) with atleast 3 other
members namely City Engineer, Chief Engineer (DP) and Chief
Engineer (P&D). The Co-ordinate Bench of this Court has enumerated
guidelines to be followed by TAC when a matter in case of a
dilapidated, dangerous and/or C-1 category building is referred to it.
41. The Co-ordinate Bench has also clarified that such
guidelines do not any manner restrict the power, scope and purpose of
Section 354 of the MMC Act and they are issued only to make Section
25
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
354 effective and to ensure that human lives are not compromised in
any manner. The aforesaid guidelines were later evolved/finalized by
the Respondent-BMC in the year 2018.
42. The aforesaid order passed by the Co-ordinate Bench of
this Court (supra) embraces dilapidated/ dangerous condition of a
building which is referred to TAC, particularly when there are
conflicting SARs. The said decision (supra) has been subsequently
followed in a catena of judgments of this Court. More particularly in
the cases of Vivek Shantaram Kokate vs The Municipal Corporation of
4
Greater Mumbai & Ors. and Khimjibhai Harjivanbhai Patadia (supra),
this Court has consistently noted that the writ jurisdiction under
Article 226 of the Constitution of India would not be used by Courts to
substitute their own views for technical/fact finding assessments made
by the TAC as an expert body, unless gross perversity/fraud or
complete non-application of mind is established.
43. Furthermore, we find that the Co-ordinate Bench of this
Court in Andheri Purab Paschim Cooperative Housing Society Ltd. v.
5
Municipal Corporation of Greater Mumbai & Anr. has held that the
purpose of establishing the TAC was to provide a check and balance
against the unilateral declaration of building as dilapidated. Moreover,
th
4
Writ Petition No.931 of 2019 dated 19 August 2019.
5
2023 SCC OnLine Bom 2522.
26
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
the intent behind creating such TAC Committee was not to provide
individuals with yet another cause of action to adjudicate and upset
the findings of TAC on factual and technical aspects, being otherwise
as per law, that too, in writ jurisdiction.
44. In view of the aforesaid, similar matters have already been
dealt with by this Court in various judgments and the principles of law
as culled out from these decisions were summarized by a Co-ordinate
Bench of this Court in paragraph Nos. 18 to 20 of the Andheri Purab
Paschim Cooperative Housing Society Ltd. (supra). The said
paragraphs are extracted herein below for ready reference :-
“18. In Tushar Ranglidas Notaria v. Municipal Corporation of
Greater Mumbai a Division Bench of which one of us (GS Patel J)
was a member considered the legal position in such situations. In
paragraphs 3 and 4, the Court said:
3. The conspectus of the petition is almost identical to nearly
two dozen petitions we have heard and dealt with in the last
two or three months : tenants of a building that is over 30
years old having received an evacuation notice from the
MCGM, and having taken no steps by themselves or by
compelling the owner to carry out essential structural repairs,
then rush to court and claim (a) that the building does not
need demolition or evacuation; (b) that it is structurally
sound; and (c) that the petitioner-tenants will continue to live
there ‘at their own risk’ and will give an ‘undertaking’ to
assume all liability, including to third parties. In at least nine
separate judgments delivered recently we have set out the law
on the subject. We begin this discussion, therefore, by noting
these decisions and summarizing the principles in law that
apply to such a situation. The decisions are:
(a) Mahendra Bhalchandra Shah v. Municipal Corporation of
Greater Mumbai, Writ Petition (L) No. 1755 of 2019,
th
decided on 24 June 2019;
(b) Inderjit Singh Sethi v. Municipal Corporation of Greater
27
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
th
Mumbai, Writ Petition No. 880 of 2018, decided on 9
July 2019;
(c) Ramesh Nathubhai Patel v. State of Maharashtra, Writ
th
Petition No. 1500 of 2016, decided on 9 July 2019;
(d) Kutbi Manzil Tenants Welfare Association v. Municipal
Corporation of Greater Mumbai, Writ Petition No. 2451 of
th
2018, decided on 16 July 2019;
(e) Sundar R. Gavaskar v. Municipal Corporation of Greater
th
Mumbai, Writ Petition No. 602 of 2019, decided on 29
July 2019;
(f) Richard Gasper Mathias v. Municipal Commissioner,
Municipal Corporation of Greater Mumbai, Writ Petition
st
No. 2108 of 2018 decided on 1 August 2019.
(g) Vivek Shantaram Kokate v. Municipal Corporation of
Greater Mumbai, Writ Petition No. 931 of 2019, decided on
th
19 August 2019.
(h) Khalil Ahmed Mohd Ali Hamdulay v. Municipal
Corporation of Greater Mumbai, Writ Petition (L) No. 2147
nd
of 2019, decided on 22 August 2019.
(i) Pandurang Vishnu Devrukhar v. State of Maharashtra, Writ
th
Petition No. 2687 of 2018, decided on 27 August 2019
(pertaining to Municipal tenants).
4. The principles of law culled from these decisions are these:
(a) It is never for a Court in exercise of its limited writ
jurisdiction under Article 226 of the Constitution of India
to decide whether a particular structure is or is not actually
in a ruinous or dilapidated condition : see : Diwanchand
Gupta v. NM Shah; Nathubhai Dhulaji v. Municipal
Corporation;
(b) The rights of tenants/occupants are not harmed by
demolition ordered and carried out. These rights are
adequately safeguarded by Section 354(5) of the MMC Act
and by the provisions of the governing Maharashtra Rent
Control Act, 1999 which fully occupies the field regarding
tenancies of built premises in Maharashtra. The Supreme
Court decision in Shaha Ratansi Khimji & Sons v. Kumbhar
Sons Hotel Pvt. Ltd.now makes it clear that the rights of
tenants and occupants are unaffected by the required
demolition.
(c) Tenants have rights but also remedies to keep their
structure in tenantable repair. We have referred extensively
28
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
to Section 14 of the Maharashtra Rent Control Act, 1999.
So far, we have not seen a single case where any tenant or
group of tenants has invoked his or their rights under this
Section.
(d) Section 353B casts an obligation not only on owners but
also on occupiers of structures that are more than 30 years
old to furnish a structural stability certificate. We have yet
to see one so furnished unbidden, or, when demanded, one
with anything meaningful in it.
(e) A Writ Court exercising jurisdiction will not substitute its
own view for that of technically qualified experts. Equally,
the Writ Court will not prefer the view of one expert over
another.
(f) In order to succeed a Petitioner before the Court must be
able to show that the impugned action suffers from
Wednesbury unreasonableness, i.e., it is so unreasonable
that no rational person could, having regard to the fact of
the case, ever have reached it. There is no scope in such
cases for any larger judicial review or invoking the doctrine
of proportionality. In other words the decision must be
shown to be utterly perverse, or in excess of authority or
manifestly illegal.
(g) It is never sufficient merely to allege mala fides without
particulars. While direct evidence may not always be
available as proof of mala fides, they must nonetheless be
established. In the words of the Supreme Court, allegations
of mala fides are more easily made than proved, and the
very seriousness of such allegations demands proof of high
order of credibility. Courts are slow to draw dubious
inferences from incomplete facts, especially when the
imputations are grave and they are made against one who
holds an office of responsibility in the administration. Mala
fides are the last refuge of a losing litigant. Hence,
whenever mala fides are alleged, we will demand proof. In
case after case, we are told that the provisions of the
MCGM Act are being abused by rapacious landlords in
connivance with venal officers of the MCGM to order the
demolition of the buildings that are otherwise structurally
sound. We have yet to come across any such case. The
argument is in generalities. Though it is an argument of
mala fides, it is always made without any particulars
whatsoever and we are asked simply to conjecture that this
must be so. The law in regard to allegations of mala fides is
well settled and we will draw no such general conclusion.
……………………………………………………….
19. A writ court is never assessing the merits of the decision -
29
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
no writ court is in a position to decide a question of civil
engineering or structural stability - but only the decision-
making process; if there is indeed a ‘decision’ properly so
called, i.e., one that determines the rights of parties. No rights
of any party are ever determined by any TAC Report. It only
assesses the structural condition of a building. Rights to parts
or the whole of that building are entirely unaffected by the
TAC Report.
20. In Hind Rubber Industries, we also observed:
22. … It is difficult to see how the occupants and tenants can
hope to dictate to a property owner what should or should not
be done with the property in an absolute sense. The rights of
the occupants and owners to their premises are fully and
sufficiently protected in law under the MMC Act, the
Development Control Regulations and also under Rent Control
Legislation (as we noted in Tushar Notaria and previous
cases). Only because the building is demolished it does not
follow that the rights of occupancies or tenancies will be lost.
Quite the reverse : the obligations of the owner are well
settled in law. It is pointless repeating these again and again.
There is, as the TAC noted, an element of public interest or
public law because a dangerous building presents a threat to
the occupants inside it. But there is an even larger public
interest involved, one with which courts are routinely
confronted, and that is the possibility of danger caused to
others, i.e., outsiders and passers-by and consequent
disruptions. We have had any number of instances of such
collapses specially in the annual monsoon period. There is
always some loss of life.
24. Therefore, while we do not think that a TAC report such as
this can be invalidated merely because there is a rival report.
Once we have rejected the absolutist argument that a report
that recommends repairs is always to be preferred, and also
found no procedural infirmity, the resultant order must
inevitably be of rejection of the Writ Petition. …
(Emphasis added)”
45. Applying the principles of law as laid down in aforesaid
decisions (supra), this is clearly not a case where the findings of TAC
are vitiated by factors such as fraud and/or gross perversity or non-
application of mind and/or adopt an absolutist approach preferring a
report that recommends repairs, which is certainly not the rule. In
30
Uploaded on - 18/11/2026 Downloaded on - 18/11/2026 19:36:20
WPL-21242-2026-J.doc
view thereof, the factual matrix in the given case, does not warrant
any interference by this Court, in exercise of its extraordinary
jurisdiction, under Article 226 of the Constitution of India.
46. In light of the conclusion given by the TAC in the
th
Impugned Order dated 20 May, 2026 (supra) , thereby accepting the
SAR of Respondent No.7-SPCE and categorizing the Subject Property
as “C-1” structure, read with the decisions rendered by this Court,
(supra) , we are of the considered view that the Impugned Order dated
th
20 May, 2026 read with Notice Impugned, stands legal scrutiny and
are within the four corners of law.
47. For all the above reasons as discussed above, we are not
th
inclined to interfere with the aforesaid Impugned Order dated 20
th
May 2026 and Impugned Notice dated 29 May 2026.
48. Accordingly, Writ Petitions are Dismissed. Rule is
discharged. No costs.
[ADVAIT M. SETHNA, J.] [CHIEF JUSTICE]