TUKARAM SADASHIV MANE vs THE CHAIRMAN, MUMBAI PORT TRUST

Court
Bombay High Court
Case type
Writ Petition
Decided on
20-02-2026

2026:BHC-OS:5148
WP-1933/2009
Neeta Sawant

IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
WRIT PETITION NO. 1933 OF 2009
Tukaram Sadashiv Mane  ….. PETITIONER
: VERSUS :
The Chairman, The Mumbai Port Trust …. RESPONDENT
Mr. Mulanshu Vora i/b Mr. Avinash K. Jalisatgi, for Petitioner.
Mr. Dhruva Gandhi with Mr. Dheer Sampat i/b M.V. Kini & Co., for
Respondent. 
CORAM : SANDEEP V. MARNE, J.
DATED : 20 February 2026.
Judgment:-
1) Petitioner, Ex-Station Master employed by Mumbai Port
Trust is aggrieved by Part-I and Part-II Awards rendered by the Presiding
Officer, Central Government Industrial Tribunal-II, Mumbai in Reference
No. (CGIT) 2/166 of 1999. The Tribunal has rejected the Reference made
in relation to dismissal of the Petitioner from service.
2) Brief facts of the case are that Petitioner was appointed as
Junior Trains Clerk on 19 August 1965 in Railway Department of the
erstwhile Bombay Port Trust, which is now named as Mumbai Port Trust.
The Port Trust has set up a railway line for facilitating movement of the
____________________________________________________________________________
PAGE NO. 1 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

consignments. Petitioner was promoted during his service career to the
position of Station Master Grade-II. During 23 February 1990 to 30
August 1994, he was posted as Station Master, Grade-II at Grains Depot
of the BPT-Railway. While working so, chargesheet dated 2 January 1995
was issued to the Petitioner proposing to hold departmental enquiry
against him under the Employees (Conduct) Regulations, 1976 read with
the BPT Employees (Classification, Control and Appeals) Regulations,
1976. It was alleged in the chargesheet that the Petitioner, while working
as Station Master, Grade-II, had forwarded two commercial statements
dated 27 June 1994 and 3 August 1994 showing occurrence of demurrage
charges on wagons arrived and detained at BPT Grain Depot during June
and July 1994. It was alleged that after going through the statement, it
was found that approximately 42 wagons were received at 10.00 a.m. on
13 June 1994 at the Station BPT-G and placement of these wagons for
delivery is shown as 16 wagons on 16 June 1994, 19 wagons on 25 June
1994 and 7 wagons on 9 July 1994. It is further alleged that 7 wagons
were received at 7.30 hrs on 9 June 1994 and its placement is shown as 3
wagons on 17 June 1994 at 23.00 hrs, 11 wagons on 17 June 1994 and 5
wagons on 18 June 1994. It was therefore alleged that there was delay in
placement of wagons ranging from 3 days to 27 days and that the
placement of wagons was in piecemeal manner resulting in charging of
less demurrage to the parties and excessive hire charges for detention of
wagons on BPT Railways. It was alleged that such act caused loss of
revenue to Trunk Railways in several lakhs. It was alleged that similar
statements were forwarded on 5 September 1994 for the month of July
1994, in which similar undue delays were noticed in the placement of
____________________________________________________________________________
PAGE NO. 2 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

wagons. It was therefore alleged that the Petitioner willfully violated
orders and instructions contained in Order No. 224 of Establishment
Section of Railway Manager, Office, TR-10 of 1992 and instructions
conveyed vide various office letters from time to time and thereby caused
loss of revenue in several lakhs to the Respondent-Port Trust. Violation
of Regulations 3(1), 3(1A)(i), 3(1A)(vi), 3(1A)(xii) and 3(1A)(xiii) of the
BPT Employees (Conduct) Regulations, 1976 was accordingly alleged.
3) Petitioner replied to the chargesheet and denied the charges
submitting that the placement of wagons in the depot used to be done by
the Senior Trains Clerk under the direct supervision of Assistant Station
Master and that he was responsible only for the overall supervision. The
Disciplinary Authority appointed Enquiry Officer, who was a practicing
Advocate, to conduct enquiry into the charges. During the course of
enquiry, the Management examined several witnesses. Petitioner
examined himself and one more witness in support of his defense. At the
end of the enquiry, Enquiry Officer submitted report holding that
charges leveled against the Petitioner were proved. Petitioner was served
with copy of the report of the enquiry alongwith show cause notice as to
why he should not be dismissed from the Port service. Petitioner replied
to the show cause notice on 26 April 1996. The Disciplinary Authority
proceeded to pass order dated 28 January 1997 dismissing the Petitioner
from service. Petitioner preferred departmental appeal on 14 February
1997. He filed Writ Petition No. 162 of 1998 challenging the dismissal
order. The petition was withdrawn with liberty to raise industrial dispute
____________________________________________________________________________
PAGE NO. 3 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

vide order dated 23 February 1998. Thereafter, the Appropriate
Government made reference to CGIT in following terms:
"Whether the action of the management of Mumbai Port Trust in
dismissing the services of Shri Tukaram Sadashiv Mane is justified? If
not, to what relief the workman is entitled to?
4) Petitioner filed the Statement of Claim, which was resisted
by the Respondent by filing Written Statement. The Tribunal thereafter
framed preliminary issues relating to status of the Petitioner as
workman, fairness of enquiry and perversity in the findings of the
Enquiry Officer. Petitioner examined himself on the preliminary issues.
The CGIT rendered Part-I Award dated 7 April 2006 holding that
Petitioner is a workman. However, the other two issues were answered
against the Petitioner by holding that the enquiry held was fair and
proper and that the findings of the Enquiry Officer are not perverse.
Petitioner thereafter led evidence on the issue of legality of punishment.
The Tribunal rendered Part-II Award dated 7 November 2007 answering
the Reference in the negative holding that the punishment imposed on
him does not warrant any interference. Aggrieved by Part-I and Part-II
Awards dated 7 April 2006 and 7 November 2007, the Petitioner has filed
the present Petition. By order dated 11 January 2010, the Petition came
to be admitted. The Respondent has filed Affidavit-in-Reply opposing
the Petition. The Petition is called out for final hearing.
5) Mr. Vora, the learned counsel appearing for the Petitioner
submits that the Tribunal has erred in dismissing the Reference and in
upholding the order of dismissal. That the Respondent-Trust could not
prove cause of any loss on account of any of the acts of the Petitioner.
____________________________________________________________________________
PAGE NO. 4 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

That it was established during the course of enquiry that placement of
wagons in the deport was done by Senior Trains Clerk under the direct
supervision of Assistant Station Master and that Assistant Station
Master used to record and maintain in the Station Diary the timing of
placements of the wagons/rakes. Accordingly, Petitioner produced the
relevant documents being the pages of Station Master Diary recording all
details about arrivals and placement of wagons at the BPT’s Grain Depot.
That the said entries clearly establish absence of any delay in placement
of wagons. That Work Order No.312 lays down the duties of Assistant
Station Master and Assistant Station Master is the person responsible for
placement and removal of wagons from the goods shed, J.F. Sliding
Stores Yard and for transfer of loads from Up yard to Down yard. Even
then, the Assistant Station Master, V.S. Mehdhele was not issued a
chargesheet. That there is specific admission of the Assistant Station
Master about making entries about placement of wagons in the Assistant
Station Master’s Diary. That Assistant Station Master further admitted
that Station Trains Clerk enters the timings of placement of wagons in
the Placement Register. That he was re-examined for the purpose of
filling up the lacunae in the cross-examination and was permitted to give
explanations to fill up the gaps.
6) Mr. Vora further submits that there is no allegation in the
chargesheet about the Petitioner receiving any monetary consideration
from any consignees. That there is no allegation of any ill motive on the
part of the Petitioner. He therefore submits that imposition of
punishment of dismissal is clearly unwarranted in the facts and
circumstances of the present case.
____________________________________________________________________________
PAGE NO. 5 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

7) The Petition is opposed by Mr. Gandhi, the learned counsel
appearing for Respondent-Port Trust. He submits that the CGIT has
already held the inquiry to be fair and proper. That these findings in the
enquiry are rendered after grant of due opportunity of defence to the
Petitioner. That principles of natural justice have been followed to the
hilt during the course of the enquiry. He further submits that there is
sufficient evidence on record to prove the misconduct alleged against the
Petitioner in the chargesheet. That after analyzing the evidence, the
Tribunal has arrived at the conclusion that the findings of the Enquiry
Officer are not perverse. That this Court is not supposed to re-appreciate
the evidence to arrive at a different conclusion than the one recorded by
the Tribunal. He would accordingly submit that the impugned Awards
do not warrant any interference in exercise of jurisdiction under Article
227 of the Constitution of India.
8) Mr. Gandhi would further submit that the acts of the
Petitioner have clearly caused huge financial losses to the Respondent-
Port Trust. That there was tripartite agreement between the
Respondent-Port Trust, Central Railways and Western Railways in so far
as delivery of wagons to the Grains Depot of the Trust was concerned.
That the Respondent-Port Trust was bound to pay hiring charges to the
Central Railways for wagons detained at its Grains Depot. At the same
time, the Respondent-Port Trust was entitled to collect demurrage
charges from the consignees from the date of unloading after expiry of
permitted free time. That in the present case, delivery of wagons in case
of few consignees was found to have been held up where demurrage bills
for some of the consignees were outstanding. As a consequence of this
____________________________________________________________________________
PAGE NO. 6 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

action, the hiring charges payable to the Central Railways ballooned and
simultaneously there was loss in terms of demurrage that could have
been earned and this is why the chargesheet was issued to the Petitioner.
9) Mr. Gandhi would further submit that the charges against
the Petitioner have been clearly established in the enquiry and that there
was effectively admission on the part of the Petitioner. He invites the
attention of the Court to Petitioner’s letter dated 27 June 1994 and the
enclosed statement. That there is express admission on the part of the
Petitioner having delayed uploading of wagons in that letter. That there
was no reason for the Petitioner to have delayed unloading of wagons for
those consignees, who had already defaulted on demurrage charges. That
Petitioner has acknowledged the position of loss caused to the Port Trust
due to his actions. He takes me through the relevant findings of the
Enquiry Officer, which consists of depositions of the Petitioner in which
there is an admission of revenue loss upto Rs.25,00,000/-. That there is
deliberate delay in unloading of wagons and consequent loss to the
Respondent were both categorically established. It was also established
during the course of cross-examination that the conduct of the
Petitioner was discriminatory where delivery of goods was not withheld
in respect of the consignee M/s. Ramgopal who also had outstanding
payments.
Mr. Gandhi would submit that there is no perversity in the
10)
Part-I Award, wherein enquiry is held to be fair and proper and the
findings are held to be not perverse. That the Part-II Award rightly
upholds the punishment of dismissal to be proportionate. This is
____________________________________________________________________________
PAGE NO. 7 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

particularly because the Petitioner himself has admitted cause of loss to
the Railways. That the punishment is neither excessive nor
disproportionate. He relies on judgment of the Apex Court in
Coimbatore District Central Coop Bank Versus. Coimbatore District
1
Central Co-operative Bank Employees Association and Another in
support of his contention that once the charges are held to be proved, it
is not for the Courts and Tribunals to interfere in the quantum of
punishment. Mr. Gandhi would pray for dismissal of the Petition.
Rival contentions of the parties now fall for my
11)
consideration.
12) The Petitioner was functioning as Station Master, Grade-II
in the BPT Railways. It appears that BPT Railways is agent of Indian
Railways. The Presenting Officer in his report has dealt with the
arrangement between the Respondent-Port Trust and India Railways
wherein it is pointed out that Indian Railways is referred as Trunk
Railways to the BPT Railways. It appears that the tripartite agreement
was executed between the Port Trust, Central Railways and Western
Railways under which the Port Trust is required to pay hiring charges to
the Trunk Railways for the wagons detained on its Railway system on
daily basis. It appears that the wagons are hired by the consignees where
the goods are transferred from the destination to the Port through
railway line. There is a dedicated railway line owned and maintained by
the Respondent-Port Trust which is connected to the Central Railway
tracks for offering rail connectivity to the Port activities for ensuring
faster and swifter movement of the transported goods. The wagons
1
2007 4 SCC 669

____________________________________________________________________________
PAGE NO. 8 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

belonging to the Trunk Railways need to be freed as soon as the
transported goods reach the Port Railway Sliding. Any delay caused in
detention of wagons resulted in paying of higher charges by the
Respondent-Port Trust to the Trunk Railways. It was therefore the
responsibility of the Respondent-Port Trust to ensure that the Railway
wagons are freed as early as possible so as to prevent payment of hiring
charges on daily basis to the Trunk Railways. The wagons are therefore
required to be made available for being unloaded immediately on their
arrival. If the consignee delays unloading of the wagons, the
Respondent-Port Trust collects demurrage charges from the consignee.
This is how demurrage charges collected from the consignee sets off the
liability of the Respondent-Port Trust to pay hiring charges to the Trunk
Railways. This was the broad arrangement between the Respondent-Port
Trust and Central/Western Railways.
13) The allegations against the Petitioner essentially was that
though 42 wagons were received at 10.00 a.m. at BPTG Station on 13
June 1994, there was delay in placement of wagons for delivery to the
consignee. 16 wagons were received on 16 June 1994, 19 wagons were
received on 25 June 1994, and 7 wagons were received on 9 July1994.
Similar delay was alleged in respect of 7 wagons received at 7.30 hrs on 9
June 1994. It was thus alleged that there was delay ranging between 3
days to 27 days in placement of wagons for delivery to the consignee
resulting in payment of excessive hiring charges by BPT Railways to the
Trunk Railways. Since the arrived wagons were placed for delivery with
substantial delay, there was corresponding reduction in the levy of
demurrage charges from the consignees. The consignees became liable
____________________________________________________________________________
PAGE NO. 9 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

to pay demurrage charges only after wagons were placed for taking
delivery. Thus in the chargesheet it was broadly alleged that actions of
the Petitioner caused delay in placement of wagons which resulted in
payment of excessive hiring charges to the Trunk Railways while
relieving the consignees of the obligation to pay demurrage charges.
14) The charges leveled against the Petitioner were found to be
proved in the departmental enquiry resulting in imposition of
punishment of dismissal from service. In the Part-I Award, the Tribunal
has decided three issues of (i) status of the Petitioner as workman, (ii)
fairness of enquiry and (iii) perversity in the findings of the Enquiry
Officer.
15) While Petitioner’s status as workman is upheld by the
Tribunal, it ruled against the Petitioner in respect of issues of fairness in
the enquiry and perversity in the findings of the Enquiry Officer. Before
me no serious attempt is made during the course of the arguments to
point out any error in the findings recorded by the Tribunal on the aspect
of fairness of enquiry. It otherwise appears that the Petitioner was
provided full opportunity of defence in the enquiry. Petitioner has cross-
examined the Management Witness. He has examined himself and one
more witness in defence. Mere reexamination of the Assistant Station
Master would not vitiate the inquiry. Therefore, no infirmity can be
found in the findings recorded by the Tribunal about fairness in the
enquiry.
16) So far as the issue of perversity in the findings of the
Enquiry Officer are concerned, it is seen that the Petitioner did not really
____________________________________________________________________________
PAGE NO. 10 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

dispute the factual aspect of delay in placement of the wagons. He
however sought to put the blame on the Assistant Station Master and the
Senior Train Clerk by contending that they were responsible for
placement of wagons arrived in the Depot. However, the Tribunal has
held Petitioner responsible for supervisory failure in his capacity as the
Station Master. It is held that the Petitioner was responsible for
supervising the staff properly so as to ensure that no loss is caused to the
Respondent-Port Trust. Also, the relevant instructions clearly places
responsibility on the Station Master in ensuring that the rakes received
at its Station are sorted out and the placement of wagons is done as
expeditiously as possible. In the present case, the delay in placement of
wagons in some of the instances is as high as 27 days. It therefore cannot
be believed that the Station Master was oblivious of detention of wagons
for such long time. Therefore Petitioner cannot be absolved of the
responsibility if it is noticed that the wagons full of goods arrived at BPT
Railway Siding and were not placed for delivery for as many as 27 days.
17) Some mileage is sought to be taken on account of Presenting
Officer’s submission in his Report dated 17 October 1995 that ‘ these two
documents are extracts of ASM’s Diary and are definitely true that there was
no delay in placements of wagons .’ This is sought to be explained by Mr.
Gandhi that use of the word ‘no’ in the above quoted statement is
typographical and an inadvertent error. In my view, it is not necessary to
delve any deeper into this aspect as Petitioner has not disputed the dates
of arrival of the wagons and the dates of their placements. His defence is
only about Station Master not being responsible for placement of arrived
wagons. He has attempted to blame the Assistant Station Master for
____________________________________________________________________________
PAGE NO. 11 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

delay in placement of wagons. However, as observed above, it is also the
duty of the Station Master to ensure that rakes arrived at its station are
sorted out and the placement of wagons is done as expeditiously as
possible.
18) Petitioner has also taken an interesting defence in letter
dated 3 August 1994 that ‘ whenever demurrage bills are outstanding
against the related parties the delivery of remaining wagons have been held
up ’. Thus, this statement contains an express admission on the part of
the Petitioner that he did hold up the placement of the wagons in case of
some of the consignees. It is difficult to appreciate the logic behind
holding of placement of wagons in respect of the parties whose
demurrage bills were outstanding. By doing so, the Petitioner was
apparently causing losses to the Respondent-Port Trust, which was
required to pay hiring charges to the Trunk Railways. Thus, for ensuring
that consignees clear the outstanding demurrage bills, Petitioner
apparently held up their wagons, but such an act resulted in cause of loss
to the BPT, which was required to pay hiring charges to the Trunk
Railways. Also, it came out during the evidence that the action of the
Petitioner in holding wagons of consignees having outstanding
demurrage bills was not uniform. He admitted during his cross
examination that only 7 wagons of consignee, Prime Solvent Extractions
Ltd were held up and that wagons of M/s. Ramgopal were not held up
though there were outstanding demurrage bills against M/s. Ramgopal
also.
____________________________________________________________________________
PAGE NO. 12 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

19) In exercise of jurisdiction under Article 227 of the
Constitution of India, this Court is not expected to reappreciate
evidence. The evidence on record has been appreciated by the Enquiry
Officer. There is implicit admission by the Petitioner about withholding
of wagons of consignees who had outstanding demurrage bills. The
evidence on record is again appreciated by the Tribunal. No element of
perversity is pointed out to me in the findings recorded by the Enquiry
Officer about proof of charges. In my view, there is sufficient evidence on
record for holding Petitioner guilty of charges leveled against him. I am
therefore of the view that there is no warrant for interference in the
Part-I Award holding that the findings of the inquiry officer are not
perverse.
20) Coming to the Part-II Award, the only issue that remained
to be decided was about the aspect of proportionality of punishment.
The Tribunal has held punishment of dismissal from service to be
proportionate for the misconduct proved against the Petitioner. It
appears that the Tribunal has taken into consideration the factum of
cause of loss to the Respondent-Port Trust though it has stayed away
from the controversy about the exact amount of loss suffered by the Port
Trust. It appears that submissions were canvassed before the Tribunal on
behalf of the Petitioner that the loss suffered could be only of
Rs.25,00,000/- and not Rs.40,00,000/- and that the loss may be caused to
Trunk Railways and not to BPT Railways. In my view, the quantum of
loss may not be a relevant factor for deciding the issue of proportionality
of punishment and this aspect has rightly been ignored by the Tribunal.
____________________________________________________________________________
PAGE NO. 13 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

21) However, the manner in which the issue of proportionality is
considered and decided by the Tribunal, the same does not appeal to this
Court. After dealing with the issue of quantum of loss, the Tribunal has
recorded following evidence while holding the punishment to be
proportionate:-
12. So if we consider this coupled with the charges proved against the
second party workman, in my considered view, punishment awarded of
dismissal cannot be observed inadequate or excessive one. Learned
Advocate for the second party tried to place reliance on Regulations of
BPT Employees and tried to point out that there are two types of
penalties one is of "minor" penalties and other is of "major" penalties.
Major penalty of dismissal is taken against second party workman.
According to second party's advocate, there are lesser types of major
penalties also like reduction to a lower stage in a time-scale of pay for a
specified period, or for forever. There is also lesser type of punishment
of compulsory retirement and reducing the employee's seniority when
charge of such type is proved and punishment of compulsory
retirement vis-à-vis dismissal from service is also regulated in the
rules. In my considered view discretion used by first party in penalizing
the employee of this type cannot be challenged without any reason.
Besides it place reliance on citation published in 2002 (3) LLN page
1009 where it is observed that, in a criminal case if employee is
acquitted definitely, it will help employee in making out case of lesser
punishment but in my considered view facts of that case since are
different from the facts of this case, ratio led by Karnataka High Court
cannot be made applicable here. Another referred citation published in
2006 III LLJ 133 where Hon'ble Bombay High Court observed that, in
case of theft case, entire responsibility cannot be put on workman. In
that case lesser punishment can be awarded. But that was a case of
theft which cannot be compared with the case of negligence. So I am of
the opinion that, even ratio of Bombay High Court cannot be applied
here to show lenience to this workman.
13. Against that learned advocate for first party referred citation
published in 1996 | CLR page 389 where it is observed that, judicial
review is not an appeal from a decision but review of the manner in
which decision is made. It was tried to distinguish what is power of
judicial review and meaning of appeal. By this learned Advocate for the
first party wants to point out that, Tribunal cannot sit as a appellant
court on the decision given by the management on the punishment
given by it in case of proved misconduct. In the instance case charge
was proved and when charge is proved first party has liberty to exercise
____________________________________________________________________________
PAGE NO. 14 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

the option of giving punishment and that exactly is done by
management. I also agree with this view since charge was proved which
was of very serious nature, management excised option of awarding
punishment which has logic behind it. Citation referred published in
2002 (III) CLR page 293 reveals, what powers are given to Tribunal
under Section 11 A of Industrial Disputes Act. Another referred citation
published in 2003 (98) FLR page 1170 also of the same point regarding
power of Tribunal under Section 11 A of the Industrial Disputes Act.
Citation referred published in 1997 I LLJ page 186 revels that
punishment awarded by management was not shockingly
disproportionate, which is not required by the Tribunal to interfere in
it. Citation published in 2005 | CLR 959 projects on jurisdiction of
Tribunal Under Section 11-A of the Industrial Disputes Act.
14. So if we consider all these coupled with case made out by both, I
conclude that, punishment awarded to second party workman Mane
does not require to interfere since I find it is proportionate to the
charges leveled and proved. In the circumstances, second party is not
entitled to get any relief. 
If the charges proved against the Petitioner are taken into
22)
consideration, it is seen that there is no allegation against him that he
deliberately caused delay for the purpose of assisting any particular
consignee. There is no allegation of favourtism or malafide intention on
the part of the Petitioner. That it is neither alleged, much less proved,
that Petitioner received any monetary benefit for himself by causing
delay in placement of wagons. This would be one of the vital
considerations for determining the issue of proportionality. Petitioner’s
actions may have resulted in loss to the Respondent-Port Trust/Trunk
Railways. However, it is not the case of the Respondent-Port Trust that
Petitioner deliberately delayed placement of wagons because he received
any gratification for doing so from any consignee. There are also certain
mitigating factors in favour of the Petitioner. Petitioner was not the only
person responsible for placement of the wagons. It has come in evidence
____________________________________________________________________________
PAGE NO. 15 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

that the Senior Train Clerk as well as Assistant Station Master were also
responsible for timely placement of wagons. A Station Master is
responsible for overall operations of railways at the station. Of course,
he is duty bound to supervise all activities occurring at his station
including the activities of persons functioning under him. However,
there is nothing on record to indicate that the Senior Train Clerk or
Assistant Station Master were chargesheeted for delay in placement of
wagons. When supervisory failure is alleged, it is also necessary that the
personnel, who actually commit the main misconduct are also dealt with.
It is discriminatory to selectively punish the supervisor while not
conducting any enquiry against the persons who actually fail to perform
their duties. Secondly, Petitioner has also taken a defence that the
wagons are held up with a view to ensure that consignees clear the
outstanding demurrage charges. Whether this action of the Petitioner
was right or not is an altogether different aspect. May be this course of
action was not implemented in a uniform manner against all consignees
who had outstanding demurrage charges. May be the Petitioner did not
realise that his actions of forcing the consignees to clear the outstanding
demurrage charges by withholding placement of wagons was actually
causing losses to BPT Railways in the form of hiring charges payable to
the Trunk Railways. Though the outcome of his actions is wrong, his
intentions were not. In my view therefore malafide intention on the part
of the Petitioner in causing delay in placement of wagons is neither
alleged nor proved and this is a major mitigating factor in favour of the
Petitioner.
____________________________________________________________________________
PAGE NO. 16 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

23) Petitioner was appointed in Respondent-Port Trust On 19
August 1965 and by the time he was dismissed from service on 28
January 1997, he had rendered 32 long years of service. There is nothing
on record to indicate that Petitioner had committed any misconduct
during his past service. Imposition of punishment of dismissal from
service has resulted in denial of even retirement benefits to the
Petitioner. It appears that in the criminal prosecution the Petitioner has
been discharged, without even subjecting him to trial.
Ordinarily, the Courts and Tribunals cannot interfere in the
24)
quantum of punishment imposed on the delinquent employee. It is well
settled position that selection of punishment is in the exclusive domain
of the employer. The Courts and Tribunals cannot decide as to which
punishment would best serve the interest of the employer considering
the nature of misconduct committed by the employee. However, there is
an exception to this well recognized rule. In cases where the punishment
is shockingly disproportionate and where the punishment shocks the
conscience of the Court, it can interfere in the punishment. Reference in
this regard can be made to the Apex Court judgment in B.C. Chaturvedi
2
vs. Union of India and Others wherein it was observed as under:
18. A review of the above legal position would establish that the disci-
plinary authority, and on appeal the appellate authority, being fact-
finding authorities have exclusive power to consider the evidence with
with the discretion
a view to maintain discipline. They are invested
to impose appropriate punishment keeping in view the magnitude or
gravity of the misconduct. The High Court/Tribunal, while exercising
the power of judicial review, cannot normally substitute its own con-
clusion on penalty and impose some other penalty. If the punishment
imposed by the disciplinary authority or the appellate authority
shocks the conscience of the High Court/Tribunal, it would appro-
2
(1995) 6 SCC 749
____________________________________________________________________________
PAGE NO. 17 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

priately mould the relief, either directing the disciplinary/appel-
late authority to reconsider the penalty imposed, or to shorten the
litigation, it may itself, in exceptional and rare cases, impose ap-
propriate punishment with cogent reasons in support thereof.”
(emphasis added)
25) In Lucknow Kshetriya Gramin Bank (Now Allahabad, Uttar
3
Pradesh Gramin Bank) and Another vs. Rajendra Singh it is held by the
Apex Court as under:-
19. The principles discussed above can be summed up and
summarised as follows:
19.1. When charge(s) of misconduct is proved in an enquiry the
quantum of punishment to be imposed in a particular case is
essentially the domain of the departmental authorities.
19.2. The courts cannot assume the function of
disciplinary/departmental authorities and to decide the
quantum of punishment and nature of penalty to be awarded, as
this function is exclusively within the jurisdiction of the
competent authority.
19.3. Limited judicial review is available to interfere with
the punishment imposed by the disciplinary authority, only
in cases where such penalty is found to be shocking to the
conscience of the court.
19.4. Even in such a case when the punishment is set aside as
shockingly disproportionate to the nature of charges framed
against the delinquent employee, the appropriate course of
action is to remit the matter back to the disciplinary authority or
the appellate authority with direction to pass appropriate order
of penalty. The court by itself cannot mandate as to what should
be the penalty in such a case.
19.5. The only exception to the principle stated in para 19.4
above, would be in those cases where the codelinquent is
awarded lesser punishment by the disciplinary authority even
when the charges of misconduct were identical or the co-
delinquent was foisted with more serious charges. This would be
on the doctrine of equality when it is found that the employee
concerned and the codelinquent are equally placed. However,
there has to be a complete parity between the two, not only in
respect of nature of charge but subsequent conduct as well after
3
(2013) 12 SCC 372
____________________________________________________________________________
PAGE NO. 18 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant
the service of chargesheet in the two cases. If the codelinquent
accepts the charges, indicating remorse with unqualified
apology, lesser punishment to him would be justifiable.”

(emphasis added)
26) Mr. Gandhi has relied on judgment of the Apex Court in
Coimbatore District Central Cooperative Bank (supra), in which it has
held in para-29, 30, 31 and 32 as under :-
29. From the above decisions, it is clear that our legal system also has
accepted the doctrine of proportionality. The question, however, is
whether in the facts and circumstances of the present case, the High
Court was justified in invoking and applying the doctrine of
proportionality. In our judgment, the answer must be in the negative.
Normally, when disciplinary proceedings have been initiated and
finding of fact has been recorded in such inquiry, it cannot be
interfered with unless such finding is based on "no evidence" or is
perverse, or is such that no reasonable man in the circumstances of the
case would have reached such finding. In the present case, four charges
had been levelled against the workmen. An inquiry was instituted and
findings recorded that all the four charges were proved. The Labour
Court considered the grievances of the workmen, negatived all the
contentions raised by them, held the inquiry to be in consonance with
principles of natural justice and findings supported by evidence.
Keeping in view the charges proved, the Labour Court, in our opinion,
rightly held that the punishment imposed on workmen could not be
said to be harsh so as to interfere with it.
30. In our opinion, therefore, the High Court was not right in exercising
power of judicial review under Articles 226/227 of the Constitution and
virtually substituting its own judgment for the judgment of the
Management and/or of the Labour Court. To us, the learned counsel for
the appellant Bank is also right in submitting that apart from Charges 1
and 2, Charges 3 and 4 were "extremely serious" in nature and could not
have been underestimated or underrated by the High Court.
31. In this connection, it is profitable to refer to a decision of this Court
in Bengal Bhatdee Coal Co. v. Ram Probesh Singh 5. In that case, the
respondents were employees of the appellant. A strike was going on in
the concern of the appellant. The respondents obstructed loyal and
willing trammers from working in the colliery and insisted those
workmen to join them in the obstruction. A charge-sheet was served on
the respondents and disciplinary inquiry was instituted. They were
found guilty and were dismissed from service. Since another reference
____________________________________________________________________________
PAGE NO. 19 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

was pending, approval of the Industrial Tribunal was sought which was
granted. In a reference, however, the Industrial Tribunal held that
penalty of dismissal was uncalled for and amounted to victimisation.
The Management approached this Court. 
32. Allowing the appeal, setting aside the order of the Tribunal and
upholding the order of dismissal, this Court stated: (AIR p. 488, para 6)
"6. Now there is no doubt that though in a case of proved
misconduct, normally the imposition of a penalty may be within
the discretion of the management there may be cases where the
punishment of dismissal for the misconduct proved may be so
unconscionable or so grossly out of proportion to the nature of
offence that the Tribunal may be able to draw an inference of
victimisation merely from the punishment inflicted. But we are
of opinion that the present is not such a case and no inference
of victimisation can be made merely from the fact that
punishment of dismissal was imposed in this case and not either
fine or suspension. It is not in dispute that a strike was going on
during those days when the misconduct was committed. It was
the case of the appellant that the strike was unjustified and
illegal and it appears that the Regional Labour Dhanbad, agreed
with this view of the appellant. It was during such a strike that
the misconduct in question took place and the misconduct was
that these thirteen workmen physically obstructed other
workmen who were willing to work from doing their work by
sitting down between the tramlines. This was in our opinion
serious misconduct on the part of the thirteen workmen and if it
is found as it has been found - proved punishment of dismissal
would be perfectly justified." 
In case before the Apex Court in Coimbatore District
27)
Central Cooperative Bank , the concerned workers had proceeded on
strike. While some of the workers signed the settlement and resumed the
work, 53 employees continued their strike badly affecting the activities
of the bank. The workers on strike also prevented other employees from
resuming duties and threatened them with dire consequences. After
conducting Departmental inquiry, punishment of stoppage of increment
for 1-4 Years and non-payment of salary during the period of strike was
____________________________________________________________________________
PAGE NO. 20 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

imposed. The Labour Court upheld the penalty. The High Court, though
agreed with the findings of the Labour Court about proof of the charges,
but found the punishment of stoppage of 1-4 Annual increments with
cumulative effect to be harsh. The management was directed to pay
arrears in respect of stoppage of increments with interest at the rate of
12% per annum. It is in the light of the above facts that the Apex Court
held that the High Court was not right in exercising power of judicial
review under articles 226 and 227 and in substituting its own judgment
for the judgment of the management.
28) In my view the ratio of the judgment in Coimbatore District
Central Cooperative Bank would have no application to the facts of the
present case. In case before the Apex Court, the High Court had
interfered in punishment which was otherwise insignificant (stoppage of
increments). In the present case however, Petitioner has been dismissed
from service resulting in denial of any benefits in respect of his 32 year of
his service. Some justification is provided by the Petitioner for delay in
placement of the wagons that there is no malafide intention alleged in
respect of his actions. In my view therefore the punishment of dismissal
from service shocks the conscience of the Court.
29) Mr. Gandhi has placed on record copy of Bombay Port Trust
Employees (Classification, Control and Appeal) Regulations, 1976.
Perusal of Regulation 8 would indicate that major penalties are reduction
to lower stage in time-scale of pay, reduction in lower time-scale of
pay/grade/post, compulsory retirement, removal from service and
dismissal from service.
____________________________________________________________________________
PAGE NO. 21 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

30) Petitioner is now almost 80 years old and has already
suffered a lot. The sufferings undergone by the Petitioner for the past 29
long years would also constitute sufficient punishment for him for the
misconduct that he has committed.
31) Ordinarily when the Court finds punishment to be
shockingly disproportionate, the correct course of action is to remand
the proceedings to the employer to impose substitute punishment,
which would be commensurate to the misconduct proved. In the present
case however, Petitioner has long since crossed the age of
superannuation and now is an octogenarian. Considering this position in
my view it would be appropriate for this Court to impose the substituted
punishment rather than remanding the proceedings to the employer.
Considering the facts and circumstances of the case I am of the view that
imposition of punishment of compulsory retirement would meet the
ends of justice.
32) I accordingly proceed to pass the following order :
(i) Part-I Award dated 7 April 2006 passed by the CGIT is
upheld.
(ii) Part-II Award dated 7 November 2007 passed by the CGIT is
set aside.
(iii) The punishment of dismissal from service imposed vide
order dated 28 January 1997 shall stand substituted with the
punishment of compulsory retirement.
____________________________________________________________________________
PAGE NO. 22 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::

WP-1933/2009
Neeta Sawant

(iv) Petitioner is held entitled for all retirement benefits on
account of imposition of punishment of compulsory
retirement w.e.f. 28 January 1997.
(v) Arrears of retirement benefits w.e.f. 28 January 1997 shall be
paid to the Petitioner by the Respondent within the outer
limit of 3 months.
33) With the above directions, the Petition is partly allowed .
Rule is made partly absolute. There shall be no order as to costs.

Digitally
signed by
NEETA
SHAILESH
SAWANT
Date:
2026.02.25
17:29:11
+0530
[SANDEEP V. MARNE, J.]

NEETA
SHAILESH
SAWANT
____________________________________________________________________________
PAGE NO. 23 of 23
20 FEBRUARY 2026
::: Uploaded on - 25/02/2026 ::: Downloaded on - 25/02/2026 17:53:04 :::