SUBRATA SENGUPTA vs UNION OF INDIA AND ORS.

Court
Calcutta High Court

1

IN THE HIGH COURT AT CALCUTTA
(CONSTITUTIONAL WRIT JURISDICTION)
APPELLATE SIDE
Present :
The Hon’ble Justice Partha Sarathi Chatterjee
WPA 10263 of 2007
With
CAN 3 of 2021
With
CAN 5 of 2023
With
CAN 6 of 2023
With
CAN 7 of 2024
With
CAN 8 of 2024
Smt. Gopa Chakraborty & Ors.
Vs.
Union of India & Ors.
With
WPA 166 of 2022
With
CAN 1 of 2022
Smt. Gopa Chakravorti & Ors.
Vs.
Union of India & Ors.
With

2

WPA 52 of 2022
With
CAN 1 of 2022
Subrata Sengupta
Vs.
Union of India & Ors.

For the petitioner : Mr. Ashoke Kumar Banerjee, Sr. Adv.,
Mr. Indranil Nandi,
Mr. Sayak Konar.
For the Respondents in
WPA 10263 of 2007 : Mr. Sanajit Kumar Ghosh,
Ms. Sabita Roy.
For the Respondents in
WPA 52 of 2022 : Mr. Sunil Singhania,
Ms. Kalpana Singhania,
Ms. Sumedha Banerjee.
Heard on : 10.08.2026
Judgment on : 27.08.2026
Partha Sarathi Chatterjee, J.:-
FACTS:
1. Having regard to the thematic coherence of the issues involved, a coordinate
Bench of this Court, by an order dated 08.09.2023, directed that all three writ
petitions be taken up for analogous hearing.

3

2. The three writ petitions arise out of disputes concerning the occupation of
shop rooms at the Tollygunge Metro Railway Station Building. Though instituted
at different points of time and challenging different notices, the petitions
emanate from a common factual matrix, namely, the expiry of the licences in
respect of the said shop rooms, the determination of the occupational charges
payable thereafter and the consequential proceedings initiated by the Metro
Railway authorities for recovery of the alleged dues and eviction. Therefore, in
view of the commonality of the issues involved, all three writ petitions, together
with the applications filed in connection therewith, are taken up for consideration
together.
3. The petitioners in the respective writ petitions were allotted shop rooms at
the Tollygunge Metro Railway Station Building under licence agreements entered
into in or about the years 1993-1994. The licences were granted for limited
periods and expired on 31st March, 2005. According to the petitioners, they had
been carrying on their respective businesses from the said shop rooms for several
years and, upon expiry of the licences, approached the Metro Railway authorities
seeking continuation of their occupation by way of grant of long-term licences or
leases. However, instead of acceding to their request, the Metro Railway
authorities allegedly demanded exorbitant amounts towards occupation charges
and, ultimately, by use of force, evicted the petitioners from their respective shop
rooms. The principal relief sought by the petitioners is, therefore, restoration of
possession of the respective shop rooms and continuation of their occupation
upon grant of long-term licences or leases.


4

Facts ascertained from the writ petition being WPA 10263 of
2007 and its connected pending applications:
4. In WPA 10263 of 2007, the petitioners state that sometime in the year 1993,
the Metro Railway authorities floated a tender inviting applications from
intending applicants for allotment of shop rooms situated at the Tollygunge
Metro Railway Station Building on licence. Upon emerging as successful
tenderers, the petitioners were granted licences in respect of the shop rooms, as
detailed in paragraph 2 of the writ petition, initially for a period of five years.
Thereafter, the licences were renewed for a further period of five years, extending
up to the year 2005, subject to an annual escalation of 10% per annum after two
years and a review upon completion of five years, based on fresh tender, auction
or land value, as might be determined by the Railway administration in its sole
discretion. The licences were further subject to various other terms and
conditions, as would be evident from the letter dated 27.11.2000/04.12.2000
issued by the Chief Engineer (O&H).
5. Though the area in which the shop rooms were situated was not a prominent
commercial locality, the petitioners invested substantial amounts in setting up
their respective shops on the assurance of the authorities that a market complex
would shortly come up in the vicinity, which, according to them, would enable
them to earn reasonable profits in due course. With such expectation, they
continued their businesses despite meagre profits at the initial stage, particularly
in view of the yearly escalation of licence fees and renewal of the licences for only
five years. Moreover, petitioner nos. 6 and 7 were handed over possession of their

5

respective shop rooms only in the year 2004 and, consequently, had little
opportunity to recover their investments.
6. The petitioners further contend that, at other Metro Railway stations, such as
Chandni Chowk, which is a more prominent commercial area, shop rooms were
allotted on long-term leases of 35 years at the rate of Rs. 1,755/- per sq. metre per
annum, whereas at Tollygunge Metro Railway Station, charges were levied at the
rate of Rs. 6,129/- per sq. metre per annum. According to the petitioners, such
differential treatment is discriminatory and amounts to hostile discrimination
against them.
7. In such conspectus, prior to the expiry of their respective licences, the
petitioners submitted a joint representation dated 24th January, 2005, setting
out all the aforesaid facts and requesting the authorities to take appropriate steps
in the matter. Despite receipt of the said representation, however, no effective
action was taken by the concerned authorities. Being aggrieved by such inaction,
the petitioners approached this Court by filing W.P. No. 4285(W) of 2005, which
was disposed of by an order dated 29th August, 2005, directing the Chief
Engineer to consider their representations upon affording them an opportunity of
personal hearing. Pursuant thereto, the petitioners were heard; however, by an
order dated 11th November, 2005, their request for grant of long-term leases was
rejected, with the further decision that the shop rooms would be put to open
tender.Aggrieved by the said decision, the petitioners thereafter approached this
Court by filing W.P. No. 25353(W) of 2005.
8. During the pendency of the aforesaid proceedings, the Estate Officer, Metro
Railway, initiated proceedings against the petitioners under the Public Premises

6

(Eviction of Unauthorised Occupants) Act, 1971 (for short, “the 1971 Act”). In
connection therewith, a show-cause notice dated 18th January, 2007 was issued
to the petitioners under Section 4 of the 1971 Act. Subsequently, by a notice dated
4th May, 2007 issued under Section 5(1) of the said Act, the petitioners were
directed to vacate their respective shop rooms. Aggrieved by the said notice, the
petitioners approached this Court by filing WPA No. 10263 of 2007.
9. By an interim order dated 8th June, 2007 passed in the said writ petition, a
coordinate Bench of this Court directed the petitioners to pay occupational
charges, at the rate of Rs.10,000/- per square foot per year, with effect from 1st
April, 2005, without prejudice to the rights and contentions of the parties. The
Railway authorities were directed to assess the arrears payable by each of the
petitioners and intimate the same to them, whereupon the petitioners were
required to clear such arrears and continue to pay the current occupational
charges at the aforesaid rate. The interim order further stipulated that, in the
event of any default on the part of a petitioner in making such payment, the
interim protection granted in his or her favour would stand vacated.
10. A dispute subsequently arose as to the unit of measurement on the basis of
which the occupational charges were to be calculated. The petitioners contend
that the licence documents, as well as the contemporaneous assessments made by
the Railway authorities, proceeded on the basis of charges calculated per square
metre and that, pursuant to the order dated 8th June, 2007, the Railway
authorities initially assessed the occupational charges on that basis. According to
the petitioners, they continued to make payments in terms of such assessments
for several years.

7

11. The petitioners state that, in the year 2021, the Metro Railway authorities
sought to calculate the occupational charges at the rate of Rs.10,000/- per square
foot per year, thereby raising substantially enhanced demands upon them. The
petitioners contend that the reference to “per square foot” in the order dated 8th
June, 2007 was a typographical error and that the occupational charges ought to
have been assessed on the basis of the area measured in square metres. In view
thereof, the petitioners filed an application being CAN 3 of 2021, seeking
modification of the interim order dated 8th June, 2007.
12. In the year 2021, respondent no. 6 issued an eviction notice calling upon the
petitioners to clear a sum of Rs.2,68,627/- by 7th October, 2021, failing which
they were directed to vacate their respective shop rooms. Subsequently, on 22nd
December, 2021, another notice was issued by the Estate Officer and Senior
Divisional Engineer, Metro Railway, Kolkata, directing the petitioners to vacate
the said shop rooms. Thereafter, on 14th August, 2023, an eviction notice was
issued under the provisions of the 1971 Act. Aggrieved by the said notice,
petitioner nos. 1, 2, 3, 4, 7 and 8 preferred an application being CAN 5 of 2023.
The respondents also issued notices in the year 2023 demanding substantially
enhanced amounts towards occupational charges. Challenging the said demands,
petitioner nos. 1, 2, 3, 4, 7 and 8 preferred the aforesaid application being CAN 5
of 2023.
13. Subsequently, notices dated 10th January, 2024 were issued under Section
147 of the Railways Act, 1989, calling upon the petitioners to vacate their
respective shop premises by 17th January, 2024. Aggrieved by the said notices,

8

petitioner nos. 1, 2, 3, 4, 7 and 8 challenged the same by filing an application
being CAN 7 of 2024.
14. The petitioners contend that, initially, the electricity supply to their
respective shop rooms was forcibly disconnected by the concerned respondents
and that, thereafter, on 17th January, 2024, they were evicted from the said shop
rooms with police assistance, during which their belongings were removed from
the premises. Aggrieved thereby, petitioner nos. 1, 3, 4 and 7 preferred an
application being CAN 8 of 2024, praying for a direction upon the concerned
respondents to permit them to re-enter their respective shop rooms and to
restore the electricity supply thereto. Subsequently, a supplementary affidavit,
duly affirmed by one of the petitioners, namely, Subrata Dutta, was filed for the
purpose of bringing on record the eviction notice dated 17th January, 2024 issued
against him.
15. The record reveals that, by an interim order dated 24th January, 2024, a
coordinate Bench of this Court stayed the operation of the notices dated 10th
January, 2024 and 17th January, 2024 for a period of fifteen days, which interim
protection was subsequently extended until 15th March, 2024. Alleging that,
despite the said order, the petitioners had been evicted in willful violation
thereof, the petitioners preferred a contempt petition being CPAN 306 of 2024.
However, the said contempt petition was dismissed by an order dated 3rd April,
2024. Thereafter, petitioner nos. 1, 2, 3, 4, 7 and 8 preferred another application
being CAN 9 of 2024, which was subsequently dismissed as having become
infructuous by an order dated 24th March, 2025.

9

Contents of affidavits used by the respondents:
16. In the affidavit-in-opposition and the supplementary affidavit filed on behalf
of respondent nos. 1 to 6, a specific objection has been raised as to the
maintainability of the present writ petition on the ground that the petitioners
have approached this Court without availing themselves of the efficacious
alternative remedy available to them. It has been contended on behalf of the
respondents that an appeal under Section 9 of the 1971 Act lies against an order
passed by the Estate Officer under Section 5 thereof. According to the
respondents, without availing themselves of such statutory appellate remedy, the
petitioners have approached this Court by filing the present writ petition.
17. The respondents further averred that, having regard to the commercial
importance of the area, certain shop rooms were constructed and a tender was
floated inviting applications from intending applicants. The petitioners, in terms
of the conditions stipulated in the tender notice, deposited the requisite security
deposit and consumption charges in advance. It was contended that, being fully
aware of the terms and conditions of the tender, the petitioners voluntarily
participated in the tender process and, upon being declared successful, entered
into the respective contracts without raising any objection thereto.
18. It was further averred therein that the petitioners had invested amounts
towards furniture, fixtures, fittings and other requirements for carrying on their
respective businesses, and that the respondents could not be held responsible for
such investments or for any loss allegedly suffered by the petitioners in the
course of their businesses. It was also stated that, as per the records of the year

10

2002, the allottees of the shop rooms at Chandni Chowk were required to pay a
sum of Rs.12,11,111/- towards lease premium, in two instalments spread over a
period of six months.
19. The licences granted in favour of the petitioners expired on 31st March,
2005, and upon expiry thereof, the petitioners became unauthorised occupants of
their respective shop rooms. Prior to such expiry, however, the petitioners had
submitted a representation dated 24th January, 2005, seeking grant of long-term
leases in respect of their respective shop rooms. Alleging inaction on the part of
the concerned authorities in considering the said representation, the petitioners
approached this Court by filing W.P. No. 4825(W) of 2005. Pursuant to the order
passed in the said writ petition, the petitioners’ representation was considered
and disposed of by a reasoned and speaking order dated 11th November, 2005.
20. Aggrieved by the order dated 11th November, 2005, the petitioners preferred
another writ petition being W.P. No. 25353(W) of 2005. In the said writ petition,
directions were issued for exchange of affidavits, and the matter is still pending
adjudication. The respondents contended therein that grant of a long-term lease
was never a subject matter of the contract entered into between the parties and,
therefore, the petitioners’ claim for grant of such long-term leases is wholly
unfounded and cannot be sustained.
21. Upon the petitioners becoming unauthorised occupants, the respondent
authorities, through the Estate Officer, issued notices under Sections 4(1) and
4(2)(b)(ii) of the 1971 Act, calling upon the petitioners to appear at the hearing
and show cause against the proposed order of eviction. However, at the hearing,
the petitioners failed to produce any document or material justifying their

11

continued occupation of the respective shop rooms after expiry of their licences.
Consequently, a notice dated 7th May, 2007 was issued under Section 5(1) of the
1971 Act, directing the petitioners to vacate their respective shop rooms within
the period specified therein. Aggrieved by the said notice, the petitioners
approached this Court by filing the present writ petition.
22. In the instant writ petition, by an interim order dated 8th June, 2007, the
Hon’ble Justice Dipankar Dutta (as His Lordship then was) directed the
petitioners to pay occupational charges at the rate of Rs.10,000/- per square foot
per year in respect of the shop rooms in question, together with the arrears
accruing from 1st April, 2005. The respondents contend that the petitioners
failed to comply with the said order by not depositing the occupational charges as
directed and also failed to pay the current occupational charges. The Railway
authorities have further disputed the allegations concerning the manner of
eviction and contended that the eviction was carried out strictly in accordance
with law and that the belongings of the petitioners were duly kept in safe custody.
23. In the supplementary affidavit, it has been contended that the writ
petitioners had earlier preferred a writ petition being W.P. No. 12723 of 2023,
which was dismissed by a coordinate Bench of this Court by an order dated 25th
May, 2023. It was, inter alia, observed therein that a party seeking equitable
relief must approach the Court with clean hands. The respondents contend that,
on the one hand, the petitioners had represented before this Court that they were
willing to pay the licence fee at the enhanced rate, while, on the other hand, they
continued to occupy and enjoy the premises without paying the occupational
charges in terms of the order passed by this Court. According to the respondents,

12

the petitioners, having failed to comply with the aforesaid order, cannot be
permitted to seek equitable relief from this Court.
24. It has been contended that, pursuant to the order dated 8th June, 2007, a
total sum of Rs.8,8,03,55,315.83/- became payable by the petitioners towards
occupational charges for the period from 1st April, 2005 to 31st March, 2022,
inclusive of interest and GST at the rate of 18%. It was further stated in the
affidavit-in-opposition filed in connection with CAN 7 of 2024 that, as on 31st
March, 2024, the total outstanding occupational charges in respect of the six
applicants amounted to Rs.106,05,06,852/- (Rupees One Hundred Six Crores
Five Lakhs Six Thousand Eight Hundred Fifty-Two only).
25. It has been contended that, at the time when the petitioners were granted
the licences, the Catering Policy, 2005 was in force. Subsequently, the Catering
Policy, 2010 was introduced, which contained no provision for renewal of the
existing licences. Thereafter, the Catering Policy, 2017 came to be adopted, under
which every shop room was required to be allotted through the e-tender process.
It has further been contended that, as the petitioners failed to pay the
occupational charges in terms of the order dated 8th June, 2007, the electricity
supply to their respective shop rooms was disconnected and, thereafter, they
were evicted upon following the procedure prescribed by law.
26. In reply, the petitioners contended that the agreement between the
petitioners and the Metro Railway was executed on 30th May, 1994. Thereafter,
on 15th June, 2004, a letter of acceptance was issued, recording the payment of
the licence fee, earnest money and initial security deposit in respect of the shop
rooms. According to the petitioners, the said statement also reflected the

13

enhanced licence fee at the rate of Rs.8,803/- per square metre. The petitioners
further contended that, pursuant to the instructions contained in the letter issued
by the Senior Divisional Engineer, they deposited all outstanding dues with the
concerned authority on 14th September, 2012. Subsequently, by a representation
dated 12th March, 2021, the petitioners sought waiver of the licence fee on
account of the financial hardship allegedly suffered by them during the COVID-19
pandemic.
27. The petitioners further contended that, until the year 2020, the concerned
authority itself had assessed and demanded occupational charges at the rate of
Rs.10,000/- per square metre per year. However, in the year 2021, the authority
sought to levy occupational charges at the rate of Rs.10,000/- per square foot per
year, purportedly in terms of the order dated 8th June, 2007. It was further
contended that, although the agreement executed between the parties stipulated
that the occupational charges would be enhanced at the rate of Rs.10,000/- per
square metre per year, the order dated 8th June, 2007 referred to the rate of
Rs.10,000/- per square foot per year. The petitioners also relied upon a notice
dated 12th June, 2007 issued by the Senior Divisional Engineer, whereby they
were called upon to pay occupational charges at the rate of Rs.10,000/- per
square metre per year for the period commencing from 1st April, 2005 to 8th
June, 2007.
Facts as delineated in WPA 52 of 2022
28. The writ petition being WPA No. 52 of 2022 concerns a shop room
measuring approximately 12.51 square metres situated in the Tollygunge Metro

14

Railway Station Building, which had been allotted to one of the petitioners in
W.P. No. 10263(W) of 2007, namely, Subrata Sengupta. The petitioner states that
an Agreement for Licence was executed on 30th May, 1994 in respect of the said
shop room for a period of five years. The said shop room, measuring
approximately 12.51 square metres, was being used by the petitioner for carrying
on business under the name and style of “Sree Durga Food Products”. The licence
expired on 31st March, 2005 and was thereafter not renewed.
29. The petitioner states that she, along with the other occupants of the shop
rooms, had earlier approached this Court challenging the policy of the Metro
Railway authorities relating to the non-grant of long-term licences in W.P. No.
25353(W) of 2005. She was also one of the petitioners in W.P. No. 10263(W) of
2007, whereby the order dated 4th May, 2007, passed by the Estate Officer under
the Public Premises (Eviction of Unauthorised Occupants) Act, 1971, was
challenged.
30. The petitioner relies upon the interim order dated 8th June, 2007, passed
in the said proceeding concerning payment of occupational charges. According to
her, the licence documents and the assessments made by the Railway authorities
were based on a per-square-metre calculation, and she duly deposited the dues
assessed by the Railway authorities on that basis. The petitioner states that, until
2020, the demands raised by the Railway authorities were calculated on a per-
square-metre basis. According to her, from 2021 onwards, the Railway
authorities began raising demands by treating the rate recorded in the order
dated 8th June, 2007, as a rate applicable per square foot.

15

31. Thereafter, notices were issued demanding payment of the alleged
outstanding occupational charges and requiring the petitioner to vacate the shop
premises under Section 147 of the Railways Act, 1989. Aggrieved by the said
notices, the petitioner challenged the demands, contending that the occupational
charges had been incorrectly calculated, that the payments already made by her
had not been duly accounted for, and that her representations in this regard had
not been considered.
32. During the pendency of WPA 52 of 2022, a further notice dated 5th April,
2022 was issued under Section 147 of the Railways Act, 1989, directing the
petitioner to vacate the shop premises by 20th April, 2022. The said notice was
challenged by filing the connected application, being CAN 1 of 2022.
Facts as depicted in WPA 166 of 2022
33. WPA 166 of 2022 which was filed by the petitioner nos. 1,2,3,4 7, & 8 in
W.P. no. 10263(W) of 2007 concerns several shop rooms at the Tollygunge Metro
Railway Station Building. From the materials placed before the Court, it appears
that the petitioners were in occupation of shop rooms bearing nos. 4, 11, 12, 14,
17, 18, 19 and 20 and that the licences in respect thereof expired on 31st March,
2005.
34. The petitioners state that they had earlier joined the proceedings challenging
the Metro Railway authorities' decision not to grant long-term licences and had
also challenged the notice dated 4th May, 2007 issued by the Estate Officer under
the Public Premises (Eviction of Unauthorised Occupants) Act, 1971 in W.P. No.
10263(W) of 2007.

16

35. Their case is substantially similar to that of the petitioner in WPA 52 of 2022.
They rely upon the order dated 8th June, 2007 concerning payment of
occupational charges and contend that the licence arrangements and the
assessments made by the Railway authorities had proceeded on a per-square-
metre basis. According to them, the subsequent demands calculated per square
foot gave rise to the present dispute.
36. The petitioners state that they made representations disputing the revised
demands and also sought modification of the order dated 8th June, 2007. Notices
were thereafter issued under Section 147 of the Railways Act, 1989 requiring
them to vacate the shop premises, which led to the filing of WPA 166 of 2022.
37. During the pendency of the writ petition, a further notice dated 5th April,
2022 was issued under Section 147 of the Railways Act, 1989 directing eviction
from the shop premises by 20th April, 2022. The said notice was challenged by
filing the connected application, CAN 1 of 2022.
38. No affidavits have been exchanged in the writ petitions, being WPA 52 of
2022 and WPA 166 of 2022.
Submission :
39. Mr. Banerjee, learned Senior Advocate, advanced oral arguments and, in
addition thereto, submitted written notes of arguments as well as supplementary
written notes of arguments. He contended that, upon following due process of
law, the petitioners were allotted shop rooms at the Tollygunj Metro Railway
Station premises in 1994. The petitioners had invested substantial amounts of
money in the said shop rooms and in their respective businesses and, despite

17

earning only a meagre profit, continued to carry on their businesses on the basis
of an assurance given by the Metro Railway authorities that a market complex
would shortly come up in the vicinity and that, in the long run, the petitioners
would be able to recoup their losses and earn profits.
40. He submitted that, before the expiry of their licences, the petitioners had
made applications seeking grant of long-term leases in respect of their respective
shop rooms. However, while keeping the said applications pending, the Metro
Railway authorities initiated proceedings against the petitioners under the 1971
Act. Subsequently, the petitioners’ prayer for grant of long-term leases was
rejected on the ground that the applicable catering policy contained no provision
for grant of such long-term leases.
41. He further submitted that, by an interim order dated 8th June, 2007, a
coordinate Bench of this Court directed the petitioners to pay occupational
charges at the rate of Rs. 10,000/- per square feet per year. However, according
to him, a typographical error crept into the said order and, instead of the words
“square metre”, the words “square feet” came to be recorded therein. He argued
that the licence agreements stipulate that rent would be realised on the basis of
“square metre” and that the assessment of rent had also been made by the
authorities on the same basis. The Metro Railway authorities, however, had all
along realised rent on the basis of square feet, even after the order dated 8th
June, 2007 was passed. It was only in 2021 that the authorities started
demanding occupational charges on the basis of square metre. He further
submitted that the application seeking modification of the order dated 8th June,
2007 is still pending for final adjudication. In such circumstances, according to

18

him, the demand for occupational charges on the basis of square metre is
unsustainable in law.
42. He argued that, ultimately, by an order passed under Section 5 of the 1971
Act, the Estate Officer directed the eviction of the petitioners from their
respective shop rooms, which constitute their only source of livelihood. He
further submitted that, on the alleged ground of non-payment of occupational
charges in terms of the order dated 8th June, 2007, the petitioners were
thereafter evicted from their shop rooms by invoking the provisions of Section
147(2) of the Railways Act. According to him, such action on the part of the
authorities cannot withstand the test of reasonableness.
43. He prayed for an order directing the respondents to restore possession of
the petitioners’ shop rooms upon acceptance of rent from the petitioners
calculated on the basis of square metre. He relied upon a decision, reported in
(1986) 2 SCC 679 (Comptroller and Auditor-General of India vs. K.S.
Jagannathan) , for the proposition that Article 226 of the Constitution is
designedly couched in wide language so as not to confine the power conferred by
it only to the power to issue prerogative writs as understood in England, but to
enable the High Courts to reach injustice whenever it is found and to mould the
reliefs to meet the peculiar and complicated requirements of this country.
44. Per contra , Mr. Ghosh, learned Advocate appearing for the respondents,
argued that the present writ petitions are not maintainable. He submitted that
the order passed by the Estate Officer under Section 5(1) of the 1971 Act is
appealable and that an appeal lies under Section 9 of the 1971 Act. However,

19

without exhausting the available statutory remedy, the present writ petitions
have been filed.
45. He argued that the petitioners’ licences had expired in 2005 and, upon
expiry of their licences, the petitioners became unauthorised occupants.
Accordingly, the authorities had rightly initiated proceedings under Section 5 of
the 1971 Act, particularly when the petitioners had failed to pay occupational
charges in terms of the order dated 8th June, 2007. The outstanding amounts
now stand at more than Rs. 100 crores. He contended that two of the petitioners,
namely, Urmila Roy and Sulochana Mukherjee, have handed over vacant
possession of their shop rooms, namely, shop room nos. 17, 18, 19 and 20.
46. Mr. Ghosh further argued that neither of the catering policies contains any
provision for grant of a long-term lease in respect of any shop room located on
the premises of the Metro Railway authorities and, as such, the petitioners’
prayer for grant of long-term leases has rightly been turned down. He contended
that the petitioners are not entitled to any of the reliefs prayed for in the present
writ petitions and, accordingly, the writ petitions are liable to be dismissed.
47. He referred to a decision of the Hon’ble Supreme Court in SLP (Civil) Diary
No. 19714 of 2021 and Diary No. 23559 of 2021 (Utran Se Besthan Railway
Jhopadpatti Vikas Mandal vs. Government of India & Ors.) , rendered on 16th
December, 2021, for the proposition that, after expiry of the notice period, if the
occupants fail to vacate the Railway premises, it would be open to the Railway to
initiate appropriate action to forcibly dispossess them with the assistance of the
local police force. He cited another decision, reported in (2005) 8 SCC 264 (U.P.
State Spinning Co. Ltd. vs. R.S. Pandey & Ors.) , for the proposition that, in view

20

of the availability of an alternative remedy, a writ petition challenging the order
passed by the Estate Officer under Section 5 of the 1971 Act is not maintainable.
He relied upon an unreported decision of a Hon’ble Division Bench of this Court
in MAT No. 1063 of 2024 (Chandannagar Station Area Hawkers Co-op Society
Ltd. vs. Union of India & Ors.) in support of his contention that, when admittedly
the property in question belongs to the Railway and the petitioner has no legal
right to continue in occupation, the Railway authorities have every right to vacate
the property with police assistance. To lend support to this view, he cited certain
unreported decisions of different coordinate Benches of this Court in WPA 18275
of 2004 (M/s. Trigun Prasad Singh & Sons & Ors.) , W.P. No. 28553 (W) of 2014
(Subrata Ghosh vs. The Union of India & Ors.) , WPA 21016 of 2023 (Asimul
Islam vs. Union of India & Ors.) , WPA 18852 of 2021 (Titagarh Wagons Limited
& Anr. vs. Union of India , represented by the Principal Secretary, Ministry of
Railways & Ors.), and W.P. No. 25015(W) of 2013 (Dhurjati Prosad Das vs.
Union of India & Ors.) and a decision, reported in (2006) 2 Cal LJ 193 (G.
Phalaguna vs. General Manager) . Mr. Ghosh also referred to three unreported
decisions of three different Hon’ble Division Benches of this Court in MAT 603 of
2017 ( Bindu Devi vs. General Manager, Eastern Railway & Ors. ), MAT 1603 of
2024 (Chandannagar Station Area Hawkers Cooperative Society Ltd. vs. Union
of India & Ors.) , and APOT No. 109 of 2016 (Eastern Railway vs. Lafarage India
Pvt. Ltd.),
48. In reply, Mr. Banerjee argued that the existence of an alternative remedy
does not impose a complete bar upon the exercise of writ jurisdiction, as the rule
is essentially a self-imposed restriction. He submitted that, notwithstanding the

21

availability of an alternative remedy, a writ petition may be entertained, inter
alia, in three instances, namely, (i) where the writ petition is filed for
enforcement of any of the fundamental rights; (ii) where there is a violation of
fundamental rights or principles of natural justice; and (iii) where the order or
proceedings are wholly without jurisdiction or the vires of an Act is under
challenge. He argued that, in the present case, the fundamental rights of the
petitioners have been violated and, as such, the present writ petitions have been
preferred for enforcement of their valuable fundamental rights and are, therefore,
maintainable.In support of his contention, he cited the decisions reported in
(2021) 16 SCC 400 (State of Rajasthan & Ors. vs. Lord Northbrook & Ors.),
(2011) 5 SCC 697 (Union of India & Ors. vs. Tantia Construction Pvt. Ltd.) and
2025 SCC OnLine SC 1992 (State of Rajasthan vs. Ajit Singh & Ors.) .
Analysis and conclusion:
49. Heard the learned advocates appearing for the respective parties. Perused
the materials on record placed before me.
50. Indisputably, it is well settled that the existence of an efficacious alternative
remedy does not operate as an absolute bar to the exercise of jurisdiction under
Article 226 of the Constitution. The rule requiring exhaustion of an alternative
statutory remedy is one of policy, convenience and discretion, and does not oust
the jurisdiction of the High Court. In Whirlpool Corporation vs. Registrar of
Trade Marks, Mumbai , reported in (1998) 8 SCC 1, and Radha Krishan
Industries vs. State of Himachal Pradesh , reported in (2021) 6 SCC 771, the
Hon’ble Supreme Court has reiterated that, notwithstanding the availability of an

22

alternative remedy, the High Court may exercise its writ jurisdiction in
appropriate cases, particularly where there is violation of fundamental rights,
breach of the principles of natural justice, lack of jurisdiction or challenge to the
vires of a statutory provision. At the same time, it is equally well settled that,
where a statute provides an efficacious alternative remedy by way of appeal or
otherwise, the High Court ordinarily should not entertain a writ petition without
requiring the aggrieved party to exhaust such remedy. In Radha Krishan
Industries (supra), the Hon’ble Supreme Court held that, where a right or liability
is created by a statute which itself prescribes the remedy for enforcing such right
or liability, resort must ordinarily be had to such statutory remedy before
invoking the discretionary jurisdiction under Article 226 of the Constitution.
51. However, in the present case, the objection as to the availability of an
alternative remedy cannot be considered in isolation from the peculiar facts and
circumstances of the case. The petitioners were allotted the respective shop
rooms in 1994 and their licences were renewed up to 2005. Before expiry of their
licences, they sought grant of long-term licences, which was rejected on the
ground that the applicable catering policy contained no provision for grant of
such licences. Proceedings under Section 5(1) of the 1971 Act were thereafter
initiated and orders of eviction were passed by the Estate Officer.
52. It is also not in dispute that, during the pendency of these writ
proceedings, an interim order dated 8th June, 2007 was passed directing the
petitioners to pay occupational charges. The petitioners have raised a specific
dispute regarding the basis of assessment of such charges, contending that the
order suffered from a typographical error as regards the unit of measurement and

23

that the payments already made by them were not duly adjusted. The application
seeking modification or clarification of the said order is stated to be pending. The
controversy assumes further significance in view of the subsequent demands
towards occupational charges and the eviction of the petitioners from the shop
rooms by invoking Section 147(2) of the Railways Act, 1989.
53. In such circumstances, it would not be appropriate to dismiss the writ
petitions in limine solely on the ground of the availability of a statutory appellate
remedy, without taking into consideration the subsequent events relating to the
payment of occupational charges, rejection of petitioners’ prayer for grant of
long-term lease of their respective shop rooms and the eviction of the petitioners
from their respective shop rooms, particularly when the issues arising from such
subsequent events may not appropriately be addressed in an appeal under
Section 9 of the 1971 Act.
54. Needless to state that the petitioners are entitled to restoration of
possession as a matter of course. The right of the petitioners to continue in
occupation after expiry of their licences is a separate question and has to be
examined on its own merits. Likewise, the legality of the demands towards
occupational charges and the effect of the order dated 8th June, 2007 and their
subsequent eviction resorting to Section 147(2) of the Railways Act require
consideration on the basis of the relevant records.
55. The petitioners, upon expiry of their respective licences, cannot claim any
indefeasible right to remain in occupation of the Railway premises or any part
thereof. They cannot claim restoration of possession merely on the ground that
they had been carrying on their respective businesses in the said shop rooms for

24

several years, particularly when their licences had admittedly expired and their
prayer for grant of long-term licences had also been rejected. Mere length of
occupation, in the absence of a subsisting licence or any other enforceable right,
cannot confer upon the petitioners a right to continue in occupation of the
Railway premises. Accordingly, the petitioners’ prayer for a direction upon the
respondents to restore possession of their respective shop rooms cannot be
acceded to, and as such, the prayers for restoration of possession of their
respective shop rooms and for a direction to grant long-term leases are rejected.
56. A coordinate Bench of this Court, in W.P. No. 25015(W) of 2013, considered
the question as to whether a person who had entered upon Railway property as a
licensee but continued in occupation beyond the tenure or termination of the
licence could be evicted by taking recourse to Section 147(2) of the Railways Act,
1989, and ultimately held that the Railway authorities have the right to evict a
person having no subsisting right to occupy Railway property by invoking Section
147 of the said Act. In Utran Se Besthan Railway Jhopadpatti Vikas Mandal
(supra), the Hon’ble Supreme Court held that the Railway authorities can evict a
person occupying Railway property without any legal right to do so by taking
recourse to the provisions of the 1971 Act and the Railways Act, 1989, and the
said view has subsequently been reiterated in G. Phalaguna (supra).
57. However, having regard to the statutory remedy available under Section 9
of the 1971 Act, this Court is of the view that the petitioners should avail such
remedy for determination of their grievances against the order of the Estate
Officer and the consequential demands. The petitioners shall, accordingly, be at
liberty to prefer appeals under Section 9 of the 1971 Act within a period of four

25

weeks from date. If such appeals are preferred within the aforesaid period, the
appellate authority shall consider the same on merits in accordance with law and
shall not reject the appeals merely on the ground of delay, subject to the
petitioners satisfying the statutory requirements and explaining the delay to the
satisfaction of the appellate authority.
58. Having regard to the materials placed on record and, in particular,
Annexure P-2 to the writ petition, being WPA 166 of 2022, wherein the
occupational charge in respect of a shop room measuring 17.4 square metres was
assessed at the rate of Rs. 8,803/- per square metre per year, and also
considering that the total licence fee in respect of the shop room for the years
2003-2005 was determined at Rs. 1,12,502/-, I am inclined to accept the
contention of the petitioners that the expression “Rs. 10,000/- per square feet per
year” occurring in the interim order dated 8th June, 2007 requires modification
and that the delay in seeking such modification cannot stand in the way of
granting the same. Accordingly, the said expression shall stand modified to “Rs.
10,000/- per square metre per year” and the occupational charges payable by the
petitioners shall be recalculated on that basis w.e.f. 1.5.2005, after giving due
credit to all payments already made by the petitioners.
59. With these observations and order, the writ petitions being W.P. no.
10263(W) of 2007, WPA 52 of 2022 and WPA 166 of 2022 and its connected
applications are, thus, disposed of ; however, without any order as to the costs.

(Partha Sarathi Chatterjee, J.)