GUJARAT URJA VIKAS NIGAM LIMITED vs TATA POWER COMPANY LIMITED & Anr

Court
Appellate Tribunal For Electricity
Case type
APPEAL NO. 348 OF 2025 & IA NO. 1797 OF 2025 APPEAL NO. 371 OF 2025 & IA NO. 1850 OF 2025 and APPEAL NO. 400 OF 2025 & IA NO. 1946 OF 2025
Decided on
25-02-2026
<div> <br /> <b>IN THE APPELLATE TRIBUNAL FOR ELECTRICITY </b><br /> <b>(Appellate Jurisdiction) </b><br /> <br /> <b> APPEAL NO. 348 OF 2025 &amp; IA NO. 1797 OF 2025 </b><br /> <b>APPEAL NO. 371 OF 2025 &amp; IA NO. 1850 OF 2025 </b><br /> <b>and </b><br /> <b>APPEAL NO. 400 OF 2025 &amp; IA NO. 1946 OF 2025 </b><br /> <br /> <b>th</b><br /> <b>Dated: 25</b> <b> February, 2026 </b><br /> <b> </b><br /> <b>Present:</b> <b>Hon’ble Mr. Justice Ramesh Ranganathan, Chairperson</b> <br /> <b> </b> <b> </b> <b>Hon’ble Mr. Ajay Talegaonkar, Technical Member (Electricity) </b><br /> <b> </b><br /> <b> </b><br /> <b>APPEAL NO. 348 OF 2025 &amp; IA NO. 1797 OF 2025 </b><br /> <b> </b><br /> <b>In the matter of: </b><br /> <b> </b><br /> <b>GUJARAT URJA VIKAS NIGAM LIMITED </b><br /> <i>Through its Managing Director </i><br /> Sardar Patel Vidyut Bhawan, <br /> Race Course Circle, Vadodara, <br /> GUJARAT - 390007 … Appellant <br /> <br /> <b><i> </i></b> <b><i> </i></b> <b><i>VERSUS </i></b><br /> <b> </b><br /> <b> </b> <b>1. </b> <b>TATA POWER COMPANY LIMITED </b><br /> <b> </b> <b> </b> <b>(earlier Coastal Gujarat Power Limited) </b><br /> <i> </i> <i>Through its Managing Director, </i><br /> “Corporate Centre” 34, Sant Tukaram Road, <br /> Carnac Bunder, <br /> Mumbai, Maharashtra - 400009 ... Respondent No.1 <br /> <br /> <b>2. </b> <b>PUNJAB STATE POWER CORPORATION </b><br /> <b> </b> <b>LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer (PP&amp;R) </i><br /> <i> </i> PP&amp;R, Shed T-1, Thermal Design, <br /> Patiala, Punjab – 147001. ... Respondent No.2 <br /> <br /> <br /> <b>3. </b> <b>MAHARASHTRA STATE ELECTRICITY </b><br /> <b> </b> <b>DISTRIBUTION COMPANY LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> th<br /> 4 Floor, Prakashgad, Plot No. G-9 <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>1</b> of <b>178</b> <br /> <br /><br /> <br /> Bandra (East), Mumbai – 400051 ... Respondent No.3 <br /> <br /> <b>4. </b> <b>AJMER VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Hathi Bhata, Old Power House, <br /> Ajmer, Rajasthan – 305001 ... Respondent No.4 <br /> <b> </b><br /> <b>5. </b> <b>JAIPUR VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Vidyut Bhawan, Janpath, <br /> Jaipur, Rajasthan – 302006 ... Respondent No.5 <br /> <b> </b><br /> <b>6. </b> <b>JODHPUR VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> New Power House, Industrial Area, <br /> Jodhpur, Rajasthan – 342003. ... Respondent No.6 <br /> <br /> <b>7. </b> <b>UTTAR HARYANA BIJLI VITRAN </b><br /> <b> </b> <b>NIGAM LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer </i><br /> Vidyut Sadan, Plot No. C-16 <br /> Sector-6, Panchkula, Haryana - 134112 ... Respondent No.7 <br /> <br /> <b>8. </b> <b>DAKSHIN HARYANA BIJLI VITRAN </b><br /> <b> </b> <b>NIGAM LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer </i><br /> Vidyut Nagar, Vidyut Sadan, <br /> Hissar, Haryana - 125005 ... Respondent No.8 <br /> <br /> <b>9. </b> <b>CENTRAL ELECTRICITY REGULATORY </b><br /> <b> </b> <b>COMMISSION </b><br /> <i> </i> <i>Through its Secretary, </i><br /> th th th<br /> 6 , 7 &amp; 8 Floors, Tower-B, <br /> World Trade Centre, Nauroji Nagar, <br /> New Delhi – 110029 ... Respondent No.9 <br /> <br /> Counsel on record for the Appellant(s) : Ranjitha Ramachandran <br /> Srishti Khindaria <br /> Aneesh Bajaj <br /> Counsel on record for the Respondent(s) : Hemant Sahai <br /> Shri Venkatesh <br /> Shryeshth Ramesh Sharma <br /> Ashutosh Kumar Srivastava <br /> Kanika Chugh <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>2</b> of <b>178</b> <br /> <br /><br /> <br /> Suhael Buttan <br /> Shubhi Sharma <br /> Tushar Srivastava <br /> Nipun Sharma <br /> Rishabh Sehgal <br /> Shaida Das <br /> Varnika Tyagi <br /> Harshit Dhamija <br /> Shambhavi Jha <br /> Divyansh Kasana <br /> Nihal Bhardwaj <br /> Siddharth Nigotia <br /> Manu Tiwari <br /> Aashwyn Singh <br /> Abhishek Nangia <br /> Mohit Mansharamani <br /> Akash Lamba <br /> Harsh Vardhan <br /> Aniket Kanhaua <br /> Adarsh Singh <br /> Indu Uttara <br /> Ananya Dutta <br /> Priya Dhankar <br /> Vineet Kumar <br /> Surbhi Kapoor <br /> Tanishka Khatana <br /> Nikunj Bhatnagar <br /> Kunal Veer Chopra <br /> Punyam Bhutani <br /> Vedant Choudhary <br /> Kamya Sharma <br /> Drishti Rathi <br /> Nishant G <br /> Manav Saluja <br /> Vandana Ragwani for Res.1 <br /> <br /> Ramanuj Kumar <br /> Vishal Binod <br /> Aditya Dubey <br /> Sagnik Maitra <br /> Swadha Sharma for Res.3 <br /> <b> </b><br /> <b>APPEAL NO. 371 OF 2025 &amp; IA NO. 1850 OF 2025 </b><br /> <b> </b><br /> <b>In the matter of: </b><br /> <b> </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>3</b> of <b>178</b> <br /> <br /><br /> <br /> <b>1. </b> <b>UTTAR HARYANA BIJLI VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer </i><br /> Vidyut Sadan, Plot No. C-16 <br /> Sector-6, Panchkula, Haryana - 134112 … Appellant No. 1 <br /> <br /> <b>2. </b> <b>DAKSHIN HARYANA BIJLI VITRAN </b><br /> <b> </b> <b>NIGAM LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer </i><br /> Vidyut Nagar, Vidyut Sadan, <br /> Hissar, Haryana - 125005 <b> </b><br /> <b><i> </i></b> <b><i> </i></b><br /> <b>Through its Haryana Power Purchase Centre </b><br /> <i>Through its Chief Engineer</i> <br /> Shakti Bhawan, Second Floor, Sector-6, <br /> Panchkula, Haryana – 134 109 … Appellant No. 2 <br /> <b><i> </i></b><br /> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i> </i></b> <b><i>VERSUS </i></b><br /> <b> </b><br /> <b> </b><br /> <b>1. </b> <b>CENTRAL ELECTRICITY REGULATORY </b><br /> <b> </b> <b>COMMISSION </b><br /> <i> </i> <i>Through its Secretary, </i><br /> th th th<br /> 6 , 7 &amp; 8 Floors, Tower-B, <br /> World Trade Centre, Nauroji Nagar, <br /> New Delhi – 110029 … Respondent No.1 <b> </b><br /> <b> </b><br /> <b>2. </b> <b>COASTAL GUJARAT POWER LIMITED </b><br /> <b> </b> <i>Through its Managing Director </i><br /> <i> </i> C/o Tata Power Company Limited <br /> 34, Sant Tuka Ram Road, <br /> Carnac Bunder, Mumbai – 400021 … Respondent No.2 <br /> <b> </b><br /> <b>3. </b> <b>TATA POWER COMPANY LIMITED </b><br /> <b> </b> <b> </b> <b>(earlier Coastal Gujarat Power Limited) </b><br /> <i> </i> <i>Through its Managing Director, </i><br /> “Corporate Centre” 34, Sant Tukaram Road, <br /> Carnac Bunder, <br /> Mumbai, Maharashtra – 400009 … Respondent No.3 <b> </b><br /> <b> </b><br /> <b>4. </b> <b>POWER SYSTEM OPERATION </b><br /> <b> </b> <b>CORPORATION LIMITED </b><br /> <b> </b> <b>WESTERN REGIONAL LOAD RESPATCH </b><br /> <b> </b> <b>CENTRE </b><br /> <b> </b> <i>Through its General Manager </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>4</b> of <b>178</b> <br /> <br /><br /> <br /> st<br /> <i> </i> B-9 (1 Floor), Qutab Institutional Area, <br /> Katwaria Sarai, New Delhi – 110016 … Respondent No.4 <b> </b><br /> <b> </b><br /> <b>5. </b> <b>GUJARAT URJA VIKAS NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Sardar Patel Vidyut Bhawan, <br /> Race Course Circle, Vadodara, <br /> GUJARAT – 390007 ... Respondent No.5 <br /> <b> </b><br /> <b>6. </b> <b>MAHARASHTRA STATE ELECTRICITY </b><br /> <b> </b> <b>DISTRIBUTION COMPANY LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> th<br /> 4 Floor, Prakashgad, Plot No. G-9 <br /> Bandra (East), Mumbai – 400051 ... Respondent No.6 <br /> <b> </b><br /> <b>7. </b> <b>AJMER VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Hathi Bhata, Old Power House, <br /> Ajmer, Rajasthan – 305001 ... Respondent No.7 <br /> <br /> <b>8. </b> <b>JAIPUR VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Vidyut Bhawan, Janpath, <br /> Jaipur, Rajasthan – 302006 ... Respondent No.8 <br /> <b> </b><br /> <b>9. </b> <b>JODHPUR VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> New Power House, Industrial Area, <br /> Jodhpur, Rajasthan – 342003. ... Respondent No.9 <br /> <br /> <b>10. </b> <b>PUNJAB STATE POWER CORPORATION </b><br /> <b> </b> <b>LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer (PP&amp;R) </i><br /> <i> </i> PP&amp;R, Shed T-1, Thermal Design, <br /> Patiala, Punjab – 147001. ... Respondent No.10 <br /> <br /> Counsel on record for the Appellant(s) : Poorva Saigal <br /> Shubham Arya <br /> Pallavi Saigal <br /> Rishabh Saxena <br /> Kaavya <br /> Shree Dwivedi <br /> <i>for Appellant No. 1 </i><br /> <i> </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>5</b> of <b>178</b> <br /> <br /><br /> <br /> Poorva Saigal <br /> Shubham Arya <br /> Pallavi Saigal <br /> Reeha Singh <br /> Rishabh Saxena <br /> Kaavya <br /> Shree Dwivedi <br /> <i>for Appellant No. 2</i> <br /> <br /> Counsel on record for the Respondent(s) : Hemant Sahai <br /> Shri Venkatesh <br /> Shryeshth Ramesh Sharma <br /> Ashutosh Kumar Srivastava <br /> Kanika Chugh <br /> Suhael Buttan <br /> Shubhi Sharma <br /> Tushar Srivastava <br /> Nipun Sharma <br /> Rishabh Sehgal <br /> Shaida Das <br /> Varnika Tyagi <br /> Harshit Dhamija <br /> Shambhavi Jha <br /> Divyansh Kasana <br /> Nihal Bhardwaj <br /> Siddharth Nigotia <br /> Manu Tiwari <br /> Aashwyn Singh <br /> Abhishek Nangia <br /> Mohit Mansharamani <br /> Akash Lamba <br /> Harsh Vardhan <br /> Aniket Kanhaua <br /> Adarsh Singh <br /> Indu Uttara <br /> Ananya Dutta <br /> Priya Dhankar <br /> Vineet Kumar <br /> Surbhi Kapoor <br /> Tanishka Khatana <br /> Nikunj Bhatnagar <br /> Kunal Veer Chopra <br /> Punyam Bhutani <br /> Vedant Choudhary <br /> Kamya Sharma <br /> Drishti Rathi <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>6</b> of <b>178</b> <br /> <br /><br /> <br /> Nishant G <br /> Manav Saluja <br /> Vandana Ragwani for Res.3 <br /> <br /> Ranjitha Ramachandran <br /> Srishti Khindaria <br /> Aneesh Bajaj for Res.5 <br /> <br /> Amal Nair <br /> Devyani Prasad <br /> Anand K. Ganesan <br /> Khyati Chhabra <br /> Swapna Seshadri <br /> <i>For Res.7, 8 &amp; 9 </i><br /> <b> </b><br /> <b>APPEAL NO. 400 OF 2025 &amp; IA NO. 1946 OF 2025 </b><br /> <b> </b><br /> <b>In the matter of: </b><br /> <b> </b><br /> <b>PUNJAB STATE POWER CORPORATION </b><br /> <b>LIMITED </b><br /> <i>Through its Dy. Chief Engineer (PP&amp;R) </i><br /> PP&amp;R, Shed T-1A, Thermal Design Complex, <br /> Shakti Vihar, PSPCL, Patiala, Punjab – 147001. ... Appellant <br /> <br /> <b><i> </i></b> <b><i>VERSUS </i></b><br /> <b> </b><br /> <b>1. </b> <b>CENTRAL ELECTRICITY REGULATORY </b><br /> <b> </b> <b>COMMISSION </b><br /> <i> </i> <i>Through its Secretary, </i><br /> th th th<br /> 6 , 7 &amp; 8 Floors, Tower-B, <br /> World Trade Centre, Nauroji Nagar, <br /> New Delhi – 110029 ... Respondent No.1 <br /> <b> </b><br /> <b>2. </b> <b>COASTAL GUJARAT POWER LIMITED </b><br /> <b> </b> <i>Through its Managing Director </i><br /> <i> </i> C/o Tata Power Company Limited <br /> 34, Sant Tuka Ram Road, <br /> Carnac Bunder, Mumbai – 400021 … Respondent No.2 <br /> <b> </b><br /> <b>3. </b> <b>TATA POWER COMPANY LIMITED </b><br /> <i> </i> <i>Through its Managing Director, </i><br /> Bombay house 24, <br /> Homi Mody Street, Mumbai, <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>7</b> of <b>178</b> <br /> <br /><br /> <br /> Maharashtra – 400001 ... Respondent No.3 <br /> <br /> <b>4. </b> <b>POWER SYSTEM OPERATION </b><br /> <b> </b> <b>CORPORATION LIMITED </b><br /> <b> </b> <b>WESTERN REGIONAL LOAD RESPATCH </b><br /> <b> </b> <b>CENTRE </b><br /> <b> </b> <i>Through its General Manager </i><br /> st<br /> <i> </i> B-9 (1 Floor), Qutab Institutional Area, <br /> Katwaria Sarai, New Delhi – 110016 … Respondent No.4 <b> </b><br /> <br /> <b>5. </b> <b>GUJARAT URJA VIKAS NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Sardar Patel Vidyut Bhawan, <br /> Race Course Circle, Vadodara, <br /> GUJARAT – 390007 ... Respondent No.5 <b> </b><br /> <b> </b><br /> <b>6. </b> <b>MAHARASHTRA STATE ELECTRICITY </b><br /> <b> </b> <b>DISTRIBUTION COMPANY LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> th<br /> 4 Floor, Prakashgad, Plot No. G-9 <br /> Bandra (East), Mumbai – 400051 ... Respondent No.6 <br /> <b> </b><br /> <b>7. </b> <b>AJMER VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Hathi Bhata, Old Power House, <br /> Ajmer, Rajasthan – 305001 ... Respondent No.7 <br /> <br /> <b>8. </b> <b>JAIPUR VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> Vidyut Bhawan, Janpath, <br /> Jaipur, Rajasthan – 302006 ... Respondent No.8 <br /> <b> </b><br /> <b>9. </b> <b>JODHPUR VIDYUT VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Managing Director </i><br /> New Power House, Industrial Area, <br /> Jodhpur, Rajasthan – 342003. ... Respondent No.9 <br /> <br /> <b>10. </b> <b>UTTAR HARYANA BIJLI VITRAN NIGAM LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer </i><br /> Vidyut Sadan, Plot No. C-16 <br /> Sector-6, Panchkula, Haryana - 134112 … Respondent No.10 <br /> <br /> <b>11. </b> <b>DAKSHIN HARYANA BIJLI VITRAN </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>8</b> of <b>178</b> <br /> <br /><br /> <br /> <b> </b> <b>NIGAM LIMITED </b><br /> <i> </i> <i>Through its Chief Engineer </i><br /> Vidyut Nagar, Vidyut Sadan, <br /> Hissar, Haryana – 125005 … Respondent No.11 <b> </b><br /> <br /> Counsel on record for the Appellant(s) : Poorva Saigal <br /> Shubham Arya <br /> Pallavi Saigal <br /> Reeha Singh <br /> Rishabh Saxena <br /> Kaavya <br /> Shree Dwivedi <br /> <br /> Counsel on record for the Respondent(s) : Hemant Sahai <br /> Shri Venkatesh <br /> Shryeshth Ramesh Sharma <br /> Ashutosh Kumar Srivastava <br /> Kanika Chugh <br /> Suhael Buttan <br /> Shubhi Sharma <br /> Tushar Srivastava <br /> Nipun Sharma <br /> Rishabh Sehgal <br /> Shaida Das <br /> Varnika Tyagi <br /> Harshit Dhamija <br /> Shambhavi Jha <br /> Divyansh Kasana <br /> Nihal Bhardwaj <br /> Siddharth Nigotia <br /> Manu Tiwari <br /> Aashwyn Singh <br /> Abhishek Nangia <br /> Mohit Mansharamani <br /> Akash Lamba <br /> Harsh Vardhan <br /> Aniket Kanhaua <br /> Indu Uttara <br /> Ananya Dutta <br /> Priya Dhankar <br /> Vineet Kumar <br /> Surbhi Kapoor <br /> Tanishka Khatana <br /> Nikunj Bhatnagar <br /> Kunal Veer Chopra <br /> Punyam Bhutani <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>9</b> of <b>178</b> <br /> <br /><br /> <br /> Vedant Choudhary <br /> Kamya Sharma <br /> Drishti Rathi <br /> Nishant G <br /> Manav Saluja <br /> Vandana Ragwani for Res.3 <br /> <br /> Ramanuj Kumar <br /> Vishal Binod <br /> Aditya Dubey <br /> Sagnik Maitra <br /> Swadha Sharma for Res.6 <br /> <b> </b><br /> <b>J U D G M E N T </b><br /> <b> </b><br /> <b>PER HON’BLE MR. JUSTICE RAMESH RANGANATHAN, CHAIRPERSON </b><br /> <b> </b><br /> <b>I. </b> <b>INTRODUCTION: </b><br /> Appeal No. 298 of 2025 is filed by Gujarat Urja Vikas Nigam Limited <br /> aggrieved by the order passed by the CERC in Petition No. 107/MP/2023 and <br /> Petition No. 205/MP/2023 dated 19.11.2025. Petition No. 107/MP/2023 was <br /> filed before the CERC by Gujarat Urja Vikas Nigam Ltd, under Sections <br /> 79(1)(b) and (f) read with Section 63 of the Electricity Act, 2003 for <br /> adjudication of disputes, and for directions to supply electricity under the <br /> contracted capacity of 1805 MW under the Power Purchase Agreement dated <br /> 22.04.2007 between Tata Power and GUVNL; for compensation/damages for <br /> short-supply/non-supply; and for consequential reliefs, including refund. <br /> Petition No. 205/MP/2023 was filed by Tata Power Company Limited against, <br /> among others, GUVNL under Section 79(1)(f) of the Electricity Act seeking <br /> appropriate directions as against wrongful and unsustainable demand of the <br /> penalty for availability below 75% during the contract year 2022-23 by GUVNL <br /> and RUVNL, and deduction of fixed charges and DC penalty by GUVNL from <br /> monthly bills being against the provisions of PPA dated 22.04.2007. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>10</b> of <b>178</b> <br /> <br /><br /> <br /> Appeal No. 371 of 2025 is filed by Uttar Haryana Bijli Vitran Nigam <br /> Limited and Dakshin Haryana Bijli Vitran Nigam Limited, against the order <br /> passed by the CERC in Petition No. 123/MP/2022 dated 19.11.2025. Petition <br /> No. 123/MP/2022 was filed, by Uttar Haryana Bijli Vitran Nigam Limited and <br /> Dakshin Haryana Bijli Vitran Nigam Limited, under Section 79(1)(b) and (f) <br /> read with Section 63 of the Electricity Act, 2003 for adjudication and directions <br /> in regard to the Power Purchase Agreement dated 22.04.2007 with Coastal <br /> Gujarat Power Limited. <br /> Appeal No. 400 of 2025 is filed by Punjab State Power Corporation <br /> Limited aggrieved by the order passed by the CERC in Petition No. <br /> 85/MP/2022 dated 19.11.2025. Petition No.85/MP/2022 was filed before the <br /> CERC by the Punjab Power Corporation Ltd, under Section 79(1)(b) and (f) <br /> read with Section 63 of the Electricity Act, 2003, for adjudication and directions <br /> in regard to the Power Purchase Agreement dated 22.04.2007 with Coastal <br /> Gujarat Power Limited. Petition No. 123/MP/2022 was filed by Uttar Haryana <br /> Bijli Vitaran Nigam Ltd before the CERC, under Section 79(1)(b) and (f) read <br /> with Section 63 of the Electricity Act, 2003, for adjudication and directions in <br /> regard to the Power Purchase Agreement dated 22.04.2007 with Coastal <br /> Gujarat Power Limited <br /> While the relief sought by GUVNL in Appeal No. 348 of 2025 is to set <br /> aside the order passed by the CERC in Petition No. 107/MP/2023 and Petition <br /> No. 205/MP/2023 dated 19.11.2025 to the extent challenged in the said <br /> appeal, the relief sought by the Haryana Discoms in Appeal No. 371 of 2025 <br /> is to set aside the order of the CERC in Appeal No. 123/MP/2022 dated <br /> 19.11.2025 to the extent challenged in its appeal. The relief sought by the <br /> Punjab State Power Corporation Limited, in Appeal No. 400 of 2025, is to set <br /> aside the order dated 19.11.2025 passed by the CERC in Petition No. <br /> 85/MP/2022 to the extent challenged in its appeal. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>11</b> of <b>178</b> <br /> <br /><br /> <br /> The Appellant-Procurers and the Respondent Tata-Power, in their <br /> respective Petitions filed before the CERC, had sought the following reliefs: <br /> <b>i. </b> <b>Petition No. 107/MP/2023 (GUVNL)</b> <br /> <i>“(a) Declare that the Respondent No. 1, TPCL is obligated to generate and </i><br /> <i>supply electricity to GUVNL at the tariff terms and conditions in the Power </i><br /> <i>Purchase Agreement (PPA) dated 22.04.2007 and without any claim for any </i><br /> <i>increase in tariff for the coal price or otherwise. </i><br /> <i>(b) Direct the Respondent No. 1, TPCL to specifically perform the obligations </i><br /> <i>under the PPA dated 22.04.2007 and undertake the generation and supply of </i><br /> <i>electricity qua the contracted capacity of 1805 MW to GUVNL at the tariff terms </i><br /> <i>and conditions contained in the said PPA dated 22.04.2007. </i><br /> <i>(c) </i> <i>Direct TPCL to declare availability to GUVNL against the contracted </i><br /> <i>capacity of 1805 MW and Western Regional Load Dispatch Centre (WRLDC) </i><br /> <i>to schedule the requirement of GUVNLin terms of the provisions of the PPA </i><br /> <i>dated 22.04.2007 and in accordance with the provisions of Electricity Act, </i><br /> <i>2003, Indian Electricity Grid Code and other applicable provisions of law. </i><br /> <i>(d) Hold that TPCL is liable to refund the excess amount of (1) Rs. 657 Crs </i><br /> <i>from for the period from 13.10.2021 to 31.12.2021 and (2) Rs 516.62 crores for </i><br /> <i>the period from 01.01.2022 to 05.05.2022 paid by GUVNL to TPCL over and </i><br /> <i>above the tariff terms and conditions contained in the PPA. </i><br /> <i>(e) Hold that TPCL is liable to pay damages to GUVNL for the non-supply </i><br /> <i>in electricity to the extent of the contracted capacity during the periods from </i><br /> <i>(i) 1st March 2021 till 05.05.2022; and (ii) from 01.01.2023 till 12.02.2023 as </i><br /> <i>per Appendix A </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>12</b> of <b>178</b> <br /> <br /><br /> <br /> <i>(f) </i> <i>Hold that TPCL is liable to pay damages to GUVNL for non-compliance </i><br /> <i>by TPCL of the Section 11 directions issued by the Central Government for </i><br /> <i>the period from 06.05.2022 to 31.12.2022. </i><br /> <i>(g) Hold that TPCL is liable to compensate and pay exemplary damages to </i><br /> <i>GUVNL in terms of Section 73 of the Indian Contract Act, 1872 (ICA, 1872) </i><br /> <i>for not undertaking the obligation of generation and supply of electricity in </i><br /> <i>terms of Article 4 of the PPA for the period from 13.02.2023 onwards for which </i><br /> <i>GUVNL is forced to procure costlier power from alternate sources to maintain </i><br /> <i>power supply to consumers of the State, without prejudice to the right of </i><br /> <i>GUVNL under prayers mentioned hereinabove for specific performance. </i><br /> <i>(h) Direct interest on the amount payable by TPCL to GUVNL at the delayed </i><br /> <i>payment surcharge rate for the respective payments relating to the date on </i><br /> <i>which the cause of action arose and till payment and discharge. </i><br /> <i>(i) </i> <i>Award exemplary costs to GUVNL payable by TPCL for deliberate and </i><br /> <i>fundamental breach or breach of fundamental terms by TPCL of the PPA </i><br /> <i>dated 22.04.2007. </i><br /> <i>(j) </i> <i> Pass ad interim ex-parte orders in terms of prayers (a), (b) &amp; (c) </i><br /> <i>mentioned above; and </i><br /> <i>(k) </i> <i>Pass any such further order or orders as this Hon’ble Commission may </i><br /> <i>deem just and proper in the circumstances of the case.” </i><br /> <b> </b> <b>ii. </b> <b>Petition No. 85/MP/2022 (PSPCL) </b><br /> <i>“(a) Direct the Respondent No 1 and Respondent No. 2 to resume generation </i><br /> <i>and supply in so far as PSPCL is concerned to the extent of contracted capacity </i><br /> <i>of 475 MW in terms of the PPA dated 22.04.2007, maintaining the </i><br /> <i>proportionality of the total generation between the procurers. </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>13</b> of <b>178</b> <br /> <br /><br /> <br /> <i>(b) Direct WRLDC to schedule the quantum of power to the extent of 475 </i><br /> <i>MW being the contracted capacity of HPPC in terms of the PPA dated </i><br /> <i>22.04.2007. </i><br /> <i>(c) </i> <i>Pass ad Interim ex parte orders in terms of prayers (a) and (b) above </i><br /> <i>and confirm the same after notice; </i><br /> <i>(d) Direct the Respondent No. 1 and 2 to re-compensate HPPC for the </i><br /> <i>amount of Rs 289.0 crores as on 31.12.2021 as well as for the period from </i><br /> <i>01.01.2022 onwards till resumption of supply, on the same principles together </i><br /> <i>with interest till payment at the rate of 1.25% per month. </i><br /> <i>(e) Direct that the Respondent No.3 shall be jointly and severably liable to </i><br /> <i>recompense PSPCL for the amount of Rs 289.0 crores as on 31.12.2021 as </i><br /> <i>well as for the period from 01.01.2022 onwards till resumption of supply, on </i><br /> <i>the same principles together with interest till payment at the rate of 1.25% per </i><br /> <i>month. </i><br /> <i>(f) </i> <i>Pass any such further order or orders as this Commission may deem </i><br /> <i>just and proper in the circumstances of the case.”</i> <br /> <b> </b> <b> </b> <b>iii. </b> <b>Petition No. 123/MP/2022 (HPPC)</b> <i> </i><br /> <i>“(a) Direct the Respondent No 1 and Respondent No. 2 to resume generation </i><br /> <i>and supply in so far as HPPC is concerned to the extent of contracted capacity </i><br /> <i>of 380 MW in terms of the PPA dated 22.04.2007, maintaining the </i><br /> <i>proportionality of the total generation between the procurers. </i><br /> <i>(b) Direct WRLDC to schedule the quantum of power to the extent of 380 </i><br /> <i>MW being the contracted capacity of HPPC in terms of the PPA dated </i><br /> <i>22.04.2007. </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>14</b> of <b>178</b> <br /> <br /><br /> <br /> <i>(c) </i> <i>Pass ad Interim ex parte orders in terms of prayers (a) and (b) above </i><br /> <i>and confirm the same after notice; </i><br /> <i>(d) Direct the Respondent No. 1 and 2 to re-compensate HPPC for the </i><br /> <i>amount of Rs 316.42 crores as on 28.02.2022 as well as for the period from </i><br /> <i>01.03.2022 onwards till resumption of supply, on the same principles together </i><br /> <i>with interest till payment at the rate of 1.25% per month. </i><br /> <i>(e) Direct that the Respondent No.3 shall be jointly and severably liable to </i><br /> <i>re-compensate HPPC for the amount of Rs 316.42 crores as on 28.02.2022 </i><br /> <i>as well as for the period from 01.03.2022 onwards till resumption of supply, </i><br /> <i>on the same principles together with interest till payment at the rate of 1.25% </i><br /> <i>per month. </i><br /> <i>(f) </i> <i>Pass any such further order or orders as this Commission may deem </i><br /> <i>just and proper in the circumstances of the case.” </i><br /> <b> </b> <b>iv. Petition No. 205/MP/2023 (TATA POWER) </b><br /> <i>“(a) Hold and declare that Supplementary Bill dated 05.04.2023 &amp; </i><br /> <i>06.04.2023 as issued by GUVNL and RUVNL are unlawful, unsustainable and </i><br /> <i>de hors the terms of the PPA and the Directions dated 05.05.2022 issued by </i><br /> <i>MoP under Section 11 of the Electricity Act, 2003 read with subsequent </i><br /> <i>clarifications; and </i><br /> <i>(b) Set aside the Supplementary Bill dated 05.04.2023 &amp; 06.04.2023 as </i><br /> <i>issued by GUVNL and RUVNL for being unlawful, unsustainable and de hors </i><br /> <i>the terms of the PPA and the Directions dated 05.05.2022 issued by MoP </i><br /> <i>under Section 11 of the Electricity Act, 2003 read with subsequent </i><br /> <i>clarifications; and </i><br /> <i>(c) Hold and declare that the methodology to calculate the DC Penalty for </i><br /> <i>the Contract Year 2022-2023 will include the entire period of 12 months </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>15</b> of <b>178</b> <br /> <br /><br /> <br /> <i>including the period of supply of power under the Directions being in </i><br /> <i>consonance with the terms of the PPA and the Directions dated 05.05.2022 </i><br /> <i>issued by MoP under Section 11 of the Electricity Act, 2003 read with </i><br /> <i>subsequent clarifications; </i><br /> <i>(d) Hold and declare that the methodology to calculate Cumulative Capacity </i><br /> <i>for the months of January and February 2023 will include the period of supply </i><br /> <i>of power under the Directions dated 05.05.2022 issued by MoP under Section </i><br /> <i>11 of the Electricity Act, 2003 read with subsequent clarifications; </i><br /> <i>(e) Hold and declare that the deductions of INR 120.99 Cr by GUVNL (being </i><br /> <i>INR 37.84 Cr towards DC Penalty and INR 79.29 Cr towards Capacity </i><br /> <i>charges and INR 4.86 Cr towards Rebate) is unlawful, unjustifiable and </i><br /> <i>unsustainable within the terms of the PPA and applicable law; and </i><br /> <i>(f) </i> <i> Pass any such further other orders or order as this Commission may </i><br /> <i>deem just and proper in the circumstances of the case.” </i><br /> A common order was passed by the CERC in Petition Nos. <br /> 107/MP/2023, 85/MP/2022, 123/MP/2022, 56/MP/2023, 185/MP/2023 and <br /> 205/MP/2023 on 19.11.2025 (“Impugned Order”). In the said order, CERC <br /> directed that the disputes between the procurers and the generating company <br /> under the long term PPA be referred to arbitration, holding that non-tariff <br /> contractual disputes must be mandatorily resolved through arbitration. <br /> Aggrieved thereby, the present Appeals. <br /> <br /> <b>II. </b> <b>RIVAL CONTENTIONS: </b><br /> Elaborate Submissions, both oral and written, were made by Sri M.G. <br /> Ramachandran, Learned Senior Counsel appearing on behalf of the <br /> Appellant-GUVNL, and Ms. Poorva Saigal, Learned Counsel appearing on <br /> behalf of the Appellant-PSPCL and HPPC. <b> </b> Oral and written submissions <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>16</b> of <b>178</b> <br /> <br /><br /> <br /> were put forth, in the afore-said three Appeals, on behalf of the <br /> Respondent-TPCL, by Sri P. Chidambaram and Sri Sanjay Sen, Learned <br /> Senior Counsel and Mr. Sri Venkatesh, Learned Counsel. It is convenient <br /> to examine the rival contentions, put forth by Learned Senior Counsel and <br /> Learned Counsel on either side, under different heads. <b> </b><br /> <b>III. SHOULD APTEL REFRAIN FROM DECIDING ISSUES WHICH ARE </b><br /> <b>NOT NECESSARY FOR DISPOSAL OF THE APPEAL? </b><br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF RESPONDENT-TPCL: </b><br /> <b> </b><br /> It is submitted, on behalf of the Respondent-TPCL, that they seek to <br /> capture the essence of the issues arising for adjudication, while consciously <br /> avoiding academic questions that do not directly bear upon the present <br /> dispute <b>(ITO v. Murlidhar Bhagwan Das, (1964) SCC Online SC 18);</b> the <br /> Appellate Court / Tribunal must only decide issues that are necessary to <br /> dispose of the Appeal; in the present batch of appeals (arising from the Order <br /> dated 19.11.2025 of the CERC), the legal issues that arise for consideration <br /> of this Tribunal are: (a) whether the DVC APTEL judgment and the DVC SC <br /> Order constitute a binding judicial precedent governing the present case?; (b) <br /> whether the dispute in the present case qualifies as a “ <i>Tariff</i> ” or a “ <i>Non-Tariff</i> ” <br /> dispute within the meaning of clause (f) of Section 79(1) read with clauses (a) <br /> to (d) of Section 79(1) of the Electricity Act?; (c) whether invocation of Section <br /> 8(1) of the Arbitration and Conciliation Act, 1996 (“ <b>A&amp;C Act</b> ”) is a mandatory <br /> pre-condition for the CERC to exercise its power of reference to arbitration <br /> under Section 79(1)(f) of the Electricity Act?; (d) whether the reliefs sought <br /> against WRLDC by HPPC and PSPCL operate as a legal impediment to the <br /> reference of the principal/main dispute to arbitration?; and (e) whether Petition <br /> No. 205/MP/2023 filed by <b>TPCL </b> could be referred to arbitration? <i> </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>17</b> of <b>178</b> <br /> <br /><br /> <br /> <b> </b> <b>B. JUDGEMENTS RELIED UPON BY THE RESPONDENT-TPCL </b><br /> <b>UNDER THIS HEAD: </b><br /> <b>1. </b> In <b>ITO v. Murlidhar Bhagwan Das: 1964 SCC OnLine SC 18, </b> the <br /> Supreme Court observed that the decision of an Income Tax Officer given in <br /> a particular year does not operate as res judicata in the matter of assessment <br /> of the subsequent years; the jurisdiction of Tribunals in the hierarchy created <br /> by the Income-Tax Act is no higher than that of the Income Tax Officer; it is <br /> also confined to the year of assessment; Section 31 prescribes the mode of <br /> disposal by an Assistant Appellate Commissioner of an appeal preferred to <br /> him : the appeal before him is certainly confined to an the assessment year; <br /> after hearing the appeal, he can either confirm, reduce, enhance or annul the <br /> assessment; he can set aside the assessment and direct the Income Tax <br /> Officer to make a fresh assessment; the various sub-sections of that section <br /> describe in detail the orders or directions that can be made or issued by him <br /> in respect of various matters; but no power is conferred on him to make an <br /> order or issue directions in respect of an assessment of a year which was not <br /> the subject-matter of the appeal; it may, therefore, be held on a construction <br /> of the provisions of Section 31, that the jurisdiction of the Appellate Assistant <br /> Commissioner is strictly confined to the assessment orders of a particular year <br /> under appeal; Section 33 inter alia, deals with an appeal to the Tribunal <br /> against the order of the Appellate Assistant Commissioner under Section 31; <br /> and Section 33-B confers power of revision on the Commissioner against an <br /> order of the Income Tax Officer; the jurisdiction of the Appellate Tribunal or <br /> the Revisional Tribunal, as the provisions indicate, is confined only to the <br /> subject-matter which is under appeal or revision; the jurisdition of the High <br /> Court or the Supreme Court under Section 66 or Section 66-B, as the case <br /> may be, is far more limited and it is confined only to the questions referred to <br /> them; obviously the questions referred by the Tribunal cannot exceed its <br /> jurisdiction; and it is, therefore, manifest that assessment or reassessment <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>18</b> of <b>178</b> <br /> <br /><br /> <br /> made under the said sections or pursuant to the orders or directions made <br /> thereunder must necessarily relate to the assessment of the year under <br /> review, revision or appeal, as the case may be. <br /> <b> </b> <b>C. ANALYSIS: </b><br /> We have no quarrel with the submission, urged on behalf of the <br /> Respondent-TPCL, that this Tribunal, while adjudicating an appeal preferred <br /> against the order of the CERC, should confine its examination only to the <br /> issues raised before the Commission, and should not be swayed by academic <br /> aspects which do not relate either to the issues involved or the contentions <br /> raised in this appeal by Learned Senior Counsel/Learned Counsel on either <br /> side. Suffice it to make it clear that we shall confine our examination only to <br /> the issues involved, consider only the contentions raised on behalf of the <br /> parties to these appeals, and refrain from deciding issues unconnected <br /> thereto. <br /> <b>IV. </b> <b>BINDING NATURE OF THE DVC JUDGEMENT AND THE EXTENT </b><br /> <b>OF ITS APPLICATION TO THE PRESENT CASE? </b><br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF THE APPELLANT </b><br /> <b>PROCURERS: </b><br /> It is contended, on behalf of the Appellant-Procurers, that the <b><i>DVC</i></b> <i> </i><br /> <i>Decision</i> of this Tribunal, as also the <b><i>MB Power </i></b> <i>Decision </i> of the Delhi High <br /> Court- 2023 SCC OnLine Del 149, are distinguishable on facts, and do not <br /> constitute a binding precedent for the present case for mandatory reference <br /> to arbitration; the <b><i>DVC </i></b> <i>Decision</i> is based on foreclosure and valid termination, <br /> and the <b><i>MB Power</i></b> <i>Decision </i> is based on non-satisfaction of conditions and <br /> termination; both these cases did not involve generation and supply of power <br /> under a valid PPA; the <b> </b> <b><i>DVC </i></b> <i>decision, </i> which was based on application of <br /> Section 8 of the Arbitration and Conciliation Act, 1996 (the “1996 Act”), does <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>19</b> of <b>178</b> <br /> <br /><br /> <br /> not hold that every breach or termination is ipso facto a contractual issue <br /> falling outside the CERC’s adjudicatory jurisdiction; Para 25 of the <b><i>DVC </i></b><br /> <i>Decision</i> qualifies it to be as ‘ <i>other than those having impact on tariff</i> ’’, and <br /> Para 22 as “other than Regulatory functions”; the <b> </b> <b><i>DVC</i></b> <i> Decision</i> in Para 25 <br /> also notes that the impact on tariff can be direct or indirect; in the Impugned <br /> Order, the <b> </b> <b><i>DVC </i></b> <i>decision</i> has been misconstrued and misapplied; the <br /> purported commonality in TPCL’s Reply with the <b> DVC Case </b> shows complete <br /> difference; and the following decisions on the scope of the term ‘tariff’ are <br /> relevant <b>(i) </b> <b><i>BSES v. DERC</i></b> <b> </b> (Judgement of APTEL in Appeal No. 94/95 of 2012 <br /> dated 04.09.2012); (ii) <b><i>SECI v. KSERC</i></b> <b> </b> (Judgement of APTEL in Appeal No. <br /> 414 of 2022 dated 13.08.2024); and (iii) <b><i>Transmission Corporation of A.P </i></b><br /> <b><i>v. Sai Renewable</i></b> <b>: (2011) 11 SCC 34.</b> <br /> It is submitted, on behalf of the Appellants-PSPCL and HPPC, that the <br /> issues involved in the PSPCL/HPPC Petitions are regulatory in nature dealing <br /> with enforcement of the Grid Code, Scheduling and Despatch, and is not <br /> arbitrable even in terms of the <b>DVC </b> case. <br /> <br /> <b> </b> <b>B. SUBMISSIONS URGED ON BEHALF OF RESPONDENT-TPCL: </b><br /> <b> </b><br /> On whether the <i> </i> <b><i>DVC APTEL Judgement </i></b> <i>as affirmed by the Supreme </i><br /> <i>Court is a binding judicial precedent, </i> it is submitted, on behalf of the <br /> Respondent-TPCL, that the DVC case and the present case demonstrate <br /> that both cases arise from alleged non-performance (in case of TPCL) / <br /> termination (in case of DVC); in short, the cases arise out of breach of <br /> contract <b>; </b> further, both the PPAs contain mutually agreed arbitration clauses; <br /> the Arbitration clause in the present case even distinguishes between a <i>Tariff </i><br /> and a <i>Non-tariff </i> dispute <i>(Ref: Chart @ Pg. 13 of the Reply &amp; Art. 17.3.2 of </i><br /> <i>PPA); </i> in the DVC case, the PPAs were terminated by MPPMCL; in the present <br /> case, the Procurers are seeking specific performance of the PPA, <br /> damages/recovery for the period of non-supply, and directions to WRLDC to <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>20</b> of <b>178</b> <br /> <br /><br /> <br /> ensure proportionate supply; importantly, even though CERC had passed final <br /> orders in the <b>DVC </b> matter, APTEL, and later the Supreme Court, upheld the <br /> primacy of arbitration and directed reference to arbitration; the DVC SC Order <br /> affirmed the APTEL order on merits; it has a binding effect as a precedent on <br /> the present dispute (including under Article 141 of the Constitution); and this <br /> is a case where the CERC inherently lacks jurisdiction ( <b><i>Jagmittar Sain </i></b><br /> <b><i>Bhagat v. Director, Health Services, Haryana: (2013) 10 SCC 136</i></b> <i>, and </i><br /> <b><i>Isabella Johnson v. MA Susai (Dead) by Lrs.’(1991) 1 SCC 494</i></b> <i>). </i><br /> <b> </b> <b>C. JUDGEMENTS </b> <b>RELIED </b> <b>UPON </b> <b>BY </b> <b>THE APPELLANTS-</b><br /> <b>PROCURERS UNDER THIS HEAD: </b><br /> <b>1. </b> In <b>Madhya Pradesh Power Management Company Ltd. V. Damodar </b><br /> <b>Valley Corporation &amp; Ors. (Judgement of APTEL in Appeal 309 of 2019 </b><br /> <b>dated 28.08.2024), </b> both the subject PPAs contained a fore-closure clause <br /> entitling either of the parties to fore-close the PPA by giving one year prior <br /> notice to the other party. <br /> It is in this context that this Tribunal observed that the concept of <br /> arbitration is not alien to disputes arising under various provisions of Electricity <br /> Act, 2003 and in appropriate cases, where a valid arbitration agreement exists <br /> between the parties and the dispute does not concern the regulatory functions <br /> of the Commission, the Commission would be not only justified but also bound <br /> to refer the dispute for arbitration; in the instant case, undisputedly both the <br /> th<br /> PPAs dated 3rd March, 2006 and 14 May, 2007 contain the arbitration clause; <br /> the PPAs also provide for fore-closure by any of the parties by giving one year <br /> prior notice to the other party; in terms of the fore-closure clauses contained in <br /> st<br /> the PPAs, the Appellant had issued notices notifying the 1 Respondent about <br /> st<br /> fore-closure of the PPAs; the notices were duly received by the 1 Respondent, <br /> and vide their letters, they had rejected termination of the PPAs by the Appellant. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>21</b> of <b>178</b> <br /> <br /><br /> <br /> This Tribunal further observed that Section 79(1) of the Electricity Act <br /> empowers the Commission to adjudicate upon the disputes relating to regulation <br /> of tariff for the generating companies as well as inter-state transmission of <br /> Electricity and to determine tariff inter-state transmission of electricity as <br /> provided under clause (a) to (d) therein; they wondered how the dispute relating <br /> to termination of PPAs would be regarded as a dispute relating to tariff or <br /> regulation of tariff of the generating companies, as held by the Commission in <br /> the impugned order; to understand this aspect, it was necessary to determine <br /> what constitutes tariff and non-tariff disputes; in their considered opinion, all <br /> matters which would have a bearing upon the tariff for a generating company <br /> would constitute “tariff disputes”, namely disputes related to Change in Law, <br /> delayed completion of projects, invocation of Force Majeure events etc; such <br /> matters impact the tariff for a generating company directly and, therefore, fall <br /> solely within the jurisdiction of the Central Commission under Section 79(1) of <br /> the Electricity Act, 2003; however, disputes related to termination or breach of <br /> contract, which do not impact tariff either directly or indirectly, can be <br /> considered as non-tariff related disputes referable to arbitration. <b> </b><br /> <b>2. </b> In <b>MB Power (M.P.) Ltd. v. SBI, 2023 SCC OnLine Del 149, </b> the plaintiff <br /> had contended that, in view of the termination, the PPA never commenced as <br /> the appointed date had not been fixed; and this position was disputed by the <br /> defendant Nos. 2 and 3 who had contended that the PPA had not come to an <br /> end, the dispute related to Section 79(1)(b) as it involved a generating <br /> company (plaintiff) having a composite scheme for generation and sale of <br /> electricity in more than one State, and as such, the same needed to be <br /> adjudicated in terms of Section 79(1)(f) by the CERC. <br /> It is in this context that the Delhi High Court held that, in the case on <br /> hand, the agreement for procurement of electricity between the plaintiff and <br /> the applicant which was a trading company, stood terminated, and in that <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>22</b> of <b>178</b> <br /> <br /><br /> <br /> sense, there was no agreement or a composite scheme governing the plaintiff <br /> and defendant No. 2 for generation and sale of electricity; the submission of <br /> the plaintiff that the agreement had not commenced; this plea was not <br /> disputed; in the absence of any agreement/scheme governing the plaintiff and <br /> the defendant No. 2/applicant, there existed no dispute with respect to tariff to <br /> be adjudicated by the CERC; if the PPA has not commenced, then Section <br /> 79(1)(b) is not attracted; this has been held by the Division Bench of the Delhi <br /> High Court in <b>Global Energy Pvt. Ltd</b> ; the submission that, since the <br /> composite scheme for generation and sale arises out of the PPAs entered into <br /> by the plaintiff, the disputes forming the subject matter of the present suit <br /> arising out of the PPA is clearly in regard to matters connected with generating <br /> companies having a composite scheme for generation and sale of electricity <br /> in more than one State, as provided in Section 79(1)(b), and as such needs <br /> to be adjudicated by the CERC under section 79(1)(f) was liable to be <br /> rejected; for the Court to accept this submission, it must be apparent that the <br /> dispute between the parties essentially relates to tariff of the generating <br /> company, i.e., the plaintiff; it was contended that the present issue has had an <br /> impact on tariff, as the actions of the plaintiff have prevented the applicant <br /> from supplying power to defendant No. 3 under the PSA, and as such <br /> defendant No. 3 has been forced to secure power from the open market at <br /> rates much higher than the tariff determined; this contention was wholly <br /> irrelevant and could not be taken into consideration while deciding this <br /> application filed under Order VII Rule 11 of the CPC, as the same has been <br /> raised in the written statement of defendant No. 3 and does not flow from the <br /> plaint or the documents of the plaintiff; even otherwise, since the PPA has not <br /> commenced, the PSA cannot be put in operation and as such no issue relating <br /> to tariff arises in the Suit for determination by CERC. <br /> <b>3. </b> In <b>BSES Rajdhani Power Limited v. Delhi Electricity Regulatory </b><br /> <b>Commission, 2012 SCC OnLine APTEL 150, </b> this Tribunal held that the term <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>23</b> of <b>178</b> <br /> <br /><br /> <br /> ‘Regulate’, used in Section 79(1)(f) of the Electricity Act, has a wider scope <br /> and implication not merely confined to determination of tariff; Section 61 and <br /> 79 not only deal with the tariff but also deal with the terms and conditions of <br /> tariff; the terms and conditions necessarily include all terms related to tariff; <br /> determination of tariff and its method of recovery will also depend on the terms <br /> and conditions of tariff; for example, interest on working capital which is a <br /> component of tariff will depend on the time allowed for billing and payment of <br /> bills; this will also have an impact on terms and conditions for rebate and late <br /> payment surcharge; similarly, billing and payment of capacity charge will <br /> depend on the availability of the power station; and, therefore, the scheduling <br /> has to be specified in the terms and conditions of tariff. <br /> This Tribunal further held that the billing, payment, consequences of <br /> early payment by way of grant of rebate, consequences of delay in payment <br /> by way of surcharge, termination or suspension of the supply, payment <br /> security mechanism such as opening of the Letter of Credit, escrow <br /> arrangement, etc, are nothing but terms and conditions of supply; terms and <br /> conditions of tariff would necessarily include all the terms related to tariff; <br /> accordingly, the billing, the payment, the consequences of delay in the <br /> payment by way of surcharge, rebate for payment within a specified period, <br /> termination or suspension of supply, payment security mechanism etc., are <br /> included in the terms and conditions of supply; Section 79(1)(f) of the Act, <br /> 2003 provides for the adjudication of the disputes involving the Generating <br /> Company in the matters connected with clauses 1 (a) to 1 (d) of Section 79; <br /> anything involving Generating Station of NTPC as to the generation and <br /> supply of electricity will be a matter governed by Section 79(1)(f) of the Act; <br /> the Central Commission has the requisite powers u/s 79 (1) (f) of the Act, 2003 <br /> to deal with the following aspects: (a) any dispute which may arise between <br /> the NTPC and the beneficiaries in regard to generation and sale of electricity <br /> by NTPC to beneficiaries; (b) any claim of NTPC for recovering the money <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>24</b> of <b>178</b> <br /> <br /><br /> <br /> from the beneficiaries for supply of electricity or for maintenance of payment <br /> security mechanism; and (c) the Central Commission by way of appropriate <br /> Regulations can make any modifications with regard to the terms of the Power <br /> Purchase Agreement entered into between the parties. <br /> <b>4. </b> In <b>Solar Energy Corpn. of India Ltd. v. Kerala State ERC, 2024 SCC </b><br /> <b>OnLine APTEL 91, </b> this Tribunal observed that Section 79(1)(f) of the <br /> Electricity Act empowered the Central Commission to adjudicate upon <br /> disputes involving generating companies or transmission licensees in the <br /> mattes connected with clauses (a) to (d) of the said Section; therefore, any <br /> dispute involving a generating station or a transmission licensee covered <br /> under Clauses (a), (b) &amp; (c) will fall within the jurisdiction of the Central <br /> Commission; Clauses (a) (b) &amp; (c) of Section 79(1) of the Act begin with the <br /> expression “to regulate”; it is only the clause (d) which begins with the term <br /> “to determine tariff”; “Regulation of Tariff” is totally distinct from “Determination <br /> of tariff”; and Regulation of Tariff includes all the necessary terms and <br /> conditions relating to the tariff such as billing, consequences of delay in <br /> payment of electricity charges, rebate, termination, suspension of electricity <br /> supply, payment of security, etc. <br /> <b>5. </b> In <b>A.P. TRANSCO v. Sai Renewable Power (P) Ltd., (2011) 11 SCC </b><br /> <b>34, </b> the Supreme Court held that, under the Electricity Act, 2003, “tariff” has <br /> neither been defined nor explained in any of its provisions; of the Act; in the <br /> absence of any specific definition in any of these Acts, the Court would have <br /> to depend upon the meaning attached to these expressions under the general <br /> law or in common parlance; the expression “tariff” has been explained in <i>Law </i><br /> <i>Lexicon With Legal Maxims, Latin Terms And Words &amp; Phrases</i> (2nd Edn., <br /> 1997) as <i> “determination, ascertainment, a table of rates of export and import </i><br /> <i>duties, in which sense the word has been adopted in English and other </i><br /> <i>European languages and as defined by the law dictionaries the word ‘tariff’ is </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>25</b> of <b>178</b> <br /> <br /><br /> <br /> <i>a cartel of commerce; a book of rates; a table or catalogue, drawn usually in </i><br /> <i>alphabetical order, containing the names of several kind of merchandise, with </i><br /> <i>the duties or customs to be paid for the same as settled by the authority or </i><br /> <i>agreed between the several princes and States that hold commerce </i><br /> <i>together.”</i> ; it has also been explained as a schedule, system, or scheme of <br /> duties imposed by the Government of a country upon goods imported or <br /> exported; published volume of rate schedules and general terms and <br /> conditions under which a product or service will be supplied; a document <br /> approved by the responsible regulatory agency listing the terms and <br /> conditions including a schedule of prices, under which utility services will be <br /> provided; purchase price ultimately would form part of the tariff, as tariff <br /> relatable to a licensee or a consumer would have essentially taken into <br /> account, the purchase price; the purchase price may not include tariff, but <br /> tariff would always or is expected to include purchase price; Sections 61 and <br /> 62 read with Sections 86(1)( <i>a</i> ) and ( <i>b</i> ) deal with fixation of tariffs in relation to <br /> production, distribution and sale of generated power to the end consumer; <br /> these provisions clearly demonstrate that the Regulatory Commission is <br /> vested with the function for determining the tariff for generation, supply, <br /> transmission and billing of electricity, etc., as well as regulation of electricity <br /> purchase and procurement process of distribution licensees, including price <br /> at which electricity shall be procured from the generating companies; it cannot <br /> be said that procurement of power from the generating companies will not fall <br /> within the ambit of powers and functions of the Regulatory Commission. <i> </i><br /> <b> </b> <b>D. JUDGEMENTS RELIED UPON BY THE RESPONDENT-TPCL </b><br /> <b>UNDER THIS HEAD: </b><br /> <b>1. </b> In <b>Jagmittar Sain Bhagat v. Health Services, Haryana, (2013) 10 </b><br /> <b>SCC 136, </b> the Supreme Court observed that it was a settled legal proposition <br /> that conferment of jurisdiction is a legislative function and it can neither be <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>26</b> of <b>178</b> <br /> <br /><br /> <br /> conferred with the consent of the parties nor by a superior court; if the court <br /> passes a decree, having no jurisdiction over the matter, it would amount to a <br /> nullity as the matter goes to the root of the cause; such an issue can be raised <br /> at any stage of the proceedings; the finding of a court or tribunal becomes <br /> irrelevant and unenforceable/inexecutable once the forum is found to have no <br /> jurisdiction; similarly, if a court/tribunal inherently lacks jurisdiction, <br /> acquiescence of parties equally should not be permitted to perpetrate and <br /> perpetuate defeating of the legislative animation; the court cannot derive <br /> jurisdiction apart from the statute; and in such eventuality the doctrine of <br /> waiver also does not apply. (Vide <b>United </b> <b>Commercial </b> <b>Bank </b><br /> <b>Ltd. v. Workmen: AIR 1951 SC 230, Nai Bahu v. Lala Ramnarayan: (1978) </b><br /> <b>1 SCC 58, Natraj Studios (P) Ltd. v. Navrang Studios: (1981) 1 SCC 523 </b> <br /> and <b>Kondiba Dagadu Kadam v. Savitribai Sopan Gujar: (1999) 3 SCC </b><br /> <b>722</b> ) <br /> <b>2. </b> In <b>Isabella Johnson (Smt) v. M.A. Susai, (1991) 1 SCC 494, </b> the <br /> Supreme Court followed its earlier decision in <b>Mathura Prasad Bajoo </b><br /> <b>Jaiswal v. Dossibai N.B. Jeejeebhoy [(1970) 1 SCC 613, </b> wherein a bench <br /> comprising three Judges of the Supreme Court had taken the view that a <br /> decision on the question of jurisdiction of the Court or a pure question of law <br /> unrelated to the right of the parties to a previous suit, was not res judicata in <br /> subsequent suit; in <b>Mathura Prasad Bajoo Jaiswal</b> , the Supreme Court had <br /> observed that, in determining the application of the rule of res judicata, the <br /> court is not concerned with the correctness or otherwise of the earlier <br /> judgment; the matter in issue, if it is one purely of fact, decided in the earlier <br /> proceeding by a competent court must in a subsequent litigation between the <br /> same parties be regarded as finally decided and cannot be reopened; a mixed <br /> question of law and fact determined in the earlier proceeding between the <br /> same parties may not, for the same reason, be questioned in a subsequent <br /> proceeding between the same parties; but, where the decision is on a <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>27</b> of <b>178</b> <br /> <br /><br /> <br /> question of law, i.e. the interpretation of a statute, it will be res judicata in a <br /> subsequent proceeding between the same parties where the cause of action <br /> is the same, for the expression “the matter in issue” in Section 11, Code of <br /> Civil Procedure means the right litigated between the parties, i.e., the facts on <br /> which the right is claimed or denied and the law applicable to the <br /> determination of that issue; where, however, the question was one purely of <br /> law and it related to the jurisdiction of the court, or a decision of the court <br /> sanctioning something which is illegal, by resort to the rule of res judicata, a <br /> party affected by the decision will not be precluded from challenging the <br /> validity of that order under the rule of res judicata, for a rule of procedure <br /> cannot supersede the law of the land. <b> </b><br /> <b> </b><br /> <b> </b> <b>E. ANALYSIS: </b><br /> <b> </b><br /> In the impugned order, passed in Petition No. 107/MP/2023 and batch <br /> dated 19.11.2025, the CERC, after noting that both sides had made elaborate <br /> submissions on the precedential values of the <b>DVC </b> Judgment, and on <br /> whether the <b>SC Order</b> (in the appeal preferred against the <b>DVC </b> Judgment) <br /> amounted to a declaration of law / a binding law of precedence in terms of <br /> Article 141 of the Constitution of India, held that it did do not find it necessary <br /> to go into the said question for the reason that, even as per TPCL, the <br /> principles of law shall be those as decided in the <b>DVC </b> Judgment, even if the <br /> doctrine of merger applied; this would inevitably require them to examine the <br /> ratio laid down and/or the principles of law decided in the <b>DVC</b> Judgment, and <br /> its applicability to the present batch of Petitions; if the submissions of <br /> Procurers were accepted and it was held that the SC Order, which declined <br /> to interfere with the <b>DVC </b> Judgment in view of the difference of language in <br /> Section 79(1)(f) from the Section 86(1)(f) of the Act, could not be held as a <br /> declaration of law under Article 141 of the Constitution, the <b>DVC </b> Judgment, <br /> having been passed by APTEL and affirmed by the Supreme Court, would be <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>28</b> of <b>178</b> <br /> <br /><br /> <br /> a binding judicial precedent for the Commission; and this would again require <br /> them to examine the ratio laid down and/or principles laid down in the <b>DVC</b> <br /> Judgment, and whether it applied to the facts and circumstances of the <br /> present batch of Petitions. <b> </b><br /> <b> </b> Against the order passed by this Tribunal in <b>Madhya Pradesh Power </b><br /> <b>Management Company Limited vs. Damodar Valley Corporation </b><br /> <b>(judgment in Appeal No. 309 of 2019 dated 28.08.2024)</b> (the “ <b>DVC</b> <br /> judgment” for short), the Damodar Valley Corporation (“DVC” for short) filed <br /> Civil Appeal No. 10480 of 2024 and the Supreme Court, in its order dated <br /> 23.09.2024, observed that they did not find any good ground and reason to <br /> interfere with the judgment of this Tribunal in view of the difference of <br /> language in Section 79(1)(f) of the Electricity Act from Section 86(1)(f) of the <br /> said Act; the power of the Central Electricity Regulatory Commission under <br /> Section 79(1)(f) was different from the discretion exercised by the State <br /> Electricity Regulatory Commissions under Section 86(1)(f) of the 2003 Act; <br /> and, accordingly, the appeal was dismissed. <b> </b><br /> It is unnecessary for us to refer to the other part of the afore-said order <br /> of the Supreme Court whereby an arbitrator was appointed in view of the <br /> dismissal of the Civil Appeal and with the consent of the Counsel for the <br /> parties who requested the Court to nominate an arbitrator. <br /> As detailed hereinabove, all that the Supreme Court has observed, in <br /> the first paragraph of its order, is that the language of Section 79(1)(f) is <br /> different from Section 86(1)(f) of the Electricity Act. The difference in language <br /> is only in the first limb of both these provisions. While the first limb of Section <br /> 79(1)(f) relates to “ <i>adjudicate upon disputes involving generating companies </i><br /> <i>or transmission licensee in regard to matters connected with Clauses (a) to </i><br /> <i>(d) </i> [i.e. Clauses (a) to (d) of Section 79(1)]”, the function of the State <br /> Commission under the first limb of Section 86(1)(f) is “to adjudicate upon the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>29</b> of <b>178</b> <br /> <br /><br /> <br /> disputes between the licensees, and generating companies.” The term <br /> “licensee” is defined in Section 2(39) of the Electricity Act to mean a person <br /> who has been granted a licence under Section 14. Section 14, in turn, <br /> provides for the grant of licence to any person (a) to transmit electricity as a <br /> transmission licensee; or (b) to distribute electricity as a distribution licensee; <br /> or (c) to undertake trading in electricity as an electricity trader. Therefore, a <br /> licensee under Section 86(1)(f) can either be a transmission licensee or a <br /> distribution licensee or a trading licensee. Disputes with any of the aforesaid <br /> licensees on the one hand, and a generating company on the other, would fall <br /> within the adjudicatory jurisdiction of the State Commissions under Section <br /> 86(1)(f) of the Electricity Act. <br /> What is, however, common both to Section 79(1)(f) and Section 86(1)(f) <br /> is the second limb which is <i>“to refer any dispute for arbitration.” </i> What was <br /> referred by the Supreme Court, in its order in Civil Appeal No. 10480 of 2024 <br /> dated 23.09.2024, is evidently only the first limb of both the afore-said <br /> provisions and not the second limb. In any event, as has been pointed out by <br /> the CERC itself in the impugned order, since the Supreme Court has <br /> expressed its disinclination to interfere with the <b>DVC </b> judgment of this Tribunal, <br /> it is the law declared the <b> DVC</b> judgment which would govern. <br /> It must be borne in mind that a judgment is only an authority for what it <br /> actually decides. What is of the essence in a decision is its ratio, and not every <br /> observation found therein nor what logically follows from the various <br /> observations made in the judgment. <b>(State of Orissa v. Sudhansu Sekhar </b><br /> <b>Misra: AIR 1968 SC 647; Quinn v. Leathem, [1901] A.C</b> . <b>495).</b> As a case is <br /> only an authority for what it actually decides, it cannot be quoted for a <br /> proposition that may seem to follow logically from it <b>. (Quinn v. Leathem </b><br /> <b>[1901] A.C. 495; State of Orissa v. Sudhansu Sekhar Misra, (1968) 2 SCR </b><br /> <b>154).</b> Judgments ought not to be read as statutes <b>. (Sri Konaseema </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>30</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Cooperative Central Bank Ltd. v. N. Seetharama Raju, AIR 1990 AP 171; </b><br /> <b>Kanwar Amninder Singh v. High Court of Uttarakhand, 2018 SCC OnLine </b><br /> <b>UTT 1026).</b> <br /> Judgments of Court should be read in the context of the questions which <br /> arose for consideration in the case in which the judgment was delivered. <br /> <b>(Director of Settlements, A.P. v. M.R. Apparao, (2002) 4 SCC 638). </b><br /> Quotability as ‘law’ applies to the principle of a case, its ratio decidendi. <br /> Statements which are not part of the ratio decidendi are not authoritative <b>. </b><br /> <b>(Gurnam Kaur, (1989) 1 SCC 101).</b> It is not everything said by a Judge, while <br /> giving judgment, that constitutes a precedent. ( <b>Union of India v. Dhanwanti </b><br /> <b>Devi, (1996) 6 SCC 44; State of Orissa v. Mohd. Illiyas (2006) 1 SCC 275; </b><br /> <b>ICICI Bank v. Municipal Corpn. of Greater Bombay (2005) 6 SCC 404; </b><br /> <b>State of Orissa v. Sudhansu Sekhar Misra 1967 SCC OnLine SC 17; </b><br /> <b>Quinn v. Leathem, [1901] A.C. 495; Mandava Rama Krishna v. State of </b><br /> <b>Andhra Pradesh, 2014 SCC OnLine AP 294). </b> The ratio of any decision must <br /> be understood in the background of the facts of that case. A little difference in <br /> facts or additional facts may make a lot of difference in the precedential value <br /> of a decision. The ratio of one case cannot be mechanically applied to another <br /> case without having regard to the fact situation and circumstances in two <br /> cases. ( <b>PTC India Ltd v Jaypee Karcham Hydro Corporation Ltd: 2010 </b><br /> <b>SCC Online Del 2735). </b> <b> </b><br /> Court should not place reliance on decisions without discussing as to <br /> how the factual situation fits in with the fact situation of the decision on which <br /> reliance is placed. Observations of Courts are neither to be read as Euclid&#x27;s <br /> theorems nor as provisions of a statute, and that too taken out of their context. <br /> The observations must be read in the context in which they appear to have <br /> been stated. Judgments of Courts are not to be construed as statutes. To <br /> interpret words, phrases and provisions of a statute, it may become necessary <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>31</b> of <b>178</b> <br /> <br /><br /> <br /> for judges to embark into lengthy discussions but the discussion is meant to <br /> explain and not to define. Judges interpret statutes, they do not interpret <br /> judgments. They interpret words of statutes; their words are not to be <br /> interpreted as statutes. ( <b>Bharat Petroleum Corporation Ltd and Anr. v. N.R. </b><br /> <b>Vairamani and Anr: AIR 2004 SC 778; PTC India Ltd v Jaypee Karcham </b><br /> <b>Hydro Corporation Ltd: 2010 SCC Online Del 2735(Del HC DB)). </b> <br /> There is always a peril in treating the words of judgment as though they <br /> are words in a legislative enactment and it is to be remembered that judicial <br /> utterances are made in setting of the facts of a particular case. Circumstantial <br /> flexibility, one additional or different fact may make a world of difference <br /> between conclusion in two cases. ( <b>P.S. Rao v. State, JT 2002 (3) SC 1</b> ; <b>PTC </b><br /> <b>India Ltd v Jaypee Karcham Hydro Corporation Ltd: 2010 SCC Online </b><br /> <b>Del 2735 (Del HC DB)). </b> Consequently, it is the ratio of the <b>DVC</b> judgement, <br /> and not a stray observation therein, which would constitute a binding <br /> precedent. <br /> <b>V. </b> <b>CAN THE CERC REFER A DISPUTE TO ARBITRATION WHICH IT </b><br /> <b>LACKS JURISDICTION TO ADJUDICATE? </b><br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF THE APPELLANT </b><br /> <b>PROCURERS: </b><br /> It is contended, on behalf of the Appellant-Procurers, that Section <br /> 79(1)(a), (b) and (f) of the Electricity Act, 2003 apply if (i) the matter is related <br /> to electricity; (ii) the matter involves a generating company; and (iii) it is <i>in </i><br /> <i>regard to</i> <i>matters connected with ‘regulation of tariff’; </i> if these tests are <br /> satisfied, there is no lack of jurisdiction in the CERC under either part of <br /> Section 79(1)(f); the second part is not wider in scope to bring within its ambit <br /> matters other than those which CERC is empowered to adjudicate under the <br /> first part; the term ‘any dispute’, in the second part, refers to any of the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>32</b> of <b>178</b> <br /> <br /><br /> <br /> disputes which fall within the first part, and not disputes wholly unconnected <br /> thereto; reading of the provision in any other manner will result in adding <br /> words to Section 79(1)(f) which is an unambiguous provision; the <b><i>DVC</i></b> <b> </b><br /> decision does not proceed on the basis that the CERC lacks jurisdiction, and <br /> there is no whisper in this regard in the said decision; the submission of lack <br /> of jurisdiction, if accepted, would require the CERC to outrightly reject the <br /> Petition (and the CERC cannot even refer the matter for arbitration); the law <br /> laid down by the Supreme Court, in <b><i>GUVNL v. Essar</i></b> <b>, (2008) 4 SCC 755</b> , still <br /> constitutes a binding precedent, including on non-application of a bilateral <br /> arbitration agreement and Section 11 of the Arbitration &amp; Conciliation Act, <br /> both with reference to Section 86 and Section 79 (Paras 59-60 of <b><i>GUVNL</i></b> ); <br /> this is also recognised in (i) <b><i>Renew Decision</i></b> <b>:</b> 2025:DHC:9650; (ii) <b><i>Coastal </i></b><br /> <b><i>Andhra Decision </i></b> : 2012 SCC OnLine Del 3352; and (iii) <b><i>PTC DHC: </i></b> <b>(2012) </b><br /> <b>130 DRJ 351</b> ; the Impugned Order was passed by the CERC without <br /> considering the binding ratio of <b><i>GUVNL v. Essar</i></b> <b>; </b> and, in any event, reference <br /> to CERC in Para 59 of the <b><i>GUVNL</i></b> <i> </i> judgement would be binding if not as a <br /> ratio, but at the least as an obiter. <b> </b> <br /> <b> </b> <b>B. SUBMISSIONS URGED ON BEHALF OF RESPONDENT-TPCL: </b><br /> It is submitted, on behalf of the Respondent-TPCL, that they are <br /> complying with the terms of the PPA which provides for payment of penalty in <br /> case of non-supply of power ( <i>Ref: Article 1.2.5); </i> there is no <i>‘dispute’ </i> about the <br /> penalty which has been paid and is payable; the present dispute is a “Non-<br /> Tariff” dispute; once the dispute is classified as a ‘ <i>Non-Tariff’ </i> dispute under <br /> Section 79(1)(f), the CERC’s adjudicatory jurisdiction stands ousted, and the <br /> CERC is statutorily bound to refer the matter to arbitration; the <b>DVC APTEL </b><br /> <b>Judgment, </b> in para 21, holds that Section 79(1)(f) provides discretion to the <br /> CERC to “ <i>refer any such disputes for Arbitration</i> ”; in this context, the phrase <br /> “ <i>refer any such disputes for Arbitration</i> ” finds its meaning and scope in the <br /> following paras (a) Para 22 of the DVC APTEL Judgement signifies that: (i) <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>33</b> of <b>178</b> <br /> <br /><br /> <br /> concept of arbitration is not alien to the Electricity Act; (ii) appropriateness has <br /> to be determined based on a valid Arbitration Agreement, and such dispute <br /> should not concern “regulatory functions” of the Commission; (iii) after such <br /> determination is done, CERC “would be not only justified but also bound to <br /> refer the dispute for arbitration”; (b) Para 25 of the DVC APTEL Judgement <br /> signifies that: (i) termination of a PPA cannot qualify as a “ <i>Tariff</i> ” dispute; (ii) <br /> the distinction between “ <i>Tariff</i> ” dispute and “ <i>Non-Tariff</i> ” dispute; (iii) all matters <br /> which would have a bearing upon tariff for a generating company will constitute <br /> “Tariff” dispute namely “disputes relating to change in law, delayed completion <br /> of projects, invocation of force majeure events etc. ...”; (iv) dispute <i>“related to </i><br /> <i>termination or breach of contract which do not impact tariff either directly or </i><br /> <i>indirectly can be considered as non-tariff related disputes referable to </i><br /> <i>Arbitration.”;</i> <b><i> </i></b> (c) Para 30 and 36 of the DVC APTEL Judgement signifies that: <br /> (i) besides Section 8, Section 79(1)(f) ‘ <i>also empowers’ </i> the CERC ‘ <i>to refer any </i><br /> <i>dispute for arbitration</i> ’ <b> </b> involving generating companies or transmission <br /> licensees; (ii) that <i>Non-tariff </i> disputes involving a generating company or a <br /> transmission licensee do not fall within the ambit of clause (f) of Section 79(1) <br /> of the Electricity Act, and are thus arbitrable; the present matter is not a case <br /> of determination or regulation of tariff; it is also not a case of direct or indirect <br /> ‘ <i>regulation of tariff’ </i> (including <i>‘in relation to’ </i> or ‘ <i>in connection with’</i> ) as: (a) the <br /> Supreme Court in <b>Jaipur Vidyut Vitran Nigam Ltd. vs. MB Power (M.P.) Ltd </b><br /> <b>(2024) 8 SCC 513, Para 103 </b> specifies the scope of ‘ <i>regulation of </i> tariff’ and <br /> takes into account all judicial pronouncement relied by the Procurers; <b> JVVNL</b> <br /> has been considered at length in the DVC APTEL Judgement; (b) hence, the <br /> scope/applicability of ‘ <i>regulation of tariff’ </i> qua <i>Non-Tariff </i> dispute is no more <br /> <i>res-integra; </i> (c) the dispute herein arises purely out of alleged breach of <br /> contract, and interpretation of contractual obligations under the PPA is a <br /> matter of private contract and not <i>Tariff</i> ; and the Supreme Court, in <b>India </b><br /> <b>Thermal Power Ltd. vs. State of M.P: (2000) 3 SCC 379, </b> held that a PPA is <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>34</b> of <b>178</b> <br /> <br /><br /> <br /> not wholly statutory, and only <b> </b> those clauses which directly relate to tariff <br /> determination under the statute partake of a statutory character, whereas <br /> other commercial and performance-related obligations remain purely <br /> contractual. <b> </b><br /> <b> </b> <b>C. JUDGEMENTS </b> <b>RELIED </b> <b>UPON </b> <b>BY </b> <b>THE APPELLANTS-</b><br /> <b>PROCURERS UNDER THIS HEAD: </b><br /> <b>1. </b> In <b>Gujarat Urja Vikas Nigam Ltd. v. Essar Power Ltd., (2008) 4 SCC </b><br /> <b>755, </b> the Supreme Court held that it is in the discretion of the State <br /> Commission whether the dispute should be decided itself or it should be <br /> referred to an arbitrator; there are various reasons why the State Commission <br /> may not decide the dispute itself and may refer it for arbitration by an arbitrator <br /> appointed by it; for example, the State Commission may be overburdened and <br /> may not have the time to decide certain disputes itself, and hence such cases <br /> can be referred to an arbitrator. Alternatively, the dispute may involve some <br /> highly technical point which even the State Commission may not have the <br /> expertise to decide, and such dispute in such a situation can be referred to an <br /> expert arbitrator; there may be various other considerations for which the <br /> State Commission may refer the dispute to an arbitrator instead of deciding it <br /> itself; there is an implied conflict between Section 86(1)( <i>f</i> ) of the Electricity <br /> Act, 2003 and Section 11 of the Arbitration and Conciliation Act, 1996 since <br /> under Section 86(1)( <i>f</i> ) the dispute between licensees and generating <br /> companies is to be decided by the State Commission or the arbitrator <br /> nominated by it, whereas under Section 11 of the Arbitration and Conciliation <br /> Act, 1996, the court can refer such disputes to an arbitrator appointed by it; <br /> on a harmonious construction of the provisions of the Electricity Act, 2003 and <br /> the Arbitration and Conciliation Act, 1996, whenever there is a dispute <br /> between a licensee and the generating companies only the State Commission <br /> or the Central Commission (as the case may be) or arbitrator (or arbitrators) <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>35</b> of <b>178</b> <br /> <br /><br /> <br /> nominated by it can resolve such a dispute; this is also evident from Section <br /> 158 of the Electricity Act, 2003; however, except for Section 11 all other <br /> provisions of the Arbitration and Conciliation Act, 1996 will apply to <br /> arbitrations under Section 86(1)( <i>f</i> ) of the Electricity Act, 2003 (unless there is <br /> a conflicting provision in the Electricity Act, 2003, in which case such provision <br /> will prevail); after the Electricity Act, 2003 has come into force, all adjudication <br /> of disputes between licensees and generating companies can only be done <br /> by the State Commission or the arbitrator (or arbitrators) appointed by it; there <br /> can be no adjudication of disputes between licensees and generating <br /> companies by anyone other than the State Commission or the arbitrator (or <br /> arbitrators) nominated by it; all disputes, and not merely those pertaining to <br /> matters referred to in Clauses ( <i>a</i> ) to ( <i>e</i> ) and ( <i>g</i> ) to ( <i>k</i> ) in Section 86(1), between <br /> the licensee and generating companies can only be resolved by the <br /> Commission or an arbitrator appointed by it; and this is because there is no <br /> restriction in Section 86(1)( <i>f</i> ) about the nature of the dispute. <br /> <b>2. </b> In <b>Coastal Andhra Power Ltd vs APCPDCL:</b> 2012 SCC OnLine Del <br /> 3352, the Delhi High Court observed that in the present case, while the issue <br /> concerning increase in price of the Indonesian coal and the consequent <br /> invocation of the <i>force majeure</i> clause by CAPL may not be strictly construed <br /> as a dispute arising from a claim by either party “for any change in or <br /> determination of the tariff or any matter related to tariff”, it is not as if the <br /> change in the price of coal will not affect the tariff at all; it is possible that the <br /> determination of such dispute could result in a change in the tariff; such a <br /> dispute can then be said to have arisen within the ambit of Article 17.3.1; <br /> therefore, one way of approaching the problem would be for CAPL to <br /> approach the CERC which will, in terms of Section 79(1)(f) of the EA, <br /> determine which part of the dispute between the parties is referable to <br /> arbitration; the words “and to refer any dispute for arbitration” occurring at the <br /> end of Section 79(1)(f) of the EA contemplates such a course; this power to <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>36</b> of <b>178</b> <br /> <br /><br /> <br /> refer any dispute to arbitration, which is common to both the CERC under <br /> Section 79(1)(f) and the SERC under Section 86(1)(f), has to be seen in <br /> addition to the power of the CERC to decide the disputes arising under <br /> Sections 79(1)(a) to (d); where the CERC is of the view that the dispute <br /> actually relates to the determination of tariff, it will exercise its jurisdiction and <br /> decide such dispute; on the other hand, a dispute not involving the tariff can <br /> be referred to arbitration; this interpretation harmonises Section 79(1)(f) of the <br /> EA with Article 17.3.1 of the PPA; and although the decision of the Supreme <br /> Court in <i>GUVNL</i> case concerned the scope of the powers of the SERC, it <br /> would equally apply to the interpretation of Section 79(1)(f) of the EA insofar <br /> as it concerns the power of the CERC to refer disputes to arbitration. <br /> <b>3. </b> In <b>PTC India Ltd. v. Jaiprakash Power Ventures Ltd., 2012 SCC </b><br /> <b>OnLine Del 2838, </b> the Delhi High Court referred to Para 35 of the judgement <br /> of the Supreme Court in <i>Booz Allen and Hamilton Inc.</i> v. <i>SBI Home Finance</i> <br /> on what was an issue involving determination of rights in rem and the apparent <br /> non-arbitrability of such dispute, and then observed that it was contended by <br /> the Respondent that Article 15.2 of the PPA states that the agreement was <br /> solely for the benefit of the parties and their successors and was not to be <br /> construed as creating any “duty, standard of care or any liability towards any <br /> third person”; however, with the goods in question being electricity which is <br /> not meant for consumption by the purchaser of the electricity but for onward <br /> sale by the trading licencee to distribution companies and ultimately to the <br /> consumers, the above interpretation that Article 15.2 does not create rights in <br /> rem is not correct. <b> </b><br /> <b> </b> <b>D. JUDGEMENTS RELIED UPON BY THE RESPONDENT-TPCL </b><br /> <b>UNDER THIS HEAD: </b><br /> <b>1. </b> In Para 103 of its judgement, in <b>Jaipur Vidyut Vitran Nigam Ltd. v. </b><br /> <b>MB Power (M.P.) Ltd., (2024) 8 SCC 513, </b> the Supreme Court referred to <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>37</b> of <b>178</b> <br /> <br /><br /> <br /></div><table><thead><tr><th>P</th><th>ara 20 of</th><th>its earlier judgement in</th></tr></thead><tbody></tbody></table><div><br /> <b>SCC 80</b> , wherein it was observed that the entire Electricity Act should be read <br /> as a whole; all discordant notes struck by the various Sections must be <br /> harmonised; considering the fact that the non obstante clause in Section 63, <br /> advisedly, restricts itself to Section 62, there is no reason to put Section 79 <br /> out of the way altogether; either under Section 62, or under Section 63, the <br /> general regulatory power of the Commission under Section 79(1)( <i>b</i> ) is the <br /> source of the power to regulate, which includes the power to determine or <br /> adopt tariff; Sections 62 and 63 deal with “determination” of tariff, which is part <br /> of “regulating” tariff; in a situation, where the guidelines issued by the Central <br /> Government under Section 63 cover the situation, the Central Commission is <br /> bound by those guidelines and must exercise its regulatory functions, albeit <br /> under Section 79(1)( <i>b</i> ), only in accordance with those guidelines; and it is only <br /> in a situation, where there are no guidelines framed at all or where the <br /> guidelines do not deal with a given situation, that the Commission&#x27;s general <br /> regulatory powers under Section 79(1)( <i>b</i> ) can be used. <br /> <b>2. </b> In <b>India Thermal Power Ltd. v. State of M.P., (2000) 3 SCC 379, </b> it <br /> was contended on behalf of the Appellant that the appellant/IPPs had entered <br /> into PPAs under Sections 43 and 43-A of the Electricity Supply Act and as <br /> such they are statutory contracts and, therefore, MPEB had no power or <br /> authority to alter their terms and conditions; and this contention has been <br /> upheld by the High Court. <br /> The Supreme Court held that the said contention was not correct and <br /> the High Court was wrong in accepting the same; Section 43 empowered the <br /> Electricity Board to enter into an arrangement for purchase of electricity on <br /> such terms as may be agreed; Section 43-A(1) provided that a generating <br /> company may enter into a contract for the sale of electricity generated by it <br /> with the Electricity Board; as regards the determination of tariff for the sale of <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>38</b> of <b>178</b> <br /> <br /><br /> <br /> electricity by a generating company to the Board, Section 43(1)(2) provided <br /> that the tariff shall be determined in accordance with the norms regarding <br /> operation and plant-load factor as may be laid down by the authority and in <br /> accordance with the rates of depreciation and reasonable return and such <br /> other factors as may be determined from time to time by the Central <br /> Government by a notification in the Official Gazette; these provisions clearly <br /> indicated that the agreement could be on such terms as may be agreed by <br /> the parties except that the tariff is to be determined in accordance with the <br /> provision contained in Section 43-A(2) and notifications issued thereunder; <br /> merely because a contract is entered into in exercise of an enabling power <br /> conferred by a statute, that by itself cannot render the contract a statutory <br /> contract; if entering into a contract containing the prescribed terms and <br /> conditions is a must under the statute, then that contract becomes a statutory <br /> contract; if a contract incorporates certain terms and conditions in it which are <br /> statutory then the said contract to that extent is statutory; a contract may <br /> contain certain other terms and conditions which may not be of a statutory <br /> character, and which have been incorporated therein as a result of mutual <br /> agreement between the parties; therefore, the PPAs could be regarded as <br /> statutory only to the extent that they contained provisions regarding <br /> determination of tariff and other statutory requirements of Section 43-A(2); <br /> opening and maintaining of an escrow account or an escrow agreement were <br /> not statutory requirements and, therefore, merely because PPAs <br /> contemplated maintaining escrow accounts that obligation could not be <br /> regarded as statutory. <br /> The Supreme Court further held that there was no dispute that MoUs <br /> and PPAs were concluded contracts, but to say that MoUs and PPAs are <br /> concluded contracts is one thing and to say that under those contracts the <br /> appellants and other IPPs acquired a legal right and MPEB incurred an <br /> enforceable obligation in respect of providing an escrow coverage is a <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>39</b> of <b>178</b> <br /> <br /><br /> <br /> different thing; the MoUs and IPPs, while providing for payment of dues by <br /> MPEB, had also at the same time made provisions for securing these <br /> payments; apart from an undertaking by MPEB under those agreements an <br /> obligation was imposed upon MPEB to open a revolving letter of credit or <br /> letters of credit for payment of the dues; by way of further security it was <br /> provided in those contracts that escrow account shall be opened and <br /> maintained by MPEB to secure payment of the amount equal to 1.5 times the <br /> monthly bill; those contracts also provided for a guarantee agreement with the <br /> State Government for payment of dues of MPEB; thus the purpose of opening <br /> and maintaining an escrow account was to secure payment for the electricity <br /> to be supplied by the generating companies to MPEB; the escrow account <br /> was, therefore, really required to be opened at that stage and, therefore, it <br /> was provided in most of these contracts that the escrow account shall be <br /> opened at the time of the first unit commercial operations date. <b> </b><br /> <b> </b> <b>E. </b> <b>ANALYSIS: </b><br /> <b> </b> <b> </b> <b>(a) CONTENTS OF THE IMPUGNED ORDER ON THIS ISSUE: </b><br /> In the impugned order, passed in Petition No. 107/MP/2023 and batch <br /> dated 19.11.2025, the CERC observed that, even if non-tariff disputes <br /> involving the generating company did not fall within the ambit of clauses (a) <br /> to (d) of Section 79(1) and could not therefore be adjudicated by the CERC <br /> under the first part of Section 79(1)(f) of the Electricity Act, such a dispute <br /> would, nonetheless, be arbitrable, and can be referred to arbitration by the <br /> Central Commission in view of the expression <i>“and to refer any dispute for </i><br /> <i>any arbitration” </i> in the latter part of Section 79(1)(f). The CERC arrived at this <br /> conclusion placing reliance on the law declared by this Tribunal in the <b>DVC</b> <br /> judgment. <b> </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>40</b> of <b>178</b> <br /> <br /><br /> <br /> The CERC further observed, albeit in the context of Section 8(1) of the <br /> Arbitration and Conciliation Act, 1996 (the “1996 Act” for short), that the <br /> jurisdiction of the Central Electricity Regulatory Commission (the <br /> ”CERC”/“Commission” for short) to adjudicate disputes, under Section 79 <br /> (1)(f) read with Section 79(1)(b) of the Electricity Act, did not extend over <br /> matters not related to the regulation of tariff of a generating company having <br /> a composite scheme; in other words, as explained by APTEL in the <b>DVC</b> <br /> Judgment, non-tariff disputes involving a generating company did not fall <br /> within the ambit of Section 79(1)(f) of the Electricity Act, not at least in the first <br /> part; such disputes would then be arbitrable – falling within the scope of the <br /> expression <i>“and to refer any dispute for arbitration” </i> as appearing in the later <br /> part of Section 79(1)(f), and the Commission was required to refer to such <br /> disputes to arbitration; the <b>DVC </b> Judgment clarified the scope of adjudicatory <br /> powers of the Commission under Section 79(1)(f) read with Section 79(1)(b) <br /> of the Electricity Act and, after examining what constitutes tariff and non-tariff <br /> disputes, specifically held that non-tariff disputes, involving a generating <br /> company, did not fall within the ambit of Section 79(1)(f) of the Electricity Act <br /> and were, thus, arbitrable (Paragraphs 25, 26 and 36 of the <b> DVC</b> Judgement). <br /> The CERC thereafter observed that, in the present case, they had <br /> examined the nature of dispute(s) involved in this batch of matters as per the <br /> principles laid down by the <b>DVC </b> Judgment, and had found that the <br /> main/primary dispute(s) involved did not impact tariff or regulation of tariff of <br /> the generating company; as a corollary, it followed that the adjudicatory <br /> jurisdiction of the Commission did not extend to dispute(s) qua TPCL and the <br /> Procurers as raised in these matters, and the only avenue left was to refer <br /> them to arbitration under Section 79(1)(f) of the Electricity Act; the objection <br /> raised by TPCL, regarding lack of adjudicatory jurisdiction of the CERC to <br /> adjudicate the main dispute(s) involved in this batch of Petitions, in light of <br /> the <b>DVC</b> Judgment, could not be faulted; the main dispute(s) involved in this <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>41</b> of <b>178</b> <br /> <br /><br /> <br /> batch of Petitions did not relate to tariff or regulation of tariff, and the <br /> Commission, therefore, lacked jurisdiction to adjudicate upon them; the <br /> Commission, being a creature of the statute, enjoyed limited adjudicatory <br /> jurisdiction under Section 79(1)(f) read with Section 79(1)(b); for matters not <br /> falling within such limited jurisdiction, i.e., non-tariff related matters, the <br /> Commission was, as laid down in the <b> DVC </b> Judgment, bound to refer such <br /> matters to arbitration; a non-tariff issue, involved in the generating station <br /> covered under Section 79(1)(b) of the Electricity Act, would fall under the <br /> scope of <i>“and to refer any dispute for arbitration” </i> as appearing in the latter <br /> part of Section 79(1)(f); and the Commission was bound to refer such non-<br /> tariff disputes to arbitration in terms thereof, even if none of the Parties had <br /> sought for such a reference. <br /> As reliance, in passing the impugned order, is placed by the CERC on <br /> the <b>DVC </b> Judgement of this Tribunal, it is necessary to take note of its <br /> contents, and the law declared therein <b>.</b> <br /> <b> </b> <b> </b> <b>(b) DVC JUDGEMENT: ITS CONTENTS: </b><br /> In <b> Madhya Pradesh Power Management Company Ltd vs Damodar </b><br /> <b>Valley Corporation </b> (Judgement in Appeal No. 309 of 2019 dated <br /> 28.08.2024), (the <b> “DVC” </b> Judgement for short), <b> </b> the issue with regards <br /> arbitrability of the dispute between a Generating Company and a Distribution <br /> Company, as well as applicability of Section 8 of the 1996 Act to Petitions <br /> under Section 79(1)(f) of the Electricity, Act, 2003 filed before the CERC, <br /> arose for consideration. <b> </b><br /> Both the PPAs, entered into by the Appellant with the first respondent, <br /> contained a foreclosure clause entitling either of the parties to fore-close the <br /> PPA by giving one-year prior notice to the other party. The Appellant issued <br /> th<br /> two notices dated 28 February, 2017 and 2nd May, 2017 thereby terminating <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>42</b> of <b>178</b> <br /> <br /><br /> <br /> rd th<br /> the PPAs dated 3 March, 2006 and 14 May, 2007 respectively in terms of the <br /> termination/foreclosure clauses contained in the two PPAs. The first Respondent <br /> did not accept termination of the PPAs, and informed the Appellant about the <br /> th th<br /> same vide communication dated 12 May, 2017 and 30 May, 2017. <br /> Subsequently, the first Respondent filed two separate Petitions under Section <br /> 79(1)(f) of the Electricity Act before the 2nd Respondent – CERC. The prayer <br /> clause read as under :- <i>(a) Declare that MPPMCL shall have the obligation </i><br /> <i>to pay for the</i> <b> </b> <i>contracted capacity in terms of the provisions of the PPA dated </i><br /> <i>3.3.2006 read with the Regulations and Orders of this Commission, and </i><br /> <i>Declare that MPPMCL shall not be entitled to treat the PPA having been </i><br /> <i>terminated from February, 2018 contrary to the terms of the PPA dated </i><br /> <i>3.3.2006; (b) Hold that the Respondent MPPMCL is liable to pay tariff to DVC </i><br /> <i>namely the fixed charges and Energy Charges for the quantum of electricity </i><br /> <i>scheduled by MPPMCL and deemed fixed charges for the quantum of </i><br /> <i>electricity declared available by DVC but not scheduled by the Respondent, </i><br /> <i>MPPMCL; (c) Direct the Respondent MPPMCL to pay the amount of Rs </i><br /> <i>437.32 crore due and outstanding to DVC as on 1.2.2018; (d) Award the cost </i><br /> <i>of proceedings; and (e ) Pass such further order or orders as this Commission </i><br /> <i>may deem just and proper in the circumstances of the case.</i> <b> </b><br /> Invoking the arbitration clause contained in the two PPAs, the Appellant <br /> filed its statement of objections in both the petitions, purportedly under Section <br /> 8 of the 1996 Act, thereby objecting to the maintainability of the Petitions, and <br /> seeking a direction to the parties to get the dispute adjudicated through <br /> arbitration in accordance with the arbitration clause of the PPAs. <br /> In its common order in both the Petitions dated 23.07.2019, the CERC <br /> held that the Petitions were not maintainable, and ruled out the applicability of <br /> Section 8(1) of the 1996 Act to the Petitions before it. The CERC held that the <br /> disputes, foreclosing the subject matter of the two petitions, were filed with it <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>43</b> of <b>178</b> <br /> <br /><br /> <br /> under section 79(1) of the Electricity Act, and was therefore not arbitrable. <br /> The CERC based its findings on two judgments of the Supreme Court (a) <br /> <b>Gujrat Urja Vikas Nigam Ltd. vs. Essar Power Ltd, </b> (2008) 4 SCC 755; and <br /> (b) <b>MRMGC Ltd. vs. Aftab Singh &amp; Anr</b> . (Judgment in Review Petition Nos. <br /> 2629-30 of 2018 dated 13.03.2018). The said order of the CERC dated <br /> 23.07.2019 was subjected to challenge before this Tribunal in Appeal No. 309 <br /> of 2019. <br /> The question which arose for consideration before this Tribunal, in the <br /> <b>DVC </b> Judgement (ie in <b>Madhya Pradesh Power Management Company Ltd. </b><br /> <b>v. Damodar Valley Corporation And Anr. (Judgement in Appeal No. 309 </b><br /> <b>of 2019 dated 28.08.2024) </b> was whether there was any provision in the <br /> Electricity Act, 2003 by virtue of which Section 8(1) of the 1996 Act had no <br /> applicability to Petitions, under Sections 79 and 86 of the Electricity Act, brought <br /> before the Commission; and whether the disputes involved therein could not <br /> be submitted to arbitration. (Refer: Para 19 of the DVC judgement). <b> </b><br /> After observing that Section 2(3) and 8(1) of the 1996 Act were material <br /> for deciding the issue under consideration (Refer: Para 18 of the DVC <br /> Judgement), this Tribunal held that there was no dispute that the Commission, <br /> be it the Central Commission or the State Commission, while adjudicating <br /> disputes under Sections 79 and 86 of the Electricity Act, 2003, as the case may <br /> be, performed an adjudicatory role and thus came within the purview of <br /> &quot;Judicial Authority” as referred to in Section 8 of the 1996 Act. (Refer: Para 19 <br /> of the said Judgement). <b> </b><br /> This Tribunal thereafter recorded its findings as under:- <b> </b><br /> (i) Section 79(1)(f) of the Electricity Act empowered the Central <br /> Commission to adjudicate disputes involving generating companies and <br /> distribution licensees with regards matters connected with clauses (a) to (d) <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>44</b> of <b>178</b> <br /> <br /><br /> <br /> of sub-section (1) ie matters connected to regulation of tariff of the generating <br /> companies as well as inter-state transmission of electricity and to determine <br /> tariff for inter-state transmission of electricity. (Refer: Para 21 of the DVC <br /> Judgement) <b> </b><br /> (ii) It (ie Section 79(1)(f)) also gives discretion to the Commission to refer <br /> any such dispute for arbitration. (Refer: Para 21 of the DVC Judgement) <b> </b><br /> (iii) In appropriate cases, where a valid arbitration agreement exists <br /> between the parties and the dispute does not concern the regulatory functions <br /> of the Commission, the Commission would not only be justified but also bound <br /> to refer the dispute for arbitration. (Refer: Para 22 of the DVC Judgement). <b> </b><br /> (iv) Disputes relating to termination of PPAs would not be regarded as a <br /> dispute relating to tariff or regulation of tariff of generating companies. (Refer: <br /> Para 25 of the DVC Judgement). <b> </b><br /> (v) All matters, which would have a bearing upon the tariff for a generating <br /> company, would constitute “tariff disputes” namely disputes related to Change <br /> in Law, delayed completion of projects, invocation of Force Majeure events etc. <br /> (Refer: Para 25 of the DVC Judgement). <br /> (vi) Such matters impact tariff for a generating company directly and, <br /> therefore, fall solely within the jurisdiction of the Central Commission under <br /> Section 79(1) of the Electricity Act, 2003. (Refer: Para 25 of the DVC <br /> Judgement). <br /> (vii) Disputes related to termination or breach of contract, which do not impact <br /> tariff either directly or indirectly, can be considered as non-tariff related disputes <br /> referable to arbitration. (Refer: Para 25 of the DVC Judgement) <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>45</b> of <b>178</b> <br /> <br /><br /> <br /> (viii) Disputes relating to termination of a PPA is confined to the legality and <br /> validity of termination of the PPA, and does not relate to tariff or regulation of <br /> tariff. (Refer: Para 26 of the DVC Judgement). <br /> (ix) The ratio which can be clearly deduced from the judgement of the <br /> Supreme Court, in <b>Gujarat Urja Vikas Nigam Ltd vs Essar Power Ltd: </b><br /> <b>(2008) 4 SCC 755 </b> and <b>Emaar MGF Land Ltd vs Aftab Singh &amp; another </b><br /> <b>(Judgement in Review Petition Nos. 2629-2630 of 2018 dated </b><br /> <b>13.02.2018)</b> , is that, in case of any conflict (express or implied) between the <br /> provisions of the Electricity Act and any other statute, the provisions of the <br /> Electricity Act would prevail, but where there is no such conflict, both the <br /> statutes are to be read together. (Refer: Para 28 of the DVC Judgement). <br /> (x) There is no conflict or inconsistency between Section 8(1) of the 1996 Act <br /> and Section 79(1) of the Electricity Act, 2003. (Refer: Para 30 of the DVC <br /> Judgement) <br /> (xi) Section 8(1) of the1996 Act makes it mandatory for a judicial authority to <br /> refer parties for arbitration where it finds that a valid arbitration agreement exists <br /> between the parties, and a party to the arbitration agreement so applies. (Refer: <br /> Para 30 of the DVC Judgement) <br /> (xii) Section 79(1)(f) of the Electricity Act also empowers the Central <br /> Commission to refer any dispute for arbitration apart from adjudicating the <br /> disputes involving generating companies or transmission licensees etc. (Refer: <br /> Para 30 of the DVC Judgement) <br /> (xiii) In view of the provisions of Clauses (a) to (d) of Section 79(1) of the <br /> Electricity Act, only non-tariff disputes can be referred to arbitration. (Refer: <br /> Para 30 of the DVC Judgement). <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>46</b> of <b>178</b> <br /> <br /><br /> <br /> (xiv) The Electricity Act is a self-contained comprehensive legislation which not <br /> only regulates generation, transmission and distribution of electricity by public <br /> bodies and encourages public sector participation in the process, but also <br /> ensures creation of special adjudicatory mechanism to deal with the grievances <br /> of any person aggrieved by any order made by an adjudicating officer under the <br /> Act. (Refer: Para 32 of the DVC Judgement). <br /> (xv) However, the expression <i>“and to refer any dispute for arbitration” </i> used at <br /> the end of clause (f) of both the Sections 79(1) and 86(1) of the Electricity Act, <br /> 2003 leaves scope for some disputes to be referred for arbitration. This view <br /> is further strengthened by Section 158 of the Act which provides that <br /> arbitration directed by the Commission shall be subject to the provisions of <br /> the 1996 Act. (Refer: Para 32 of the DVC Judgement). <br /> (xvi) In case it is held that all disputes brought before the Commission are to <br /> be adjudicated upon by it, and the Commission does not have the power to refer <br /> any dispute for arbitration even though it finds a valid arbitration agreement <br /> existing between the parties, it would render the above noted expressions used <br /> in Section 79(1) and 86(1) of the Electricity Act, 2003 (ie <i>“and to refer any dispute </i><br /> <i>for arbitration”</i> ), <i> </i> as well as Section 158, totally redundant. (Refer: Para 33 of the <br /> DVC Judgement). <br /> (xvii) It is manifest that the Parliament, while passing the Electricity Act, 2003, <br /> did not intend to completely rule out the applicability of the provisions of the <br /> 1996 Act to disputes under the Electricity Act, 2003. (Refer: Para 33 of the DVC <br /> Judgement). <br /> (xviii) Non-tariff disputes, involving a generating company or a distribution <br /> licensee, do not fall within the ambit of clause (f) of Section 79(1) of the <br /> Electricity Act, 2003, and are thus arbitrable. (Refer: Para 36 of the DVC <br /> Judgement). <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>47</b> of <b>178</b> <br /> <br /><br /> <br /> (xix) In the instance case, there is undisputedly a valid and subsisting arbitration <br /> clause contained in the PPAs. As the dispute between the parties primarily <br /> relates to termination of the PPAs, which is a non-tariff dispute, it is referrable to <br /> arbitration. (Refer: Para 37 of the DVC Judgement). <br /> As reference was made, in the <b>DVC</b> Judgement, to (1) the judgement of <br /> the Supreme Court in <b>Gujarat Urja Vikas Nigam Limited; </b> (2) the judgement of <br /> the Supreme Court in <b>Emmar MGF Land Limited; </b> (3) the judgement of the <br /> Delhi High Court in <b>MB Power (Madhya Pradesh) Limited Vs. State Bank of </b><br /> <b>India &amp; Ors. </b> <b>– </b> <b>2023/DHC/000227; </b> and (4) the judgement of the Supreme Court <br /> in <b>Jaipur Vidyut Vitran Nigam Ltd vs MB Power (Madhya Pradesh) Ltd: 2024 </b><br /> <b>SCC OnLine SC 26,</b> it is useful to note the facts and the law declared therein. <br /> <b> </b> <b> </b> <b>(c) JUDGEMENT OF THE SUPREME COURT IN GUJARAT URJA </b><br /> <b>VIKAS NIGAM LIMITED: </b><br /> What was referred, in the <b>DVC Judgement </b> of this Tribunal, are the <br /> observations of the Supreme Court in Paras 56 to 59 and 61 of its Judgement <br /> in <b>Gujarat Urja Vikas Nigam Ltd. v. Essar Power Ltd., (2008) 4 SCC 755. </b><br /> Paras 56 to 59 read thus:- <b> </b><br /> “ <b><i>56.</i></b> <i> Hence, we have to add the aforementioned words at the end of Section </i><br /> <i>175 otherwise there will be an irreconcilable conflict between Section 174 and </i><br /> <i>Section 175.</i> <b> </b><br /> <b><i>57.</i></b> <i> In our opinion the principle laid down in Section 174 of the Electricity </i><br /> <i>Act, 2003 is the principal or primary whereas the principle laid down in Section </i><br /> <i>175 is the accessory or subordinate to the principal. Hence Section 174 will </i><br /> <i>prevail over Section 175 in matters where there is any conflict (but no further).</i> <b> </b><br /> <b><i>58.</i></b> <i> In our opinion Section 174 and Section 175 of the Electricity Act, 2003 </i><br /> <i>can be read harmoniously by utilising the samanjasya, badha and </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>48</b> of <b>178</b> <br /> <br /><br /> <br /> <i>gunapradhana principles of Mimansa. This can be done by holding that when </i><br /> <i>there is any express or implied conflict between the provisions of the </i><br /> <i>Electricity Act, 2003 and any other Act then the provisions of the Electricity </i><br /> <i>Act, 2003 will prevail, but when there is no conflict, express or implied, both </i><br /> <i>the Acts are to be read together.</i> <b> </b><br /> <b><i>59.</i></b> <i> In the present case we have already noted that there is an implied </i><br /> <i>conflict between Section 86(1)(f) of the Electricity Act, 2003 and Section 11 of </i><br /> <i>the Arbitration and Conciliation Act, 1996 since under Section 86(1)(f) the </i><br /> <i>dispute between licensees and generating companies is to be decided by the </i><br /> <i>State Commission or the arbitrator nominated by it, whereas under Section </i><br /> <i>11 of the Arbitration and Conciliation Act, 1996, the court can refer such </i><br /> <i>disputes to an arbitrator appointed by it. Hence on harmonious construction </i><br /> <i>of the provisions of the Electricity Act, 2003 and the Arbitration and </i><br /> <i>Conciliation Act, 1996 we are of the opinion that whenever there is a dispute </i><br /> <i>between a licensee and the generating companies only the State Commission </i><br /> <i>or the Central Commission (as the case may be) or arbitrator (or arbitrators) </i><br /> <i>nominated by it can resolve such a dispute, whereas all other disputes (unless </i><br /> <i>there is some other provision in the Electricity Act, 2003) would be decided in </i><br /> <i>accordance with Section 11 of the Arbitration and Conciliation Act, 1996. This </i><br /> <i>is also evident from Section 158 of the Electricity Act, 2003. However, except </i><br /> <i>for Section 11 all other provisions of the Arbitration and Conciliation Act, 1996 </i><br /> <i>will apply to arbitrations under Section 86(1)(f) of the Electricity Act, 2003 </i><br /> <i>(unless there is a conflicting provision in the Electricity Act, 2003, in which </i><br /> <i>case such provision will prevail).” </i><br /> After extracting Paras 56 to 59 of <b>Gujarat Urja Vikas Nigam Ltd.</b> , this <br /> Tribunal, in the <b> DVC </b> Judgement, observed that the ratio which could be <br /> clearly deduced there-from was that, in case of any conflict (express or <br /> implied) between the provisions of the Electricity Act and any other statute, <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>49</b> of <b>178</b> <br /> <br /><br /> <br /> the provisions of the Electricity Act would prevail but where there is no such <br /> conflict, both the statutes are to be read together. <b> </b><br /> This Tribunal, in the <b>DVC </b> Judgement, then extracted Para 61 of the <br /> Judgement in <b>Gujarat Urja Vikas Nigam Ltd, </b> which reads thus:- <b> </b><br /> <b> </b> <b>“</b> <b><i>61.</i></b> <i> We make it clear that it is only with regard to the authority which </i><br /> <i>can adjudicate or arbitrate disputes that the Electricity Act, 2003 will prevail </i><br /> <i>over Section 11 of the Arbitration and Conciliation Act, 1996. However, as </i><br /> <i>regards the procedure to be followed by the State Commission (or the </i><br /> <i>arbitrator nominated by it) and other matters related to arbitration (other than </i><br /> <i>appointment of the arbitrator) the Arbitration and Conciliation Act, 1996 will </i><br /> <i>apply (except if there is a conflicting provision in the Act of 2003). In other </i><br /> <i>words, Section 86(1)(f) is only restricted to the authority which is to adjudicate </i><br /> <i>or arbitrate between licensees and generating companies. Procedural and </i><br /> <i>other matters relating to such proceedings will of course be governed by the </i><br /> <i>Arbitration and Conciliation Act, 1996, unless there is a conflicting provision </i><br /> <i>in the Act of 2003.</i> ” <b> </b><br /> This Tribunal, in the <b>DVC </b> Judgement, thereafter opined that they did not <br /> see any conflict or inconsistency between Section 8(1) of the 1996 Act and <br /> Section 79(1) of the Electricity Act; Section 8(1) of the 1996 Act made it <br /> mandatory for a judicial authority to refer the parties for arbitration where it <br /> finds that a valid arbitration agreement exists between the parties, and a party <br /> to the arbitration agreement so applies; Section 79(1)(f) of the Electricity Act <br /> also empowers the Central Commission to refer any dispute for arbitration <br /> apart from adjudicating the disputes involving generating companies or <br /> transmission licensees etc; and, in view of clauses (a) to (d) of Section 79(1) <br /> of the Electricity Act, only non-tariff disputes can be referred to arbitration. <b> </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>50</b> of <b>178</b> <br /> <br /><br /> <br /> Apart from the afore extracted paras, there are other observations of the <br /> Supreme Court in <b>Gujarat Urja Vikas Nigam Ltd. v. Essar Power Ltd., </b><br /> <b>(2008) 4 SCC 755 </b> which are also of significance. They read thus:- <b> </b><br /> <b>“</b> <b><i>26.</i></b> <i> It may be noted that Section 86(1)(f) of the Act of 2003 is a special </i><br /> <i>provision for adjudication of disputes between the licensee and the generating </i><br /> <i>companies. </i> <b><i>Such disputes can be adjudicated upon either by the State </i></b><br /> <b><i>Commission or the person or persons to whom it is referred for </i></b><br /> <b><i>arbitration. In our opinion the word “and” in Section 86(1)(f) between the </i></b><br /> <b><i>words “generating companies” and “to refer any dispute for arbitration” </i></b><br /> <b><i>means “or”. It is well settled that sometimes “and” can mean “or” and </i></b><br /> <b><i>sometimes “or” can mean “and” (vide G.P. Singh&#x27;s Principles of </i></b><br /> <b><i>Statutory Interpretation, 9th Edn., 2004, p. 404).</i></b> <b> </b><br /> <b><i>27.</i></b> <i> </i> <b><i>In our opinion in Section 86(1)(f) of the Electricity Act, 2003 the </i></b><br /> <b><i>word “and” between the words “generating companies” and the words </i></b><br /> <b><i>“refer any dispute” means “or”, otherwise it will lead to an anomalous </i></b><br /> <b><i>situation because obviously the State Commission cannot both decide </i></b><br /> <b><i>a dispute itself and also refer it to some arbitrator. Hence the word “and” </i></b><br /> <b><i>in Section 86(1)(f) means “or”.</i></b> <b> </b><br /> <b><i>28.</i></b> <i> </i> <b><i>Section 86(1)(f) is a special provision and hence will override the </i></b><br /> <b><i>general provision in Section 11 of the Arbitration and Conciliation Act, </i></b><br /> <b><i>1996 for arbitration of disputes between the licensee and generating </i></b><br /> <b><i>companies. It is well settled that the special law overrides the general </i></b><br /> <b><i>law. Hence, in our opinion, Section 11 of the Arbitration and Conciliation </i></b><br /> <b><i>Act, </i></b> <b><i>1996 </i></b> <b><i>has </i></b> <b><i>no </i></b> <b><i>application </i></b> <b><i>to </i></b> <b><i>the </i></b> <b><i>question </i></b> <b><i>who </i></b> <b><i>can </i></b><br /> <b><i>adjudicate/arbitrate disputes between licensees and generating </i></b><br /> <b><i>companies, and only Section 86(1)(f) shall apply in such a situation.</i></b> <b> </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>51</b> of <b>178</b> <br /> <br /><br /> <br /> <b><i>29. This is also evident from Section 158 of the Electricity Act, 2003 </i></b><br /> <b><i>which has been quoted above.</i></b> <i> We may clarify that the agreement dated 30-</i><br /> <i>5-1996 is not a part of the licence of the licensee. An agreement is something </i><br /> <i>prior to the issuance of a licence. Hence any provision for arbitration in the </i><br /> <i>agreement cannot be deemed to be a provision for arbitration in the licence. </i><br /> <i>Hence also it is the State Commission which alone has power to </i><br /> <i>arbitrate/adjudicate the dispute either itself or by appointing an arbitrator.</i> <b> </b><br /> <b><i>30.</i></b> <i> Shri Jayant Bhushan, learned counsel for one of the parties in the </i><br /> <i>connected case submitted that Section 86(1)(f) is violative of Article 14 of the </i><br /> <i>Constitution of India because it does not specify when the State Commission </i><br /> <i>shall itself decide a dispute and when it will refer the matter to arbitration by </i><br /> <i>some arbitrator. In our opinion there is no violation of Article 14 at all. </i> <b><i>It is in </i></b><br /> <b><i>the discretion of the State Commission whether the dispute should be </i></b><br /> <b><i>decided itself or it should be referred to an arbitrator. </i></b> <i>Some leeway has </i><br /> <i>to be given to the legislature in such matters and there has to be judicial </i><br /> <i>restraint in the matter of judicial review of constitutionality of a statute </i><br /> <i>(vide Govt. of A.P. v. P. Laxmi Devi [(2008) 4 SCC 720 : JT (2008) 2 SC 639 </i><br /> <i>: (2008) 3 Scale 45] ).</i> <b> </b><br /> <b><i>31.</i></b> <i> </i> <b><i>There are various reasons why the State Commission may not </i></b><br /> <b><i>decide the dispute itself and may refer it for arbitration by an arbitrator </i></b><br /> <b><i>appointed by it. For example, the State Commission may be </i></b><br /> <b><i>overburdened and may not have the time to decide certain disputes </i></b><br /> <b><i>itself, and hence such cases can be referred to an arbitrator. </i></b><br /> <b><i>Alternatively, the dispute may involve some highly technical point which </i></b><br /> <b><i>even the State Commission may not have the expertise to decide, and </i></b><br /> <b><i>such dispute in such a situation can be referred to an expert arbitrator. </i></b><br /> <b><i>There may be various other considerations for which the State </i></b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>52</b> of <b>178</b> <br /> <br /><br /> <br /> <b><i>Commission may refer the dispute to an arbitrator instead of deciding it </i></b><br /> <b><i>itself.</i></b> <i> Hence there is no violation of Article 14 of the Constitution of India.</i> <b> </b><br /> <b><i>33.</i></b> <i> Section 175 of the Electricity Act, 2003 states that the provisions of the </i><br /> <i>Act are in addition to and not in derogation of any other law. This would </i><br /> <i>apparently imply that the Arbitration and Conciliation Act, 1996 will also apply </i><br /> <i>to disputes such as the one with which we are concerned. However, in our </i><br /> <i>opinion Section 175 has to be read along with Section 174 and not in isolation.</i> <b> </b><br /> <b><i>35.</i></b> <i> It is well settled that where a statute provides for a thing to be done in a </i><br /> <i>particular manner, then it has to be done in that manner, and in no other </i><br /> <i>manner [vide Chandra Kishore Jha v. Mahavir Prasad [(1999) 8 SCC 266 : </i><br /> <i>AIR 1999 SC 3558] (SCC para 17 : AIR para 12), Dhanajaya Reddy v. State </i><br /> <i>of Karnataka [(2001) 4 SCC 9 : 2001 SCC (Cri) 652 : AIR 2001 SC 1512] </i><br /> <i>(SCC para 23 : AIR para 22), etc.]. </i> <b><i>Section 86(1)(f) provides a special </i></b><br /> <b><i>manner of making references to an arbitrator in disputes between a </i></b><br /> <b><i>licensee and a generating company. Hence by implication all other </i></b><br /> <b><i>methods are barred.</i></b> <b> </b><br /> <b><i>60.</i></b> <i> In the present case, it is true that there is a provision for arbitration in </i><br /> <i>the agreement between the parties dated 30-5-1996. Had the Electricity Act, </i><br /> <i>2003 not been enacted, there could be no doubt that the arbitration would </i><br /> <i>have to be done in accordance with the Arbitration and Conciliation Act, 1996. </i><br /> <i>However, </i> <b><i>since the Electricity Act, 2003 has come into force w.e.f. 10-6-</i></b><br /> <b><i>2003, after this date all adjudication of disputes between licensees and </i></b><br /> <b><i>generating companies can only be done by the State Commission or the </i></b><br /> <b><i>arbitrator (or arbitrators) appointed by it. After 10-6-2003 there can be </i></b><br /> <b><i>no adjudication of dispute between licensees and generating companies </i></b><br /> <b><i>by anyone other than the State Commission or the arbitrator (or </i></b><br /> <b><i>arbitrators) nominated by it. We further clarify that all disputes, and not </i></b><br /> <b><i>merely those pertaining to matters referred to in Clauses (a) to (e) and </i></b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>53</b> of <b>178</b> <br /> <br /><br /> <br /> <b><i>(g) to (k) in Section 86(1), between the licensee and generating </i></b><br /> <b><i>companies can only be resolved by the Commission or an arbitrator </i></b><br /> <b><i>appointed by it. This is because there is no restriction in Section 86(1)(f) </i></b><br /> <b><i>about the nature of the dispute.</i></b> <b> </b><br /> <b><i>62. Since the High Court has appointed an arbitrator for deciding the </i></b><br /> <b><i>dispute between the licensee and the generating company, in our </i></b><br /> <b><i>opinion, the judgment of the High Court has to be set aside. Only the </i></b><br /> <b><i>State Commission or the arbitrator (or arbitrators) appointed by it could </i></b><br /> <b><i>resolve such a dispute. </i></b> <i>We, therefore, set aside the impugned judgment of </i><br /> <i>the High Court but leave it open to the State Commission or the arbitrator (or </i><br /> <i>arbitrators) nominated by it to adjudicate/arbitrate the dispute between the </i><br /> <i>parties expeditiously. Appeal allowed. The impugned judgment set </i><br /> <i>aside…………..” </i> (emphasis supplied). <b> </b><br /> After extracting Paras 26 to 28 of the Judgement in <b>Gujarat Urja Vikas </b><br /> <b>Nigam Ltd. v. Essar Power Ltd., (2008) 4 SCC 755, </b> a three judge bench of <br /> the Supreme Court, in <b>Hindustan Zinc Ltd. v. Ajmer Vidyut Vitran Nigam </b><br /> <b>Ltd., (2019) 17 SCC 82</b> , observed that it was clear on a reading of this <br /> judgment that the expression “and” occurring in Section 86(1)( <i>f</i> ) must be read <br /> as “or”; but this is only because, as has been pointed out in the <b>Gujarat Urja </b><br /> <b>Vikas Nigam Ltd</b> judgment, the State Commission cannot both decide the <br /> dispute itself and also refer it to an arbitrator. <b> </b><br /> After extracting Paras 26 to 28 of the Judgement in <b>Gujarat Urja Vikas </b><br /> <b>Nigam Ltd. v. Essar Power Ltd., (2008) 4 SCC 755, </b> having noted that this <br /> position had been subsequently approved by a three-Judge Bench of the <br /> Supreme Court in <b> Hindustan Zinc Ltd. v. Ajmer Vidyut Vitran Nigam Ltd., </b><br /> <b>(2019) 17 SCC 82</b> , and on taking note of Sections 86(1)(f) and 174 of the <br /> Electricity Act, another three Judge bench of the Supreme Court, in <b>M.P. </b><br /> <b>Power Trading Co. Ltd. v. Narmada Equipments (P) Ltd., (2021) 14 SCC </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>54</b> of <b>178</b> <br /> <br /><br /> <br /> <b>548, </b> observed that it was evident that Section 86(1)( <i>f</i> ) of the 2003 Act is a <br /> special provision which overrides the general provisions contained in Section <br /> 11 of the 1996 Act; Section 86(1)( <i>f</i> ) vests a statutory jurisdiction with the State <br /> Electricity Commission to adjudicate upon disputes between licensees and <br /> generating companies, and to refer any dispute for arbitration; the word “and” <br /> between “generating companies” and “to refer any dispute for arbitration” is to <br /> be read as “or”, since the State Electricity Commission cannot obviously <br /> resolve the dispute itself and also refer it to arbitration. <b> </b><br /> The law declared by the Supreme Court, in <b>Gujarat Urja Vikas Nigam </b><br /> <b>Ltd. v. Essar Power Ltd., (2008) 4 SCC 755,</b> (which has been referred with <br /> approval and followed in the subsequent three-judge bench judgements of the <br /> Supreme Court, in <b>Hindustan Zinc Ltd. v. Ajmer Vidyut Vitran Nigam Ltd., </b><br /> <b>(2019) 17 SCC 82</b> , and <b>M.P. Power Trading Co. Ltd. v. Narmada </b><br /> <b>Equipments (P) Ltd., (2021) 14 SCC 548), </b> are summarized as under: <b> </b><br /> (1) Disputes under Section 86(1)( <i>f</i> ) can be adjudicated upon either by the <br /> State Commission or the person or persons to whom it is referred for <br /> arbitration. (Para 26) <b> </b><br /> (2) The word “and” in Section 86(1)( <i>f</i> ), between the words “generating <br /> companies” and “to refer any dispute for arbitration”, means “or”. (Para 26) <b> </b><br /> (3) Otherwise, it will lead to an anomalous situation because obviously the <br /> State Commission cannot both decide a dispute itself and also refer it to some <br /> arbitrator. Hence the word “and” in Section 86(1)( <i>f</i> ) means “or”. (Para 27) <b> </b><br /> (4) Section 86(1)( <i>f</i> ) is a special provision and hence will override the <br /> general provision in Section 11 of the 1996 Act for arbitration of disputes <br /> between licensees and generating companies. (Para 28) <b> </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>55</b> of <b>178</b> <br /> <br /><br /> <br /> (5) Section 11 of the 1996 Act has no application to the question who can <br /> adjudicate/arbitrate disputes between licensees and generating companies, <br /> and only Section 86(1)( <i>f</i> ) shall apply in such a situation. (Refer Para 28). This <br /> is also evident from Section 158 of the Electricity Act, 2003 <b>. </b> It is the State <br /> Commission which alone has power to arbitrate/adjudicate the dispute either <br /> itself or by appointing an arbitrator. (Para 29). <b> </b><br /> (6) It is in the discretion of the State Commission whether the dispute <br /> should be decided itself or it should be referred to an arbitrator. (Para 30). <b> </b><br /> (7) Section 86(1)( <i>f</i> ) provides a special manner of making reference to an <br /> arbitrator in disputes between a licensee and a generating company. Hence, <br /> by implication, all other methods are barred. (Para 35). <b> </b><br /> (8) There is an implied conflict between Section 86(1)(f) of the Electricity <br /> Act, 2003 and Section 11 of the 1996 Act since, under Section 86(1)(f), the <br /> dispute between licensees and generating companies is to be decided by the <br /> State Commission or the arbitrator nominated by it, whereas under Section <br /> 11 of the 1996 Act, the court can refer such disputes to an arbitrator appointed <br /> by it. (Para 59). <b> </b><br /> (9) Whenever there is a dispute between a licensee and a generating <br /> company only the State Commission or the Central Commission (as the case <br /> may be) or arbitrator (or arbitrators) nominated by it can resolve such a <br /> dispute, whereas all other disputes (unless there is some other provision in <br /> the Electricity Act, 2003) would be decided in accordance with Section 11 of <br /> the 1996 Act. This is also evident from Section 158 of the Electricity Act, 2003. <br /> (Para 59) <b> </b><br /> (10) Except for Section 11, all other provisions of the 1996 Act will apply to <br /> arbitration under Section 86(1)(f) of the Electricity Act, 2003 (unless there is a <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>56</b> of <b>178</b> <br /> <br /><br /> <br /> conflicting provision in the Electricity Act, 2003, in which case such provision <br /> will prevail). (Para 59) <b> </b><br /> (11) After the Electricity Act, 2003 came into force w.e.f. 10-6-2003, all <br /> adjudication of disputes between licensees and generating companies can <br /> only be done by the State Commission or the arbitrator (or arbitrators) <br /> appointed by it. There can be no adjudication of dispute between licensees <br /> and generating companies by anyone other than the State Commission or the <br /> arbitrator (or arbitrators) nominated by it. (Para 60). <b> </b><br /> (12) All disputes, and not merely those pertaining to matters referred to in <br /> Clauses ( <i>a</i> ) to ( <i>e</i> ) and ( <i>g</i> ) to ( <i>k</i> ) in Section 86(1), between licensees and <br /> generating companies can only be resolved by the Commission or an <br /> arbitrator appointed by it. This is because there is no restriction in Section <br /> 86(1)( <i>f</i> ) about the nature of the dispute (Para 60). <b> </b><br /> (13) It is only with regard to the authority which can adjudicate or arbitrate <br /> disputes that the Electricity Act, 2003 will prevail over Section 11 of the 1996 <br /> Act. (Para 61) <b> </b><br /> (14) As regards the procedure to be followed by the State Commission (or <br /> the arbitrator nominated by it) and other matters related to arbitration (other <br /> than appointment of the arbitrator) the Arbitration and Conciliation Act, 1996 <br /> will apply (except if there is a conflicting provision in the Electricity Act. (Para <br /> 61). <b> </b><br /> (15) Section 86(1)(f) is only restricted to the authority which is to adjudicate <br /> or arbitrate between licensees and generating companies. Procedural and <br /> other matters relating to such proceedings will be governed by the 1996 Act, <br /> unless there is a conflicting provision in the Electricity Act. (Para 61) <b> </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>57</b> of <b>178</b> <br /> <br /><br /> <br /> (16) Only the State Commission or the arbitrator (or arbitrators) appointed by <br /> it can resolve a dispute between the licensee and the generating company. <br /> (Para 62). <b> </b><br /> <b> </b> <b> </b> <b>(d) JUDGEMENT OF THE SUPREME COURT IN EMAAR MGF </b><br /> <b>LAND LTD v. AFTAB SINGH: </b><br /> In <b> Emaar MGF Land Ltd. v. Aftab Singh: (2019) 12 SCC 751,</b> the <br /> Supreme Court observed that, not only were proceedings under the <br /> Consumer Protection Act, 1986 special proceedings which were required to <br /> be continued under the said Act despite an arbitration agreement, there were <br /> a large number of other fields where an arbitration agreement could neither <br /> stop nor stultify the proceedings; for example, any action of a party, omission <br /> or commission of a person which amounts to an offence had to be examined <br /> by a criminal court and no amount of agreement between the parties shall be <br /> relevant for the said case; there may be a commercial agreement between <br /> two parties that all issues pertaining to the transaction are to be decided by <br /> arbitration as per the arbitration clause in the agreement; in case where a <br /> cheque is dishonoured by one party in a transaction, despite the arbitration <br /> agreement, the party aggrieved has to approach the criminal court; similarly, <br /> there are several issues which are non-arbitrable; there can be prohibition, <br /> both express or implied, for not deciding a dispute on the basis of an <br /> arbitration agreement; the Supreme Court had occasion to consider the above <br /> aspect and has noticed various disputes which were non-arbitrable, including <br /> in <b>Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 SCC </b><br /> <b>532; </b> Section 2(3) of the 1996 Act contains a general provision which clarifies <br /> that <i>“This Part shall not affect any other law for the time being in force by virtue </i><br /> <i>of which certain disputes may not be submitted to arbitration”</i> ; and Section <br /> 2(3) gives predominance to <i>any other law for the time being in force by virtue </i><br /> <i>of which certain disputes may not be submitted to arbitration</i> . <b> </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>58</b> of <b>178</b> <br /> <br /><br /> <br /> The Supreme Court, in <b>Emaar MGF Land Ltd</b> , further observed that the <br /> amendments, under Section 8 of the 1996 Act, were aimed to minimise the <br /> scope of judicial authority to refuse reference to arbitration, and the only <br /> ground on which reference could have been refused was that it, prima facie, <br /> finds that no valid arbitration agreement exists; notwithstanding any prior <br /> judicial precedents referred to under Section 8(1), the amendment related to <br /> those judicial precedents which explained the discretion and power of judicial <br /> authority to examine various aspects while exercising power under Section 8; <br /> the legislative intent and object were confined only to the above aspects, and <br /> was not on those aspects where certain disputes were not required to be <br /> referred to arbitration; it could not be said that, after the amendment under <br /> Section 8(1), the law laid down by the Supreme Court with reference to <br /> Section 2(3) of the 1996 Act, where large number of categories were held to <br /> be non-arbitrable, had been reversed or set at naught; neither any such <br /> legislative intendment was there nor any such consequence was <br /> contemplated that the law laid down by the Supreme Court, in the context of <br /> Section 2(3) of the 1996 Act, has to be ignored or reversed; while carrying out <br /> the amendment to Section 8(1) of the 1996 Act, the statutes providing <br /> additional remedies/special remedies were not in contemplation; the <br /> legislative intent was clear that the judicial authority&#x27;s discretion to refuse <br /> arbitration was minimised in respect of the jurisdiction exercisable by the <br /> judicial authority with reference to Section 8; that the amendment was also <br /> aimed to do away with the special or additional remedies was not <br /> decipherable from any material; in the event, the interpretation as put by the <br /> learned counsel for the petitioner was accepted, Section 8 had to be read to <br /> override the law laid down by the Supreme Court, with reference to various <br /> special/additional jurisdictions as had been adverted to and noted in <b>Booz </b><br /> <b>Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 SCC 532</b> , which <br /> was never the intent of the amendment to Section 8; the amendment to <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>59</b> of <b>178</b> <br /> <br /><br /> <br /> Section 8 could not be given such an expansive meaning and intent so as to <br /> inundate the entire regime of special legislations where such disputes were <br /> held to be not arbitrable; and something which the legislation never intended <br /> could not be accepted as a side wind to override settled law. <br /> <b> </b> <b> </b> <b>(e) JUDGEMENT OF THE DELHI HIGH COURT IN MB POWER </b><br /> <b>(MADHYA PRADESH) LIMITED v. STATE BANK OF INDIA &amp; </b><br /> <b>ORS:</b> <br /> In <b>MB POWER (MADHYA PRADESH) LIMITED v. STATE BANK OF </b><br /> <b>INDIA &amp; ORS: 2023/DHC/000227 (Judgement of the Delhi High Court in </b><br /> <b>CS(COMM) 282/2022 dated 13.01.2023), </b> an application was filed under <br /> Order VII Rule 11 of the Code of Civil Procedure, 1908 (“CPC‟, for short) by <br /> the applicant PTC India Limited (Defendant No. 2 in the titled suit) seeking <br /> rejection of the suit on the ground that the disputes therein were covered <br /> under the Electricity Act, 2003, and as such ought to be adjudicated by the <br /> appropriate Electricity Regulatory Commission under the aegis of the said Act. <b> </b><br /> The plaintiff in the suit, MB Power (Madhya Pradesh) Limited- a <br /> company incorporated under the Companies Act, 1956 and a generating <br /> company’ within the meaning of Section 2 (28) of the Electricity Act, had <br /> developed and was operating a 1200 MW (2 x 600 MW) coal-based thermal <br /> power project. Defendant No. 1 was a public sector bank, Defendant No. <br /> 2/applicant was an Electricity Trading Licensee as per the provisions of the <br /> Electricity Act, and Defendant No. 3 was an Electricity Distribution Licensee <br /> in the State of Tamil Nadu. The Applicant entered into a Power Supply <br /> Agreement (“PSA‟) with Defendant No. 3, and later entered into a back-to- <br /> back Power Purchase Agreement (“PPA‟) with the plaintiff. In terms of the <br /> PPA, Defendant No. 1 issued a Performance Security in the form of a Bank <br /> Guarantee for an amount of ₹15 crore on behalf of the plaintiff, and in favour <br /> of the applicant. It is the case of the plaintiff in the suit that the applicant has <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>60</b> of <b>178</b> <br /> <br /><br /> <br /> been unlawfully withholding the Bank Guarantee, after lapse of the PPA dated <br /> October 28, 2021, and has filed the suit for declaration, mandatory and <br /> permanent injunction against the defendants, and to restrain them from <br /> invoking the Bank Guarantee. <br /> It was contended, on behalf of the applicant, that the suit was liable to <br /> be rejected under Order VII Rule 11 of the CPC, as the suit is barred by law; <br /> the Supreme Court in <b>Gujarat Urja Vikas Nigam Ltd. v. Essar Power Ltd., </b><br /> <b>(2008) 4 SCC 775</b> , while interpreting 86(1)(f) of the Electricity Act, had held <br /> that it is a special provision and will override the general provisions of the <br /> Arbitration and Conciliation Act, 1996; this position was reiterated by the <br /> Supreme Court in <b>Chief General Manager (IPC) MP Power Trading Co. Ltd. </b><br /> <b>v. Narmada Equipments Pvt. Ltd., 2021 SCC Online SC 255, </b> and <br /> <b>Hindustan Zinc Ltd. (HZL) v. Ajmer Vidhyut Nigam Ltd., (2019) 17 SCC </b><br /> <b>82; </b> the scope of the term ‘regulate’ used in the above provision was very wide; <br /> in <b>Transmission Corporation of Andhra Pradesh Ltd v. Rain Calcining </b><br /> <b>Ltd and Ors., 2019 SCC Online SC 1537,</b> it was held that regulatory powers <br /> of the Commission were extensive and included whatever needs to be done <br /> for achieving the objects and purposes of the Act; any dispute involving a <br /> generating company, i.e., plaintiff, would be a matter connected with regard <br /> to clauses (a) to (d) of Section 79(1) and as such, as per Section 79(1)(f), <br /> needed to be adjudicated by the CERC. <br /> It is in this context that the Delhi High Court observed that it was not the <br /> case of the parties that the dispute between them needed to be adjudicated <br /> by the State Commission in terms of the functions stipulated in Section 86 of <br /> the Act; Section 79(1) itself, in clauses (c), (d) and (e), speaks of inter-State <br /> transmission and inter-State operations; this is to be contrasted with Section <br /> 86 which deals with functions of the State Commission which uses the <br /> expression “within the State” in clauses (a), (b) and (d), and “intra-State” in <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>61</b> of <b>178</b> <br /> <br /><br /> <br /> clause (c); and the issue which was to be considered was whether the dispute <br /> falls within the ambit of Section 79(1)(b) to enable the CERC to adjudicate the <br /> same under Section 79(1)(f). <br /> The Delhi High Court, thereafter, observed that the applicant received a <br /> letter dated April 19, 2022 from the plaintiff informing them of the deemed <br /> termination of the PPA in terms of Article 4.4 therein; Article 4.4, inter-alia, <br /> stipulates that, if the appointed date does not occur for whatever reason, on <br /> expiry of 120 days from the date of the PPA, the PPA is automatically deemed <br /> to be terminated with the mutual consent of the parties without requiring any <br /> positive action on the part of either party; it is the case of the plaintiff that, in <br /> view of the termination, the PPA never commenced, as the appointed date <br /> has not been fixed; the aforesaid position is disputed by defendant Nos.2 and <br /> 3, inasmuch as, according to them, the PPA has not come to an end; and, it <br /> is in this background, the jurisdiction of the CERC has to be seen. <br /> The Delhi High Court then observed that sub clauses (a), (c) and (d) of <br /> Section 79(1) had no applicability to the present issue; it was the case of <br /> defendant Nos.2 and 3 that the dispute related to Section 79(1)(b), as it <br /> involved a generating company (plaintiff) having a composite scheme for <br /> generation and sale of electricity in more than one state and, as such, the <br /> same needs to be adjudicated in terms of Section 79(1)(f) by the CERC; <br /> Section 79(1)(b) stipulates the functions of the CERC to include regulating the <br /> tariff of generating companies other than those owned or controlled by the <br /> Central Government specified in clause (a), if such generating companies <br /> entered into or otherwise have a composite scheme for generation and sale <br /> of electricity in more than one state; in the case on hand, the agreement for <br /> procurement of electricity between the plaintiff and the applicant which is a <br /> trading company, stood terminated and, in that sense, there is no agreement <br /> or a composite scheme governing the plaintiff and defendant No.2 for <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>62</b> of <b>178</b> <br /> <br /><br /> <br /> generation and sale of electricity; it was the submission, urged on behalf of <br /> the plaintiff, that the agreement had not commenced; this plea was not <br /> disputed; and, in the absence of any agreement / scheme governing the <br /> plaintiff and defendant No.2 / applicant, there exists no dispute with respect <br /> to tariff to be adjudicated by the CERC. <br /> The Delhi High Court, thereafter, observed that the functions of CERC <br /> are limited to matters covered by clauses (a) to (k) of Sub-Section (1) of <br /> Section 79 of the Act; it was the plea of the applicant that Section 79(1)(b) will <br /> come into play only when a PPA for supply to more than one State is in place; <br /> it followed that, if the PPA has not commenced, then Section 79(1)(b) is not <br /> attracted; the submission urged on behalf of Defendant No.3 that, since the <br /> composite scheme for generation and sale arises out of the PPAs entered into <br /> by the plaintiff such as the PPA dated October 28, 2021, the disputes forming <br /> the subject matter of the present suit, arising out of the PPA, is clearly in <br /> regard to matters connected with generating companies having a composite <br /> scheme for generation and sale of electricity in more than one State, as <br /> provided in Section 79(1)(b), and as such needs to be adjudicated by the <br /> CERC under Section 79(1)(f), was also liable to be rejected; for this Court to <br /> accept this submission, it must be apparent that the dispute between the <br /> parties essentially relates to tariff of the generating company, i.e., the plaintiff; <br /> it was contended that the present issue has had an impact on tariff, as the <br /> actions of the plaintiff had prevented the applicant from supplying power to <br /> defendant No. 3 under the PSA, and as such defendant No. 3 has been forced <br /> to secure power from the open market at rates much higher than the tariff <br /> determined; this contention was wholly irrelevant and could not be taken into <br /> consideration while deciding this application filed under Order VII Rule 11 of <br /> the CPC, as the same has been raised in the written statement of defendant <br /> No. 3, and did not flow from the plaint or the documents of the plaintiff; even <br /> otherwise, since the PPA had not commenced, the PSA could not be put in <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>63</b> of <b>178</b> <br /> <br /><br /> <br /> operation and as such no issue relating to tariff arises in the Suit for <br /> determination by the CERC; the submission of defendant Nos. 2 and 3, that <br /> the present matter relates to Section 79(1)(b) and as such needs to be <br /> adjudicated by the CERC under Section 79(1)(f), is liable to be rejected; <br /> further, there were no averments in the plaint and/or the documents filed by <br /> the plaintiff which showed that the dispute was with regard to tariff of the <br /> generating company (plaintiff); and, in fact, the prayer made was with regard <br /> to return of the Bank Guarantee pursuant to termination of the PPA by the <br /> plaintiff. <br /> With respect to the contention that, in view of Section 174 of the <br /> Electricity Act, Civil Courts had no jurisdiction, the Delhi High Court observed <br /> that, in view of the finding that the dispute raised in the plaint was not covered <br /> by Section 79(1)(b), the CERC had no jurisdiction to entertain the same; the <br /> suit filed by the plaintiff shall be maintainable; the plea that the right of the <br /> plaintiff to seek relief squarely entails adjudication of the rights and obligations <br /> under the PPA, and can only be done by the Commission is also not appealing <br /> in the facts of this case when the PPA has not commenced which governs <br /> tariff; it is not to be construed that the dispute with regard to tariff, relatable to <br /> the period when the PPA was in operation before termination, the Commission <br /> shall not have jurisdiction; in other words, a dispute relatable to tariff for the <br /> period when the PPA was in operation before termination, surely, can be <br /> decided by the Commission as the same falls within the ambit of Section <br /> 79(1)(b) of the Act. <br /> <b> </b> <b> </b> <b>(f) JUDGEMENT OF THE SUPREME COURT IN JAIPUR VIDYUT </b><br /> <b>VITRAN NIGAM LTD VS MB POWER (MADHYA PRADESH) </b><br /> <b>LTD: 2024 SCC ONLINE SC 26: </b><br /> It is unnecessary for us to take note of the contents of this judgement under <br /> this head, in as much as this Tribunal, in the <b>DVC </b> Judgement, observed that the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>64</b> of <b>178</b> <br /> <br /><br /> <br /> judgement in <b>JAIPUR VIDYUT VITRAN NIGAM LTD </b> did not advance the case <br /> of DVC; in <b>JAIPUR VIDYUT VITRAN NIGAM LTD, </b> the dispute between a <br /> distribution licensee and a generating company was entertained by the High <br /> Court of Judicature of Rajasthan in a Writ Petition; and, in these circumstances, <br /> the Supreme Court held that the High Court erred in directly entertaining the Writ <br /> Petition, and the Writ Petitioner had an alternate remedy of approaching the State <br /> Electricity Regulatory Commission. <br /> <b> </b> <b> </b> <b>(g) JUDGEMENT OF THE DELHI HIGH COURT IN</b> <b>RENEW </b><br /> <b>WIND ENERGY (AP2) (P) LTD. V. SOLAR ENERGY CORPN. </b><br /> <b>OF INDIA: 2025 SCC ONLINE DEL 8252</b> <br /> Since reliance is placed, on behalf of the Respondent-TPCL, on the <br /> judgement in <b>Renew Wind Energy (AP2) (P) Ltd, v. Solar Energy Corpn. </b><br /> <b>of India, 2025 SCC OnLine Del 8252</b> , it is useful to refer to the law declared, <br /> by the Delhi High Court, in this Judgement. <br /> The law declared by the Delhi High Court, in <b>Renew Wind Energy </b><br /> <b>(AP2) (P) Ltd, </b> can be summarized as under:- <br /> (i) An objection pertaining to statutory bars/exclusion to proceeding under <br /> the 1996 Act can be gone into by a Court acting under the jurisdiction <br /> conferred by Section 9 of the 1996 Act; <br /> (ii) Section 2(3) of the 1996 Act accounts for the possibility of a special <br /> statute prevailing over the 1996 Act and providing for a different mechanism <br /> to deal with a category of dispute(s) arising within the domain of the <br /> exclusionary legislation. <br /> (iii) Disputes made non-arbitrable, by legislative command, cannot be <br /> privately adjudicated by parties&#x27; consent. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>65</b> of <b>178</b> <br /> <br /><br /> <br /> (iv) In a scenario, where a statute provides for arbitration through a <br /> specialized procedure, arbitration, as a mode of dispute resolution, is not <br /> ousted, but the manner in which it is to be invoked may be governed by the <br /> special statute. <br /> (v) In Section 79(1)(f) of the Electricity Act, the word “and”, which appears <br /> between the words “clauses (a) to (d) above” and the words “to refer any <br /> dispute for arbitration”, should read as “or” in accordance with the law <br /> declared by the Supreme Court, <b> in Gujarat Urja Vikas Nigam Ltd. v. Essar </b><br /> <b>Power Ltd,</b> in the context of Section 86(1)(f), which is, in this context, pari-<br /> materia to Section 79(1)(f). <br /> (vi) The two-fold functions of the CERC, under Section 79(1)(f) of the <br /> Electricity Act, are (a) adjudication of disputes and (b) referring them for <br /> arbitration. <br /> (vii) The power of the CERC, qua the first facet, is discretionary as <br /> recognized by the Supreme Court in Paras 30 and 31 of <b>GUVNL</b> , in the <br /> context of Section 86(1)(f). <br /> (viii) In a case before the CERC involving generating companies or <br /> transmission licensees, where the dispute is connected with matters listed <br /> under Section 79(1)(a)-(d), the CERC may choose to itself adjudicate upon <br /> the dispute or refer the same for arbitration. The mere existence of an <br /> arbitration clause in the agreement between the parties would not have a <br /> determinative effect on the CERC&#x27;s decision while exercising its discretionary <br /> power under this provision. <br /> (ix) A conjoint reading of Section 79(1)(f) and Section 158 of the Electricity <br /> Act would reveal that the CERC&#x27;s referral power, as also the act of referring <br /> parties for arbitration, is effectively a trigger mechanism for invoking the <br /> provisions of the 1996 Act. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>66</b> of <b>178</b> <br /> <br /><br /> <br /> (x) Paragraph 59 of <b>GUVNL</b> is not limited to an analysis of Section 86(1)(f). <br /> The express words “or the Central Commission (as the case may be) or <br /> arbitrator (or arbitrators) nominated by it” squarely apply to Section 79(1)(f). <br /> (xi) The referral power of the CERC under Section 79(1)(f) would disable <br /> any Court/authority, other than the CERC, from referring disputes involving <br /> generating companies or transmission licensees for arbitration. <br /> (xii) Section 86(1)(f) is broader than Section 79(1)(f) of the Electricity Act. <br /> In <b>Torrent Power Ltd. v. U.P. ERC: 2025 SCC OnLine SC 1410,</b> the <br /> Supreme Court held that the adjudicatory jurisdiction of the Central <br /> Commission is specified under Section 79(1)(f) and is limited to adjudication <br /> of disputes involving generating companies or transmission licensees, in <br /> regard to matters connected with clauses (a) to (d), and the State ERCs have <br /> a comparatively broader jurisdiction under Section 86, to adjudicate upon all <br /> disputes between the licensees and generating companies, without being <br /> limited to categories specified in clauses (a) to (d) of Section 79. <br /> (xiii) Since the scope of referral powers under Section 79(1)(f) and 86(1)(f) <br /> are the same, the dictum of <b>GUVNL</b> would squarely apply, and the referral <br /> powers under Section 79(1)(f) would prevail over Section 11 of the Arbitration <br /> Act. <br /> In short, the law declared by the Delhi High Court, in <b>Renew Wind </b><br /> <b>Energy (AP2) (P) Ltd, </b> is that: (a) Section 79(1)(f) of the Electricity Act vests <br /> two distinct powers with the CERC, ie adjudicatory powers and referral <br /> powers; the CERC, in the exercise of its adjudicatory powers, can only <br /> adjudicate upon disputes connected with Section 79(1)(a)-(d); however, while <br /> exercising its referral powers, it can refer “any” dispute for arbitration; (b) the <br /> power of the CERC to refer a dispute involving generating companies or <br /> transmission licensee for arbitration prevails over the referral powers of a <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>67</b> of <b>178</b> <br /> <br /><br /> <br /> Court/authority, other than the CERC, under Sections 8 or 11 of the Arbitration <br /> Act; and (c) the CERC has the exclusive power and prerogative under Section <br /> 79(1)(f) of the Electricity Act to refer disputes concerning generating <br /> companies or transmission licensee for arbitration. <br /> The Delhi High Court is the jurisdictional High Court and exercises <br /> judicial superintendence over orders of both the CERC and this Tribunal. The <br /> afore-said observations of the Delhi High Court, in <b>Renew Wind Energy </b><br /> <b>(AP2) Pvt Ltd, </b> are therefore binding on this Tribunal. <br /> The contents of the other part of the Judgement of the Delhi High Court <br /> in <b>Renew Wind Energy (AP2) Pvt Ltd,</b> wherein the scope and ambit of the <br /> second limb of Section 79(1)(f) of the Electricity Act was considered, shall be <br /> referred to later under this head. Suffice it to note that the opinion expressed <br /> by the Delhi High Court, on the applicability of the second limb of Section <br /> 79(1)(f) to the nature of disputes to be referred to arbitration, appears to be <br /> contrary to the judgement of the Supreme Court in <b> Hindustan Zinc</b> , and may <br /> therefore not constitute a precedent binding on this Tribunal. More on these <br /> aspects later in this order. <br /> <b> </b> <b> </b> <b>(h) SECTION 79(1)(f): ITS SCOPE: </b> <br /> Section 79 of the Electricity Act relates to the functions of the Central <br /> Commission and, under sub-section (1) thereof, the CERC discharges the <br /> functions enumerated in clauses (a) to (k). Section 79 (1)(f) requires the <br /> Commission to discharge the function <i> “to adjudicate upon disputes involving </i><br /> <i>generating companies or transmission licensee in regard to matters </i><br /> <i>connected with clauses (a) to (d)…. and to refer any dispute for arbitration” </i><br /> The power conferred on the Central Commission, under Section 79(1)(f) <br /> of the Electricity Act to adjudicate disputes, is confined only to those disputes <br /> involving (1) generating companies or (2) transmission licensees. As long as <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>68</b> of <b>178</b> <br /> <br /><br /> <br /> the dispute involves a generating company or a transmission licensee, and <br /> even if the other party/parties to the dispute are neither generating companies <br /> nor transmission licensees, the Central Commission would have jurisdiction <br /> to adjudicate such disputes, provided they fall within the ambit of clauses (a) <br /> to (d) of Section 79(1). <b> (Nuclear Power Corporation of India V. Central </b><br /> <b>Electricity Regulatory Commission: (Judgement of APTEL in Appeal No. </b><br /> <b>134 Of 2024 dated 27.03.2025).</b> The Respondent-TPCL is a generating <br /> company in terms of Section 79(1)(b) of the Electricity Act. <br /> Apart from the requirement that the dispute should involve a generating <br /> company, the jurisdiction conferred on the Central Commission, under the first <br /> limb of Section 79(1)(f), is further confined to adjudication of such disputes <i>“in </i><br /> <i>regard to matters connected with”</i> clauses (a) to (d) of Section 79(1). It is not <br /> every dispute involving a generating company, but only those disputes which <br /> involve a generating company and are in regard to matters connected with <br /> clauses (a) to (d) of Section 79(1) which can be adjudicated by the Central <br /> Commission. While clauses (c) and (d) relate to inter-State transmission with <br /> which we are not concerned in the present appeal, clauses (a) of Section <br /> 79(1) relates to regulation of tariff of generating companies owned or <br /> controlled by the Central Government. The Respondent-TPCL is not a <br /> generating company owned or controlled by the Central Government, and <br /> hence clause (a) of Section 79(1) is also inapplicable to the case on hand. <br /> Consequently, it is only if the disputes raised by GUVNL, PSPCL, HPPV and <br /> TPCL, in the Petitions filed by them before the CERC, which culminated in the <br /> impugned order being passed, fall within the ambit of clause (b) of Section <br /> 79(1), can the CERC be held to have jurisdiction to adjudicate such disputes. <br /> The function of the CERC, under Section 79(1)(b), is to regulate the tariff <br /> of non-central govt owned and controlled generating companies which enter <br /> or otherwise have a composite scheme for generation and sale of electricity <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>69</b> of <b>178</b> <br /> <br /><br /> <br /> in more than one State. It is not in dispute that, in the present case, the <br /> Respondent-TPCL is a generating company which generates and sells <br /> electricity in more than one State, for the electricity generated by the <br /> Respondent-TPCL is procured by GUVNL, PSPCL and HCC, among other <br /> procurers, all of which distribute electricity in different States. Consequently, <br /> regulation of tariff of the Respondent-TPCL would fall within the ambit of <br /> Section 79(1)(b) of the Electricity Act. <br /> <b> </b> <b> </b> <b>(i) JURISDICTION BEING CONFERRED ON A TRIBUNAL </b><br /> <b>UPON CERTAIN SPECIFIED TERMS: ITS EFFECT: </b><br /> Wherever jurisdiction is given to a court (or Tribunal) by an Act of <br /> Parliament, and such jurisdiction is only given upon certain specified terms <br /> contained in that Act, these terms must be complied with, in order to create <br /> and confer jurisdiction on it for, if they be not complied with, it would lack <br /> jurisdiction. <b>(Nusserwanjee Pestonjee v. Meer Mynoodeen Khan [LR </b><br /> <b>(1855) 6 MIA 134 (PC); Mohd. Hasnuddin v. State of Maharashtra, (1979) </b><br /> <b>2 SCC 572).</b> Every tribunal of limited jurisdiction is bound to determine <br /> whether the matter, in which it is asked to exercise its jurisdiction, comes <br /> within the limits of its special jurisdiction, and whether the jurisdiction of such <br /> a tribunal is dependent on the existence of certain facts or circumstances. Its <br /> obvious duty is to see that these facts and circumstances exist to invest it with <br /> jurisdiction, and where a tribunal derives its jurisdiction from the statute that <br /> creates it, and that statute also defines the conditions under which the tribunal <br /> can function, it goes without saying that, before that tribunal assumes <br /> jurisdiction in a matter, it must be satisfied that the conditions requisite for its <br /> acquiring seisin of that matter have in fact arisen. <b>(Mohd. Hasnuddin v. State </b><br /> <b>of Maharashtra, (1979) 2 SCC 572). </b><br /> As it derives its powers from the express provisions of the Electricity Act, <br /> the powers, which have not been expressly given by the said Act, cannot be <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>70</b> of <b>178</b> <br /> <br /><br /> <br /> exercised by the Regulatory Commissions <b>. (Rajeev Hitendra Pathak v. </b><br /> <b>Achyut Kashinath, (2011) 9 SCC 541). </b> Since the Central Commission is a <br /> creation of the Electricity Act under Section 76(1), and a body corporate under <br /> Section 76(3) thereof, its jurisdiction is limited to those specifically conferred <br /> on it under the provisions of the Electricity Act, and not beyond. <b>(BSES </b><br /> <b>Rajdhani Power Ltd vs DERC: (Judgement of the Supreme Court in Civil </b><br /> <b>Appeal No.4324 of 2015 dated 18.10.2022). Such Tribunals exercise </b><br /> <b>limited jurisdiction. (S.D. Joshi v. High Court of Bombay, (2011) 1 SCC </b><br /> <b>252).</b> The Central Electricity Regulatory Commission can exercise jurisdiction <br /> only when the subject matter of adjudication falls within its competence, and <br /> the order that may be passed is within its authority, and not otherwise. <br /> <b>(Dakshin Haryana Bijli Vitaran Nigam Ltd. v. Princeton Park </b><br /> <b>Condominium: 2007 Aptel 764; BSES Rajdhani Power Limited v. Delhi </b><br /> <b>Electricity Regulatory Commission, 2009 SCC OnLine APTEL 52).</b> <br /> <b>(Nuclear Power Corporation of India v. Central Electricity Regulatory </b><br /> <b>Commission (Judgment of Aptel in Appeal No. 134 of 2024 dated </b><br /> <b>27.03.2023). </b> Consequently, it is only if the dispute involves generating <br /> companies and is in regard to matters connected with clauses (a) to (d) of <br /> Section 79(1) can the CERC exercise its adjudicatory jurisdiction under the <br /> first limb of Section 79(1)(f) of the Electricity Act. <br /> <b> </b> <b> </b> <b>(j) JURISDICTIONAL FACTS: </b><br /> While the CERC is empowered, by Section 79(1)(b), to regulate the tariff <br /> of the Respondent-TPCL, the question which arises for consideration is <br /> whether it is also has jurisdiction under Section 79(1)(f) to adjudicate disputes, <br /> involving the Respondent-TPCL, in the various Petitions filed by the Procurers <br /> and TPCL itself before the Commission, for it is only if such disputes are in <br /> regard to matters connected with the regulation of tariff of the Respondent-<br /> TPCL, would the CERC have jurisdiction to adjudicate such disputes. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>71</b> of <b>178</b> <br /> <br /><br /> <br /> A ‘jurisdictional fact’ is a fact which must exist before a court, tribunal or <br /> an authority assumes jurisdiction over a particular matter. A jurisdictional fact <br /> is one on existence or non-existence of which depends the jurisdiction of a <br /> court, a tribunal or an authority <b>. (Arun Kumar vs. Unio of India:(2007) 1 SCC </b><br /> <b>732; Ramesh Chandra Sankla v. Vikram Cement, (2008) 14 SCC 58). </b> The <br /> fact or facts upon which the jurisdiction of a court, a Tribunal or an authority, <br /> depends can be said to be a &quot;jurisdictional fact&quot;. If the &quot;jurisdictional fact&quot; <br /> exists, a court, Tribunal or authority has jurisdiction to decide other issues. If <br /> such fact does not exist, a court, Tribunal or authority cannot act. The <br /> existence of a jurisdictional fact is thus the sine qua non or the condition <br /> precedent for the assumption of jurisdiction by a court or Tribunal of limited <br /> jurisdiction. Once such a jurisdictional fact is found to exist, the court or <br /> Tribunal has the power to decide adjudicatory facts or facts in issue <b>. (Carona </b><br /> <b>Ltd. v. Parvathy Swaminathan &amp; Sons (2007) 8 SCC 559; Ramesh </b><br /> <b>Chandra Sankla v. Vikram Cement, (2008) 14 SCC 58; Halsbury&#x27;s Laws </b><br /> <b>of England (Fourth Edition), Volume 1, para 55, page 61 ; Reissue, </b><br /> <b>Volume 1(1), para 68, pages 114-15, Chaube Jagdish Prasad v. Ganga </b><br /> <b>Prasad Chaturvedi AIR 1959 SC 492; Arun Kumar v. Union of India [2006] </b><br /> <b>286 ITR 89 (SC) ; (2007) 1 SCC 732; BGR Energy Systems Ltd. v. ACCT, </b><br /> <b>2009 SCC OnLine AP 238; Bharat Electronics Ltd. v. Deputy Commr., </b><br /> <b>(CT), 2011 SCC OnLine AP 1080; K. G. F. Cottons (P) Ltd. v. Asst. Commr. </b><br /> <b>(CT): 2015 SCC OnLine Hyd 46; and Ad Age Outdoor Advertising P. Ltd. </b><br /> <b>v. Govt., A. P., 2011 SCC OnLine AP 1077)</b> . <b> </b> <br /> As existence of a ‘jurisdictional fact’ is the sine qua non for the exercise <br /> of power, the CERC can only proceed with the case and take an appropriate <br /> decision in accordance with law if the jurisdictional fact exists. <b>(Arun Kumar </b><br /> <b>v. Union of India:(2007) 1 SCC 732; Ramesh Chandra Sankla v. Vikram </b><br /> <b>Cement, (2008) 14 SCC 58; Carona Ltd. v. Parvathy Swaminathan &amp; </b><br /> <b>Sons, (2007) 8 SCC 559). </b> The jurisdictional facts necessary for the CERC to <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>72</b> of <b>178</b> <br /> <br /><br /> <br /> exercise its powers of adjudication of the dispute, under Section 79(1)(f) read <br /> with Section 79(1)(b) of the Electricity Act, is firstly that the dispute involves a <br /> generating company, other than those owned or controlled by the Central <br /> Government; secondly that such a generating company enters into or <br /> otherwise has a composite scheme for generation and sale of electricity in <br /> more than one State; and thirdly, that the dispute is in regard to matters <br /> connected with clause (b) of Section 79(1) ie matters connected with the <br /> regulation of tariff of such a generating company. <br /> The first requirement of the Respondent-TPCL not being a generating <br /> company owned or controlled by the Central Govt, as also the second <br /> requirement of the Respondent-TPCL generating and selling electricity in <br /> more than one State, are satisfied in the present case. It is only if the third <br /> jurisdictional fact, of the dispute being in regard to matters connected with the <br /> regulation of tariff of such a generating company, is satisfied, can the CERC <br /> then exercise jurisdiction to adjudicate the dispute considering the <br /> adjudicatory facts involved in such a lis. <b> </b> We shall examine, what the <br /> expressions “involve”, <i> “in regard to”</i> , <i>“connected with”</i> and <i>“regulate”</i> in <br /> Section 79(1)(f) mean, later in this order under another head. <br /> <b> </b> <b> </b> <b>(k) SECTION 79 VIS-À-VIS SECTION 86 OF THE ELECTRICITY </b><br /> <b>ACT: </b><br /> Section 86 of the Electricity Act relates to the functions of the State <br /> Regulatory Commission, and Section 86(1)(a) empowers the State <br /> Commission to determine the tariff for generation and supplying within the <br /> State. Unlike Section 79(1)(b) which relates to regulation of tariff of generating <br /> companies involved in inter-State generation and supply of electricity, Section <br /> 86(1)(a) is confined to determining the tariff for generation and supply within <br /> the State and not inter-State. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>73</b> of <b>178</b> <br /> <br /><br /> <br /> Section 86(1)(f) confers power on the State Commission to adjudicate <br /> disputes between licensees and generating companies, and to refer any <br /> disputes to arbitration. Adjudication of disputes under Section 86(1)(f) is with <br /> respect to disputes between licensees (which would include distribution <br /> licensees) and generating companies. The scope of Section 86(1)(f) is very <br /> wide as it covers all disputes, between licensees and generating companies, <br /> which relate to the regulatory jurisdiction of the State Commission. In other <br /> words, there is no restriction in Section 86(1)(f) regarding the nature of the <br /> licensee. Thus, all disputes relating to the regulatory jurisdiction of the State <br /> Commission which involves the Distribution Licensee or a trading licensee or <br /> a transmission licensee should be adjudicated exclusively by the State <br /> Commission. <b>(Pune Power Development Private Ltd. v. Karnataka </b><br /> <b>Electricity Regulatory Commission, 2011 SCC OnLine APTEL 24) </b><br /> A comparison of Section 79 and Section 86 of the Electricity Act would <br /> make it evident that the jurisdiction of the Central Commission is restricted <br /> only to clauses (a) to (d) of Section 79(1) with regard to disputes involving <br /> generating Companies or transmission licensees. This means that any <br /> dispute between distribution licensees and inter-State trading licensees is <br /> excluded from the ambit of Section 79(1)(f). The power to adjudicate disputes <br /> between a Distribution Licensee and a Trading Licensee has been vested with <br /> the State Commission under Section 86(1)(f) of the Act. ( <b>Pune Power </b><br /> <b>Development </b> <b>Private </b> <b>Ltd. </b> <b>v. </b> <b>Karnataka </b> <b>Electricity </b> <b>Regulatory </b><br /> <b>Commission, 2011 SCC OnLine APTEL 24). </b><br /> All disputes between licensees which do not fall under Section 79(1)(a) <br /> to (d) are within the jurisdiction of the State Commission. ( <b>Pune Power </b><br /> <b>Development </b> <b>Private </b> <b>Ltd. </b> <b>v. </b> <b>Karnataka </b> <b>Electricity </b> <b>Regulatory </b><br /> <b>Commission, 2011 SCC OnLine APTEL 24). </b> Unlike Section 79(1)(f) which <br /> confines exercise of jurisdiction by the CERC only to adjudicate disputes <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>74</b> of <b>178</b> <br /> <br /><br /> <br /> involving generating companies in regard to matters connected with clauses <br /> (a) to (d) of Section 79(1), Section 86(1) empowers the State Commission to <br /> adjudicate any dispute between licensees and generating companies, apart <br /> from those disputes which fall within the ambit of clauses (a) &amp; (b) of Section <br /> 79(1) as the jurisdiction to adjudicate such disputes is conferred on the Central <br /> Commission alone and, notwithstanding the wide language used in Section <br /> 86(1)(f), the State Commission lacks jurisdiction to adjudicate such disputes <br /> since the Electricity Act does not confer concurrent jurisdiction on both the <br /> Commissions. In other words in view of the scheme of the Electricity Act, more <br /> particularly Sections 79 and 86 thereof, the State Commission cannot claim <br /> concurrent jurisdiction with the Central Commission in any dispute covered by <br /> clauses (a) to (d) of Section 79(1), and if any matter falls under the scheme of <br /> clauses (a) to (d) of Section 79(1), the provisions of Section 86(1)(f) are <br /> inapplicable. ( <b>SECI vs KSERC</b> (Judgement of Aptel in Appeal No. 414 of 2022 <br /> dated 13.08.2024) <br /> <b> </b> <b> </b> <b>(l) THE WORD “AND” IN SECTION 79(1)(f) SHOULD BE READ </b><br /> <b>AS “OR”: </b><br /> There are two limbs to clause (f) of Section 79(1) of the Electricity Act. <br /> The first relates to adjudication of disputes involving generating companies in <br /> regard to matters connected with clauses (a) to (d) of Section 79(1), and the <br /> second is <i>“to refer any dispute for arbitration”</i> . Unlike the first limb of clause <br /> (f) of Section 79(1), the language of which is different from that used in the <br /> first limb of Section 86(1)(f), the words <i> “and to refer any dispute for arbitration”</i> , <br /> used in the second limb of Section 79(1)(f), are identical to the words <i>“and to </i><br /> <i>refer any dispute for arbitration”</i> used in the second limb of Section 86(1)(f) of <br /> the Electricity Act. <br /> In <b>GUVNL v. ESSAR, (2008) 4 SCC 755, </b> the Supreme Court held that <br /> the word “and” in Section 86 (1)(f) should be read as “or” in as much as the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>75</b> of <b>178</b> <br /> <br /><br /> <br /> State Commission cannot, at the same time, adjudicate upon disputes <br /> between licensees and generating companies, and simultaneously refer such <br /> disputes to arbitration; and on the word <i>“and”</i> being read as <i>“or”</i> , the State <br /> Commission would have the discretion either to adjudicate disputes between <br /> licensees and generating companies or to refer such disputes for arbitration. <br /> In <b>Renew Wind Energy (AP2) (P) Ltd, v. Solar Energy Corpn. of </b><br /> <b>India, 2025 SCC OnLine Del 8252</b> , the Delhi High Court held that, in Section <br /> 79(1)(f) of the Electricity Act, the word <i>“and”</i> , which appears between the <br /> words “clauses (a) to (d) above” and the words “to refer any dispute for <br /> arbitration”, should read as <i>“or”</i> in accordance with the law declared by the <br /> Supreme Court, <b> in Gujarat Urja Vikas Nigam Ltd. v. Essar Power Ltd,</b> in <br /> the context of Section 86(1)(f), which is, in this context, pari-materia to Section <br /> 79(1)(f). <br /> <b> </b> <b> </b> <b>(m) \WHERE THE SAME EXPRESSION IS USED IN TWO </b><br /> <b>SIMILAR PROVISIONS, IT SHOULD BE UNDERSTOOD TO </b><br /> <b>CARRY THE SAME MEANING: </b><br /> It is, at all events, reasonable to presume that the same meaning is <br /> implied by the use of the same expression in every part of an Act <b>(Maxwell&#x27;s </b><br /> <b>Interpretation of Statutes, Edn. 10, p. 522).</b> Where the legislature uses the <br /> same expression in two provisions of the same Statute, the said expression <br /> must be understood to carry the very same meaning, for words are generally <br /> used in the same sense throughout in a statute unless there is something <br /> repugnant in the context. <b>(Bhogilal Chunilal Pandya v. State of Bombay: </b><br /> <b>AIR 1959 SC 356). </b> Ordinarily, the rule of construction is that the same <br /> expression, where it appears more than once in the same statute, must <br /> receive the same meaning unless the context suggests otherwise. <b>(Suresh </b><br /> <b>Chand v. Gulam Chisti, (1990) 1 SCC 593: 1990 SCC OnLine SC 93).</b> In <br /> other words, where the legislature uses the same expression in the same <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>76</b> of <b>178</b> <br /> <br /><br /> <br /> statute at two places or more, then the same interpretation should be given to <br /> that expression unless the context requires otherwise. ( <b>Raghubans Narain </b><br /> <b>Singh v. U.P. Government, 1966 SCC OnLine SC 37; Singareni Colleries </b><br /> <b>Company Limited V. Telangana State Electricity Regultory Commission: </b><br /> <b>(Judgement of Aptel in Appeal No. 256 of 2024 and batch dated </b><br /> <b>28.08.2025).</b> If the field of the two provisions were to be the same, the same <br /> words would, ordinarily, be used. ( <b>B.R. Enterprises v. State of U.P (1999) 9 </b><br /> <b>SCC 700; Kurapati Bangaraiah vs Govt of AP: (2015) 5 ALD 622) (Uttar </b><br /> <b>Pradesh Power Corporation Limited and Ors. V. Uttar Pradesh Electricity </b><br /> <b>Regulatory Commission Ors: (Judgement of APTEL in Appeal No. 308 </b><br /> <b>Of 2024 Dated 30.08.2024)</b> <br /> As the very same words <i>“to refer any dispute to arbitration” </i> are <br /> used both in the second limb of Section 79(1)(f) and 86(1)(f) and, since the <br /> context does not suggest otherwise and there is nothing repugnant in the <br /> context of both these provisions requiring a meaning being given to the words <br /> <i>“to refer any dispute to arbitration”</i> in Section 79(1)(f) different from that to be <br /> given to the said words in Section 86(1)(f), the words <i>“to refer any dispute to </i><br /> <i>arbitration” </i> must carry the same meaning in both these provisions. <br /> Consequently, the word <i>“and”</i> in Section 79(1)(f) must be read as <i>“or”</i> , and the <br /> Central Commission as having the discretion under Section 79(1)(f) either to <br /> adjudicate disputes in regard to matters connected with clauses (a) to (d) of <br /> Section 79(1) or to refer any dispute for arbitration. <br /> <b> </b> <b> </b> <b>(n) TWO </b> <b>LIMBS </b> <b>OF </b> <b>SECTION </b> <b>79(1)(f): </b> <b>ARE </b> <b>THEY </b><br /> <b>UNCONNECTED WITH EACH OTHER: </b><br /> It is contended, on behalf of the Respondent-TPCL, that the CERC has <br /> rightly held that the second limb of Section 79(1)(f) should be read <br /> independent of the first limb and, even in cases where the Central <br /> Commission lacks jurisdiction to adjudicate disputes under the first limb of <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>77</b> of <b>178</b> <br /> <br /><br /> <br /> Section 79(1)(f) (ie to adjudicate disputes in regard to matters connected with <br /> clauses (a) to (d) of Section 79(1), more particularly non-tariff disputes), it <br /> would nonetheless have jurisdiction to refer <i>“any”</i> dispute (ie the non-tariff <br /> dispute) to arbitration. <br /> This submission also finds support from the Delhi High Court <br /> Judgement, in <b> Renew Wind Energy (AP2) (P) Ltd,</b> wherein it was held that <br /> the Central Commission not only has the jurisdiction to refer disputes, in <br /> regard to matters connected with clauses (a) to (d) of Section 79(1) to <br /> arbitration, but it also has the power to refer disputes, even in regard to <br /> matters unconnected with clauses (a) to (d) of Section 79(1), to arbitration as <br /> the scope and ambit of the second limb of Section 79(1)(f) is extremely wide. <br /> Accepting this submission, urged on behalf of the Respondent-TPCL, <br /> would result in startling consequences. A plain and literal reading of the words <br /> refer <i> “any” </i> dispute for arbitration, independent of the first limb of Section <br /> 79(1)(f), can be construed to mean that the Central Commission could refer <br /> even a dispute which does not fall within the ambit of Electricity Act, say for <br /> example a matrimonial dispute, also to arbitration. In this context, it must be <br /> borne in mind that a Tribunal, which is a creation of a Statute, has only the <br /> powers expressly conferred on it, or resulting directly from the powers so <br /> conferred. Acting otherwise goes to the very existence of the power. Statutory <br /> Tribunals, set up under an Act of Parliament, are creations of the Statute <b>, </b><br /> <b>(R.K. Jain v. Union of India, (1993) 4 SCC 119), </b> and should be guided by <br /> the conditions stipulated in the statutory provisions while exercising powers <br /> expressly conferred or those incidental thereto. <b>(Commissioner of Central </b><br /> <b>Excise v. Sri Chaitanya Educational Committee, 2011 SCC OnLine AP </b><br /> <b>1078).</b> Statutory Tribunals, created by an Act of Parliament, have limited <br /> jurisdiction and must function within the four-corners of the Statute which <br /> created them. <b>(O.P. Gupta v. Dr. Rattan Singh, (1964) 1 SCR 259).</b> It is not <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>78</b> of <b>178</b> <br /> <br /><br /> <br /> open to such Tribunals to travel beyond the provisions of the statute. <b>(D. </b><br /> <b>Ramakrishna Reddy v. Addl. Revenue Divisional Officers, (2000) 7 SCC </b><br /> <b>12). </b> An authority created by a statute must act under the Act and not outside <br /> it. As it is a creation of the statute, it can only decide the dispute in terms of <br /> the provisions of the Act. <b>(K.S. Venkataraman &amp; Co. v. State of Madras, AIR </b><br /> <b>1966 SC 1089; Mysore Breweries Lt. v. Commissioner of Income-Tax, </b><br /> <b>(1987) 166 ITR 723 (KAR)). (Nuclear Power Corporation of India v. </b><br /> <b>Central Electricity Regulatory Commission (Judgment of Aptel in Appeal </b><br /> <b>No. 134 of 2024 dated 27.03.2025). </b><br /> Both the CERC and the State Commissions are creations of the <br /> Electricity Act, and their powers and functions are confined only to the <br /> provisions of the said Act and not beyond. Consequently, the jurisdiction <br /> conferred on the CERC under the second limb of Section 79(1)(f), and on the <br /> State Commission under the second limb of Section 86(1)(f), to refer any <br /> dispute to arbitration must be understood only as the power to refer <i>“any”</i> <br /> dispute under the Electricity Act to arbitration, and not disputes falling outside <br /> the purview of the said Act. <br /> Even if we were to read the words <i>“any dispute”</i> , in the second limb of <br /> Section 79(1)(f), to mean any dispute under the Electricity Act, and that the <br /> CERC can refer any dispute under the Electricity Act to arbitration, it would <br /> still result in unacceptable consequences. <br /> <b> </b> Not all disputes under the Electricity Act fall within the adjudicatory <br /> jurisdiction of either the CERC or the State Commissions. Disputes involving <br /> consumers are not amenable to the adjudicatory jurisdiction of either of these <br /> Commissions. In <b>Torrent Power Ltd vs UPERC: 2025 SCC OnLine 1410</b> , <br /> the Supreme Court held that the adjudicatory jurisdiction of the Central <br /> Commission is specified under Section 79(1)(f) and is limited to adjudication <br /> of disputes involving generating companies or transmission licensees, in <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>79</b> of <b>178</b> <br /> <br /><br /> <br /> regard to matters connected with clauses (a) to (d); the State Electricity <br /> Regulatory Commissions have a comparatively broader jurisdiction under <br /> Section 86, to adjudicate upon all disputes between the licensees and <br /> generating companies, without being limited to categories specified in (a) to <br /> (d) of Section 79; however, even this enlarged jurisdiction of the State <br /> Electricity Regulatory Commissions does not include the power to adjudicate <br /> disputes involving consumers, and by extension their grievances. <br /> The Electricity Act provides for separate fora for redressal of grievances <br /> of consumers. Section 42(5) requires every distribution licensee to establish <br /> a forum for redressal of grievances of consumers in accordance with the <br /> guidelines as may be specified by the State Commission. Section 42(6) <br /> enables any consumer, who is aggrieved by the non-redressal of his <br /> grievances by the forum for redressal of consumer disputes, to make a <br /> representation, for the redressal of his grievance, to an Ombudsman <br /> appointed or designated by the State Commission. The CGRF established in <br /> terms of the guidelines made by the State Commission, and the Ombudsman <br /> appointed/ designated by the State Commission, are the two authorities which <br /> can be approached by a consumer for redressal for his grievance, and not <br /> either the Central or the State Commission. If, on an expanded meaning being <br /> given to the words <i>“any dispute”</i> , disputes involving consumers under the <br /> Electricity Act are held capable of being referred to arbitration by the CERC <br /> under Section 79(1)(f), we must then hold that such disputes can be referred <br /> to arbitration by the State Commission also, for the second limb in both the <br /> said provisions are identically worded. As shall be elaborated later, in this <br /> order, such a construction would fall foul of the law laid down by the Supreme <br /> Court in <b>Hindustan Zinc Ltd. v. Ajmer Vidyut Vitran Nigam Ltd., (2019) 17 </b><br /> <b>SCC 82.</b> <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>80</b> of <b>178</b> <br /> <br /><br /> <br /> Further, even if the words <i>“any dispute”</i> in Section 79(1)(f) were to be <br /> read as <i>“any dispute”</i> under the Electricity Act involving generating <br /> companies, but unrelated to clauses (a) to (d) of Section 79(1), it would still <br /> result in a situation where the CERC would then be held to have jurisdiction <br /> to refer a dispute, between a generating company supplying electricity intra- <br /> State and a distribution licensee, to arbitration. This would result in conferring <br /> power on the CERC to refer a dispute, not falling within its adjudicatory <br /> jurisdiction under Section 79(1)(f) and falling within the adjudicatory <br /> jurisdiction of the State Commission under Section 86(1)(f) of the Electricity <br /> Act, for arbitration. It may also result in conferring concurrent jurisdiction in <br /> both the CERC and the State Commission to refer any dispute, under the <br /> Electricity Act involving generating companies, to arbitration ie the State <br /> Commission must thereby be held to have the jurisdiction to refer disputes, <br /> falling within clauses (a) &amp; (b) of Section 79(1) to arbitration in the exercise of <br /> its powers under Section 86(1)(f), though the jurisdiction to adjudicate such <br /> disputes vests exclusively with the Central Commission under Section 79(1)(f) <br /> of the Electricity Act. <br /> In this context, it must be borne in mind that the Electricity Act is <br /> conceived to be a complete code in itself. <b>(PTC India Ltd vs CERC: (2010) 4 </b><br /> <b>SCC 603; Pune Power Development Private Ltd. v. Karnataka Electricity </b><br /> <b>Regulatory Commission, 2011 SCC OnLine APTEL 24). </b> All disputes, in <br /> relation to transaction involving generators/ licensees, are made subject to <br /> the jurisdiction of the State Commission or the Central Commission as <br /> contained in Sections 86 and 79 of the Electricity Act respectively. ( <b>Pune </b><br /> <b>Power Development Private Ltd. v. Karnataka Electricity Regulatory </b><br /> <b>Commission, 2011 SCC OnLine APTEL 24). </b> However, a PPA executed <br /> between parties, which deals with generation and supply of electricity, will <br /> either be governed by the State Commission or the Central Commission <br /> constituted under the Electricity Act, for, if neither Commission is held to have <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>81</b> of <b>178</b> <br /> <br /><br /> <br /> jurisdiction, it would lead to absurdity. ( <b>Energy Watchdog v. CERC, (2017) </b><br /> <b>14 SCC 80; SECI vs KSERC</b> (Judgement of Aptel in Appeal No. 414 of 2022 <br /> dated 13.08.2024) <b>.</b> <br /> Except for Section 64(5) which enables, on fulfilment of the conditions <br /> stipulated therein, for a State Commission to exercise jurisdiction to determine <br /> tariff for inter-state supply of electricity, which may otherwise fall within the <br /> jurisdiction of the Central Commission, our attention has not been drawn to <br /> any other provision in the Electricity Act which confers concurrent jurisdiction <br /> on both the Central and the State Commission. Accepting the construction <br /> placed, on behalf of the Respondent-TPCL, on the words <i>“refer any dispute </i><br /> <i>for arbitration”</i> in Section 79(1)(f), as conferring power on the CERC to refer <br /> a non-tariff dispute involving a generating company, not falling under Section <br /> 79(1)(b) of the Electricity Act, for arbitration, would require us to hold that, <br /> since the second limb of Section 86(1)(f) is identically worded, the State <br /> Commission would also have jurisdiction to refer such a dispute to arbitration, <br /> meaning thereby that both the CERC and the State Commission would have <br /> concurrent jurisdiction to refer such disputes to arbitration. <br /> Even more unacceptable consequences may result on such a <br /> construction being placed on the second limb of Sections 79(1)(f) /86(1)(f), for <br /> the Regulatory Commission of one State would then be entitled to refer a <br /> dispute, falling outside the said State in its entirety, to arbitration resulting in <br /> such a Commission exercising the power of referral of disputes to arbitration, <br /> the jurisdiction to adjudicate which is not conferred on it but is vested <br /> exclusively in another State Regulatory Commission. The law does not permit <br /> any court/tribunal/authority/forum to usurp jurisdiction, especially in cases <br /> where such an authority does not have jurisdiction on the subject-matter. <br /> <b>(Jagmittar Sain Bhagat v. Health Services, Haryana, (2013) 10 SCC 136).</b> <br /> The powers, which have not been expressly given to them by the Statute <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>82</b> of <b>178</b> <br /> <br /><br /> <br /> creating them, cannot be exercised by them. <b>(Rajeev Hitendra Pathak v. </b><br /> <b>Achyut Kashinath, (2011) 9 SCC 541).</b> The Central Electricity Regulatory <br /> Commission can exercise jurisdiction only when the subject matter falls within <br /> its competence, and the order that may be passed is within its authority, and <br /> not otherwise. <b>(Dakshin Haryana Bijli Vitaran Nigam Ltd. v. Princeton Park </b><br /> <b>Condominium: 2007 Aptel 764; BSES Rajdhani Power Limited v. Delhi </b><br /> <b>Electricity Regulatory Commission, 2009 SCC OnLine APTEL 52).</b> <br /> If the second limb of Section 79(1)(f)/86(1)(f) were intended to be <br /> independent of and unconnected with the first limb, Parliament would not have <br /> provided for both of them in the same clause (f) and, instead, would have <br /> made a separate provisions for both of them (ie (1) adjudication and (2) <br /> referring the dispute to arbitration) in two different clauses of Section <br /> 79(1)/86(1). As Parliament chose to provide for both of them in the same <br /> clause, it is evident that the first and the second limbs of clause (f) of Section <br /> 79(1) are integrally connected with each other, with both adjudication and <br /> referral to arbitration relating to the same nature of disputes. The word <i>“any </i><br /> <i>dispute”</i> , in the second limb of both Section 79(1)(f) and Section 86(1)(f), can <br /> therefore only mean any dispute as referred to in the first limb of the said <br /> provision. <br /> The word <i>“any” </i> has been defined by the Concise Oxford English <br /> Dictionary (Eleventh Edition) to mean (1) used to refer to one or some of a <br /> thing or number of things, no matter how much or how many; and (2) <br /> rd<br /> whichever of a specified class might be chosen. P. Ramanatha Aiyar 3 <br /> Edition 2005 <b> </b> defines the words “any dispute” to mean any dispute which the <br /> authority is competent to try and decide. <br /> Since the CERC is competent to decide (adjudicate) only disputes falling <br /> under clauses (a) to (d) of Section 79(1), its jurisdiction under Section 79(1)(f), <br /> to refer disputes to arbitration, must be confined only to such disputes which <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>83</b> of <b>178</b> <br /> <br /><br /> <br /> fall within clauses (a) to (d) of Section 79(1), and none other. In other words, <br /> the jurisdiction of the CERC to refer disputes to arbitration is confined to “any <br /> dispute” falling under clauses (a) to (d) of Section 79(1) of the Electricity Act. <br /> Likewise, since the power conferred by Section 86(1)(f) on the State <br /> Commission is to adjudicate disputes between a generator and a licensee <br /> within its jurisdiction, it can only refer such disputes for arbitration, and not any <br /> other dispute. In other words, the jurisdiction of the State Commission, to refer <br /> disputes to arbitration, is confined to any dispute between a generator and a <br /> licensee falling within its jurisdiction ie intra-state. <br /> The underlying basis for the Supreme Court, in <b>GUVNL v. ESSAR, </b><br /> <b>(2008) 4 SCC 755, </b> to hold that the word <i>“and” </i> in Section 86(1)(f) should be <br /> read as <i>“or”</i> is that the State Commission cannot adjudicate disputes between <br /> licensees and generating companies, and simultaneously refer such disputes <br /> for arbitration; and it can only do one of the two, meaning thereby that Section <br /> 86(1)(f) confers power on the State Commission to refer only such disputes <br /> for arbitration which it was otherwise entitled to adjudicate. Applying the same <br /> analogy, it is only such disputes which the CERC is empowered to adjudicate <br /> under Section 79(1)(f) that can be referred by it for arbitration, instead of <br /> taking upon itself the task of adjudicating such disputes. Those disputes, <br /> which do not fall within the ambit of clauses (a) to (d) of Section 79(1) and <br /> which the CERC lacks jurisdiction to adjudicate, cannot be referred to <br /> arbitration by the Central Commission. <b> </b><br /> In this context it is necessary to note that the law declared by the <br /> Supreme Court in <b>GUVNL v. ESSAR</b> has been referred with approval and <br /> followed in two subsequent three-judge bench judgements of the Supreme <br /> Court in <b>Hindustan Zinc Ltd. v. Ajmer Vidyut Vitran Nigam Ltd., (2019) 17 </b><br /> <b>SCC 82</b> and <b>M.P. Power Trading Co. Ltd. v. Narmada Equipments (P) Ltd., </b><br /> <b>(2021) 14 SCC 548, </b> neither of which were noticed by this Tribunal in the <b>DVC </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>84</b> of <b>178</b> <br /> <br /><br /> <br /> judgment. In fact, paras 26, 27 and 30 of the <b>GUVNL</b> judgment, which <br /> required the word “and” under Section 86(1)(f) to be read as “or”, were also <br /> not brought to the notice of this Tribunal in the <b>DVC </b> judgment. <br /> We must therefore express our inability to agree with the submission, <br /> urged on behalf of the Respondent-TPCL, that the power to refer disputes to <br /> arbitration, under the second limb of Section 79(1)(f), is independent of and <br /> unconnected with the power of adjudication conferred by the first limb of the <br /> said provision. Consequently, the CERC cannot, in cases where it lacks <br /> jurisdiction to adjudicate the dispute in terms of Section 79(1) (f), refer such a <br /> dispute to arbitration. <br /> <b> </b> <b> </b> <b>(o) STRAY SENTENCE IN A JUDGEMENT CANNOT BE READ </b><br /> <b>OUT OF CONTEXT OR BE UNDERSTOOD AS A </b><br /> <b>DECLARATION OF LAW: </b><br /> Nowhere, in the <b>DVC</b> judgment, has this Tribunal specifically stated that <br /> disputes, which do not fall within the ambit of Clauses (a) to (d) of Section <br /> 79(1)(f), should, nonetheless, be referred to arbitration under the second limb <br /> of the said provision. Such an inference is drawn by the CERC, possibly, on <br /> the basis of a stray sentence in Para 36 of the <b> DVC </b> judgment, that <i>“non-tariff </i><br /> <i>disputes involving the generating company or a distribution licensee do not </i><br /> <i>fall within the ambit of clause (f) of Section 79(1) of the Electricity Act, 2003 </i><br /> <i>and are thus are arbitrable”</i> . This sentence is sought to be read out of context <br /> by the CERC, and as a declaration of the law by this Tribunal that, though the <br /> CERC lacks jurisdiction to adjudicate non-tariff disputes involving a <br /> generating company, it can nonetheless refer such disputes to arbitration. <br /> As noted hereinabove, the ratio of the <b>DVC</b> judgment must be gathered <br /> from the facts of the case and the setting in which the law was declared. The <br /> afore-said sentence, in para 36 of the said judgement, cannot be read out of <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>85</b> of <b>178</b> <br /> <br /><br /> <br /> context to conclude that disputes, which do not fall within the ambit of clauses <br /> (a) to (d) of Section 79(1), can nonetheless be referred to arbitration by the <br /> CERC in the exercise of its jurisdiction under the second limb of Section <br /> 79(1)(f). <br /> A stray sentence in a judgment cannot be read out of context <b>. (GUVNL </b><br /> <b>v. (GERC (Order of APTEL in Appeal No. 371 of 2023 dated 09.11.2023).</b> <br /> It is not a profitable task to extract a sentence here and there from a judgment <br /> and to build upon it <b>. (Quinn v. Leathern, [1901] A.C. 495; State of Orissa v. </b><br /> <b>Sudhansu Sekhar Misra, AIR 1968 SC 647; Delhi Administration (NCT of </b><br /> <b>Delhi) v. Manohar Lal, (2002) 7 SCC 222; Dr. (Investigation), (2002) Nalini </b><br /> <b>257 Mahajan v. Director of Income-tax ITR 123 Delhi) and Bhavnagar </b><br /> <b>University v. Palitana Sugar Mill P. Ltd., (2003) 2 SCC 111; B.F. Ditia v. </b><br /> <b>Appropriate Authority, Income-Tax Department, 2008 SCC OnLine AP </b><br /> <b>904; Sri. Konaseema Cooperative Central Bank Ltd. v. N. Seetharama </b><br /> <b>Raju, AIR 1990 AP 171; Kanwar Amninder Singh v. High Court of </b><br /> <b>Uttarakhand, 2018 SCC OnLine UTT 1026)</b> A word here or a word there <br /> should not be made the basis for inferring inconsistency or conflict of opinion. <br /> Law does not develop in a casual manner. It develops by conscious, <br /> considered steps <b>. (Sri. Konaseema Cooperative Central Bank Ltd. v. N. </b><br /> <b>Seetharama Raju, AIR 1990 AP 171). </b> Further, a stray sentence in a <br /> judgment cannot be understood as this Tribunal overruling the earlier <br /> judgments of this Tribunal which have held that the power of the Central <br /> Commission to adjudicate disputes is confined only to clauses (a) to (d) of <br /> Section 79(1). <br /> Such a construction would also fall foul of the judgment of the Supreme <br /> Court in <b>GUVNL Vs. ESSAR </b> which has been followed in two subsequent <br /> three-judge bench judgments of the Supreme Court in <b>Hindustan Zinc </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>86</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Ltd. v. Ajmer Vidyut Vitran Nigam Ltd., (2019) 17 SCC 82</b> , and <b>M.P. Power </b><br /> <b>Trading Co. Ltd. v. Narmada Equipments (P) Ltd., (2021) 14 SCC 548). </b><br /> <b> </b> <b> </b> <b>(p) JUDGEMENT OF THE HIGH COURT IN RENEW WIND </b><br /> <b>ENERGY: </b><br /> While this Tribunal may not have explicitly stated, in the <b>DVC </b><br /> Judgement, that the CERC has the jurisdiction under Section 79(1)(f) to refer <br /> disputes, which do not fall within the ambit of Clauses (a) to (d) of Section <br /> 79(1), to arbitration in the purported exercise of its powers under the second <br /> limb of Section 79(1)(f), such a conclusion has been arrived at by the Delhi <br /> High Court in <b>Renew Wind Energy (AP2) Private Limited vs. SECI (2025 </b><br /> <b>DHC 9650)</b> . <br /> With respect to the scope and ambit of the words <i> “and refer any dispute </i><br /> <i>for arbitration” </i> in the second limb of both Section 79(1)(f) and Section 86(1)(f), <br /> the observations of the Delhi High Court, in <b>Renew Wind Energy (AP2) (P) </b><br /> <b>Ltd. v. Solar Energy Corpn. of India, 2025 SCC OnLine Del 8252, </b> are <br /> summarized as under: <br /> (i) The power to refer disputes for arbitration, under the second part of <br /> Section 79(1)(f), is broader than the power to adjudicate disputes in the first <br /> part. <br /> (ii) While the adjudicatory powers are restricted to disputes connected with <br /> matters enumerated under Section 79(1)(a)-(d), the referral power extends to <br /> “any dispute” involving generating companies or transmission licensee. <br /> (iii) The referral power of the CERC has two facets: (a) the power to refer <br /> disputes, connected with clauses (a) to (d) of Section 79(1), for arbitration <br /> which the CERC is itself capable of adjudicating; and (b) the power to refer a <br /> dispute for arbitration which it is not capable of adjudicating. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>87</b> of <b>178</b> <br /> <br /><br /> <br /> (iv) Referral power of the CERC, to refer disputes for arbitration which fall <br /> outside the scope of Section 79(1)(a)-(d), shall be exercised when there exists <br /> an arbitration clause, on the basis of which CERC can refer a given dispute <br /> for arbitration. <br /> (v) In such a situation, while the CERC cannot adjudicate upon the dispute, <br /> it can nevertheless refer the same for arbitration. In this context, there is no <br /> discretion vested with the CERC. Once it is ascertained that the nature of <br /> dispute falls beyond the matters enumerated in Section 79(1)(a)-(d), and there <br /> exists an arbitration clause in the agreement entered into between the parties, <br /> the CERC is bound to refer the same for arbitration. <br /> (vi) If the second limb is confined to disputes referred to in the first limb, the <br /> words ‘connected therewith’ would be required to be read after the words “to <br /> refer any dispute” in Section 79(1)(f) ie as: <i>“to adjudicate upon disputes </i><br /> <i>involving generating companies or transmission licensee in regard to matters </i><br /> <i>connected with clauses (a) to (d) above and to refer any dispute </i> <b><i>connected </i></b><br /> <b><i>therewith</i></b> <i> for arbitration”</i> . <br /> (vii) CERC would remain competent to refer a dispute for arbitration, even if <br /> the same is found to not relate to tariff. <br /> (viii) While the adjudicatory powers may be different, the referral powers are <br /> similarly worded. Both Section 79(1)(f) and Section 86(1)(f) contain the <br /> expression <i> “and to refer any dispute for arbitration”</i> . Thus, qua referral <br /> powers, neither the CERC nor the State Commission is bound by the nature <br /> of dispute before them. <br /> The law declared by the Delhi High Court in this regard, in <b>Renew Wind </b><br /> <b>Energy (AP2) Private Limited</b> , in short, is that the CERC can refer any <br /> dispute to arbitration; while it has the discretion either to refer disputes falling <br /> within the ambit of Clauses (a) to (d) of Section 79(1) for arbitration or to <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>88</b> of <b>178</b> <br /> <br /><br /> <br /> exercise its jurisdiction to adjudicate such disputes; however, disputes which <br /> do not fall within the ambit of clauses (a) to (d) of Section 79(1) must <br /> necessarily be referred to arbitration, as the CERC lacks jurisdiction to <br /> adjudicate such disputes. Though this judgment of the Delhi High Court, in <br /> <b>Renew Wind Energy (AP2) Private Limited,</b> has not been specifically <br /> referred to in the impugned order passed by the CERC, the law declared by <br /> the Delhi High Court in the afore-said judgement does support the view taken <br /> by the CERC, in the impugned order, in justification of its decision to refer the <br /> subject disputes to arbitration in as much as the CERC has held that the <br /> primary dispute, in the present case which related to a breach of contract, was <br /> a non-tariff dispute and did not fall within the ambit of clauses (a) to (d) of <br /> Section 79(1). <br /> <b> </b> <b> </b> <b>(q) JUDGEMENT OF THE JURISDICTIONAL HIGH COURT IS </b><br /> <b>BINDING: </b> <b> </b><br /> In this context, we must also bear in mind that the law declared by the <br /> Delhi High Court, which is jurisdictional High Court both for the CERC and this <br /> Tribunal, is binding both on this Tribunal and the CERC. In <b>East India </b><br /> <b>Commercial Co. Ltd. v. Collector of Customs, 1962 SCC OnLine SC 142,</b> <br /> the Supreme Court held that the law declared by the highest court in the State <br /> is binding on authorities or tribunals under its superintendence. In <b>Ambica </b><br /> <b>Industries v. CCE, (2007) 6 SCC 769, </b> the Supreme Court held that the <br /> decision of the High Court shall be binding on the authorities which are within <br /> its jurisdiction. <br /> In <b>Commissioner of Income-Tax v. Thana Electricity Supply Ltd: </b><br /> <b>1993 SCC OnLine Bom 591, </b> a Division Bench of the Bombay High Court <br /> observed that the law declared by the Supreme Court are binding on all courts <br /> in India, what is binding is, of course, the ratio of the decision and not every <br /> expression found therein; and the decisions of the High Court are binding on <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>89</b> of <b>178</b> <br /> <br /><br /> <br /> the subordinate courts and authorities or Tribunals under its superintendence <br /> throughout the territories in relation to which it exercises jurisdiction. <br /> <b> </b> <b> </b> <b>(r)</b> <b>JUDGEMENTS </b> <b>OF </b> <b>HIGH </b> <b>COURT </b> <b>WHICH </b> <b>RUNS </b><br /> <b>CONTRARY TO THE LAW DECLARED BY THE SUPREME </b><br /> <b>COURT IS NOT BINDING: </b> <b> </b><br /> However, if the law declared by the jurisdictional High Court is contrary <br /> to the law declared by the Supreme Court, both the CERC and this Tribunal <br /> would be bound to follow and apply the law declared by the Supreme Court, <br /> and not the contrary view taken by the High Court, for it is settled law that all <br /> courts/statutory tribunals in India are bound to follow the decision of the <br /> Supreme Court in view of Article 141 of the Constitution of India. Judicial <br /> discipline requires, and decorum known to law warrants, that appellate <br /> directions should be taken as binding and followed. In the hierarchical system <br /> of courts which exists, it is necessary for each lower tier to accept loyally the <br /> decisions of the higher tier. <b>(Cassell &amp; Co. v Broome: (1972) 1 ALL ER 801 </b><br /> <b>(HL); Smt. Kaushalya Devi Bogra (Smt) and Ors. vs The Land Acquisition </b><br /> <b>Officer, 1984 2 SCC 324).</b> When the Supreme Court decides a principle, it <br /> would be the duty of the High Court or a subordinate Court (or for that matter <br /> a statutory tribunal) to follow the decision of the Supreme Court. A judgment <br /> of the High Court (or Tribunal which refuses to follow the decision and <br /> directions of the Supreme Court is a nullity. ( <b>Narinder Singh v. Surjit Singh, </b><br /> <b>(1984) 2 SCC 402); Kausalya Devi Bogra v. Land Acquisition Officer, </b><br /> <b>(1984) 2 SCC 324; Municipal Corporation of Guntur, Guntur v. B. Syamala </b><br /> <b>Kumari, 2006 SCC OnLine AP 838; Somprakash v. State of Uttarakhand, </b><br /> <b>2019 SCC OnLine Utt 648; Director of Settlements, A.P. v. M.R. Apparao, </b><br /> <b>(2002) 4 SCC 638).</b> In the hierarchical set up of our courts, the High <br /> Court/subordinate Tribunal is bound by the decisions of the Supreme Court. <br /> <b>(Sakinala Harinath v. State of A.P., 1993 SCC OnLine AP 195 (FB)). </b> <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>90</b> of <b>178</b> <br /> <br /><br /> <br /> No order of a subordinate Court/tribunal can be construed to run counter <br /> to the Supreme Court&#x27;s order. ( <b>Mohd. Aslam v. Union of India, (1997) 5 SCC </b><br /> <b>475). </b> The law declared by the Supreme Court binds Courts in India ( <b>Rajeswar </b><br /> <b>Prasad Misra v. State of W.B., AIR 1965 SC 1887).</b> It is the duty of the High <br /> Court (as also statutory tribunals), whatever be its view, to act in accordance <br /> with Article 141 of the Constitution of India and to apply the law laid down by <br /> the Supreme Court. Judicial discipline to abide by the declaration of law, of <br /> the Supreme Court, cannot be forsaken by any Court/Tribunal oblivious of <br /> Article 141 of the Constitution of India <b>. (Chandra Prakash v. State of UP, </b><br /> <b>(2002) 4 SCC 234; State of Punjab v. Bhag Singh, (2004) 1 SCC 547; and </b><br /> <b>State of Orissa v. Dhaniram Luhar, (2004) 5 SCC 568).</b> <br /> <b> </b> <b> </b> <b>(s) JUDGEMENT OF THE SUPREME COURT IN HINDUSTAN </b><br /> <b>ZINC LTD: </b><br /> It is useful in this context to refer to the judgment of the Supreme Court <br /> in <b>Hindustan Zinc Ltd. v. Ajmer Vidyut Vitran Nigam Ltd., (2019) 17 SCC </b><br /> <b>82. </b> The question that arose for consideration, in <b>Hindustan Zinc Ltd, </b> was <br /> regarding the scope of arbitration proceedings under the Electricity Act, 2003, <br /> in particular, Section 86(1)( <i>f</i> ) thereof read with Section 158. The appellant-<br /> Hindustan Zinc Ltd had four high tension electricity connections for which four <br /> contracts were entered into with the respondent for purchase of <br /> electricity. The appellant also set up a captive power plant which was <br /> commissioned and synchronized with the Rajasthan Vidyut Prasaran Nigam <br /> Ltd Grid. Short-term open access, to the transmission and distribution <br /> systems of this grid, was sought under the Regulations and requisite <br /> permission was obtained. Thereafter, the appellant entered into three open <br /> access agreements with the respondent for wheeling of power from its captive <br /> power plant, on the respondent&#x27;s distribution system, to the three units that <br /> were owned by it. Open access commenced, and the power generated at its <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>91</b> of <b>178</b> <br /> <br /><br /> <br /> captive power plant was injected at the grid sub-stations from where it was <br /> transmitted on the respondent&#x27;s transmission system, and then supplied to <br /> the appellant&#x27;s three units. <br /> The dispute that arose between the parties was as to the unscheduled <br /> inter-change charges which became payable under clauses 8 and 9 of the <br /> three agreements. Each of the three units was described as an open access <br /> consumer. When disputes arose between the appellant and the respondent, <br /> the Rajasthan Electricity Regulatory Commission, by two Orders passed by it, <br /> stated that it will itself decide the dispute between the parties; however, by a <br /> subsequent Order, the Commission appointed an arbitrator under Section <br /> 86(1)( <i>f</i> ) read with Section 158 of the Electricity Act, referring the dispute to <br /> arbitration. The award passed by the arbitrator was challenged before the <br /> Commercial Court in a Petition filed under Section 34 of the 1996 Act which <br /> was dismissed. <br /> In the Section 37 appeal filed thereagainst, the High Court held that the <br /> captive generating plant of the company was to use, through open access, <br /> the distribution system of the respondent to wheel power to three of its own <br /> units. Given this fact, and given the fact that the three agreements were <br /> entered into with respect to these three units, the High Court held that the <br /> status of the appellant company was that an <i>open access consumer</i> , and not <br /> that of a generating company; and, as a result, Section 86(1)( <i>f</i> ) of the <br /> Electricity Act would not be attracted. Consequently, the issue being one of <br /> inherent lack of jurisdiction, the High Court reversed the order of the <br /> Commercial Court, Ajmer, and set aside the entire award stating that the <br /> dispute raised between the parties, in the present case, would be outside the <br /> scope of Section 86(1)(f) of the Electricity Act altogether. <br /> It is in this context that the Supreme Court, in <b>Hindustan Zinc Ltd</b> , <br /> observed that adjudication of disputes, under Section 86(1)(f) of the Electricity <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>92</b> of <b>178</b> <br /> <br /><br /> <br /> Act, can only be between licensees and generating companies and not <br /> between licensees and consumers, which is provided for in an open access <br /> situation by Section 42; under the Rajasthan Electricity Regulatory <br /> Commission (Terms and Conditions for Open Access) Regulations, 2004, , <br /> clause 29, in particular, gives a three-tier hierarchy of challenge when it comes <br /> to disputes raised between distribution licensees and consumers in relation to <br /> matters qua open access; this is quite apart from the separate mechanism <br /> provided in Section 42(6) of the Electricity Act, where a representation for <br /> redressal of grievances may be made to the Ombudsman appointed or <br /> designated by the State Commission; and the Supreme Court, in <b> Gujarat </b><br /> <b>Urja Vikas Nigam Ltd. v. Essar Power Ltd., (2008) 4 SCC 755</b> , had <br /> occasion to construe the language of Section 86(1)( <i>f</i> ) of the 2003 Act. <br /> After extracting Paras 26 to 28 of the judgement in <b>Gujarat Urja Vikas </b><br /> <b>Nigam Ltd</b> , the Supreme Court, in <b>Hindustan Zinc Ltd. v. Ajmer Vidyut </b><br /> <b>Vitran Nigam Ltd., (2019) 17 SCC 82, </b> observed that what becomes clear on <br /> a reading of the judgment, in <b>Gujarat Urja Vikas Nigam Ltd. </b> ,was that the <br /> expression <i>“and” </i> occurring in Section 86(1)( <i>f</i> ) must be read as <i>“or”</i> ; but this is <br /> only because, as has been pointed out in the judgment, the State Commission <br /> cannot both decide the dispute itself and also refer it to an arbitrator; otherwise <br /> also, reference of any dispute for arbitration can only be between the <br /> licensees and generating companies and not otherwise; this being the case, <br /> the High Court was right in stating that the arbitrator could not, in law, have <br /> been appointed by the State Commission under Section 86(1)(f) of the <br /> Electricity Act; and the award based on such appointment would be non-est <br /> in law. <br /> As the attention of the Delhi High Court in <b>Renew Wind Energy (AP2) </b><br /> <b>(P) Ltd</b> , was not drawn to the judgement of the Supreme Court in <b>Hindustan </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>93</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Zinc Ltd, </b> we must necessary follow the law declared in the judgement of the <br /> Supreme Court, and not the contrary view taken by the Delhi High Court. <br /> <b> </b> <b> </b> <b>(t) ONLY DISPUTES WHICH CAN BE ADJUDICATED BY THE </b><br /> <b>COMMISSION CAN, AT ITS DISCRETION, BE REFERRED </b><br /> <b>TO ARBITRATION: </b><br /> From the law declared by the Supreme Court, in <b>Hindustan Zinc Ltd, </b> <br /> it is clear that a State Commission can only refer such disputes to arbitration <br /> which it can adjudicate under the first limb of Section 86(1)(f). In other words, <br /> it is only disputes between licensees and generating companies, (which the <br /> State Commission can adjudicate under the first limb of Section 86(1)(f)), <br /> which can be referred to arbitration under the second limb of the said <br /> provision, and not disputes between licensees and consumers, which do not <br /> fall within the adjudicatory jurisdiction of the State Commission under the first <br /> limb of Section 86(1)(f). Consequently, and in as much as the language <br /> employed in the second limb of both Sections 79(1)(f) and 86(1)(f) is identical, <br /> it must necessarily be held, following the declaration of law by the Supreme <br /> Court in <b> Hindustan Zinc Ltd, </b> that it is only disputes involving generating <br /> companies in regard to matters connected with clauses (a) to (d) of Section <br /> 79(1), (i.e. the disputes which the CERC is empowered to adjudicate), which <br /> can be referred to arbitration by the Central Commission. It is for this reason <br /> that in all the three judgments, i.e. in <b>Gujarat Urja Vikas Nigam Ltd. v. Essar </b><br /> <b>Power Ltd., (2008) 4 SCC 755, </b> in <b> Hindustan Zinc Ltd. v. Ajmer Vidyut </b><br /> <b>Vitran Nigam Ltd., (2019) 17 SCC 82</b> , and in <b>M.P. Power Trading Co. Ltd. </b><br /> <b>v. Narmada Equipments (P) Ltd., (2021) 14 SCC 548,</b> the Supreme Court <br /> has held the word <i>“and”</i> , in Section 86(1)(f) of the Electricity Act, should be <br /> read as <i>“or”.</i> As a result, disputes which do not fall within the ambit of clauses <br /> (a) to (d) of Section 79(1), and which cannot be adjudicated by the CERC <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>94</b> of <b>178</b> <br /> <br /><br /> <br /> under Section 79(1)(f), cannot be referred to arbitration under the second limb <br /> of Section 79(1)(f). <br /> Since the word <i>“and”</i> was read as “or” in <b>GUVNL Vs. ESSAR, </b> on the <br /> ground that the Commission cannot simultaneously adjudicate the same <br /> dispute and simultaneously refer such a dispute to arbitration, and it can do <br /> only one or the other, it is evident that the power to refer a dispute to arbitration <br /> can be exercised only with respect to those disputes which the Commission <br /> is empowered to adjudicate, and none other. Consequently, if the CERC lacks <br /> jurisdiction to adjudicate a non-tariff dispute involving a generating company, <br /> it must be held to also lack jurisdiction to refer such a dispute to arbitration. <br /> Suffice it to conclude, our opinion under this head, holding that it is only <br /> disputes, which fall within the ambit of clauses (a) to (d) of Section 79(1), <br /> which can either be adjudicated by the CERC or, in the alternative, be referred <br /> to arbitration under Section 79(1)(f) of the Electricity Act. As shall be <br /> elaborated later in this Judgement, reference to arbitration is permissible only <br /> with respect to such disputes which do not fall under the “non-arbitrable <br /> disputes” category. <br /> Following the <b>DVC </b> Judgement of this Tribunal, we hold that disputes, <br /> including those which fall within the ambit of the regulatory functions of the <br /> Commission, or which impact tariff either directly or indirectly, are non-<br /> arbitrable and, not-withstanding an arbitration agreement in existence and the <br /> tests stipulated in Section 8(1) of the 1996 Act being satisfied, cannot be <br /> referred to arbitration. <br /> <b>VI. </b> <b>REGULATION OF TARIFF: A STATUTORY FUNCTION: </b><br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF THE APPELLANT </b><br /> <b>PROCURERS: </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>95</b> of <b>178</b> <br /> <br /><br /> <br /> It is contended, on behalf of the Appellant-Procurers, that the real issue <br /> is as to what matters the CERC should adjudicate itself, and what matters it <br /> can or should refer to arbitration; in <b><i>GUVNL v. Essar </i></b> : <b>(2008) 4 SCC 755,</b> <br /> reference to arbitration has been held to be a discretion (judicial discretion); <br /> ‘Regulation of tariff’ is a statutory function vested in the CERC; it is covered, <br /> qua generators, by Sections 79(1)(a) &amp; (b); it is a function vested primarily to <br /> regulate generation and supply of electricity at a reasonable tariff, determine <br /> terms and conditions for supply by the distribution licensees to its consumers; <br /> Section 79 read with Sections 61 to 64, the Rules/Regulations notified <br /> thereunder, and Regulatory Orders relate to the regulatory functions of the <br /> CERC i.e. regulation of tariff; <b> </b> <b><i>PTC v. Jaiprakash,</i></b> <b> (2012) 130 DRJ 351 </b> holds <br /> such matters to be <i>in rem</i> (Refer: Section 61(d), Section 94(3)); and the <br /> regulator’s role is to ensure accessibility of goods/services and ensure <br /> comprehensive development, and not for proliferation of remedies (Refer: <b><i> </i></b><br /> <b><i>State of HP v. JSW, </i></b> <b>2025 INSC 857)</b> ; in the two decisions, ie in <b> </b> <b><i>BSES v. </i></b><br /> <b><i>DERC,</i></b> and <b><i>SECI v. KSERC</i></b> , this Tribunal has listed wide ranging aspects <br /> falling under the CERC’s adjudicatory jurisdiction, namely, method of <br /> recovery, billing, payment rebate, late payment surcharge, availability, <br /> scheduling, termination, suspension of supply, force majeure, payment <br /> security mechanism, Letter of Credit, escrow arrangement; implementation <br /> issues, fulfilment/non-fulfilment of condition precedent, conditions <br /> subsequent, extension of time in commissioning the projects; these are not <br /> mere rate or price; all these have been construed as being part of Regulation <br /> of tariff or matters connected therewith; the <b> </b> <b><i>DVC</i></b> <i>decision, </i> including the <br /> Supreme Court’s order in the Civil Appeal preferred there-against, could not <br /> and did not overrule these decisions; as the scope of Section 79 is clearly laid <br /> down therein, these decisions cannot also be held inapplicable on the ground <br /> that they had examined the scope of Section 79 vis-à-vis Section 86, and was <br /> not rendered in the context of arbitration; the issue, specifically raised in the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>96</b> of <b>178</b> <br /> <br /><br /> <br /> said judgements, was that non-tariff issues do not fall under the jurisdiction of <br /> the CERC (Para <b> </b> 37 of <b><i>BSES v. DERC</i></b> ), and are matters falling within the <br /> jurisdiction of the SERC, and it was held therein that all these issues are <br /> related to regulation of tariff; CERC has not considered the settled principles <br /> on the regulatory and adjudicatory functions vested in the CERC/Regulator; <br /> and, in <b> </b> <b><i>Sai Renewable</i></b> <b>,</b> (2011) 11 SCC 34, it was held that tariff includes <br /> terms and conditions of supply, and the term ‘tariff’ is wider in scope than <br /> purchase price. (Also refer: <b><i>PTC</i></b> <b> </b> <b><i>Constitution Bench</i></b> <b>, (2010) 4 SCC 603</b> <b> </b> and <br /> the <b><i>BSES v. DERC</i></b> <b> </b> judgement of this Tribunal. <br /> <b> </b> <b>B. JUDGEMENTS </b> <b>RELIED </b> <b>UPON </b> <b>BY </b> <b>THE APPELLANTS-</b><br /> <b>PROCURERS UNDER THIS HEAD: </b><br /> <b>1. </b> In <b>State of H.P. v. JSW Hydro Energy Ltd., 2025 SCC OnLine SC </b><br /> <b>1460, </b> the Supreme Court held that the Court should bear in mind the need to <br /> enable the regulator to exercise comprehensive jurisdiction; Courts must not <br /> impair the functioning of the regulator by taking away certain aspects of the <br /> sector outside the regulator&#x27;s scope, thereby fragmenting regulation and <br /> creating plurality of jurisdictions; it is in the interest of good governance <br /> through regulation to ensure that there is no proliferation of remedies and <br /> there are no parallel, multiple remedial forums; further, this also ensures that <br /> the sectoral law is developed in a coordinated and systematic fashion by the <br /> regulator that is equipped to deal with not only legal issues but also has <br /> specialised knowledge in other areas. <br /> <b>2. </b> In <b>PTC India Ltd. v. Central Electricity Regulatory Commission, </b><br /> <b>(2010) 4 SCC 603, </b> the Supreme Court held that the term “tariff” is not defined <br /> in the 2003 Act; the term “tariff” includes within its ambit not only the fixation <br /> of rates but also the rules and regulations relating to it; if one reads Section <br /> 61 with Section 62 of the 2003 Act, it becomes clear that the appropriate <br /> Commission shall determine the actual tariff in accordance with the provisions <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>97</b> of <b>178</b> <br /> <br /><br /> <br /> of the Act, including the terms and conditions which may be specified by the <br /> appropriate Commission under Section 61 of the said Act; under the 2003 Act, <br /> if one reads Section 62 with Section 64, it becomes clear that although tariff <br /> fixation like price fixation is legislative in character, the same under the Act is <br /> made appealable vide Section 111; and these provisions, namely, Sections <br /> 61, 62 and 64 indicate the dual nature of functions performed by the <br /> Regulatory Commissions viz. decision-making and specifying terms and <br /> conditions for tariff determination. <br /> <b> </b> <b>C. ANALYSIS: </b><br /> <b> </b> <b> </b> <b>(a) CONTENTS OF THE IMPUGNED ORDER ON THIS ISSUE: </b> <br /> On Issue No.1, ie whether the subject dispute was connected with <br /> ‘regulation of tariff’ of TPCL, and was a ‘tariff’ dispute or a ‘non-tariff’ dispute <br /> as explained by the <b>DVC </b> Judgment, the CERC, in the impugned order passed <br /> in Petition No. 107/MP/2023 and batch dated 19.11.2025, observed that, <br /> insofar as the jurisdiction of the Commission under Section 79(1)(f) read with <br /> Section 79(1)(b), to adjudicate upon the disputes involving generating <br /> companies having a composite scheme was concerned, the same would <br /> extend to matters connected with the regulation of tariff of such generating <br /> companies; indisputably, TPCL qualified as a generating company having a <br /> composite scheme for the generation and sale of electricity in more than one <br /> State in terms of Section 79(1)(b) of the Act; for the exercise of adjudicatory <br /> jurisdiction under Section 79(1)(f) read with Section 79(1)(b) of the Act, the <br /> disputes involving such a generating company had to be in regard to matters <br /> connected with the regulation of its tariff; the crucial question was as to what <br /> constituted a dispute connected with the regulation of tariff, in other words, <br /> ‘tariff dispute’ and ‘non-tariff disputes’; this issue was answered by APTEL in <br /> paragraphs 25 and 26 of the <b> DVC </b> Judgment; as per the findings of APTEL in <br /> the said paras, all matters which would have a bearing upon the tariff for a <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>98</b> of <b>178</b> <br /> <br /><br /> <br /> generating company would constitute “tariff disputes”; for e.g. disputes related <br /> to Change in Law, delayed completion of Projects, invocation of Force <br /> Majeure events, etc., impacted the tariff for a generating company directly <br /> and, therefore, fell solely within the jurisdiction of the Commission under <br /> Section 79(1) of the Act; however, disputes related to termination of contract <br /> or breach of contract that did not impact tariff either directly or indirectly, could <br /> be considered as non-tariff related disputes referable to arbitration. <br /> The CERC further held that the Judgment in <b>BSES Rajdhani Power </b><br /> <b>Limited v. Delhi Electricity Regulatory Commission and Anr. (Judgement </b><br /> <b>of Aptel in Appeal Nos. 94 &amp; 95 of 2012</b> <b>dated 4.9.2012)</b> was specifically <br /> referred to and relied upon by DVC in Appeal No. 309 of 2019, and it was only <br /> after taking into account the submissions made thereon that the findings <br /> pertaining to tariff and non-tariff disputes were rendered by APTEL in the <b>DVC </b><br /> Judgement; the Judgment in <b>Solar Energy Corporation of India Limited v. </b><br /> <b>Kerala State Electricity Regulatory Commission (Judgement of Aptel in </b><br /> <b>Appeal No. 414 of 2022)</b> reiterated the scope of ‘regulation of tariff’ as held <br /> in the <b>BSES Rajdhani Power Limited</b> Judgment, and further held that the <br /> adjudicatory powers of the CERC under Section 79(1)(f) were not only <br /> restricted to determination of tariff as well as regulation of tariff, but included <br /> other disputes or differences which necessarily impact regulation of tariff; and, <br /> unlike the <b> DVC </b> Judgment, the <b>SECI </b> Judgment did not deal with the specific <br /> disputes between the parties, and/or the prayers made in connection thereof, <br /> to examine whether the dispute impacted the tariff or the regulation of the <br /> tariff. <br /> <b> </b> <b> </b> <b>(b) ARBITRABILITY OF DISPUTES: </b><br /> As noted earlier in this order, this Tribunal, in the <b>DVC </b> Judgement, has <br /> held that (i) disputes concerning the regulatory functions of the Commission, <br /> (ii) disputes relating to tariff or regulation of tariff of generating companies, (iii) <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>99</b> of <b>178</b> <br /> <br /><br /> <br /> matters which have a bearing upon the tariff for a generating company, and (iv) <br /> matters which impact the tariff for a generating company directly or indirectly, <br /> fall solely within the jurisdiction of the Central Commission under Section 79(1) <br /> of the Electricity Act, 2003, and cannot be referred to arbitration. In effect, such <br /> disputes cannot be referred for arbitration, as they are non-arbitrable or are <br /> incapable of being subjected to arbitration. <br /> The 1996 Act contains two Parts — Part I and Part II. Part I contains the <br /> heading “Arbitration” and Part II the heading “Enforcement of Certain Foreign <br /> Awards”. Chapter I of Part I relates to the “General Provisions”, in which <br /> Section 2 deals with definitions. Section 2(3) contains a general provision <br /> which clarifies that “This Part shall not affect any other law for the time being <br /> in force by virtue of which certain disputes may not be submitted to <br /> arbitration”. Section 2(3) gives predominance to <i>any other law for the time </i><br /> <i>being in force by virtue of which certain disputes may not be submitted to </i><br /> <i>arbitration</i> . <b>(Emaar MGF Land Ltd. v. Aftab Singh, (2019) 12 SCC 751)</b> . <br /> The three facets of arbitrability, relating to the jurisdiction of the Arbitral <br /> Tribunal, are as under: ( <i>i</i> ) <i>Whether the disputes are capable of, </i> having regard <br /> to their nature, being resolved by a private forum chosen by the parties (the <br /> Arbitral Tribunal) or whether they would exclusively fall within the domain of a <br /> public fora (courts or specialized tribunals); ( <i>ii</i> ) <i>Whether the disputes are </i><br /> <i>covered by the arbitration agreement</i> ? That is, whether the disputes are <br /> enumerated or described in the arbitration agreement as matters to be <br /> decided by arbitration or whether the disputes fall under the “excepted <br /> matters” excluded from the purview of the arbitration agreement; ( <i>iii</i> ) <i>Whether </i><br /> <i>the parties have referred the disputes to arbitration</i> ? That is, whether the <br /> disputes fall under the scope of the submission to the Arbitral Tribunal, or <br /> whether they do not arise out of the statement of claim and the counter-claim <br /> filed before the Arbitral Tribunal. <b>(Booz Allen &amp; Hamilton Inc. v. SBI Home </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>100</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Finance Ltd., (2011) 5 SCC 532; Arasmeta Captive Power Co. (P) Ltd. v. </b><br /> <b>Lafarge India (P) Ltd., (2013) 15 SCC 414).</b> <br /> Arbitral Tribunals are private fora chosen voluntarily by the parties to the <br /> dispute, to adjudicate their disputes in the place of courts and tribunals which <br /> are public fora constituted under the laws of the country. Adjudication of <br /> certain categories of proceedings are reserved by the legislature exclusively <br /> for public fora as a matter of public policy. Certain other categories of cases, <br /> though not expressly reserved for adjudication by public fora (courts and <br /> tribunals), may, by necessary implication, stand excluded from the purview of <br /> private fora. Consequently, where the cause/dispute is non-arbitrable, the <br /> court where a suit is pending, will refuse to refer the parties to arbitration even <br /> if the parties may have agreed upon arbitration as the forum for settlement of <br /> such disputes. <b> (Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., </b><br /> <b>(2011) 5 SCC 532). </b> Arbitration is not permissible where the legislature has <br /> reserved adjudication of disputes to a special forum. <b>(Umri Pooph Pratappur </b><br /> <b>(UPP) Tollways (P) Ltd. v. M.P. Road Development Corpn., 2025 SCC </b><br /> <b>OnLine SC 1569; Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd: </b><br /> <b>(2011) 5 SCC 532; Emaar MGF Land Ltd. v. Aftab Singh, (2019) 12 SCC </b><br /> <b>751).</b> <br /> The well-recognized examples of non-arbitrable disputes are: ( <i>i</i> ) <br /> disputes relating to rights and liabilities which give rise to or arise out of <br /> criminal offences; ( <i>ii</i> ) matrimonial disputes relating to divorce, judicial <br /> separation, restitution of conjugal rights, child custody; ( <i>iii</i> ) guardianship <br /> matters; ( <i>iv</i> ) insolvency and winding-up matters; ( <i>v</i> ) testamentary matters <br /> (grant of probate, letters of administration and succession certificate); and ( <i>vi</i> ) <br /> eviction or tenancy matters governed by special statutes where the tenant <br /> enjoys statutory protection against eviction and only the specified courts are <br /> conferred jurisdiction to grant eviction or decide the disputes. <b> (Booz Allen &amp; </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>101</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 SCC 532). </b> In addition to <br /> the six non-arbitrable categories set out in <b><i>Booz Allen &amp; Hamilton Inc.</i></b> <b> v. </b> <b><i>SBI </i></b><br /> <b><i>Home Finance Ltd.</i></b> <b>, (2011) 5 SCC 532</b> , a seventh category of non-arbitrable <br /> disputes are those relating to trusts, trustees and beneficiaries arising out of <br /> a trust deed and the Trust Act. ( <b>Vimal Kishor Shah v. Jayesh Dinesh Shah, </b><br /> <b>(2016) 8 SCC 788; Emaar MGF Land Ltd. v. Aftab Singh, (2019) 12 SCC </b><br /> <b>751).</b> <br /> The afore-said cases relate to actions in rem. A right in rem is a right <br /> exercisable against the world at large, as contrasted from a right in personam <br /> which is an interest protected solely against specific individuals. Actions in <br /> personam refer to actions determining the rights and interests of the parties <br /> themselves in the subject-matter of the case, whereas actions in rem refer to <br /> the rights of the parties, not merely among themselves but also against all <br /> persons at any time claiming an interest. Correspondingly, a judgment in <br /> personam refers to a judgment against a person as distinguished from a <br /> judgment against a thing, right or status and a judgment in rem refers to a <br /> judgment that determines the status or condition of property which operates <br /> directly on the property itself. (Vide <i>Black&#x27;s Law Dictionary</i> ). <b> </b> Generally, and <br /> traditionally, all disputes relating to rights in personam are considered to be <br /> amenable to arbitration; and all disputes relating to rights in rem are required <br /> to be adjudicated by courts and public tribunals, being unsuited for private <br /> arbitration. <b>(Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) </b><br /> <b>5 SCC 532; A. Ayyasamy v. A. Paramasivam, (2016) 10 SCC 386; Emaar </b><br /> <b>MGF Land Ltd. v. Aftab Singh, (2019) 12 SCC 751).</b> <br /> <b> </b> <b> </b> <b>(c) REGULATORY FUNCTIONS AND TARIFF: </b><br /> In order to examine what disputes would fall within the regulatory <br /> functions of the Commission, and what disputes would impact tariff- directly <br /> or indirectly, rendering such disputes non-arbitrable and as incapable of <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>102</b> of <b>178</b> <br /> <br /><br /> <br /> reference to arbitration under Section 79(1)(f) of the Electricity Act, we must <br /> first understand what are the regulatory functions which the Commission <br /> discharges, and what the expression “tariff” means. <br /> The jurisdiction of the CERC under Section 79(1)(f) of the Electricity Act, <br /> to either adjudicate upon disputes or refer disputes for arbitration, is confined, <br /> among others, to clause (b) of Section 79(1). It is only if the dispute is <br /> referrable to clause (b) of Section 79(1), ie the dispute is in regard to matters <br /> connected with the regulation of tariff of the Respondent-TPCL (a generating <br /> company selling electricity in more than one State), can the CERC validly <br /> exercise jurisdiction to either adjudicate such a dispute or to refer such a <br /> dispute for arbitration. It is necessary for us, therefore, to understand what the <br /> expressions “regulate” and “tariff” mean. <br /> <b> </b> <b> </b> <b>(d) JUDGEMENT OF THE DELHI HIGH COURT IN RENEW </b><br /> <b>WIND ENERGY (AP2) (P) LTD: </b><br /> The Delhi High Court, in <b>Renew Wind Energy (AP2) (P) Ltd</b> , observed <br /> that the word ‘regulation’ is of wide amplitude; Section 79(1)(f) of the Electricity <br /> Act would attract, not merely a strict regulation of tariff, but also disputes <br /> “connected with” the regulation of tariff; the test for determining whether <br /> Section 79(1)(f)&#x27;s adjudicatory powers are attracted is the requirement of a <br /> nexus between the dispute between the parties and the regulation of tariff; <br /> and the powers of the CERC under the said provision are broad enough to <br /> cover disputes which affect considerations that has led to the fixation of tariff <br /> and further entitlements, charges, rights and obligations the determination of <br /> which utilizes tariff as an input function. <br /> On the scope of the expression ‘regulation of tariff’, the Delhi High Court, <br /> in <b>Renew Wind Energy (AP2) (P) Ltd, </b> referred to the judgement of this <br /> Tribunal in <b>BSES Rajdhani Power Ltd. v. Delhi Electricity Regulatory </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>103</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Commission</b> , declaring that Section 79 of the Electricity Act deals, not merely <br /> with tariff, but also the terms related to tariff; the term ‘Regulate’ used in <br /> Section 79(1)(f) of the Act has a wider scope and implication not merely <br /> confined to determination of tariff; Section 61 and 79 not only deal with the <br /> tariff but also deal with the terms and conditions of tariff; the terms and <br /> conditions necessarily include all terms related to tariff; determination of tariff <br /> and its method of recovery will also depend on the terms and conditions of <br /> tariff; for example, interest on working capital which is a component of tariff <br /> will depend on the time allowed for billing and payment of bills; this will also <br /> have an impact on the terms and conditions for rebate and late payment <br /> surcharge; similarly, billing and payment of capacity charge will depend on the <br /> availability of the power station, and therefore, the scheduling has to be <br /> specified in the terms and conditions of tariff; and, accordingly, billing, <br /> payment, consequences of early payment by way of grant of rebate, <br /> consequences of delay in payment by way of surcharge, termination or <br /> suspension of the supply, payment security mechanism such as opening of <br /> the Letter of Credit, escrow arrangement, etc., are nothing but terms and <br /> conditions of supply. <br /> The Delhi High Court, in <b>Renew Wind Energy (AP2) (P) Ltd, </b> also <br /> referred to the judgement of this Tribunal, in <b>Solar Energy Corporation of </b><br /> <b>India Ltd. v. Kerala State Electricity Regulatory Commission</b> , wherein it <br /> was held that the expression ‘Regulation of Tariff’ was broad, and included <br /> terms and conditions related to tariff; the powers of the CERC under Section <br /> 79(1)(f) extend not only to regulation of tariff but also to disputes or differences <br /> which necessarily impact the regulation of tariff. The Delhi High Court further <br /> held that the finding of APTEL, in <b>Solar Energy Corporation of India </b><br /> <b>Ltd. v. Kerala State Electricity Regulatory Commission</b> , seemed to arise <br /> not just from an interpretation of the term ‘regulation of tariff’ but also the <br /> expression “in regard to matters connected with” as it appeared in Section <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>104</b> of <b>178</b> <br /> <br /><br /> <br /> 79(1)(f), as it was held in the said judgement that clauses (a),(b) &amp; (c) of <br /> Section 79(1) of the Act begin with the expression “to regulate”; it is only <br /> clause (d) which begins with the term “to determine tariff”; regulation of Tariff <br /> is totally distinct from “Determination of tariff; Regulation of Tariff includes all <br /> the necessary terms and conditions relating to the tariff such as billing, <br /> consequences of delay in payment of electricity charges, rebate, termination, <br /> suspension of electricity supply, payment of security, etc; a close and <br /> meaningful interpretation of the provisions of Section 79 &amp; 86 of the Act, would <br /> indicate that the adjudicatory powers of the Central Commission under <br /> 79(1)(f) are not restricted to only determination of tariff as well as Regulation <br /> of tariff, but include other disputes or differences between generating <br /> companies and transmission licensees which necessarily impact regulation of <br /> tariff; this would include fulfilment/non-fulfilment of conditions precedent as <br /> well as conditions subsequent, claim for extension of time in commissioning <br /> all projects on the ground of Force Majeure events etc; even though disputes <br /> on these subjects do not specifically relate to determination or the regulation <br /> of tariff but these would necessarily have a direct bearing upon the regulation <br /> of tariff and, therefore, would come under the purview of the Central <br /> Commission under Section 79 of the Act. <br /> <b> </b> <b> </b> <b>(e) “REGULATE”: ITS SCOPE: </b><br /> In this context, it must be borne in mind that the Commission exercises <br /> the powers of a regulator. Regulatory powers are extensive, and they include <br /> whatever needs to be done for achieving the objects and purposes of the <br /> Electricity Act. ( <b>Transmission Corpn. of A.P. Ltd. v. Rain Calcining Ltd., </b><br /> <b>(2021) 13 SCC 674; K. Ramanathan v. State of T.N., (1985) 2 SCC 116; </b><br /> <b>V.S. Rice &amp; Oil Mills v. State of A.P., AIR 1964 SC 1781; Deepak </b><br /> <b>Theatre v. State of Punjab, 1992 Supp (1) SCC 684; AIR 1992 SC 1519]</b> ; <br /> and <b>D.K. Trivedi &amp; Sons v. State of Gujarat, 1986 Supp SCC 20</b> ). <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>105</b> of <b>178</b> <br /> <br /><br /> <br /> The word “regulate” is wide enough to confer power on the State to <br /> regulate either by increasing the rate or decreasing the rate, the test being <br /> what is it that is necessary or expedient to be done to maintain, increase, or <br /> secure supply of the essential articles in question (electricity) and to arrange <br /> for its equitable distribution and its availability at fair prices. The power to <br /> regulate can be exercised for ensuring the payment of a fair price. ( <b>V.S. Rice </b><br /> <b>&amp; Oil Mills v. State of A.P: AIR 1964 SC 1781;</b> <b>Nuclear Power Corporation </b><br /> <b>Of India V. Central Electricity Regulatory Commission &amp; Anr. </b><br /> <b>(Judgement of Aptel in Appeal No. 134 of 2024 &amp; batch dated 27.03.2025). </b> <br /> The word “regulation” has no fixed connotation. Its meaning differs <br /> according to the nature of the thing to which it is applied. In modern statutes, <br /> concerned as they are with economic and social activities, ‘regulation’ must, <br /> of necessity, receive a wide interpretation. <b>(G.K. Krishnan v. State of T.N; </b><br /> <b>(1975) 1 SCC 375; Nuclear Power Corporation Of India V. Central </b><br /> <b>Electricity Regulatory Commission &amp; Anr. (Judgement of Aptel in Appeal </b><br /> <b>No. 134 of 2024 &amp; batch dated 27.03.2025). </b> <br /> The word ‘regulate’ is difficult to define as having any precise meaning. <br /> It is a word of broad import, having a broad meaning, and is very <br /> comprehensive in scope. Some courts have given to the term a somewhat <br /> restricted, and others have given to it a liberal, construction. The different <br /> shades of meaning are brought out in <b>Corpus Juris Secundum, Vol. 76 at </b><br /> <b>p. 611</b> : ‘“Regulate” is variously defined as meaning to adjust; to adjust, order, <br /> or govern by rule, method, or established mode; to adjust or control by rule, <br /> method, or established mode, or governing principles or laws; to govern; to <br /> govern by rule; to govern by, or subject to, certain rules or restrictions; to <br /> govern or direct according to rule; to control, govern, or direct by rule or <br /> regulations; “Regulate” is also defined as meaning to direct; to direct by rule <br /> or restriction; to direct or manage according to certain standards, laws, or <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>106</b> of <b>178</b> <br /> <br /><br /> <br /> rules; to rule; to conduct; to fix or establish; to restrain; to restrict.’(See also <br /> <b>Webster&#x27;s Third New International Dictionary, Vol. 2, p. 1913 and Shorter </b><br /> <b>Oxford Dictionary, Vol. 2, 3rd Edn., p. 1784</b> ). ( <b>K. Ramanathan v. State of </b><br /> <b>T.N., (1985) 2 SCC 116; Nuclear Power Corporation Of India V. Central </b><br /> <b>Electricity Regulatory Commission &amp; Anr. (Judgement of Aptel in Appeal </b><br /> <b>No. 134 of 2024 &amp; batch dated 27.03.2025). </b> <br /> The power to regulate carries with it full power over the thing subject to <br /> regulation and in absence of restrictive words, the power must be regarded <br /> as plenary over the entire subject. It implies the power to rule, direct and <br /> control, and involves the adoption of a rule or guiding principle to be followed, <br /> or the making of a rule with respect to the subject to be regulated. The power <br /> to regulate implies the power to check and may imply the power to prohibit <br /> under certain circumstances, as where the best or only efficacious regulation <br /> consists of suppression. The word ‘regulation’ cannot have any inflexible <br /> meaning as to exclude ‘prohibition’. It has different shades of meaning and <br /> must take its colour from the context in which it is used having regard to the <br /> purpose and object of the legislation, and the Court must necessarily keep in <br /> view the mischief which the legislature seeks to remedy. The question <br /> essentially is one of degree, and it is impossible to fix any definite point at <br /> which ‘regulation’ ends and ‘prohibition’ begins. ( <b>K. Ramanathan v. State of </b><br /> <b>T.N., (1985) 2 SCC 116; Nuclear Power Corporation of India V. Central </b><br /> <b>Electricity Regulatory Commission &amp; Anr. (Judgement of Aptel in Appeal </b><br /> <b>No. 134 of 2024 &amp; batch dated 27.03.2025). </b> <br /> The Court (or, for that matter, this Tribunal), while interpreting the <br /> expression “regulate”, must necessarily keep in view the object to be achieved <br /> and the mischief sought to be remedied. ( <b>Jiyajeerao Cotton Mills Ltd. v. M.P. </b><br /> <b>Electricity Board: 1989 Supp (2) SCC 52; Nuclear Power Corporation Of </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>107</b> of <b>178</b> <br /> <br /><br /> <br /> <b>India V. Central Electricity Regulatory Commission &amp; Anr. (Judgement </b><br /> <b>of Aptel in Appeal No. 134 of 2024 &amp; batch dated 27.03.2025). </b> <br /> <b> </b> <b> </b> <b>(f) “IN REGARD TO” AND “CONNECTED WITH”: ITS </b><br /> <b>MEANING: </b><br /> The power conferred on the CERC, by Section 79(1)(f), is to adjudicate <br /> upon disputes involving generating companies in regard to matters connected <br /> with, among others, clause (b). Let us now examine what the expressions <br /> “involving”, “in regard to” and “matters connected with”, used in Section <br /> 79(1)(f) mean. The expressions ‘in respect of’ or ‘in connection with’ or ‘in <br /> relation to’ or ‘relating to’ or ‘regard to’ are of the widest amplitude. <br /> <b>(Renusagar Power Co. Ltd. v. General Electric Co: (1984) 4 SCC 679; </b><br /> <b>Mansukhlal Dhanraj Jain v. Eknath Vithal Ogale (1995) 2 SCC 665).</b> In <br /> Blacks&#x27; Law Dictionary, Super Deluxe 5th Edition, at page 1158, the term <br /> ‘relate’ (which is similar to the term ‘regard’) is defined as under: “to stand in <br /> some relation; to have bearing or concern; to pertain; refer; to bring into <br /> association with or connection with; ‘with to’.” <b>(State Wakf Board v. Abdul </b><br /> <b>Azeez: AIR 1968 Mad 79 : (1967) 1 MLJ 190; Nitai Charan Bagchi v. </b><br /> <b>Suresh Chandra Paul: 66 CWN 767; Shyam Lal v. M. Shyamlal [AIR 1933 </b><br /> <b>All 649 : 1933 All LJ 728).</b> In 76 Corpus Juris Secundum at pages 620 and <br /> 621 it is stated that the term ‘relate’ is also defined as meaning to bring into <br /> association or connection with; ‘relating to’ has been held to be equivalent to <br /> or synonymous with as to ‘concerning with’ and ‘pertaining to’ <b>. (Doypack </b><br /> <b>Systems (P) Ltd. v. Union of India: (1988) 2 SCC 299).</b> <br /> Section 79(1)(f), which confers on the CERC the power to adjudicate <br /> disputes “involving” generating companies, is “in regard to” matters <br /> “connected with” clauses (a) to (d) of Section 79(1) of the Electricity Act 2003. <br /> The word “involve”, according to the Shorter Oxford Dictionary, means “to <br /> enwrap in anything, to enfold or envelop; to contain or imply”. <b>(CIT v. Surat </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>108</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Art Silk Cloth Manufacturers&#x27; Assn., (1980) 2 SCC 31).</b> It is stated, in the <br /> <b>Advanced Law Lexicon, P Ramanatha Aiyer 3rd Edition, 2005, Book 2, </b><br /> <b>Pg 2455, </b> that the primary significance of the word “involve” is “to roll up or <br /> envelop; and it also means to comprise, to contain, to include by rational or <br /> logical construction. <br /> The words ‘in regard to’, occurring in a statute, must be given the <br /> interpretation justified by the context in which they occur. These words, <br /> ordinarily, mean ‘for’ or ‘for the purpose of’ <b>. (M.A. Jaleel v. State of Mysore, </b><br /> <b>AIR 1961 Mys 210).</b> The word “connected” means intimately connected or <br /> connected in a manner so as to be unable to act independently <b>. (Kashi Nath </b><br /> <b>Misra v. University of Allahabad, 1965 SCC OnLine All 416).</b> The <br /> connection, contemplated by the words “connected with”, must be real and <br /> proximate, not far-fetched or problematical. ( <b>Rex v. Basudev, 1949 SCC </b><br /> <b>OnLine FC 26). </b> In <b> Strong &amp; Co., of Romsey Limited, Appellants and</b> <br /> <b>Woodifield (Surveyor Of Taxes) Respondent., [1906] A.C.448,</b> it has been <br /> held that the words “connected with” are used in the sense that they are really <br /> incidental to the subject of the provision itself, and not if they are mainly <br /> incidental to some other subject other than what the provision relates to. <br /> By use of the words ‘in regard to’, in Section 79(1)(f), Parliament has <br /> made it clear that the disputes, to which a generator is a party to, can be <br /> adjudicated by the CERC only ‘for the purposes of’ clauses (a) to (d) of Section <br /> 79(1), and not otherwise. By use of the words “connected with”, in Section <br /> 79(1)(f), Parliament has stipulated that the dispute should be really incidental <br /> or in close proximity to clauses (a) to (d) of Section 79(1). As clauses (a), (c) <br /> and (d) of Section 79(1) have no application to the facts of the present case, <br /> it is only if the jurisdictional facts disclose that the dispute, in the present case, <br /> is inter-twined with clause (b) of Section 79(1), can the CERC then exercise <br /> jurisdiction under Section 79(1)(f) to adjudicate the present dispute. In other <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>109</b> of <b>178</b> <br /> <br /><br /> <br /> words the dispute, which can be adjudicated by the CERC, must be an integral <br /> part of clause (b) of Section 79(1), and should be incidental to or in close <br /> proximity thereof. <br /> <b> </b> <b> </b> <b>(g) “TARIFF”: ITS SCOPE: </b><br /> The PPA executed between the Appellants-Procurers and CGPL (now <br /> TPCL) defines ‘tariff’ to mean the tariff as computed in accordance with <br /> Schedule 7. Clause 1.1(i) of Schedule 7 stipulates that the method of <br /> determination of Tariff Payments for any Contract Year during the Term of <br /> Agreement shall be in accordance with this Schedule. Clause 1.1(ii) <br /> stipulates that the tariff shall be paid in two parts comprising of Capacity and <br /> Energy Charge. Clause 1.2 relates to monthly tariff payment, and Clause <br /> 1.2.1 relates to the Components of Monthly Tariff Payment. Thereunder, the <br /> Monthly Bill for any Month in a Contract Year shall consist of the following: (i) <br /> Monthly Capacity Charge Payment in accordance with Article 1.2.2 below; (ii). <br /> Monthly Energy Charge for Scheduled Energy in accordance with Article 1.2.3 <br /> below; (iii). Incentive Payment determined in accordance with Article 1.2.4 <br /> below (applicable on annual basis and included only in the Monthly Tariff <br /> Payment for the first month of the next Contract Year); (iv). Penalty Payment <br /> determined in accordance with Article 1.2.5 below (applicable on annual basis <br /> and included only in the Monthly Tariff Payment for the first month of the next <br /> Contract Year); (v). Penalty Payment determined in accordance with Article <br /> 1.2.8 below (applicable on annual basis and included only in the Monthly Tariff <br /> Payment for the first month <i> of the next Contract Year).” </i> While Clause 1.2.2 <br /> relates to monthly capacity charge payment, Clause 1.2.3 relates to monthly <br /> energy charges and prescribes the formula for its calculation. <br /> The term “tariff” is not defined in the Electricity Act. Tariff means a <br /> schedule of standard/prices or charges provided to the category or categories <br /> for procurement by the licensee from the generating company, ( <b>Gujarat Urja </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>110</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Vikas Nigam Ltd. v. Solar Semiconductor Power Company (India) Pvt. </b><br /> <b>Limited, ((2017) 16 SCC 498; Ginni Global Ltd. v. H.P. ERC, 2022 SCC </b><br /> <b>OnLine APTEL 124).</b> While the word “Tariff” can be said to mean the amount <br /> that the licensee is permitted to recover from its beneficiaries in any financial <br /> year ( <b>Transmission Corpn. of A.P. Ltd. v. Rain Calcining Ltd., (2021) 13 </b><br /> <b>SCC 674), </b> it would include within its ambit not only the fixation of rates but <br /> also the rules and regulations relating to it. <b> (PTC (India) Ltd. v. CERC, (2010) </b><br /> <b>4 SCC 603).</b> <br /> On the question as to what would constitute a tariff dispute, this Tribunal, <br /> in the <b>DVC</b> judgment, has held that disputes relating to ( <i>i</i> ) change in law, ( <i>ii</i> ) <br /> delay in completion of projects, ( <i>iii</i> ) invocation of force majeure event etc. <br /> would constitute tariff disputes as they impact the tariff of a generating <br /> company directly and fall solely within the jurisdiction of the Central <br /> Commission under Section 79(1). By use of the word “etc”, this Tribunal, in <br /> the <b>DVC</b> judgment, made it clear that they had only provided instances of tariff <br /> disputes, and these instances were not to be understood as an exhaustive list <br /> of tariff disputes which are non-arbitrable. <br /> In <b>BSES RAJDHANI Power Limited vs. DERC (judgment of APTEL </b><br /> <b>in Appeal Nos. 94 and 95 of 2012 dated 04.09.2012),</b> this Tribunal held that <br /> the terms and conditions of supply, necessarily, include all terms related to <br /> tariff; interest on working capital is a component of tariff since this would <br /> depend on billing; payment of bills, will also have an impact on terms and <br /> conditions for rebate and late payment surcharge; payment of security <br /> mechanism, such as opening of the Letter of Credit, and escrow arrangement, <br /> also relate to the terms and conditions of supply; and billing, payment, <br /> surcharge, rebate for payment, termination or suspension of the supply, <br /> payment mechanism would fall within the terms and conditions of tariff. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>111</b> of <b>178</b> <br /> <br /><br /> <br /> In <b>SECI vs KSERC (judgment of APTEL in Appeal No. 414 of 2022 </b><br /> <b>dated 13.08.2024),</b> this Tribunal held that regulation of tariff would include the <br /> terms and conditions relating to tariff such as billing, consequences of delay <br /> in payment of electricity charges, rebate, termination, suspension of electricity <br /> supply, payment of security, etc. <br /> In <b>Mokia Green Energy Private Limited vs. Punjab State Power </b><br /> <b>Corporation Ltd. &amp; Anr. (Judgment of APTEL in Appeal No. 323 of 2025, </b><br /> <b>dated 08.01.2026)</b> this Tribunal held that tariff is not a mere numerical figure <br /> but is intrinsically linked to, and inseparable from, the terms and conditions <br /> stipulated in the bid documents, it is beyond dispute that variations in the <br /> applicable terms and conditions can result in materially different numerical <br /> value in terms of ₹ per kWh, as such conditions have a direct bearing not only <br /> on project costs but also on the risk perception and commercial assessment <br /> of the bidders. <br /> As noted hereinabove, the components of monthly tariff payment under <br /> Clause 1.2.1 of Schedule-7 of the PPA includes monthly capacity charge <br /> payment, monthly energy charges for scheduled energy, penalty payment <br /> determined in accordance with Article 1.2.5 and penalty payment determined <br /> in accordance with Article 1.2.8. Consequently, any dispute which may impact <br /> tariff, as referred to in the afore-said judgements, as also the components of <br /> Tariff in Schedule-7 of the PPA, can be said to impact tariff rendering such <br /> disputes non-arbitrable. Such disputes, falling within the ambit of Section <br /> 79(1)(b), must, therefore, only be adjudicated by the CERC, and cannot be <br /> referred to arbitration, as such disputes are non-arbitrable. <br /> While disputes with respect to matters, referred to in the afore-said <br /> judgements, may constitute tariff disputes and hence non-arbitrable, it would <br /> be wholly inappropriate for us to provide an exhaustive list of disputes which <br /> would fall within the ambit of Regulatory functions of the Commission either <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>112</b> of <b>178</b> <br /> <br /><br /> <br /> under Section 79(1) or Section 86(1), as also what would, either directly or <br /> indirectly, impact tariff for such disputes to be held non-arbitrable. Suffice it to <br /> hold that, in the light of the law declared by this Tribunal in the <b>DVC</b> judgment, <br /> any dispute which concerns the Regulatory functions of the Commission, or <br /> impacts tariff directly or indirectly, or relates to tariff or regulation of tariff, <br /> cannot be referred to arbitration as such disputes are non-arbitrable. <br /> Regulatory functions are assigned to, and the power to determine tariff <br /> is conferred on, an independent regulator (the Regulatory Commission, be it <br /> Central, State or Joint) by the Electricity Act, a special enactment. As <br /> discharge of the regulatory functions, and exercise of the power to determine <br /> tariff, would have a bearing on the public at large (for instance, the <br /> consumers), it is only the Regulatory Commissions which can discharge <br /> Regulatory functions and exercise the power to determine tariff, and such <br /> functions can neither be discharged nor can such power be exercised by a <br /> private forum such as an arbitral tribunal. Consequently, disputes which relate <br /> to the regulatory functions of the Commission and those which impact tariff, <br /> both directly and indirectly, can only be adjudicated by the Regulatory <br /> Commissions and cannot be referred for arbitration by an arbitrary Tribunal. <br /> Before deciding whether it should exercise its discretion to refer the <br /> dispute before it to arbitration, the CERC must first examine whether the <br /> dispute raised before it involves a generating company or a transmission <br /> licensee, and secondly whether the dispute is in regard to matters connected <br /> with clauses (a) to (d) of Section 79(1). If it does not, then the CERC can <br /> neither adjudicate the dispute nor refer such dispute to arbitration. If the <br /> dispute raised before it satisfies the afore-said two requirements, the CERC <br /> should then examine whether the dispute forms part of the regulatory <br /> functions of the Commission, and whether the dispute impacts tariff either <br /> directly or indirectly. If it either impacts tariff or relates to the regulatory <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>113</b> of <b>178</b> <br /> <br /><br /> <br /> functions, the Commission cannot refer such disputes to arbitration. If the <br /> dispute does not, then the Commission can exercise its discretion, for just and <br /> valid reasons, to either adjudicate such a dispute or refer the said dispute to <br /> arbitration. <br /> <b> </b> <b> </b> <b>(h) WHAT DISPUTES CAN BE REFERRED TO ARBITRATION? </b><br /> <b> </b> The next question which arises for consideration is to what disputes can <br /> be referred by the CERC to arbitration. It is clear that the disputes which <br /> relate to the regulatory functions of the CERC and which impact tariff, either <br /> directly or indirectly cannot be referred to arbitration, as such disputes are <br /> non-arbitrable. As noted hereinabove, the power conferred on the Central <br /> Commission, under Section 79(1)(f), is with respect to disputes involving <br /> generating companies ( <i>i</i> ) in regard to, ( <i>ii</i> ) matters connected with, Clauses (a) <br /> to (d) of Section 79(1). As the jurisdiction of the CERC is confined to <br /> adjudicate only such disputes, it cannot refer any dispute, not falling within the <br /> ambit of clauses (a) to (d) of Section 79(1), for arbitration. There may well be <br /> disputes which are in regard to matters connected with clauses (a) to (d) of <br /> Section 79(1), but which do not relate to the regulatory functions of the CERC <br /> or impact tariff either directly or indirectly. Such disputes can, in the exercise <br /> of the discretionary jurisdiction of the CERC under Section 79(1)(f), either be <br /> adjudicated by the Central Commission or be referred to arbitration. One such <br /> instance would be valid termination of a PPA which does not impact tariff, <br /> which was referred, by the DVC Judgement of this Tribunal, to arbitration. <br /> <b>VII. IS THE PRESENT DISPUTE A REGULATORY DISPUTE WHICH </b><br /> <b>IMPACTS TARIFF? </b> <br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF THE APPELLANT </b><br /> <b>PROCURERS:</b> <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>114</b> of <b>178</b> <br /> <br /><br /> <br /> It is contended, on behalf of the Appellant-Procurers, that TPCL’s <br /> contention, that a tariff dispute relates only to determination of tariff, is <br /> erroneous; Section 79(1)(b) deals with regulation of tariff which is wider in <br /> scope than determination; in fact, determination of tariff is a plenary function, <br /> and cannot be said to be adjudicatory; Section 79(1)(f) does not relate to <br /> regulation of tariff, but to adjudication in regard to matters connected <br /> therewith, which obviously is not restricted to determination or even regulation <br /> of tariff; the expressions ‘regulate’, ‘involving’, ‘in regard to’, ‘matters <br /> connected with’ are wide enough to cover all disputes with a nexus to <br /> regulation or tariff (Ref: (i) <b><i>UPPCL v. NTPC</i></b> <b>, </b> (2009) 6 SCC 235); (ii) <br /> <b><i>Renusagar v. General Electric</i></b> <b>,</b> (1984) 4 SCC 679); and (iii) <b><i>SECI v. KSERC</i></b> ; <br /> the Impugned Order itself rejects TPCL’s claim that Tariff relates only if those <br /> matters covered in Schedule 7 of the PPA; and yet it has considered <br /> regulation of tariff in a narrow / pedantic manner, and without reference to <br /> other binding precedents. <br /> It is further contended, on behalf of the Appellant-Procurers, that TPCL <br /> has a subsisting obligation to generate and supply electricity to <br /> procurers/discoms for supply to consumers in the respective states; this <br /> obligation is as per the PPA dated 22.04.2007 entered into for 25 years <br /> pursuant to a competitive bidding process undertaken in terms of Section 63, <br /> and as per the Central Government Guidelines, terms and conditions, bid <br /> documents including PPA terms and conditions; this, as per <b><i>DVC</i></b> <i> Decision</i> , <br /> falls squarely within the scope of regulatory functions (Para 22), having impact <br /> on tariff (Para 25), falls under adjudicatory functions, and is not an arbitrable <br /> dispute (Section 2(3) of the Arbitration &amp; Conciliation Act); both the Petitions <br /> filed by GUVNL and TPCL are matters connected with regulation of tariff and <br /> the regulatory functions of the CERC; if the contents of the Petitions and <br /> prayers are seen, the contrary claim is untenable; GUVNL is seeking specific <br /> performance to enforce the obligations of TPCL to generate and supply <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>115</b> of <b>178</b> <br /> <br /><br /> <br /> electricity at the tariff terms and conditions of the PPA; Tariff is a clear input in <br /> seeking specific performance and calculation of damages for non-<br /> performance; the stand of TPCL is that it will not generate and supply at the <br /> PPA tariff, and should be given a higher tariff for performance of its obligations <br /> (Ref: Para 7 (BB), (CC) of the Memorandum of Appeal at Pg.20-21, Vol 1); <br /> this plea is taken despite the fact that a similar claim for higher tariff was <br /> conclusively rejected on all counts, including on grounds of force majeure, in <br /> <b><i>Energy Watchdog: </i></b> (2017) 14 SCC 80 - contract becoming onerous cannot <br /> be a ground for wriggling out of obligations; TPCL is camouflaging the same <br /> aspects of force majeure by taking the impermissible plea that TPCL is entitled <br /> to commit a breach of the 25 years agreement, and the same is outside the <br /> purview of the regulatory jurisdiction of the Commission; nothing can be more <br /> bizarre than a party taking advantage of its own wrong, and self-creating a <br /> deliberate breach; GUVNL had also raised the issue of refund of the amount <br /> paid in excess of the PPA tariff which is again necessarily related to tariff; the <br /> consideration of damages is also based on the tariff payable to TPCL, and the <br /> higher cost incurred by GUVNL; further, non-compliance of Section 11 is also <br /> raised; in Petition No. 205/MP/2023, TPCL is challenging deduction of <br /> capacity charges by GUVNL and compensation for GUVNL as per PPA terms <br /> for not meeting availability; the aspect of availability is directly related to <br /> capacity charges and penalty which is clearly tariff even as per PPA, and is <br /> further recognised in <b><i>BSES v. DERC</i></b> <b> </b> at Para 32; similarly, suspension of <br /> supply is also recognised in <b><i>BSES v. DERC </i></b> at Para 33; the impugned Order, <br /> at Paras 30 and 31, acknowledges and holds that there is nexus to tariff, but <br /> proceeds on the basis that it is not sufficient; this means that there is, <br /> admittedly, some elements of the CERC’s regulatory functions, and therefore <br /> the whole matter is not arbitrable; and even a consequential effect on tariff <br /> means the dispute has an impact on tariff. especially when the <i>DVC Decision</i> <br /> states in Para 25 ‘ <i>directly or indirectly</i> ’; and, in Para 107-109 of the <b><i>Renew </i></b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>116</b> of <b>178</b> <br /> <br /><br /> <br /> <i>Decision</i> , the Delhi High Court has held that regulation of tariff is wide, and <br /> matters related to Tariff as input falls within the adjudicatory jurisdiction of the <br /> CERC. <br /> It is also contended, on behalf of the Appellant-Procurers, that TPCL has <br /> wrongly alleged that there has been an agreement of GUVNL to accept LD or <br /> to pay higher tariff; the claim for damages, for non-performance, is under <br /> Section 79 for breach of Article 4 of the PPA (Para 75 of GUVNL’s Petition at <br /> Page 625, Vol. III, Appeal); there was no agreement to pay higher price by <br /> GUVNL for supply of power; any amendment of PPA needs approval of the <br /> CERC [Article 18]; and, in any event, these are matters on merits, and are not <br /> relevant to the issue of arbitrability. <br /> <b> </b> <b>B. JUDGEMENTS </b> <b>RELIED </b> <b>UPON </b> <b>BY </b> <b>THE APPELLANTS-</b><br /> <b>PROCURERS UNDER THIS HEAD:</b> <br /> <b>1</b> In <b>U.P. Power Corpn. Ltd. v. NTPC, (2009) 6 SCC 235, </b> the Supreme Court <br /> held that regulatory provisions are required to be applied having regard to the <br /> nature, textual context and situational context of each statute and case <br /> concerned; the power to regulate implies a power to prescribe and enforce all <br /> such proper and reasonable rules and regulations as may be deemed <br /> necessary to conduct the business in a proper and orderly manner; it also <br /> includes the authority to prescribe the reasonable rules, regulations or <br /> conditions subject to which the business may be permitted or may be <br /> conducted; the word ‘regulation’ is a word of broad import, having a broad <br /> meaning, and is very comprehensive in scope; the different shades of <br /> meaning are brought out in <i>Corpus Juris Secundum</i> , Vol. 76 at p. 611 which <br /> states that ‘ “Regulate” is variously defined as meaning to adjust; to adjust, <br /> order, or govern by rule, method, or established mode; to adjust or control by <br /> rule, method, or established mode, or governing principles or laws; to govern; <br /> to govern by rule; to govern by, or subject to, certain rules or restrictions; to <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>117</b> of <b>178</b> <br /> <br /><br /> <br /> govern or direct according to rule; to control, govern, or direct by rule or <br /> regulations; “Regulate” is also defined as meaning to direct; to direct by rule <br /> or restriction; to direct or manage according to certain standards, laws, or <br /> rules; to rule; to conduct; to fix or establish; to restrain; to restrict.’ (See <br /> also <i>Webster&#x27;s Third New International Dictionary</i> , Vol. II, p. 1913 and <i>Shorter </i><br /> <i>Oxford Dictionary</i> , Vol. II, 3rd Edn., p. 1784.)” <br /> <b>2. </b> In <b>Renusagar Power Co. Ltd. v. General Electric Co., (1984) 4 SCC </b><br /> <b>679, </b> the Supreme Court held that <b> </b> expressions such as “arising out of” or “in <br /> respect of” or “in connection with” or “in relation to” or “in consequence of” or <br /> “concerning” or “relating to” the contract are of the widest amplitude and <br /> content. <br /> <b>3. </b> In <b>Renew Wind Energy (AP2) (P) Ltd. v. Solar Energy Corpn. of </b><br /> <b>India, 2025 SCC OnLine Del 8252, </b> the Delhi High Court held that it was it is <br /> important to stress and give sufficient weight to Parliament&#x27;s wisdom to <br /> empower the CERC to refer disputes involving generating companies or <br /> transmission licensee for arbitration; Parliament, by a special statute, has <br /> conferred this referral power on the CERC for disputes between a defined <br /> category of litigants; permitting any other Court or authority to exercise powers <br /> under Sections 8 or 11 of the Arbitration Act in the same field would displace <br /> the forum chosen by the special law and render Parliament&#x27;s wisdom <br /> nugatory; doctrinally, Section 79(1)(f) read with Section 158 of the Electricity <br /> Act provides a special statutory route to reach the destination, which is <br /> arbitration; any other general route, such as the one provided for under <br /> Sections 8 or 11, would inherently conflict with this special route, even though <br /> the ultimate outcome remains the same; the referral power of the CERC under <br /> Section 79(1)(f) whereby, it can refer disputes involving generating companies <br /> or transmission licensee for arbitration, conflicts with the power of a <br /> Court/Authority, other than the CERC, under Sections 11 or 8 of the Arbitration <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>118</b> of <b>178</b> <br /> <br /><br /> <br /> Act; the Supreme Court in <b><i>GUVNL</i></b> has held that provisions of the Electricity <br /> Act prevail over the Arbitration Act insofar as the latter is found to be in conflict, <br /> both implied and express, with the former; applying the ratio of the <b><i>GUVNL,</i></b> <br /> would lead to the conclusion that the referral powers of the CERC under <br /> Section 79(1)(f) would preclude any other Court/authority, other than the <br /> CERC, from referring disputes involving generating companies or <br /> transmission licensee for arbitration; paragraph 59 of the judgment in <b><i>GUVNL</i></b> <br /> is not limited to an analysis of Section 86(1)(f); the express words “ <i>or the </i><br /> <i>Central Commission (as the case may be) or arbitrator (or arbitrators) </i><br /> <i>nominated by it</i> ” squarely apply to Section 79(1)(f); thus, by the sheer weight <br /> of precedent, it can safely be concluded that the referral powers of Section <br /> 79(1)(f) preclude the application of any provision of the Arbitration Act, <br /> including Section 11, which trigger arbitration or change the authority which is <br /> making the referral for arbitration. <br /> The Delhi High Court clarified that the words used by APTEL in the DVC <br /> Judgement, ie “ <i>disputes related to termination or breach of contract</i> ”, must <br /> be considered in the context of the preceding finding as well in conjunction <br /> with the following words in the same sentence, meaning thereby, the disputes <br /> related to termination or breach of contract, without impacting the tariff either <br /> directly or indirectly, would qualify as non-tariff disputes; and merely because <br /> a dispute has arisen from a breach of contract would not necessarily be <br /> determinative of the nature of dispute. <br /> The Delhi High Court further held that the word ‘regulation’ is of wide <br /> amplitude, and Section 79(1)(f) of the Electricity Act would attract, not merely <br /> a strict regulation of tariff, but also disputes “ <i>connected with</i> ” the regulation of <br /> tariff; the test for determining whether Section 79(1)(f)&#x27;s adjudicatory powers <br /> are attracted is the requirement of a nexus between the dispute between the <br /> parties and the regulation of tariff; and the powers of the CERC under the said <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>119</b> of <b>178</b> <br /> <br /><br /> <br /> provision are broad enough to cover disputes which affect considerations that <br /> had led to the fixation of tariff and further entitlements, charges, rights and <br /> obligations the determination of which utilises tariff as an input function. <br /> <b> </b> <b>C. ANALYSIS: </b><br /> In the impugned order passed in Petition No. 107/MP/2023 and batch <br /> dated 19.11.2025, the CERC observed that the principal disputes, raised in <br /> the said batch of cases, pertained to alleged failure on the part of TPCL to <br /> fulfil its obligations under the PPA, in other words, breach of the contractual <br /> obligations; similarly, in the Petition filed by TPCL, the primary dispute <br /> pertained to the correct methodology for the calculation of Declared Capacity <br /> and levy of Penalty thereon; in some of these cases, the Procurers had prayed <br /> for directions for payment of the amount due and payable under the <br /> agreement and/or refund of the amounts already paid/deducted/withheld; in <br /> Petition No. 205/MP/2023, TPCL had itself prayed for a refund of the amounts <br /> deducted by the Procurers towards Penalty and refund of Capacity Charges; <br /> however, these prayers were ancillary or consequential in nature to the main <br /> dispute involved in the cases; in the <b> DVC </b> Judgement, <b> </b> DVC had, inter alia, <br /> prayed for a declaration that MPPMCL was liable to pay tariff (fixed charges <br /> and energy charges as well as deemed energy charges) in Petition No. <br /> 236/MP/2017, and that an amount of Rs. 437.32 crores was due and <br /> outstanding to it in Petition No. 78/MP/2017 (which primarily comprised of <br /> outstanding tariff under the monthly &amp; supplementary bills (for ECR and AFC <br /> &amp; revision thereof), and the applicable delayed payment charges thereof), in <br /> respect of the concerned generating station of DVC; however the <b>DVC </b><br /> Judgment concluded that these prayers were only ancillary or consequential <br /> in nature, and the primary relief was the declaration that MPPMCL shall not <br /> be entitled to treat the PPAs as having been terminated; in the cases at hand <br /> also, although some of these cases contained the prayers of refund of the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>120</b> of <b>178</b> <br /> <br /><br /> <br /> amount already paid to/deducted by the other side including towards capacity <br /> charges/energy charges, such prayers did not amount to primary prayer(s), <br /> and were consequential or ancillary in nature; the main issues involved in <br /> these cases remained the alleged breach of contractual obligations, which did <br /> not appear to have any impact or bearing on the tariff; as per the ratio laid <br /> down in the <b>DVC</b> Judgment, such issues could not be termed as ‘tariff <br /> disputes’; as a result, the adjudicatory jurisdiction of this Commission, under <br /> Section 79(1)(f) read Section 79(1)(b), did not extend to such disputes; the <br /> ratio of the <b> DVC </b> Judgment was examination of the nature of the primary <br /> dispute involved, and whether such primary dispute impacted tariff or <br /> regulation of tariff; in doing so, the prayers seeking direction of outstanding <br /> amount/payment, even though related to tariff, may not be a determinative <br /> factor, if found to be ancillary/consequential in nature to the main <br /> prayer/dispute; this scrutiny has to be undertaken in respect of the <br /> main/principal dispute only; and disputes relating to breaches of contractual <br /> obligations, that do not impact tariff directly or indirectly, should be considered <br /> as non-tariff disputes referable to the arbitration. <br /> In this context it must be noted that the Delhi High Court, in <b>Renew </b><br /> <b>Wind Energy (AP2) (P) Ltd, </b> has clarified the observations of APTEL in Para <br /> 25 of the <b>DVC</b> Judgement. The Delhi High Court held that the words used by <br /> APTEL, ie <i>“dispute related to termination or breach of contract”</i> , must be <br /> considered in the context of the preceding finding as well as in conjunction <br /> with the following words in the same sentence. Meaning thereby, that disputes <br /> related to termination or breach of contract, without impacting tariff either <br /> directly or indirectly, would qualify as non-tariff disputes; and merely because <br /> a dispute has arisen from a breach of contract would not necessarily be <br /> determinative of the nature of the dispute. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>121</b> of <b>178</b> <br /> <br /><br /> <br /> The claims of the Appellants-Procurers, in the batch of petitions before <br /> the Commission, appear to relate to tariff as detailed in Schedule 7 of the PPA. <br /> While we may not be understood to have expressed any conclusive opinion <br /> in this regard, it does appear that the dispute in the petitions before the CERC <br /> required detailed scrutiny, and the CERC was not justified in brushing it aside <br /> as a mere breach of contract and to be a non-tariff dispute; and in treating all <br /> other claims, even if it related to tariff, as consequential and ancillary to the <br /> main relief. What the CERC ought to have done is to undertake a detailed <br /> examination as to whether or not the alleged breach of contract by the <br /> Respondent-TPCL impacted tariff, directly or indirectly. While an order of <br /> remand would have been in order, so that the CERC could have undertaken <br /> such an exercise, it is unnecessary for us to do so in the present case, as the <br /> impugned order must be set aside for other reasons which are detailed later <br /> in this order. <b> </b><br /> <b> </b> <b>D. CONSEQUENTIAL ISSUES:</b> <br /> Difficulties would arise as a result of the observations of the CERC, <br /> following the <b>DVC</b> judgment, that consequential issues, even if they touch <br /> upon the regulatory functions of the Commission or impact tariff directly or <br /> indirectly, should be referred to arbitration if the primary dispute is a non-tariff <br /> dispute. In the impugned order, the CERC has noted that, in some of the <br /> cases before it, the procurers had prayed for directions for payment of the <br /> amounts due and payable under the agreement or to refund the amounts <br /> already paid/ deducted/ withheld; and, in the petition filed by it, TPCL had also <br /> prayed for refund of the amounts deducted by the procurers towards penalty <br /> and refund of capacity charges. While not disputing that such prayers may <br /> impact tariff either directly or indirectly, the CERC proceeds to hold that these <br /> prayers are ancillary or consequential in nature to the main dispute involved <br /> in the case; and has, thereafter, referred the dispute to arbitration. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>122</b> of <b>178</b> <br /> <br /><br /> <br /> Questions which may arise for consideration, in an appropriate case, is <br /> what the Commission should do in cases where the consequential relief <br /> sought is with respect to a dispute which is non-arbitrable, and the primary <br /> dispute, which may be a non-tariff dispute, cannot be segregated from such a <br /> consequential dispute. Should the Commission leave the dispute, with respect <br /> to such consequential relief, open for adjudication by it in a separate <br /> proceedings while referring the primary dispute to arbitration? or should it <br /> refer only the primary dispute to arbitration and keep the ancillary issues <br /> pending before it, to be taken up for adjudication after the arbitration dispute <br /> is resolved? or should it, notwithstanding such consequential disputes being <br /> non-arbitrable, refer the consequential disputes, along with the primary <br /> dispute, for arbitration. As adjudication of these aspects may, possibly, require <br /> us to take a view, different from that taken by this Tribunal in the <b> DVC</b> <br /> judgment, we refrain from examining these questions in the present appeal, <br /> and leave such questions open for examination in appropriate proceedings in <br /> future. <br /> <b>VIII. SECTION 8 OF THE ARBITRATION &amp; CONCILIATION ACT:</b> <br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF THE APPELLANT </b><br /> <b>PROCURERS:</b> <br /> It is contended, on behalf of the Appellant-Procurers, that in cases <br /> where electricity is directly supplied to end users (Section 49) or to merchant <br /> traders, without back-to-back supply to DISCOMs, and where consumers <br /> serviced by the DISCOMs are not affected, the CERC can exercise discretion <br /> to refer the matter to arbitration; the <b><i>DVC </i></b> <i>Decision </i> and the <b> </b> <b><i>MB Power </i></b><br /> <i>Decision </i> fall in such category; the <b> </b> <b><i>MB Power </i></b> <i>Decision </i> specifically recognises <br /> that, in the case of operation of the PPA, such matters would fall under the <br /> jurisdiction of the CERC, which fortifies the above categorisation; in such <br /> cases of non-supply to DISCOM, if an arbitration clause exists, Section 8 of <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>123</b> of <b>178</b> <br /> <br /><br /> <br /> the Arbitration &amp; Conciliation Act would apply and bind the CERC, as a judicial <br /> body, to refer the dispute to arbitration, as per the <b> </b> <b><i>DVC</i></b> <i> Decision</i> ; the term <br /> ‘ <i>bound</i> <i>to refer</i> ’ used in Para 22 of the <b> </b> <b><i>DVC</i></b> <i> Decision</i> is in the context of <br /> Section 8 of the Arbitration &amp; Conciliation Act and, if there is no arbitration <br /> clause, the CERC may, in its discretion, refer such matters to arbitration or <br /> adjudicate the dispute itself; such a decision is to be taken at the initial stage; <br /> Paras 58-60 of the <b><i>Renew </i></b> <i>Decision</i> of the Delhi High Court, referring to <br /> application of Section 8 of the Arbitration &amp; Conciliation Act, is for any authority <br /> other than the CERC; the impugned Order cannot be said to follow the <b><i>DVC </i></b><br /> <i>Decision</i> , as a binding precedent; if it had followed the <b><i>DVC </i></b> <i>Decision</i> , the <br /> CERC ought to have rejected TPCL’s claim for reference to arbitration for their <br /> failure to satisfy the test, of Section 8(1) of the Arbitration &amp; Conciliation Act, <br /> for an application seeking reference to arbitration being filed at the appropriate <br /> stage; there cannot be any reference of the Petition to arbitration, where TPCL <br /> itself is the Petitioner before the CERC; Section 158 is not a provision for <br /> referring disputes to arbitration; and it follows when reference is under other <br /> provisions, “by” the Act under Section 160(3), and “under” the Act under <br /> Sections 79(1)(f) &amp; 86(1)(f), license conditions, other similar regulations etc. <br /> It is submitted, on behalf of the Appellants-PSPCL and HPPC, that <br /> TPCL has belatedly, i.e. after 2 years of filing its reply on 11.07.2022, raised <br /> the issue of reference to arbitration on 07.10.2024, contrary to Section 8 of <br /> the Arbitration &amp; Conciliation Act; and, in addition, CERC has failed to <br /> consider Regulation 48 of the CERC, (Conduct of Business) Regulations, <br /> 2023. <br /> <b> </b> <b>B. SUBMISSIONS URGED ON BEHALF OF RESPONDENT-TPCL:</b> <br /> In support of their submission that an application, under Section 8 of the <br /> Arbitration &amp; Conciliation Act, is not a pre-requisite for the CERC to refer the <br /> matter to arbitration, it is submitted, on behalf of the Respondent-TPCL, that <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>124</b> of <b>178</b> <br /> <br /><br /> <br /> Section 8 of the Arbitration &amp; Conciliation Act applies only when the judicial <br /> authority otherwise has inherent jurisdiction over the dispute; in the present <br /> case, CERC does not have jurisdiction to adjudicate “ <i>Non-Tariff” </i> disputes; in <br /> <b>K. Mangayarkarasi &amp; Anr. vs. N.J. Sundaresan &amp; Anr., (2025) 8 SCC 299, </b><br /> the Supreme Court has held that the correct approach which the judicial <br /> authority has to adopt, when Section 8 is invoked, is not to ask whether the <br /> court still has jurisdiction, but whether its jurisdiction stands ousted by a <br /> special statute, as the general law must yield to the special law; under Section <br /> 79(1)(f), once the CERC classifies a dispute as “ <i>Non-Tariff”, </i> its jurisdiction is <br /> statutorily ousted; therefore, there was no occasion or necessity for TPCL to <br /> invoke Section 8; further, the Delhi High Court, in <b>Renew Wind Energy (AP2) </b><br /> <b>Pvt. Ltd. vs. SECI (Judgment dated 03.11.2025 in O.M.P.(I) (COMM.) </b><br /> <b>213/2025), </b> <i>inter alia, </i> has held that the power to refer disputes to arbitration <br /> vests solely in the CERC, to the exclusion of Sections 8 and 11 of the <br /> Arbitration &amp; Conciliation Act; in the <b> DVC APTEL </b> Judgement as well, there <br /> was no issue of interpretation of and applicability of Section 8 of the Arbitration <br /> &amp; Conciliation Act; Section 8 was invoked in the DVC case, but it was in fact <br /> the interpretation and interplay of Section 79(1)(f) (and not Section 8) and its <br /> applicability to <i>Non-Tariff </i> dispute which was under consideration ( <b>Order </b><br /> <b>dated 23.07.2019 passed in Petition No. 236/MP/2017 passed by CERC </b><br /> <b>titled as ‘DVC vs. MPPMCL.’); </b> and the stage of proceedings is immaterial <br /> once jurisdiction is found to be lacking <b><i> </i></b> <b>(</b> <b><i>MA Murthy v. State of Karnataka, </i></b><br /> <b><i>(2003) 7 SCC 517 </i></b> <i>and</i> <b><i> P.V. George v State of Kerala, (2007) 3 SCC 557</i></b> <b>)</b> . <br /> It is further submitted, on behalf of the Respondent-TPCL, that Petition <br /> No. 205/MP/2023 filed by TPCL equally qualifies for arbitration; the reliefs <br /> sought under said Petition are purely contractual, and not a case of <br /> determination of tariff; it seeks declaration of certain deductions as illegal on <br /> the ground that they are contractually impermissible under the PPA; APTEL’s <br /> judgment in <b> PTC India Ltd. v. Punjab SERC, 2024 SCC OnLine APTEL 124 </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>125</b> of <b>178</b> <br /> <br /><br /> <br /> clearly holds that, where the statutory scheme allocates jurisdiction to a <br /> specific forum, parties’ conduct cannot vest or confer jurisdiction in another <br /> forum. <br /> It is also submitted, on behalf of the Respondent-TPCL, that Section <br /> 2(3) of the Arbitration &amp; Conciliation Act expressly saves the operation of <br /> special statutes by providing that Part I shall not affect any law under which <br /> certain disputes may not be submitted to arbitration; the Electricity Act <br /> constitutes such a special statute, which statutorily governs both the <br /> classification of disputes and the manner of reference to arbitration under <br /> Section 79(1)(f) read with Section 158; Section 158 of the Electricity Act <br /> employs the expression ‘ <i>by or under this Act’ </i> and the phrase ‘ <i>directed to be </i><br /> <i>determined</i> ’, which makes it clear that arbitration is triggered only after the <br /> CERC, in the exercise of its power under Section 79(1)(f), directs such <br /> determination; reference to arbitration flows from Section 79(1)(f) and not <br /> independently of it [Ref: Pa 33 @ Pg. 24 of the Reply filed by TPCL in APL. <br /> 348]; the <b>DVC APTEL </b> Judgment, after expressly considering Section 2(3) of <br /> the Arbitration &amp; Conciliation Act, held that, while <i>Tariff </i> disputes stand excluded <br /> from arbitration by virtue of the Electricity Act, disputes relating to termination <br /> or breach of PPAs, which do not impact tariff, are “ <i>Non-tariff</i> ” disputes, and are <br /> mandatorily referable to arbitration under Section 79(1)(f) read with Section <br /> 158 of the Electricity Act (Para 25); and this was affirmed by the Supreme <br /> Court. <br /> <b> </b> <b>C. JUDGEMENTS RELIED UPON BY THE RESPONDENT-TPCL </b><br /> <b>UNDER THIS HEAD:</b> <br /> <b>1. </b> In <b>K. Mangayarkarasi v. N.J. Sundaresan, (2025) 8 SCC 299, </b> the <br /> Supreme Court held that allegations of fraud or criminal wrongdoing or of <br /> statutory violation would not detract from the jurisdiction of the Arbitral <br /> Tribunal to resolve a dispute arising out of a civil or contractual relationship <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>126</b> of <b>178</b> <br /> <br /><br /> <br /> on the basis of the jurisdiction conferred by the arbitration agreement; once <br /> an application, in due compliance with Section 8 of the 1996 Act is filed, the <br /> approach of the civil court should be not to see whether the court has <br /> jurisdiction; it should be to see whether its jurisdiction has been ousted; there <br /> is a lot of difference between the two approaches; once it is brought to the <br /> notice of the court that its jurisdiction has been taken away in terms of the <br /> procedure prescribed under a special statute, the civil court should first see <br /> whether there is ouster of jurisdiction in terms of or in compliance with the <br /> procedure under the special statute; the general law should yield to the special <br /> law — <i>generalia specialibus non derogant</i> ; in such a situation, the approach <br /> shall not be to see whether there is still jurisdiction in the civil court under the <br /> general law; such approaches would only delay the resolution of disputes and <br /> complicate the redressal of grievance and of course unnecessarily increase <br /> the pendency in the court. ( <b><i>A. </i></b> <b><i>Ayyasamy</i></b> <b> </b> <b>[</b> <b><i>A. </i></b> <b><i>Ayyasamy</i></b> <b> v. </b> <b><i>A. </i></b><br /> <b><i>Paramasivam</i></b> <b>, (2016) 10 SCC 386</b> ); once there is an arbitration agreement <br /> between the parties, a judicial authority before whom an action is brought <br /> covering the subject-matter of the arbitration agreement is under a positive <br /> obligation to refer parties to arbitration by enforcing the terms of the contract; <br /> and there is no element of discretion left in the court or judicial authority to <br /> obviate the legislative mandate of compelling parties to seek recourse to <br /> arbitration. <br /> <b>2. </b> In <b>M.A. Murthy v. State of Karnataka, (2003) 7 SCC 517, </b> the Supreme <br /> Court held that the law declared by the Supreme Court is presumed to be the <br /> law at all times; normally, the decision of the Supreme Court enunciating a <br /> principle of law is applicable to all cases irrespective of its stage of pendency <br /> because it is assumed that what is enunciated by the Supreme Court is, in <br /> fact, the law from the inception; the doctrine of prospective overruling is an <br /> exception to the normal principle of law, it is a part of the principles of <br /> constitutional canon of interpretation, and can be resorted to by the Supreme <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>127</b> of <b>178</b> <br /> <br /><br /> <br /> Court while superseding the law declared by it earlier; it is a device innovated <br /> to avoid reopening of settled issues, to prevent multiplicity of proceedings, <br /> and to avoid uncertainty and avoidable litigation; in other words, actions taken <br /> contrary to the law declared prior to the date of declaration are validated in <br /> larger public interest; the law as declared applies to future cases; it is for the <br /> Supreme Court to indicate as to whether the decision in question will operate <br /> prospectively; in other words, there shall be no prospective overruling, unless <br /> it is so indicated in the particular decision; it is not open to be held that the <br /> decision in a particular case will be prospective in its application by application <br /> of the doctrine of prospective overruling; the doctrine of binding precedent <br /> helps in promoting certainty and consistency in judicial decisions, and enables <br /> an organic development of the law besides providing assurance to the <br /> individual as to the consequences of transactions forming part of the daily <br /> affairs; and, that being the position, the High Court was in error by holding that <br /> the judgment which operated on the date of selection was operative, and not <br /> the review judgment in <b>Ashok Kumar Sharma case No. II: (1997) 4 SCC 18.</b> <br /> <b>3. </b> Following its earlier decision, in <b>M.A. Murthy v. State of Karnataka, </b><br /> <b>(2003) 7 SCC 517,</b> and after noting that the effect of declaration of law, the <br /> rule of stare decisis, the consequences flowing from a departure from an <br /> earlier decision, and the doctrine of prospective over-ruling, had been <br /> considered in great detail by the House of Lords in <b>National Westminster </b><br /> <b>Bank Plc. v. Spectrum Plus Ltd: </b> 2005 UKHL 41, the Supreme Court, in <b> </b><br /> <b>P.V.George vs State of Kerala: (2007) 3 SCC 557,</b> observed that, in service <br /> matters, the Supreme Court, on a number of occasions, had passed orders <br /> on equitable consideration; but the same did not mean that, whenever a law <br /> is declared, it will have effect only because it has taken a different view from <br /> the earlier one; in those cases it is categorically stated that it would have <br /> prospective operation; and the law declared by a court will have retrospective <br /> effect if not otherwise stated to be so specifically. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>128</b> of <b>178</b> <br /> <br /><br /> <br /> <b>4. </b> In <b>PTC India Ltd. v. Punjab SERC, 2024 SCC OnLine APTEL 124, </b><br /> <b>Para 108-111), </b> this Tribunal observed that, in <b>A.B.C. Laminart (P) </b><br /> <b>Ltd. v. A.P. </b> <b>Agencies, (1989) </b> <b>2 </b> <b>SCC </b> <b>163, A.V.M. </b> <b>Sales </b><br /> <b>Corpn. v. Anuradha Chemicals (P) Ltd., (2012) 2 SCC 315, and Inter </b><br /> <b>Globe Aviation Ltd. v. N. Satchidanand, (2011) 7 SCC 463, </b> the Supreme <br /> Court held that any contractual clause which ousts the jurisdiction of courts <br /> having jurisdiction, and which confers jurisdiction on a court not otherwise <br /> having jurisdiction, would be invalid;’ and parties cannot by agreement, confer <br /> jurisdiction on a court which does not have jurisdiction; in <b> Jagmittar Sain </b><br /> <b>Bhagat v. Health Services, Haryana, (2013) 10 SCC 136, </b> the Supreme <br /> Court held that conferment of jurisdiction is a legislative function and it can <br /> neither be conferred with the consent of parties nor by a superior court; if the <br /> court, having no jurisdiction over the matter, passes a decree, it would amount <br /> to a nullity as the matter goes to the root of the cause; such an issue can be <br /> raised at any stage of the proceedings; the finding of a court or tribunal <br /> becomes irrelevant and unenforceable/inexecutable once the forum is found <br /> to have no jurisdiction; similarly, if a court/tribunal inherently lacks jurisdiction, <br /> acquiescence of the party should not be permitted to perpetrate and <br /> perpetuate defeating the legislative animation; the court cannot derive <br /> jurisdiction apart from the statute, and in such eventuality the doctrine of <br /> waiver also does not apply; and the law does not permit any <br /> court/tribunal/authority/forum to usurp jurisdiction on any ground whatsoever, <br /> in case, such an authority does not have jurisdiction on the subject-matter. <br /> This Tribunal thereafter observed that conferment of jurisdiction is a <br /> legislative function; jurisdiction can neither be conferred on a court or tribunal <br /> with the consent of parties or by a Superior Court or Tribunal. ( <b>Jagmittar Sain </b><br /> <b>Bhagat v. Health Services, Haryana, (2013) 10 SCC 136</b> ); Consent does <br /> not confer jurisdiction ( <b>Narendra S. Chavan v. Vaishali V. Bhadekar, (2009) </b><br /> <b>15 SCC 166</b> ); nor can consent give a court jurisdiction if a condition which <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>129</b> of <b>178</b> <br /> <br /><br /> <br /> goes to the root of the jurisdiction has not been performed or fulfilled; no <br /> consent can give a jurisdiction to a court of limited jurisdiction which it does <br /> not possess ( <b>United Commercial Bank Ltd. v. Workmen, 1951 SCC 364</b> ); <br /> the distinction clearly is between the jurisdiction to decide matters and the <br /> ambit of the matters to be heard by a tribunal having jurisdiction to deal with <br /> the same; in the second case, the question of acquiescence or irregularity <br /> may be considered and overlooked; when, however, the question is of the <br /> jurisdiction of the Tribunal, no question of acquiescence or consent can affect <br /> the decision ( <b>United Commercial Bank Ltd. v. Workmen, 1951 SCC 364</b> ); <br /> parties cannot by agreement give the courts&#x27; jurisdiction which the legislature <br /> has enacted they are not to have; and the court cannot give effect to an <br /> agreement whether by way of compromise or otherwise, inconsistent with the <br /> provisions of the Act. ( <b>Barton v. Fincham [[1921] 2 K.B. 291; Peachey </b><br /> <b>Property Corporation Ltd. v. Robinson, [1966] 2 All ER 981; Sushil </b><br /> <b>Kumar Mehta v. Gobind Ram Bohra, (1990) 1 SCC 193</b> ). <br /> <b> </b> <b>D. ANALYSIS: </b> <br /> <b> </b> <b> </b> <b>(a) CONTENTS OF THE IMPUGNED ORDER ON THE </b><br /> <b>APPLICABILITY OF SECTION 8 OF THE 1996 ACT: </b> <br /> On Issue No. 2, ie whether timely invocation of Section 8 of the 1996 <br /> Act was an essential pre-requisite for the Commission to refer a dispute to <br /> arbitration under the Electricity Act, the CERC, in the impugned order passed <br /> in Petition No. 107/MP/2023 and batch dated 19.11.2025, observed that, in <br /> the present batch of matters, the parties had already filed their pleadings on <br /> merits and, thus, it was beyond dispute that one of the necessary ingredients <br /> of Section 8 of the 1996 Act, i.e. a Party being required to apply for an <br /> arbitration on or before submitting its first statement on the substance of the <br /> dispute, was not fulfilled; however, it was equally true that the jurisdiction of <br /> the CERC to adjudicate upon disputes under Section 79(1)(f) read with <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>130</b> of <b>178</b> <br /> <br /><br /> <br /> Section 79(1)(b) of the Electricity Act did not extend over matters not related <br /> to the regulation of tariff of a generating company having a composite scheme; <br /> in other words, as explained by APTEL in the <b>DVC</b> Judgment, non-tariff <br /> disputes involving a generating company did not fall within the ambit of <br /> Section 79(1)(f) of the Electricity Act, not at least in the first part, and such <br /> disputes would then be arbitrable – falling within the scope of the expression <br /> <i>“and to refer any dispute for arbitration” </i> as appearing in the later part of <br /> Section 79(1)(f); and the Commission was required to refer to such disputes <br /> to arbitration. <br /> After extracting Paras 21 and 22, Paras 30, 32, 36 and 37 of the <b>DVC </b><br /> Judgment, the CERC observed that, in the <b>DVC</b> Judgement, the Appellant-<br /> MPPMCL had filed its statement of objections under Section 8 of the 1996 Act <br /> seeking a direction to the parties to get the disputes adjudicated through <br /> arbitration in accordance with the arbitration clause in the PPAs; in the said <br /> appeals, APTEL was, however, dealing with the issue(s) with regard to the <br /> arbitrability of the dispute between a generating company and distribution <br /> company, as well as the applicability of Section 8 of the 1996 Act to the <br /> Petition under Section 79(1)(f) of the Act; in the course of dealing with the <br /> above issue(s), the <b>DVC </b> Judgment clarified the scope of adjudicatory powers <br /> of the Commission under Section 79(1)(f) read with Section 79(1)(b) of the <br /> Electricity Act and, after examining as to what constitutes tariff and non-tariff <br /> disputes, specifically held that non-tariff disputes involving a generating <br /> company did not fall within the ambit of Section 79(1)(f) of the Act and were, <br /> thus, arbitrable (Paragraphs 25, 26 and 36); in the present case, they had <br /> already examined the nature of dispute(s) involved in this batch of matters as <br /> per the principles laid down by the <b>DVC </b> Judgment, and had found that the <br /> main/primary dispute(s) involved did not impact tariff or regulation of tariff of <br /> the generating company; as a corollary, it followed that the adjudicatory <br /> jurisdiction of the Commission did not extend to dispute(s) qua TPCL and the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>131</b> of <b>178</b> <br /> <br /><br /> <br /> Procurers as raised in these matters; and the only avenue left was to refer <br /> them to arbitration under Section 79(1)(f) of the Electricity Act. <br /> The CERC then observed that it was settled law that a question relating <br /> to jurisdiction, which goes to the root of the matter, can always be raised at <br /> any stage; conferment of jurisdiction was a legislative function, and <br /> Courts/Tribunal cannot confer jurisdiction on itself which is not provided in the <br /> Law; a statutory tribunal, created by an Act of Parliament, has limited <br /> jurisdiction and must function within the four corners of the statute that created <br /> it; it was not open to it to travel beyond the provisions of the statute; the <br /> objection raised by TPCL, regarding lack of adjudicatory jurisdiction of the <br /> CERC to adjudicate upon the main dispute(s) involved in this batch of <br /> Petitions at this stage, in light of the <b>DVC</b> Judgment, could not be faulted; <br /> further, once having held that the main dispute(s) involved in this batch of <br /> Petitions did not relate to tariff or regulation of tariff and the Commission, <br /> therefore, lacked jurisdiction to adjudicate upon them, filing of the application <br /> under Section 8 of the 1996 Act, on or before submitting the first statement on <br /> substance of dispute, may not hold much significance in the present case; <br /> the Commission, being a creature of statute, enjoyed limited adjudicatory <br /> jurisdiction under Section 79(1)(f) read with Section 79(1)(b), and for matters <br /> not falling within such limited jurisdiction, i.e., non-tariff related matters, the <br /> Commission was, as laid down in the <b> DVC </b> Judgment, bound to refer such <br /> matters to arbitration; even if they were to accept the submission of the <br /> Procurers that non-filing of the application, in terms of Section 8 of the 1996 <br /> Act at the first instance by TPCL, was fatal to its argument to refer the matters <br /> to arbitration, it would result in a peculiar situation wherein, while the matters <br /> cannot be referred to arbitration, but at the same time the Commission also <br /> lacked jurisdiction to adjudicate upon the non-tariff issues involved in the <br /> cases before it; in such circumstances, such a non-tariff issue, involved in the <br /> generating station covered under Section 79(1)(b) of the Electricity Act, would <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>132</b> of <b>178</b> <br /> <br /><br /> <br /> then have to fall under the scope of <i>“and to refer any dispute for arbitration” </i><br /> as appearing in the later part of Section 79(1)(f); and the Commission was <br /> bound to refer such non-tariff disputes to arbitration in terms thereof, <br /> irrespective of the stage at which such reference was sought by the Party or <br /> even if none of the Parties had sought for such reference. <br /> <b> </b> <b> </b> <b>(b) JUDICIAL AUTHORITY: DOES IT INCLUDE THE CERC?</b> <br /> Section 8 of the 1996 Act relates to the power to refer parties to <br /> arbitration where there is an arbitration agreement. Under sub-section (1) <br /> thereof, a judicial authority, before which an action is brought in a matter which <br /> is the subject of an arbitration agreement, shall, if a party to the arbitration <br /> agreement or any person claiming through or under him, so applies not later <br /> than the date of submitting his first statement on the substance of the dispute, <br /> then, notwithstanding any judgement, decree or order of the Supreme Court <br /> or any Court, refer the parties to arbitration unless it finds that prima facie no <br /> valid arbitration agreement exists. <br /> The 1996 Act does not define the term “judicial authority”. In its ordinary <br /> parlance the words “judicial authority”, as used in Section 8(1) of the 1996 Act, <br /> would comprehend a court defined under the 1996 Act but also courts which <br /> would either be a civil court or other authorities which perform judicial <br /> functions or quasi-judicial functions. The expression “judicial authority” must, <br /> therefore, be interpreted having regard to the purport and object for which the <br /> 1996 Act was enacted. <b>(Morgan Securities &amp; Credit (P) Ltd. v. Modi Rubber </b><br /> <b>Ltd., (2006) 12 SCC 642; Emaar MGF Land Ltd. v. Aftab Singh, (2019) 12 </b><br /> <b>SCC 751).</b> As noted hereinabove, this Tribunal, in the <b> DVC </b> judgment, has <br /> held that the CERC is a judicial authority under Section 8(1) of the 1996 Act. <b> </b> <br /> <b> </b> <b> </b> <b>(c) SECTION 158 OF THE ELECTRICITY ACT: ITS SCOPE: </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>133</b> of <b>178</b> <br /> <br /><br /> <br /> Section 158 of the Electricity Act stipulates that where any matter is, by <br /> or under this Act, directed to be determined by arbitration, the matter shall, <br /> unless it is otherwise expressly provided in the license of a licensee, be <br /> determined by such person or persons as the appropriate Commission may <br /> nominate in that behalf on the application of either party; but in all other <br /> respects the arbitration shall be subject to the provisions of the Arbitration &amp; <br /> Conciliation Act, 1996. <br /> The words “by this Act”, used in Section 158, would mean by the <br /> Electricity Act, and the words” under this Act” evidently refers to a matter which <br /> the Appropriate Commission directs to be determined by arbitration ie a <br /> dispute being referred to arbitration under Sections 79(1)(f)/86(1)(f) of the <br /> Electricity Act. Such a dispute can, in view of Section 158, only be determined <br /> by the person or persons nominated by the Commission. In other words, <br /> notwithstanding Section 11 of the 1996 Act, an arbitrator, to whom the dispute <br /> can be referred under Sections 79(1)(f)/86(1)(f), must necessarily be <br /> nominated by the Commission concerned, and none other. <br /> There is nothing in the language of Section 158 which indicates that it <br /> is only after the stage of reference to arbitration would the provisions of the <br /> 1996 Act apply. In effect, the submission, urged on behalf of the Respondent-<br /> TPCL, is that it is only the provisions of the 1996 Act, after Section 11 thereof <br /> (which relates to the appointment of an arbitrator), which would apply to <br /> disputes referred to arbitration under Sections 79(1)(f)/86(1)(f), and not <br /> provisions prior thereto. <br /> In this context, it is useful to note that the Supreme Court in the <b>GUVNL </b><br /> Judgement, and this Tribunal in the <b>DVC </b> Judgement, have specifically <br /> referred to Section 158 of the Electricity Act. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>134</b> of <b>178</b> <br /> <br /><br /> <br /> The Supreme Court, in <b> GUVNL,</b> made it clear that it was only with <br /> regard to the authority, which can adjudicate or arbitrate disputes, that <br /> the Electricity Act, 2003 will prevail over Section 11 of the Arbitration and <br /> Conciliation Act, 1996; however, as regards, the procedure to be followed by <br /> the State Commission (or the arbitrator nominated by it), and other matters <br /> related to arbitration (other than appointment of the arbitrator), the Arbitration <br /> and Conciliation Act, 1996 will apply (except if there is a conflicting provision <br /> in the Act of 2003); the power to refer disputes to arbitration, under Section <br /> 86(1)(f), is only restricted to the authority which is to adjudicate or arbitrate <br /> between licensees and generating companies; and procedural and other <br /> matters relating to such proceedings will be governed by the Arbitration and <br /> Conciliation Act, 1996, unless there is a conflicting provision in the Electricity <br /> Act. [Para 59]. <br /> The Supreme Court, in <b>GUVNL,</b> referred to Section 158 of the Electricity <br /> Act, and then held that, except for Section 11, all other provisions of the 1996 <br /> Act would apply to arbitrations under Section 86(1)(f) of the Electricity Act, <br /> 2003 (unless there is a conflicting provision in the Electricity Act, 2003, in <br /> which case such provision will prevail). It is not even contended before us on <br /> behalf of the TPCL that, apart from Section 11, there is any other provision of <br /> the Arbitration and Conciliation Act, 1996, which is in conflict with the <br /> provisions of the Electricity Act. All provisions, apart from Section 11, would <br /> include Section 8 of the 1996 Act also. The submission that it is only provisions <br /> after Section 11, and not provisions of the 1996 Act prior thereto which would <br /> apply to arbitration proceedings under the Electricity Act, therefore <br /> necessitates rejection. <br /> After extracting Sections 2(3) and 8(1) of the 1996 Act in Para 18, and <br /> Section 158 of the Electricity Act in Para 21, this Tribunal, in the <b>DVC</b> <br /> Judgement, observed that Section 79(1)(f) gives discretion to the Commission <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>135</b> of <b>178</b> <br /> <br /><br /> <br /> to refer any such dispute for arbitration and, in this regard, Section 158 of the <br /> Electricity Act was relevant (Para 21); the concept of arbitration is not alien to <br /> the disputes arising under various provisions of the Electricity Act (Para 22); <br /> they saw no conflict or inconsistency between Section 8(1) of the 1996 Act <br /> and Section 79(1) of the Electricity Act; Section 8(1) of the 1996 Act made it <br /> mandatory for a judicial authority to refer the parties for arbitration where it <br /> finds that a valid arbitration agreement exists between the parties and a party <br /> to the arbitration agreement so applies (Para 30); the expression <i>“and to refer </i><br /> <i>any dispute for arbitration” </i> , used at the end of clause (f) of both Sections <br /> 79(1) and 86(1) of the Electricity Act, definitely leaves scope for some disputes <br /> to be referred for arbitration; and this view was further strengthened by <br /> Section 158 of the Electricity Act which provided that arbitration, directed by <br /> the Commission, shall be subject to the provisions of the 1996 Act (Para 32). <br /> In other words, the law declared by this Tribunal, in the <b> DVC </b> judgment, is that, <br /> in the absence of any conflict, both the provisions, ie Section 8(1) of the 1996 <br /> Act and Section 79(1) of the Electricity Act, can co-exist. Consequently, the <br /> tests stipulated in Section 8(1) of the 1996 Act must be satisfied, before the <br /> CERC can refer the dispute to arbitration. <br /> In the light of the law declared by the Supreme Court in <b>GUVNL,</b> and <br /> this Tribunal in the <b>DVC </b> Judgement, the submission, urged on behalf of the <br /> Respondent-TPCL, that it is only provisions after Section 11 of the 1996 Act, <br /> and not provisions prior thereto, which would apply to arbitration proceedings <br /> referred under clause (f) of both Sections 79(1) and 86(1), necessitates <br /> rejection. While the Supreme Court in <b>GUVNL</b> has held that all provisions of <br /> the 1996 Act, other than Section 11, would apply, this Tribunal, in the DVC <br /> Judgement, has held that Section 8(1) of the 1996 Act would apply to <br /> proceedings under the Electricity Act. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>136</b> of <b>178</b> <br /> <br /><br /> <br /> Curiously, while it is sought to be suggested on behalf of the <br /> Respondent-TPCL that it is only the provisions of the 1996 Act, which follow <br /> after an arbitrator is appointed under Section 11 of the said Act, which would <br /> apply to arbitrations under Section 86(1)(f)/ 79(1)(f), they themselves have <br /> relied on Section 2(3) which finds place in the 1996 Act prior to Section 11 <br /> thereof. It was the Respondent-TPCL which had placed heavy reliance before <br /> the CERC on the <b> DVC </b> judgement of this Tribunal wherein the Appellant-<br /> MPPCL had filed its statement of objections under Section 8(1) of the 1996 <br /> Act objecting to the maintainability of the petitions filed by the Respondent-<br /> DVC, and had sought a direction to the parties to get the dispute adjudicated <br /> through arbitration in accordance with the arbitration clause of the PPAs. <br /> Consequently, Section 8 of the 1996 Act would, in view of the <b>DVC</b> Judgement <br /> of this Tribunal, squarely apply even in cases where either the Central or the <br /> State Commission is inclined to refer the dispute to arbitration. <br /> <b> </b> <b> </b> <b>(d) SCOPE OF ENQUIRY IN PROCEEDINGS UNDER SECTION </b><br /> <b>8 OF THE 1996 ACT:</b> <br /> Where a suit is filed by one of the parties to an arbitration agreement <br /> against the other parties to the arbitration agreement, and if the defendants <br /> file an application under Section 8 stating that the parties should be referred <br /> to arbitration, the court (judicial authority) will have to decide: ( <i>i</i> ) whether there <br /> is an arbitration agreement among the parties; ( <i>ii</i> ) whether all the parties to <br /> the suit are parties to the arbitration agreement; ( <i>iii</i> ) whether the disputes <br /> which are the subject-matter of the suit fall within the scope of the arbitration <br /> agreement; ( <i>iv</i> ) whether the defendant had applied under Section 8 of the Act <br /> before submitting his first statement on the substance of the dispute; and ( <i>v</i> ) <br /> whether the reliefs sought in the suit are those that can be adjudicated and <br /> granted in an arbitration. ( <b><i>Booz Allen &amp; Hamilton Inc. v. SBI Home Finance </i></b><br /> <b><i>Ltd.</i></b> <b>, (2011) 5 SCC 532). </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>137</b> of <b>178</b> <br /> <br /><br /> <br /> The first limb of Section 8(1) of the 1996 Act, for parties to be referred <br /> to arbitration, requires the Commission, as a judicial authority, to be satisfied <br /> firstly that the dispute raised before it is a matter which is the subject of an <br /> arbitration agreement or, in other words, the agreement executed between <br /> the parties to the dispute before it contains an arbitration clause. Secondly, <br /> the party to the arbitration agreement should apply, to the Commission to refer <br /> such a dispute to arbitration, not later than the date of submitting his first <br /> statement on the substance of the dispute. In other words, an application to <br /> the Commission to refer the dispute to arbitration can be made by the <br /> Respondent, in the Petition filed before the Commission, prior to filing its reply <br /> to the said Petition. On such an application being filed, the judicial authority <br /> (ie the Commission) is bound to refer the dispute to arbitration unless it finds <br /> that, prima facie, no valid arbitration agreement exists. For the judicial <br /> authority (in the present case the CERC) to examine, albeit prima facie, <br /> whether or not a valid arbitration agreement exists, Section 8(2) requires the <br /> application under Section 8(1) to be accompanied by either the original <br /> arbitration agreement or a duly certified copy thereof. Consequently, the <br /> CERC, under Section 8(1) of the 1996 Act, can, if the application under <br /> Section 8(1) is filed by the Respondent in the Petition before filing its reply, <br /> refuse to refer the dispute to arbitration only if no arbitration agreement exists <br /> between the parties to the dispute. <br /> <b> </b> <b> </b> <b>(e) ISSUE OF ARBITRABILITY IN THE CONTEXT OF A </b><br /> <b>SECTION 8 APPLICATION:</b> <br /> Sub-section (1) of Section 8 provides that the judicial authority, before <br /> whom an action is brought in a matter, will refer the parties to arbitration of <br /> the said matter in accordance with the arbitration agreement. This, however, <br /> postulates that what can be referred to the arbitrator is only that dispute or <br /> matter which the arbitrator is competent or empowered to decide. ( <b>Haryana </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>138</b> of <b>178</b> <br /> <br /><br /> <br /> <b>Telecom Ltd. v. Sterlite Industries (India) Ltd: (1999) 5 SCC 688; Booz </b><br /> <b>Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 SCC 532). </b> Where <br /> the issue of “arbitrability” arises, in the context of Section 8 of the Arbitration <br /> &amp; Conciliation Act, 1996, all aspects of arbitrability must be decided by the <br /> court seized of the suit, and cannot be left to the decision of the arbitrator. <br /> <b>(Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd: (2011) 5 SCC 532).</b> <br /> If the cause/dispute is inarbitrable, the Court, where a suit is pending, will <br /> refuse to refer the parties to arbitration, under Section 8 of the Act, even if the <br /> parties might have agreed upon arbitration as the forum for settlement of such <br /> disputes. <b>(Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd: (2011) 5 </b><br /> <b>SCC 532).</b> <br /> Even if there is an arbitration agreement between the parties, and even <br /> if the dispute is covered by the arbitration agreement, the court (or judicial <br /> authority), where the proceedings are pending, will refuse an application <br /> under Section 8 of the 1996 Act, to refer the parties to arbitration, if the <br /> subject-matter of the proceedings is capable of adjudication only by a public <br /> forum or the relief claimed can only be granted by a special court or Tribunal. <br /> <b>(Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 SCC 532).</b> <br /> Section 8 (1) postulates that what can be referred to the arbitrator is only that <br /> dispute or matter which the arbitrator is competent or empowered to decide. <b> </b><br /> <b>(Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd: (2011) 5 SCC 532).</b> <br /> Section 2(3) of the 1996 Act, as noted hereinabove, stipulates that Part-<br /> I of the 1996 Act shall not affect any other law, for the time being in force, by <br /> virtue of which certain disputes may not be submitted to arbitration. Part-I <br /> includes Sections 8(1) and (2) of the 1996 Act also. Consequently, reference <br /> to arbitration can be refused by the judicial authority (such as the Commission, <br /> both Central and State), if the dispute before it ought not to be submitted to <br /> arbitration. The Electricity Act, 2003 is a special enactment to consolidate the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>139</b> of <b>178</b> <br /> <br /><br /> <br /> laws relating to generation, transmission, distribution, trading and use of <br /> electricity, and for taking measures conducive to the development of electricity <br /> industries including promoting competition, protecting the interest of <br /> consumers and supply of electricity to all areas, rationalization of electricity <br /> tariff etc. The regulatory functions which the Commissions discharge, under <br /> Section 79(1) and 86(1) of the Electricity Act, are statutory functions under a <br /> special enactment. Such functions are discharged in larger public interest <br /> including protection of the interest of consumers, rationalization of electricity <br /> tariff etc. Consequently, disputes with respect to the regulatory functions of <br /> the Commission can only be adjudicated by a public forum such as the <br /> Regulatory Commission, and are not amenable to resolution by a private <br /> forum such as an Arbitrary Tribunal. <br /> As held by this Tribunal, in the <b>DVC</b> judgment, disputes which concern <br /> the regulatory functions of the Commission (para 22), matters which have a <br /> bearing upon the tariff of a generating company, and matters which impact the <br /> tariff of a generating company either directly or indirectly (para 25), and <br /> disputes relating to tariff or regulation of tariff (para 26), cannot be referred to <br /> arbitration, evidently since such disputes are non-arbitrable and, in view of <br /> Section 2(3) of the 1996 Act, are matters which ought not to be referred to <br /> arbitration. <br /> <b> </b> <b> </b> <b>(f) TIME LIMIT FOR FILING AN APPLICATION UNDER </b><br /> <b>SECTION </b> <b>8 OF THE ARBITRATION &amp; CONCILIATION </b><br /> <b>ACT:</b> <br /> Though Section 8 of the 1996 Act does not prescribe any time-limit for <br /> filing an application under that Section, and only states that the application <br /> under Section 8 of the Act should be filed before submission of the first <br /> statement on the substance of the dispute, the scheme of the 1996 Act and <br /> the provisions of the section clearly indicate that the application thereunder <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>140</b> of <b>178</b> <br /> <br /><br /> <br /> should be made at the earliest. A party who willingly participates in the <br /> proceedings in the suit and subjects himself to the jurisdiction of the court <br /> cannot subsequently turn around and say that the parties should be referred <br /> to arbitration in view of the existence of an arbitration agreement. Whether a <br /> party has waived his right to seek arbitration and subjected himself to the <br /> jurisdiction of the court, depends upon the conduct of such party in the suit. <br /> <b>(Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 SCC 532). </b><br /> In terms of Section 8(1) of the 1996 Act, it is only if the Respondent-<br /> TPCL had applied, not later than the date of submitting its first statement on <br /> the substance of the dispute, could the dispute have been referred to <br /> arbitration. In the present case, not only did the Respondent-TPCL choose <br /> not to make any such request, for reference of the dispute for arbitration, prior <br /> to filing their reply to the Petitions filed by the Appellant procurers, they, in <br /> addition, had themselves filed a petition before the CERC on their own. <br /> Consequently, and in as much as they did not adhere to the conditions <br /> stipulation in Section 8(1) of the 1996 Act which, in view of the law declared <br /> by the Supreme Court in <b>Gujarat Urja Vikash Nigam Limited vs. Essar </b><br /> <b>Power Ltd, </b> would apply to cases where reference to arbitration is sought <br /> before the Central/ State Commission, the CERC ought not to have referred <br /> the dispute to arbitration. <b> </b><br /> The contention of the Respondent-TPCL, that the interpretation and <br /> inter-play of Section 79(1)(f) was alone considered in the <b>DVC</b> Judgement, <br /> and Section 8 was not, is a contention only to be noted to be rejected. In the <br /> <b>DVC</b> case, the application under Section 8(1) was filed by MPPCL before it <br /> filed its reply to the Petitions filed by DVC before the Commission. It does not <br /> appear to have been in dispute, in the said case, that the conditions of Section <br /> 8(1) were fulfilled by the Appellant therein. What is however of relevance is <br /> that this Tribunal, in the <b>DVC judgment,</b> has held that the Commission was <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>141</b> of <b>178</b> <br /> <br /><br /> <br /> bound to refer the dispute for arbitration evidently because Section 8(1) of the <br /> 1996 Act mandates reference of a dispute to arbitration when an application <br /> in terms of Section 8(1) is filed. Having itself filed a petition before the <br /> Commission, the Respondent-TPCL cannot be heard to contend that such a <br /> petition should also be referred to arbitration. As we have already rejected <br /> their contention regarding the jurisdiction of the Commission to refer disputes <br /> to arbitration where it lacks jurisdiction to adjudicate such disputes under <br /> Section 79(1)(f)/ 86(1)(f), reliance placed by them on the judgment of the <br /> Supreme Court in <b>Murthy and P V George, </b> and on the <b> PTC </b> Judgment of this <br /> Tribunal, is wholly misplaced. It is only with respect to matters where the <br /> Central/ State Commission have jurisdiction to adjudicate disputes, can they <br /> instead choose to refer such disputes to arbitration, provided there exists an <br /> arbitration agreement between the parties, the dispute does not suffer from <br /> the vice of non-arbitrability, and an application, complying with the <br /> requirements of Section 8(1) of the 1996 Act, is filed seeking reference to <br /> arbitration. Since the Respondent-TPCL did not choose to seek a reference <br /> to arbitration by filing a Section 8(1) application before filing its reply before <br /> the Commission to the Petitions filed by the Appellant-Procurers, and as they <br /> failed to fulfil the tests stipulated in Section 8(1) of the 1996 Act, the subject <br /> dispute could not have been referred by the CERC to arbitration on the <br /> erroneous premise that the CERC lacked jurisdiction to adjudicate such <br /> disputes, but could refer such disputes for arbitration, under Section 79(1)(f) <br /> of the Electricity Act. <b> </b><br /> <b> </b> <b> </b> <b>(g) POSSIBLE </b> <b>CONFLICT </b> <b>BETWEEN </b> <b>MANDATORY </b><br /> <b>REFERENCE UNDER SECTION 8(1) OF THE 1996 ACT </b><br /> <b>AND </b> <b>THE </b> <b>DISCRETIONARY </b> <b>JURISDICTION </b> <b>UNDER </b><br /> <b>SECTIONS 79(1)(f)/86(1)(f): </b><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>142</b> of <b>178</b> <br /> <br /><br /> <br /> Yet another question which may arise for consideration, more so in the <br /> context of the observations of the Supreme Court in <b>GUVNL </b> (the relevant <br /> paragraphs of which were not brought to the notice of this Tribunal in the <b>DVC</b> <br /> judgment), is whether a mandatory reference to arbitration under Section 8(1) <br /> may not conflict with the discretionary power conferred on the Commission <br /> under Section 79(1)(f)/ 86(1)(f) of the Electricity Act to either adjudicate the <br /> dispute itself or to refer such a dispute to arbitration. <b> </b><br /> On the jurisdiction of the Commission to refer disputes to arbitration <br /> being discretionary, the Delhi High Court, in <b>Renew Wind Energy (AP2) (P) </b><br /> <b>Ltd. v. Solar Energy Corpn. of India, 2025 SCC OnLine Del 8252, </b><br /> observed that, as insistence of the parties to seek mandatory referral for <br /> arbitration on the strength of the arbitration clause, would conflict with the <br /> discretionary powers of the CERC, Section 79(1)(f) would serve as a statutory <br /> exclusion to the application of the 1996 Act, and the Electricity Act, being the <br /> special law, would de-operationalize the provisions of the 1996 Act to the <br /> extent they are inconsistent (generalia specialibus non derogant) as held in <br /> Paras 28 of <b>GUVNL. </b><br /> In the light of the afore-said observations of the Delhi High Court in <br /> <b>Renew Wind Energy (AP2) (P) Ltd, </b> in view of the observations of the <br /> Supreme Court in <b>GUVNL </b> that reference of disputes to arbitration is <br /> discretionary, and in the light of Sections 174 and 175 of the Electricity Act, it <br /> may be possible to hold that, since discretion is conferred on the Commission <br /> either to adjudicate or refer disputes under clauses (a) to (d) for arbitration, <br /> the provisions of Section 79(1)(f) and 86(1)(f) are in conflict with Section 8(1) <br /> of the 1996 Act and, therefore, the latter should yield to the former, meaning <br /> thereby that, notwithstanding the requirement of a dispute being mandatorily <br /> referred to arbitration if the tests stipulated in Section 8(1) are satisfied, the <br /> Commission, be it Central or State, would nonetheless have the discretion <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>143</b> of <b>178</b> <br /> <br /><br /> <br /> either to adjudicate the dispute itself or to refer the disputes, other than those <br /> which are non-arbitrable, for arbitration. <b> </b><br /> We refrain from delving into this issue any further as that may, possibly, <br /> require a different view being taken contrary to the judgement of this Tribunal <br /> in the <b>DVC </b> judgment. Judicial discipline would, in such circumstances, require <br /> us to refer the dispute to a larger bench. In the facts of the present case, and <br /> in the light of what we intend to hold in conclusion, it is unnecessary for us to <br /> delve into this issue any further. We respectfully, follow the law laid down, in <br /> the DVC Judgement of this Tribunal, and hold that, if the tests stipulated in <br /> Section 8(1) of the 1996 Act had been satisfied, the CERC may have, then, <br /> been justified in referring the dispute to arbitration. As the test stipulated in <br /> Section 8(1) of the 1996 Act, of the Respondent-TPCL being required to file <br /> its application seeking reference before it filed its reply to the Petition filed by <br /> the Appellant-Procurers before the CERC, is not satisfied in the present case, <br /> the Commission was not justified in referring the dispute to arbitration. <b> </b><br /> <b>IX. </b> <b>IS SPLITTING OF CAUSE OF ACTION, FOR REFERENCE OF </b><br /> <b>DISPUTES TO ARBITRATION, PERMISSIBLE? </b><br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF THE APPELLANTS-</b><br /> <b>PSPCL AND HPPC: </b><br /> While adopting the submissions of GUVNL, in Appeal No. 348 of 2025, <br /> on the common issues arising from the impugned Order of the CERC, it is <br /> submitted, on behalf of the Appellants-PSPCL and HPPC, that, in respect of <br /> issues concerning WRLDC, the CERC has impermissibly split the cause of <br /> action; PSPCL filed Petition 85/MP/2022 and HPPC filed Petition No. <br /> 123/MP/2022 before the CERC seeking directions to the effect that TPCL and <br /> WRLDC shall jointly and severally be liable to recompense PSPCL/HPPC for <br /> the period of non-supply; the same cannot be bifurcated i.e. for Prayers (a) &amp; <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>144</b> of <b>178</b> <br /> <br /><br /> <br /> (d) to be adjudicated by an Arbitral Tribunal (governed by the provisions of <br /> the Arbitration &amp; Conciliation Act – Section 34, 37 etc) and for Prayers (b) &amp; <br /> (e) to be adjudicated by the CERC (governed by the provisions of the <br /> Electricity Act, 2003 – Section 111, 125 etc); the proposed bifurcation is not <br /> in terms of the Grid Code, the PPA, Scheduling and Despatch, Availability etc; <br /> it may lead to the possibility of conflicting judgments on the same cause of <br /> action (Ref: <b> Sukanya Holding</b> : (2003) 5 SSCC 531, <b> </b> and <b>Booz Allen</b> : (2011) <br /> 5 SCC 532); <b> </b> TPCL’s reliance, on <b>Tarun Meghani,</b> is misconceived; TPCL <br /> ceased supply to PSPCL and HPPC w.e.f. 18.09.2021 and declared <br /> availability only to the other procurers, as PSPCL and HPPC did not consent <br /> to the Supplementary PPA proposed by TPCL for higher tariff/ECR under <br /> Section 11 directions (Letter dated 29.12.2022); TPCL thereafter supplied <br /> power only under MoP Section 11 directions and discontinued supply entirely <br /> from 01.07.2025; PSPCL and HPPC have consistently contended before the <br /> CERC that WRLDC wrongly acted on such availability declarations, contrary <br /> to the PPA dated 22.04.2007 (Article 4.3.2) and the Grid Code; and WRLDC <br /> is therefore a necessary party, and has not been introduced with an attempt <br /> to ‘thwart’ reference to arbitration. <br /> <b> </b> <b>B. SUBMISSIONS URGED ON BEHALF OF RESPONDENT-TPCL: </b><br /> In support of their submission that the reliefs qua WRLDC are the <br /> subject of an independent cause of action, it is submitted, on behalf of the <br /> Respondent-TPCL, that GUVNL has not <b> </b> made WRLDC a party in Petition <br /> No. 107/MP/2023; further, Prayer (c) of the said Petition itself demonstrates <br /> that the principal relief is sought against TPCL; consequently, this issue does <br /> not arise for consideration in the appeal filed by GUVNL; the common <br /> contractual reliefs sought, namely claims for refund of alleged excess <br /> payments, re-compensation for procurement of alternate power, damages for <br /> alleged breach, and specific performance of the PPA, are appropriately and <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>145</b> of <b>178</b> <br /> <br /><br /> <br /> lawfully referable to arbitration for adjudication in accordance with law, while <br /> the alleged statutory violations concerning WRLDC may be examined <br /> independently before the competent forum; such a course of action neither <br /> prejudices nor impairs any rights of the Procurers; the relief sought against <br /> WRLDC by HPPC and PSPCL is governed by Section 28(3) and Section 29(5) <br /> of the Electricity Act; adding a prayer simpliciter, which altogether arises from <br /> a separate cause of action, does not confer jurisdiction on the court/tribunal <br /> which did not have jurisdiction over the subject-matter; the CERC has given <br /> liberty to the Procurers to file a separate Petition against WRLDC; the present <br /> case is squarely covered by the judgement of the Bombay High Court in <b>Tarun </b><br /> <b>Meghani vs. Shree Tirupati Greenfield, 2020 SCC Online Bom 110, </b><br /> wherein the Bombay High Court has exhaustively dealt with the applicability <br /> of <b>Sukanya Holdings, </b> and has held that arbitration cannot be thwarted by <br /> the presence of an additional prayer which has an equivalent remedy in law. <b> </b><br /> <b> </b> <b>C. JUDGEMENTS </b> <b>RELIED </b> <b>UPON </b> <b>BY </b> <b>THE APPELLANTS-</b><br /> <b>PROCURERS UNDER THIS HEAD: </b><br /> <b>1. </b> After referring to Sections 5 and 8 of the Arbitration &amp; Conciliation Act, <br /> 1996, the Supreme Court, in <b>Sukanya Holdings (P) Ltd. v. Jayesh H. </b><br /> <b>Pandya, (2003) 5 SCC 531, </b> observed that there was no provision in the <br /> Arbitration &amp; Conciliation Act that, when the subject-matter of the suit includes <br /> subject-matter of the arbitration agreement as well as other disputes, the <br /> matter is required to be referred to arbitration; there is also no provision for <br /> splitting the cause or parties and referring the subject-matter of the suit to the <br /> arbitrators; there is no provision as to what is required to be done in a case <br /> where some parties to the suit are not parties to the arbitration agreement; as <br /> against this, under Section 24 of the Arbitration Act, 1940, some of the parties <br /> to a suit could apply that the matters, in difference between them, be referred <br /> to arbitration and the court may refer the same to arbitration provided that the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>146</b> of <b>178</b> <br /> <br /><br /> <br /> same can be separated from the rest of the subject-matter of the suit; that <br /> Section also provided that the suit would continue so far as it related to parties <br /> who had not joined in such application; the relevant language used in Section <br /> 8 of the A &amp; C Act was: “ <i>in a matter which is the subject of an arbitration </i><br /> <i>agreement</i> ”, the court is required to refer the parties to arbitration; therefore, <br /> the suit should be in respect of “ <i>a matter</i> ” which the parties have agreed to <br /> refer, and which comes within the ambit of arbitration agreement; where, <br /> however, a suit is commenced — “as to a matter” which lies outside the <br /> arbitration agreement, and is also between some of the parties who are not <br /> parties to the arbitration agreement, there is no question of application of <br /> Section 8; the words “ <i>a matter</i> ” indicate that the entire subject-matter of the <br /> suit should be subject to arbitration agreement. <b> </b><br /> On the question, even if there was no provision for partly referring the <br /> dispute to arbitration, whether such a course was possible under Section 8 of <br /> the A &amp; C Act, the Supreme Court, in <b>Sukanya Holdings (P) Ltd.</b> , observed <br /> that it would be difficult to give an interpretation to Section 8 under which <br /> bifurcation of the cause of action, that is to say, the subject-matter of the suit <br /> or in some cases bifurcation of the suit between parties who are parties to the <br /> arbitration agreement and others is possible; this would be laying down a <br /> totally new procedure not contemplated under the A &amp; C Act; if bifurcation of <br /> the subject-matter of a suit was contemplated, the legislature would have <br /> used appropriate language to permit such a course; since there is no such <br /> indication in the language, it follows that bifurcation of the subject-matter of <br /> an action brought before a judicial authority is not allowed; secondly, such <br /> bifurcation of suit in two parts, one to be decided by the Arbitral Tribunal and <br /> the other to be decided by the civil court would inevitably delay the <br /> proceedings; the whole purpose of speedy disposal of dispute and decreasing <br /> the cost of litigation would be frustrated by such procedure; it would also <br /> increase the cost of litigation and cause harassment to the parties; and, on <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>147</b> of <b>178</b> <br /> <br /><br /> <br /> occasions, there is a possibility of conflicting judgments and orders by two <br /> different fora. <b> </b><br /> <b>2. </b> In <b>Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 </b><br /> <b>SCC 532, </b> the Supreme Court held that the term “arbitrability” has different <br /> meanings in different contexts; the three facets of arbitrability, relating to the <br /> jurisdiction of the Arbitral Tribunal, are as under: ( <i>i</i> ) <i>Whether the disputes are </i><br /> <i>capable of adjudication and settlement by arbitration</i> ? That is, whether the <br /> disputes, having regard to their nature, could be resolved by a private forum <br /> chosen by the parties (the Arbitral Tribunal) or whether they would exclusively <br /> fall within the domain of public fora (courts), ( <i>ii</i> ) <i>Whether the disputes are </i><br /> <i>covered by the arbitration agreement</i> ? That is, whether the disputes are <br /> enumerated or described in the arbitration agreement as matters to be <br /> decided by arbitration or whether the disputes fall under the “excepted <br /> matters” excluded from the purview of the arbitration agreement, and <br /> ( <i>iii</i> ) <i>Whether the parties have referred the disputes to arbitration</i> ? That is, <br /> whether the disputes fall under the scope of the submission to the Arbitral <br /> Tribunal, or whether they do not arise out of the statement of claim and the <br /> counterclaim filed before the Arbitral Tribunal; a dispute, even if it is capable <br /> of being decided by arbitration and falls within the scope of the arbitration <br /> agreement, will not be “arbitrable” if it is not enumerated in the joint list of <br /> disputes referred to arbitration or, in the absence of such joint list of disputes, <br /> does not form part of the disputes raised in the pleadings before the Arbitral <br /> Tribunal; Arbitral Tribunals are private fora chosen voluntarily by the parties <br /> to the dispute, to adjudicate their disputes in place of courts and tribunals <br /> which are public fora constituted under the laws of the country; every civil or <br /> commercial dispute, either contractual or non-contractual, which can be <br /> decided by a court, is in principle capable of being adjudicated and resolved <br /> by arbitration unless the jurisdiction of the Arbitral Tribunal is excluded either <br /> expressly or by necessary implication; adjudication of certain categories of <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>148</b> of <b>178</b> <br /> <br /><br /> <br /> proceedings are reserved by the legislature exclusively for public fora as a <br /> matter of public policy; certain other categories of cases, though not expressly <br /> reserved for adjudication by public fora (courts and tribunals), may by <br /> necessary implication, stand excluded from the purview of private fora; <br /> consequently, where the cause/dispute is inarbitrable, the Court, where a suit <br /> is pending, will refuse to refer the parties to arbitration, under Section 8 of the <br /> A &amp; C Act, even if the parties might have agreed upon arbitration as the forum <br /> for settlement of such disputes. <b> </b><br /> After giving the well-recognised examples of non-arbitrable disputes, <br /> none of which may be directly applicable to the present case, the Supreme <br /> Court, in <b>Booz Allen &amp; Hamilton Inc.</b> , observed that the afore-said examples <br /> related to actions in rem; a right in rem is a right exercisable against the world <br /> at large, as contrasted from a right in personam which is an interest protected <br /> solely against specific individuals; actions in personam refer to actions <br /> determining the rights and interests of the parties themselves in the subject-<br /> matter of the case, whereas actions in rem refer to actions determining the <br /> title to property and the rights of the parties, not merely among themselves <br /> but also against all persons at any time claiming an interest in that property; <br /> correspondingly, a judgment in personam refers to a judgment against a <br /> person as distinguished from a judgment against a thing, right or status and a <br /> judgment in rem refers to a judgment that determines the status or condition <br /> of property which operates directly on the property itself. (Vide <i>Black&#x27;s Law </i><br /> <i>Dictionary</i> .). <b> </b><br /> The Supreme Court, in <b>Booz Allen &amp; Hamilton Inc.</b> , then referred to <br /> the observations of Mustill and Boyd, in their <i>Law and Practice of Commercial </i><br /> <i>Arbitration in England</i> (2nd Edn., 1989), that, in practice, the question has not <br /> been whether a particular dispute is capable of settlement by arbitration, <i>but </i><br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>149</b> of <b>178</b> <br /> <br /><br /> <br /> <i>whether it ought to be referred to arbitration</i> or whether it has given rise to an <br /> enforceable award. <b> </b><br /> The Supreme Court, in <b>Booz Allen &amp; Hamilton Inc</b> , then observed that <br /> the types of remedies, which the arbitrator can award, are limited by <br /> considerations of public policy, and by the fact that he is appointed by the <br /> parties and not by the State; for example, he cannot impose a fine or a term <br /> of imprisonment, commit a person for contempt or issue a writ of subpoena; <br /> nor can he make an award <i>which is binding on third parties or affects the </i><br /> <i>public at large, such as a judgment in rem</i> against a ship, an assessment of <br /> the rateable value of land, a divorce decree, a winding-up order. <b> </b><br /> After referring to the observations in <b>Mustill and Boyd</b> in their 2001 <br /> Companion Volume to the 2nd Edn. of <b><i>Commercial Arbitration</i></b> <b>,</b> that an <br /> arbitrator, whose powers are derived from a private agreement <br /> between <i>A</i> and <i>B,</i> plainly has no jurisdiction to bind anyone else by a <br /> decision, for no one else has mandated him to make such a decision, and a <br /> decision which attempted to do so would be useless, the Supreme Court, in <br /> <b>Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) 5 SCC 532</b> , <br /> relied on the observations in <b>Sukanya Holdings (P) Ltd. v. Jayesh H. </b><br /> <b>Pandya: (2003) 5 SCC 531,</b> that it would be difficult to give an interpretation <br /> to Section 8 of the A &amp; C Act under which bifurcation of the cause of action, <br /> that is to say, the subject-matter of the suit or in some cases bifurcation of the <br /> suit between parties who are parties to the arbitration agreement and others <br /> is possible; this would be laying down a totally new procedure not <br /> contemplated under the said Act; if bifurcation of the subject-matter of a suit <br /> was contemplated, the legislature would have used appropriate language to <br /> permit such a course; and since there was no such indication in the language, <br /> it followed that bifurcation of the subject-matter of an action brought before a <br /> judicial authority was not allowed. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>150</b> of <b>178</b> <br /> <br /><br /> <br /></div><table><thead><tr><th>3. In Taru Meghani v. Shree Tirupati Greenfield, 2020 SCC OnLine</th><th></th></tr></thead><tbody><tr><td>Bom 110, the Supreme Court held that, in the facts of the case, the question</td><td>the facts of the case, the question</td></tr><tr><td>which cropped up for consideration was whether there would be splitting of</td><td></td></tr><tr><td></td><td></td></tr><tr><td>cause of action in the event the arbitration agreement in the MOU is given</td><td></td></tr><tr><td></td><td></td></tr><tr><td>effect to; and there appears a fine distinction between splitting of a single</td><td></td></tr><tr><td></td><td></td></tr><tr><td>cause of action into parts, each being made a subject matter of a distinct</td><td></td></tr><tr><td></td><td></td></tr><tr><td>proceedings and the separation of causes of caution which are joined</td><td></td></tr><tr><td></td><td></td></tr><tr><td>together, albeit in conformity with the provisions of the</td><td></td></tr></tbody></table><div><br /> Procedure, 1908 (‘the Code’). <br /> <b> </b> <b>D. JUDGEMENTS RELIED UPON BY THE RESPONDENT-TPCL </b><br /> <b>UNDER THIS HEAD:</b> <br /> <b>1. </b> In <b>Taru Meghani v. Shree Tirupati Greenfield, 2020 SCC OnLine </b><br /> <b>Bom 110, </b> the plaintiffs’ case was that, on the representation of the defendants <br /> that the handsome return could be earned in the event of making an <br /> investment in the projects which the defendant No. 1 was developing, the <br /> plaintiffs had collectively advanced a sum of Rs. 54 lakhs; the initial <br /> investment was of Rs. 35 lakhs; the defendants executed a Memorandum of <br /> nd<br /> Understanding, dated 22 July 2014 (‘MOU’) and assured to repay the said <br /> amount along with interest @ 33% per annum at quarterly rest; the <br /> defendants, in order to instill a sense of confidence and security, had paid <br /> interest @ 33% per annum till December 2015; plaintiff Nos. 2 and 3 advanced <br /> a further sum of Rs. 19 lakhs to the defendants; the defendants had drawn <br /> bills of exchange in favour of plaintiff Nos. 2 and 3; the defendants had drawn <br /> cheques towards repayment of the said amount; however, the cheques were <br /> returned un-encashed on presentment; and, hence, the suit for recovery of <br /> the said amount along with interest. <b> </b><br /> The defendants preferred an interim application seeking reference of <br /> the dispute to arbitration, in view of an arbitration clause in the MOU, <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>151</b> of <b>178</b> <br /> <br /><br /> <br /> contending that the transaction between the parties was of an investment in <br /> the project which was being developed by the defendants; the transaction was <br /> evidenced by the MOU; apart from the other terms, the MOU contained an <br /> arbitration clause; as the plaintiffs had approached the Court with a claim for <br /> recovery of an amount advanced thereunder and the dispute was clearly <br /> covered by the arbitration clause, the reference under section 8 of <br /> the Arbitration and Conciliation Act, 1996 (hereinafter referred to as ‘the Act’) <br /> was warranted. <br /> The plaintiffs resisted the application by filing an affidavit in reply <br /> contending that there was a series of transactions between the plaintiffs and <br /> the defendants; as of now, five suits had been instituted against the <br /> defendants by the plaintiffs and other investors; some of the transactions were <br /> not covered by the Memorandum of Understanding, though forming part of <br /> one and the same bargain; in the case at hand, the subsequent loan of Rs. <br /> 19 lakhs was not covered by the MOU; the said advance was against the bills <br /> of exchange, which fell out of the purview of the dispute covered by the <br /> arbitration clause in the MOU; thus, the subject matter of the suit could not be <br /> bifurcated; the application under Section 8 of the Act, therefore, becomes <br /> untenable; and, thus, the prayer for reference to arbitration be rejected. <br /> While not disputing the execution of the MOU and the arbitration clause <br /> therein, it was contended, on behalf of the plaintiffs, that, as regards the first <br /> tranche of Rs. 35 lakhs, despite there being an arbitration clause, in the <br /> peculiar facts of the case, when there are multiple transactions between the <br /> parties, resulting in as many as five suits, reference of the dispute to <br /> arbitration would lead to conflicting decisions in diverse proceedings; it was <br /> impermissible to bifurcate the subject matter of the dispute for referring a part <br /> of the dispute to arbitration and adjudicating the rest by the Court as, in the <br /> case at hand, the plaintiffs had sought to recover an amount which was not <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>152</b> of <b>178</b> <br /> <br /><br /> <br /> advanced under the MOU; the arbitration clause thus did not govern the <br /> dispute in respect of repayment of the said amount of Rs. 19 lakhs, advanced <br /> against the bills of exchange; resultantly, if the submission on behalf of the <br /> defendants of referral of the entire dispute to arbitration was accepted, it would <br /> necessarily involve reference of the dispute to arbitration, which was not <br /> covered by the arbitration clause; conversely, the dispute as regards the <br /> amount covered by the MOU also could not be referred to arbitration as it <br /> would entail the consequence of the bifurcation of the subject matter of the <br /> dispute, which was legally impermissible. Reliance was placed by the plaintiffs <br /> on the judgment of the Supreme Court in <i>Sukanya Holdings (P) Ltd.</i> v. <i>Jayesh </i><br /> 1<br /> <i>H. Pandya</i> wherein the Supreme Court repelled the submission on behalf of <br /> the appellant that a dispute which is covered by an arbitration agreement <br /> between the parties, can be referred to arbitration, despite the suit having <br /> been filed claiming certain reliefs in respect of a dispute, which was not <br /> subject matter of arbitration, and it having been instituted against the persons <br /> who were not parties to the arbitration agreement. <b> </b><br /> It is in this context that the Bombay High Court observed that the <br /> clauses of the MOU led to a legitimate inference that not only the amount was <br /> advanced, under the MOU, but the terms of repayment, including the interest <br /> at which the amount was to be repaid and the consequences, in the event of <br /> default in repayment, were explicitly provided therein; it was clear that the <br /> arbitration clause was comprehensive and covered all the disputes including <br /> the failure on the part of the defendants to repay the amount, as agreed; from <br /> the text of Section 8 of the Act, referral of the parties to arbitration becomes <br /> imperative, if the following conditions are satisfied: (i) there is an arbitration <br /> agreement; (ii) a party to the agreement brings an action in the court against <br /> the other party; (iii) subject-matter of the action is the same as the subject-<br /> matter of the arbitration agreement; and (iv) the opposite party applies to the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>153</b> of <b>178</b> <br /> <br /><br /> <br /> judicial authority for referring the parties to arbitration before it submits his first <br /> statement on the substance of the dispute. <br /> The Bombay High Court noted that, in so far as the first transaction of <br /> advance of Rs. 35 lakhs was concerned, all the conditions appear to have <br /> been satisfied, in the sense that, there was an arbitration clause in the MOU; <br /> the plaintiffs, who were parties to the said agreement, had brought an action <br /> based thereon, the subject matter of the action was governed by the <br /> arbitration clause, and the defendants had sought referral of the parties to <br /> arbitration before the defendants had submitted their first statement on the <br /> substance of the dispute. <br /> The Bombay High Court observed that the crucial question was whether <br /> the effect and force of the aforesaid arbitration clause gets diluted on account <br /> of inclusion in the suit, of a claim in respect of a dispute which is not governed <br /> the arbitration clause; in <b> Sukanya Holdings (P) Ltd. v. Jayesh H. Pandya, </b><br /> the Supreme Court had held that where a suit was commenced “as to a <br /> matter” which lies outside the arbitration agreement and is also between some <br /> of the parties who are not parties to the arbitration agreement, there is no <br /> question of application of Section 8, the words ‘a matter’ indicated that the <br /> entire subject matter of the suit should be subject to arbitration agreement, <br /> and there was no provision for splitting the causes or parties and referring the <br /> subject matter of the suit to arbitrators. <br /> While holding that the language of Section 8 was peremptory in nature, <br /> in cases where there is an arbitration clause in the agreement, the Court is <br /> enjoined to refer the dispute to arbitration in terms of the arbitration <br /> agreement, and the Court would have no jurisdiction to adjudicate the dispute <br /> after such an application seeking a reference under section 8 of the Act, the <br /> Bombay High Court posed the question whether this salutary object of the Act <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>154</b> of <b>178</b> <br /> <br /><br /> <br /> could be defeated by adding a claim over and above the claim in respect of <br /> the matter which is squarely covered by arbitration agreement? <br /> The Bombay High Court held that, in the facts of the case, the question <br /> which crops up for consideration is whether there would be splitting of cause <br /> of action in the event the arbitration agreement in the MOU was given effect <br /> to; there appeared a fine distinction between splitting of a single cause of <br /> action into parts, each being made a subject matter of a distinct proceedings <br /> and the separation of causes of caution which are joined together, albeit in <br /> conformity with the provisions of the Code of Civil Procedure, 1908 (‘the <br /> Code’); the plaintiffs were within their rights in joining multiple causes of action <br /> against the defendants; in fact, the provisions contained in the CPC envisaged <br /> such joining of several causes of action by the plaintiffs against the <br /> defendants. <br /> After referring to Rules 3 and 6 of Order II of the Civil Procedure Code, <br /> the Bombay High Court observed that a conjoint reading of the aforesaid <br /> provisions would indicate that Rule 3 provides for joinder of causes of action <br /> and permits the plaintiffs to unite in the same suit, several causes of action <br /> against the same defendants; the remedy for any possible embarrassment, <br /> delay or inconvenience on account of the joinder of causes of action in one <br /> suit is provided in Rule 6; it authorizes the Court to order separate trials or <br /> make other order as may be expedient in the interest of justice, where the <br /> joinder of causes of action in one suit, though permissible under Rule (3)(1), <br /> would result in embarrassment, inconvenience or delay; this legal position <br /> was required to be considered coupled with the approach which was expected <br /> of the Court where an application seeking reference of the dispute to <br /> arbitration on the strength of an arbitration clause was preferred; such an <br /> application, in substance, constituted a plea of statutory exclusion of the <br /> <b>2</b><br /> jurisdiction of the court; in <b> Sundaram Finance Limited v. T. Thankam</b> <b>,</b> the <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>155</b> of <b>178</b> <br /> <br /><br /> <br /> Supreme Court delineated the approach expected of the Civil Court in dealing <br /> with an application under section 8 of the Act, and held that once an <br /> application in due compliance of Section 8 of the Arbitration Act is filed, the <br /> approach of the civil court should be not to see whether the court has <br /> jurisdiction; it should be to see whether its jurisdiction has been ousted; there <br /> is a lot of difference between the two approaches; once it is brought to the <br /> notice of the court that its jurisdiction has been taken away in terms of the <br /> procedure prescribed under a special statue, the civil court should first see <br /> whether there is ouster of jurisdiction in terms or compliance of the procedure <br /> under the special statute; the general law should yield to the special law - <br /> generalia specialibus non derogant; in such a situation, the approach shall not <br /> be to see whether there is still jurisdiction in the civil court under the general <br /> law; and such approaches would only delay the resolution of disputes and <br /> complicate the redressal of grievance, and unnecessarily increase the <br /> pendency in the court.” <br /> In the light of the aforesaid exposition of the legal position, the Bombay <br /> High Court held that the broad submission on behalf of the plaintiffs, that the <br /> reference of the dispute to arbitration as regards the first transaction, would <br /> entail the bifurcation of the subject matter of the suit and, thus, it was <br /> impermissible in law, could not accepted in an unqualified manner; the <br /> submission was fraught with the danger of defeating an arbitration agreement <br /> by simply adding a cause of action the plaintiff may have against the <br /> defendants, which was not covered by the arbitration agreement; if such a <br /> course was readily accepted, it had the propensity to give a long leash to the <br /> plaintiff to circumvent the arbitration agreement by uniting a cause of action <br /> which was beyond the purview of the arbitration agreement; it would have the <br /> effect of denuding section 8 of the Act of its force and vigour; such an <br /> interpretation would also derogate from the object which the Arbitration and <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>156</b> of <b>178</b> <br /> <br /><br /> <br /> Conciliation Act, 1996 is intended to achieve ie of minimum judicial <br /> intervention where parties have agreed to arbitrate the dispute. <br /> The Bombay High Court observed that, in the peculiar facts of the case, <br /> the Court would be justified in referring the dispute to arbitration in respect of <br /> the first transaction, as it was squarely covered by the arbitration clause and <br /> all the conditions of Section 8 of the Act were fulfilled, and exercising its power <br /> under Order II Rule 6 of the Code to direct the plaintiffs to institute a separate <br /> suit in respect of the second tranche of Rs. 19 lakhs. <br /> <b> </b> <b>E. ANALYSIS: </b><br /> <b> </b> <b> </b> <b>(a) PETITION NO. 85/MP/2022 FILED BY PSPCL BEFORE THE </b><br /> <b>CERC ON 10.02.2022: </b><br /> In Petition No. 85/MP/2022, filed by them before the CERC on <br /> 10.02.2022, it was stated on behalf of PSPCL that, with effect from March, <br /> 2021, CGPL (now TPCL) has been declaring less availability and had finally <br /> ceased operations from 18.09.2021 onwards alleging financial distress owing <br /> to Indonesia Coal Regulations; till 18th September, 2021, though the <br /> declaration of availability was less in quantum, CGPL had been following the <br /> proportionate declaration of availability in terms of the provisions of the PPA <br /> read with the applicable provisions of law; however, with effect from 18th <br /> September, 2021, CGPL ceased to generate electricity, particularly when <br /> there was high demand (paddy season in Punjab) for electricity; thereafter, <br /> from 18.10.2021, CGPL, while undertaking generation of electricity and <br /> declaring availability to some of the Procurers, has not been declaring <br /> availability to PSPCL (Para 18). A statement of the monthly availability <br /> declared by CGPL w.e.f March,2020 till date was furnished by PSPCL, in the <br /> form of a table, giving details of the quantum declared available to PSPCL, <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>157</b> of <b>178</b> <br /> <br /><br /> <br /> and the proportion of such quantum to the total declaration of availability (Para <br /> 19). <b> </b><br /> It was further stated, on behalf of PSPCL, that, while CGPL entirely <br /> stopped declaring availability to the extent of the contracted capacity of <br /> PSPCL effective from 18.09.2021, they continued to supply power to GUVNL <br /> clearly establishing that it had the requisite fuel stock to generate power and <br /> was still not declaring availability to PSPCL (Para 30); CGPL was yet to <br /> commence supply of the contracted capacity vis-à-vis PSPCL, though it had <br /> no cause, legal or in equity, to cease generation and supply of electricity to <br /> PSPCL; any interruption to supply of power would be contrary to the terms of <br /> the PPA as well as the decision of the Supreme Court in the <b>Energy </b><br /> <b>Watchdog </b> Case; non-supply of power had already caused severe hardship <br /> to PSPCL during the peak paddy season, and was contrary to the interests of <br /> the consumers in the State of Punjab (Para 31); as a direct consequence of <br /> the deliberate action of CGPL, in not declaring and making available the <br /> contracted capacity to them, PSPCL was forced to arrange power from other <br /> sources at a much higher cost; PSPCL has been burdened with the <br /> requirement to procure 475 MW/11.4 Million Units (MUS) from alternate/more <br /> expensive sources, and the landed cost of such procurement has been in the <br /> range of Rs 3.45/kWH - Rs 11.41/kWH; and the day wise statement of such <br /> alternate purchases are given in the form of a table (Para 32). <br /> After extracting Section 28(3)(a) of the Electricity Act, it is stated, on <br /> behalf of PSPCL, that Respondent No. 3 - WRLDC was not undertaking the <br /> schedule and dispatch functions vis-à-vis CGPL in accordance with the <br /> contract entered into with the Procurers including PSPCL; WRLDC was <br /> wrongly acting on the basis of the declaration of availability made by CGPL, <br /> contrary to the provisions of the PPA dated 22.04.2007; the Statement <br /> contained in Para 19 of the Petition showed the deviation from the contract in <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>158</b> of <b>178</b> <br /> <br /><br /> <br /> the scheduling and dispatch allowed by Respondent No. 3, with more power <br /> being scheduled to GUVNL; thus, WRLDC has acted contrary to the statutory <br /> mandate of enforcing the declaration of proportionate availability to PSPCL as <br /> per the provisions of the PPA and Section 28 of the Electricity Act; WRLDC <br /> was also responsible to compensate PSPCL for the loss caused on account <br /> of such deliberate action on the part of WRLDC, and in not following the <br /> mandate under Section 28 of the Electricity Act (Para 34); further, PSPCL has <br /> been paying the PoC charges to CTU/POSOCO to the extent of the <br /> contracted capacity of 475 MW from 18.09.2021 onwards, even though CGPL <br /> had ceased all operations; PSPCL. has also been made liable to pay RLDC <br /> charges to the WRLDC to the extent of the contracted capacity with CGPL; <br /> details of the PoC Charges and/or RLDC charges paid by PSPCL for the <br /> period with effect from 18.09.2021 is also given in the form of a table (Para <br /> 35); the action of CGPL, in ceasing generation and supply of electricity from <br /> its Project, has caused serious prejudice to public interest and irreparable loss <br /> to the PSPCL; CGPL cannot be allowed to act in such a high-handed manner <br /> contrary to its legal obligations assumed under the PPA; and PSPCL had to <br /> resort to load shedding and blackouts on account of the deficit in power (Para <br /> 36). <br /> PSPCL prayed that, in these facts and circumstances, the CERC should <br /> issue directions to CGPL to maintain, without interruption, the generation and <br /> supply of electricity from the Mundra Power Project to the extent of the <br /> contracted capacity of PSPCL; and to also adjudicate and determine the <br /> compensation by Respondents No 1, 2 and 3 to PSPCL for their respective <br /> actions mentioned above (Para 37); the claim of PSPCL qua TPCL and <br /> CGPL, in regard to their failure to ensure due supply of electricity to PSPCL <br /> for the period from September, 2021 till date, and further till resumption of <br /> supply in accordance with the provisions of the PPA are detailed in the form <br /> of a table; CGPL and TPCL are liable to pay the above compensation as <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>159</b> of <b>178</b> <br /> <br /><br /> <br /> exemplary damages in view of their deliberate act, knowing fully well the likely <br /> consequences of their failure to make available the requisite quantum of <br /> electricity, against the quantum of 475 MW (Para 38); as mentioned above, <br /> PSPCL is also entitled to compensation from WRLDC for not ensuring that <br /> CGPL undertakes declaration of availability in terms of the proportion provided <br /> under the PPA dated 22.04.2007; and, in addition, WRLDC is also required to <br /> compensate PSPCL for the future period, namely till the resumption of supply <br /> to PSPCL as per the terms of the PPA (Para 39). <br /> The reliefs sought by PSPCL, in Petition No. 85/MP/2022 filed by them <br /> before the CERC, were: (a). direct Respondent No 1 &amp; 2 (TPCL and CGPL) <br /> to resume generation and supply in so far as PSPCL is concerned to the <br /> extent of contracted capacity of 475 MW in terms of the PPA dated <br /> 22.04.2007, maintaining the proportionality of the total generation between <br /> the Procurers; (b) direct WRLDC to schedule the quantum of power to the <br /> extent of 475 MW being the contracted capacity of PSPCL In terms of the PPA <br /> dated 22.04.2007; (d) direct Respondent No. 1 and 2 (TPCL and CGPL) to <br /> recompense PSPCL for the amount of Rs 289.0 crores as on 31.12.2021 as <br /> well as for the period from 1.01.2022 onwards till resumption of supply, on the <br /> same principles together with interest till payment at the rate of 1.25% per <br /> month; (e ) direct that the Respondent No. 3 (WRLDC) shall be jointly and <br /> severally liable to recompense PSPCL for the amount of Rs 289.0 crores as <br /> on 31.12.2021, as well as for the period from 1.01.2022 onwards till <br /> resumption of supply, on the same principles together with interest till payment <br /> at the rate of 1.25% per month <br /> <b> </b> <b> </b> <b>(b) PETITION NO. 123/MP/2022 FILED BY HPPC BEFORE THE </b><br /> <b>CERC ON 13.04.2022: </b><br /> In Petition No. 123/MP/2022 <b> </b> filed by them before the CERC on <br /> 13.04.2022, it is stated on behalf of HPPC that, with effect from April, 2021, <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>160</b> of <b>178</b> <br /> <br /><br /> <br /> CGPL has been declaring less availability and had finally ceased operations <br /> from 18.09.2021 onwards alleging financial distress owing to Indonesia Coal <br /> Regulations; till 18.09.2021, though declaration of availability was less in <br /> quantum, CGPL had been following proportionate declaration of availability in <br /> terms of the provisions of the PPA read with the applicable provisions of law; <br /> however, with effect from 18.09.2021, CGPL ceased to generate electricity; <br /> thereafter, from 13.10.2021, CGPL, while undertaking generation of electricity <br /> and declaring availability to some of the Procurers, had not been declaring <br /> availability to HPPC (Para 17); HPPC is filing herewith a Statement of the <br /> monthly availability declared by CGPL with effect from March, 2020 till <br /> February 2021, giving details of the quantum declared available to HPPC, the <br /> proportion of such quantum to the total declaration of availability was being <br /> filed in the form of the table (Para 18); the said request of CGPL was <br /> consented to and conveyed by WRLDC to all the Procurers of CGPL including <br /> HPPC on 13.10.2021; in response to the email dated 13.10.2021 from <br /> WRLDC, HPPC immediately intimated WRLDC that it was bound by the <br /> provisions of the Indian Electricity Grid Code and had to necessarily schedule <br /> power as per the PPA and the contracted share of each of the States; HPPC <br /> also expressly stated that the course proposed by CGPL was contrary to the <br /> MoP Guidelines and the provisions of the PPA, and that the Declared Capacity <br /> (DC) had to be proportionately allocated between the Procurer States; even <br /> in case of special dispensation for Gujarat and Punjab, 10% of the power had <br /> to be scheduled to HPPC (Para 26); on 14.10.2021, WRLDC wrote to CGPL <br /> seeking its comments on the HPPC response dated 13.10.2021; CGPL re-<br /> iterated its financial distress and went to the extent of alleging that HPPC has <br /> been acting imprudently by taking an adversarial position and insisting on the <br /> PPA tariff; and, further, CGPL stated that it would indemnify WRLDC against <br /> the legal consequences of such actions. (Para 27). <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>161</b> of <b>178</b> <br /> <br /><br /> <br /> It is further stated, on behalf of HPPC, that, effective 18.09.2021, CGPL <br /> had entirely stopped declaring availability to the extent of the contracted <br /> capacity of HPPC; CGPL was however continuing to supply power to GUVNL, <br /> and for a period of time to the States of Punjab and Rajasthan, clearly <br /> establishing that it had the requisite fuel stock to generate power and was still <br /> not declaring availability to HPPC (Para 34); in spite of repeated requests to <br /> CGPL and WRLDC, CGPL was yet to commence supply of the contracted <br /> capacity vis-à-vis HPPC; CGPL had no cause, legal or in equity, to cease <br /> generation and supply of electricity to HPPC; any interruption to supply of <br /> power would be contrary to the terms of the PPA as well as the decision of the <br /> Supreme Court in Energy Watchdog; non-supply of power had already caused <br /> severe hardship to HPPC, and was also contrary to the interests of the <br /> consumers in the State of Haryana (Para 35); as a direct consequence of the <br /> deliberate action of CGPL, in not declaring and making available the <br /> contracted capacity to HPPC, HPPC has been forced to arrange power from <br /> other sources at a much higher cost; HPPC has been burdened with the <br /> requirement to procure 380 MW from alternate/more expensive sources, and <br /> the landed cost of such procurement has been worked out during the period <br /> from 18.09.2021 to 28.02.2021 to be in the range of Rs. 62,52,672/day to Rs. <br /> 8,65,08,672/day; further, the additional cost is being borne by HPPC till the <br /> date of filling of this Petition; the day wise statement indicating the cost borne <br /> for such alternate purchases are furnished in the form of a table (Para 36); <br /> had CGPL declared availability to the extent of its contracted capacity, and <br /> had abided by the terms of the PPA, the availability would have been within <br /> the merit order dispatch of HPPC, and would have been scheduled by HPPC; <br /> and a statement of the indicative position of the 380 MW contracted with <br /> CGPL (Month wise), in the Merit Order Dispatch of HPPC was attached. (Para <br /> 37). <br /> <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>162</b> of <b>178</b> <br /> <br /><br /> <br /> After extracting Section 28(3)(a) of the Electricity Act, it is stated on <br /> behalf of HPPC that Respondent No. 3 - WRLDC was not undertaking the <br /> schedule and dispatch functions vis-à-vis CGPL in accordance with the <br /> contract entered into with the Procurers including HPPC; WRLDC has been <br /> wrongly acting on the basis of declaration of availability made by CGPL, <br /> contrary to the provisions of the PPA dated 22.04.2007; the Statement <br /> contained in Para 18 of the Petition clearly showed the deviation from the <br /> Contract in the scheduling and dispatch allowed by Respondent No. 3 <br /> (WRLDC) with more power being scheduled to GUVNL and other procurers; <br /> thus, WRLDC had acted contrary to the statutory mandate of enforcing the <br /> declaration of proportionate availability to HPPC as per the provisions of the <br /> PPA, the Indian Electricity Grid Code and Section 28 of the Electricity Act; <br /> WRLDC was also responsible to compensate HPPC for the loss caused on <br /> account of such deliberate action on the part of WRLDC, and in not following <br /> the mandate under Section 28 of the Electricity Act; this was particularly when <br /> HPPC had specifically called upon WRLDC to act in accordance with its <br /> statutory mandate (Para 38); further, HPPC was paying PoC charges to <br /> CTU/POSOCO to the extent of the contracted capacity of 380 MW from <br /> 18.09.2021 onwards, even though CGPL has ceased all operations; HPPC <br /> has also been made liable to pay RLDC charges to the WRLDC to the extent <br /> of the contracted capacity with CGPL; the details of the PoC Charges and/or <br /> RLDC charges paid by HPPC for the period with effect from 18.09.2021 in the <br /> form of table (Para 39); the action of CGPL, in ceasing generation and supply <br /> of electricity from its Project, had caused serious prejudice to public interest <br /> and irreparable loss to HPPC; and HPPC had to resort to load shedding on <br /> account of the deficit in power (Para 40). <br /> <br /> In the light of the aforesaid averments, HPPC sought directions from the <br /> CERC to CGPL to maintain, without interruption, the generation and supply of <br /> electricity from the Mundra Power Project to the extent of the contracted <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>163</b> of <b>178</b> <br /> <br /><br /> <br /> capacity of HPPC, as also to adjudicate and determine the compensation <br /> payable by Respondents No 1, 2 and 3 (TPCL, CGPL and WRLDC) to HPPC <br /> for their respective actions (Para 41); HPPC was also entitled to <br /> compensation from WRLDC for not ensuring that CGPL undertakes <br /> declaration of availability in terms of the proportion provided under the PPA <br /> dated 22.04.2007; in addition, the WRLDC was also required to compensate <br /> HPPC for the future period, namely till the resumption of supply to HPPC as <br /> per the terms of the PPA (Para 43). <br /> In the light of the afore-said averments in Petition No. 123/MP/2022, <br /> HPPC sought the following reliefs from the CERC: (a) direct Respondent No <br /> 1 and 2 (TPCL and CGPL) to resume generation and supply in so far as HPPC <br /> is concerned to the extent of contracted capacity of 380 MW in terms of the <br /> PPA dated 22.04.2007, maintaining the proportionality of the total generation <br /> between the Procurers; (b) direct WRLDC to schedule the quantum of power <br /> to the extent of 380 MW being the contracted capacity of HPPC in terms of <br /> the PPA dated 22.04.2007; (d) direct Respondent No. 1 and 2 to recompense <br /> HPPC for the amount of Rs 316.42 crores as on 28.02.2022 as well as for the <br /> period from 01.03.2022 onwards till resumption of supply, on the same <br /> principles together with interest till payment at the rate of 1.25% per month; <br /> (e ) direct that the Respondent No. 3 (WRLDC) shall be jointly and severally <br /> liable to re compense HPPC for the amount of Rs 316.42 crores as on <br /> 28.02.2022 as well as for the period from 01.03.2022 onwards till resumption <br /> of supply, on the same principles together with interest till payment at the rate <br /> of 1.25% per month; <br /> <b>(c)</b> <b>CONTENTS OF THE IMPUGNED ORDER WITH RESPECT </b><br /> <b>TO BIFURCATION OF THE DISPUTE?</b> <br /> On <b> </b> Issue No.3, ie whether the relief as sought against WRLDC acts as <br /> a legal deterrent to any reference of the dispute to Arbitration?, the CERC, in <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>164</b> of <b>178</b> <br /> <br /><br /> <br /> the impugned order passed in Petition No. 107/MP/2023 and batch dated <br /> 19.11.2025, observed that a few of the Petitions filed by the Procurers <br /> contained specific prayers against WRLDC and, on this basis, the Procurers <br /> had sought to argue that these Petitions could not be bifurcated between the <br /> parties who were parties to the arbitration agreement (Procurers and TPCL), <br /> and others (WRLDC), as Section 8 of the 1996 Act did not permit so, as held <br /> by the Supreme Court in <b>Sukanya Holdings</b> ; however, the peculiar facts and <br /> circumstances involved in the present case could not be equated to those <br /> involved in the <b> Sukanya Holding </b> Judgement, and the ratio laid down by the <br /> Supreme Court regarding the scope and interpretation of Section 8 of the <br /> 1996 Act; in the present case, the disputes involved in this batch of the <br /> Petitions, being non-tariff disputes, as explained by the <b> DVC</b> Judgment, the <br /> adjudicatory jurisdiction of the CERC under Section 79(1)(f) read with Section <br /> 79(1)(b) of the Electricity Act did not extend to such disputes, and the only <br /> avenue left with the CERC, in dealing with such disputes, was to refer them <br /> to arbitration in terms of the latter part of Section 79(1)(f) of the Electricity Act; <br /> on the other hand, if the argument of the Procurers that, owing to the prayers <br /> sought against WRLDC, these cases cannot be split into two and be referred <br /> to arbitration, then this Commission would be embarking upon adjudication of <br /> non-tariff disputes qua the Procurers and TPCL, even in the absence of <br /> jurisdiction to this effect being vested in this Commission; and this would not <br /> only be impermissible but would also be against the principles laid down in <br /> the DVC Judgment. <br /> <b>(d)</b> <b>ANALYSIS</b> <br /> As held earlier in this judgement, in the light of the law declared by the <br /> Supreme Court in <b>Hindustan Zinc</b> , it is only such disputes which the CERC <br /> is entitled to adjudicate which can, if the Commission exercises its discretion <br /> so to do, be referred to arbitration. Consequently, if the CERC lacks <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>165</b> of <b>178</b> <br /> <br /><br /> <br /> jurisdiction under Section 79(1)(f) to adjudicate the disputes before it, it would <br /> also lack jurisdiction to refer such disputes to arbitration. <br /> While applying the tests to determine whether or not it has the power to <br /> adjudicate the dispute, in the petitions instituted before it, the Commission <br /> should ascertain whether the dispute involves a generating company, and <br /> whether the disputes are “in regard to matters” “connected with” clauses (a) <br /> to (d) of Section 79(1). It is only if the CERC was satisfied that it did, was it <br /> then entitled in law to adjudicate such disputes. It is not necessary that the <br /> dispute must relate exclusively to regulation of the tariff of the Respondent-<br /> Generator ie TPCL. So long as the dispute is in regard to matters connected <br /> with the regulation of tariff of the Respondent-TPCL, the CERC would have <br /> jurisdiction to adjudicate such disputes. If, on the other hand, the disputes do <br /> not fall within the scope and ambit of Section 79(1)(b), the Commission can <br /> then neither adjudicate such disputes nor refer them to arbitration. All that the <br /> CERC would then be required to do is to so declare that the petitions instituted <br /> before it can neither be adjudicated nor referred to arbitration as the <br /> Commission suffers from inherent lack of jurisdiction to do so. <br /> It is not in dispute that the prayers sought by them, in the petition filed <br /> before the CERC seeking certain reliefs, disclose the grievance of both <br /> PSPCL and HPCC, among others, against WRLDC; and both the aforesaid <br /> procurers have sought compensation jointly and severally from WRLDC and <br /> TPCL for the stated sum, along with interest. They have also sought a <br /> direction to WRLDC to schedule the quantum of power to the extent of the <br /> contracted capacity of PSPCL i.e. for 475 MW in terms of the PPA, and 380 <br /> MW for HPPC. <br /> Section 28 of the Electricity Act relates to the functions of the Regional <br /> Load Despatch Centre and, under Section 28(3), the Regional Load Despatch <br /> Centre shall ( <i>a</i> ) be responsible for optimum scheduling and despatch of <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>166</b> of <b>178</b> <br /> <br /><br /> <br /> electricity within the region, in accordance with the contracts entered into with <br /> the licensees or the generating companies operating in the region; ( <i>b</i> ) monitor <br /> grid operations; ( <i>c</i> ) keep accounts of quantity of electricity transmitted through <br /> the regional grid; ( <i>d</i> ) exercise supervision and control over the inter-State <br /> transmission system; and (e) be responsible for carrying out real time <br /> operations for grid control and despatch of electricity within the region <br /> through secure and economic operation of the regional grid in accordance <br /> with the Grid Standards and the Grid Code. The grievance of the Appellant-<br /> Procurers (PSPCL and HPPC) is that the WRLDC has failed to discharge its <br /> statutory functions under Section 28(3) of Electricity Act, and has not ensured <br /> that the Respondent-TPCL schedules the quantum of power to the extent of <br /> their (ie PSPCL and HPPC’s) contract capacity. <br /> The PPA, executed between the procurers on the one hand and CGPL <br /> (now TPCL) on the other, defines “allocated contract capacity” to mean the <br /> portion of the contracted capacity allocated to each of the procurers as <br /> provided in Schedule 13 of the PPA subject to adjustment as per the terms of <br /> the agreement. The PPA was executed between five procurers referred to in <br /> Schedule-1 of the PPA i.e. (i) GUVNL, (ii) MSEDCL, (iii) the Rajasthan <br /> Discoms, (iv) Punjab State Electricity Board (now PSPCL), and (v) Haryana <br /> Power Generation Corporation Limited (now HPPC) with CGPL (now TPCL). <br /> Clause 4.3.2 of the said PPA stipulates that, unless otherwise instructed by all <br /> the Procurers (jointly), the Seller shall sell all the Available Capacity up to the <br /> Contracted Capacity of the Power Station to each Procurer in proportion of <br /> each Procurer’s then existing Allocated Contracted Capacity pursuant to <br /> Dispatch Instructions. <br /> Schedule 13 of the PPA gives the break-up of the allocated contracted <br /> capacity both in terms of percentage and in MWs. While 47.5% of the <br /> allocated contracted capacity is for GUVNL, it is 10% for HPPC and 12.5% for <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>167</b> of <b>178</b> <br /> <br /><br /> <br /> PSPCL. As against 1806 MW being the allocated contract capacity for <br /> GUVNL, it is 380 MW for HPPC and 470 MW for PSPCL. The grievance of <br /> both HPPC and PSPCL is that, while TPCL had diverted a part of their <br /> contracted capacity to GUVNL, the WRLDC had failed to discharge its <br /> statutory functions of ensuring that TPCL did not do so. <br /> The dispute raised by these two procurers, in the petitions filed by them <br /> before the CERC, with respect to WRLDC could not have been, and was <br /> rightly not, referred by the CERC to arbitration in as much as (a) the dispute <br /> was not arbitrable since it related to the statutory functions of the WRLDC <br /> under the Electricity Act; and (b) WRLDC was not a party to the arbitration <br /> agreement (i.e. arbitration clause) of the PPA executed between the <br /> Appellants herein and TPCL. It is for this reason that the CERC has not <br /> referred this dispute to arbitration and, while referring the other parts of the <br /> dispute to arbitration, has granted liberty to the procurers to file separate <br /> petitions against WRLDC. In effect the CERC has bifurcated the petition. <br /> It is settled law that, if there is no provision for partly referring a dispute <br /> to arbitration, such a course is not possible under Section 8 of the 1996 Act. <br /> Bifurcation of the cause of action, that is to say, the subject-matter of the suit <br /> or in some cases bifurcation of the suit between parties who are parties to the <br /> arbitration agreement and others, is not possible under Section 8 of the 1996 <br /> Act, as this would be laying down a totally new procedure not contemplated <br /> under the said Act. If bifurcation of the subject-matter of a suit was <br /> contemplated, the legislature would have used appropriate language to permit <br /> such a course. Since there is no such indication in the language, it follows that <br /> bifurcation of the subject-matter of an action brought before a judicial authority <br /> is not allowed. ( <b>Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., </b><br /> <b>(2011) 5 SCC 532; Sukanya Holdings (P) Ltd. v. Jayesh H. Pandya: (2003) </b><br /> <b>5 SCC 531).</b> <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>168</b> of <b>178</b> <br /> <br /><br /> <br /> In <b>Vidya Drolia v. Durga Trading Corpn., (2021) 2 SCC 1,</b> a three-<br /> judge bench of the Supreme Court referred with approval to its earlier <br /> judgement in <b>Booz Allen &amp; Hamilton Inc. v. SBI Home Finance Ltd., (2011) </b><br /> <b>5 SCC 532</b> wherein the earlier judgement in <b>Sukanya Holdings (P) </b><br /> <b>Ltd. v. Jayesh H. Pandya, (2003) 5 SCC 531 </b> was referred with approval. <br /> The Supreme Court, in <b>Vidya Drolia, </b> observed that <b>Sukanya Holdings (P) </b><br /> <b>Ltd. v. Jayesh H. Pandya, (2003) 5 SCC 531</b> , was a decision upholding <br /> rejection of an application under Section 8, on the ground that there was no <br /> provision in the 1996 Act to bifurcate and divide the causes or parties, that is, <br /> the subject-matter of the suit/judicial proceedings, and parties to the <br /> arbitration agreement; the suit should be in respect of a “matter” which the <br /> parties had agreed to refer and which comes within the ambit of the arbitration <br /> agreement; the words “a matter” would indicate that the entire subject-matter <br /> of the suit should be subject to arbitration agreement; bifurcation of the <br /> subject-matter or causes of action in the suit is not permissible and <br /> contemplated; similarly, the parties to the suit should be bound by the <br /> arbitration agreement, as there is no provision in the 1996 Act to compel third <br /> persons who have not exercised the option to give up the right to have access <br /> to courts and be bound by the arbitration clause; this would violate party <br /> autonomy and consensual nature of arbitration; bifurcation in such cases <br /> would result in a suit being divided into two parts, one being decided by the <br /> Arbitral Tribunal, and the other by the court or judicial authorities; this would <br /> defeat the entire purpose and inevitably delay the proceedings and increase <br /> cost of litigation, cause harassment and on occasions give rise to conflicting <br /> judgments and orders by two different fora; cause of action, in relation to the <br /> subject-matter, relates to the scope of the arbitration agreement, and whether <br /> the dispute can be resolved by arbitration; and a second mandate relating to <br /> common parties exposits the inherent limitation of the arbitration process <br /> which is consensual and mutual. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>169</b> of <b>178</b> <br /> <br /><br /> <br /> As is evident from the contents of the said judgement as noted <br /> hereinabove, while the Bombay High Court, in <b>Tarun Meghani vs. Shree </b><br /> <b>Tirupati Greenfield: (2020) SCC Online Bom 110</b> has, no doubt, referred to <br /> the judgment of the Supreme Court in <b>Sukanya Holding Private Limited</b> , its <br /> attention does not appear to have been drawn to the judgment of the Supreme <br /> Court in <b>Booz Allen. </b> The Supreme Court judgement in <b>Vidya Drolia</b> was, <br /> evidently, passed after the Bombay High Court had delivered its judgement in <br /> <b>Tarun Meghani</b> <br /> Even otherwise, the judgment of the Bombay High Court, in <b>Tarun </b><br /> <b>Meghani</b> as has been noted in the judgment itself, turned on the peculiar facts <br /> of the case; and the Bombay High Court has drawn a distinction therein <br /> between splitting of a single cause of action into parts, each being made the <br /> subject matter of distinct proceedings, and separation of causes of action <br /> which have been joined together, albeit in conformity with the CPC. <br /> In <b>Tarun Meghani</b> , the Bombay High Court took note of the fact that, of <br /> a large number of disputes between the same parties, some were covered by <br /> the arbitration agreement, and some were not It is in this context that the High <br /> Court observed that the submission against bifurcation, if accepted, could well <br /> result in defeating the arbitration agreement by simply adding a cause of <br /> action which was not covered by the arbitration agreement. In the present <br /> case, no such allegation of deliberate adding of a cause of action has even <br /> been made by TPCL either in the reply filed by them to the petitions filed by <br /> the procurers or even in the petition they filed before the CERC. The dispute, <br /> under this head, relates to TPCL supplying power to GUVNL denying HPPC <br /> and PSPCL of their contracted share of the allocated capacity. Both these <br /> procurers have sought compensation jointly and severally from TPCL which <br /> is a party to the arbitration agreement, and WRLDC which is not. The <br /> grievance of the Appellants-PSPCL and HPPC, in the Petitions filed by them <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>170</b> of <b>178</b> <br /> <br /><br /> <br /> before the CERC, is also of failure of WRLDC to discharge its statutory duties <br /> under Section 28(3)(a) of the Electricity Act, unlike in <b>Tarun Meghani </b> where <br /> the inter-se disputes were purely contractual. Disputes regarding failure of a <br /> statutory body to discharge its statutory functions under a special enactment <br /> is, in any event, non-arbitrable. <br /> The dispute in the present case cannot, by any stretch of imagination, <br /> be said to be a deliberate act of adding a cause of action only to defeat the <br /> arbitration agreement. Further, the Bombay High Court has itself held that the <br /> directions, issued in <b>Tarun Meghani</b> , was in the peculiar facts of the case <br /> before it and, consequently, the said judgment would not also constitute a <br /> binding precedent. In any event, when confronted with the contrary judgments <br /> of the High Court, as against several judgements of the Supreme Court, this <br /> Tribunal is bound to adhere to the law declared by the Supreme Court, and <br /> not that of the High Court. <br /> We must, therefore, express our inability to agree with submission, <br /> urged on behalf of TPCL, that the CERC was justified in bifurcating the petition <br /> filed by PSPCL and HPPC, and in permitting them to file a separate petition <br /> against WRLDC. Since both these procurers have sought compensation <br /> jointly and severally against TPCL and WRLDC, it does not stand to reason <br /> that, when their claim is for an identical sum which they hold both TPCL and <br /> WRLDC to be jointly and severally liable to pay them, their claim against TPCL <br /> should be referred to arbitration while their claim against WRLDC, for the very <br /> same amount, should be left open for adjudication by the CERC later. <br /> We, therefore, hold that the CERC has erred in bifurcating the dispute <br /> on the erroneous premise that it would, otherwise, be required to adjudicate <br /> a non-tariff dispute which it does not have jurisdiction to adjudicate. We have <br /> not expressed any opinion on whether or not the dispute, apart from that which <br /> relates to the WRLDC, is a non-tariff dispute. All that we have held is that if <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>171</b> of <b>178</b> <br /> <br /><br /> <br /> the CERC lacks jurisdiction to adjudicate such a dispute, it also lacks <br /> jurisdiction to refer the said dispute to arbitration under Section 79(1)(f) of the <br /> Electricity Act; and that the CERC was not justified in bifurcating the dispute <br /> between PSPCL and HPPC on the one hand and WRLDC on the other, from <br /> the other part of the dispute, as the disputes are integrally connected with <br /> each other. As the dispute, with respect to WRLDC was non-arbitrable and <br /> was therefore not referred to arbitration, the CERC could not have referred <br /> the remaining dispute to arbitration, as the disputes are integrally connected <br /> with each other. <br /> <b>X. </b> <b>REFERENCE TO SUBSEQUENT ORDERS OF THE CERC:</b> <br /> <b> </b> <b>A. SUBMISSIONS URGED ON BEHALF OF THE APPELLANTS-</b><br /> <b>PSPCL AND HPPC:</b> <br /> It is submitted, on behalf of the Appellants-PSPCL and HPPC, that the <br /> Impugned Order lacks consistency and is contrary to the subsequent Order <br /> of CERC in Petition No. 71/MP/2023 dated 17.01.2026 (MB Power – Paras <br /> 11&amp;12) which has held that issues of CIL and FM affecting tariff for contracted <br /> capacity and termination/breach issues are non-arbitrable. <br /> On the other hand, reliance is placed, on behalf of the Respondent-<br /> TPCL, on the order of the CERC, in <b>‘DVC vs. MPPMCL.’,</b> ( <b>Order dated </b><br /> <b>23.07.2019 passed in Petition No. 236/MP/2017 passed by CERC titled as </b><br /> <b>Para 17,19, 23, 27, 33 and 36), </b> to contend that the DVC Judgement of this <br /> Tribunal dealt with the interpretation and interplay of Section 79(1)(f) (and not <br /> Section 8) and its applicability to <i>Non-Tariff </i> dispute. <br /> <b> </b> <b>B. ANALYSIS: </b><br /> It would be wholly inappropriate for us to express any opinion on the <br /> other orders passed by CERC, on which reliance is placed by Learned <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>172</b> of <b>178</b> <br /> <br /><br /> <br /> Counsel on either side, firstly as the order of the CERC dated 17.01.2026 may <br /> well be subjected to challenge before this Tribunal later. In any event, orders <br /> of the Regulatory Commissions, which are subordinate to APTEL are not <br /> orders which would constitute a binding precedent. We see no reason, <br /> therefore, to express any opinion on the submissions urged by Learned <br /> Counsel on either side on the afore-said orders of the CERC. <br /> <b>XI. CONCLUSION: </b><br /> We summarize our opinion, which may be read along with what has <br /> been expressed earlier in this judgment. They are: <br /> (i) The ratio of the <b>DVC</b> judgement, passed by a co-ordinate bench of this <br /> Tribunal, constitutes a binding precedent, and not a stray observation therein. <br /> (ii) The jurisdiction of the Central Commission under Section 79(1)(f), with <br /> regards disputes involving generating Companies or transmission licensees, <br /> is restricted only to matters falling within clauses (a) to (d) of Section 79(1). <br /> (iii) Section 86(1) empowers the State Commission to adjudicate any <br /> dispute between licensees and generating companies, apart from those <br /> disputes which fall within the ambit of clause (b) of Section 79(1), as the <br /> jurisdiction to adjudicate such disputes is conferred on the Central <br /> Commission alone. <br /> (iv) Notwithstanding the wide language used in Section 86(1)(f), the State <br /> Commission lacks jurisdiction to adjudicate disputes under Section 79(1)(b) <br /> since the Electricity Act does not confer concurrent jurisdiction on both the <br /> Commissions. <br /> (v) <b> </b> In view of the scheme of the Electricity Act, more particularly Sections <br /> 79 and 86 thereof, the State Commission cannot claim concurrent jurisdiction <br /> with the Central Commission in any dispute covered by clauses (a) to (d) of <br /> Section 79(1). Consequently, if any matter falls under the scheme of clauses <br /> (a) to (d) of Section 79(1), the provisions of Section 86(1)(f) are inapplicable. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>173</b> of <b>178</b> <br /> <br /><br /> <br /> (vi) The word <i>“and”</i> in Section 79(1)(f) must be read as <i>“or”</i> . As a result, the <br /> Central Commission must be held to have the discretion under Section <br /> 79(1)(f) either to adjudicate disputes in regard to matters connected with <br /> clauses (a) to (d) of Section 79(1) or to refer any dispute for arbitration. <br /> (vii) Since the CERC is competent to decide (adjudicate) only disputes falling <br /> under clauses (a) to (d) of Section 79(1), its jurisdiction under Section 79(1)(f), <br /> to refer disputes to arbitration, must be confined only to such disputes which <br /> fall within clauses (a) to (d) of Section 79(1), and none other. In other words, <br /> the jurisdiction of the CERC to refer disputes to arbitration is confined to “any <br /> dispute” falling under clauses (a) to (d) of Section 79(1) of the Electricity Act. <br /> (viii) Likewise, since the power conferred, by Section 86(1)(f), on the State <br /> Commission is to adjudicate disputes between a generator and a licensee <br /> within its jurisdiction, it can only refer such disputes for arbitration, and not any <br /> other dispute. In other words, the jurisdiction of the State Commission, to refer <br /> disputes to arbitration, is confined to any dispute between a generator and a <br /> licensee falling within its jurisdiction ie intra-state. <br /> (ix) It is only disputes, which fall within the ambit of clauses (a) to (d) of <br /> Section 79(1), which can either be adjudicated by the CERC or, in the <br /> alternative, be referred to arbitration under Section 79(1)(f) of the Electricity <br /> Act. <br /> (x) In the light of the law declared by this Tribunal, in the <b>DVC </b> Judgement, <br /> it must be held that disputes, including those which fall within the ambit of the <br /> regulatory functions of the Commission, or which impact tariff either directly <br /> or indirectly, are non-arbitrable and, not-withstanding an arbitration agreement <br /> in existence and the tests stipulated in Section 8(1) of the 1996 Act being <br /> satisfied, cannot be referred to arbitration. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>174</b> of <b>178</b> <br /> <br /><br /> <br /> (xi) Disputes which are in regard to matters connected with clauses (a) to <br /> (d) of Section 79(1), but which do not relate to the regulatory functions of the <br /> CERC or impact tariff either directly or indirectly, can, in the exercise of the <br /> discretionary jurisdiction of the CERC under Section 79(1)(f), either be <br /> adjudicated by the Central Commission or be referred to arbitration. One such <br /> instance would be valid termination of a PPA which does not impact tariff, <br /> which was referred, by the <b>DVC </b> Judgement of this Tribunal, to arbitration. <br /> (xii) In the light of the law declared by the Supreme Court in <b>GUVNL,</b> and <br /> this Tribunal in the <b>DVC </b> Judgement, it cannot be said that only provisions after <br /> Section 11 of the 1996 Act, and not provisions prior thereto, which would apply <br /> to arbitration proceedings referred under clause (f) of both Sections 79(1) and <br /> 86(1) of the Electricity Act. <br /> (xiii) Section 8 of the 1996 Act would, in view of the <b>DVC</b> Judgement of this <br /> Tribunal, apply in cases where either the Central or the State Commission is <br /> inclined to refer the dispute to arbitration. <br /> (xiv) In terms of Section 8(1) of the 1996 Act, it is only if the Respondent-<br /> TPCL had applied, not later than the date of submitting its first statement on <br /> the substance of the dispute, could the dispute have been referred to <br /> arbitration. <br /> (xv) In the present case, not only did the Respondent-TPCL choose not to <br /> make any such request, for reference of the dispute for arbitration, prior to <br /> filing their reply to the Petitions filed by the Appellant-Procurers, they, in <br /> addition, had themselves filed a petition before the CERC on their own. <br /> (xvi) As the Respondent-TPCL failed to comply with the conditions stipulation <br /> in Section 8(1) of the 1996 Act, the CERC ought not to have referred the <br /> subject dispute to arbitration. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>175</b> of <b>178</b> <br /> <br /><br /> <br /> (xvii) Regulatory functions are assigned to, and the power to determine tariff <br /> is conferred on, an independent regulator (the Regulatory Commission, be it <br /> Central, State or Joint) by the Electricity Act, a special enactment. As <br /> discharge of the regulatory functions, and exercise of the power to determine <br /> tariff, would have a bearing on the public at large (for instance, the <br /> consumers), it is only the Regulatory Commissions which can discharge <br /> Regulatory functions and exercise the power to determine tariff, and such <br /> functions can neither be discharged nor can such power be exercised by a <br /> private forum such as an arbitral tribunal. Consequently, disputes which relate <br /> to the regulatory functions of the Commission, and those which impact tariff, <br /> both directly and indirectly, can only be adjudicated by the Regulatory <br /> Commissions and cannot be referred for arbitration by an arbitrary Tribunal. <br /> (xviii) Bifurcation of the cause of action, that is to say, the subject-matter of the <br /> suit, or in some cases bifurcation of the suit between parties who are parties <br /> to the arbitration agreement and others, is not possible under Section 8 of the <br /> 1996 Act, as this would be laying down a totally new procedure not <br /> contemplated under the said Act. <br /> (xix) Since both PSPCL and HPPC have sought compensation jointly and <br /> severally against TPCL and WRLDC, it does not stand to reason that, when <br /> their claim is for an identical sum which they hold both TPCL and WRLDC to <br /> be jointly and severally liable to pay them, their claim against TPCL should be <br /> referred to arbitration while their claim against WRLDC, for the very same <br /> amount, should be left open for adjudication by the CERC later. <br /> (xx) The CERC has erred in bifurcating the dispute on the erroneous premise <br /> that it would, otherwise, be required to adjudicate a non-tariff dispute which it <br /> does not have jurisdiction to adjudicate. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>176</b> of <b>178</b> <br /> <br /><br /> <br /> (xxi) If the CERC lacks jurisdiction to adjudicate a dispute, it also lacks <br /> jurisdiction to refer the said dispute to arbitration under Section 79(1)(f) of the <br /> Electricity Act. <br /> (xxii) The CERC was not justified in bifurcating the dispute between PSPCL <br /> and HPPC on the one hand and WRLDC on the other, from the other part of <br /> the dispute, as the disputes are integrally connected with each other. <br /> (xxiii) As the dispute, with respect to WRLDC was non-arbitrable and was <br /> therefore not referred to arbitration, the CERC could not have referred the <br /> remaining dispute to arbitration, as the disputes are integrally connected with <br /> each other. <br /> As the CERC erred in referring the disputes raised by the Appellant-<br /> Procurers to arbitration, despite the Respondent-TPCL having failed to <br /> comply with the requirement of Section 8(1) of the 1996 Act of filing an <br /> application seeking reference to arbitration before filing its reply to the <br /> Petitions filed by the Procurers, and as the Petitions filed by PSPCL and <br /> HPPC could not have been bifurcated, the impugned order passed by the <br /> CERC must be, and is accordingly, set aside. As the CERC cannot refer a <br /> dispute for arbitration which it cannot adjudicate, reference of the Petition filed <br /> by the Respondent-TPCL to arbitration must also be set aside. <br /> The CERC shall examine whether the subject matter of the disputes <br /> raised in the Petitions filed by the Appellant-Procures, and the Petition filed by <br /> the Respondent-TPCL falls within the ambit of clause (b) of Section 79(1) of <br /> the Electricity Act. If it does, then the CERC shall adjudicate the disputes in <br /> the exercise of its jurisdiction under Section 79(1)(f) of the Electricity Act. If it <br /> does not, then the CERC, after recording reasons, shall non-suit the parties <br /> on the ground that it lacks inherent jurisdiction to adjudicate the disputes <br /> raised in the said Petitions. <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>177</b> of <b>178</b> <br /> <br /><br /> <br /> The impugned order passed by the CERC is set aside, and all the three <br /> Appeals are allowed. All the Petitions are restored to the file of the CERC <br /> which shall, with utmost expedition, decide whether it has jurisdiction to <br /> adjudicate the disputes raised in the Petitions instituted before it. <br /> <b>th</b><br /> Pronounced in the open court on this the <b>25</b> <b>day of February, 2026.</b> <br /> <br /> (Ajay Talegaonkar) <br /> Technical Member (Electricity)<br /> (Justice Ramesh Ranganathan) <br /> Chairperson<br /> <br /> REPORTABLE / NON-REPORTABLE <br /> <br /> _______________________________________________________________________________________________ <br /> <i>Judgment in Appeal Nos.348, 371 &amp; 400 of 2025 </i> <i> </i> <i> </i> <i> </i> <i> </i> Page <b>178</b> of <b>178</b> <br /> </div>