Dlf Home Developers Limited vs Klassik Lamitex Pvt. Ltd.

Court
Delhi High Court

* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
Date of decision: 05 AUGUST, 2026
IN THE MATTER OF:
# CNR No.DLHC010401022021
+ O.M.P. (COMM) 379/2021 & I.A. 19661/2023, I.A. 3262/2024
DLF HOME DEVELOPERS LIMITED .....Petitioner
Through: Ms. Kanika Agnihotri, Ms. Ambika,
Ms. Unnimaya Advocates

versus

KLASSIK LAMITEX PVT. LTD. .....Respondent
Through: Mr. Manik Dogra, Mr. Anurag
Ahluwalia, Senior Advocates with Mr
Abhigyan Siddhant, Mr. Dhruv
Pande, Mr. Imon Bhattacharya,
Advocate

CORAM:
HON'BLE MR. JUSTICE SUBRAMONIUM PRASAD
JUDGMENT
1. The present Petition filed under Section 34 of the Arbitration and
Conciliation Act, 1996 [“ Arbitration Act ”], challenges the Arbitral Award
dated 17.07.2021 passed by the learned Sole Arbitrator [“ Impugned
Award ”], on the ground that it is in conflict with the public policy of India.
2. A brief factual background leading to the filing of the present Petition
is stated as under:
(i) The Petitioner, erstwhile known as DLF Universal Limited, who
was the Claimant before the learned Sole Arbitrator, is engaged in
the business of real estate development, and has been involved in
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 1 of 31

the promotion and building of several residential, retail, IT and
commercial projects throughout the country.
(ii) The Respondent, who was the Claimant before the learned Sole
Arbitrator, deals in lamination of various goods.
(iii) In March 2008, the Petitioner launched a high-end commercial
project spreading over 23,323 square yards, namely, DLF Towers
(Okhla Project), which was to comprise of three multi-storey
buildings, each of which would consist of six floors [“ the
Project ”].
(iv) On 21.03.2008, the Respondent applied for a provisional allotment
of a commercial office space, approximately measuring 830 sq. ft.,
along with one parking space. For this purpose, the Respondent
deposited a sum of INR 10 lakhs as the booking amount.
(v) The Application Form filled by the Respondent for provisional
allotment contained several terms and conditions, which were to
remain in force till such time the Respondent executed the
Commercial Office Space Buyer‟s Agreement [“ Buyers’
Agreement ”], containing a more detailed and comprehensive
terms and conditions. It was also inter alia provided under Clause
7(a) of the application form that the present use of land on which
the Project was to come up was „industrial‟, which was
permissible to be converted to „commercial‟ as per the Delhi
Master Plan, 2021, and since the concerned authority was yet to
communicate on such conversion, the work would only commence
once such permission was granted. Clause 7(a) reads as under:
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 2 of 31

“ 7.(a) The company has made it clear to the Intending
Allottee that the 'said land' on which the complex is
being erected, constructed and other peripheral area
within the boundary of the land is owned by Land
Owning Company, which has through a Development
Agreement granted the development rights to the
company to develop, construct and market the said
complex and the Intending Allottee understands that
the present land use is industrial, which is permissible
to be changed to commercial as per Delhi Master Plan,
2021. Since the concerned authority has yet to
communicate for converting the industrial land to
commercial land, the work will commence only after
the change in land use is permitted. ”
(Emphasis Supplied)

(vi) It is stated that the investors were also informed that in case they
withdrew their application or failed to return the Buyers‟
Agreement within thirty days from the date of dispatch by the
Petitioner, then the Petitioner on its sole discretion could treat
such application as cancelled, forfeiting the earnest money paid by
such an applicant. Per contra, if the Petitioner for any reason,
including non-sanction of the building plans, was unable to finally
allot the spaces applied for within one year from the date of the
application, the investors would become entitled to refund of the
amount deposited by them with simple interest @9% p.a.,
calculated for the period for which such monies were lying with
the Petitioner.
(vii) The Petitioner further informed the investors that the Petitioner
would endeavor to complete the construction of the spaces within
a period of three years from the date of execution of the Buyers‟
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 3 of 31

Agreement, subject to the timely payment by the intending
allottees of sale price, stamp duty and other charges according to
the applicable payment plan.
(viii) Vide a letter dated 19.04.2008, the Petitioner informed the
Respondent that the latter had been allotted the property no. DOA
514 in DLF Towers Okhla Phase-1. This letter was accompanied
by a payment schedule wherein the area allotted was stated to be
77.11 sq. meters and the total price as INR 1,51,25,000/-. The
payment was to be made in twelve instalments.
(ix) In furtherance of the Letter dated 19.04.2008, the Respondent, by
26.09.2008, made a payment of INR 66,19,500/-, which accounted
for 44% of the total sale consideration. In the interregnum, on
10.09.2008, the Petitioner sent a letter to its investors, inter alia
stating that the demolition work at the Project Site had
commenced and was near completion, all requisite approvals had
been applied for, a number of them received, while the balance
were expected by the end of October 2008. This Letter dated
10.09.2008 further stated that the Petitioner expected the works to
start by mid-November 2008 and had two and half years to
complete the Project.
(x) Subsequently, vide a Letter dated 17.11.2008, the Respondent
invited its investors for a „Bhoomi Pujan Ceremony‟ at the Project
Site. While the Respondent did not attend the Ceremony, it is
stated that the Director of the Respondent visited the Project Site a
week thereafter where, according to him, no there was no trace of
construction.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 4 of 31

(xi) Later, on 26.11.2008, the Respondent was in receipt of a letter
from the Petitioner, accompanied by the Buyers‟ Agreement, on
which the Petitioner demanded the Respondent‟s signatures.
However, the Respondent refused to sign the Buyers‟ Agreement
on the ground that some of the clauses incorporated therein were
inconsistent with the Application Form filled by the Respondent
while applying for the allotment. The Respondent, instead, voiced
its concerns regarding certain clauses in the Buyers‟ Agreement as
well as the total inactivity on the Project Site, but did not receive a
suitable response from the Petitioner.
(xii) Ultimately, the Respondent sent a Legal Notice dated 23.04.2009,
wherein inter alia the Respondent highlighted the inequitable and
unilateral clauses in the Buyers‟ Agreement and demanded the
Petitioner to refund the entire amount deposited by it towards the
provisional allotment of the office space, along with an interest of
18%, barring a sum of INR 1,00,000/-.
(xiii) In response to the Respondent‟s Legal Notice, the Petitioner
referred the matter to arbitration before one K.V.N. Sharma,
Senior Vice President (Legal) of the Petitioner. The Respondent
objected to this arbitration, upon which the arbitrator terminated
the proceedings on 28.05.2009.
(xiv) On 20.11.2009, the Petitioner received a letter from the Municipal
Corporation of Delhi [“ MCD ”], regarding the payment of
conversion charges for commercial usage of industrial plots.
Thereafter, the one-time conversion charges were finally paid by
the Petitioner to the MCD on 10.05.2010.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 5 of 31

(xv) The Respondent, being unsatisfied by the progress of the Project
on the Petitioner‟s part as also aggrieved by the Petitioner‟s
refusal to refund the amount deposited by the Respondent between
March to September, 2008, the Respondent approached this Court
on 09.05.2013 in a petition under Section 9 of the Arbitration Act
seeking inter alia interim relief for staying the illegal and arbitrary
demand raised by the Petitioner and from taking any coercive
measures to recover the same. The Respondent also sought a
th
restraint order refraining the Petitioner from constructing the 7
th
and 8 floor in its Project, namely DLF Prime Towers, Okhla.
(xvi) On assurance of the counsel for the Petitioner that no coercive
measures would be taken against the Respondent, disposed of the
petition under Section 9 of the Arbitration Act and referred the
matter to arbitration leaving it to the arbitrator to pass further
directions as deemed fit.
(xvii) Before the learned Sole Arbitrator, the Respondent claimed the
following reliefs:
“ a) pass an award directing the respondent to perform
their obligations as agreed in the application for
provisional allotment dated 21.03.2008, and to the
handover to the claimant vacant peaceful possession
and to execute a Sale Deed in favor of the claimant for
office/shop no. DPT 532 in DLF Prime Towers (Earlier
known as DLF towers), F-79/80, Okhla Industrial
Area, Phase 1, New Delhi-110020.
OR
in the alternative and without prejudice to the above
pass an award directing the respondent to refund to the
claimant the sum of Rs.66,19,500/- (Rs. Sixty-six lacs
nineteen thousand five hundred only) along with simple
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 6 of 31

interest at 18% per annum calculable from the date of
the booking of office/shop no. DPT 532 in DLF Prime
Towers (earlier known as DLF towers), F-79/80, Okhla
Industrial Area, Phase 1, New Delhi-110020 i.e.,
21.03.2008.

b) pass an award directing the respondent to pay
Rs.24,21,348/- towards damage caused to the claimant
due to breach of the terms and conditions as stated in
the application for provisional allotment dated
21.03.2008.

c) pass such further orders as this Hon'ble Tribunal
may deem fit and proper in the facts and circumstances
of the case.”

(xviii) As noted in the Impugned Award, after constitution of the
arbitral tribunal, several other investors came forward to file their
claims against the Petitioner however, in the course of the arbitral
proceedings all, except the Respondent, settled their disputes with
the Petitioner. However, before the settlement, the following
common issues were framed for adjudication:
“ 1. Whether the respondent has breached the contract
as contained in the application from dated 21.03.2008
or any modification thereof? OPC

2. Whether the time was the essence of the contract?
OPC

3. Whether the respondent is responsible for delay in
construction of the project under question? OPC

4. whether the respondent has made any
misrepresentation to the claimants pertaining to the
contract under question and if so, its effect? OPC
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 7 of 31


5. whether the respondent is entitled to change the
layout/building plan unilaterally.

6. whether the respondent has concealed any material
fact from the claimant? OPC

7. Whether the claimants have suffered any loss? OPC

8. Whether all the objections raised by the claimants
have been rendered academic/virtually infructuous, in
view of the receipt of Occupancy Certification by the
respondent on 19.09.2014? OPR

9. Whether the reliefs sought by the claimants are
beyond the terms of the application form? OPR

10. Whether claimants have committed any breach of
their obligations under the binding inter-se
agreement/application forms? OPR

11. Whether the claimants are entitled to the reliefs
claimed? OPR

12. Reliefs. ”

(xix) Soon after the disputes with the other investors were settled, the
Petitioner filed raised its own counter-claims against the
Respondent. As per the Petitioner, it had received Occupation
Certificate of the Project on 19.09.2004 and consequent thereto,
the Respondent was liable to pay INR 93,89,531/-, as per the
following break-up given at Paragraph No. 4 of the Petitioner‟s
Counter-Claims:
Particulars Amount in
INR
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 8 of 31

Basic Sale Price (balance) 70,10,524/-
Car Parking charges 3,30,000/-
Pro-rata Electricity Charges 21,276/-
Cost of increase in Area 1,98,900/-
Conversion Charges 7,50,480/-
House Tax 5,694/-
Service Tax 3,71,271/-
Other Govt. Charges 2,77,386/-
Interest Bearing Maintenance Security 4,24,000/-
Total Outstanding 93,89,531/-

(xx) During the course of the arbitral proceedings, it is stated that Issue
No. 1 concerning the alleged breach of the contract contained in
the application from dated 21.03.2008 by the Petitioner was
dropped, the following additional issues arising out of the
Petitioner‟s counter-claims were framed:
“ 1. Whether the counter claim is not within time? OPC

2. Whether the counter claimant is entitled to balance
sale consideration as prayed for? OPR

3. Whether the counter claimant is entitled to interest
on the balance sale consideration? If yes, at what rate?
OPR

4. Whether the claimant is liable to pay common
maintenance charges to the respondent/maintenance
agency w.e.f. 1.1.2016? OPR

5. Whether the counter claimant is entitled to pendente
lite and future interest? If yes, at what rate? OPR

6. Whether the counter claimant is entitled to costs?
OPR

Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 9 of 31

7. Whether the respondent has reduced the undivided
interest in the land under-lying the project? OPC

8. Relief .”

3. Ultimately, the learned Sole Arbitrator by way of the Impugned Award
held that the Petitioner breached the contract in failing to get the relevant
proposals/sanctions in a timely manner. He further observed that the
Petitioner was responsible for the delay in execution of the Project, as no
application for conversion was made till 2009 and there was no evidence to
show that the Petitioner was seeking grant of approvals/sanctions from the
concerned authority. With these broad conclusions, the learned Sole
Arbitrator first rejected the main prayer of the Respondent, which was for
directing the Petitioner to perform their obligations as per the provisional
allotment application form dated 21.03.2008, as the Respondent conveyed
its willingness to exit the Project altogether. He then allowed the alternative
prayer of the Respondent, and directed the Petitioner to refund the sum of
INR 66,19,500/- to the Respondent along with an interest at the rate of 9%
per annum w.e.f. 21.03.2008 till the filing of the claim petition, and
pendente lite interest at the rate of 12% p.a. thereafter.
4. The last prayer of the Respondent came to be rejected by the learned
Sole Arbitrator, on account of it being unsupported by evidence.
5. As a natural corollary, the learned Sole Arbitrator rejected the counter-
claims of the Petitioner.
6. Now, by way of the instant Petition, the Petitioner challenges the
findings of the learned Sole Arbitrator, on the ground that the Impugned
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 10 of 31

Award is in violation of the public policy of India. The following arguments
have been raised, praying for the setting aside of the Impugned Award:
(i) It is stated that the learned Sole Arbitrator failed to provide
reasons for not granting the principal relief of specific
performance, despite the Petitioner having received the
Occupation Certificate in the year 2014 and offered possession to
all the allottees of the Project.
(ii) The learned Sole Arbitrator overlooked the fact that at the instance
of the Respondent, the office space was kept vacant and was being
maintained by the Petitioner at its own expense in view of the
Order dated 23.07.2013 passed by this Court in the Section 9
Petition.
(iii) By placing reliance on a judgment passed by a Division bench of
this Court in V4 Infrastructure Pvt. Ltd. vs Jindal Biochem Pvt.
Ltd. (FAO) (OS)(COMM) 107/2018 , learned Counsel for the
Petitioner states that grant of refund instead of specific
performance is contrary to public policy.
(iv) It is stated that the Petitioner offered possession to the Respondent
in 2014 and as a goodwill gesture, also offered refund in 2015.
Despite noting this and the fact that it was the Respondent who
refused to accept either the possession or refund, as well as noting
that about forty-seven other similar placed allottees accepted the
refund and withdrew their claims against the Petitioner, the
learned Sole Arbitrator nonetheless refused to grant specific
performance.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 11 of 31

(v) The learned Sole Arbitrator erroneously held that time was of the
essence for the Project, as Clause 16 of the application form only
indicated that the Petitioner would endeavor to complete
construction of the Project within three years from the date of
execution of the Buyers‟ Agreement, which was never done
between the parties. In any event, time could never have been of
the essence, as the construction was subject to conversion of the
land from „industrial‟ to „commercial‟ by the concerned
authorities, which fact was always known to the Respondent.
(vi) The learned Sole Arbitrator misinterpreted Clause 7(a) of the
Application Form. Instead, the correct interpretation of the said
clause would suggest that the Petitioner was awaiting
communication from the concerned authority, who was “ yet to
communicate, ” on the guidelines for conversion of land use.
(vii) The learned Sole Arbitrator wrongly held changes/alterations to be
unilateral, despite of the Respondent being timely informed of the
changes in the Project‟s layout as per Clause 13 of the Application
Form, vide Letters dated 11.02.2013 and 27.02.2013, which also
stated the change in office numbers of the Respondent. As the
Respondent never objected to such changes, it was a deemed
consent as per Clause 13 of the Application Form.
(viii) The learned Sole Arbitrator incorrectly held that the terms of the
Buyers‟ Agreement were unilateral and the Respondent was not
bound to sign the same, as there is virtually no difference between
the terms of the Application Form and the Buyer‟s Agreement.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 12 of 31

7. Per contra, the learned Senior Counsel for the Respondent has argued
as under:
(i) The property which was subject of the Application Form dated
21.03.2008 was supposed to have six floors, construction whereof
would be completed within three years. However, the building
was constructed after a lapse of six years, that too, with a
completely different layout, consisting of not six but eight floors.
As such, the property with whose respect specific performance
was sought, could not have been granted.
(ii) Since the Petitioner made substantial changes to the layout plan of
the building, its offer of possession in the year 2014 had no
meaning, more so when there were no sanction plans from the
concerned authorities at the relevant time for constructing the
same.
(iii) On account of the various false representations made by the
Petitioner, the Application Form dated 21.03.2008, being the only
agreement between the parties, stood breached on part of the
Petitioner. One of the most significant misrepresentations was in
Clause 7(a) of the Application Form dated 21.03.2008, which led
the Respondent to believed that the Petitioner had already applied
for conversion of the land from „industrial‟ to „commercial‟, when
such application was only done in 2009.
(iv) The learned Sole Arbitrator correctly observes that the letter dated
19.04.2008 allegedly allotting the property no. DOA 514 to the
Respondent was meaningless, as on the said date not only was the
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 13 of 31

building pending construction but even permission therefor was
not granted by the concerned authorities.
(v) The learned Sole Arbitrator‟s observation that the Respondent was
under no obligation to sign the Buyers‟ Agreement does not
warrant any interference, as the Petitioner made unilateral changes
to the building layout.
(vi) The Petitioner‟s contention that the changes to the layout plan
were within the 20% limit permitted under the Application Form
dated 21.03.2008 was unsupported by any evidence whatsoever,
and therefore, the learned Sole Arbitrator correctly observes that
the Petitioner could not have unilaterally declared as such and
assume the Respondent‟s silence as acceptance.
(vii) Rejection of the Petitioner‟s counter-claims by the learned Sole
Arbitrator is justified, as it is a reasonable conclusion after having
observed that the Petitioner was in breach of the terms of the
Application Form, guilty of delaying the Project, making
alterations without notice to the Respondent and disallowing the
Respondent from exiting the Project.
8. Heard the learned Counsels for the parties and perused the material on
record.
9. Before dealing with the merits of the case, this Court deems it fit to
recall the contours within which an application under Section 34 of the
Arbitration Act can be adjudicated upon, with specific emphasis on the
parameter of challenge based on violation of „public policy‟.
10. It is trite law that a challenge to the arbitral award can only be on the
grounds provided under Section 34 of the Arbitration Act. The award should
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 14 of 31

not be interfered with until the conclusion arrived at is perverse. Proceedings
under Section 34 of the Arbitration Act cannot be equated with appellate
jurisdiction and the court cannot reappreciate evidence. Accordingly,
interference by the court is limited to the grounds specified under the
Arbitration Act, including violation of public policy, fundamental principles
of Indian law or patent illegality going to the root of the matter. Mere errors
of law or reassessment of evidence do not justify setting aside an arbitral
award. Reference is made of the Judgment of the Apex Court in MMTC Ltd.
v. Vedanta Ltd., ( 2019) 4 SCC 163 , wherein the following observations were
made:
“ 11. As far as Section 34 is concerned, the position is
well-settled by now that the Court does not sit in
appeal over the arbitral award and may interfere on
merits on the limited ground provided under Section
34(2)(b)(ii) i.e. if the award is against the public policy
of India. As per the legal position clarified through
decisions of this Court prior to the amendments to the
1996 Act in 2015, a violation of Indian public policy, in
turn, includes a violation of the fundamental policy of
Indian law, a violation of the interest of India, conflict
with justice or morality, and the existence of patent
illegality in the arbitral award. Additionally, the
concept of the “fundamental policy of Indian law ”
would cover compliance with statutes and judicial
precedents, adopting a judicial approach, compliance
with the principles of natural justice, and Wednesbury
[Associated Provincial Picture Houses Ltd. v.
Wednesbury Corpn., (1948) 1 KB 223 (CA)]
reasonableness. Furthermore, “ patent illegality ” itself
has been held to mean contravention of the substantive
law of India, contravention of the 1996 Act, and
contravention of the terms of the contract.

Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 15 of 31

12. It is only if one of these conditions is met that the
Court may interfere with an arbitral award in terms of
Section 34(2)(b)(ii), but such interference does not
entail a review of the merits of the dispute, and is
limited to situations where the findings of the
arbitrator are arbitrary, capricious or perverse, or
when the conscience of the Court is shocked, or when
the illegality is not trivial but goes to the root of the
matter. An arbitral award may not be interfered with if
the view taken by the arbitrator is a possible view
based on facts. (See Associate Builders v. DDA
[Associate Builders v. DDA, (2015) 3 SCC 49 : (2015)
2 SCC (Civ) 204] . Also see ONGC Ltd. v. Saw Pipes
Ltd. [ONGC Ltd. v. Saw Pipes Ltd., (2003) 5 SCC 705]
; Hindustan Zinc Ltd. v. Friends Coal Carbonisation
[Hindustan Zinc Ltd. v. Friends Coal Carbonisation,
(2006) 4 SCC 445] ; and McDermott International Inc.
v. Burn Standard Co. Ltd. [McDermott International
Inc. v. Burn Standard Co. Ltd., (2006) 11 SCC 181] )

13. It is relevant to note that after the 2015 Amendment
to Section 34, the above position stands somewhat
modified. Pursuant to the insertion of Explanation 1 to
Section 34(2), the scope of contravention of Indian
public policy has been modified to the extent that it
now means fraud or corruption in the making of the
award, violation of Section 75 or Section 81 of the Act,
contravention of the fundamental policy of Indian law,
and conflict with the most basic notions of justice or
morality. Additionally, sub-section (2-A) has been
inserted in Section 34, which provides that in case of
domestic arbitrations, violation of Indian public policy
also includes patent illegality appearing on the face of
the award. The proviso to the same states that an
award shall not be set aside merely on the ground of an
erroneous application of the law or by reappreciation
of evidence.

Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 16 of 31

14. As far as interference with an order made under
Section 34, as per Section 37, is concerned, it cannot
be disputed that such interference under Section 37
cannot travel beyond the restrictions laid down under
Section 34. In other words, the court cannot undertake
an independent assessment of the merits of the award,
and must only ascertain that the exercise of power by
the court under Section 34 has not exceeded the scope
of the provision. Thus, it is evident that in case an
arbitral award has been confirmed by the court under
Section 34 and by the court in an appeal under Section
37, this Court must be extremely cautious and slow to
disturb such concurrent findings. ”

11. Reference is also made to a judgment rendered by a three-Judge
Bench of the Apex Court in OPG Power Generation (P) Ltd. v. Enexio
Power Cooling Solutions (India) (P) Ltd., (2025) 2 SCC 417, wherein the
following discussion regarding how the term „public policy‟ is to be
construed is pertinent:
“ Relevant legal principles governing a challenge to
an arbitral award
30. Before we delve into the issue/sub-issues culled out
above, it would be useful to have a look at the relevant
legal principles governing a challenge to an arbitral
award. Recourse to a court against an arbitral award
may be made through an application for setting aside
such award in accordance with sub-sections (2), (2-A)
and (3) of Section 34 of the 1996 Act. Sub-section (2)
of Section 34 has two clauses, (a) and (b). Clause (a)
has five sub-clauses which are not relevant to the
issues raised before us. Insofar as clause (b) is
concerned, it has two sub-clauses, namely, (i) and (ii).
Sub-clause (i) of clause (b) is not relevant to the
controversy in hand. Sub-clause (ii) of clause (b)
provides that if the Court finds that the arbitral award
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 17 of 31

is in conflict with the public policy of India, it may set
aside the award.

Public policy
31. “Public policy” is a concept not statutorily defined,
though it has been used in statutes, rules, notification,
etc. since long, and is also a part of common law.
Section 23 of the Contract Act, 1872 uses the
expression by stating that the consideration or object of
an agreement is lawful, unless, inter alia, opposed to
public policy. That is, a contract which is opposed to
public policy is void.

35. In Renusagar Power Co. Ltd. v. General Electric
Co., 1994Supp (1) SCC 644, a three-Judge Bench of
this Court observed that the doctrine of public policy is
somewhat open—textured and flexible. By citing
earlier decisions, it was observed that there are two
conflicting positions which are referred to as the
“narrow view” and the “broad view”. According to the
narrow view, courts cannot create new heads of public
policy whereas the broad view countenances judicial
law making in these areas. In the field of private
international law, it was pointed out, courts refuse to
apply a rule of foreign law or recognise a foreign
judgment or a foreign arbitral award if it is found that
the same is contrary to the public policy of the country
in which it is sought to be invoked or enforced.
However, it was clarified, a distinction is to be drawn
while applying the rule of public policy between a
matter governed by domestic law and a matter
involving conflict of laws. It was observed that the
application of the doctrine of public policy in the field
of conflict of laws is more limited than that in the
domestic law and the courts are slower to invoke
public policy in cases involving a foreign element than
when a purely municipal legal issue is involved. It was
held that contravention of law alone will not attract the
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 18 of 31

bar of public policy, and something more than
contravention of law is required.

37. What is clear from above is that for an award to be
against public policy of India a mere infraction of the
municipal laws of India is not enough. There must be,
inter alia, infraction of fundamental policy of Indian
law including a law meant to serve public interest or
public good.”

12. Now, this Court shall deal with the rival contentions advanced on
behalf of the parties.

13. The fulcrum of the disputes between the parties, as noted by the
learned Sole Arbitrator is stated as under:
(a) Whether the Petitioner misrepresented facts to the Respondent,
which induced the latter to book an office space in the Project;
(b) Whether the Respondent was under an obligation to execute the
Buyers‟ Agreement as received, and return the same within thirty
days from the date of its dispatch failing which, whether the
Petitioner at its sole discretion could treat the application as
cancelled and forfeit earnest money deposited by the Respondent;
(c) Whether, if the Petitioner for any reason including non-sanction of
the building plans was not in a position to finally allot an office
space within a period of one year from the date of the booking
application, the Respondent was entitled to refund of the amount
deposited with simple interest at the rate of 9%; and
(d) Whether the Petitioner was under an obligation to complete the
Project within a period of three years from the date of execution of
the Buyers‟ Agreement and if so, in the event of the Petitioner
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 19 of 31

failing to hand over possession within the stipulated time, the
Respondent was within its right to exit the Project and claim
refund of the amount which was lying in deposit with the
Petitioner along with interest.
14. To determine Point (a) noted above, the learned Sole Arbitrator rightly
emphasized on the wordings of Clause 7(a) under the Application Form,
which is again being extracted below for ease of reference:
“ 7.(a) The company has made it clear to the Intending
Allottee that the 'said land' on which the complex is
being erected, constructed and other peripheral area
within the boundary of the land is owned by Land
Owning Company, which has through a Development
Agreement granted the development rights to the
company to develop, construct and market the said
complex and the Intending Allottee understands that
the present land use is industrial, which is permissible
to be changed to commercial as per Delhi Master Plan,
2021. Since the concerned authority has yet to
communicate for converting the industrial land to
commercial land, the work will commence only after
the change in land use is permitted. ”

15. The learned Sole Arbitrator observed that the wordings of the above
clause affirmatively indicated that at the time of booking of the office space
by the Respondent, the Petitioner had already applied for conversion, and
was only awaiting response from the concerned authority. He further took
note of the cross-examination of one of the Petitioner‟s witness, being the
Assistant Vice President of the Petitioner‟s Company before the learned Sole
Arbitrator. The witness unwaveringly admitted that the Petitioner
commenced construction of the industrial plot, without applying for or being
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 20 of 31

granted conversion to „commercial‟ land, at the relevant time in 2009.
Considering this, the learned Sole Arbitrator refused the stance of the
Petitioner that it was pursuing the concerned authority all along regarding
the conversion, as no document to reflect the same was placed on record by
the Petitioner.
16. The above conclusion is discernible from the material on record as
well. The very first communication from the Petitioner to the concerned
authority, being the South Delhi Municipal Corporation [“ SDMC ”] was sent
somewhere in November, 2009, which is reflected from a Letter dated
20.11.2009 sent by the MCD to the Petitioner, regarding the latter‟s land-use
change application. Thereafter, the actual and final grant of sanction for the
Petitioner‟s plan for construction of the Project for commercial activities is
dated 29.01.2013, which position was also confirmed by the Petitioner‟s
then-Assistant Vice President, who was arraigned as RW-2 before the
learned Sole Arbitrator. Before 29.01.2013, it is borne out from the record
and confirmed by RW-2 that two sanctions were also granted in June 2009
and September 2009, however, these sanctions were limited for construction
up to two floors only, while the office space allotted to the Respondent was
on the fifth floor. Interestingly however, prior to that, the Petitioner appears
to have sent out a letter to its investors, including the Respondent herein on
10.09.2008 claiming that they had applied for and received a number of
approvals from the concerned authority, while some others were awaited,
and their prospective receipt would be by the end of October, 2008. Clearly,
this Letter dated 10.09.2008 sent by the Petitioner did not show the true
picture. For which reason, the conclusion in the Impugned Award that the
Petitioner‟s ipse dixit of actively pursuing the matter of obtaining approvals
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 21 of 31

from the concerned authority cannot be believed and thus, the representation
made under Clause 7(a) of the Application Form is a misleading one, cannot
be interfered with by this Court. As a consequence, the argument advanced
by the learned Counsel for the Petitioner that the learned Sole Arbitrator
misinterpreted Clause 7(a), is rejected.
17. To answer Point (c) enlisted above, the learned Sole Arbitrator turned
its attention to the following recital contained in the Application Form,
which essentially put the Petitioner under an obligation to either finally allot
an office space to the Respondent within a period of one year from the date
of signing of the Application Form, or return the entire amount by the
Respondent along with interest at the rate of 9%:
“ I/We have instructed the company that if for any
reason including non-sanction of the building plans,
the company is not in a position to finally allot a
shop/office space/ parking space/other commercial
space(s) applied for within a period of one year from
the date hereof, I/We would like to have refund of the
amount deposited with simple interest at the rate of 9%
per annum calculated for the period for which such
monies have been lying with the company. ”

18. This Court has already noted the Letter dated 19.04.2008, wherein the
is Petitioner stated to have allotted an office space to the Respondent.
However, the above discussion on Point (a) clearly revealed that the actual
and final grant of sanction by the SDMC was only on 29.01.2013, while the
prior two sanctions in June and September 2009 were only two construction
of two floors. As such, the learned Sole Arbitrator returned a finding that the
purported allotment of an office space on the fifth floor in April 2008, was
actually non-existent, as even till September 2009, the Petitioner could
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 22 of 31

manage to receive sanctions for construction of only two floors. For this
reason, this Court has no hesitation in agreeing with the conclusion of the
learned Sole Arbitrator that the Respondent, in terms of the Recital extracted
above, was well within its right to claim refund from the Petitioner along
with interest.
19. Next point to adjudicate upon was Point (b), which was to decide as to
whether the Respondent was under an obligation to execute the Buyers‟
Agreement within 30 days from its dispatch or not, and upon a failure to do
so, the Petitioner could cancel and forfeit the amounts paid by the
Respondent. The rival stances on this point were on one hand, that since the
Respondent refused to sign the Buyers‟ Agreement within the stipulated
time, the Petitioner was empowered to cancel and forfeit the amounts paid
by the Respondent and refuse the refund on ground that the Respondent
breached Clause 11 of the Application Form.
20. On the other hand, the Respondent refused to sign the Buyers‟
Agreement sent by the Petitioner on 26.11.2008, since the same contained
one-sided clauses but more importantly, the Respondent discovered that the
Petitioner collected huge amounts from various investors without any update
on grant of sanctions by the concerned authority. On this ground, the
Respondent requested refund of amounts deposited by it vide its Letter dated
23.04.2009.
21. Again, the Petitioner sought to rely on a Clause 29 in the Application
Form, to state that its inability to get the necessary approvals was not
attributable to it, but a force majeure condition, out of the Petitioner‟s
control. Clause 29 of the Application Form is extracted below:
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 23 of 31

“ The intending allottee agrees that the sale of the
shop/ office space/ parking space/ other commercial
space(s) in the said complex is subjected to force
majeure clause which inter alia include delay on
account of non-availability of steel and/or cement or
other building materials or water supply or electric
power or slow down strike or due to a dispute with the
construction agency employed by the company, civil
commotion or by reason of war or enemy action or
terrorist action or earthquake or any act of God or if
non delivery of possession as a result of any notice
order, rule or notification of the Government and/or
any other public or competent authority or for any
other reason beyond the control of the company and in
any ·of the aforesaid events the company shall be
entitled to a reasonable extension of time for delivery
of possession of the shop/office space/ parking space/
other commercial space(s) in the said building.

The company as a result of such a contingency arising
reserves the right to alter or vary the terms and
conditions of allotment or if the circumstances beyond
the control of the company so warrant the company
may suspend the scheme for such period as it may
consider expedient and non-compensation of any
nature whatsoever can be claimed by the Intending
Allottee for the period of suspension of scheme.
In consequence of the company abandoning the
scheme, the company's liability shall be limited to the
refund of the amount paid by the Intending Allottee(s)
without any interest or compensation whatsoever.”


22. On the Respondent‟s refusal to sign the Buyers‟ Agreement, the
learned Sole Arbitrator observed that the Respondent‟s wish to discuss
clauses contained in a contract, which was to end up being a bilateral
agreement, was not unnecessary and as such, it was under no obligation to
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 24 of 31

sign the Buyers‟ Agreement without any questions. In fact, this brings to
light a judgment of the Apex Court in Central Inland Water Transport Corpn.
v. Brojo Nath Ganguly, (1986) 3 SCC 156 , which was referred to in Pioneer
Urban Land & Infrastructure Ltd. v. Govindan Raghavan, (2019) 5 SCC
725 , whereby the Apex Court had observed as under:
“ 89. … Our Judges are bound by their oath to “uphold
the Constitution and the laws”. The Constitution was
enacted to secure to all the citizens of this country
social and economic justice. Article 14 of the
Constitution guarantees to all persons equality before
the law and the equal protection of the laws. … This
principle is that the courts will not enforce and will,
when called upon to do so, strike down an unfair and
unreasonable contract, or an unfair and unreasonable
clause in a contract, entered into between parties who
are not equal in bargaining power. It is difficult to give
an exhaustive list of all bargains of this type. No court
can visualise the different situations which can arise in
the affairs of men. One can only attempt to give some
illustrations. For instance, the above principle will
apply where the inequality of bargaining power is the
result of the great disparity in the economic strength of
the contracting parties. It will apply where the
inequality is the result of circumstances, whether of the
creation of the parties or not. It will apply to situations
in which the weaker party is in a position in which he
can obtain goods or services or means of livelihood
only upon the terms imposed by the stronger party or
go without them. It will also apply where a man has no
choice, or rather no meaningful choice, but to give his
assent to a contract or to sign on the dotted line in a
prescribed or standard form or to accept a set of rules
as part of the contract, however unfair, unreasonable
and unconscionable a clause in that contract or form
or rules may be. This principle, however, will not apply
where the bargaining power of the contracting parties
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 25 of 31

is equal or almost equal. This principle may not apply
where both parties are businessmen and the contract is
a commercial transaction. … These cases can neither
be enumerated nor fully illustrated. The court must
Judge each case on its own facts and circumstances. ”

23. Noting the above, the Apex Court in Pioneer Urban Land &
Infrastructure Ltd. v. Govindan Raghavan (Supra), observed as under:
“ 6.8. A term of a contract will not be final and binding
if it is shown that the flat purchasers had no option but
to sign on the dotted line, on a contract framed by the
builder. The contractual terms of the agreement dated
8-5-2012 are ex facie one-sided, unfair and
unreasonable. The incorporation of such one-sided
clauses in an agreement constitutes an unfair trade
practice as per Section 2(1)(r) of the Consumer
Protection Act, 1986 since it adopts unfair methods or
practices for the purpose of selling the flats by the
builder. ”

24. Another conclusion drawn by the learned Sole Arbitrator is that
Clause 29 of the Application Form cannot come to the Petitioner‟s rescue, as
the delay in taking the first steps to apply for conversion of land and
approval of building layout plans was completely attributable to it. On this
observation, the learned Sole Arbitrator relied upon a judgment of the Apex
Court in Energy Watchdog v. CERC, (2017) 14 SCC 80 , which held that the
scope of force majeure cannot take in its fold mere onerous performance of a
contract by one or the other party. As such, the learned Sole Arbitrator held
that the Petitioner, being a old-hand in the field of real estate and
construction, and knowing well enough how much time it takes for
conversion of land and sanction of lay out plans, cannot term the delay in
getting approvals as a force majeure condition.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 26 of 31

25. Upon perusing the material on record, this Court finds itself in
agreement with both the conclusions of the learned Sole Arbitrator, that the
Respondent was not obligated to sign the Buyers‟ Agreement if it was of the
opinion that the same contained one-sided clauses. This Court also agrees
with the observation in the Impugned Award that since it was the
Respondent itself who was responsible for the delays in getting approvals
and sanctions, it could not take aid of Clause 29 of the Application Form and
as such, could not forfeit the amounts paid by the Respondent.

26. Lastly, perusal of the Impugned Award also shows that the learned
Sole Arbitrator, having already seen that the delays were entirely attributable
to the Petitioner, also rejected the Petitioner‟s contention that time was not
of the essence of the contract between the parties. This Court has already
agreed with the interpretation of the learned Sole Arbitrator of the various
clauses in the Application Form that contained within them an aspect of
limitation, for instance, Clause 7(a) and Clause 16. As such, this Court most
certainly also concurs on this point, to state that it is too unjust a position if
the Petitioner is allowed to demand monies from the investors as per the
initial time communicated by it, but at the same time, expect the same
investors to wait ad nauseum till the Petitioner struggles to receive the bare
minimum of approvals and sanctions from the concerned authorities. On this
aspect, this Court is also cognizant of the judgment of the Apex Court in
Saradamani Kandappan v. S. Rajalakshmi, (2011) 12 SCC 18 , wherein an
important discussion on time being of the essence in contracts such as the
one in the present case took place. Relevant parts of the said judgment is
extracted below:
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 27 of 31

“ 36. The principle that time is not of the essence of
contracts relating to immovable properties took shape
in an era when market values of immovable properties
were stable and did not undergo any marked change
even over a few years (followed mechanically, even
when value ceased to be stable). As a consequence,
time for performance, stipulated in the agreement was
assumed to be not material, or at all events considered
as merely indicating the reasonable period within
which contract should be performed. The assumption
was that grant of specific performance would not
prejudice the vendor defendant financially as there
would not be much difference in the market value of the
property even if the contract was performed after a few
months. This principle made sense during the first half
of the twentieth century, when there was comparatively
very little inflation, in India. The third quarter of the
twentieth century saw a very slow but steady increase
in prices. But a drastic change occurred from the
beginning of the last quarter of the twentieth century.
There has been a galloping inflation and prices of
immovable properties have increased steeply, by leaps
and bounds. Market values of properties are no longer
stable or steady. We can take judicial notice of the
comparative purchase power of a rupee in the year
1975 and now, as also the steep increase in the value of
the immovable properties between then and now. It is
no exaggeration to say that properties in cities, worth a
lakh or so in or about 1975 to 1980, may cost a crore
or more now.

37. The reality arising from this economic change
cannot continue to be ignored in deciding cases
relating to specific performance. The steep increase in
prices is a circumstance which makes it inequitable to
grant the relief of specific performance where the
purchaser does not take steps to complete the sale
within the agreed period, and the vendor has not been
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 28 of 31

responsible for any delay or non-performance. A
purchaser can no longer take shelter under the
principle that time is not of essence in performance of
contracts relating to immovable property, to cover his
delays, laches, breaches and “non-readiness”. The
precedents from an era, when high inflation was
unknown, holding that time is not of the essence of the
contract in regard to immovable properties, may no
longer apply, not because the principle laid down
therein is unsound or erroneous, but the circumstances
that existed when the said principle was evolved, no
longer exist. In these days of galloping increases in
prices of immovable properties, to hold that a vendor
who took an earnest money of say about 10% of the
sale price and agreed for three months or four months
as the period for performance, did not intend that time
should be the essence, will be a cruel joke on him, and
will result in injustice. Adding to the misery is the delay
in disposal of cases relating to specific performance, as
suits and appeals therefrom routinely take two to three
decades to attain finality. As a result, an owner
agreeing to sell a property for rupees one lakh and
received rupees ten thousand as advance may be
required to execute a sale deed a quarter century later
by receiving the remaining rupees ninety thousand,
when the property value has risen to a crore of rupees.

42. Therefore there is an urgent need to revisit the
principle that time is not of the essence in contracts
relating to immovable properties and also explain the
current position of law with regard to contracts
relating to immovable property made after 1975, in
view of the changed circumstances arising from
inflation and steep increase in prices. We do not
propose to undertake that exercise in this case, nor
referring the matter to a larger Bench as we have held
on facts in this case that time is the essence of the
contract, even with reference to the principles in Chand
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 29 of 31

Rani [(1993) 1 SCC 519] and other cases. Be that as it
may.

43. Till the issue is considered in an appropriate case,
we can only reiterate what has been suggested in K.S.
Vidyanadam [(1997) 3 SCC 1] :
(i) The courts, while exercising discretion in suits
for specific performance, should bear in mind that
when the parties prescribe a time/period, for taking
certain steps or for completion of the transaction,
that must have some significance and therefore
time/period prescribed cannot be ignored.
(ii) The courts will apply greater scrutiny and
strictness when considering whether the purchaser
was “ready and willing” to perform his part of the
contract.
(iii) Every suit for specific performance need not be
decreed merely because it is filed within the period
of limitation by ignoring the time-limits stipulated
in the agreement. The courts will also “frown”
upon suits which are not filed immediately after the
breach/refusal. The fact that limitation is three
years does not mean that a purchaser can wait for
1 or 2 years to file a suit and obtain specific
performance. The three-year period is intended to
assist the purchasers in special cases, as for
example, where the major part of the consideration
has been paid to the vendor and possession has
been delivered in part-performance, where equity
shifts in favour of the purchaser. ”

27. A careful and comprehensive perusal of the Impugned Award
demonstrates that the learned Sole Arbitrator has examined the pleadings,
documentary material, correspondence exchanged between the parties, and
the evidence led in support of their respective claims and assertions. The
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 30 of 31

Impugned Award reflects due consideration of the relevant facts and
surrounding circumstances germane to the disputes.
28. The Impugned Award reflects a plausible and reasoned interpretation
of the contract and an evaluation of evidence within the jurisdiction of the
learned Sole Arbitrator. It is well settled that a court exercising limited
supervisory jurisdiction under Section 34 of the Arbitration Act cannot re-
appreciate evidence or substitute its own interpretation of contractual clauses
where the view taken by the learned Sole Arbitrator is a possible and
reasonable one.
29. Viewed in its entirety, the Impugned Award reflects a reasoned and
structured adjudication of the disputes by the learned Sole Arbitrator within
the confines of the contractual terms agreed upon by the parties, the material
placed on record, and the jurisdiction vested in the learned Sole Arbitrator.
The Impugned Award demonstrates due application of mind to the
pleadings, evidence, and relevant contractual provisions.
30. In view of the foregoing discussion, this Court is of the considered
opinion that the Petitioners have failed to establish any ground under Section
34(2) or Section 34(2A) of the Arbitration Act warranting interference with
the Impugned Award.
31. Accordingly, the present Petition, along with pending Application(s),
if any, stands dismissed.


SUBRAMONIUM PRASAD, J
AUGUST 05, 2026
Prateek /AP
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:07.08.2026
21.08.45
O.M.P. (COMM) 379/2021 Page 31 of 31