M/S Milky Investment And Trading Company vs M/S Collage Group Infrastructure Pvt. Ltd. & Ors.
- Court
- Delhi High Court
- Case type
- Civil Suit Commercial
- Decided on
- 17-02-2026
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
Date of decision: 17 FEBRUARY, 2026
IN THE MATTER OF:
+ CS(COMM) 358/2025, I.A. 9998/2025, I.A. 9999/2025, I.A.
10000/2025, I.A. 10001/2025, I.A. 11887/2025 & I.A. 18343/2025
M/S MILKY INVESTMENT AND TRADING COMPANY
.....Plaintiff
Through: Mr. Sudhir Makkar, Sr. Adv. Ms.
Mehak Nayak, and Ms. Aadhya
Shrotriya, Advs.
versus
M/S COLLAGE GROUP INFRASTRUCTURE PVT. LTD. & ORS.
.....Defendants
Through: Mr. Rajeeve Mehra Sr. Adv with Mr.
Kashish Narang, Ms. Deboshree
Saha, Mr. Sanjeet Ranjan and Ms.
Shreya Vedantika Mehra, Advs.
CORAM:
HON'BLE MR. JUSTICE SUBRAMONIUM PRASAD
JUDGMENT
1. The present suit has been instituted seeking specific performance of
the Agreement of Sale dated 20.04.2015, vide which the Second Floor, Plot
No. 3, Anand Lok, New Delhi – 110049 ( hereinafter referred to as “ Subject
Property ” ) is to be transferred and handed over to the Plaintiff. The prayers
made in the present Suit reads as under:
“(a) Pass a decree of specific performance, directing
the Defendant No. 1 to execute and register a sale deed
to transfer the Suit Property which is subject matter of
the Agreements to Sell dated 20.04.2015, being the
second floor flat at Plot No. 3, Anand Lok, New Delhi -
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 1 of 14
06.03.2026 19:40
- 110049, in favour of Plaintiff, handover of vacant
peaceful possession thereof to the Plaintiff, and to
complete all formalities to perfect the title to the Suit
Property in the name of the Plaintiff;
(b) In the alternative, award damages equivalent to the
value of advance amount paid by the Plaintiff towards
the second floor flat at Plot No. 3, Anand Lok, New
Delhi - 110049 under the Agreement to Sell dated
20.04.2015, i.e. INR.6,50,00,000/-(Rupees Six Crores
Fifty Lakhs only), along with interest at the rate of 18
per cent per annum from the date of the Agreement to
Sell, i.e. 20.04.2015 till the filing of the Suit, in favour
of the Plaintiff;
(c) Award pendente lite and future interest on the
aforesaid suit amount at the rate of 18 per cent per
annum from date of filing of the present suit till the
actual date of payment;
(d) Pass an order restraining the Defendants from
selling, mortgaging, transferring, alienating in any
manner, creating any third party rights or parting with
possession of the second floor flat at Plot No. 3, Anand
Lok, New Delhi- 110049.
(e) Award cost of these proceedings in favour of the
Plaintiff;
(f) Pass such other or further orders as this Hon'ble
Court may deem fit and proper in the facts and
circumstances of the case.”
2. Shorn of unnecessary details, the facts of the case, as discernible from
the Plaint, are as follows:-
a. A Development Agreement dated 01.06.2010 was entered into
between Defendant No. 1, one Inder Mohan Khaneja and
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 2 of 14
06.03.2026 19:40
Defendants No. 2 & 3, who are the owners of the Subject
Property, whereby the Subject Property was to be developed into
independent floors i.e., consisting of ground, first, second and
third floors. It is pertinent to mention that Defendant Nos. 2 & 3
are the Directors of Defendant No.1.
b. It is stated that the Plaintiff herein entered into a Memorandum
of Understanding ( hereinafter referred to as „the MoU ‟ ) dated
08.11.2010 with Defendant No. 1, under which the Plaintiff
advanced a loan of Rs.15 Crores to Defendant No. 1 at an agreed
interest rate of 12% per annum. It is stated that under the said
MoU, it was agreed that the loan was to be repaid by March 2013
and that in the event of default, Defendant No. 1 would allot
three floors of the Subject Property to the Plaintiff. It is stated
that this assertion was made on the basis that Defendant No. 1
had lawful authority to sell portions of the property under the
Development Agreement dated 01.06.2010. Clause No. 7 of the
said MoU reads as under:-
“ 7. In case of non-repayment of loan amount, the
Borrower agrees to allot three floors being built
at 3, Anand Lok, New Delhi under Development
Agreement dated 01.06.2010.”
c. It is stated that by March 2013, Defendant No. 1 repaid only
Rs.10 Crores to the Plaintiff, leaving an outstanding balance of
Rs.5 Crores. Consequently, on 29.03.2013, an Addendum to the
MoU dated 08.11.2010 was executed, whereby Defendant No. 1
was granted additional two years to repay the balance amount
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 3 of 14
06.03.2026 19:40
and it was specifically agreed that if the remaining loan amount
was not repaid within the extended period, Defendant No. 1
would offer to sell the second floor of the Subject Property to the
Plaintiff in lieu of the outstanding amount. Clause 2 of the said
Addendum reads as under:-
“ 2. In case the loan amount is not repaid by the
Borrower to the Lender, the Borrower shall offer
to sell, property being Second Floor of 3, Anand
Lok, New Delhi- 110049, which the Borrower is
authorized to do in terms of the .Development
Agreement entered into between the Owners of the
aforesaid residential property and the Borrower,
for the remaining loan amount of Rs.5,00,00,000/-
(Rupees Five Crores Only) as per Clause 7 of
MOU dated 08.11:2010.”
d. It is stated that upon expiry of the extended period and its failure
to repay the balance loan, Defendant No. 1 offered the second
floor of the Subject Property to the Plaintiff. Accordingly, an
Agreement to Sell ( hereinafter referred to as „the ATS ‟ ) dated
20.04.2015 was executed between Defendant No. 1 (as
Developer), the Plaintiff (as Buyer), and Defendants No. 2 and 3
along with Inder Mohan Khaneja (as Confirming Parties). It is
stated that under the said ATS, the second floor of the Subject
Property was agreed to be sold to the Plaintiff herein for a total
consideration of Rs.6.5 Crores, out of which Rs.5 Crores stood
adjusted against the outstanding loan amount. Accordingly, an
MoU dated 20.04.2015 was also executed between the Plaintiff
and the Defendant No. 1, whereby it was agreed that the
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 4 of 14
06.03.2026 19:40
remaining payable amount of Rs.5 Crores in terms of the MoU
dated 08.11.2010 and Addendum dated 29.03.2013 shall be
adjusted against the sale consideration for the second floor of the
Subject Property in terms of the Agreement to Sell of even date.
The balance consideration of Rs.1.5 Crores was to be paid at the
time of execution of the sale deed. Clause 10 of the ATS
stipulated that possession would be handed over within 18
months, i.e., on or before 18.10.2016. Clause 10 of the ATS
reads as under:
“ 10. The Developer agrees to hand over the
vacant, actual, physical and peaceful possession
of the said premises to the Purchaser upon
execution and presentation of Sale Deed before
the Sub-Registrar, after receiving the entire sales
consideration, on or before 18 months from the
date of this Agreement.”
e. It is stated that after entering into an ATS, the Defendant No.1,
on 16.02.2016, availed a term loan facility of Rs.90 Crores from
Defendant No. 4, IL&FS Financial Services Ltd., by mortgaging
the Subject Property. It is stated that the loan documents
recorded that construction had already commenced on the
Subject Property and that one floor had already been sold. It is
stated that the Plaintiff was not informed of this mortgage at any
point of time.
f. It is stated that on 18.02.2016, the Plaintiff addressed a letter to
Defendant No. 3 seeking an update on construction, noting that
approximately 77% of the sale consideration had already been
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 5 of 14
06.03.2026 19:40
paid. It is stated that the Defendant No.1, vide its reply dated
08.03.2016, assured the Plaintiff that construction on the Subject
Property had commenced after resolving technical and
contractor-related issues and that possession would be handed
over within 16 months, i.e., by 08.07.2017. It is stated that
despite the assurances, construction could not be completed
within the stipulated time. It is stated that in September 2018,
officials of the Plaintiff visited the site and discovered that no
construction activity was going-on on the Subject Property. It is
stated that the Plaintiff further discovered that Defendant No. 4
had taken physical possession of the entire Subject Property
pursuant to a Possession Notice dated 22.09.2018 issued under
Section 13(4) of the Securitisation and Reconstruction of
Financial Assets and Enforcement of Security Interest Act, 2002
( hereinafter referred to as „the SARFAESI Act ‟ ).
g. It is stated that aggrieved by this the Plaintiff approached the
Debt Recovery Tribunal ( hereinafter referred to as „the DRT’ ),
New Delhi, by filing Securitization Application No. 295/2018 on
15.10.2018, challenging the securitisation measures of Defendant
No.4 and asserting that no valid mortgage could have been
created over the second floor of the Subject Property. It is stated
that Defendant No.1 filed a reply to the said Securitization
Application on 16.03.2019 whereby the Defendant No.1
categorically admitted the existence of the ATS dated 20.04.2015
and confirmed that the second floor of the Subject Property was
not part of the mortgage made in favour of Defendant No. 4.
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 6 of 14
06.03.2026 19:40
h. It is stated that on 25.02.2023, Defendants No. 2 and 3 initiated
personal insolvency proceedings under Section 94 of the
Insolvency and Bankruptcy Code, 2016, ( hereinafter referred to
as „the IBC’ ) before the NCLT, New Delhi, which resulted in an
interim moratorium. It is stated that during the pendency of these
proceedings, Defendant No. 4 was restrained from proceeding
further against the Subject Property under the SARFAESI Act.
i. It is stated that while the DRT proceedings remained pending,
Defendant No. 4 issued newspaper advertisements dated
02.12.2024 seeking assignment of the loan account of Defendant
No. 1. It is stated that aggrieved by the action of the Defendant
No.4, Defendant No. 2 filed a Writ Petition before this Court,
wherein it was admitted by the Defendant No. 2 that the second
floor of the Subject Property had been sold to the Plaintiff under
the ATS dated 20.04.2015 and that the possession thereof had
been taken by Defendant No. 4 on 22.09.2018. It is stated that
pursuant thereto, the Plaintiff issued a Legal Notice dated
23.12.2024 to Defendants No. 1 to 3, seeking specific
performance of the ATS within 60 days. It is stated that despite
expiry of the said period on 23.02.2025, since no reply was
received, the Plaintiff has filed the present Suit for specific
performance seeking enforcement of the Agreement to Sell dated
20.04.2015.
3. When the Suit came up for hearing on 22.04.2025, learned Counsel
appearing for Defendant No.4 raised a preliminary objection to the
maintainability of the suit on multiple grounds. This Court directed the
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 7 of 14
06.03.2026 19:40
learned Counsel for Defendant No.4 as well as the learned Counsel for the
Plaintiff to file written note of arguments along with judgments and relevant
orders of pending proceedings before the DRT and NCLT before the next
date of hearing. On 09.05.2025, this Court directed the learned Counsel for
the Plaintiff to file the original ATS dated 20.04.2015 before the next date of
hearing, i.e. before 20.05.2025. However, the same was not filed on
20.05.2025. On 20.05.2025, one week’s time was further granted to the
learned Counsel for the Plaintiff to file the original ATS dated 20.04.2015
on or before 31.07.2025. The Original ATS along with an affidavit of
compliance was filed on 25.07.2025.
4. The principal contentions of Defendant No.4 are that the present Suit
for specific performance of the Agreement to Sell dated 20.04.2015 is ex
facie barred by limitation, and this bar is apparent from the Plaintiff’s own
pleadings, documents, and admitted chronology. It is stated that the present
suit is governed by Article 54 of the Limitation Act, 1963, which prescribes
a period of three years either from the date fixed for performance or, where
no such date is fixed, from the date when the performance is refused. It is
stated that on a meaningful reading of the Plaint, it is clear that the suit fails
under both limbs of Article 54 of the Limitation Act, 1963. It is stated that
the Agreement to Sell dated 20.04.2015 expressly contemplated delivery of
possession within 18 months, i.e. on or before 20.10.2016, and in any event,
the subsequent assurance dated 08.03.2016 indicated completion and
handing over within 16 months. It is stated that in any case, the outer
timeline for performance expired between October 2016 and July 2017.
Once such a determinable period exists, limitation does not remain open-
ended and therefore, the cause of action for seeking specific performance
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 8 of 14
06.03.2026 19:40
crystallised, at the latest, by mid-2017, and the limitation period expired by
mid-2020. It is stated that the present Suit was filed in 2025 which is far
beyond the prescribed period of limitation.
5. Learned Counsel for the Defendant No.4 further stated that even if it
is assumed that no specific date for performance of the ATS was fixed, the
Plaintiff had clear notice that the ATS would not be performed when
Defendant No. 4 took possession of the property under the SARFAESI Act
on 22.09.2018. It is stated that when a secured creditor takes possession of
the entire property, it amounts to a clear denial of the Plaintiff’s claim to
seek conveyance or possession. It is further stated that the Plaintiff itself
admits that it became aware of this action in September 2018 and thereafter
filed a Securitisation Application No. 295/2018 before the DRT on
15.10.2018. It is stated that with the filing of the Securitisation Application,
the Plaintiff had full knowledge that the ATS could not be performed and,
therefore, at the latest, the limitation started running from October, 2018 and
the same will be expiring by October 2021. It is, therefore, stated that the
Suit, which was filed in 2025, is time-barred.
6. Learned Counsel for the Defendant No.4 further states that the
Plaintiff cannot rely on the pendency of proceedings before the DRT to
explain the delay. He states that the proceedings under the SARFAESI Act
are limited to examining the legality of the bank’s actions and do not decide
rights relating to specific performance of an Agreement to Sell. He states
that there is no provision in law which stops or suspends limitation merely
because such proceedings are pending and, therefore, limitation continues to
run regardless of parallel proceedings before another forum.
7. Learned Counsel for the Defendant No.4 also stated that the
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 9 of 14
06.03.2026 19:40
Plaintiff’s reliance on the legal notice dated 23.12.2024 is misplaced. He
states that by the time the said notice was sent, the limitation period had
already expired, and no fresh cause of action could arise from such a notice.
He states that once a claim has become time-barred, it cannot be revived by
issuing a notice several years later.
8. Learned Counsel for Defendant No.4 has also drawn the attention of
this Court regarding the veracity of the ATS which is filed on record. He
states that in the ATS which was filed along with the Plaint, the date is
mentioned whereas in the ATS which has been filed prior to the directions
of this Court, no date is mentioned. He further points out that the ATS has
been signed by different persons. It is stated that the ATS which has been
filed prior to the directions of this Court was signed on behalf of the Plaintiff
by Mr. Pankaj Bhardwaj, the Authorised Signatory of the Plaintiff, whereas
the ATS which was filed along with the Plaint, was signed by Mr. Abhay
Agarwal, Director of the Plaintiff. He, therefore, states that in the absence
of the correct ATS, the present Suit cannot be entertained.
9. Per contra , learned Counsel for the Plaintiff contends that the Suit is
not barred by limitation for the reason that under Article 54 of the Limitation
Act, 1963, time begins to run from the date when Defendant No.1 refused to
perform its obligation under the ATS, i.e. after 60 days from the service of
the Legal Notice, which is on 23.02.2025. He contends that the fact that the
possession has been taken over by Defendant No.4 cannot be implied as a
refusal by Defendant Nos.1, 2 & 3. It is also stated that the fact that the
Plaintiff has approached the forums under the SARFAESI Act challenging
the steps taken by Defendant No.4 would also not mean that the Plaintiff
cannot approach this Court seeking specific performance of the Agreement
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 10 of 14
06.03.2026 19:40
to Sell by Defendant No.1. It is stated that the principal relief is only against
Defendant No.1 and the only relief against Defendant No.4 is for a direction
to restrain Defendant No.4 from creating any third party rights in the Subject
Property and that relief would be contingent on the Prayer Clause (a) which
is for specific performance of the Agreement to Sell. It is, therefore, stated
that the Defendant No.4 is only a proforma party and not a necessary party
to the present Suit. He further states that the interim moratorium under
Section 96 of the IBC in respect of Defendants No. 2 and 3 does not bar the
present Suit, as the reliefs sought do not pertain to the recovery of any debt
from them, but pertains to enforcement of contractual rights arising from the
Agreement to Sell, to which they are confirming parties.
10. Heard the learned Counsels for the parties and perused the material on
record.
11. It is well settled that limitation is a mixed question of law and facts
and would depend on the interpretation of the clauses. The intention of the
parties while executing clause 10 of the ATS would depend upon the
evidence led by the parties and, therefore, it cannot be categorically said that
the present Suit is barred by limitation.
12. The Clause 10 on which reliance has been placed by the Defendant
No.4 does not categorically fix the outer date from which the limitation can
be calculated. The said Clause states that the developer has to agree to hand
over the vacant, actual, physical and peaceful possession of the premises to
the purchaser i.e., the Plaintiff upon the execution and presentation of the
sale deed before the Sub-Registrar after receiving the entire sale
consideration, on or before the 18 months of the date of agreement. Not only
does the Agreement indicate that within 18 months the constructions had to
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 11 of 14
06.03.2026 19:40
be completed and the sale deed ought to have been presented to the Sub-
Registrar, but it also contains one more condition that the entire sale
consideration had to be paid by the Plaintiff.
13. Material on record, as placed in the plaint, does not disclose that the
construction had indeed been completed. Material on record does indicate
that a Communication dated 08.03.2016 from Defendant No.1 assuring the
Plaintiff that the construction on the Subject Property had commenced after
resolving technical and contractual related issues and that the possession
will be handed over within 16 months. However, there is nothing on record
to show that the Plaintiff was informed that the construction indeed had been
completed. In the absence of anything in the plaint or any other documents
showing that the construction had been completed, it cannot be said that the
limitation period had commenced. Further, there is no communication from
the Defendants asking for the payment, in fact, the material on record
indicates that even in September, 2018 when the Plaintiff visited the site, he
discovered that the construction activities was going on. It, therefore, cannot
be stated with certainty that the construction had been completed which
would raise a cause of action.
14. The primary contention of the learned Counsel for the Defendant
No.4 that when the Plaintiff discovered that Defendant No.4 had taken the
possession of the Subject Property, the limitation would start running again
does not merit acceptance. Article 54 of the Limitation Act, 1963 states that
the limitation would start running from the date fixed for performance or if
no such date is fixed, then when the Plaintiff has noticed the performance is
refused. The fact that the Defendant No.4 has taken possession of the
premises, does not indicate that Defendant Nos.1 to 3 have refused
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 12 of 14
06.03.2026 19:40
performance and, therefore, the fact that the Defendant No.4 has taken the
possession again will not start the clock running. In view of the above, the
plaint cannot be rejected at this stage on the ground of limitation.
15. The second argument of learned Counsel for the Defendant No.4 is
that there are discrepancies in the Agreement and more particularly, in the
ATS which has been filed pursuant to the direction of the Court also will not
result in rejection of the plaint at this juncture. It is the case of Defendant
No. 4 that no ATS was entered into by the Plaintiff and the Defendants.
However, the veracity of the ATS and the effect thereof on the suit will be
decided at the time of trial.
16. Further, the fact the Plaintiff had also approached the DRT for a
relief, again would not take away the right of the Plaintiff to approach this
Court to file the present suit for ATS. The proceedings before the DRT were
to take the Subject Property out of the provisions of the SARFAESI Act
contending that the ATS entered into between the Plaintiff and Defendant
Nos. 1 to 3 is prior to the mortgage.
17. The moratorium under Section 14 of the IBC which would apply
against the Defendant No. 1 would also not be a bar for the present suit
being proceeded against the Defendant No. 2 and 3 who are the confirming
parties to ATS. Moreover, the question as to what is the effect of Section 14
of the IBC on the instant suit would be again a matter to be seen at the later
stage and cannot be the reason to reject the plaint at this juncture.
18. Since summons are yet to be issued, let the present Plaint be
registered as a Suit.
19. The objections raised by the Defendant No. 4 at this juncture will not
come within the parameters of the Order VII Rule 11 or under Order XII
Signature Not Verified
PRATEEK
CS(COMM) 358/2025 Page 13 of 14
06.03.2026 19:40
Rule 6 or under Order XV Rule 1 of the CPC.
20. Issue summons to the Defendants through all permissible modes,
including Dasti .
21. Learned Counsel for the Defendant No.4 accepts summons.
22. The summons to the Defendants shall indicate that the Written
Statement(s) to the Plaint shall be positively filed within a period of 30 days
from the date of receipt of summons. Along with the Written Statement(s),
the Defendants shall also file the affidavit(s) of admission/denial of the
documents of the Plaintiff, without which the Written Statement(s) shall not
be taken on record.
23. It is made clear that the limitation period for the purpose of filing
Written Statement would start from the date of this Order.
24. Liberty is given to the Plaintiff to file the Replication within a period
of 15 days of the receipt of the Written Statement(s). Along with the
Replication, if any, filed by the Plaintiff, the affidavit(s) of admission/denial
of documents of the defendant(s) shall be filed by the Plaintiff, without
which the Replication(s) shall not be taken on record.
25. If any of the parties wish to seek inspection of any documents, the
same shall be sought and given within the timelines.
26. List before the Joint Registrar on 06.04.2026.
27. List before the Court on 15.07.2026.