Northeast Veneers and Plywood LLP and 3 Others vs The State of Tripura and 3 Others
- Court
- Tripura High Court
( 2026:THC:1552 )
TRHC010020952025
HIGH COURT OF TRIPURA
AGARTALA
WP(C) 715 of 2025
North East Veneers & Plywood LLP, a Partnership firm,
constituted under the Indian Partnership Act, having its
registered Office at R.K. Nagar Industrial Area, P.S.
Bodhjungnagar, P.O. Banikya Chowmuhani, West Tripura,
PIN-799008. Represented by its Partners:
1. Sri Vinayak Agarwala, son of Sri Anup Kumar Agarwala,
permanent resident of Nalini Bala Devi Path Sreeenagar,
Guwahati, P.O. Assam Sachvalaya SO P.S. Dispur, Assam, PIN
781006, aged about 31 years, by occupation Businessman,
(Partner/position) of the petitioner.
2. Sri Aman Garg, son of Sri Ram Prasad Garg, permanent
resident of 10-511/143, Satya Bhaskar Empire, F.301 FAcor
Layout, Vishakapatnam (Urban), P.O. Andhra University Sub-
Office (S.O). P.S. III Town, Andhra Pradesh, PIN-530002.
3. Sri Arijit Jana, son of Sri Ajit Kr Jana, resident of
Panchajanya Bhawan, Block-B, Barthakur Mill Road, Ulubari,
Guwahati, P.O.- Ulubari, P.S.- Paltan Bazar, Assam, PIN-
781007
4. Sri Ankit Jana, son of Sri Ajit Kr. Jana, resident of
Panchajanya Bhawan, Block-B, Barthakur Mill Road, Ulubari,
Guwahati, P.O. Ulubari, P.S. Paltan Bazar, Assam, PIN-
781007.
…………… Petitioner(s)
Versus
1. The State of Tripura, represented by the Principal
Secretary, Forest Department, Government of Tripura, having
his office at New Secretariat Complex, Agartala, West Tripura,
PIN 799006;
2. The Principal Chief Conservator of Forests & Head of
Forest Force, Tripura, having his office at Aranya Bhawan,
Page 2 of 14
Gurkhabasti, P.S. New Capital Complex, Agartala, West
Tripura, PIN 799006;
3. The District Forest Officer (DFO), West Tripura
Division, having his office at the Office of the District Forest
Officer, West Tripura District, Agartala;
4. The Sadar Sub-Divisional Forest Officer (SDFO), West
Tripura, having his office at the Office of the SDFO, West
Tripura District, Agartala.
…...Respondent(s)
For Petitioner(s) : Mr. Somik Deb, Sr. Advocate
Mr. Panna Lal Debbarma, Advocate
Ms. Adwitiya Chakraborty, Advocate
For Respondent(s) : Mr. P. Gautam, Sr. G.A.
Mr. Kohinoor N. Bhattacharya, G.A.
Date of hearing : 13.11.2026
Date of delivery of judgment &
Order : 21.11.2026
Whether fit for reporting : YES.
HON’BLE JUSTICE DR. T. AMARNATH GOUD
Judgment and Order
[1] Heard Mr. Somik Deb, learned senior counsel assisted by Ms. A.
Chakraborty, learned counsel appearing for the petitioner firm. Also heard Mr.
Kohinoor N. Bhattacharya, learned G.A. appearing for the State respondents.
[2] The present writ petition has been filed under Article 226 of the
Constitution of India seeking the following reliefs:
Page 3 of 14
“i) Issue Rule, calling upon the respondents and each one of them to
show cause as to why a Writ of Certiorari and/or in the nature thereof
should not be issued, directing them, to transmit the entire records,
appertaining to the subject matter of this writ petition, including but not
limited to the approvals granted to the petitioner, licences, consumption
limits and related proceedings, for rendering substantive and conscionable
justice to the petitioner, and for quashing/setting aside the impugned
Minutes/Decision of the State Level Committee (SLC) dated 25.07.2025
(Annexure-6 infra);
ii) Issue Rule, calling upon the Respondents and each one of them to
show cause as to why a Writ of Mandamus and/or in the nature thereof
should not be issued, directing them to forthwith revoke/rescind the
impugned SLC decision dated 25.07.2025 (Annexure-6 infra), and to
restore and re-affirm the Annual Rubber Timber Consumption Limit of
65,000 CUM, earlier sanctioned in favour of the petitioner;
iii) Issue Rule, calling upon the respondents and each one of them to
show cause as to why a Writ of Mandamus and/or in the nature thereof
should not be issued, for restraining the respondents, from acting in any
manner, in furtherance of the impugned SLC Minutes dated 25.07.2025
(Annexure-6 infra), issued to the prejudice of the petitioner;
iv) In the ad-Interim, and therefore, on hearing the parties, in the
Interim, an Order, in terms of Relief (iv) supra,
v) Call for the records, appertaining to this writ petition,
vi) After hearing the parties, be pleased to make the Rule Absolute in
terms of i. to v. above;
vii) Costs of and incidental to this writ proceeding,
viii) Any other Relief(s) as to the Hon'ble High Court may deem fit and
proper;…..………….………. ……..”
[3] Briefly stated, the case of the petitioner firm, North East Veneers
& Plywood LLP, is that it is a Limited Liability Partnership engaged in the
manufacture of veneers and plywood exclusively from senile rubber wood
within the State of Tripura. It is contended that with the objective of promoting
rubber-wood based industries in the State of Tripura, in the year 2023, the
petitioner submitted an application before the Forest Department, Government
of Tripura for establishment of a Veneer & Plywood Industrial Unit in Tripura
and consequently, the Tripura Industrial Development Corporation Ltd. (TIDC
for short) was pleased to allot 3 acres of industrial land in favour of the
petitioner in the R.K. Nagar Industrial Estate, West Tripura for setting up the
Page 4 of 14
said industry. On 27.04.2023, the State Level Committee (SLC for short)
expressly recorded and approved the petitioner's annual requirement of 65,000
cum (cubic meters) of rubber timber. This approval was reiterated by the DLC
on 09.09.2024. Acting upon these clear representations, the petitioner made
substantial and irreversible investments amounting to Rs.82.87 crores, procured
necessary Forest Licenses, acquired 12.3 acres of industrial land through
Tripura Industrial Development Corporation Ltd. (TIDC for short), and
installed machinery with certified processing capacity of 67,200 CUM/annum,
by the manufacturer's certificate provided by „Guru Amar Industry Limited,
Haryana, India. It is contended on behalf of the petitioner firm that despite such
approvals and reliance, the respondents abruptly reduced the petitioner's
sanctioned capacity from 65,000 CUM to 40,000 CUM in the impugned SLC
Minutes dated 25.07.2025, without prior notice, opportunity of hearing, or any
fresh scientific study regarding timber availability whereas, consumption
quotas of seven newly established plywood and veneer units were increased
from 5,000 to 8,000 CUM each, notwithstanding the State's own
acknowledgment that the assessment of available rubber timber is outdated and
requires immediate revision. It is alleged that the respondents' action is
arbitrary, irrational, discriminatory, and violative of Articles 14 and 19(1)(g) of
the Constitution and the same also violates the doctrines of promissory
estoppel, legitimate expectation, and the statutory framework of the Wood
Based Industries (Establishment & Regulation) Guidelines, 2016. In spite of
being the earliest approved and highest-capacity unit, the petitioner firm is now
Page 5 of 14
being denied essential raw material necessary for continued industrial
operations. Being aggrieved thereby, the petitioner firm has approached this
Court seeking the afore-quoted reliefs.
[4] Mr. Somik Deb, learned senior counsel appearing for the
petitioner firm contends that induced by the decisions and the notations, made
in the SLC Meetings the petitioner made substantial investment, and has
already made a huge investment of Rs.82.87 crores, as reflected in the
Certificate (Annexure-2), issued by the Chartered Accountant. It is also
contended that the petitioner has now, therefore, altered its position
irreversibly, and such alteration of its position cannot be restored. Mr. Deb,
learned senior counsel further submits that the doctrine of promissory estoppel
and its allied principle of legitimate expectation are involved in the present case
since, in the instant case, the sequence of approvals granted to the petitioner,
beginning with the approval of the SLC dated 27.04.2023 (Annexuer-1),
followed by the re-affirmation of the same in the DLC Meeting dated
09.09.2025 (Annexure-3), and the issuance of Forest License and Forest Trade
License constituted clear, unequivocal representations by the respondents that
the petitioner was authorized, and entitled to operate with a rubber timber
consumption capacity of 65,000 CUM per annum. It is also submitted on behalf
of the petitioner firm that acting on such approvals, the petitioner has installed
operational machinery with a certified processing capacity of 67,200 CUM per
annum, as certified in the Manufacturer's Capacity Certificate dated 29.11.2025
issued by Guru Amar Industry Limited (Annexure-4). The said certificate
Page 6 of 14
conclusively establishes that the machinery was already supplied to and
operational in the unit of the petitioner, and that such installation and operation
were undertaken strictly in reliance upon the approvals granted by the statutory
authorities, therefore, the respondents, having repeatedly represented that the
operating capacity of the petitioner stood at 65,000 CUM per annum, are now
estopped from taking a contrary stand or diluting the earlier approval through
the impugned SLC decision dated 25.07.2025 (Annexure-6), particularly when
such dilution has been undertaken without notice, hearing, justification,
changed circumstances or statutory basis.
[5] He further contends that the respondents has proceeded to
approve multiple new plywood and veneer industries, enhanced timber limits
for several newly established units, and sanction additional sawmills and
treatment plants, far exceeding the raw material availability reflected in their
own official assessments. It is contended that such action, in the absence of an
updated scientific evaluation, is irrational, arbitrary, contrary to the governing
guidelines, and liable to be struck down. According to the learned senior
counsel for the petitioner, in the case in hand, the impugned actions of the
respondents, particularly the decisions recorded in the SLC Meeting dated
25.07.2025 (Annexure-6), are patently arbitrary and discriminatory, inasmuch
as while the already approved consumption limit of 65,000 CUM per annum
has been directly curtailed without basis, the consumption quotas of seven
newly established industries have been enhanced from 5,000 CUM to 8,000
CUM each. The State has thus favoured later entrants while prejudicing the
Page 7 of 14
petitioner, the earliest approved and highest-capacity unit, violating the
guarantee of equality enshrined under Article 14 of the Constitution of India. It
is also submitted on behalf of the petitioner firm that the respondents have
recorded that the estimated availability of rubber timber in Tripura is only
1,12,500 CUM per annum, as per the 2019 assessment, and that a fresh
scientific study is overdue, but, despite this, the SLC on 25.07.2025 proceeded
to expand allocations to other units while curtailing the petitioner. Learned
senior counsel representing the petitioner firm, represents before this Court that
the impugned notations of the Minutes of the Meeting (Annexure-6 supra),
thereby reducing the annual supply to the petitioner from the sanctioned
capacity of 65,000 CUM per annum to 40,000 CUM per annum without
providing any prior opportunity of hearing, nor putting the petitioner on notice,
is not sustainable in the eye of law. He, therefore, urges this Court to set aside
the impugned Minutes of SLC Meeting dated 25.07.2025.
[6] During the course of argument, Mr. Somik Deb, learned senior
counsel for the petitioner firm has placed reliance on the following judgments
of the Hon‟ble Supreme Court:
1. State of Punjab v. Nestle India Ltd. and another reported in (2004) 6 SCC
465 .
2. Trimex International FZE Limited, Dubai v. Vedanta Aluminium Limited,
India reported in (2010) 3 SCC 1 .
Page 8 of 14
3. Manuelsons Hotels Private Limited v. State of Kerala and others reported
in (2016) 6 SCC 766 .
[7] Per contra, Mr. Kohinoor N. Bhattacharya, learned G.A.
representing the State respondents opposes the submissions made on behalf of
the petitioner firm. He contends that in the application submitted by Shri.
Vinayak Agarwala (Partner) of North East Veneers & Plywood LLP for setting
up of plywood factory, Rs.12.25 crores was shown as the capital value for the
th
Unit which is enclosed as Annexure-I to the counter affidavit dated 8 May,
2026 filed on behalf of the State. Thus, the claim of investing Rs.82.87 crores
for the establishment of the said factory is not known and is also not matter of
concern for Forest Department. It is contended that no such proposal to increase
the capital investments was ever submitted to Authorized Officer of the Forest
Department. It is also contended that while submitting the application for grant
of license, Shri. Vinayak Agarwala (Partner) of North East Veneers & Plywood
LLP, petitioner firm herein, has shown rated capacity in license Form-II as
65000 cum per annum of rubber timber and capital Value was shown as 12.25
crores only. The State Level Committee (SLC) had approved the proposal on
27/04/2023 for setting up of North East Veneers & Plywood LLP at R. K Nagar
Industrial Estate based on the recommendation of District Level Committee
(DLC) without explicitly conveying approval for consumption of rubber timber
to the tune of 65000 cum per annum nor it was mentioned against the capacity
in the License issued by the DFO (District Forest Officer). While giving
approval, nowhere it was mentioned that the SLC has given approval for
Page 9 of 14
consuming 65000 CUM per annum of rubber timber. The license issued by the
District Forest Officer also does not show that the approved consumption limit
as 65000 CUM per annum. No detailed plan/proposal including machineries
and plan for expansion etc. were submitted with the application by the
applicant. It is also contended that since the capital value of Rs.12.25 crores has
been shown while making application, now, the contention made on behalf of
the petitioner firm stating that the company has already invested Rs.82.87
crores for want of more raw materials for their approved industry, cannot be
justified. It is submitted that the decision of fixing a cap on the consumption of
rubber timber was based on the assessment report of Rubber Board and Sub-
Committee and the decision of the State Level Committee. The SLC in its
meeting dated 25.07.2025 decided to conduct further assessment of the
availability of rubber timber in the State and accordingly a committee has been
constituted to assess the rubber timber availability in the State. Learned G.A.,
therefore, urges this Court to dismiss the instant writ petition.
[8] To support his contention, learned G.A. has placed reliance on
the following judgments of the Hon‟ble Apex Court:
1. The State of Maharashtra & others v. Reliance Industries Ltd. & others in
case No. Civil Appeal Nos.3012-3026 of 2010 with Civil Appeal Nos.3027 –
3029 of 2010 .
2 . Union of India & Others v. M/S Unicorn Industries (Civil Appeal No.7432
of 2019) reported in [2019] 12 S.C.R. 270.
Page 10 of 14
3. Puja Ferro Alloys P. Ltd. v. State of Goa and others reported in 2025 SCC
OnLine SC 326.
4. Hero Motocorp Limited v. Union of India and others reported in (2023) 1
SCC 386.
[9] Heard the submissions made at the Bar. Perused the material
evidence on record.
[10] On perusal of records, this Court has observed that there is
nothing on record to show that the respondents have ever promised to supply
65,000 CUM per annum rubber timber to the petitioner firm. It is seen from the
application submitted by Shri Vinayak Agarwala (Partner) of North East
Veneers & Plywood LLP, petitioner firm herein seeking license for setting up
of plywood factory (Annexure I to the counter affidavit), that Rs.12.25 crores
was shown to be the capital value for the unit and rated capacity (volume of
timber, etc.) consumed per year was shown to be 65,000 cubic meters. It is
mentioned in the license dated 17.06.23 issued in favour of the petitioner firm
by the District Forest Officer, West Tripura (Annexure II to the counter
affidavit) that installed capacity of the unit to be 517.5 HP (Horse Power) and
capital value of the Unit to be 12.25 (Rupees twelve crores twenty five Lakh).
There is no separate agreement or any license condition giving the petitioner a
minimum guarantee of 65,000 CUM per annum.
[11] On the other hand, in the Minutes of the meeting of the State
Level Committee (SLC) held on 24.02.2025 (marked as Annexure A to the
Page 11 of 14
additional affidavit dated 19.12.2025 filed by the petitioner), it is categorically
stated that the SLC has looked into the rubber timber assessment report of the
sub-committee constituted on 21.08.2019 for rubber wood sector and has seen
that as per the report there is an estimated availability of 1,12,500 CUM of
timber per annum up to 2049. It is also seen from the said minutes of the SLC
meeting that a quantity of 40,000 CUM rubber timber/annum was allowed to
the petitioner firm though the machines were not completely operational and
consumption capacity of the petitioner was only 12,000 CUM for the previous
year observing that the installed machineries would be operational soon. The
question of doctrines of promissory estoppel and legitimate expectation are not
applicable to the facts and circumstances of the present case where no
agreement was made between the parties for providing 65000 CUM rubber
timber/annum to the petitioner firm by the respondents. The word „capacity‟
mentioned in the application for license and the issued license cannot be treated
as „promise‟. The certificate showing processing capacity of the installed
machineries as 67,200 CUM/annum, issued by the manufacturer „Guru Amar
Industry Limited, Haryana, India‟ is only an indication. Further the petitioner
firm has not consumed 65,000 CUM annually. Its average consumption per
year never exceeded 12,000 cum/annum as per reports received from DFO and
the same is reflected in the report signed on 24.02.2025 of the Committee
constituted on its visit to North East Veneer/Plywood Industry on 18.02.2025
marked as Annexure-XI to the counter affidavit filed on behalf of respondents
Page 12 of 14
No.1 to 4. In this regard, the relevant contents of the said report is extracted as
under:
“………2. The month wise consumption of rubber wood by M/S North East Veneers & Plywood LLP as per
the monthly report submitted is given below:
Month Consumption
August, 2024 897.452 cum
September, 2024 946.284 cum
October, 2024 819.968 cum
November, 2024 1050.083 cum
December, 2024 1136.546 cum
January, 2025 1009.480 cum
Total (06 months): 5859.813 Cum
3. It may be mentioned here that the Indian Plywood Industry Research and Training Institute (IPIRTI),
Bangalore has assessed the limber requirement per unit for peeling length of 4 feet and 8 feet size in the
plywood/veneer units as 5 cum and 11 cum respectively per day on an average of 8 working hours per day, on
an average for 300 days in a year the normal timber requirement of the peeling length of 4 feet size in veneer
units is 1500 cum. The total timber requirement for the stand-alone veneer units may be assessed by calculating
the equivalent number of 4 feet length machines and by taking its normal installed capacity as 1500 cum per
annum (Source: Wood Based Industries (Establishment and Regulation) Guidelines, 2016).
However, it was learnt during the discussion / visit to the M/S North East Veneer & Plywood LLP
industry that the new peeling machines (as the ones which have been/ are going to be commissioned at M/S
North East Veneer & Plywood Industry) come with the capacity consumption of 30-40 cum per day due to
advancement of technology. Hence, the assessments made by the IPIRTI in 2016-17 may not be sacrosanct now
8. The tentative malure rubber timber expected to be available in Tripura is 1-1.125 lakh cum per
annum. Report of the Inter Departmental Group for Rubber Wood Sector (Dt. 18/10/2019) & the Rubber Board
(Dt. 21/02/2024) are placed at page-2-5 & 6.
9. The present status of the rubber-based Veneer/Plywood Industry in the state and their
consumption is detailed below:
Page 13 of 14
Name of the industry Requirement of
rubber timber per
annum as per
license issued
Actual consumption of rubber
timber Remarks(average) per
annum as per the reports
received from DFO‟s
Remarks
North East Veneers &
Plywood LLP
Avg of about 12000
cum/peeling machine/ annum
(going by the consumption
made during the past 6
months)
Mentioned as requirement in
the application for 65000
Cum
Eastern Plywood 472 cum Mentioned as requirement in
the application for 15000
Cum
Premier Valley Not yet approved from the
Govt. and in operation
Mentioned as requirement in
the application for 70000
Cum
TFDPC Ltd.(two
units)
60 HP 4000 cum
N.G. Plywood 20 HP 220 cum
Total: 16692 cum
…..”
[12] The petitioner has neither raised any kind of objection during the
years 2023-26 to say that its production capacity is 65,000 CUM or more per
annum and for supplying less rubber timber it has sustained any loss nor has
made any request seeking supply of more rubber timber from the State during
2023 to 2026. When the capacity of the government in the entire State is
estimated as 1,12,500 CUM of rubber timber per annum up to 2049, the
capacity of the petitioner 65,000 CUM per annum cannot construe that 65,000
CUM/annum is a promise for allotment. It is not for the petitioner to suggest or
advise that the remaining rubber timber should be distributed among the other
Page 14 of 14
companies. There is no separate agreement between the petitioner and the
respondents promising 65,000 CUM/annum and since the petitioner has not
claimed any loss or damage and approached the respondents seeking more
rubber timber, it cannot be construed that the petitioner is entitled for 65,000
CUM/annum and there is any such promise.
[13] It is well settled principle that in the event of any agreement, it
has to be agreed and signed by both sides and mere proposal or suggestion
cannot be treated as a promise. The claim of the petitioner cannot act against
the larger interest of public and it is the duty of the respondents to cater the
needs and to see the survivals of all the other companies. The petitioner alone
cannot take over the major chunk of the production and further there cannot be
monopoly in trade. This Court also observes that the judgments referred on
behalf of the petitioner firm are not applicable to the facts and circumstances of
the present case.
[14] In terms of the above, the writ petition is liable to be dismissed.
Accordingly, this writ petition stands dismissed. As a sequel, miscellaneous
application(s), pending if any, shall also stand closed.
DR. T. AMARNATH GOUD, J.
Sabyasachi G.
Digitally signed by SABYASACHI
GHOSH
Date: 2026.11.21 17:43:08 +05'30'
SABYASACHI GHOSH