Ravi Shankar Vedam vs Mr. M. Poobalan Authorized Representative Of M/S. Udhayaman Investments Pvt. Ltd

Court
National Company Law Appellate Tribunal
Case type
IA
Decided on
18-03-2026
<div> <b>NATIONAL COMPANY LAW APPELLATE TRIBUNAL </b><br /> <b>AT CHENNAI </b><br /> <b>(APPELLATE JURISDICTION) </b><br /> <b> </b><br /> <b>Company Appeal (AT) (CH) (Ins) No. 138/2026 </b><br /> <b>(IA Nos. 416 &amp; 417/2026) </b><br /> <b> </b><br /> <b>In the matter of : </b><br /> <b>DR. RAVI SHANKAR VEDAM </b><br /> 143/1, Uthamar Gandhi Road, <br /> Nungambakkam, Chennai – 600 034 <b> … APPELLANT </b><br /> <b> </b><br /> <b>V </b><br /> <b> </b><br /> <b>M. POOBALAN </b><br /> Authorized Representative of M/s. Udhyaman Investments Pvt. Ltd, <br /> No. 2, 3rd Cross Street, 1st Main Road, Devappa Garden, <br /> Nageshettyhalli, RMV 2nd Stage Extension, <br /> Bangalore – 5600094 <b> … RESPONDENT NO.1 </b><br /> <b> </b><br /> <b>K. VASUDEVAN </b><br /> Resolution Professional of M/s. Tiffins Barytes Asbestos and Paints Ltd <br /> No. 17B/7B, Maruthi Nagar, <br /> Hasthinapuram, Chromepet, <br /> Chennai – 600064 <b> … RESPONDENT NO.2 </b><br /> <b> </b><br /> <b>INDIAN OVERSEAS BANK </b><br /> Represented by the General Manager <br /> Esplanade Branch, <br /> Esplanade, Chennai – 600104 <br /> Mumbai – 400 013 <b> … RESPONDENT NO.3 </b><br /> <b> </b><br /> <b>EMBASSY PROPERTY DEVELOPMENTS PVT. LTD. </b><br /> Embassy Golf links Business Park Royal Oaks <br /> Intermediate Link Road, <br /> Bangalore – 560 071 <b> … RESPONDENT NO.4 </b><br /> <b> </b><br /> <b>Present : </b><br /> <b> </b><br /> <b>For Appellant </b> : Mr. Sai Kaushal, Advocate <br /> For Mr. Praveen R, Advocate <br /> <br /> <br /> <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>1</b> of <b>13</b> <br /> <br /><br /> <b>O R D E R </b><br /> <b>(Hybrid Mode) </b><br /> <b> </b><br /> <b>18.03.2026:</b> <br /> <b>Oral Judgment: Justice Sharad Kumar Sharma, Member (Judicial) </b><br /> This company appeal could be referred to as to be the best example for an <br /> utmost malicious recourse adopted by the Appellant to abuse the process of law <br /> and judicial proceedings. The Appellant had neither been fair to the learned <br /> NCLT nor to this Appellate Tribunal even, in the manner and diligence with <br /> which the Appellant has taken the proceedings before the various Courts and the <br /> Tribunals. <br /> 2. The instant company appeal is accompanied with an application seeking <br /> condonation of delay in refiling, being <b>IA No.416/2026</b> . Looking into the <br /> grounds taken therein, the delay of 29 days as prayed for by the Appellant in <br /> refiling the company appeal would stand ‘condoned’. Accordingly, <b>IA </b><br /> <b>No.416/2026</b> would stand ‘allowed’. <br /> 3. The challenge in the instant company appeal, as given by the Appellant is <br /> to the impugned order dated 16.12.2025 as passed on IA(IBC)/922/CHE/2025 <br /> in CP(IB)/39(CHE)/2018, which is said to have been preferred to seek the <br /> following reliefs: - <br /> <i>“1. Declare that the admission of the Corporate Insolvency </i><br /> <i>Resolution Process (CIRP) was illegal and obtained through </i><br /> <i>fraudulent means. </i><br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>2</b> of <b>13</b> <br /> <br /><br /> <i>2. </i> <i>Issue a detailed and reasoned order addressing each of the </i><br /> <i>allegations raised, thereby contributing to the jurisprudence </i><br /> <i>on fraudulent initiation of proceedings under the Insolvency </i><br /> <i>and Bankruptcy Code. </i><br /> <i>3. </i> <i>Impose appropriate penalties and grant such other reliefs as </i><br /> <i>this Hon’ble Tribunal may deem just, in view of the </i><br /> <i>irreparable financial and mental harm caused by the </i><br /> <i>Respondents’ unlawful actions. </i><br /> <i>4. </i> <i>Pass such further or other orders as may be deemed fit and </i><br /> <i>proper in the facts and circumstances of the case, and thus </i><br /> <i>render justice.” </i><br /> 4. For the brevity of facts, the reliefs sought in IA(IBC)/462(CHE)/2024 by <br /> the Appellant involved invoking the provisions contained under Section 379 of <br /> Bharathiya Nagarik Suraksha Sanhita, 2023 for the offence punishable u/s 227 <br /> to 229 of Bharatiya Nyaya Sanhita, 2023 r/w 424 of Companies Act, 213 and <br /> Rule 11 of NCLT Rules are extracted hereunder: - <br /> <i>“a. to record a finding to that effect; </i><br /> <i>b. to make a complaint thereof in writing; </i><br /> <i>c. to send it to a Magistrate of the First-Class having </i><br /> <i>Jurisdiction; </i><br /> <i>d. to take sufficient Security for appearance of the Accused </i><br /> <i>before such Magistrate, or if the alleged offence is non-</i><br /> <i>bailable and the Court thinks it necessary so to do, send </i><br /> <i>the Accused in custody to such Magistrate. </i><br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>3</b> of <b>13</b> <br /> <br /><br /> <i>e. bind over any person to appear and give evidence before </i><br /> <i>such Magistrate.” </i><br /> The impugned order dated 16.12.2025 is a common order, which was also <br /> passed in this interlocutory application. <br /> 5. One of the questions that would be falling for consideration is as to, <br /> whether at all an order passed by a forum exercising the power under Rule 11 of <br /> the NCLT Rules, 2016, and consequentially a challenge given to that order in an <br /> Appeal under Section 61 of the I &amp; B Code, 2016, could be maintainable before <br /> this Appellate Tribunal under the aforesaid provisions as extracted above. In the <br /> common order passed by learned NCLT dated 16.12.2025, it has been observed <br /> that the Appellant almost intends to draw a criminal proceeding, in relation to <br /> the provisions mentioned therein pertaining to Bharathiya Nagarik Suraksha <br /> Sanhita, 2023. The attempt which has been consciously made by the Appellant <br /> is nothing, but a malicious intent to blend the so-called intended criminal <br /> proceedings, which he intended to take against the Respondents by filing <br /> IA(IBC)/462/CHE/2024. A civil forum as that of the learned NCLT cannot be <br /> forced upon to perform criminal functions, under the penal provisions of the <br /> criminal law. <br /> 6. There could be yet another issue that would be required to be considered <br /> as to, whether at all the Appellant would have any locus, as such, to initiate a <br /> proceedings, to contest the same, and to continue it in the shape of the instant <br /> company appeal, particularly when, the admitted position of the Appellant <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>4</b> of <b>13</b> <br /> <br /><br /> happens to be that of a shareholder of M/s. Tiffins Barytes Asbestos and Paints <br /> Limited (the Corporate Debtor herein), at whose behest proceedings either <br /> before the learned NCLT or in continuation thereto the appeal before this <br /> Appellate Tribunal would not be maintainable. It has been conclusively settled <br /> by us in the larger bench judgment dated 22.07.2025 rendered in <b>CA (AT) </b><br /> <b>(CH) (Ins) No. 62/2023</b> , in the matters of <b>Park Energy Private Limited v. </b><br /> <b>State Bank of India &amp; Ors.</b> , on a reference made to larger bench. <br /> 7. The brief facts and the chronology of the proceedings, which has been <br /> taken by the Appellant are as follows: - <br /> (i) On 16.04.2016 a Memorandum of Understanding (MoU) was signed <br /> between M/s. Udhyaman Investments Private Limited (Financial <br /> Creditor) and M/s. Tiffins Barytes Asbestos and Paints Limited <br /> (Corporate Debtor). This MoU has already been tested in a proceedings <br /> under Section 7 of the I &amp; B Code, being CP (IB)/39(CHE)/2018 for <br /> CIRP, and consequentially in a subsequent proceedings, which was being <br /> carried as against the order of approval of the resolution plan. <br /> (ii) Based upon the MoU dated 16.04.2016 and the consequential default, a <br /> proceeding under Section 7 of the I &amp; B Code was initiated by way of <br /> CP/39/(IB)/CB/2018. Those proceedings, which were taken under <br /> Section 7 of the I &amp; B Code, the Corporate Debtor had been directed to <br /> admitted into the CIRP by an order passed by the learned NCLT, <br /> Chennai, on 12.03.2018. <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>5</b> of <b>13</b> <br /> <br /><br /> (iii) After the Corporate Debtor was admitted into CIRP, a proceedings <br /> thereafter by way of MA No.179/2019, was filed in CP/39/(IB)/CB/2018 <br /> under Section 30 (6) of I &amp; B Code, in the matter of Mr. Vasudevan v. <br /> Committee of Creditors, that was taken up before the learned NCLT, <br /> Chennai, which by virtue of an order passed on 12.06.2019 had approved <br /> the resolution plan, after having considered the compliance report filed by <br /> resolution professional in Form-H of Regulation 39 (4) of IBBI <br /> (Insolvency Resolution Process for Corporate Persons) Regulations, <br /> 2016. The resultant effect of the approval of the plan under Sub-Section <br /> (1) of Section 31 of the I &amp; B Code, would be that the resolution plan was <br /> supposed to be executed, in accordance with law. <br /> <br /> (iv) The Appellant expressing his grievances allegedly being aggrieved as <br /> against the order of 12.06.2019, preferred TA (AT) No.134/2021 and TA <br /> (AT) No.135/2021, questioning the two orders that were passed on MA <br /> No.179/2019 and MA No.120/2019, whereby the plan was approved by <br /> first order and by the second order passed on the aforesaid MA, the <br /> learned Tribunal had denied to provide with the forensic audit report of <br /> the books of accounts of the Corporate Debtor, which was sought for by <br /> the present Appellant, on the ground that the entire proceedings as <br /> conducted on the basis of the MoU dated 16.04.2016 was tainted by fraud <br /> and also not to approve the resolution plan. The proceedings of TA (AT) <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>6</b> of <b>13</b> <br /> <br /><br /> No.134/2021 and TA (AT) No.135/2021, were filed by the Appellant, in <br /> the capacity of being the shareholder. <br /> (v) The matter was taken up by this Appellate Tribunal and judgment was <br /> rendered on 13.06.2023. This Appellate Tribunal had dismissed the <br /> company appeal, holding thereof that, there is no infirmity in the order of <br /> approval of the resolution plan and further, observed that the resolution <br /> plan has been successfully implemented. <br /> (vi) The decision of 13.06.2023, would be affirming the MoU dated <br /> 16.04.2016, having been considered in the proceedings of CIRP and <br /> approval of plan. <br /> (vii) This judgment of dismissal of the Appeal, preferred by the Appellant, <br /> dated 13.06.2023 was challenged by the Appellant, by filing a Civil <br /> Appeal No.5516/2023, Dr. Ravi Shankar Vedam v. Tiffins Barytes <br /> Asbestos and Paints Limited &amp; Ors., before the Hon’ble Apex Court. The <br /> Hon’ble Apex Court too vide order dated 06.11.2023, dismissed the <br /> Appeal. <br /> (viii) The Appellant being dissatisfied with the dismissal of Appeal by the <br /> Hon’ble Apex Court had filed a review petition being Review Petition <br /> Diary No. 51138 / 2023, which too was dismissed on 13.02.2024. <br /> 8. Upto this stage, at least we can be very sure that, the proceedings of <br /> CIRP, upon the culmination of proceedings under Section 7 of the I &amp; B Code, <br /> as against the Corporate Debtor, till the stage of approval of the resolution plan <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>7</b> of <b>13</b> <br /> <br /><br /> by the order of learned NCLT dated 12.06.2019 has attained finality at the due <br /> to dismissal of the company appeal preferred by the Appellant before NCLAT <br /> and later with the dismissal of the civil appeal by the Hon’ble Apex Court, and <br /> subsequent dismissal of the review petition by the Hon’ble Apex Court on <br /> 13.02.2024. In all these proceedings by the Appellant the consistent foundation <br /> has been the MoU dated 16.04.2016, which is now being alleged by the <br /> Appellant, by way of reiteration to be based on fraud. The propriety of the MoU <br /> has already been tested by this Appellate Court and which has been affirmed by <br /> the Hon’ble Apex Court by its order of 06.11.2023. <br /> 9. Maliciously and with ill intention, for the reasons best known to the <br /> Appellant and absolutely by abusing the process of law, he filed <br /> IA(IBC)/922/CHE/2025 before the learned NCLT on 02.06.2025, i.e., almost <br /> after more than 1 year and 6 months, from the date of the dismissal of the civil <br /> appeal by the Hon’ble Apex Court on 06.11.2023. We don’t find any logic or <br /> any valid reason as to how such an application under Section 65 of I &amp; B Code, <br /> to be read with Section 60 (5) of the I &amp; B Code, could have been preferred by <br /> the Appellant, and that too in the capacity of being the shareholder, and too <br /> when the Appellant is bound by the earlier dismissal of his Appeals by the <br /> NCLAT and finally by the Hon’ble Apex Court against the order of the <br /> approval of resolution plan, and that too, for the nature of relief, which has been <br /> sought by the Appellant in the IA, which has already been extracted above. <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>8</b> of <b>13</b> <br /> <br /><br /> 10. The relief sought with regards to the declaration of the CIRP to be <br /> fraudulent, in fact, is a mischievous relief that has been grafted by the Appellant <br /> by filing the application much belatedly only on 02.06.2025, i.e., almost after 1 <br /> year, 6 months and 27 days of the decision of the Hon’ble Apex Court <br /> dismissing the civil appeal of the Appellant. In fact, if we consider the relief <br /> sought for by the Appellant, it is rather a concealed attempt to <i>de novo</i> open the <br /> exercise of the entire proceedings, which otherwise has attained finality, as <br /> against the Appellant, in proceedings drawn by him only, and that too, with the <br /> approval of the resolution plan and its final implementation. <br /> 11. It is this application, which has been rejected by the learned NCLT by the <br /> impugned order dated 16.12.2025, which is under challenge before this <br /> Appellate Tribunal. <br /> 12. The learned Tribunal, considered the rival contentions including the <br /> application that was preferred by the Appellant invoking the provisions <br /> contained under Bharatiya Nyaya Sanhita by filing IA(IBC)/462/CHE/2024, <br /> decided the same by a common order dated 16.12.2025 and proceeded to reject <br /> the IAs preferred by the Appellant. The learned Tribunal, while considering the <br /> entirety of the proceedings had observed that the Appellant had been <br /> instrumental in filing various other applications before the learned Tribunal. <br /> The applications concerning the Company Petition filed by the Appellant as <br /> being observed in the impugned order are extracted hereunder: - <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>9</b> of <b>13</b> <br /> <br /><br /> (i) MA No. 120/2019, which was dismissed on 09.07.2019 <br /> <br /> (ii) MA No. 747/2021, which was dismissed as withdrawn on 21.03.2024 <br /> (iii) MA No. 843/2021, which was dismissed as withdrawn on 21.03.2024 <br /> (iv) MA No. 1157/2021, which was dismissed as withdrawn on 21.03.2024 <br /> 13. So, up to passing of the order on 21.03.2024, the Appellant had almost <br /> lost in all the interlocutory proceedings, as well in the main proceedings <br /> thereafter, relating to approval of plan, which the Appellant has preferred before <br /> the learned NCLT. His subsequent chain of company appeals were dismissed by <br /> the Appellate Tribunal followed by the final dismissal of Appeal by the Hon’ble <br /> Apex Court means that the resolution plan has attained finality. We are of the <br /> view that, after having consecutively lost in all the proceedings where the aspect <br /> of fraud was also one of the grounds agitated by the Appellant has been duly <br /> considered and has therefore attained finality. It is that now on the same ground, <br /> his subsequent proceedings in the shape of IA(IBC)/922/CHE/2025 filed on <br /> 02.06.2025 would not be maintainable and that too, particularly, when the <br /> Appellant being a shareholder, who cannot be said to be prejudiced at all in his <br /> individual capacity, whose proceedings could be held to be maintainable in the <br /> eyes of law. <br /> 14. The Appellant has to be dealt with strictly by this Appellate Tribunal for <br /> the reason that there is a specific finding recorded, that while pressing upon the <br /> IAs decided by the common order dated 16.12.2025 (which is impugned in this <br /> company appeal), the Appellant had: <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>10</b> of <b>13</b> <br /> <br /><br /> (i) Suppressed the material facts being brought on record to the knowledge <br /> of the Tribunal, that he had earlier attempted, when the CIRP was being <br /> carried and has attained finality and the Tribunal after considering the <br /> records had observed that the Appellant, when he had approached before <br /> the Tribunal was duty bound to be fair to the Tribunal, while pressing his <br /> present application and since, there was a concealment of fact, the <br /> Tribunal declined to interfere by the impugned order, <br /> (ii) As we have already observed that the Appellant in the capacity and in his <br /> admitted status of being that of a shareholder has got no <i>locus standi</i> to <br /> maintain the proceedings. <br /> (iii) The Tribunal observed that the Appellant had drawn criminal proceedings <br /> also, which were too withdrawn by him. <br /> (iv) Further, that all the grounds, which were raised by the Appellant in the <br /> IA(IBC)/922/CHE/2025, were already raised by the Appellant in the <br /> earlier Company Petition and that has been negated by the judgment of <br /> the NCLAT and also because of the judgment by the Hon’ble Apex Court <br /> and thus, on the basis of the analysis and finding recorded by the <br /> Tribunal, the Tribunal declined to interfere in the matter and had rejected <br /> his application. Hence the Appellant is before us. <br /> 15. In consistent judicial proceedings, resorted by the Appellant, the <br /> Appellant was regularly made conscious of his legal rights by the Tribunals, <br /> observing thereof that, in the capacity of being a shareholder, he has got no right <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>11</b> of <b>13</b> <br /> <br /><br /> as such, to agitate a cause on behalf of a Corporate Debtor. There had been <br /> consistent finding recorded that, once the order of approval of the resolution <br /> plan has attained finality by this Appellate Tribunal vide its judgment of <br /> 13.06.2023, observing that the plan has already been implemented, the <br /> Appellant ought not to have reagitated the issue and that too by filing the IA <br /> under Section 65 of the I &amp; B Code on 02.06.2025, at a much belated stage. <br /> Furthermore, when the decision of this Appellate Tribunal approving the <br /> resolution plan, has been affirmed by the Hon’ble Apex Court, and <br /> subsequently with the dismissal of review petition also by the Hon’ble Apex <br /> Court. The conduct of the Appellant itself shows that he was not fair to himself <br /> and to the judicial setup, by not approaching the Tribunal by disclosing all the <br /> true and correct facts and raising pleadings by concealing and grafting the <br /> material fact having a vital bearing on the decision to be finally taken by the <br /> Tribunal. When the Appellant was conscious about the dismissal of his review <br /> petition by the Hon’ble Apex Court on 13.02.2024 and when the Appellant was <br /> conscious of the cause he had agitated in the Appeal, which was similar to the <br /> cause which was agitated by him in IA(IBC)/922/CHE/2025, which is <br /> impugned as now filed on 02.06.2025, which has been dismissed by the <br /> impugned order, the institution of the present IA itself would have been an <br /> abuse of process. Thus, the Appellant has got no legs to stand as against the <br /> impugned order dismissing his IA. <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>12</b> of <b>13</b> <br /> <br /><br /> 16. Looking into the facts, and manner in which the Appellant has abused the <br /> judicial process by not being fair to the Tribunal by disclosing all the vital facts, <br /> the company appeal stands ‘dismissed’ along with all the interlocutory <br /> applications, subject to the payment of a cost of Rs.5 lakhs to be deposited in <br /> the Prime Minister’s Relief Fund. If the said amount is not deposited within a <br /> period of 2 months from the date of uploading of this order, the same to be <br /> recovered as arrears of land revenue by attachment of assets of the Appellant. <br /> <br /> <br /> <b>[Justice Sharad Kumar Sharma] </b><br /> <b>Member (Judicial) </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <b>[Indevar Pandey] </b><br /> <b>Member (Technical) </b><br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> AR/MS/AK <br /> <br /> Company Appeal (AT) (CH) (Ins) No. 138/2026 Page <b>13</b> of <b>13</b> <br /> </div>