M/S Brij Gopal Construction Co. Pvt. Ltd. vs Haryana State Industrial Andinfrastructure Development Corporation Ltd.

Court
Punjab and Haryana High Court


FAO-CA



ARB-14-2021 (O&M)

-1-
IN
THE HIGH COURT OF PUN
NJAB AND HARYANA AT
GARH
CHANDIG

FAO-CA
1+21


Reserved
on
ARB-14-2021 (O&M)
d Pronounced Uploaded
on on


Whether only
the operative
part of the
judgment is
pronounced
Whether t
full judgme
is
pronounced
the
ent
d
27.10.202
26 16.11.2026 17.11.2026
No Yes

M/S BRIJ


J GOPAL CONSTRUCTION CO
O. PVT. LTD.


...APPELLANT
T
VERSUS


NA STATE INDUSTRIAL AND
OPMENT CORPORATION LTD

HARYAN
DEVELO

DINFRASTRUCTURE
D.& ANR....RESPONDENTS
CORAM

M: HON'BLE MR. JUSTICE S
SUVIR SEHGAL
RAJESH GAUR
R
HON'BLE MR. JUSTICE

Present:
Mr.Suvir Kumar, Advocate
for theappellant.

Mr. Deepak Vashisth, DAG,
Haryana.




SUVIR S
*

SEHGAL, J.
1.
This appeal has been pre
eferred under Section 13 of
the
Commerc
cial Courts Act, 2015, impugn
ning judgment dated 24.01.20
020,
passed b
y the learned Additional Dis
strict Judge-cum-Presiding Jud
dge,
SHEETAL
2026.11.17 15:24
I attest to the accuracy and
integrity of this document
Commerc
cial Court, Gurugram, where
by objections preferred by
the


FAO-CA


appellant

ARB-14-2021 (O&M)

-2-
under Section 34 of the Arbit
tration and Conciliation Act, 19
996
(hereinaft
ter referred to as “the Arbitratio
on Act”) against an arbitral aw
ward
were dism
missed.
2.
The genesis of the dispute is
award of a construction contrac
ct to
the appel
lant by Haryana State Industria
al and Infrastructure Developm
ment
Corporati
on Limited (for short “the Cor
rporation”) for construction of
f 12
blocks co
mprising 192 dwelling units and
d 3 blocks comprising 36 dormit
tory
units alon
ng with allied works in Secto
r 8, IMT Manesar, Gurugram.
. A
contract a
agreement was executed betwee
n the parties on 29.01.2007. Le
etter
of Intent w
was issued, which was followed
d by a work order. Stipulated per
riod
for compl
letion of work was 15 months,
i.e., till 19.03.2008, but work w
was
completed
d on 30.07.2009 after extension
ns were granted by the Corporat
tion
without le
evy of liquidated damages. Appe
ellant has attributed the delay to
the
Corporati
on on account of non-availab
bility of the clear site, delay
in
providing
g drawings and failure to take tim
mely decision. It has been claim
med
that appel
llant suffered losses due to esc
alation of cost of material, labo
our,
idling of r
resources, etc. A dispute was rais
sed by the appellant and matter w
was
referred f
for arbitration to Hon’ble Mr. Ju
ustice (Retd.) Mukul Mudgal, w
who
passed aw
ward dated 03.04.2017, accepting
g some claims and declining oth
ers.
Learned A
Arbitrator awarded the following
g amounts:-
(i) Claim No.1: Rs
.19,77,994/- towards additiona
ally
executed work.
(ii) Claim No.3: Rs
.8,01,166.14 towards increase
in
SHEETAL
2026.11.17 15:24
I attest to the accuracy and
integrity of this document


FAO-CA



ARB-14-2021 (O&M)

-3-
minimum wages during the e
extended period.
(iii) Claim No.4:
Rs.76,762/- towards additio
onal
insurance charges and
(iv) Claim No.12: Rs 5
5,00,000/- towards arbitration co
osts.
3.
A total sum of Rs.33,55,9
22.14 was awarded in favour
r of
appellant
under claim Nos.1,3,4 and 12 w
with post-award interest in the ev
vent
of non-pa
ayment within stipulated period
d. Claims under other heads w
were
rejected. D
Dissatisfied with the rejection of
f the remaining claims, particula
arly
claim No.
.2, which pertains to escalation o
of Rs.3,60,77,250/- and claim N
No.5
relating to
o loss of profits and overheads
as well as interest, appellant fi
iled
objections
s under Section 34 of the Arbit
tration Act. These objections h
ave
been dism
missed by the Commercial Court,
, vide judgment impugned herein
n.
4.
Mr. Suvir Kumar, counsel f
for the appellant, has confined
the
appeal to
rejection of claims No.2 and 5. H
He contends that learned Arbitra
ator
as well a
as Commercial Court failed to
o appreciate that prolongation
of
contract w
was attributable to the Corporati
ion and once it has been found t
that
delay has
s occurred on account of failur
re of the Corporation to fulfill
its
contractua
al obligations, appellant become
es entitled to compensation. He
has
placed rel
liance upon Sections 54 and 73 o
of the Indian Contract Act, 1872
, as
well as j
judgment of the Hon’ble Supr
reme Court in K.N. Sathyapa
alan
(Dead) by
y LRs Versus State of Kerala an
nd another (2007) 13 SCC 43 . I
It is
his argum
ment that even in the absence of
f any escalation clause, a contrac
ctor
is entitled
d to compensation for increased
cost incurred by him due to de
elay
SHEETAL
2026.11.17 15:24
I attest to the accuracy and
integrity of this document


FAO-CA


attributab

ARB-14-2021 (O&M)

-4-
le to the Corporation. He urge
es that learned Arbitrator failed
d to
specifical
ly adjudicate claim No.5, wher
reas the learned Commercial Co
ourt
has given
its own reasons for rejecting the
e said claim.
5.
Mr. Deepak Vashishth, lea
arned Deputy Advocate Gene
eral,
Haryana,
counsel for the respondents has
s, however, supported the award
d as
well as ju
udgment passed by the Commer
rcial Court under Section 34 of
the
Arbitratio
on Act. He has argued that lear
rned Arbitrator has interpreted
the
contractua
al provisions and passed a re
easonable award in favour of
the
appellant,
, which does not contravene
the public policy and cannot
be
interfered
d with in exercise of limited scop
pe under the Arbitration Act.
6.
We have heard the rival con
ntentions of counsel for the par
ties
and exam
mined the record relied upon by th
hem.
7.
Scope of interference under
r the Arbitration Act is restrict
ted.
Appellate
e Court is required to examine a
as to whether the objections un
nder
Section 34
4 of the Arbitration Act have be
een determined by the Commerc
cial
Court by
applying the correct legal princ
ciples and whether any ground
for
setting as
side the arbitral award is est
tablished. Appellate Court can
nnot
undertake
e an independent reassessment
of the contractual disputes mer
rely
because a
appellant is dissatisfied with the
e conclusions of the Arbitrator.
. In
Associate
e Builders Vs. Delhi Developm
ment Authority, (2015) 3 SCC
49 ,
Hon’ble S
Supreme Court held that interp
pretation of contractual terms f
falls
exclusivel
ly within the domain of an Arbit
trator. Where such an interpretat
tion
ibid
ce under Section 34, , is
is reason
able and plausible, interferenc
not
SHEETAL
2026.11.17 15:24
I attest to the accuracy and
integrity of this document


FAO-CA


permissib

ARB-14-2021 (O&M)

-5-
ble merely because an alternat
tive interpretation is possible.
In
Ssangyon
ng Engineering and Construct
tion Company Ltd. Vs. Natio
onal
Highway
Authority of India (NHAI), (2
2019) 15 SCC 131 and Swan G
Gold
Mining L
Limited vs. Hindustan Coppe
er Limited, (2015) 5 SCC 7
739 ,
Supreme
Court reiterated that ground of
patent illegality cannot be invok
ked
to re-appr
reciate evidence or to correct eve
ery alleged error of law of fact.
8.
This Court shall first deal
with the rejection of claim No
o.2,
under wh
hich appellant has sought Rs.3
,60,77,250/- towards escalation
n in
market ra
ates during the extended perio
od of execution. Agreement da
ated
29.01.200
07 executed between the parties
s was a fixed rate contract. Cla
ause
6.8 (at pa
age 206 of the paper book) sp
pecifically stipulated that no pr
rice
escalation
n would be payable during
the contractual period and t
that
percentag
ge rates quoted by appellant wou
uld remain firm and binding. Th
here
is a separa
ate provision governing consequ
uences of extension of time. Clau
uses
5.25 and 5
5.26 (at pages 166-167 of the pa
aper book) provide for extension
n of
time with
hout any escalation in case of a
any delays on account of delay
y in
receiving
instructions, etc. There is a sp
pecific provision that no escalat
tion
would be
paid during the period of delay.
Learned Arbitrator examined th
hese
provisions
s and concluded that the partie
es had consciously agreed that
no
escalation
n would be payable in the event o
of extension of time, irrespective
e of
which par
rty was responsible for the delay
.
9.
Learned Arbitrator has noti
ced that delay was on account
t of
furnishing
g drawings and non-availability
y of clear site for construction
n of
SHEETAL
2026.11.17 15:24
I attest to the accuracy and
integrity of this document


FAO-CA


boundary

ARB-14-2021 (O&M)

-6-
wall. The delay was attributed
d to the Corporation and extens
sion
was gran
nted to appellant without lev
vy of liquidated damages. Up
pon
interpreta
tion of all the provisions, learne
d Arbitrator recorded that appell
lant
was not en
ntitled to the revision of the agre
eed rates on account of escalation
n.
10.
In K.N. Sathyapalan’s c
case (supra), construction w
work
awarded t
to petitioner therein was substan
ntially delayed on account of fail
lure
to control
l obstruction at the work site, n
non-availability of stipulated qua
arry
and failur
re to provide appropriate locatio
on for disposal of excavated ea
arth.
Learned
Arbitrator, upon examining th
he evidence and determining
the
consequen
nces, awarded compensation
to petitioner therein towa
ards
additional
l expenditure incurred by the con
ntractor including escalation in c
cost
of materia
al and transportation. High Cou
urt interfered with the award on
the
ground t
that original agreement did
not provide for escalation a
and
suppleme
ntary agreement prohibited en
hanced rates during the extend
ded
period. Ho
on’ble Supreme Court reversed t
the judgment of the High Court a
and
restored t
the arbitral award holding that
where a contracting party fails
s to
fulfill its o
obligations directly affecting the
e execution of work, Arbitrator m
may
award co
ompensation for additional ex
xpenditure in the absence of
an
escalation
n clause or any stipulation debar
rring award of enhanced amount
t. In
the presen
nt case, learned Arbitrator has e
xamined the contractual provisi
ons
and decli
ined the claim for price esca
alation while separately grant
ting
compensa
ation for certain additional expen
nses attributable to extended per
riod
of executi
ion. The present agreement, exp
pressly regulates extension of ti
ime
SHEETAL
2026.11.17 15:24
I attest to the accuracy and
integrity of this document


FAO-CA


under Cla

ARB-14-2021 (O&M)

-7-
auses 5.25 and 5.26, which have
e been interpreted by the Arbitra
ator
while dec
clining appellant's claim for en
nhanced rates during the extend
ded
period.
Learned Arbitrator's interpr
retation represents a possi
ible
interpreta
tion of the contractual stipulatio
on. Award passed by him cannot
t be
set aside m
merely because appellant advan
nces another interpretation based
d on
Sections
54 and 73 of the Contract Act
t, 1872. Arbitrator has specifica
ally
awarded R
Rs.8.01,166.14 towards increase
ed minimum wages and Rs.76,76
62/-
towards a
additional insurance charges i
incurred by appellant during
the
extended
period. Learned Arbitrator has
clearly distinguished between
the
claim for
general enhancement of contrac
ctual rates and claims for additio
onal
expenditu
ure due to prolongation of work
, which can be identified. Relia
nce
placed by
y appellant upon K.N. Sathyapala
lan's case (supra) does not adva
nce
its case.
11.
The next argument of appella
ant is based upon non-considerat
tion
of claim N
No.5 by the learned Arbitrator. A
Appellant had sought compensat
tion
of Rs.95,2
24,040/- towards loss of profit a
and overheads. This claim arises
s on
account o
of prolongation of contract, which
h forms the foundation of claim
for
escalation
n and idle resources. Learne
ed Arbitrator has examined
the
consequen
nces of extended period as well a
as additional expenditure that co
ould
be compe
ensated and ultimately awarded t
the amount found admissible. L
Loss
of profit c
cannot be presumed merely on a
account of the fact that contract
has
been prol
longed on account of some defa
fault by the Corporation. Appell
lant
was requi
ired to establish loss actually s
suffered including the existence
e of
SHEETAL
2026.11.17 15:24
I attest to the accuracy and
integrity of this document


FAO-CA


opportuni

ARB-14-2021 (O&M)

-8-
ities of earning profit, which c
could not be pursued because
the
resources
remained idle due to delayed pr
roject.
12.
In M/S Unibros Vs. All In
ndia Radio, 2023 AIR SC 52
231 ,
Hon’ble S
Supreme Court held that a claim
m for loss of profitability and loss
s of
opportuni
ities requires substantial evide
ence. Formula based calculat
tion
cannot be
e a substitute for proof of loss.
Counsel for the appellant has
not
been able
e to demonstrate that appellant
t lost business opportunities or
an
opportuni
ity to earn profit during the ex
xtended period. When read in
its
entirety, a
award makes the basis for reject
tion of claim No.5 very discernib
ble.
Failure to
o reproduce claim No.5 under a s
separate heading does not establ
lish
that the A
Arbitrator has altogether failed to
adjudicate this claim and object
tion
raised by
y petitioner does not warrant a
any interference in the impugn
ned
judgment
or award.
13.
For the foregoing reasons, th
his Court does not find any meri
it in
the appeal
l, which is dismissed, though wi
th no order as to costs.
14.
Pending miscellaneous app
plication(s), if any, shall sta
and
disposed o
of.






(SUVIR SEHGAL)
JUDGE
RAJESH GAUR
( )
JUDGE

16.11.202
sheetal


26
Whether Speaking/reasoned Ye
Whether Reportable Ye
es/No
es/No

SHEETAL
2026.11.17 15:24