Rensar Infra Private Limited vs Rais Kasam Shaikh
- Court
- Bombay High Court
CNR No : HCBM020029162026
arbap-205-2026-J.doc
Shabnoor
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
ARBITRATION APPLICATION NO.205 OF 2026
Rensar Infra Private Limited … Applicant
V/s.
Rais Kasam Shaikh & Ors … Respondents
SHABNOOR
AYUB
PATHAN
Mr. Zaid Ansari, for the Applicant.
Digitally signed by
SHABNOOR AYUB
PATHAN
Date: 2026.10.07
13:24:49 +0530
Mr. Rohan Sawant a/w Mr. Aagam Mehta, Mr. Pratik K
Shah, for Respondent Nos.1 and 2.
CORAM : AMIT BORKAR, J.
RESERVED ON : OCTOBER 1, 2026
PRONOUNCED ON : OCTOBER 7, 2026.
JUDGMENT:
1. The present Application has been filed under Section 11 of
the Arbitration and Conciliation Act, 1996. The Applicant seeks
appointment of a Sole Arbitrator to decide the disputes between
the Applicant and Respondent Nos. 1 and 2. These disputes have
arisen out of the Agreement for Sale dated 31 December 2020
(“the said Contract”). The said Contract was entered into between
the Applicant, Respondent No. 3 and Respondent Nos. 1 and 2 in
respect of Flat No. 1901. The said Contract was registered with the
Sub-Registrar of Assurances, Mumbai City-2, under Serial No.
BBE2-5849/2021. The said Contract contains an arbitration clause.
Under the said clause, disputes between the parties relating to or
1
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
connected with the said Contract are to be referred to arbitration
in accordance with the provisions of the Arbitration and
Conciliation Act, 1996. The present Application has been filed for
constitution of the arbitral tribunal.
2. The relevant facts of the matter are as follows. On 27
January 2011, a Development Agreement was entered into
between the Society, its members and Respondent No. 3.
Thereafter, on 18 December 2015, a Joint Development Agreement
was entered into between the Society, its members, Respondent
No. 3 and the Applicant. On 31 December 2020, Respondent Nos.
1 and 2 entered into the said Contract with the Applicant and
Respondent No. 3 in respect of Flat No. 1901. In the year 2021,
disputes arose between the parties. As a result, the Society and its
members filed Commercial Arbitration Petition No. 10 of 2022
against the Applicant and Respondent No. 3 before this Court
under Section 9 of the Arbitration and Conciliation Act, 1996. On
3 January 2022, this Court passed an order directing the Applicant
and Respondent No. 3 to hand over fit-out possession of the
respective flats allotted to the twelve members of the Society in the
building, subject to payment of their outstanding dues. The said
order dated 3 January 2022 was challenged by the Applicant and
Respondent No. 3 before this Court. The said proceedings were
disposed of by a Consent Award dated 27 July 2022.
3. In or about January 2022, the Applicant gave limited access
of Flat No. 1901 to Respondent Nos. 1 and 2 for carrying out fit-
out works. Thereafter, on 7 October 2022, the additional
construction which was contemplated under the amended
2
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
sanctioned plans of the building was completed. In the year 2024,
Respondent Nos. 1 and 2 filed Complaint No.
CC006000000530718 before the Maharashtra Real Estate
Regulatory Authority (“MahaRERA”) under Section 18 of the Real
Estate (Regulation and Development) Act, 2016. The said
complaint was allowed by MahaRERA by its order dated 14 August
2024. Being aggrieved by the said order, the Applicant filed Review
Application No. CC006000000530718/APPL/RV/1 under
Regulation 36 of the MahaRERA (General) Regulations, 2017. By
order dated 17 April 2025, MahaRERA rejected the said Review
Application. Thereafter, the Applicant filed Appeal No.
AT06/00500/25 before the Maharashtra Real Estate Appellate
Tribunal.
4. On 20 May 2025, the Applicant issued a Demand Notice to
Respondent Nos. 1 and 2. Respondent Nos. 1 and 2 replied to the
said notice by their letter dated 18 June 2025. Thereafter, on 25
July 2025, the Applicant issued a notice to Respondent Nos. 1 and
2 under Section 21 of the Arbitration and Conciliation Act, 1996.
By the said notice, the Applicant invoked the arbitration agreement
contained in the said Contract. Respondent No. 1, through its
Advocates, gave a reply dated 22 August 2025 to the notice issued
on behalf of the Applicant. Disputes have arisen between the
parties and the parties have not been able to agree upon the
constitution of the arbitral tribunal. The Applicant has approached
this Court by filing the present Application under Section 11 of the
Arbitration and Conciliation Act, 1996. The Applicant seeks
appointment of a Sole Arbitrator to decide the disputes between
3
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
the Applicant and Respondent Nos. 1 and 2 arising out of the said
Contract.
5. Mr. Zaid Ansari, learned Advocate appearing for the
Applicant, submitted that at the stage of considering an application
under Section 11 of the Arbitration and Conciliation Act, 1996, the
Court has to make only a limited enquiry. The Court has to see
whether, prima facie, an arbitration agreement exists between the
parties. According to him, questions regarding accord and
satisfaction, limitation of the claims on merits and whether the
disputes can be referred to arbitration are matters which have to
be considered by the Arbitral Tribunal under Section 16 of the said
Act. In support of this submission, reliance was placed upon the
judgment of the Supreme Court in SBI General Insurance Co. Ltd.
v. Krish Spinning, 2024 INSC 532.
6. Learned Advocate submitted that, as held by the Supreme
Court in paragraph 133 of the said judgment, even when an
objection regarding limitation is raised before the Court hearing
the application for appointment of an arbitrator, the Court is
required to examine only whether the application under Section
11(6) has been filed within the prescribed period. According to
him, at this stage the Court is not required to decide whether the
claims which are sought to be referred to arbitration are
themselves within limitation. This is so where deciding such an
issue would require detailed examination of evidence and facts.
7. Learned Advocate then dealt with the judgments relied upon
by Respondent Nos. 1 and 2 regarding the relationship between
4
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
the RERA Act and arbitration. He submitted that the judgment of
this Court in Rashmi Realty Builders Pvt. Ltd. v. Rahul Pagariya ,
reported in 2024 SCC OnLine Bom 3871, is distinguishable on
facts and on the issue considered therein. According to the
Applicant, the question before the Court in Rashmi Realty was
whether the remedies available under the RERA Act excluded or
took away the remedy of arbitration. The question involved in the
present case, according to the Applicant, is different. It is whether
the availability or use of a remedy under the RERA Act prevents
arbitration of an independent dispute arising out of the Agreement
for Sale. It was submitted that this question did not arise for
consideration in Rashmi Realty .
8. In support of this submission, learned Advocate relied upon
the decision of this Court in Abhay Kanhere v. Morya
Infraconstruct, Arbitration Petition No. 148 of 2024. It was
submitted that the observations made in Rashmi Realty have to be
understood with reference to the particular question which was
before the Court in that case. Learned Advocate relied upon the
judgment of the Supreme Court in Ravi Ranjan Developers v.
Aditya Kumar Chatterjee, 2022 SCC OnLine SC 568. According to
the said principle, a judgment is a precedent for the issue which
arose for consideration and was decided by the Court. Every
observation made in a judgment cannot be treated as a precedent
for all other matters.
9. Learned Advocate referred to the subsequent judgment in
Laxman Vaid v. Shree Siddhivinayak, 2026:BHC-OS:20687. He
submitted that the said judgment followed Rashmi Realty because
5
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
there was no subsequent contrary decision and, therefore, Rashmi
Realty was treated as binding. At the same time, the Court noted
that the Special Leave Petition filed against Rashmi Realty had
been dismissed without laying down any ratio. It was submitted
that the decision in Abhay Kanhere was not brought to the notice
of the Court in Laxman Vaid . Therefore, according to the
Applicant, Laxman Vaid can be distinguished on this ground as
well as on the facts on which that decision was rendered.
10. Learned Advocate dealt with the objection based upon
Section 8 of the Arbitration and Conciliation Act, 1996. He
submitted that Section 8 applies where a party, before submitting
its first statement on the substance of the dispute, asks the Court
to refer to arbitration a matter which is the subject matter of a
pending judicial proceeding. According to the Applicant, Section 8
does not create a general prohibition against pursuing an
independent cause of action merely because, in an earlier
proceeding filed by the other party, no application under Section 8
was made.
11. It was submitted that the complaint filed by Respondent Nos.
1 and 2 before MahaRERA was regarding delayed possession and
payment of interest under Section 18 of the RERA Act. On the
other hand, the claim sought to be raised by the Applicant in the
present proceedings is for recovery of outstanding sale
consideration, including the amount payable for the additional
area. According to the Applicant, these claims were not the subject
matter of the complaint filed before MahaRERA. Therefore, merely
because Respondent Nos. 1 and 2 had independently used their
6
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
statutory remedy before MahaRERA, it cannot be said that the
Applicant's claims were submitted for adjudication before
MahaRERA. Learned Advocate submitted that the decision of
Respondent Nos. 1 and 2 to pursue their own claims before
MahaRERA could not decide or restrict the forum which the
Applicant could choose for pursuing its own independent claims
arising under the Agreement for Sale. It was submitted that the
original order passed by MahaRERA on 14 August 2024 was
passed ex parte. Therefore, according to the Applicant, there was
no occasion for the Applicant to file a statement of defence in
those proceedings. The Review Application filed by the Applicant
was contested, but it was rejected on the ground relating to service
and not after deciding the merits of the Applicant's claims.
Thereafter, the Applicant filed an appeal before the Maharashtra
Real Estate Appellate Tribunal. According to the Applicant,
participation in the appellate proceedings was required because of
the circumstances and could not be treated as a voluntary choice
by the Applicant to have its independent claims decided before the
RERA forum.
12. Learned Advocate referred to prayers (e) and (f) in the
Memo of Appeal. He submitted that these prayers were made for
challenging the Non-Compliance Order, Recovery Warrant and
Attachment Notice. According to the Applicant, these were
coercive steps which followed from the ex parte order dated 14
August 2024. The said prayers, therefore, have to be read as part
of the complete relief sought in the appeal. They cannot be treated
as an independent request to MahaREAT to decide the Applicant's
7
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
claim as an original proceeding. It was submitted that MahaREAT,
while hearing the appeal arising from the complaint filed by
Respondent Nos. 1 and 2 under Section 18 of the RERA Act, could
not grant a money decree in favour of the Applicant in respect of
an independent claim. According to the Applicant, such a claim
could only be made by filing a separate original proceeding before
the appropriate forum. Learned Advocate submitted that even
before filing the appeal and before issuing the notice under Section
21 of the Arbitration and Conciliation Act, 1996, the Applicant had
issued a separate Demand Notice to Respondent Nos. 1 and 2.
According to the Applicant, this showed that it had consistently
intended to pursue its claim for recovery independently.
13. Reliance was placed upon Miscellaneous Application No. 630
of 2026, which was filed seeking waiver of the deposit required
under Section 43(5) of the RERA Act. Learned Advocate submitted
that, in that application, the Applicant had disclosed that the
present Section 11 proceedings were pending and would be
pursued. The Applicant had placed documentary material at
Exhibit “D”, which included a screenshot of the Bombay High
Court website. Learned Advocate relied upon paragraph 9 of the
said application in support of this submission. As regards the
observations made by MahaREAT in its order dated 4 September
2026 passed in the said Miscellaneous Application, learned
Advocate submitted that the said order was limited only to the
question of deposit under Section 43(5) of the RERA Act. He
pointed out that MahaREAT observed in paragraph 14 that the
Applicant's claim was still disputed and required adjudication on
8
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
merits. He relied upon paragraph 17, where MahaREAT clarified
that nothing contained in that order should be treated as a final
finding and that all issues were kept open. Learned Advocate dealt
with the objection relating to the claim for compensation. He
submitted that Sections 19(6) and 19(7), read with Section 31 of
the RERA Act, permit a promoter to initiate proceedings for
recovery of interest from an allottee. However, according to him,
the RERA Act does not contain a similar provision allowing a
promoter to claim compensation from an allottee. In support of
this submission, reliance was placed upon the judgment of the
Kerala High Court in Gopakumar B. Nair v. K.V. Sugunan, dated 30
January 2025.
14. Learned Advocate submitted that, in any event, the question
as to what is the real nature of the compensation claim and
whether it can be referred to arbitration should be left to the
Arbitral Tribunal. Reliance was placed upon Abhay Kanhere .
According to the Applicant, at the stage of considering an
application under Section 11, the Court should not decide the
nature of the claim and reject the Applicant's request for
arbitration on that basis. It was submitted that the claim for
compensation was a genuine claim and was not subsequently
created only for the purpose of the present proceedings. According
to the Applicant, the claim arose from events which had taken
place before the filing of the present Arbitration Application. It was
submitted that Respondent No. 1, personally and through Mr.
Balwinder Singh Gujral, had made complaints to the MCGM.
According to the Applicant, these complaints obstructed the
9
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
process of obtaining the Occupation Certificate and resulted in
revocation of the fire approval. The Applicant relied upon the
criminal proceedings initiated in connection with these acts, which
ended in acquittal.
15. Learned Advocate submitted that the acts of Respondent No.
1, who was the owner or occupant of the said Flat, had been
pleaded in paragraphs 4.9 and 4.14 to 4.16 of the Arbitration
Application. According to the Applicant, these acts gave rise to
disputes arising under or in connection with the Agreement for
Sale. It was submitted that such disputes fall within the scope of
Article 17.21 of the said Agreement.
16. Learned Advocate dealt with the objection regarding
limitation. He submitted that although the objection was orally
raised at the hearing, Respondent Nos. 1 and 2 had relied upon
limitation in their Affidavit-in-Reply.
17. In respect of the claim for the additional area amounting to
Rs.92,45,590/-, learned Advocate submitted that the claim was
within limitation from the record. According to the Applicant, the
cause of action for this claim arose on 7 October 2022, when the
amended sanctioned plans were completed. The notice invoking
arbitration was issued on 25 July 2025. Therefore, according to
the Applicant, the notice was issued within three years from the
date on which the cause of action arose. As regards the claim for
the balance consideration of Rs.41,59,726/-, learned Advocate
submitted that the claim was, in any event, saved by Section 19 of
the Limitation Act, 1963. He relied upon the Applicant's contention
10
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
that Respondent No. 1's own Review Application before
MahaRERA records, in paragraph 4 of the order dated 30 April
2026, the part-payments made on 9 August 2023 and 10 August
2023 towards the said flat. According to the Applicant, these
payments amount to acknowledgment within the meaning of
Section 19 of the Limitation Act. Therefore, a fresh period of
limitation would commence from the date of such payment. On
this basis, the Applicant submitted that the claim remained within
limitation up to 10 August 2026.
18. Learned Advocate submitted that, in view of the law laid
down by the Supreme Court in SBI General Insurance Co. Ltd. v.
Krish Spinning, (2024) 12 SCC 1 the enquiry at the stage of
Section 11 is limited to determining whether the application under
Section 11(6) has been filed within the prescribed period.
According to the Applicant, the present Application has been filed
within time. Whether the individual claims sought to be referred to
arbitration are themselves barred by limitation is a separate
question. Such questions, according to the Applicant, involve the
merits of the claims and ought to be considered by the Arbitral
Tribunal in exercise of its jurisdiction under Section 16 of the
Arbitration and Conciliation Act, 1996.
19. Mr. Rohan Savant, learned Advocate appearing for
Respondent Nos. 1 and 2, submitted that the judgment of this
Court in Laxman Mura Vaid and Anr. v. Shree Siddhivinayak
Infrastructure and Realty, Commercial Arbitration Application No.
637 of 2026, cannot be said to have been decided per incuriam.
Learned Advocate submitted that the judgment in Abhay Damodar
11
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
Kanhere , did not consider the judgment of the Supreme Court in
Arif Azim Co. Ltd. v. Aptech Ltd., (2024) 5 SCC 313. According to
the Respondents, the decision in Abhay Kanhere proceeded on the
basis that, while considering an application under Section 11 of
the Arbitration and Conciliation Act, 1996, the Court only has to
see whether an arbitration agreement exists and need not examine
anything. It was submitted that this is not the correct position, in
view of the judgment in Rashmi Realty . According to the
Respondents, the said judgment holds that disputes between an
individual allottee and a promoter are not capable of being
referred to arbitration. Learned Advocate submitted that the
observations made in paragraph 12 of Abhay Kanhere regarding
the jurisdiction of the civil court being excluded under Section 79
of the RERA Act were made considering the particular facts of that
case. According to the Respondents, those observations cannot be
treated as laying down a general rule which is contrary to the ratio
laid down in Rashmi Realty .
20. It was submitted that the finding in paragraph 63(i) of
Rashmi Realty , namely that disputes between an individual
allottee and a promoter are non-arbitrable, is the ratio of that
judgment. According to the Respondents, it is not merely an
observation made in passing. They submitted that this finding was
necessary for reaching the conclusion in paragraph 63(ii), namely
that the jurisdiction of the RERA Authority constituted under
Section 20 of the RERA Act is not taken away merely because the
Agreement between the promoter and the allottee contains an
arbitration clause. Learned Advocate submitted that the Special
12
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
Leave Petition challenging the judgment in Rashmi Realty was
dismissed by the Supreme Court by order dated 1 September 2025.
Therefore, according to the Respondents, the principle stated in
paragraph 63(i) of Rashmi Realty continues to apply. It was
submitted that this binding principle was not considered in Abhay
Kanhere . On the other hand, it was considered in Laxman Mura
Vaid . Therefore, according to the Respondents, the judgment in
Laxman Mura Vaid cannot be said to have been rendered per
incuriam.
21. Learned Advocate next submitted that the disputes for which
the Applicant is seeking appointment of an Arbitrator are
themselves matters covered by the statutory scheme of the RERA
Act. It was submitted that the Applicant's claims include recovery
of arrears of balance sale consideration and interest on delayed
payments. According to the Respondents, these claims are covered
by Sections 19(6) and 19(7) of the RERA Act. These provisions
deal with the obligation of an allottee to make payments as agreed
under the Agreement for Sale and to pay interest when there is
delay in making such payments. It was submitted that Sections 36,
37, 38 and 40 of the RERA Act give powers to the RERA Authority
to issue proper directions and to enforce its orders where there is a
breach of the obligations of an allottee. Therefore, according to the
Respondents, the claims mentioned by the Applicant in its notice
invoking arbitration, could have been raised before the competent
RERA forum.
22. Learned Advocate submitted that the claims which the
Applicant is now seeking to refer to arbitration had, in fact, been
13
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
raised by the Applicant in First Appeal No. 500 of 2025 before the
Maharashtra Real Estate Appellate Tribunal. Specific reliance was
placed upon prayer clauses (e) and (f) of the said appeal.
According to the Respondents, those prayers relate to the same
claims which the Applicant is now seeking to refer to arbitration.
Reliance was placed upon the order dated 4 September 2026
passed by the Maharashtra Real Estate Appellate Tribunal in the
quantification application filed in the said appeal. Learned
Advocate submitted that the Tribunal had recorded in paragraph
14 of that order that the Applicant's claims would be considered
and decided at the time of final hearing of the First Appeal.
23. As regards the claim for damages or compensation, learned
Advocate submitted that the said claim was an afterthought.
According to the Respondents, the claim had neither arisen nor
been raised by the Applicant before filing the present Application
under Section 11. It was contended that the claim was raised
orally for the first time during the hearing of the present
Application. According to the Respondents, this was done to bring
the dispute within the arbitration clause and to subject the
Respondent-allottees to arbitration proceedings.
24. Learned Advocate sought to distinguish the judgment of the
Kerala High Court in Gopakumar B. Nair , relied upon by the
Applicant. It was submitted that the said judgment dealt with the
question of jurisdiction of the RERA Authority as against the
jurisdiction of the civil court. It did not deal with the effect of an
arbitration clause contained in an Agreement for Sale governed by
the RERA Act. According to the Respondents, the said judgment
14
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
does not apply to the present dispute.
25. Objection under Section 8 of the Arbitration Act. Learned
Advocate then dealt with the objection based upon Section 8 of the
Arbitration and Conciliation Act, 1996. It was submitted that
Respondent Nos. 1 and 2 had filed proceedings before MahaRERA
seeking, among other reliefs, interest for delayed possession and a
direction to the Applicant to hand over lawful possession of the
premises along with the Occupation Certificate and two car-
parking spaces. Other reliefs were sought in those proceedings. It
was submitted that although the Applicant was served with the
MahaRERA proceedings, the Applicant chose not to remain present
before MahaRERA. As a result, MahaRERA proceeded with the
matter and passed its final order dated 14 August 2024 allowing
the complaint. Learned Advocate submitted that the Applicant did
not invoke Section 8 of the Arbitration and Conciliation Act, 1996
before MahaRERA at the stage permitted by law. According to the
Respondents, after the complaint had proceeded and ended in a
final order, the Applicant could no longer seek reference of the
disputes which were the subject matter of that proceeding to
arbitration. In support of the submission regarding the stage at
which Section 8(1) has to be invoked, reliance was placed upon
SSIPL Lifestyle Pvt. Ltd. v. Vama Apparels (India) Pvt. Ltd., 2020
SCC OnLine Del 1667. It was submitted that, after the amendment
to Section 8(1) by the Arbitration and Conciliation (Amendment)
Act, 2015, the provision refers to the stage of submitting the first
statement on the substance of the dispute. According to the
Respondents, the purpose is that a party which wants arbitration
15
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
must act with due diligence and cannot wait for the proceedings to
progress before seeking arbitration. Learned Advocate submitted
that once the Applicant failed to invoke Section 8 at the proper
stage and the proceedings before MahaRERA ended in a final
order, the Applicant could not approach this Court under Section
11(6) in respect of the same subject matter. Reliance was placed
upon Anil v. Rajendra, (2015) 2 SCC 583, paragraphs 9 to 12 and
16, in support of the submission based on the principle of issue
estoppel. It was submitted that, after filing the appeal before
MahaREAT, the Applicant submitted to the jurisdiction of the
statutory RERA framework. According to the Respondents, the
claims which the Applicant now seeks to refer to arbitration had,
in any event, been raised by the Applicant in the said First Appeal.
26. Alleged splitting of cause of action. Learned Advocate lastly
submitted that the Applicant cannot divide its cause of action by
asking the RERA forum to decide some of the disputes and seeking
arbitration for the remaining disputes. Reliance was placed upon
the judgment of the Supreme Court in Sukanya Holdings (P) Ltd.
v. Jayesh H. Pandya, (2003) 5 SCC 531.
27. It was submitted that the claims raised by Respondent Nos. 1
and 2 before MahaRERA and the claims which the Applicant now
seeks to refer to arbitration arise from the same Agreement for
Sale. According to the Respondents, even the Applicant accepts
that these disputes fall within the scope of the arbitration clause.
However, when the MahaRERA proceedings were pending, the
Applicant did not ask for the claims raised by Respondent Nos. 1
and 2 to be referred to arbitration. According to the Respondents,
16
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
the Applicant failed to invoke the arbitration clause at the proper
stage and participated in the appellate proceedings before
MahaREAT. It cannot now invoke the same arbitration clause only
in respect of some of the disputes. According to the Respondents,
such a course would amount to splitting the cause of action, which
is not permissible in law. Learned Advocate submitted that the
Applicant had raised its claims before the RERA forum and could
not seek another forum for deciding the same subject matter. It
was contended that, after having given up or not used the
arbitration clause in the earlier proceedings, the Applicant could
no longer invoke that clause for its alleged claims. This would
include the claim for damages, which according to the
Respondents was sought to be raised for the first time during the
hearing of the present Application.
28. Without prejudice to the above submissions, learned
Advocate submitted that even if it is assumed that any claim of the
Applicant could not be decided by the RERA Authority, the
Applicant could, at the highest, pursue such claim by filing an
independent civil proceeding. However, according to the
Respondents, the Applicant could not again revive or invoke the
arbitration clause after having chosen to proceed before the RERA
forum and after failing to invoke Section 8 at the proper stage.
REASONS AND FINDINGS:
29. The dispute before me is not only about the money claims
made by the Applicant against Respondent Nos.1 and 2. The main
question is whether these claims can at all be sent to arbitration
17
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
considering the provisions of the Real Estate (Regulation and
Development) Act, 2016.
30. There is an arbitration agreement between the parties.
Respondent Nos.1 and 2 have not disputed that the arbitration
clause exists. The Applicant has acted on the said clause and has
issued notice under Section 21 of the Arbitration and Conciliation
Act, 1996. Therefore, the first requirement for exercising
jurisdiction under Section 11 is satisfied.
31. The Applicant submits that once it is found that there is an
arbitration agreement, the Court should not go into the matter. For
this purpose, reliance is mainly placed on Krish Spinning and on
Abhay Damodar Kanhere. The submission is that proceedings
under Section 11 are not like a full trial and disputed questions,
including arbitrability, should be left to the Arbitral Tribunal under
Section 16. To this extent, the Applicant is right that Section 11
proceedings cannot become a trial about every dispute. The
Applicant is right that questions relating to limitation of the
individual claim, accord and satisfaction and other matters
requiring detailed evidence should not be decided at this stage.
But the submission that only because an arbitration clause exists,
the enquiry of the Court must come to an end cannot be accepted
in such an absolute manner. In Arif Azim Co. Ltd , the Supreme
Court has made a distinction between jurisdictional issues and
admissibility issues. The question that the Arbitral Tribunal has no
power to decide a particular dispute is different from the question
that a particular claim is time -barred or otherwise not admissible.
The Supreme Court has held that non-arbitrability can be looked
18
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
into at the stage of reference, but such examination has to be
limited and only prima facie.
32. The Supreme Court in Vidya Drolia v. Durga Trading
Corporation, (2021) 2 SCC 1, and in NTPC Ltd. v. SPML Infra Ltd.
(2023) 9 SCC 385, has held that at the stage of reference, the
main enquiry is regarding existence and validity of the arbitration
agreement. There can be an enquiry regarding non-arbitrability.,
the Arbitral Tribunal is the first authority to decide the question of
non-arbitrability. But where the dispute is and on the face of it
non-arbitrable, the Court at the stage of reference can interfere.
This is the limited area in which this Court has to examine the
present dispute. It is not the stage for conducting a detailed trial.
The Court has only to see whether, from the admitted or
undisputed relationship between the parties and the statutory
provisions, the dispute can be referred to arbitration.
33. The Respondents are not asking this Court to decide whether
the Applicant is entitled to Rs.92,45,590/- towards additional area,
Rs.41,59,726/- towards balance consideration or any
compensation. Their objection is at an earlier stage, namely
whether this type of dispute can at all be decided by a private
Arbitral Tribunal. For deciding this question, the Court need not
examine all accounts, payments, adjustments, or evidence
regarding actual loss. It is necessary to see the nature of the
relationship between the parties and the nature of the dispute.
Therefore, the objection cannot be rejected only by saying that
Section 16 gives power to the Arbitral Tribunal.
19
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
34. The judgment in Abhay Damodar Kanhere is relevant
regarding the limited nature of enquiry under Section 11. In that
judgment, it was observed that the jurisdiction under Section 11 is
“a very limited” one and that questions of jurisdiction can be
considered by the Arbitral Tribunal under Section 16. More
importantly, the learned Judge noticed that the exact question
before the Court in the earlier Second Appeal was whether the
jurisdiction of RERA is taken away because of an arbitration
clause, and not whether the existence of RERA takes away
arbitration. In Abhay Kanhere , the question which was framed
was:
“Whether the jurisdiction of Real Estate Regulatory Authority
established under Section 20 of the Real Estate Regulation
and Development Act, 2016 is ousted, if the agreement
between the promoter and the allottee contains arbitration
clause?”
35. The learned Judge held that an arbitration clause cannot
take away the statutory jurisdiction of RERA. It was observed that
whether the statutory powers of RERA would make arbitration
proceedings impossible was not the question which was framed
before the Court. Therefore, the observations regarding that
converse issue were not treated as the ratio of that judgment.
36. The Applicant has rightly relied upon paragraph 41 of Ravi
Ranjan Developers . The following words explain that while
considering a judgment, the Court has to see what exact issue was
decided:
“41. It is well settled that a judgment is a precedent for the
20
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
issue of law that is raised and decided. The judgment has to
be construed in the backdrop of the facts and circumstances
in which the judgment has been rendered. Words, phrases
and sentences in a judgment, cannot be read out of context.
Nor is a judgment to be read and interpreted in the manner
of a statute. It is only the law as interpreted by in an earlier
judgment, which constitutes a binding precedent, and not
everything that the Judges say. [Emphasis Supplied]”
37. This principle is required to be kept in mind while
considering Rashmi Realty . In Rashmi Realty , the Court, after
considering the provisions and scheme of RERA, recorded in
paragraph 63 the following conclusion:
“63. In view of the above discussion following conclusions
are recorded:— (i) The dispute between the individual
allottee and the promoter or the dispute between the
Association of the Allottees and the Promoter covered under
Real Estate Regulation and Development Act, 2016 is non-
arbitral in nature. (ii) The jurisdiction of Real Estate
Regulatory Authority established under Section 20 of the
Real Estate Regulation and Development Act, 2016 is not
ousted, even if the agreement between the promoter and the
allottee contains arbitration clause.”
38. Therefore, paragraph 63 has two parts. The second part
answers the question which was framed before the Court, namely
that the jurisdiction of RERA is not taken away only because the
Agreement contains an arbitration clause. But the first part says
that the dispute between an individual allottee and promoter
which is covered by RERA is non-arbitral. That part cannot be
ignored as if it is not there. At the same time, the reasoning in
Abhay Kanhere cannot be ignored. That judgment has considered
the question which was framed and the principle of precedent and
21
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
has understood the effect of Rashmi Realty in a different manner.
39. The issue becomes more important because of the later
judgment in Laxman Mura Vaid . In that matter, this Court
considered Rashmi Realty as well as the contrary view taken by the
Delhi High Court. It was held that Rashmi Realty had not been set
aside and continues to operate as a judgment of this Court. The
argument that dismissal of the Special Leave Petition does not
mean that the Supreme Court has declared any ratio was
considered. Though that argument was accepted, the Court held
that Rashmi Realty still remains a judgment of this Court and
cannot be ignored.
40. In Laxman Mura Vaid, a claim for balance consideration
under an Agreement for Sale was not treated merely as a simple
money dispute between two persons having no other relationship.
The Court looked at from where the claim came, between whom
the claim was made and from which real estate transaction the
claim arose. It held that merely describing the claim as contractual
does not take it outside the promoter-allottee relationship. The
Court held that Section 16 cannot give jurisdiction where the
substantive law has taken away such jurisdiction.
41. I have carefully considered the submission of the Applicant
that Laxman Mura Vaid should be distinguished because Abhay
Kanhere was not brought to the notice of that Court. This
submission has some force while considering whether both
judgments can be read together. A judgment which was not
considered by a later coordinate Bench does not for that reason
22
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
disappear., merely because a judgment is delivered later, it does
not become a judgment of a larger Bench. The law of precedent
does not depend only upon which judgment is later in date. The
strength of the Bench and the exact issue which was decided are
important. At the same time, Laxman Mura Vaid cannot be
ignored. It is a recent decision of this Court which considered the
same broad issue and followed Rashmi Realty . Even in the final
part of that judgment it was held that a dispute between an
individual allottee and promoter covered by RERA was non-
arbitrable, even though the Agreement contained an arbitration
clause. The Respondents have some substance in saying that this
Court cannot proceed as if there is no judgment of this Court
dealing with arbitrability. The intention of the parties to arbitrate
is subject to the law which governs the particular subject. Just
because the parties have agreed for arbitration does not mean that
the legislature has permitted that dispute to be taken away from
the statutory forum.
42. The Applicant is correct on one important aspect. The
dispute raised in the present application is not the same as the
reliefs which Respondent Nos.1 and 2 originally sought before
MahaRERA. The present claims include balance sale consideration
and an amount said to be payable towards additional area.
Therefore, it is necessary to see the subject matter of the dispute
and not only the fact that both proceedings arise from the same
Agreement for Sale. The Applicant has relied upon the fact that
Respondent Nos.1 and 2 themselves started the RERA proceedings.
This submission cannot be rejected without considering it. The
23
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
Applicant has relied upon the separate Demand Notice and the fact
that its proceedings before MahaREAT arose from an ex parte
order. These matters are shown from the record. On the other side,
the Respondents say that the present claims are connected with the
same Agreement for Sale and that the Applicant participated in the
appeal before MahaREAT. They rely upon prayer clauses (e) and
(f) of First Appeal No.500 of 2025 and the order dated 4
September 2026, in which, according to them, the Appellate
Tribunal has observed that the Applicant's claims would be
considered at the final hearing. This material does show that there
is some connection between the RERA proceedings and the present
claims. However, from the material available, it cannot be said that
the Applicant's claims have been decided on by MahaREAT.
43. I now come to the claims. The Applicant says that
Rs.92,45,590/- towards additional area became payable when the
amended sanctioned plans were completed on 7 October 2022. It
is claiming Rs.41,59,726/- towards balance consideration. The
Applicant relies upon part-payments made on 9 August 2023 and
10 August 2023 and says that these payments have effect under
Section 19 of the Limitation Act. These claims cannot be called
sham claims only because the Respondents dispute them. On the
face of the record, there are actual claims which require
consideration. But the manner in which the Applicant describes the
claim cannot decide whether it is arbitrable. The balance sale
consideration is, according to the Applicant, payable under the
Agreement for Sale concerning Flat No.1901. The claim for
additional area comes from the same real estate transaction. The
24
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
persons against whom the claims are made are the allottees and
the person making the claim is the promoter. Therefore, the
dispute has a clear connection with the promoter-allottee
relationship. This is the connection which Rashmi Realty and
Laxman Mura Vaid have considered important. In Laxman Mura
Vaid , an attempt to separate a sale consideration claim from the
allotment transaction merely by calling it a money claim was not
accepted.
44. The Respondents rely upon Sections 19(6) and 19(7) of
RERA. Their submission is that the duty of the allottee regarding
payment under the Agreement for Sale and interest for delayed
payment falls within the statutory field of RERA. There is
substance in this submission for understanding the nature of the
relationship. However, I am not deciding at this stage the exact
amount payable, whether the Applicant's calculation is correct,
whether any payments or adjustments were made or what defence
the Respondents may have. Those are matters concerning the
merits. At present, it is enough to say that the dispute cannot be
treated as having no connection with RERA.
45. The Applicant relies upon Gopakumar B. Nair , decided by
the Kerala High Court on 30 January 2025. Reliance is placed on
the discussion concerning Sections 19(6), 19(7) and 71 of RERA.
The submission is that RERA does not create a substantive right in
favour of a promoter to claim compensation from an allottee. The
Kerala High Court considered the provisions and held, in
substance, that although RERA does not create such statutory right
of compensation in favour of the promoter, a right under the
25
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
general law of damages may still be available outside RERA. This
submission of the Applicant helps only to a limited extent. It may
show that every claim for compensation by a promoter does not
become a compensation claim under RERA. But this is not the
same question as whether the claim can be referred to arbitration.
A claim being outside one particular remedy under RERA does not
give a party a right to choose arbitration. The question of
arbitrability still has to be considered from the statutory scheme
and the law applicable to it. On this limited issue, the Respondents
have a point.
46. I do not accept the submission of the Respondents that the
compensation claim should at this stage be rejected as merely an
afterthought. The Applicant has stated about complaints made
before MCGM, issues concerning the Occupation Certificate, fire
approval and criminal proceedings and has pleaded these facts in
the Arbitration Application. According to the Applicant, these
matters arise under Article 17.21 of the Agreement. Whether these
allegations can be proved, whether they caused loss, whether such
loss is recoverable and whether the Agreement permits recovery of
such amount are matters which cannot be decided at this stage.
47. I now come to the objection under Section 8 of the
Arbitration and Conciliation Act. The Respondents submit that they
had approached MahaRERA, that the Applicant was served but did
not appear, that the Applicant did not make an application under
Section 8 and entered into the appellate proceedings before
MahaREAT. According to the Respondents, after doing so, the
Applicant cannot now come back and seek arbitration. The
26
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
Applicant is right to the extent that Section 8 cannot become a
permanent prohibition against every independent claim made by
the other party. Merely because several disputes arise from the
same Agreement for Sale, it cannot be said that every possible
claim is the same subject matter.
48. The Respondents rely upon Sukanya Holdings (P) Ltd. . The
Supreme Court observed:
“13. Secondly, there is no provision in the Act that when the
subject-matter of the suit includes subject-matter of the
arbitration agreement as well as other disputes, the matter is
required to be referred to arbitration. There is no provision
for splitting the cause or parties and referring the subject-
matter of the suit to the arbitrators.”
49. The Supreme Court held:
“16. The next question which requires consideration is —
even if there is no provision for partly referring the dispute
to arbitration, whether such a course is possible under
Section 8 of the Act. In our view, it would be difficult to give
an interpretation to Section 8 under which bifurcation of the
cause of action, that is to say, the subject-matter of the suit
or in some cases bifurcation of the suit between parties who
are parties to the arbitration agreement and others is
possible. This would be laying down a totally new procedure
not contemplated under the Act. If bifurcation of the subject-
matter of a suit was contemplated, the legislature would
have used appropriate language to permit such a course.
Since there is no such indication in the language, it follows
that bifurcation of the subject-matter of an action brought
before a judicial authority is not allowed.”
50. And in paragraph 17 the Court held :
27
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
“17. Secondly, such bifurcation of suit in two parts, one to
be decided by the Arbitral Tribunal and the other to be
decided by the civil court would inevitably delay the
proceedings. The whole purpose of speedy disposal of
dispute and decreasing the cost of litigation would be
frustrated by such procedure. It would increase the cost of
litigation and harassment to the parties and on occasions
there is possibility of conflicting judgments and orders by
two different forums.”
51. Sukanya Holdings shows that a party cannot artificially
divide one subject matter only for getting parallel adjudication
before two different forums. But the judgment cannot be extended
to mean that every new claim which arises under the same
contract becomes barred only because some earlier proceeding was
filed under another law. The present case is not one where the
Applicant first asked for arbitration under Section 8, failed in that
request and came under Section 11 for reopening the same
decision.
52. The Respondents rely upon Anil . The facts of that case are
different. There the party had approached the civil Court, had
opposed the reference to arbitration under Section 8 and the civil
Court had decided the issue. The Supreme Court observed in
paragraph 9:
“9. The facts as narrated by us hereinbefore would show
that the application filed by the respondents herein under
Section 11 of the Act is nothing but an abuse of process. The
partnership firm is the first plaintiff in the suit. The dispute
between the parties is the subject of the suit. Precisely for
that reason, the appellants sought the matter to be referred
to the arbitrator. That was opposed by the respondents.
28
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
When the suit is at the final stage, the respondents have
sought appointment of an arbitrator under Section 11(6) of
the Act. Having approached the civil court and having
opposed the reference to arbitration under Section 8(1) of
the Act and the decision of the court in that regard having
become final, the respondents cannot invoke jurisdiction
under Section 11(6) of the Act; it is hit by the principle of
issue estoppel.”
53. In paragraph 12, the Supreme Court stated that when the
civil Court's decision to entertain the dispute despite the
arbitration clause had become final, the principle of res judicata
would apply. In the present matter, there is no such earlier final
judicial decision deciding the question of arbitration. Therefore, I
am not able to accept the submission of the Respondents that Anil
creates bar in the present case. There was no order of MahaRERA
deciding an application under Section 8 and rejecting arbitration.
There is no judicial finding that the Applicant consciously gave up
its right under the arbitration agreement. The original MahaRERA
order is stated to have been passed ex parte. The later appeal was
filed against the consequences arising from that order. This
position is different from the final Section 8 decision which was
present in Anil .
54. The reliance on SSIPL Lifestyle Pvt. Ltd , does show that a
party who wants arbitration cannot remain silent for an indefinite
period after entering judicial proceedings. The Delhi High Court in
paragraph 27 held that the words “not later than the date of”
provide a definite point of time for making an application under
Section 8 and treated the date of filing the first statement on the
substance of the dispute as the outer limit. In paragraph 31, the
29
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
Court described the amendment as a conscious step towards
prescribing a limitation period and said:
“31. Viewed in the background of the amendments in the
CPC including the recent amendments in CPC in the context
of the Commercial Courts Act, 2015 and the amendments in
the Arbitration Act, 2016, this Court concludes that the
amendment is a conscious step towards prescribing a
limitation period for filing the Section 8 application. The
mention of the word “date” in the amended provision means
that it is a precise date and usually incapable of ambiguity.
The same is a crystalized date and not a “period” prior to the
filing of the first statement on the substance of the dispute.
The entire intention is that those parties who wish to
proceed for arbitration ought to do so with alacrity and
speed and not merely procrastinate.”
55. This principle would still require that there was an earlier
judicial proceeding relating to the same subject matter. It cannot
increase or enlarge the subject matter of the earlier proceeding. If
the Applicant's present claim for additional consideration was not
placed before MahaRERA for adjudication as an independent claim
and no final order decided that claim, then the failure to invoke
Section 8 in that earlier proceeding cannot create a wider bar than
what Section 8 provides. There is one more development which
cannot be ignored. On 11 August 2026 the Supreme Court decided
Neo Developers Private Limited v. Rahul Bhargava & Ors. , 2026
INSC 875. In that case, the Supreme Court did not permit parallel
proceedings where “The prayers made before both the authorities
are substantially the same”, and held that the application for
arbitration was misplaced on those facts. The parties were sent
back to HRERA and the contentions of the developer were kept
30
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
open. Neo Developers gives some support to the Respondents on
the question of election and overlapping proceedings. But in my
view it does not decide the question which arises in the present
case. The Supreme Court was considering a factual situation where
the prayers before the two forums were substantially the same and
the statutory proceedings had reached the stage considered by the
Supreme Court. It did not hold that every dispute between every
promoter and allottee under every Agreement for Sale governed by
RERA is, as a class, incapable of arbitration. Therefore, it cannot be
treated as giving the answer to the difference between Rashmi
Realty and Abhay Kanhere .
56. I find that the Respondents have not shown bar under
Section 8, issue estoppel or election so as to dispose of the whole
Section 11 Application. At the same time, if any particular prayer is
substantially the same as a prayer placed before the RERA forum
and pursued before the Appellate Tribunal, the Applicant cannot
use arbitration as another parallel route for getting another
adjudication. This follows from Sukanya Holdings , Anil in its
factual situation, the principle in SSIPL Lifestyle and the decision
of the Supreme Court in Neo Developers .
57. The next objection is regarding limitation. The Applicant
says that the claim of Rs.92,45,590/- arose on 7 October 2022 and
the notice invoking arbitration was issued on 25 July 2025. It is
submitted that the part-payments made on 9 August 2023 and 10
August 2023 saved the claim for balance consideration under
Section 19 of the Limitation Act. The Respondents say that the
claims are stale.
31
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
58. On this question, the position is more clear. The Applicant
relies upon paragraph 133 of Krish Spinning , which states:
“133. Thus, we clarify that while determining the issue of
limitation in exercise of the powers under Section 11(6) of
the Act, 1996, the referral court should limit its enquiry to
examining whether Section 11(6) application has been filed
within the period of limitation of three years or not. The date
of commencement of limitation period for this purpose shall
have to be construed as per the decision in Arif Azim
(supra). As a natural corollary, it is clarified that the referral
courts, at the stage of deciding an application for
appointment of arbitrator, must not conduct an intricate
evidentiary enquiry into the question whether the claims
raised by the applicant are time barred and should leave that
question for determination by the arbitrator.”
59. Therefore, I am not deciding at this stage whether each
individual claim is within limitation. The effect of the two part-
payments, whether Section 19 of the Limitation Act applies, the
exact date when the cause of action arose and whether there was
any subsequent acknowledgment may require evidence and
detailed consideration. These issues are kept open. The Section 11
Application has not been shown to be barred by limitation.
60. Taking the matter as a whole, my findings so far are that
there is a valid and existing arbitration agreement. There are
genuine disputes and the claims are not being rejected as sham.
The question of limitation of the claims cannot be decided at this
stage. The objections based upon Section 8 and issue estoppel do
not create bar against every claim. The compensation claim cannot
be rejected merely by saying that it is an afterthought. But all these
32
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
findings still do not answer the main question as to whether the
dispute is arbitrable.
61. The difficulty is the question of arbitrability. On one side
there is Rashmi Realty , which in paragraph 63(i) says that a
dispute between an individual allottee and promoter covered by
RERA is non-arbitral. On the other side is Abhay Kanhere , which
says that the question framed in the earlier judgment was whether
arbitration would take away the jurisdiction of RERA, and that the
converse question was not decided. There is the judgment of the
Delhi High Court in Priyanka Tak Sood , where the view was taken
that RERA and arbitration can operate as concurrent remedies in
an appropriate individual dispute. That reasoning was based upon
Sections 79, 88 and 89 of RERA. Thereafter, Laxman Mura Vaid
considered the contrary Delhi view but followed Rashmi Realty as
the judgment of this Court governing the issue. Therefore, this is
not a case where one party has one judgment and the other party
has another judgment on some small point. The difference goes to
the basic question. The issue is whether the existence of a statutory
forum under RERA and its public nature takes the entire promoter-
allottee class outside private arbitration, or whether the Court has
to examine the exact relief, subject matter and nature of dispute in
every case. This difference is important. If the first view is correct,
every such Section 11 application would fail at the beginning. If
the second view is correct, an Arbitral Tribunal may have
jurisdiction over some contractual disputes even though RERA
remedies are available or were earlier used. The reasoning in
Abhay Kanhere cannot be ignored because Laxman Mura Vaid was
33
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
decided later. The Supreme Court has stated that a precedent has
to be understood by seeing the issue which was raised and
decided. A later coordinate Bench is not a Bench of larger strength.
Therefore, the issue cannot be decided merely by seeing which
judgment came later. At the same time, I cannot ignore Laxman
Mura Vaid . It is a recent decision of this Court which considered
the contrary view of the Delhi High Court, considered the position
of Rashmi Realty and followed it. Therefore, for a Single Judge of
this Court, that judgment gives a reason not to take a different
view because another interpretation may be possible. Judicial
discipline is an important part of administration of justice. But
judicial discipline does not mean that a conflict between decisions
of coordinate Benches has to continue without resolution. If a
Judge finds that the existing judgments cannot be reconciled and
the difference concerns an important issue which can arise, the
proper course is not to create another separate line of law. The
matter can be placed before a larger Bench. The Constitution
Bench in Central Board of Dawoodi Bohra Community v. State of
Maharashtra , (2005) 2 SCC 673, has held that when a Bench of
lesser strength doubts the correctness of an earlier decision, the
matter may be placed before a Bench of larger strength instead of
the lesser Bench directly departing from the earlier decision.
62. I have considered whether the present Application should be
dismissed by following Laxman Mura Vaid and holding that the
dispute is non-arbitrable. There is considerable force in such a
course. If the only question was whether Rashmi Realty continues
to be a judgment of this Court, there is no difficulty in saying that
34
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
it does. But the issue before me is deeper. The Applicant has relied
upon Abhay Kanhere , the principle stated in Ravi Ranjan
Developers , the distinction held in Arif Azim and the reasoning of
the Delhi High Court in Priyanka Tak Sood . The Respondents, on
the other side, have relied upon Rashmi Realty , Laxman Mura
Vaid , the statutory scheme of RERA and now Neo Developers . In
my view, it would not be correct to answer the whole controversy
merely by saying that Section 16 will take care of it. Section 16 is
an important principle of arbitral autonomy, but it cannot create
jurisdiction where the law does not permit it. On the other hand, it
would not be correct to reject every Section 11 application merely
because the dispute has some relation with RERA. The Supreme
Court has required only a limited prima facie examination at the
Section 11 stage. The present difficulty is to determine what
amounts to a prima facie bar in promoter-allottee disputes under
RERA. For this reason, an authoritative decision is required.
63. I am aware that arbitration proceedings are intended to be
completed quickly and unnecessary reference to a larger Bench
may cause delay. The Supreme Court has held that the referral
Court should not conduct a mini trial. However, the present
reference is not proposed for deciding the Applicant's damages or
contractual rights. It is only for settling an important question
which affects the existence of arbitral jurisdiction in a category of
disputes. In these circumstances, some delay for getting an
authoritative answer would be better than passing another
judgment which may lead to another reference. Therefore, in the
present Section 11 proceedings, I do not hold that every dispute
35
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
between a promoter and individual allottee under an Agreement
for Sale governed by RERA is non-arbitrable. At the same time, I
do not hold that every such contractual dispute is arbitrable only
because the Agreement contains an arbitration clause.
64. The question which, in my opinion, requires consideration by
a larger Bench may be framed as follows:
“Whether, having regard to Sections 79, 88 and 89 and the
other relevant provisions of the Real Estate (Regulation and
Development) Act, 2016, a dispute arising between an
individual promoter and allottee under an Agreement for
Sale containing an arbitration clause is, merely because the
relationship and transaction are governed by RERA, non-
arbitrable as a class, or whether the arbitrability must be
examined by reference to the subject matter, nature of relief
and the matters which the statutory authorities under RERA
are empowered to determine;
and, consequently, whether the conclusion in paragraph
63(i) of Rashmi Realty Builders Pvt. Ltd. v. Rahul
Rajendrakumar Pagariya , 2024 SCC OnLine Bom 3871, is to
be understood as a general rule of non-arbitrability of all
such disputes, notwithstanding the reasoning in Abhay
Damodar Kanhere v. Morya Infraconstruct Pvt. Ltd ,
Arbitration Petition No.148 of 2024, and the principles
governing limited scrutiny under Section 11 as held by the
Supreme Court in Arif Azim Co. Ltd. v. Aptech Ltd,(2024) 5
SCC 313 , Vidya Drolia v. Durga Trading Corporation , (2021)
2 SCC 1 and NTPC Ltd. v. SPML Infra Ltd,(2023) 9 SCC 385
?”
65. I find that the objection of Respondent Nos.1 and 2
regarding non-arbitrability raises a substantial question of law
which requires an authoritative consideration by a larger Bench of
36
Uploaded on - 07/10/2026 Downloaded on - 07/10/2026 13:33:40
arbap-205-2026-J.doc
this Court.
66. The papers of the present Arbitration Application shall be
placed before the Hon'ble the Chief Justice on the administrative
side for constitution of an appropriate larger Bench to consider the
questions formulated in paragraphs 64 above, or such other or
modified questions as may be considered appropriate by the
Hon'ble Chief Justice or the larger Bench.
67. The proceedings under Section 11 shall remain deferred for
consideration in accordance with the decision of the Larger Bench.
(AMIT BORKAR, J.)