Pramod Kumar Aggarwal vs Kishore Lall & Ors.
- Court
- Delhi High Court
- Case type
- Civil Suit Original Side
- Decided on
- 24-02-2026
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
Date of decision: 24 FEBRUARY, 2026
IN THE MATTER OF:
I.A. 3505/2023
IN
+ CS(OS) 651/2022
PRAMOD KUMAR AGGARWAL .....Plaintiff
Through: Mr. Arvind Nigam, Senior Advocate
with Mr. Samar Bansal, Mr. Vedant
Kapur and Ms. Anshika Saxena,
Advocates.
versus
KISHORE LALL & ORS. .....Defendants
Through: Ms. Malvika Trivedi, Senior
Advocate with Mr. Ghanshyam Joshi,
Mr. Chirag Joshi, Mr. Shailendra
Slaria and Ms. Sajal Gupta,
Advocates for D-1.
Mr. Vinayak Mehrotra, Ms. Nandini
and Ms. Mayuri, Advocates for D-3.
CORAM:
HON'BLE MR. JUSTICE SUBRAMONIUM PRASAD
JUDGMENT
I.A. 3505/2023
1. This application under Order VII Rule 11(a) & (d) has been filed on
behalf of Defendant No.1 for rejection of the Plaint on the ground that the
Plaint does not disclose a cause of action and is barred by law.
2. The present Suit is one for specific performance of an oral Agreement
to Sell dated 26.10.2019 [“ATS”] whereby according to the Plaintiff, the
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 1 of 19
Defendant No.1 had agreed to sell the Plaintiff the entire Ground Floor,
Basement to be constructed, and Second Floor, Third Floor & Terrace above
Third Floor once constructed, along with 77.5% undivided ownership share
in the plot of land admeasuring 500 sq. yards. bearing No.M-1, Green Park
(Main), New Delhi [“Suit Property”] for a total sale consideration of Rs.
14,00,00,000/-.
3. It is stated that the Plaintiff is a Director in a Delhi-based real estate
company wherein he specializes in residential construction, consulting,
project management and trading of apartments, builder floors and houses in
South Delhi.
4. It is further stated that the Defendant No.1 is a citizen of the United
States of America (USA), ordinarily a resident of New York, a businessman
and the owner of the Suit Property. It is stated that Defendant No.2 is the
nephew of Defendant No.1 and was instrumental in the negotiation and
finalization of the ATS.
5. Facts as borne out from the Plaint are stated as under:
(i) The ATS was executed in Defendant No.2’s presence at his
residence and the Defendant No.2 remained in constant touch with
the Plaintiff, assuring him that Defendant No.1 would return to
India and complete the sale transaction. It is stated that Defendant
No.2 is, therefore, a proper party to the present Suit. It is stated
that Defendant No. 3 is a real estate broker, who was engaged by
the Defendant No.1, to act on his behalf in the transaction. It is
stated that the ATS was entered into in Defendant No.3’s presence
and was memorialised by him in his own handwriting and,
therefore, he is also a proper party to the present Suit.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 2 of 19
(ii) The Plaintiff’s case is that somewhere in the month of October
2019, the Parties were introduced by the Defendant No. 3, who is
the broker engaged by the Defendant No. 1 for the purpose of
exploring sale and purchase of the Suit Property.
(iii) It is stated that the Parties met at the Hyatt Regency Hotel in
October 2019 to discuss the terms and commercials of the ATS
and since demolition or re-construction of the Suit Property would
also entail obtaining ASI permissions, building sanctions, tree
felling approvals etc, the Parties also discussed the modalities of
the same. Pursuant to the said meeting, the Parties also met at the
residence of Defendant No.2 along with their respective brokers
i.e., Defendant No.3 on behalf of the Defendants and one Mr.
Rajesh Arora, on behalf of the Plaintiff. In the said meeting, all the
salient terms and commercials of the ATS were finalized, and a
binding oral contract was concluded between Plaintiff and
Defendant No.1 for sale and purchase of the Suit Property. It is
stated that Defendant No.3 reduced the agreed terms of the ATS
into writing in a note, which was recorded in his own handwriting
by Defendant No.3 in the said meeting in the presence of all the
participants of the meeting i.e., Defendant Nos.1, 2 & 3 and the
broker of the Plaintiff. It is stated that all the salient terms
necessary to conclude the sale were agreed upon, inter alia , (i)
Description of Suit Property being sold; (ii) Total sale
consideration of Rs. 14,00,00,000/-; (iii) Part Payment of Rs.
11,00,000/- was paid by Plaintiff to the Defendant No.1
simultaneous with execution of the ATS, as memorialised in the
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 3 of 19
document contemporaneously handwritten by Defendant No. 3
and the said amount was to be a refunded without interest in 120
days if the transaction was not concluded for any reason; and (iv)
Balance amount was to be paid simultaneous with execution of
Sale Deeds for various floors in the Suit Property in favour of
Plaintiff or his nominees in accordance with the timelines stated in
the note.
(iv) The Plaintiff was always ready and willing to pay the balance
amount, however, the occasion to pay the balance amount never
arose as the Defendant No.1 went back on his obligations to
conclude the transaction.
(v) It is stated that in accordance with the oral ATS, which was
reduced into writing by Defendant No.3, the Plaintiff was to apply
and obtain approvals from the Archaeological Survey of India
[“ASI”] and National Monuments Authority for construction as
the Suit Property was in a restricted zone.
(vi) It is stated that the Plaintiff was also to apply for sanction of
building plans from the South Delhi Municipal Corporation
[“SDMC”] in the name of Defendant No. 1 for demolition and
construction of the Suit Property. It is stated that Defendant No.1
was obliged, in terms of the ATS, to co-operate with any
documentation required including signing on all applications made
to the ASI and the SDMC. The said approvals were applied and
obtained at a cost of approximately Rs.17,00,000/- which was
borne entirely by the Plaintiff. These approvals were obtained by
Plaintiff with the knowledge, active consent and under the
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 4 of 19
signatures of the Defendant No.1 which is evident from the emails
exchanged between the Parties.
(vii) The Defendant No.1 has actively co-operated in the various
necessary documentations and preparations for obtaining all
relevant statutory approvals and sanctions from the authorities like
ASI approval, sanction of building plans, tree felling permissions
etc., and these permissions could not have been granted without
the active involvement and consent of Defendant No.1, who is the
owner of the Suit Property.
(viii) The Defendant No.1 has signed all the applications which were
submitted by the Plaintiff to co-ordinate with the Governmental
Authorities.
(ix) The Defendant No.1 vide email dated 25.01.2020 had also
informed the Plaintiff about the receipt of above-stated approvals
from the National Monuments Authority & ASI and explicitly
thanked the Plaintiff for his efforts in obtaining the same in
accordance with the ATS. It is stated that Defendant No.1 in the
email further requested the Plaintiff to obtain sanction of building
plans and approval for tree cutting, which the Defendant No.1
called formalities for ASI’s approval.
(x) The Defendant No.1 further stated that the Parties had “previously
targeted a closing by 28.02.2020” unless there were delays in
getting approvals, which is not the case. It is stated that the
Defendant No.1 also fixed up a call with Plaintiff to “discuss a
closing time frame”. The said email is in line with the ATS as
memorialised on 26.10.2019 and the repeated usage of the
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 5 of 19
definitive language of fixing a date for “closing” confirms that
there was a concluded contract between the parties, and now only
the ministerial act of execution of documents remained. In the said
email Defendant No.1 also requested his Advocate - Mr. Naresh
Gupta, Advocate to draft Sale Deeds for separate floors of the Suit
Property, which were also shared by him, pertaining to the Second
and Third Floors of the Suit Property, which clearly shows the
intent of the Parties to conclude the transaction and perform the
ATS.
(xi) Acting on the request in the above-stated email dated 25.01.2020,
and also in accordance with the obligations under the ATS, the
Plaintiff made efforts towards obtaining sanction plan approval
from SDMC and tree cutting permission from the relevant
authorities. Approval for the Sanctioned Plan was obtained by the
Plaintiff from SDMC vide Grant of Sanction dated 25.02.2020 at a
total cost of Rs.16,68,948/-, plus administrative expenses and the
said amount was entirely paid by the Plaintiff. The Defendant
No.1 participated in all the above mentioned approval processes,
signed whatever documents which the Plaintiff requested him to
sign and co-operated throughout the process taking full advantage
of the expertise of the Plaintiff in this regard.
(xii) Now having obtained these sanctions and permissions and taking
advantage of outbreak of COVID-19, due to which travel
restrictions were imposed, the Defendants have stopped taking
phone calls of the Plaintiff. The Plaintiff also attempted to reach
out to the Defendants over the next many months over WhatsApp
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 6 of 19
and telephone calls, however, all such attempts were to no avail.
(xiii) Since considerable time had passed and Plaintiff had begun to
suspect the motives of the Defendants in delaying the completion
of the transaction, the Plaintiff was constrained to issue a Public
Notice dated 30.03.2022, notifying the public at large about the
details of the ATS. The said Public Notice was refuted by
Defendant No.1 and, therefore, the present Suit has been filed by
the Plaintiff with the following prayers:
“a) Direct the Defendant No. 1 to specifically
perform the oral Agreement to Sell dated 26.10.2019
entered into between the Plaintiff and Defendant No.
1 by executing Sale Deeds in favour of the Plaintiff
or his nominee(s), with respect to entire Ground
Floor, Basement to be constructed, and Second
Floor, Third Floor & Terrace above Third Floor to
be constructed along with 77.5% undivided
ownership share in the plot of land admeasuring 500
sq. yards. Bearing No. M-1, Green Park (Main),
New Delhi;
b) As a consequence of the above prayer & if the
Defendant fails to come forward to complete the sale
after passing of decree of specific performance, then
Direct appointment of an agency / officer of this
Hon’ble Court to specifically perform the
obligations of Defendant No. 1 under the Agreement
to Sell dated 26.10.2019 by executing Sale Deed(s)
in favour of Plaintiff or his nominee(s) in terms of
prayer (a);
c) Pass a decree of Permanent Injunction
restraining the Defendants, their agents, assignees
etc from in any manner acting contrary to the
Agreement and further restrain them from creating
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 7 of 19
any third - party right, title or interest in respect of
the Suit Property;
d) Pass a decree of Declaration declaring the
refusal of the Defendant No. 1 to comply with the
terms of the oral Agreement to Sell dated 26.10.2019
as being void and illegal;
e) Award costs of the suit to the Plaintiff and against
the Defendants; and
f) Pass any other order or further order(s) as this
Hon’ble Court may deem fit and proper in the facts
and circumstances of the case.”
6. Along with the Plaint, the Plaintiff has filed about 20 documents
which includes the Memorabilia, i.e., a note dated 26.10.2019 which is
termed as an oral ATS, approval from the National Monuments Authority,
approval from the Municipal Authorities granting permission for
construction in the Suit Property, application seeking felling of trees, a copy
of the email dated 25.01.2020 sent by Defendant No.1 to the Plaintiff, a
copy of the email dated 12.02.2020 sent by the Lawyer – Mr. Naresh Gupta
along with the draft Sale Deed, sanctioned plan obtained from the NDMC
etc.
7. The present application has been field by Defendant No.1 under Order
VII Rule 11(a) & (d) of CPC for rejection of the Plaint.
8. By way of the present Application under Order VII Rule 11(a) & (d)
of the CPC, the Defendant No.1 contends that the present Suit, which is one
for specific performance of an oral ATS dated 26.10.2019, cannot be filed
only on the basis of an oral agreement, which is based only on the alleged
memorialised writing in the form of a note.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 8 of 19
9. It is the case of Defendant No.1 that if all the facts are put together,
the only inference would be drawn is that there was no concluded contract
between the parties.
10. It is further stated that averments in the Plaint categorically show that
the relief sought by the Plaintiff in the present Suit is hit by the provisions of
Section 14(b) of the Specific Relief Act, 1963 (as Amended in 2018)
[“SPA”] . According to Defendant No.1, Section 14(b) of SPA provides that
a Contract, performance of which involves performance of a continuous
duty which the Court cannot supervise shall not be enforced. Paragraph No.5
of the Application reads as under:
“5. It is further averred in the Suit that on the
instructions of Defendant No.1, the Defendant No. 3
memorialized the terms of alleged the Agreement into
writing into me Alleged Note in his handwriting at the
same meeting in the presence of all participants in the
meeting. The said document has been filed as
Document-I. A reading of paragraphs 1, 8 and 9 of the
suit and Document No. I shows the following:
(a) The said Alleged Note dated 26th October 2019 is
unsigned. The suit is completely silent on the aspect as
to whether the parties addressed/sent confirmatory
communications affirming, acknowledging or agreeing
to the terms so alleged to form an alleged
Collaboration Agreement.
(b) The names of the Vendor and the Vendee are not
stated.
(c) There is no description of the property.
The consideration in the Note is shown to be "12+02".
It is not stated and nor explained in the suit as to what
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 9 of 19
does "12+02" mean i.e. as to whether it is in lacs or
crores or in which currency. The terms of the payment
of the said alleged sale consideration are not averred
in the suit. It is further not averred in the suit as to
which entity shall pay the sale consideration and in
lieu of which portion of the property (to be constructed
in the future). A reading of paragraphs 1, 8 and 9 of
the suit as well as the Alleged Note dated 26th
October, 2019 are completely bereft of:
(i) Any details of the nature of the collaboration
between the Owner and the Developer and the
incidents required and forming part of such an
Agreement. It is stated that a Collaboration Agreement
by its very nature would include the details of the
construction materials starting from the laying of
foundation work till the completion of the entire
building, name of the Architect, contractors and sub-
contractors etc.
(ii) The nature and quality of the material to be used
for interior works such as laying of floors, washrooms,
flooring etc.
(iii) The material used to make the building earthquake
resistant.
(iv) Division of parking spaces in spilt parking and
arrangements for common areas.
(v) Provisions for the safeguard of labor force as per
the statutory guidelines.”
11. It is the case of Defendant No.1 that a reading of the abovementioned
paragraph shows that if a continuous duty is cast on the Court to
continuously supervise the numerous, multifarious and multidisciplinary
details and other terms and conditions of the alleged and purported
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 10 of 19
Collaboration Agreement and such an agreement cannot be directed to be
specifically performed, and therefore, the Suit is hit by Section 14(b) of
SPA.
12. The Defendant No.1 argues that only preliminary discussions had
taken place between the Parties which cannot lead to a concluded contract.
13. Learned Senior Counsel appearing for Defendant No.1 has drawn the
attention of this Court to various paragraphs of the Plaint to contend that the
Suit is hit by Section 14(b) of SPA and the same is barred by law. Attention
of this Court has been drawn to a judgment passed by the Apex Court in
Sushil Kumar Agarwal v. Meenakshi Sadhu, (2019) 2 SCC 241 and more
particularly to Paragraph Nos.16 & 17 of the said judgment which read as
under:
“16. The requirements to be satisfied by the
plaintiff bringing forth a suit for specific performance
have been analysed in Hudson's Building and
Engineering Contracts [ Eleventh Edn., Vol. 1, p. 677]
and in Price v. Strange [Price v. Strange, 1978 Ch 337
at p. 359 : (1977) 3 WLR 943 (CA)] , where the rule
has been settled that the court will order specific
performance of an agreement to build if:
16.1. The building work is sufficiently defined by
the contract, for example, by reference to detailed
plans;
16.2. The plaintiff has a substantial interest in the
performance of the contract of such a nature that
damages would not compensate him for the defendant's
failure to build; and
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 11 of 19
16.3. The defendant is in possession of the land so
that the plaintiff cannot employ another person to build
without committing a trespass.
17. The expression “development agreement” has
not been defined statutorily. In a sense, it is a catch-all
nomenclature which is used to be describe a wide
range of agreements which an owner of a property may
enter into for development of immovable property. As
real estate transactions have grown in complexity, the
nature of these agreements has become increasingly
intricate. Broadly speaking, (without intending to be
exhaustive), development agreements may be of
various kinds:
17.1. An agreement may envisage that the owner of
the immovable property engages someone to carry out
the work of construction on the property for monetary
consideration. This is a pure construction contract;
17.2. An agreement by which the owner or a person
holding other rights in an immovable property grants
rights to a third party to carry on development for a
monetary consideration payable by the developer to
the other. In such a situation, the owner or right holder
may in effect create an interest in the property in
favour of the developer for a monetary consideration;
17.3. An agreement where the owner or a person
holding any other rights in an immovable property
grants rights to another person to carry out
development. In consideration, the developer has to
hand over a part of the constructed area to the owner.
The developer is entitled to deal with the balance of the
constructed area. In some situations, a society or
similar other association is formed and the land is
conveyed or leased to the society or association;
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 12 of 19
17.4. A development agreement may be entered into
in a situation where the immovable property is
occupied by tenants or other right holders. In some
cases, the property may be encroached upon. The
developer may take on the entire responsibility to settle
with the occupants and to thereafter carry out
construction; and
17.5. An owner may negotiate with a developer to
develop a plot of land which is occupied by slum
dwellers and which has been declared as a slum.
Alternately, there may be old and dilapidated buildings
which are occupied by a number of occupants or
tenants. The developer may undertake to rehabilitate
the occupants or, as the case may be, the slum dwellers
and thereafter share the saleable constructed area with
the owner.”
14. It is further submitted by the learned Senior Counsel for Defendant
No.1 that the facts in the aforesaid judgment are more or less identical to the
present case and, therefore, the Suit is barred by law. It is contended that the
nature of the oral ATS is such that a constant supervision of this Court
would be required to oversee the entire development of the Suit Property
and, therefore, the Suit is hit by Section 14(b) of SPA.
15. Per contra , learned Senior Counsel appearing for the Plaintiff states
that the present Suit has been filed on the basis of a concluded contract
between the parties, specific performance of which is now being sought. He
states that the salient terms of the ATS have been reproduced in the Plaint
and the same do not lack any material particulars and comprehensively
records the sale description of the property being sold, including payment
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 13 of 19
provisions, etc. He states that the details of the development of the building
were also agreed between the Parties and that the Defendant No.1 has
himself signed applications for approvals, which have been taken in the
name of Defendant No.1 himself. He argues that substantial money has been
spent by the Plaintiff to get the approvals and, therefore, it cannot be said
that the contract has not been concluded. Learned Senior Counsel for the
Plaintiff has relied upon the following judgments in support of his
contentions:
i. Dahiben vs. Arvindbhai Kalyanji Bhanusali (Gajra),
(2020) 7 SCC 366 .
ii. Vinod Seth vs. Devinder Bajaj and Another, (2010) 8
SCC 1 .
iii. Davender Kumar Sharma vs. Mohinder Singh & Ors.,
2012 SCC OnLine Del 4441 .
iv. Rajan Gupta vs. Pradeep Kumar Gupta and Others, 2023
SCC OnLine Del 1237 .
v. Jatin Jitendra Rasiklal Shah vs. Shardul Associates, 2023
SCC OnLine Bom 710 .
16. The law regarding Order VII Rule 11 of CPC has now been
crystallized by the Apex Court in its latest judgment passed in Indian
Evangelical Lutheran Church Trust Assn. v. Sri Bala & Co., 2025 SCC
OnLine SC 48 . Paragraph No.6.1 of the said judgment reads as under:
“6.1. …
(i) In T. Arivandandam v. T.V. Satyapal, (1977) 4
SCC 467, this Court while examining the
aforesaid provision has held that the trial court
must remember that if on a meaningful and not a
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 14 of 19
formal reading of the plaint it is manifestly
vexatious and meritless in the sense of not
disclosing a clear right to sue, it should exercise
the power under Order VII Rule 11 of the Code
taking care to see that the ground mentioned
therein is fulfilled. If clever drafting has created
the illusion of a cause of action, it has to be
nipped in the bud at the first hearing by
examining the party searchingly under Order X of
the Code, as observed by Krishna Iyer, J.
(ii) The object of the said provision was laid down
by this Court in Sopan Sukhdeo Sable v. Assistant
Charity Commissioner, (2004) 3 SCC 137.
Similarly, in Popat and Kotecha Property v. State
Bank of India Staff Association, (2005) 7 SCC
510, this Court has culled out the legal ambit of
Order VII Rule 11 of the Code.
(iii) It is trite law that not any particular plea has
to be considered, but the whole plaint has to be
read. As was observed by this Court in Roop Lal
Sathi v. Nachhattar Singh Gill, (1982) 3 SCC 487,
only a part of the plaint cannot be rejected and if
no cause of action is disclosed, the plaint as a
whole must be rejected. Similarly, in Raptakos
Brett & Co. Ltd. v. Ganesh Property, (1998) 7
SCC 184, it was observed that the averments in
the plaint as a whole have to be seen to find out
whether clause (d) of Rule 11 Order VII of the
Code is applicable.
(iv) It was further held with reference to Order
VII Rule 11 of the Code in Saleem Bhai v. State of
Maharashtra, (2003) 1 SCC 557 that the relevant
facts which need to be looked into for deciding an
application thereunder are the averments in the
plaint. The trial court can exercise the power at
any stage of the suit i.e. before registering the
plaint or after issuing summons to the defendant
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 15 of 19
at any time before the conclusion of the trial. For
the purposes of deciding an application under
clauses (a) and (d) of Order VII Rule 11 of the
Code, the averments in the plaint are germane;
the pleas taken by the defendant in the written
statement would be wholly irrelevant at that
stage.
(v) In R.K. Roja v. U.S. Rayudu, (2016) 14 SCC
275, it was reiterated that the only restriction is
that the consideration of the application for
rejection should not be on the basis of the
allegations made by the defendant in his written
statement or on the basis of the allegations in the
application for rejection of the plaint. The court
has to consider only the plaint as a whole, and in
case the entire plaint comes under the situations
covered by Order VII Rules 11(a) to (f) of the
Code, the same has to be rejected.
(vi) In Kuldeep Singh Pathania v. Bikram Singh
Jaryal, (2017) 5 SCC 345, this Court observed
that the court can only see whether the plaint, or
rather the pleadings of the plaintiff, constitute a
cause of action. Pleadings in the sense where,
even after the stage of written statement, if there
is a replication filed, in a given situation the same
also can be looked into to see whether there is any
admission on the part of the plaintiff. In other
words, under Order VII Rule 11, the court has to
take a decision looking at the pleadings of the
plaintiff only and not on the rebuttal made by the
defendant or any other materials produced by the
defendant.
(vii) In an application under Order VII Rule 11 of
the Code, a plaint cannot be rejected in part. This
principle is well established and has been
continuously followed since the 1936 decision
in Maqsud Ahmad v. Mathra Datt & Co. AIR
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 16 of 19
1936 Lah 1021. This principle is also explained in
another decision of this Court in Sejal Glass
Ltd. v. Navilan Merchants Private Ltd., (2018) 11
SCC 780 which was again followed in Madhav
Prasad Aggarwal v. Axis Bank Ltd., (2019) 7 SCC
158.
(viii) In Biswanath Banik v. Sulanga Bose, (2022)
7 SCC 731, this Court discussed the issue whether
the suit can be said to be barred by limitation or
not, and observed that at this stage, what is
required to be considered is the averments in the
plaint. Only in a case where on the face of it, it is
seen that the suit is barred by limitation, then and
then only a plaint can be rejected under Order VII
Rule 11(d) of the Code on the ground of
limitation. At this stage what is required to be
considered is the averments in the plaint. For the
aforesaid purpose, the Court has to consider and
read the averments in the plaint as a whole.”
17. By applying the aforesaid law to the facts as borne out from the
Plaint, it is seen that a meeting was held between the Parties on 26.10.2019,
where some understanding was entered into between the Parties which was
memorialised and put up on a note by the Defendant No.3, which is annexed
with the present Plaint.
18. The averments made in the Plaint show that the Plaintiff obtained
permissions and approvals from the ASI, SDMC, National Monuments
Authority etc., by spending substantial money on his own. Draft Sale Deeds
have also been exchanged between the Parties, which were sent by the
lawyer of Defendant No.1 to the Plaintiff through email. All these incidents
give an indication that substantial steps have been taken after the meeting
was held between the Parties.
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 17 of 19
19. The question as to whether any agreement had been entered into
regarding the nature of collaboration, the nature and quality of the material
to be used for construction, the safeguard for labour force etc., would all be
determined only by leading evidence and the question as to whether the suit
is hit by Section 14(b) of the SPA can be determined only after the trial and
not at this stage.
20. Insofar as supervision is concerned, this Court is conscious that
“constant supervision,” involves the possibility of the Court having to give
an indefinite succession of rulings in order to ensure that the order is carried
out, which would prove undesirable [Ref: Prem Kumar Bansal v. Ambarish
Garg, 2016 SCC OnLine Del 2549 ]. What that means is that the court
cannot be asked to stop its normal functions for the purpose of giving effect
to the terms of a contract, which cannot be conveniently supervised or
enforced by the court itself. Be that as it may, given the facts and
circumstances as borne out from the Plaint, what is the nature of supervision
that is required by this Court, if any, would be determined after the
conclusion of evidence and not at this juncture.
21. Under the ATS, the entire Ground Floor, Basement to be constructed,
and Second Floor, Third Floor & Terrace above Third Floor once
constructed, along with 77.5% undivided ownership share in the Suit
Property are to be given to the Plaintiff. The Defendant No.1 is entitled to
only one floor of the Suit Property which is the First Floor, and therefore the
concern of the Defendant No.1 would be only for that one floor and the
issues regarding the same can be determined only at the time of leading of
evidence when Defendant Nos.1, 2 and 3 would be cross-examined by the
Plaintiff. Therefore, at this juncture, it cannot be said that the Suit is hit by
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 18 of 19
Section 14(b) of SPA.
22. The present Suit is in any event with respect to one portion of the Suit
Property, and it is entirely plausible that the Plaintiff may decide to sell
other portions in future which may involve separate contracts with
others/third parties which may not require supervision by this Court.
Therefore, at this juncture, this Court is in no position to conclude that the
contract requires continuous supervision or not.
23. After the evidence is adduced and if it is found that constant
monitoring would be required by the Court, it is always open for Defendant
No.1 to move an application under Order XII Rule 6 of CPC for dismissal of
the Suit. The Plaint, at this juncture, cannot be rejected. After investing
substantial amount of money by the Plaintiff in getting permissions and
approvals from the various authorities, the Plaint cannot be rejected on an
averment made by Defendant No.1 that the nature of the Agreement is such
that it requires monitoring from the Court which can only be seen at the
subsequent stage.
24. In view of the above, the Application is dismissed.
CS(OS) 651/2022& I.A. 10273/2025, I.A. 3025/2026
25. List on 20.07.2026.
SUBRAMONIUM PRASAD, J
FEBRUARY 24, 2026
S. Zakir /AP
Signature Not Verified
Digitally Signed
By:PRATEEK
Signing Date:28.02.2026
20.00.17
CS(OS) 651/2022 Page 19 of 19