Hemlata Ajay Ramani vs Alag Property Constructions Pvt Ltd
- Court
- Bombay High Court
CNR No : HCBM020242312026
carbpl-24230-2026-J.doc
Shabnoor
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
IN IT’S COMMERCIAL DIVISION
COMM ARBITRATION PETITION (L) NO.24230 OF 2026
Hemlata Ajay Ramani … Petitioner
V/s.
Alag Property Constructions Pvt Ltd. … Respondents
SHABNOOR
AYUB
PATHAN
Mr. Mutahhar Khan a/w Mr. Maulik Tanna, Mr. Krupesh
Bhosle, Ms. Krutika Dongarkar, & Mr. Harshal Gandhi,
for the Petitioner.
Digitally signed by
SHABNOOR AYUB
PATHAN
Date: 2026.10.05
11:27:31 +0530
Mr. Bhavik Lalan a/w Mr. Sanjay P. Shinde, for
Respondent.
CORAM : AMIT BORKAR, J.
RESERVED ON : SEPTEMBER 30, 2026.
PRONOUNCED ON : OCTOBER 5, 2026.
JUDGMENT:
1. By filing this Petition, the Petitioner is seeking interim reliefs.
One of the main reliefs sought is a direction to the Respondent to
deposit an amount of Rs.58,97,600/- (Rupees Fifty-Eight Lakhs
Ninety-Seven Thousand Six Hundred only). According to the
Petitioner, this amount is due and payable by the Respondent
under the registered Deed of Cancellation dated 28 March 2026.
The Respondent had issued a cheque towards payment of this
amount. However, when the cheque was presented, it was
1
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
returned dishonoured.
2. The facts which have led to filing of the present Petition are,
in brief, as follows. On 31 March 2021, the Petitioner and the
Respondent entered into an Agreement for Sale in respect of Flat
No.1001 in the new building known as “Alag Endeavour”. Under
the Agreement for Sale, the Respondent was required to give
possession of the said flat to the Petitioner on or before 31
December 2025. According to the Petitioner, the Respondent,
without taking the consent of the Petitioner, extended the date for
giving possession of the flat up to 30 June 2026. In the meantime,
in or about the year 2025, Mulund Endeavour CHS Ltd. filed
Commercial Arbitration Petition (L) No.21165 of 2025. In that
Petition, one of the reliefs sought was termination of the
development rights of the Respondent. Since the Respondent was
not in a position to give possession of the said flat, the Petitioner,
in or about December 2025, asked the Respondent to refund the
amounts already paid by her along with interest. For seeking such
refund, the Petitioner filed Complaint No.CC12503104 before the
MahaRERA Authority. Thereafter, on 28 March 2026, the Petitioner
and the Respondent executed and registered a Deed of
Cancellation. As per the said Deed of Cancellation, the Respondent
became liable to refund the amounts payable to the Petitioner.
3. Towards payment of the said liability, the Respondent issued
a post-dated cheque dated 30 June 2026 for Rs.58,97,600/-, which
was the principal amount payable to the Petitioner. When the
cheque was presented for payment, it was dishonoured on 1 July
2026 with the endorsement “Funds Insufficient”. After the cheque
2
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
was dishonoured, the Petitioner, through her Advocate, issued a
statutory notice dated 6 July 2026 to the Respondent and its
Director. The notice was sent on 7 July 2026 under three postal
receipts and was duly delivered to the concerned addressees. The
same notice was sent by email to the Respondent and its Director
on 8 July 2026. In these circumstances, the Petitioner has
approached this Court by filing the present Petition under Section
9 of the Arbitration and Conciliation Act, 1996. By this Petition,
the Petitioner seeks interim measures in respect of the amount
which, according to her, has become payable under the Deed of
Cancellation and in view of the subsequent events stated above.
4. Mr. Mutahhar Khan, Learned Advocate for the Petitioner,
submits that because of the circumstances prevailing at the
relevant time, the Respondent was not in a position to complete
the construction and give possession of the said Flat to the
Petitioner as agreed under the Agreement for Sale. Therefore, the
Petitioner expressed her desire to cancel the said Agreement for
Sale and to get back the amount paid by her along with interest.
The Learned Advocate for the Petitioner submits that discussions
and negotiations took place between the Petitioner and the
Respondent and both parties arrived at an amicable settlement. It
was agreed that the Agreement for Sale would be cancelled by
executing a registered Deed of Cancellation. It was agreed that the
Respondent would refund to the Petitioner the part consideration
amount of Rs.58,97,600/- (Rupees Fifty-Eight Lakhs Ninety-Seven
Thousand Six Hundred only).
3
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
5. The Learned Advocate for the Petitioner submits that
accordingly, the Respondent gave the Petitioner a post-dated
cheque bearing No.013669 dated 30 June 2026, drawn on HDFC
Bank, Vikas Palazzo Branch, Mulund (West), Mumbai-400080, for
an amount of Rs.58,97,600/-. The said cheque was signed by Mr.
Pratik Mukesh Somaiya, Director and Authorised Signatory of the
Respondent. According to the Petitioner, the Respondent had given
an assurance that the said post-dated cheque would be honoured
when it was presented for payment. The Learned Advocate for the
Petitioner submits that a Deed of Cancellation dated 28 March
2026 was executed between the Respondent, through Mr. Pratik
Mukesh Somaiya as the Developer, and the Petitioner as the
Purchaser. The said Deed of Cancellation was duly stamped and
registered with the Joint Sub-Registrar of Assurances, Mumbai-30,
under Document Sr. No.MUM-30/6196/2026. The Learned
Advocate for the Petitioner submits that thereafter, on 30 June
2026, the Petitioner deposited the said post-dated cheque bearing
No.013669 for Rs.58,97,600/- with her bank, namely Kotak
Mahindra Bank. However, the cheque was not honoured and was
returned unpaid with the remark “Funds Insufficient”, as shown in
the bank memo dated 1 July 2026. The Learned Advocate for the
Petitioner submits that although the Respondent had assured the
Petitioner that the cheque would be honoured when presented, the
cheque was nevertheless returned unpaid. It is therefore submitted
that the Respondent has failed to pay the amount which became
due and payable to the Petitioner under the Deed of Cancellation
dated 28 March 2026. According to the Petitioner, the said amount
4
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
is still outstanding and has not been paid till date.
6. The Learned Advocate for the Petitioner additionally submits
that the Respondent Company has been carrying on construction
work, including development and redevelopment of different
buildings, for several years. According to the Petitioner, the
Respondent has been involved in various redevelopment projects
concerning Mulund Trupti Co-operative Housing Society Ltd.
(“Trupti Society”), Santosh Apartment Co-operative Housing
Society Ltd. (“Santosh Society”), Mulund Endeavour Co-operative
Housing Society Ltd. (“Endeavour Society”), Niranjan Apartment
Co-operative Housing Society Ltd. (“Niranjan Society”) and Kanta
Surendra Co-operative Housing Society Ltd. (“Kanta Surendra
Society”). The Learned Advocate for the Petitioner submits that
Trupti Society, Santosh Society and Endeavour Society have
already terminated their respective Development Agreements with
the Respondent Company. These Societies have filed different
proceedings, including arbitration proceedings, against the
Respondent. In those proceedings, they have, among other things,
sought recovery of unpaid rent and possession of their respective
plots. It is, therefore, submitted that the Respondent is facing
various arbitration proceedings before different Arbitral Tribunals.
7. The Learned Advocate for the Petitioner further submits that
Santosh Society has filed Commercial Execution Application No.99
of 2025 for enforcement of an interim award and the said
proceedings are still pending. It is submitted that during the
hearing of Interim Application No.2442 of 2025 filed by the
Respondent in those proceedings, the Respondent, through its
5
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
Advocate, had clearly submitted that the amounts lying in all the
accounts of the Respondent which were disclosed before the Court
were negligible. This submission was recorded by the Court in its
order dated 20 November 2025 passed in Commercial Execution
Application No.99 of 2025. The Learned Advocate for the
Petitioner submits that the said order dated 20 November 2025
was challenged by the Directors of the Respondent before the
Supreme Court by filing SLP (C) Diary No.279 of 2026. It is
submitted that the injunction granted against the Respondent
Company continues to remain in force and the said SLP is still
pending. It is further submitted that the Supreme Court passed an
order dated 12 January 2026 in the said SLP.
8. The Learned Advocate for the Petitioner further submits that
Endeavour Society has obtained an interim award from the
Learned Sole Arbitrator in the arbitration proceedings against the
Respondent. Under the said interim award, the Respondent has
been directed to pay substantial amounts towards rent, which
according to the Petitioner is at least Rs.6 crores. It is submitted
that the Respondent was unsuccessful in challenging the said
interim award and has been directed to hand over possession of
the said plot to Endeavour Society. The Learned Advocate for the
Petitioner submits that on 14 July 2026, the Respondent
transferred and assigned its redevelopment rights relating to
Niranjan Society and Kanta Surendra Society in favour of
Shraddha Yog Lifespaces LLP for lump-sum consideration. The said
transfer and assignment were made by two registered Deeds of
Assignment, both dated 14 July 2026. The Learned Advocate for
6
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
the Petitioner submits that from all these facts and circumstances,
it can be seen that the Respondent has committed various defaults
in its redevelopment projects and is facing different arbitration,
execution and contempt proceedings. It is submitted that the
Respondent has lost its redevelopment rights in respect of Trupti
Society, Santosh Society and Endeavour Society. It is further
submitted that the Respondent has transferred and assigned its
redevelopment rights in respect of Niranjan Society and Kanta
Surendra Society for lump-sum consideration.
9. Mr. Khan, learned Advocate for the Petitioner, submits that
the cheque in question was annexed to the registered Deed of
Cancellation. He submits that any difference in the cheque number
is not material, as both the numbers referred to by the Respondent
appear on the cheque. According to him, the numbers 000147 and
013669 are printed at the bottom of the cheque which is annexed
to the registered instrument. He therefore submits that the
Respondent cannot question the genuineness or validity of the
cheque.
10. The Learned Advocate for the Petitioner therefore submits
that, to the best of the Petitioner's knowledge, the Respondent
presently does not have any redevelopment or development
project and no business is being carried on by the Respondent
Company. It is submitted that the conduct of the Respondent and
its Directors creates a serious apprehension that the Respondent
may not comply with the orders passed by the Court. There is an
apprehension that the amount which is due and payable to the
Petitioner may not be recovered unless appropriate interim
7
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
protection is granted by this Court.
11. The Learned Advocate for the Petitioner therefore submits
that, until the arbitral proceedings are heard and decided, this
Court may direct the Respondent to deposit before this Court the
amount of Rs.58,97,600/- (Rupees Fifty-Eight Lakhs Ninety-Seven
Thousand Six Hundred only).
12. Mr. Bhavik Lalan, Learned Advocate for the Respondent,
submits that it is denied that the Petitioner had expressed her
desire to book a flat in the said building or that the Respondent
had agreed to sell Flat No.1001, admeasuring 1109 sq. mtrs. RERA
carpet area, situated on the 10th Floor of Wing-C of the building
known as “Alag Endeavour”. It is further denied that an Agreement
for Sale dated 31 March 2021 was executed in respect of the said
Flat for a total consideration of Rs.2,97,31,600/-. It is denied that
the Petitioner had paid Rs.58,97,600/- towards purchase of the
said Flat. The Learned Advocate for the Respondent submits that
the Petitioner is trying to recover the alleged amount invested by
her along with exaggerated and excessive interest. It is submitted
that there is a dispute as to whether the amount claimed to have
been paid by the Petitioner was received and there is a dispute
regarding the claim made in the present Petition.
13. The Learned Advocate for the Respondent further submits
that Mr. Atul Ramani and the Director of the Respondent are well
acquainted with each other and that Mr. Atul Ramani was an
investor in the Respondent's project. It is submitted that several
disputes arose between Mr. Atul Ramani and the Respondent,
8
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
resulting in various proceedings, some of which are still pending. It
is further submitted that different orders have been passed by the
Civil Courts and the High Court in the proceedings between Mr.
Atul Ramani and the Respondent.
14. The Learned Advocate for the Respondent submits that two
petitions were filed before the NCLT under Sections 8 and 9 of the
Insolvency and Bankruptcy Code. Those petitions came to be
rejected. It is submitted that an appeal against one of those orders
is pending before the NCLAT. The Learned Advocate for the
Respondent submits that the Agreement referred to in the Petition
did not arise from any independent legal liability of the
Respondent. It is submitted that there was no obligation which was
required to be performed by the Respondent under the said
Agreement. According to the Respondent, there were other
disputes between the parties which were required to be settled.
The Learned Advocate for the Respondent submits that the present
Petition is an attempt by the Petitioner to compel and pressurize
the Respondent to settle the disputes according to the demands of
the Petitioner. It is submitted that there is no legal liability upon
the Respondent towards the Petitioner and that the claim made in
the present Petition is disputed.
REASONS AND FINDINGS:
15. The main question which comes before the Court is whether
under Section 9 of the Arbitration and Conciliation Act, 1996, the
Petitioner has shown sufficient grounds for directing the
Respondent to deposit Rs.58,97,600/- till the arbitral proceedings
9
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
are decided.
16. First, it is necessary to see on what basis the Petitioner is
asking for this amount. The Petitioner had entered into an
Agreement for Sale dated 31 March 2021 in respect of Flat
No.1001 in the building known as “Alag Endeavour”. As per the
Petitioner, possession of the Flat was to be given on or before 31
December 2025. Since the Respondent could not give possession,
the Petitioner says that she decided to cancel the transaction and
asked for return of the amount paid by her. Thereafter, the Deed of
Cancellation dated 28 March 2026 came to be executed. The
Petitioner is not claiming refund only on the basis of some oral
promise made by the Respondent. Her case is that after discussions
and negotiations between the parties, it was agreed that the earlier
transaction would be cancelled and Rs.58,97,600/- would be
refunded to her. This understanding was put in writing in the
registered Deed of Cancellation.
17. In my view, this registered Deed of Cancellation is an
important document for considering the present interim
application. The Respondent has submitted that there was no
separate legal liability upon it and that the Agreement referred to
by the Petitioner did not create any obligation which was required
to be performed. But this submission cannot be seen separately
from the subsequent registered document. If the parties executed a
registered Deed of Cancellation through the Director of the
Respondent, then the earlier transaction and the manner in which
it was cancelled cannot be ignored.
10
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
18. The Petitioner has relied upon the post-dated cheque bearing
No.013669 dated 30 June 2026 for Rs.58,97,600/-. The cheque is
stated to have been signed by Mr. Pratik Mukesh Somaiya, Director
and Authorised Signatory of the Respondent. More importantly,
the material before the Court shows that the cheque was annexed
to the registered Deed of Cancellation. The Petitioner presented
the cheque for payment. However, the cheque was returned unpaid
with the endorsement “Funds Insufficient”, as shown in the bank
memo dated 1 July 2026.
19. The Respondent has denied that the Petitioner had paid
Rs.58,97,600/- towards purchase of the Flat. The Respondent has
disputed the transaction. This submission has to be considered. It
is true that while exercising powers under Section 9, this Court
should not decide disputed questions which are to be decided by
the Arbitral Tribunal. But there is a difference between a claim
which is disputed only by an oral statement and a claim which is
supported by a registered document and a cheque issued in
connection with that document. In the present case, the
Respondent has not explained the execution of the registered Deed
of Cancellation dated 28 March 2026. It has not explained why the
post-dated cheque for the same amount was issued, which
according to the Petitioner was towards refund. The Respondent
has denied the liability. But the material before the Court shows
that the Petitioner's claim cannot be treated as a claim which is
without any basis.
20. The dishonour of the cheque is a relevant circumstance. The
cheque was not returned because of some technical mistake. The
11
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
bank memo gives the reason as “Funds Insufficient”. This
circumstance alone does not establish what is the financial position
of the Respondent. But it does show that the payment which was
expected through the cheque was not made. Therefore, at least
prima facie, the Petitioner has shown that Rs.58,97,600/- was to
be paid pursuant to the Deed of Cancellation and that the cheque
issued towards the said amount was dishonoured. I am not giving
any final finding that the Respondent has no defence. That
question can be decided by the Arbitral Tribunal. For deciding the
present application under Section 9 the Petitioner's claim is
supported by the documents and the circumstances which were
existing at the relevant time.
21. The next question is whether only because the Petitioner has
shown a prima facie monetary claim, the Respondent should be
directed to deposit the entire amount. This question cannot be
decided only by seeing that some amount is claimed from the
Respondent. Under Section 9, the Court has power to take
measures for securing the amount which is in dispute. The
Supreme Court in Essar House Private Limited v. Arcellor Mittal
Nippon Steel India Limited , (2022) 20 SCC 178 while considering
Section 9, has observed that the provision permits the Court to
pass an interim measure to “secure the amount in dispute in the
arbitration” and that such power has to be used in a proper and
careful manner. The Supreme Court has observed that the basic
principles of procedural law are relevant, though the Court is not
required to mechanically follow every technical requirement of the
CPC.
12
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
22. This principle is relevant in the present case. The power
under Section 9 cannot be used merely because there is some
disputed claim for money. The party asking for protection has to
show circumstances because of which such protection is necessary,
so that the final arbitral award, if passed in its favour, does not
become difficult to enforce. At the same time, the Court is not
required to follow one fixed formula in every case. If the material
before the Court shows that there is a real need for protection, the
Court can consider an appropriate interim measure.
23. I, therefore, proceed to consider the other circumstances
relied upon by the Petitioner. The Petitioner has referred to the
redevelopment projects concerning Trupti Society, Santosh Society,
Endeavour Society, Niranjan Society and Kanta Surendra Society.
According to the Petitioner, various disputes have arisen regarding
these projects and different proceedings are pending against the
Respondent. The Petitioner has particularly relied upon
Commercial Execution Application No.99 of 2025 filed by Santosh
Society. It is submitted that during those proceedings, the
Respondent, through its Advocate, had stated that the amounts
lying in all the disclosed accounts of the Respondent were
negligible. It is further submitted that this statement was recorded
in the order dated 20 November 2025. This statement, when seen
in the circumstances in which it was made and along with the
other material relied upon by the Petitioner, is a circumstance
which cannot be ignored while considering whether some
protection is required. At the same time, merely because execution
proceedings are pending, it cannot be said that the Respondent
13
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
intends to defeat the claim of the Petitioner. An execution
proceeding shows that another person or Society is seeking
enforcement against the Respondent. It does not automatically
mean that the Petitioner will not be able to recover her amount.
Therefore, the Court has to look at the entire circumstances and
not only one circumstance separately.
24. The Petitioner has relied upon the interim award obtained by
Endeavour Society. Under the said interim award, substantial rent
is stated to be payable by the Respondent and possession of the
plot is stated to have been directed to be handed over. These
proceedings and the interim award may show that the Respondent
is involved in serious financial and contractual disputes. But this
fact alone cannot lead to a final conclusion that the Respondent
will not pay the Petitioner's amount.
25. Another circumstance relied upon by the Petitioner is the
transfer and assignment of redevelopment rights concerning
Niranjan Society and Kanta Surendra Society under two registered
Deeds of Assignment dated 14 July 2026. From the submissions
recorded before me, the Respondent has not disputed that these
registered assignments were made. According to the Petitioner, the
rights were transferred for lump-sum consideration. This
circumstance is relevant because it shows that the Respondent has
dealt with some of its redevelopment rights after disputes had
arisen regarding its projects. But merely transferring rights for
consideration cannot by be treated as proof that the Respondent
intended to defeat the Petitioner's claim. The amount received as
consideration may be available as an asset of the Respondent.
14
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
26. The Petitioner has submitted that, according to her
knowledge, the Respondent presently has no redevelopment
project and no business is being carried on by the Respondent
Company. This submission has to be considered carefully. The
Court cannot treat it as an established fact merely because the
Petitioner has such an apprehension. There should be reliable
material to show the present financial position of the Respondent
or that its assets are being disposed of. However, all the
surrounding circumstances cannot be ignored. There is a registered
Deed of Cancellation. There is a cheque issued towards the amount
stated in that document. The cheque was presented on the agreed
date and was returned with the endorsement “Funds Insufficient”.
There are various disputes and proceedings concerning the
redevelopment projects of the Respondent, including execution
proceedings. There are registered assignments of redevelopment
rights shortly before the cheque was presented. When all these
circumstances are considered together, there is a genuine concern
about whether the amount of the Petitioner can be recovered easily
if it is found payable.
27. The Respondent has relied upon the disputes involving Mr.
Atul Ramani. The Respondent has referred to petitions filed before
the NCLT under Sections 8 and 9 of the Insolvency and Bankruptcy
Code and an appeal pending before the NCLAT. These facts, by
themselves, do not have any direct connection with the Petitioner's
claim under the registered Deed of Cancellation. The disputes
between Mr. Atul Ramani and the Respondent are separate
matters. Similarly, the NCLT and NCLAT proceedings by themselves
15
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
cannot decide whether the Petitioner is entitled to interim
protection under Section 9. The Respondent has submitted that the
present Petition has been filed only to compel or pressurize the
Respondent to settle the dispute according to the demand of the
Petitioner. At this stage, I do not find sufficient material to accept
this submission. The Petitioner is not relying only upon a demand
made by letter. She is relying upon a registered Deed of
Cancellation and a cheque issued in connection with the same.
Therefore, filing of the Petition cannot be treated merely as an
attempt to pressurize the Respondent.
28. It is important to keep in mind that the Petitioner is not
asking this Court to decide the entire monetary claim. She is
asking for protection till the arbitral proceedings are decided.
There is one thing which needs to be made clear. The prayer
describes the amount as “admittedly due and payable”. The
Respondent has disputed its liability. Therefore, it cannot be
recorded that the Respondent has admitted the amount as payable.
The finding at this stage is that the Petitioner's claim is prima facie
supported by the registered Deed of Cancellation and the cheque,
while the Respondent has raised a dispute regarding the liability.
This distinction is important. An interim order should not be based
upon an admission which is not made by the Respondent.
29. The balance of convenience is required to be considered. If
the Respondent is directed to deposit the amount, the money will
remain subject to further orders of the Court. The Respondent will
still have full opportunity to contest its liability before the Arbitral
Tribunal. On the other hand, if no protection is given and the
16
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
apprehension regarding the financial position of the Respondent is
found to be correct, it may become difficult for the Petitioner to
recover the amount after the arbitral proceedings are completed.
The dishonoured cheque and the other circumstances referred to
above give some support to the concern raised by the Petitioner.
The possible prejudice to the Respondent has to be considered.
The direction sought by the Petitioner is only to secure the amount
and not to pay the amount to the Petitioner. The Respondent will
continue to have the opportunity to place its defence before the
Arbitral Tribunal and establish, if it can, that the amount was not
legally payable. Therefore, a direction to deposit the amount will
not decide the rights of either party.
30. For all these reasons, I find that the Petitioner has made out
a prima facie case for protection under Section 9 of the Arbitration
and Conciliation Act, 1996. The balance of convenience is in
favour of securing the identified principal amount. There is a
reasonable apprehension that if the amount is not secured at this
stage, recovery of the amount, if found payable to the Petitioner,
may become difficult. The material on record therefore justifies an
interim direction requiring the Respondent to secure the amount of
Rs.58,97,600/-, subject to the final decision in the arbitral
proceedings.
31. In view of the foregoing discussion, and upon overall
assessment of the material record, the following order is passed:
i) The petition is partly allowed in terms of prayer clause
(a), subject to the following directions:
17
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
ii) The respondent shall deposit before this court an
amount of rs.58,97,600/- (rupees fifty eight lakhs ninety
seven thousand six hundred only) within a period of four
weeks from the date of this order;
iii) The amount so deposited shall be kept in a fixed
deposit with a nationalised bank, initially for a period of one
year, and shall be renewed from time to time until further
orders of this court;
iv) The amount deposited pursuant to this order shall not
be released to the petitioner at this stage. the rights and
contentions of both parties in respect of the said amount are
kept open for determination in the arbitral proceedings;
v) It is clarified that the observations made in this order
are prima facie and only for the purpose of deciding the
present application under section 9 of the arbitration and
conciliation act, 1996. The arbitral tribunal shall decide the
dispute on its own merits and shall not be influenced by the
observations made in this order;
vi) The claim of the petitioner, if any, towards interest or
any other amount is kept open for consideration in the
arbitral proceedings;
vii) The respondent shall furnish a copy of the receipt of
deposit and the fixed deposit receipt to the petitioner within
one week from the date of such deposit;
18
Uploaded on - 05/10/2026 Downloaded on - 05/10/2026 11:39:46
carbpl-24230-2026-J.doc
viii) The petition stands disposed of in the above terms.
ix) All contentions of the parties are kept open.
(AMIT BORKAR, J.)