Larsen And Toubro Limited Thru. Authorized Representative,Mr.Arghya Chattopadhyay vs State Of U.P. Thru. Prin. Secy. Deptt. Infrastucture And Industrial Developmanent Lko And 4 Others

Court
Allahabad High Court

A.F.R.
HIGH COURT OF JUDICATURE AT ALLAHABAD
LUCKNOW
WRIT - C No. - 10823 of 2026
Larsen And Toubro Limited Thru. Authorized
Representative, Mr.Arghya Chattopadhyay
…..Petitioner(s)
Versus
State Of U.P. Thru. Prin. Secy. Deptt. Infrastucture And
Industrial Developmanent Lko And 4 Others
…..Respondent(s)
Counsel for Petitioner(s) : Prashant Kumar Singh
Counsel for Respondent(s) : C.S.C., Sharad Tewari
Court No. - 3
HON'BLE SHEKHAR B. SARAF, J.
HON'BLE ABDHESH KUMAR CHAUDHARY, J.
1 . Heard Mr. Mukul Rohatgi an d Mr. J.N. Mathur, learned
Senior Advocates, assisted by Ms. Mahima Pahwa and Mr.
Prashant Kumar Singh, appearing for and on behalf of the
petitioner; Mr. Pritish Kumar, learned Senior Advocate and
Additional Advocate General, assisted by Mr. Rahul
Kapoor, appearing for and on behalf of the respondent no.
1-State of U.P.; as well as Mr. Gaurav Mehrotra, learned
Senior Advocate, assisted by Mr. Abhineet Jaiswal and Mr.
Sharad Tewari, appearing for and on behalf of respondent
nos. 2 and 3 at sufficient length.

2
WRIC No. - 10823 of 2026
2. The present writ petition has been filed, seeking
the following substantial reliefs:
"(a) issue a writ of certiorari or a writ, order or
direction in the nature of certiorari quashing the
impugned rejection order dated 25.09.2026
passed by the Respondent No. 2 contained in
Annexure No. 1 to the writ petition to the extent it
arbitrarily rejects the technical bid of the
petitioner;
(b) issue a writ of mandamus or a writ, order or
direction in the nature of mandamus commanding
the Respondents to declare the technical bid
submitted by the Petitioner as qualified and to
consider and open the financial bid of the
Petitioner along with the financial bids of other
technically qualified tenderers; "
3. Mr. Mukul Rohatgi and Mr. J.N. Mathur learned
Senior Advocates, appearing for and on behalf of the
petitioner, submit that the petitioner is one of the
India's largest construction companies and amongst
the world's top contractors. Its end to end capabilities
span highways, high speed rail, metros, airports,
nuclear and green energy plants, refineries, water
infrastructure and defence systems, making it the
partner of choice for India's most complex, first of its
kind projects, including having executed projects of
international and social importance in the State of
Uttar Pradesh.
4. The learned Senior Advocate further submits that
the respondent no. 2, being the Uttar Pradesh
Expressways Industrial Development Authority
(hereinafter to be referred as “UPEIDA”) floated a
notice, inviting e-tenders on 17.02.2026 for
Development of Agra Lucknow Exressway to Ganga
Expressway Via Farrukhabad Link Expressway

3
WRIC No. - 10823 of 2026
(Package-II) from Kataiya (Distt. Farrukhabad) to
Timirpur (Distt. Hardoi) (Km.50+000 to Km. 90+838)
in the State of Uttar Pradesh on EPC Basis.
5. It has emerged from the records that in respect
to the aforesaid tender notice, the petitioner has
submitted a bid on 07.09.2026 along with 06 other
participants/bidders.  
6. According to Mr. Mukul Rohatgi , the present
controversy arises from the illegal rejection of the
technical bids submitted by the petitioner in the
aforesaid tender. According to him, the technical bids
of the petitioner was declared non-responsive by the
technical evaluation committee on 25.09. 2026. on the
sole ground that the petitioner was “debarred by the
Jal Jeevan Mission U.P.”.
7. It has been submitted by the learned Sr. Counsel,
that the said rejection is contrary to the express terms
of the Request for Proposal (hereinafter referred to as
“RFP”). Highlighting clause 2.1.18 of Section 2 of the
RFP he has submitted that the said clause no doubt
provides that any entity barred by the central/state
government would be not eligible to submit his bid, if
the said debarment existed on the bid due date,
however, the fact remains that clause 2.2.2.10
specifically deals with catastrophic failure of
structure/highway due to construction defects and
requires the bidder to furnish an undertaking in that
regard. According to him, clause 2.2.2.10 outshines
the requirement of 2.1.18. The learned counsel taking
a cue from the said clauses has submitted that the

4
WRIC No. - 10823 of 2026
rejection of the bid submitted by the petitioner
company is for reasons not stipulated in the notice
inviting tender dated 22nd of June, 2026. According to
him, the bidder was required to furnish a declaration to
substantiate its stand that no catastrophic failure of
structure/highway due to construction benefits has
occurred in the last five years and no such declaration
relating to debarment was required to be made. He
further submits that as per sub clause 2.1.18 which
relates to the general terms of bidding and describes
the entity who may apply for bidding only, does not
examine the eligibility of the participants. According to
him a reading of clause 2.1.18 indicates that no
condition has been stipulated, mandating the bidder to
make any declaration regarding debarment, and as
such, the rejection of the bid submitted by the
petitioner company was not as per law especially when
the petitioner has already submitted a declaration
regarding absence of catastrophic failure of structures.
8. He has further submitted that as far as clause
2.1.18 is concerned, the clause itself stipulates that
the bar must subsist as on the bid due date, and
according to him, in the present case the order of
debarment dated 13.04.2026, relied upon by UPEIDA
had already been kept in abeyance by the U.P. State
Water and Sanitation Mission vide order dated
14.09.2026, that is, much prior to the technical
evaluation dated 25.09.2026 and as such, according to
him, consequently on the date of technical evaluation
on 25.09.2026, there was no operative Order of

5
WRIC No. - 10823 of 2026
debarment by the U.P. Jal Jeevan Mission against the
petitioner so as to disqualify him in the technical bid.
9. It has been further submitted that as per clause
1.2.2 of the RFP the bid was to remain valid for a
period of 120 days from the date specified in class 1.3
for submission of bids and according to him since the
final evaluation of the technical bid was uploaded on
25.09.2026, the said date ought to have been
construed as the bid due date and the eligibility ought
to have been checked as on the said date, wherein
admittedly the petitioner was not debarred because of
the abeyance order by the concerned authority. He has
also highlighted that the technical evaluation
committee has not taken into consideration the
subsequent event of keeping the debarment order at
abeyance on 14.09.2025, which has caused great
prejudice to the petitioner. Grounds for not providing
any opportunity to cure/clarify the deficiencies in their
technical submission required under RFP has also been
raised as was provided to other participants of the
tender.
10. Thus, according to the learned Senior counsel the
issue before the court was not one of substituting, the
courts commercial judgment for that of the technical
evaluation committee but the limited issue was as to
whether the respondents have evaluated the petitioner
bid in accordance with the conditions contained in the
RFP. According to Mr. Mukul Rohatgi , the decision-
making process, proceeded on conditions, not
stipulated in the document and completely ignored
clarification with respect to the debarment that had

6
WRIC No. - 10823 of 2026
already been kept in abeyance. Hence, according to
him the decision of the technical evaluation committee
is amenable to judicial review by this Court.
11. The Learned Senior Counsel has also highlighted
the subsequent development after the technical bid
was rejected, and the financial bid opened of other
participants. He has submitted that the price quoted
by the lowest bidder (L-1) in comparison to the price
quoted by the petitioner is more than 260 Crores and
accordingly the subsequent events/development
patently demonstrates the actual prejudice caused by
the exclusion of the petitioner from the financial
evaluation. It has been thus submitted that the
impugned technical evaluation dated 25.09.2026 in so
far as it declares the petitioner’s bid as non-
responsive deserves to be set aside and the
respondents be directed to reconsider the petitioner’s
technical bid in accordance with the RFP. He has relied
on the judgments of Kimberly club Private Limited
versus Krishi, Mandi and others, reported in 2025
SC online SC 2323; Banshidhar Construction (P)
Ltd. v. Bharat Coking Coal Ltd., reported in (2024)
10 SCC 273; National high-speed Trail
corporation Limited versus Monte Carlo Limited,
and another, reported in 2022 6 SCC 401; U.P. Jal
Sansthan Karmchari Sangh v. State of U.P.,
reported in 2019 SCC OnLine All 6723; and Food
Corporation of India v. Kamdhenu Cattle Feed
Industries, reported in (1993) 1 SCC 71 in support
of his contentions.

7
WRIC No. - 10823 of 2026
12. Per contra , Mr. Gaurav Mehrotra, learned Senior
Advocate, who has appeared on behalf of UPEIDA, the
contesting respondent nos. 2 and 3, has submitted
that clause 2.1.18 specifically provides “any entity,
which has been barred but the Central/State
Government, or any entity controlled by it, from
participating in any project, and the bar subsists as on
the Bid Due Date, would not be eligible to submit the
BID”. According to him, the said clause sufficiently
indicates that the debarment had to be checked at the
time of the Bid Due Date, which in the present case
was 07.09.2026, and since admittedly, the petitioner
was debarred on the said date, as per first principles of
law was not eligible to participate in the tender.
13. He further submits that the Petitioner is also
guilty of fraudulent practice as provided under clause
4.3 (b) of the RFP, according to which fraudulent
practice means a representation or omission of facts or
suppression of facts. He has submitted that since the
petitioner was not eligible because of the existence of
debarment on the bid due date, he purposely did not
disclose such debarment. Thus, according to Mr.
Mehrotra, the petitioner has not come with clean
hands by suppressing material and relevant facts
regarding the said debarment on the Bid Due Date,
which amounts to a fraudulent practice on the part of
the petitioner. He further referred to clause 2.6.3 of
the RFP to demonstrate that the eligibility and/or
qualification requirement of the bidder can be
evaluated by them during the evaluation or at any
time before signing of the agreement and as such has

8
WRIC No. - 10823 of 2026
justified the procedure adopted by them in giving the
petitioner a chance to explain the debarment.
According to him, the mere providing of the said
chance to explain does not in any manner entitle the
petitioner to furnish fresh documents and rely on the
same, when the last date or the bid due date has
already lapsed. The counsel submitted that during the
technical bid evaluation of the petitioner certain
information came to light as was available in the public
domain and as such UPEIDA issued letter dated 18th
of September 2026 seeking clarification of the said
information in view of clause 2.2.10 and 2.1.18.
14. He has further taken this Court to the response
dated 22nd of September 2026 to the letter issued by
the respondent wherein the petitioner has for the first
time mentioned that a letter dated 14th of September
2026 was issued by the U.P. Jal Jeevan Mission relating
to putting on hold the debarment issued to them. He
has also submitted that in the said response the
petitioner has also disclosed that even the State of
Madhya Pradesh has issued a debarment notice to the
petitioner on 13th of August 2026, that has been
assailed before the High Court of Madhya Pradesh at
Jabalpur. The learned Counsel has also argued that in
view of these facts it is apparent from the records that
the bid of the petitioner was not eligible on the Bid
Due Date, that is, on 7th of September, 2026, and in
any case the putting on hold of the debarment by the
UP mission came to be effective on 14th of September,
2026 as it is on that date the debarment notice was
kept in abeyance. He further submits that the said

9
WRIC No. - 10823 of 2026
abeyance letter cannot relate back to the date of the
Bid Due Date, and technically the petitioner was not
eligible on the said date, and accordingly, prayed that
the present petition be dismissed in limine.
15. The learned Senior counsel has further submitted
that any relief to the petitioner would be in the nature
of not providing an equal level playing field to other
participants who due to the said clause of eligibility
being clause 2.1.18 have not participated thinking
themselves to be not eligible in the present tender. As
far as the arguments of the counsel for the petitioner
placing heavy reliance on the catastrophic declaration
is concerned the counsel has submitted that the
certificate was in addition to the eligibility of the
participants and was broadly under the technical
capacity head. According to him, the said certificate
demonstrates the technical capacity and/or capability
of the petitioner and does not in any manner, dilute
the eligibility of the petitioner or the other participants,
as ought to have been ‘in existence’ on the Bid Due
Date.
16. Mr. Mehrotra has relied on the judgment Central
Coalfields Limited and another Vs. SLL-SML
(Joint Venture Consortium and others) reported in
(2016) 8 SCC 622,  to submit that the respondent-
authority being the author of the tender has a right for
strict enforcement of the terms of the tender and since
no case of arbitrary action, unreasonableness and
perversity has been made out, there is no case for
interference by this Court. He has also relied on the
judgment State of Madhya Pradesh and another

10
WRIC No. - 10823 of 2026
Vs. Uttar Pradesh State Bridge Corporation
Limited and another reported in (2022) 16 SCC
633, to submit that this Court, in exercise of the scope
of judicial review, has limited powers of evaluation,
and the rejection of technical bid on the ground of
suppression of information is correct and as per law.
He further relies on the judgments Najma Khatun
and others Vs. State of West Bengal and others
reported in 2026 SCC OnLine SC 1313, and Shree
Chamundi Mopeds Ltd Vs. Church of South India
Trust Association CSI Cinod Secretariat, Madras
reported in (1992) 3 SCC 1, to substantiate an effect
of an interim order, staying operation of an order
under challenge and quashing of the said order.
According to him, the quashing of an order results in
restoration of the position as it stood on the date of
passing of the order which has been quashed, whereas
the stay of operation of an order operates
prospectively from the date the stay order has been
passed and does not in any manner mean that the
order which has been passed has been wiped out from
its existence. He has also relied on the judgment Tata
Motors Limited Vs. Brihan Mumbai Electric Supply
and Transport Undertaking (Best) and others
reported in (2023) 19 SCC 1, to substantiate that this
Court is normally loath to interfere in contractual
matters unless a clear-cut case of arbitrariness or mala
fide or bias or irrationality is made out. He has also
relied on the judgment PSEB and others Vs. Bhatia
International Limited reported in (2006) 13 SCC
284, to substantiate that the High Court should not
extend the last date for submitting any document

11
WRIC No. - 10823 of 2026
which was necessarily required to be filed with the
tender to make it a valid tender bid.
17. Mr. Pritish Kumar, Learned Additional Advocate
General, appearing for and on behalf of the State, has
adopted the submission advanced by UPEIDA and has
additionally submitted that a technical objection based
on the rejection order cannot be allowed to prevail in
the case of the debarment of the petitioner on the bid
due date. According to him, the petitioner was duty
bound on the date of submitting its tender to disclose
the debarment. He further submits that on the plain
reading of clause 2.1.18 it emerges that the said
clause is in the nature of eligibility and, as such, it was
incumbent on the petitioner to have satisfied itself of
being eligible and then participated in the tender
process. He has also relied on the judgment dated
01.06.2022 passed by the Division Bench of the Delhi
High Court in CJDARCL Logistics Ltd Vs. Rites Ltd
and others, reported in 2022 LawSuit (Del) 1429;
to submit that deviation from the terms and conditions
is not permissible as a rule and the same can be
permitted only with the caveat that the said
permission provides a level playing field so that it does
not result in any arbitrariness or discrimination. He has
submitted that if the petitioner, dehors his debarment
on the bid due date, is allowed to participate further in
the tender process, it would be prejudicial to all those
participants who did not participate by making the
correct self-assessment of being debarred on the said
due date but having qualified subsequently by an order

12
WRIC No. - 10823 of 2026
of abeyance and/or quashing of such debarment prior
to the date of Tender opening. Thus, according to him,
any dilution of the said terms and conditions would
result in not providing a level playing field and would
result in arbitrariness and discrimination to those
proposed participants.
18. This Court has given a patient hearing to the
learned senior counsel appearing for the parties and
has perused the material available on record. The
admitted facts of the present lis , relevant to the
context can be re-capitulated in the following pointers:
(a) The Notice Inviting Tender (NIT) was
issued on 22.06.2026. As per the
corrigendum, the bid due date was
07.09.2026 , and the technical bids were
opened on 08.09.2026.
(b) By order dated 13.04.2026 , the Jal
Jeevan Mission, U.P., debarred the petitioner.
On the bid due date this order was in force.
(c) The petitioner did not disclose the
debarment in its bid. It furnished only the
declaration under clause 2.2.2.10 regarding
absence of catastrophic failure of structures
or highways due to construction defects in
the preceding five years.
(d) During evaluation, information available
in the public domain came to UPEIDA’s
notice. By letter dated 18.09.2026 , UPEIDA
sought the petitioner’s clarification under
clauses 2.2.10 and 2.1.18.

13
WRIC No. - 10823 of 2026
(e) By response dated 22.09.2026 , the
petitioner disclosed for the first time that the
Mission had, by letter dated 14.09.2026 ,
kept the debarment in abeyance. It also
disclosed a further debarment by the State of
Madhya Pradesh dated 13.08.2026 , which it
said was under challenge before the High
Court of Madhya Pradesh at Jabalpur.
(f) On 25.09.2026 the Committee declared
the bid non-responsive. The financial bids of
the other bidders were thereafter opened,
and the petitioner says that its price was
about 260 crores lower than the L-1 price. ₹
19. Thus, the petitioner challenges the decision of the
Technical Evaluation Committee dated 25.09.2026,
whereby its technical bid was declared “non-responsive”
in the tender floated by the UPEIDA under the Notice
Inviting Tender dated 22.06.2026, for development of
the Jewar Airport to Ganga Expressway link (Package-
I). The stated ground of rejection is that the petitioner
stood “debarred by the Jal Jeevan Mission, U.P.” The
petitioner prays that the decision be quashed and that
its technical bid be reconsidered in accordance with the
RFP by exercising the power of judicial review by this
Court.
20. The principles governing judicial review of tender
decisions are well settled. This Court need not burden
this judgment with the catena of judgments, which have
invariably held that this Court, while exercising its
extra-ordinary power of judicial review in tender

14
WRIC No. - 10823 of 2026
matters does not sit in appeal over the decision of the
employer or its expert committee. It merely examines
the decision-making process and not the decision. The
well celebrated judgment of the Hon’ble Supreme Court
in Tata Cellular v. Union of India, reported in (1994)
6 SCC 651; has in clear and unequivocal terms held
that judicial review is concerned with the legality of the
process and not the merits of the decision, and that the
Court must not substitute its own opinion for that of the
authority. The said power of judicial review was further
codified by the Supreme Court in the case of Jagdish
Mandal v. State of Orissa, reported in (2007) 14
SCC 517; wherein the Supreme Court framed the test,
and while testing the legality of the process, the Court
asks as to whether the process or decision is so arbitrary
or irrational that no responsible authority acting
reasonably and in accordance with law could have
reached it, and whether public interest is affected. If the
answer is in the negative, there would be no scope for
interference. The contours of the extent and scope of
judicial review in tender matters have been reiterated
in Michigan Rubber (India) Ltd. v. State of
Karnataka, reported in (2012) 8 SCC 216; Afcons
Infrastructure Ltd. v. Nagpur Metro Rail
Corporation Ltd., reported in (2016) 16 SCC 818;
Silppi Constructions Contractors v. Union of India,
reported in (2020) 16 SCC 489; and Uflex Ltd. v.
Government of Tamil Nadu, reported in (2022) 1
SCC 165.
21. It would be apt to mention herein and also
relevant to the context that the Supreme Court held in

15
WRIC No. - 10823 of 2026
Afcons case (supra) that the author of a tender
document is the best person to understand and
appreciate its requirements. Unless the construction is
so absurd that no reasonable person could adopt it, the
Court must defer to the employer’s interpretation. This
was reaffirmed in Agmatel India Pvt. Ltd. v.
Resoursys Telecom, reported in (2022) 5 SCC 362
and N.G. Projects Ltd. v. Vinod Kumar Jain, reported
in (2022) 6 SCC 127. In Tata Motors v. BEST,
reported in (2023) 19 SCC 1, the Court went to an
extent of cautioning against interference in the absence
of a clear case of arbitrariness, mala fides, bias or
irrationality.
22. As far as the submission of Mr. Mukul Rohatgi ,
learned Senior counsel for the petitioner is concerned
that the tender authority must act within the four
corners of the tender document and a decision that
ignores the document’s terms, or introduces a condition
foreign to it, would be arbitrary, we find force in his
arguments in view of the judgments of the Supreme
Court in Ramana Dayaram Shetty v. International
Airport Authority, reported in (1979) 3 SCC 489 and
Food Corporation of India v. Kamdhenu Cattle
Feed Industries, reported in (1993) 1 SCC 71 .
23. Therefore, according to this Court, the question to
be decided in the present petition percolates to as to
whether the respondents acted within the framework of
the RFP or outside it. For the sake of convenience, we
have created different headings of arguments
addressed by the learned senior counsels and as such

16
WRIC No. - 10823 of 2026
we propose to deal with them independently and in
seriatim.
Clause 2.1.18 is an eligibility condition.
24. The first line of argument was relating to clause
2.1.18 of the RFP, which provides that any entity barred
by the Central or State Government, or by an entity
controlled by it, from participating in any project, where
the bar subsists on the bid due date, “would not be
eligible to submit the bid.”
25. The language of the said clause is plain and
simple. It says who “would not be eligible to submit the
bid.” A clause declaring a class of person’s ineligible to
submit a bid is by definition an eligibility condition. The
submission of Mr. Mukul Rohatgi, Senior Advocate that
the clause merely “describes the entity who may apply”
and “does not examine eligibility” is self-defeating,
because determining who may apply is what an
eligibility clause does. The label of the Section or sub-
section in which the clause appears cannot alter its
substance. Clauses in a tender document are read as a
whole and according to their ordinary meaning, and the
employer’s interpretation of its own document will be
accepted unless it is perverse.
26. It is also of no consequence that the clause does
not expressly demand a declaration. An eligibility bar
operates by its own force. A bidder is presumed to know
whether it is barred and must bid only if it is eligible.
The absence of a prescribed format for declaring

17
WRIC No. - 10823 of 2026
debarment does not license a barred entity to
participate. If it did, an ineligible bidder could sidestep
the bar simply by remaining silent. The employer may
therefore verify eligibility during evaluation, and clause
2.6.3 expressly reserves that power until execution of
the agreement.
Clause 2.2.2.10 does not displace clause 2.1.18.
27. Mr. Mukul Rohatgi , learned Senior Advocate has
retorted that clause 2.2.2.10, which deals with
catastrophic failure of structures or highways due to
construction defects and requires an undertaking, is the
only debarment-related requirement, and that
satisfying it disposes of the matter. However, we are
unable to subscribe to the contention of Mr. Mukul
Rohatgi , as the said submission appears to be
misconceived. According to this Court, the two clauses
serve different purposes. In as much as, clause 2.2.2.10
tests the bidder’s construction record, namely whether
any project of the bidder suffered catastrophic failure
during the preceding five years, it is a technical-capacity
attribute. Whereas, clause 2.1.18 is a threshold
condition that goes to the very right to submit a bid. A
bidder may have a spotless construction record and still
be barred by a governmental authority for entirely
different reasons. The debarment here was imposed by
the Jal Jeevan Mission, Uttar Pradesh, not for a highway
failure, but for a different reason. A clean declaration on
structural failure says nothing on the subject of clause
2.1.18 or eligibility and as such according to us, both of

18
WRIC No. - 10823 of 2026
them operate in different hemispheres and are
independent of each other.
28. According to this Court, reading the two clauses
harmoniously, as they must be read, both apply
cumulatively. The petitioner’s construction that
catastrophic declaration meets the ends of the tender
qualification, would make clause 2.1.18 redundant,
which is contrary to the settled rule that no part of a
document should be rendered otiose. It would also read
into the RFP an exclusivity that the RFP does not
contain. The petitioner’s own case, that the debarment
is “meaningless” once clause 2.2.2.10 declaration is
furnished, cannot be accepted.
The relevant date is the Bid Due Date, not the date
of evaluation.
29. The next line of argument developed by the
learned Senior Counsel for the petitioner is that the Bid
Due Date ought to be the date the Technical Evaluation
Committee uploaded the result of the said evaluation,
that is, 25.09.2026 and not the bid due date mentioned
in clause 3.1 of the RFP, which was 07.09.2026.
30. First and foremost, we must understand that
clause 2.1.18 expressly fixes the reference point: the
bar must subsist “as on the bid due date.” This is clear,
and the employer chose it and the same is apparent
from a plain reading of the clause itself. It emerges from
the fact that the bid due date is 07.09.2026 and as a
matter of fact the petitioner does not dispute that on

19
WRIC No. - 10823 of 2026
that date the debarment order of 13.04.2026 was in
force.
31. No doubt, the learned Senior Counsel, seeks to
shift the reference date to 25.09.2026 through clause
1.2.2. However, in our view the said clause merely
provides that bids remain valid for 120 days. It only
addresses how long a bidder is held to its offer and is
basically a validity clause and says nothing about when
eligibility is to be judged. A provision fixing the period
of validity of an offer cannot be used to amend an
express, specific provision fixing the date on which
eligibility is tested. The date of evaluation, or the date
on which the Technical Evaluation was uploaded, is a
stage in the process. It is not the “bid due date,” which
the RFP defines by reference to clause 1.3 and the
corrigendum.
32. Further, we find that the aforesaid understanding
is consistent with the general principle that eligibility is
tested by the conditions, and as on the date, stipulated
in the tender, and that a bidder cannot cure an
ineligibility after the cut-off. In Central Coalfields Ltd.
v. SLL-SML (Joint Venture Consortium), reported in
(2016) 8 SCC 622; the Supreme Court held that
essential conditions of the tender must be strictly
complied with, and that a bidder cannot be permitted to
cure or rectify an essential deficiency after the due date.
In Rashmi Metaliks Ltd. v. Kolkata Metropolitan
Development Authority, reported in (2013) 10 SCC
95; eligibility was likewise tested on the basis of the
tender conditions. The same view was taken in PSEB v.

20
WRIC No. - 10823 of 2026
Bhatia International, reported in (2006) 13 SCC
284; which held that the last date for submission cannot
be extended to allow a document essential to a valid bid
to be supplied.
The abeyance of 14.09.2026 does not relate
back.
33. The next argument of the learned Senior counsel
is that the abeyance of debarment dated 14.09.2026
relates to the date of its issuance, that is, 13.04.2026
and as such according to him on the bid due date, there
was no debarment of the petitioner. According to this
Court, the said submission sufferers from serious
infirmity. Even if one considers the effect of the Mission’s
letter dated 14.09.2026, it cannot assist the petitioner,
for the simple reason that the said debarment letter was
not quashed and/or recalled/withdrawn, but was merely
kept in abeyance. That letter dated 14.09.2026 merely
kept the debarment in abeyance with effect from
14.09.2026, seven days after the bid due date. An order
suspending the operation of a debarment operates
prospectively. It does not erase the debarment or makes
it non-existent for any period prior to its passing.
According to this Court, this distinction is settled. In
Shree Chamundi Mopeds Ltd. v. Church of South
India Trust Association, reported in (1992) 3 SCC
1; the Supreme Court held that a stay of an order does
not have the effect of setting it aside or wiping it out.
The order continues to exist, and the stay merely
prevents its operation from the date of the stay.
Quashing, on the other hand, restores the position as it
stood on the date of the impugned order. The abeyance

21
WRIC No. - 10823 of 2026
here is akin to a stay. It is not a quashing, and it has no
retrospective consequence. On 07.09.2026, therefore,
the petitioner was, as a matter of fact and law, an entity
“barred” within the meaning of clause 2.1.18. The
decision in Najma Khatun v. State of W.B., reported
in 2026 SCC OnLine SC 1313; cited by the
respondents, is to the same effect.
34. The petitioner’s own case that the debarment was
kept in abeyance on 14.09.2026 is thus an admission
that a valid, operative debarment existed on
07.09.2026. Nothing in the record suggests that the
debarment order was quashed or that the abeyance was
made retrospective from a date on or before the bid due
date. Further, a plain reading of the said letter, clearly
indicates that the abeyance was with immediate effect,
that is, on and from 14.09.2026.
35. The Court has also noted that the record reveals
a second debarment, by the State of Madhya Pradesh
dated 13.08.2026, which was in existence on the bid
due date and, on the petitioner’s own statement, is
under challenge. The petitioner has not shown that this
debarment was stayed or quashed as on 07.09.2026.
clause 2.1.18 speaks of a bar imposed by “the
Central/State Government.” A debarment by the State
of Madhya Pradesh falls squarely within it. According to
us, this is an additional and independent reason why the
petitioner was not eligible on the Bid Due Date.
However, it is settled position of law, right from the
decision of the Constitution Bench rendered in the year
1978, in the case of Mohinder Singh Gill v. Chief

22
WRIC No. - 10823 of 2026
Election Commr., reported in (1978) 1 SCC 405, that
existence of reasons must be seen in the impugned
order itself and cannot be supplemented by a
subsequent affidavit/arguments. It is stated that since
the petitioner has been marked as “non-responsive”
only on the ground of their debarment by the Jal Jeevan
Mission, U.P, we do not need to speak our mind on the
debarment by the State of Madhya Pradesh.
Essential and non-essential conditions; no right
to “cure”.
36. The next argument of the learned Senior Counsel
for the Petitioner, is that the debarment was a curable
defect and in as much as once the said debarment was
put on abeyance, he ought to have been made
responsive in the technical bid. He further submits that
other bidders were allowed to cure deficiencies,
however, the petitioner was not permitted. According to
this Court, the whole proposition of the petitioner
proceeds on a misconception. Tender law does not treat
all conditions alike. It distinguishes conditions that go to
the root of the matter, which must be complied with
strictly, from ancillary or procedural conditions, which
the employer may waive or allow to be rectified.
Whether a bidder may “cure” a deficiency depends on
which side of that line the deficiency falls.
37. The distinction was drawn in Poddar Steel
Corporation v. Ganesh Engineering Works,
reported in (1991) 3 SCC 273 . There the Supreme
Court held that conditions that are essential must be
strictly adhered to, while the employer may waive

23
WRIC No. - 10823 of 2026
ancillary conditions meant only to secure the proper
conduct of the process, provided no prejudice results to
others. It was applied in W.B. State Electricity Board
v. Patel Engineering Co. Ltd., reported in (2001) 2
SCC 451; where non-compliance with an essential
condition was held to be beyond the employer’s power
to overlook. B.S.N. Joshi & Sons v. Nair Coal
Services Ltd., reported in (2006) 11 SCC 548;
restated the test that a departure may be permitted
only if the condition is not essential and the departure
does not confer an unfair advantage or cause prejudice
to other bidders.
38. In Central Coalfields Ltd. v. SLL-SML (Joint
Venture Consortium), reported in (2016) 8 SCC
622; the Supreme Court held that an essential condition
of a tender must be complied with as stipulated. The
employer has no power to relax it in favour of one
bidder, and a bidder cannot be allowed to rectify an
essential deficiency after the cut-off. This was followed
in Bakshi Security & Personnel Services (P) Ltd. v.
Devkishan Computed (P) Ltd., reported in (2016) 8
SCC 446; and in State of Jharkhand v. CWE-SOMA
Consortium, reported in (2016) 14 SCC 172 . In
Reliance Telecom Ltd. v. Union of India, reported
in (2017) 4 SCC 269; the Court held that an essential
condition cannot be waived selectively for one
participant. In Afcons case (supra) and Silppi
Constructions (supra) , the Court added that it is for
the author of the document to decide which conditions
are essential, and that the Court will not second-guess
that classification unless it is perverse.

24
WRIC No. - 10823 of 2026
39. Applying these principles, clause 2.1.18 is plainly
an essential condition, for four reasons:-
(i) It is a threshold condition. It decides who
“would not be eligible to submit the bid” at all,
before any question of technical merit arises.
(ii) It is a public-interest and integrity
safeguard. It bars entities that another arm of
government has already found unfit to deal with
the State. It is not a matter of form or
convenience.
(iii) It is tied to a fixed reference date, the bid
due date. A condition tested on a fixed date is
meant to be applied rigidly. Otherwise, the date
would have no purpose.
(iv) It affects persons outside this litigation.
Prospective bidders read it and stayed away.
Waiving it for one bidder would prejudice them,
which is the very prejudice that the Poddar
Steel (supra) and B.S.N. Joshi (supra) line
treats as the limit of the employer’s power to
relax.
40. According to this Court, the petitioner cannot
therefore claim parity with bidders who were permitted
to rectify curable, non-essential lapses such as an
unsigned page, a missing annexure or a formatting
defect. Those deficiencies do not change the bidder’s
status. Here, what the petitioner asks is a change in its
status, from “barred” to “not barred”, by reference to an
event after the due date. That is not rectification of a

25
WRIC No. - 10823 of 2026
lapse in the bid. It is a change in the eligibility of the
bidder.
41. The petitioner’s reliance on the clarification stage
is equally misplaced. Clarification exists to explain what
is already in the bid. It does not permit a bidder to
supply, after the due date, a document or a fact that did
not exist on the due date. The abeyance letter of
14.09.2026 did not exist on 07.09.2026. Accepting it
would amount to what Central Coalfields (supra) and
Bhatia International (supra) forbid, which is to let a
bidder complete an ineligible bid after the deadline.
Opportunity was in any event given on 18.09.2026. The
petitioner was asked about the very clauses on which it
was later rejected, and it answered. The Committee
took the reply on record and decided on 25.09.2026.
The petitioner was thus heard on the very point on
which it was rejected.
42. Nor is this a case in which the Court can say that
the employer’s approach to the condition was irrational.
The test in Jagdish Mandal (supra) and Tata
Motors (supra) is whether the decision is so arbitrary
that no reasonable authority could have reached it. An
employer that enforces an express, unambiguous
eligibility bar, as on its own stipulated date, is on firm
ground.
Level playing field.
43. Mr. Gaurav Mehrotra, learned Senior Counsel for
the respondent - UPEIDA has rightly pointed out that
any relief to the petitioner would prejudice those who

26
WRIC No. - 10823 of 2026
read clause 2.1.18, considered themselves ineligible,
and did not bid. Fairness in public procurement requires
that all prospective bidders be able to rely on the
published conditions. In Reliance Energy Ltd. v.
Maharashtra State Road Development
Corporation Ltd., reported in (2007) 8 SCC 1 , the
Supreme Court emphasised the principle of a level
playing field and held that the terms of a tender must
be applied uniformly, and that a departure to
accommodate one bidder is arbitrary and
discriminatory. The Division Bench of the Delhi High
Court in CJDARCL Logistics Ltd. ( supra) took the
same view: deviation from tender terms is not
permissible as a rule, and where permitted must not
result in arbitrariness or discrimination.
44. In our considered view, if the petitioner is barred
on the bid due date, they cannot now be permitted to
participate on the strength of a post-due-date
abeyance, other entities that abstained on account of
the same clause would be treated unequally. That would
be the very arbitrariness which judicial review guards
against and would be in the teeth of Article 14 of the
Constitution of India.
The price difference does not confer a right.
45. Mr. Mukul Rohatgi, learned Senior counsel has laid
great emphasis on the subsequent development in the
tender process and has submitted that there is almost
a price difference of about 260 crores between the ₹
petitioner’s price and the L-1 price. The Court is
conscious of the importance of public money. But the

27
WRIC No. - 10823 of 2026
lower price argument presupposes that the petitioner
was eligible to have its financial bid opened. Financial
competitiveness is examined only for bidders who clear
the eligibility stage. Otherwise the eligibility conditions
would be meaningless.
46. The Supreme Court in Jagdish Mandal (supra)
and Afcons case (supra) has held that the decisions on
such matters are appropriately left to the tendering
authority, and that a bidder has no right beyond fair
consideration in accordance with the tender terms. In
Meerut Development Authority v. Association of
Management Studies, reported in (2009) 6 SCC
171; it was held that a bidder has no vested right to
have its bid accepted, and that the employer is not
bound to accept even the lowest bid. A lower quote by
an ineligible bidder does not translate into a right to be
considered. Nor can the Court, in the name of price
advantage, direct the respondents to ignore an express
eligibility clause. The Court has also to be mindful that
interference at this stage would disturb a project of
public importance and delay the ongoing tender
process.
The petitioner’s own case on disclosure.
47. The Court has considered whether the absence of
a specific “no debarment” declaration excuses the
petitioner. In the considered opinion of this Court, on a
facial reading of the various clauses of the RFP, the
answer has to be in negative for the following reasons:

28
WRIC No. - 10823 of 2026
(i) Eligibility is not conditional on a
declaration. As held above, clause 2.1.18
operates on its own force.
(ii) A bidder that knows it is barred and
submits a bid, while giving a certificate on its
record under clause 2.2.2.10, cannot claim that
silence about the bar was innocent. A prudent
bidder in that position would have disclosed and
explained the position at the time of bidding.
(iii) The disclosure came only after UPEIDA
raised the matter by letter dated 18.09.2026,
and the Madhya Pradesh debarment surfaced
only in that reply. The petitioner has given no
explanation for its silence at the time of
submitting the Bid.
Conduct and clean hands.
48. Independent of the merits, this Court is entitled
to weigh the petitioner’s conduct in exercising its
discretionary jurisdiction under Article 226 of the
Constitution of India. A litigant that seeks a
discretionary writ must approach the Court with clean
hands and must not suppress or gloss over facts that
bear on its claim. (See Ramjas Foundation v. Union
of India, reported in 1993 Supp (2) SCC 20; K.D.
Sharma v. Steel Authority of India Ltd., reported in
(2008) 12 SCC 481; Dalip Singh v. State of U.P.,
reported in (2010) 2 SCC 114.) By analogy, in the
service jurisprudence context the Supreme Court has
held that suppression of a material fact in the course of
a selection is a relevant consideration whatever the

29
WRIC No. - 10823 of 2026
eventual outcome on the merits: Avtar Singh v. Union
of India, reported in (2016) 8 SCC 471. The petitioner
disclosed the debarment only after being confronted,
and its pleadings in this Court present the matter as one
of interpretation while understating the sequence of
disclosure. That conduct weighs against exercise of the
Court’s discretion in its favour, even apart from the
merits already decided.
49. This Court is mindful of the principle in S.P.
Chengalvaraya Naidu v. Jagannath, reported in
(1994) 1 SCC 1, that fraud vitiates everything. We
emphasise, however, that we have not come to any
finding of fraud against the petitioner. The conclusion on
the tender rests on ineligibility under clause 2.1.18. The
non-disclosure is relevant only to the equities and to the
discretion under Article 226 of the Constitution of India.
The authorities cited for the petitioner.
50. As far as the judgments relied on by the
petitioner, the same do not assist the case of the
petitioner. The case reported as Banshidhar
Construction (P) Ltd. v. Bharat Coking Coal Ltd., in
(2024) 10 SCC 273; stands for the proposition that
the Court may interfere where the decision is arbitrary
or the process unfair. Here, the decision is grounded on
an express clause and is not arbitrary. Similarly,
National High Speed Rail Corporation v.
Montecarlo, reported in (2022) 6 SCC 401; supports
the respondents. The Supreme Court there reiterated
the limited scope of review and set aside the High

30
WRIC No. - 10823 of 2026
Court’s interference with the employer’s technical
decision. Further, as far as Food Corporation of India
v. Kamdhenu Cattle Feed Industries, reported in
(1993) 1 SCC 71; is concerned, it recognises that the
State must act fairly, but also that the terms of the
tender are to be applied as written. It does not permit
a bidder to escape an eligibility bar. Further, as far as
judgment of Kimberly Club (supra) and U.P. Jal
Sansthan Karmchari Sangh (supra) , is concerned,
the Court has not been shown any ratio that holds a
debarment subsisting on the bid due date to be
irrelevant, or that fixes the date of evaluation as the
reference date contrary to an express clause.
51. On the contrary, we find that the respondents’
authorities, particularly Tata Motors (supra) , Bhatia
International (supra) , Shree Chamundi Mopeds
(supra), and CJDARCL Logistics (supra) , buttress the
view taken above.
52. After sifting through the catena of judgments
discussed above, the following principles of law emerge:
(i) Where a tender document contains an
express eligibility condition that bars an entity
from submitting a bid if a governmental
debarment “subsists on the bid due date,”
such a condition is an essential and threshold
requirement;
(ii) Eligibility must be judged strictly as on
the Bid Due Date fixed by the Tender itself. A

31
WRIC No. - 10823 of 2026
subsequent order of abeyance or stay of the
debarment operates only prospectively and
does not relate back so as to render the bidder
eligible on the due date;
(iii) The tendering authority has no power to
waive, relax or cure non-compliance with such
an essential condition after the due date, nor
can a Court, in the exercise of writ jurisdiction,
compel it to do so. Any selective
accommodation would destroy the level
playing field and fall foul of Article 14 of the
Constitution of India;
(iv) Judicial review is confined to examining
whether the decision is so arbitrary, irrational,
mala fide or perverse that no reasonable
authority could have reached it; and
(v) A bidder has no vested right to have its
bid accepted, and that the employer is not
bound to accept even the lowest bid, nor can
the Court, in the name of price advantage,
direct the respondents to ignore an express
eligibility clause.
53. For all the reasons as aforesaid and on a careful
consideration of the record and the law, the Court is of
the considered view that:
(a) Clause 2.1.18 is an eligibility condition,
and the petitioner was barred on the bid due

32
WRIC No. - 10823 of 2026
date, i.e. 07.09.2026, by the order of the Jal
Jeevan Mission dated 13.04.2026.
(b) Clause 2.2.2.10 is a distinct technical-
capacity/capability requirement and does not
displace clause 2.1.18.
(c) The bid due date, and not the date of
evaluation, is the relevant date, and clause
1.2.2 has no bearing on eligibility.
(d) The abeyance of 14.09.2026 operates
prospectively and does not relate back.
(e) The petitioner was given an opportunity
by the letter of 18.09.2026 and its reply was
considered.
(f) The Technical Evaluation Committee acted
within the terms of the RFP, and its decision is
neither arbitrary, irrational, mala fide nor
perverse.
(g) Clause 2.1.18 is an essential condition,
non-compliance with which cannot be cured by
post-due-date events or waived for one bidder.
(h) The petitioner’s non-disclosure of a
subsisting debarment, without explanation until
confronted, weighs against the grant of
discretionary relief.
54. As a sequel to our aforesaid view, no ground for
interference under Article 226 of the Constitution of
India is made out. The writ petition is accordingly
dismissed.
55. There shall be no order as to costs. Any interim
order stands vacated.

33
WRIC No. - 10823 of 2026
56. It is clarified that the observations herein are
confined to this petition. Nothing in this judgment
prevents the petitioner from pursuing its remedies
against the debarment orders before the competent
forum, and nothing here prejudices the pending
challenge before the High Court of Madhya Pradesh at
Jabalpur.
(Abdhesh Kumar Chaudhary,J.) (Shekhar B. Saraf,J.)
September 29, 2026
MVS/-
Digitally signed by :-
MANOJ VIKRAM SINGH CHAUHAN
High Court of Judicature at Allahabad,
Lucknow Bench