NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED vs BIHAR ELECTRICITY REGULATORY COMMISSION & Anr
- Court
- Appellate Tribunal For Electricity
<div> <i> Judgement in Appeal No. 48 of 2021 </i><br /> <b>IN THE APPELLATE TRIBUNAL FOR ELECTRICITY </b><br /> <b>(Appellate Jurisdiction) </b><br /> <b>APPEAL No. 48 OF 2021 </b><br /> <b>th</b><br /> <b>Dated: </b> <b> 13</b> <b> April, 2026 </b><br /> <b>Present: Hon`ble Ms. Seema Gupta, Officiating Chairperson</b><br /> <b>Hon`ble Mr. Virender Bhat, Judicial Member</b><br /> <b>IN THE MATTER OF: </b><br /> NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED, <br /> <i>Through its Resident Engineer, </i><br /> Sh. Umang Anand, <br /> Nehru Marg, Patna – 800021. … Appellant(s) <br /> <b><i>VERSUS</i></b><br /> 1. BIHAR ELECTRICITY REGULATORY COMMISSION<br /> <i>Through its Secretary</i> , <br /> Ground Floor, <br /> Vidyut Bhawan-II, Jawahar Lal <br /> Nehru Marg, Patna – 800021. <br /> 2. BIHAR INDUSTRIES ASSOCIATION INDUSTRY HOUSE, <br /> <i>Through its Chairman-cum-Managing Director,</i><br /> Sinha Library Rd, <br /> Block C, Central Revenue Colony, <br /> Chajju Bagh, Patna, Bihar – 800017. <br /> Counsel on record for the Appellant(s) : Mr.Nishant Kumar <br /> Ms.Anisha Upadhyay<br /> for App. 1 <br /> Counsel on record for the Respondent(s) : Mr.Ravi Kishore <br /> for Res. 1 <br /> Page <b>1</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> <b>JUDGEMENT </b><br /> <b>PER HON’BLE MRS. SEEMA GUPTA, OFFICIATING CHAIRPERSON </b><br /> 1. The captioned Appeal No. 48 of 2021 has been filed by North Bihar Power <br /> Distribution Company Limited <b>,</b> assailing the order dated 21.03.2018 in Case No. <br /> 40 of 2017 ( <b>“ Impugned Order”</b> )and the review order dated 19.12.2018 in Case <br /> No.20 of 2018 passed by the Bihar Electricity Regulatory Commission <br /> <b><i>Description of Parties </i></b><br /> 2. The Appellant, North Bihar Power Distribution Company Limited, is a State <br /> government owned distribution licensee in North Bihar and is a 100 % <br /> subsidiary of Bihar State Power Holding Company Limited (BSPHCL). The <br /> Respondent No.1 i.e. Bihar Electricity Regulatory Commission (herein after <br /> referred as <b>“BERC/State Commission</b> ”), is the State Electricity Regulator. The <br /> Respondent No.2 is the Bihar Industries Association Industry House, a non-profit <br /> organization. <br /> <b><i>Factual matrix of the Case: </i></b><br /> 3. On 01.11.2012 the Appellant came into being after restructuring of erstwhile <br /> Bihar State Electricity Board (BSEB) vide Notification No. 17 dated 30.10.2012 <br /> issued by Energy Department, Government of Bihar, wherein the Appellant was <br /> vested with the distribution activities in the State of Bihar, in terms of sub section <br /> (2) of Section 131 of the Electricity Act, 2003. Until 01.04.2012, the distribution <br /> functions and activities were carried out by BSEB. <br /> 4. On 05.12.2017, the Appellant filed a petition before the State Commission <br /> being Case No. 40 of 2017 for truing up of ARR for FY 2016-17, APR for FY 2017-<br /> Page <b>2</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> 18, ARR and determination of tariff for FY 2018-19 under the Multi Year <br /> Distribution Tariff Regulations, 2015 <b>(“MYDT Regulations 2015”),</b> in which State <br /> Commission passed the Order on 21.03.2018, and disallowed some claims of the <br /> Appellant. Appellant filed a review petition being Case No. 20 of 2018 before the <br /> State Commission on 18.05.2018, which was dismissed by the State Commission <br /> vide its order dated 19.12.2018. Aggrieved thereby, Appellant filed the present <br /> appeal assailing the correctness of the Tariff order/True up order dated <br /> 21.03.2018 and review order dated 19.12.2018 of the State Commission. <br /> <b>DISCUSSION AND ANALYSIS </b><br /> 5. Heard Mr. S.B. Upadhyay, learned senior counsel appearing on behalf of <br /> the Appellant and Mr. Ravi Kishore, learned counsel for the State Commission <br /> and perused the Impugned Order dated 21.03.2018 and review Order dated <br /> 23.12.2018, written submission filed by the parties and other documents. The <br /> Appellant has challenged following six issues: <br /> i. Disallowance of fixed cost of Adani Enterprises Limited (“AEL”) for Jan–<br /> June 2016. <br /> ii. Imposition of 1% “deemed rebate” on power purchase as non ‑ tariff <br /> income. <br /> iii. Disallowance of prior period expenses. <br /> iv. Apportionment of fixed versus variable costs, especially PPA capacity <br /> charges, in tariff design for FY 2018–19. <br /> v. Interest on Working Capital (IoWC) for FY 2016–17 and FY 2017–18. <br /> vi. Late Payment Surcharge (LPSC) for FY 2016–17. <br /> Our consideration and views on each of these issues are deliberated in following <br /> paragraphs: <br /> <b>ISSUE 1 – DISALLOWANCE OF FIXED COST OF ADANI POWER (AEL) FOR </b><br /> <b>APRIL 2016-JUNE 2016</b><br /> Page <b>3</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> 6. It has been contended on behalf of the Appellant that the State Commission <br /> has disallowed Rs.27.75 Crores out of Rs.32.46 Crores claimed by the Appellant <br /> on account of total charges paid to the Adani Enterprise Limited under its medium <br /> term PPA, during the period from January to June 2016, citing the imprudent <br /> demand forecasting for such disallowance. It is submitted that during April to <br /> June 2016, the price on the power exchange were consistently lower than the <br /> AEL energy charge and accordingly, the Appellant prudently backed down the <br /> comparatively costlier power from AEL and procured power from the IEX which <br /> resulted in substantial savings for the consumers. It has been further <br /> contended that the disallowed amount pertains to AEL’s fixed capacity charge <br /> which constituted unavoidable contractual obligations. The State Commission <br /> has misapplied Regulation 20.2 (5) of the MYDT Regulations 2015 which is <br /> intended to disallow cost increment arising from the penalties, interest or <br /> operational inefficiency and not legitimate fixed capacity charges payable under <br /> the approved PPA. As such, the variation in demand is an un-controllable <br /> parameter under Regulation 9.1(d) of the MYDT Regulations 2015. <br /> 7. We note from the impugned order and the submissions made on behalf of <br /> the State Commission that the Appellant had approached and persuaded the <br /> State Commission for extension of PPA dated 23.02.2012 executed with AEL, for <br /> further period of two years beyond 31.12.2015, for purchase of 200 MW power <br /> on the same terms and conditions as stipulated in the said PPA. The State <br /> Commission, after considering the various explanations furnished by the <br /> Appellant, had accepted to extend the PPA with AEL for further six months i.e. <br /> up to 30.06.2016 on the same terms and conditions of the PPA, which was to <br /> supply 200 MW power on RTC basis. However, during the period April to June <br /> 2016, only 7.49 MUs of energy was purchased against the extended PPA, <br /> Page <b>4</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> whereas a total charge of Rs. 22.74 Crores were paid to the AEL which included <br /> the fixed cost liability under the PPA as shown below: <br /></div><table><thead><tr><th>Month</th><th>Energy<br>(MU)</th><th>Fixed<br>Charges<br>(Rs. Crore)</th><th>Energy<br>Charges (Rs.<br>Crore)</th><th>Other<br>Charges<br>(Rs. Crore)</th><th>Total<br>Charges<br>(Rs. Crore)</th></tr></thead><tbody><tr><td>April 2016</td><td>5.57</td><td>6.09</td><td>2.06</td><td>1.09</td><td>9.24</td></tr><tr><td>May 2016</td><td>1.92</td><td>6.17</td><td>0.71</td><td>0.32</td><td>7.19</td></tr><tr><td>June 2016</td><td>0.00</td><td>6.09</td><td>0.00</td><td>0.22</td><td>6.30</td></tr><tr><td>Total</td><td>7.49</td><td>18.34</td><td>2.76</td><td>1.63</td><td>22.74</td></tr></tbody></table><div><br /> 8. The Appellant contended that during April–June 2016, the price on the <br /> power exchange (IEX) were consistently lower than AEL’s energy charges, <br /> accordingly NBPDCL, along with other Bihar Discoms, prudently backed down <br /> the comparatively costlier power from AEL and procured power from IEX, thereby <br /> resulting in substantial savings and during April to June 2016, approximately <br /> 413.8 MU of AEL energy was surrendered and replaced by around 792 MUs <br /> procured from IEX, leading to savings of about Rs 42.76 Crore in energy costs. <br /> 9. The Appellant has referred to Regulation 9.1(d) of MYDT Regulations, 2015 <br /> to contend that demand is an uncontrollable parameter. The said Regulation is <br /> extracted below: <br /> <b><i>9. Controllable and uncontrollable factors </i></b><br /> <i>9.1 The "uncontrollable factors" shall comprise the following factors </i><br /> <i>which are beyond the control of, and could not be mitigated by the </i><br /> <i>applicant: </i><br /> <i>(a)Force Majeure events, such as acts of war, fire and natural calamities. </i><br /> <i>(b) Change in law;</i><br /> <i>(c) Taxes and Duties;</i><br /> Page <b>5</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> <i>(d) Variation in sales; if the Distribution Licensee has adequate power </i><br /> <i>Availability”. </i><br /> 10. There is no issue with this submissions of the Appellant, however, it is not <br /> the case of the Appellant that the power contracted from AEL was not required <br /> due to variation in load demand of customers, however as per the submissions <br /> of the Appellant, this power was substituted by procuring comparatively cheaper <br /> power available on the power exchange, notwithstanding the subsisting fixed cost <br /> liability in the PPA with AEL. From the tabulated data, it does appear that the <br /> considering the total amount of Rs. 22.74 Crore claimed for purchasing 7.49 MUs <br /> in the months April 16 to June 2016, leads to a very high per unit cost of energy <br /> from the AEL as Rs 30 per unit, as also noted in the Impugned Order. The State <br /> Commission, in the Impugned Order, has allowed cost of Rs 3.3 Crore for 7.49 <br /> MUs as per PPA tariff of Rs 4.41 per unit and disallowed the balance cost from <br /> the AEL for FY 2016-17 , which in accordance with the table works out to Rs. <br /> 19.44 Crore (i.e., Rs 22.74 Crore minus Rs3.3 Crore). On a first glance, it appears <br /> that Appellant was not prudent enough, while undertaking the power purchase <br /> from the exchange, and surrendering its power from AEL, with which it had an <br /> approved PPA and has a liability to pay fixed cost charges. However, the <br /> submissions made by Appellant, cannot be brushed aside on this conjuncture, <br /> but need to evaluated, whether such an action has actually resulted in the overall <br /> savings to the consumer as claimed by the Appellant. <br /> 11. There is no denial of fact that the Appellant had a valid PPA for 200 MW of <br /> power on RTC basis up to 30.06.2016 at a tariff of Rs 4.41 per unit approved by <br /> State Commission, in which energy charge works out to Rs 3.69 per unit in terms <br /> of above referred table. We take note from the Table 4.13 of the Impugned Order <br /> ( source wise power purchase quantum approved for FY 2016-17) that a quantum <br /> Page <b>6</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> of 7.49 MUs is reflected against AEL and about 809 MUs from the exchanges ( <br /> IEX and PXIL) with resultant tariff for AEL as Rs 30.36 per unit, while the same <br /> from exchange ( IEX/PXIL) is reflected as Rs 2.84 per unit. Undoubtedly, due to <br /> availing of only 7.49 MUs of energy for three months (April 2016 to June 2016) <br /> coupled with fixed cost liability in terms of the PPA, the resultant per unit tariff <br /> would be high for AEL after accounting the entire fixed cost for only 7.49 MUs <br /> of energy. The Appellant has claimed that they have surrendered about 429 MUs <br /> of energy from the AEL and substituted the same from cheaper energy available <br /> from Exchange. <br /> 12. In order to test the proposition advanced on behalf of the Appellant <br /> regarding the alleged savings from sourcing power through the exchange rather <br /> than from AEL, let us assume that the Appellant had in fact availed 429 MUs of <br /> power from AEL under the approved PPA, notwithstanding the availability of <br /> cheaper power in the exchange. In such a scenario, the cost of procurement from <br /> AEL at Rs 4.41 per unit would amount to Rs189.2 Crore, whereas the same <br /> quantum procured from the exchange at the average rate of Rs 2.84 per unit <br /> would cost only Rs121.8 Crore and even after considering fixed cost charges <br /> liability of AEL, purchase from exchange would be cheaper. Even under partial <br /> procurement scenarios, the comparative analysis demonstrates that reliance on <br /> AEL power leads to higher overall costs, when cheaper power is available at the <br /> Rs in Crore<br /> Exchange. Few scenarios are considered below : <br /></div><table><thead><tr><th>S.No.</th><th>Quantum<br>surrendered<br>(MUs) ( April<br>2016-June<br>2016)</th><th>Cost of<br>power from<br>AEL @Rs<br>4.41/unit<br>(B)</th><th>Cost of power<br>from exchange<br>@ Rs 2.84<br>/unit.<br>(C)</th><th>Fixed Cost<br>Liability<br>incl. other<br>charges of<br>AEL ( Rs<br>18.34+1.63)<br>(D)</th><th>Total<br>Cost<br>(E=C+D)</th><th>Benefits/loss<br>to Consumer<br>(F =E-B)</th></tr></thead><tbody></tbody></table><div><br /> Page <b>7</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /></div><table><thead><tr><th>1</th><th>429</th><th>189.19</th><th>121.8</th><th>19.97</th><th>141.77</th><th>47.42</th></tr></thead><tbody><tr><td>2</td><td>300</td><td>132.3</td><td>85.2</td><td>19.97</td><td>105.17</td><td>27.13</td></tr><tr><td>3</td><td>250</td><td>110.2</td><td>71.0</td><td>19.97</td><td>90.97</td><td>19.23</td></tr><tr><td>4</td><td>200</td><td>88.2</td><td>56.8</td><td>19.97</td><td>76.77</td><td>11.43</td></tr></tbody></table><div><br /> 13. From the comparative analysis set out above, it is evident that even if one <br /> were to assume a requirement of only 200 MUs of power, and such requirement <br /> had been met through procurement from AEL under the PPA rather than <br /> surrendered in favour of cheaper exchange power, the overall cost to consumers <br /> would nonetheless have been higher. This assumption is, in fact, conservative, <br /> since the record demonstrates that up to 1100 MUs have actually been procured <br /> from the open market. Thus, even in the limited scenario as reflected above, <br /> procurement from the exchange remains demonstrably more economical, <br /> whereas reliance on AEL power would have resulted in higher overall power <br /> purchase cost. <br /> 14. It is pertinent to note that the State Commission, in the Impugned Order, <br /> has not recorded any finding with respect to the quantum of power procured from <br /> the exchange, thereby implicitly acknowledging the necessity of open market <br /> procurement to meet the prevailing demand. We take note that initially the State <br /> Commission was not inclined to extend the term of the PPA beyond 31.12.2015, <br /> considering the high cost of energy, however subsequently it had extended the <br /> same up to 30.06.2016, and accordingly liability of payment of fixed charges gets <br /> affixed on the Appellant. Thus, the State Commission having already approved <br /> Page <b>8</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> the PPA with AEL, the procumbent of cheaper power from exchange and <br /> surrendering power from AEL under PPA in the month of April 2016 to June 2016, <br /> has not resulted in more power procurement cost to the ultimate consumer, even <br /> after considering fixed cost liability under the said PPA. Therefore, it cannot be <br /> concluded that surrendering AEL power and substituting the same with exchange <br /> procurement has occasioned more power purchase cost to the consumers on <br /> account of liability towards fixed charges under the PPA. The substitution has <br /> resulted in tangible consumer benefit, consistent with the principle of least-cost <br /> procurement. <br /> 15. We would however like to add that though in the present cost, not availing <br /> power under approved PPA but by substituting the same with cheaper power from <br /> exchange, has ultimately resulted in overall reduction in power purchase cost, <br /> however in case of non-extension of said PPA, there would have been no liability <br /> of fixed charges resulting in savings on that account also and still Discoms could <br /> have been in a position to meet their demand by availing power from Exchange. <br /> We therefore feel, that going forward, the DISCOM should adopt more pragmatic <br /> approach before entering into the PPA to undertake the fixed cost liability if power <br /> is not required to be availed under the PPA, and anticipate market situation <br /> better. <br /> 16. The State Commission, in the Review Order dated 31.12.2016 has referred <br /> to the Regulation 20(2)(5) of BERC (Multi Year Distribution Tariff) Regulations <br /> 2015, for denial of fixed cost charges of AEL. In this context, it is pertinent to note <br /> that referred regulation 20 (2) pertains to the formula for computing incremental <br /> charges on account of increase in fuel cost and power purchase fuel cost <br /> adjustment (FPPCA) and under (5) it has been stated that <i>“ any increase by the </i><br /> <i>licensee by way of penalty, interest due to delayed payments and due to </i><br /> <i>operational inefficiency shall not be allowed”. </i> In our view the said Regulation is <br /> Page <b>9</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> not application while dealing with fixed capacity charge under the PPA and such <br /> observation in the review Order is set aside. <br /> 17. In view of above deliberations, we allow the fixed capacity charge and other <br /> charge of AEL for the month of April 2016 to June 2016. The Impugned Order <br /> stands modified to the aforesaid extent on this issue. <br /> 18. The learned Senior counsel on behalf of the Appellant has contended that <br /> State Commission has computed average charges as Rs 3.937/kWh considering <br /> total power purchase cost including Transmission cost as Rs 4058.09 Crore and <br /> has effected double disallowance as while disallowing 1396.96 MU of power (Rs. <br /> 552.02 Crore), it has applied computed composite power purchase rate, which <br /> already includes fixed charges, while fixed cost of AEL was already disallowed. <br /> Having allowed the fixed capacity charge for the AEL as noted above, the issue <br /> of double disallowance on account of disallowance of cost of AEL stands duly <br /> addressed. <br /> <b>ISSUE 2 – 1% “DEEMED REBATE” ON POWER PURCHASE AS NON</b> ‑ <b>TARIFF </b><br /> <b>INCOME</b><br /> 19. The State Commission in the Impugned Order has considered normative <br /> rebate of 1% on total power purchase cost of Rs. 4153.73 Crore i.e. about Rs. <br /> 41.54 crore, and treated this as non ‑ tariff income for FY 2016 -17 as reflected in <br /> the Table 4.54 of the Impugned Order. Learned Senior counsel on behalf of <br /> Appellant has contended that Appellant has got actual rebate of only about Rs. <br /> 10.18 crore as reflected in audited accounts and same should only be considered; <br /> State Commission has even applied this rebate on power purchase cost that it <br /> had disallowed (and was being funded by State subsidy), effectively assuming <br /> that the utility got rebate on costs it never paid . By imputing rebate even on the <br /> disallowed cost, the State Commission has further reduced the ARR by <br /> Page <b>10</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> approximately Rs. 2.9 crore (being 1% of about Rs. 290 Crore disallowed), <br /> thereby imposing an unfunded burden on the Appellant. Such an approach <br /> results in a double adjustment of ARR—first by disallowing the cost and thereafter <br /> by assuming an income on that disallowed cost—which is both inconsistent and <br /> punitive. It is further contended on behalf of Appellant that the MYDT <br /> Regulations, 2015 do not provide for any deemed or notional rebate on power <br /> purchase and State Commission, has relied upon Regulation 44 of the CERC <br /> Tariff Regulations, 2014 (relating to rebate structure) and this Tribunal judgement <br /> in <b><i>“NDPL v. DERC” (Appeal No. 153 of 2009) </i></b> to justify the assumption of a 1% <br /> rebate, which is not applicable in the present case <b><i>. </i></b><br /> 20. The referred judgement of this Tribunal dated 30.07.2010 in <b><i>“NDPL v. </i></b><br /> <b><i>DERC” (Appeal No. 153 of 2009)</i></b> is with regard to deductions made for the <br /> rebate earned by the Appellant from the power purchase cost and observed that <br /> in some cases generation companies offer rebate of 2 % immediately on <br /> presentation of bill. This Tribunal, after analysing the billing cycle of domestic <br /> consumer and considering that there is mismatch between receipt of payment <br /> from the consumer and payment to be made by distribution licensee for power <br /> purchase for getting 2% rebate, held that rebate earned on early payment of <br /> power purchase cost cannot be deducted from the power purchase cost and <br /> rebate earned only up to 1% alone can be treated as part of non-tariff Income. <br /> This tribunal in this judgement held that even if a licensee has earned a rebate of <br /> 2%, however rebate earned of only up 1% can only be treated as non-tariff <br /> income. Emphasis on this judgement is on the rebate earned and it does not hold <br /> that mandatorily 1% rebate is to be accounted for, whether earned or not, for <br /> reducing power purchase cost or treating as non-tariff income. Thus, the referred <br /> judgement is not applicable to the facts of the Present case. <br /> Page <b>11</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> 21. It is apposite to reproduce the Regulation 44 of the CERC Tariff <br /> Regulations, 2014 as hereunder: <br /> <i>“44. Rebate Tariff Regulations 2014-19 (1) </i><br /> <i>payment of bills of the generating company and the transmission licensee </i><br /> <i>through letter of credit on presentation or through NEFT/RTGS within a </i><br /> <i>period of 2 days of presentation of bills by the generating company or the </i><br /> <i>transmission licensee, a rebate of 2% shall be allowed. (2) Where </i><br /> <i>payments are made on any day after 2 days and within a period of 30 days </i><br /> <i>of presentation of bills by the generating company or the transmission </i><br /> <i>licensee, a rebate of 1% shall be allowed.” </i><br /> 22. Since the rebate clauses are embedded in the CERC Tariff Regulations, <br /> the obligation to extend rebate is statutory in nature and binding upon the <br /> generating companies. Once the DISCOMs effect timely payment within the <br /> stipulated time, the generators cannot lawfully refuse the rebate. There is no <br /> dispute that DISCOMs ought to make all reasonable efforts to avail such rebate, <br /> however, neither the CERC Regulations nor the BERC Regulations have been <br /> shown to contain any provision mandating that DISCOMs must necessarily <br /> structure their finances so as to avail such rebate. In fact, even in the absence of <br /> actual rebate availed, the Impugned Order proceeds on the assumption of a <br /> normative 1% rebate to be treated as non-tariff income, which is without <br /> regulatory foundation. <br /> 23. In the absence of any statutory or regulatory mandate, DISCOMs cannot <br /> be compelled to arrange their financial operations in a manner directed towards <br /> availing rebates. Consequently, the direction to treat a normative 1% rebate as <br /> non-tariff income for the purpose of reducing the ARR is unsustainable in law. <br /> The Impugned Order, to the extent it rests upon such reasoning, cannot be <br /> upheld and is accordingly set aside on this issue and the Rebate actually availed <br /> Page <b>12</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> by the Discoms, as indicated in the audited accounts, is to be considered as non-<br /> tariff Income.<br /> <b>ISSUE 3 – PRIOR PERIOD EXPENSES </b><br /> 24. Appellant had claimed net prior period expenses amounting to Rs. 281.09 <br /> Crore, as appearing in audited accounts, however, State Commission, in the <br /> Impugned Order, after reclassification of an amount of Rs. 8.84 Crore pertaining <br /> to holding-tax related A&G expenses as prior period expense and considering <br /> negative prior period power purchase cost of Rs 9.33 Crore, approved a net prior <br /> period income of Rs. 0.49 crore. It has been contended on behalf of the Appellant, <br /> that State Commission has relied upon the absence of an item-wise and year-<br /> wise break-up from the field offices to disallow the claimed net prior period <br /> expenses of Rs. 281.09 Crore, while at the same time accepting the prior period <br /> sale of power (income) figures reflected in the same audited accounts. <br /> 25. We note from the Impugned Order that the State Commission has asked <br /> the details of net prior period expenses claimed during True up of FY 2016-17, <br /> and in response, the Appellant herein have indicated that it is unable to furnish <br /> item wise and year wise details of prior period expenses as the same is distributed <br /> over various offices. It has been contended on behalf of the Appellant that courts <br /> have consistently treated audited accounts and Chartered Accountant certificates <br /> as adequate proof of actual expenditure. <br /> 26. There is no doubt that auditors play a critical role in certifying audited <br /> accounts by ensuring that financial statements present a <i>true and fair view</i> of a <br /> company’s financial position, comply with applicable statutory requirements, and <br /> are free from material misstatements. It provides credibility to the accounts and <br /> builds trust among shareholders, including regulators, and the general public. <br /> Auditors examines the books of account, vouchers, invoices and ensure <br /> Page <b>13</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> accuracy, completeness and compliance with accounting standards and it also <br /> tend to identify material misstatements due to error or fraud. However, in terms <br /> of Section 61 of Electricity Act, 2003, the Appropriate Commission is required to <br /> safeguard the consumer’s interest and is required to undertake an independent <br /> prudence check to verify whether the costs claimed are reasonable, efficient, and <br /> in line with sectoral benchmarks. Thus, it is onerous on the part of Appellant, to <br /> provide year wise details of prior period expenses. We do not find any error in the <br /> Impugned Order on this issue and the same is upheld. However, since on some <br /> issues we intend to remand the matter to State Commission, we feel it proper to <br /> provide liberty to the Appellant, to submit requisite details as desired by State <br /> Commission with regard to prior period expenses for FY 2016-17 expeditiously <br /> and State Commission, on prudence check may pass order for such prior period <br /> expenses also along with other issues being remanded. <br /> <b>Issue 4 – Apportionment Of Fixed And Variable Charges In Tariff Design </b><br /> <b>(FY 2018–19) </b><br /> 27 <b>. </b> Learned senior Counsel for the Appellant has contended that PPA capacity <br /> charges and transmission charges are inherently fixed costs, and treating almost <br /> the entire power purchase cost of Rs. 6480.33 Crore as “variable” while <br /> recognizing only Rs. 567.06 Crore as “fixed” results in an artificially low fixed cost <br /> share of 10.47%, thereby leading to the erroneous conclusion in the Impugned <br /> Order that a fixed charge recovery of 18.28% indicates over-recovery. While <br /> same may constitute 44-45 % of the ARR, if fixed cost burden is correctly <br /> aggregated. In accordance with the principles of cost causation and Section 61(g) <br /> of the Electricity Act, such costs ought to be primarily recovered through fixed or <br /> demand charges, while energy-related costs, including losses, should <br /> appropriately be recovered through per-unit energy charges. <br /> Page <b>14</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> 28. Per Contra, learned counsel on behalf of the State Commission submitted <br /> that fixed charges for the Discom denote the network-related costs such as O&M <br /> expenses, depreciation, return on Equity (RoE) etc, whereas the power purchase <br /> represents the actual cost of power procurement, which inherently includes both <br /> fixed and variable components of generation cost. In the Impugned Order, the <br /> fixed cost on account of network related cost has been indicated as Rs 567.06 <br /> Crore and with existing tariff the revenue in fixed cost component of tariff works <br /> out to Rs 1229.89 Crore and same has been considered to be recovered as fixed <br /> cost under the total revenue of 7047.39 Crore. <br /> 29. There is no dispute that DISCOMs incur fixed cost liabilities under the <br /> power purchase Agreements. Accepting the contention advanced by the <br /> Appellant would imply that the entire fixed cost liability, including that embedded <br /> in the power purchase cost, ought to be recovered exclusively through fixed <br /> demand charges, while only the energy component of the power purchase cost <br /> would be recovered as variable charges. In our considered view, such an <br /> approach would result in disproportionately high fixed demand charges for <br /> consumers, with correspondingly low energy charges, thereby distorting the tariff <br /> structure. Ordinarily, fixed charges represent those costs which do not vary with <br /> the quantum of electricity consumed, such as the cost of maintaining the <br /> distribution network and administrative overheads. Variable charges, on the other <br /> hand, vary directly with consumption (kWh) and reflect the cost of purchasing or <br /> generating electricity. To recover the entire fixed cost of power purchase solely <br /> through fixed charges is neither advisable nor consistent with sound regulatory <br /> practice, as it reduces flexibility, imposes unavoidable burden on consumers, and <br /> diminishes incentives for efficient electricity consumption. <br /> 30. It is also not the case of the Appellant that the fixed cost component of <br /> power purchase is not being recovered. On the contrary, the fixed cost <br /> Page <b>15</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> component is subsumed within the variable charges, thereby ensuring recovery <br /> while simultaneously encouraging efficient consumption. We therefore find no <br /> infirmity in the Impugned Order on this issue, and the same is accordingly upheld. <br /> <b>Issue 5 – Interest On Working Capital (FY 2016–17 And 2017–18) </b><br /> 31. In the Impugned Order, State Commission has approved “Nil” Interest on <br /> Working Capital (IoWC) for FY 2016–17, and Rs. 22.96 Crore for FY 2018-19 as <br /> noted below: <br /></div><table><thead><tr><th>Sl.No.</th><th>Particulars</th><th>Revised and<br>approved for<br>FY 2016-17<br>(RE) in Tariff<br>Order dated<br>24.03.2017</th><th>approved for<br>FY 2016-17 in<br>Truing up</th><th>Approved<br>in review<br>for FY<br>2017-18</th></tr></thead><tbody><tr><td>1</td><td>O&M exp. (1 month)</td><td>26.63</td><td>27.17</td><td>--</td></tr><tr><td>2</td><td>Maintenance spares<br>40% of R&M expenses<br>for one month</td><td>1.84</td><td>1.84</td><td>904.40</td></tr><tr><td>3</td><td>Receivables – 2 months</td><td>786.66</td><td>736.88</td><td>2.08</td></tr><tr><td>4</td><td>Total working capital<br>(1+2+3)</td><td>815.13</td><td>765.89</td><td>906.48</td></tr><tr><td>5</td><td>Less:<br>a. Power purchase<br>cost, transmission<br>charges and load<br>dispatch charges<br>of one month</td><td>347.25</td><td>346.14</td><td>413.48</td></tr><tr><td></td><td>b. Depreciation, RoE<br>and contingency<br>reserve</td><td>34.47</td><td>10.41</td><td>20.76</td></tr><tr><td></td><td>c. Security deposit<br>from consumers</td><td>268.89</td><td>271.55</td><td></td></tr><tr><td></td><td>d. Grant received<br>from State Govt.<br>for purchaser of</td><td>236.30</td><td>252.28</td><td>309.28</td></tr></tbody></table><div><br /> Page <b>16</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /></div><table><thead><tr><th></th><th>power and other<br>O&M expenses</th><th></th><th></th><th></th></tr></thead><tbody><tr><td></td><td>Sub-total (a+b+c+d)</td><td>886.91</td><td>880.38</td><td>743.06</td></tr><tr><td>6</td><td>Net working capital<br>requirement (4-5)</td><td>(71.78)</td><td>(114.48)</td><td>163.42</td></tr><tr><td>7</td><td>Rate of interest %</td><td>14.75%</td><td>14.05%</td><td>14.05%</td></tr><tr><td>8</td><td>Interest on working<br>capital (6*7)</td><td>--</td><td>--</td><td>22.96</td></tr></tbody></table><div><br /> 32. It has been contended on behalf of the Appellant that First Amendment to <br /> Regulations 26, introduced in 2017, which removed O&M expenses from the <br /> working capital computation for distribution licensees, has been applied by State <br /> Commission to the ongoing second control period (2016–19) as well as to the <br /> true-up for FY 2016–17, thereby giving it an impermissible retrospective effect, <br /> contrary to the regulatory framework under which control-period norms are <br /> required to remain locked-in ex ante . It is further submitted that, for FY 2016–17, <br /> State Commission deducted one month’s power purchase cost, which also <br /> included the amounts that had already been disallowed on account of excess <br /> distribution losses, whereas Regulations 26 contemplates deduction only of the <br /> actual power purchase cost forming part of the ARR, and any disallowed portion <br /> funded through State subsidy cannot be treated either as a working-capital <br /> requirement or as an available source for deduction. Deduction on account of <br /> depreciation and Return on Equity (RoE) is also not correct as these are not <br /> readily available cash resources, and do not necessarily translate into immediate <br /> cash inflows aligned with the working-capital cycle. Regulation 26 provides for <br /> reduction of working capital only where the State Government provides a grant <br /> or subsidy specifically towards power purchase and O&M expenses; however, <br /> subsidy provided to consumers, including support extended under the UDAY <br /> scheme, constitutes tariff income and cannot automatically be treated as a <br /> Page <b>17</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> working-capital grant, a distinction that State Commission has itself <br /> acknowledged while observing that resource-gap subsidy cannot, in all <br /> circumstances, be simply netted off against the working capital requirement. <br /> 33. We note that, in the True Up exercise for FY 2016–17, one month’s O&M <br /> expenses have been considered in accordance with Regulation 26 of the MYDT <br /> Tariff Regulations 2015. Accordingly, we find no merit in the contention of the <br /> Appellant regarding the alleged retrospective application of the first amendment <br /> to the MYDT Regulations, 2015, dated 30.06.2017, for FY 2016–17. The <br /> deductions on account of depreciation and Return on Equity (RoE) have also <br /> been made in line with the extant regulations, and the Impugned Orders warrants <br /> no interference on this count. <br /> 34. It is pertinent to note that the MYDT Regulations, 2015, were applicable <br /> from 1st April 2016 until 31st March 2021, or until amended. The first amendment, <br /> dated 30.06.2017, came into force only upon its notification in the Official Gazette <br /> on 11.07.2017, and therefore its applicability commences from that date. We do <br /> not find merit in the submission of the Appellant that the said amendment cannot <br /> be applied to the entire control period (2016–19). However, applying the <br /> amended provisions to the working capital requirement for the entire FY 2017–<br /> 18 period, including the period prior to 11.07.2017, as has been done in the <br /> Impugned Order, is not in accordance with law and cannot be sustained. <br /> 35. In view of the above, the Impugned Order requires interference on this <br /> issue. The matter is remanded to the State Commission with a direction to <br /> re-compute the working capital requirement by applying the provisions of the <br /> applicable Regulations on a prorated basis, duly distinguishing between the <br /> period prior to 11.07.2017 and the period thereafter. <br /> Page <b>18</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> 36. With regard to the deduction of power purchase cost, including disallowed <br /> cost, we note that in calculating the working capital requirement for FY 2016–17, <br /> one month’s power purchase cost amounting to Rs. 346.14 crore has been <br /> excluded. This said figure also includes the amount disallowed on account of <br /> excess losses, thereby leading to a reduction in the working capital requirement. <br /> Regulation 26 of the MYDT Tariff Regulations 2015 provides for the exclusion of <br /> ‘power purchase cost, transmission charges and load dispatch charges of one <br /> month,’ but does not specify whether such exclusion should extend to disallowed <br /> power purchase cost. In our considered view, the reduction in working capital <br /> requirement on account of power purchase and other costs ought to be confined <br /> to the power purchase cost as allowed by the Commission. Inclusion of <br /> disallowed costs in such computation would not be just or proper, since <br /> disallowed costs are not recognised in the ARR, their inclusion, however, results <br /> in an artificial reduction of the working capital allowance. Such an approach is <br /> inconsistent with the regulatory framework. Accordingly, the matter is remanded <br /> to the State Commission, to consider the only allowed power purchase costwhile <br /> computing the working capital requirement. <br /> 37. The existing Regulation 26 of MYDT Regulation 2015, provides that <i>“if the </i><br /> <i>State Government is providing resource gap grant or subsidy, working capital </i><br /> <i>shall be reduced by that amount.". </i> In the impugned order, in the working capital <br /> requirement, for FY 2017-18, State Commission has not considered the subsidy <br /> of Rs 1165.60 Crores received from the State Government under the head of <br /> exclusions, and has observed as under: <br /> <i>“The Commission observes that the subsidy of Rs.1165.60 crore </i><br /> <i>projected by the Petitioner represent tariff subsidy extended to the </i><br /> <i>consumers by the State Government being received @ Rs.97.13 </i><br /> <i>crore per month during FY 2017-18. The amount shall be considered </i><br /> <i>as tariff income only but not the subsidy from GoB. Hence, the </i><br /> <i>Commission has not considered Rs.1165.60 crore as subsidy from </i><br /> Page <b>19</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> <i>GoB for FY 2017-18 and accordingly for computation of working </i><br /> <i>capital requirement for FY 2017-18. </i><br /> 38. For FY 2016-17, it has been contended on behalf of Appellant that one <br /> month’s subsidy considered under the exclusions forms part of the subsidy <br /> provided to consumers, including support extended under the UDAY scheme, <br /> and constitutes tariff income. We find merit in these submissions. Accordingly, <br /> the matter is remanded to State Commission to undertake prudence check of the <br /> subsidy received by the Appellant for FY 2016-17 and for the government subsidy <br /> received as tariff income, and extend treatment in working capital requirement for <br /> FY 2016-17, in line with the approach adopted for FY 2017-18. <br /> <b>ISSUE 6 – LATE PAYMENT SURCHARGE (LPSC) </b><br /> 39. It has been submitted on behalf of the Appellant that for FY 2016-17, claim <br /> of about Rs. 39 crore towards Late Payment Surcharge (LPSC) paid to <br /> generators and suppliers, has been disallowed in the Impugned Order by <br /> invoking Regulation 20(2)(5), attributable to inefficiency. It is further submitted <br /> that LPSC arose due to systemic liquidity constraints, including the restrictions <br /> imposed under the UDAY scheme and RBI norms which limited the ability of the <br /> utility to avail fresh working capital borrowings that would otherwise have enabled <br /> timely payment to generators and suppliers. The simultaneous denial of LPSC, <br /> the near-nil allowance of IoWC, and the imputation of a notional 1% rebate <br /> cumulatively deprive the Appellant of reasonable recovery of financing costs and <br /> pray for recovery of the Late Payment Surcharge of Rs 39.1 crore for FY 2016–<br /> 17. <br /> 40. In the Impugned Order, financing cost on the Delayed Payment Surcharge <br /> (DPS) has been allowed basis judgment of this Tribunal dated 12.07.2011 in <br /> Appeal Nos. 142 and 147 of 2009. It has been submitted on behalf of the <br /> Appellant that financing cost of DPS amounting to Rs 41.59 Crore has been <br /> Page <b>20</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /> allowed, calculated on a principal sum of Rs 296 Crore at 14.05%, thereby <br /> recognising financing cost on the receivables side. <br /> 41. In our view, allowance of financing cost on DPS would imply that in the <br /> absence of timely collection of monthly charges which has resulted in accrual of <br /> DPS, the payment obligations of the DISCOMs, otherwise to be met from monthly <br /> collections, stand addressed through additional borrowing. We do not consider it <br /> necessary to enter into the specific constraints faced by the Appellant in resorting <br /> to such additional borrowing. In our considered view, however, permitting <br /> financing cost of DPS as well as Late Payment Surcharge (LPSC) to be <br /> simultaneously passed through in tariff would result in a double benefit to the <br /> DISCOMs and a corresponding loss to consumers. Such an outcome cannot be <br /> countenanced. The other disallowances have already been addressed in other <br /> paragraphs of this judgement. Accordingly we find no error apparent in the <br /> Impugned Order on this issue and the same is upheld. <br /> <b> CONCLUSION </b><br /> 42. In view of the above deliberations, decision on all the issues is summarized <br /> in following table: <br /></div><table><thead><tr><th>S. No</th><th>Issue</th><th>Order</th></tr></thead><tbody><tr><td>1.</td><td>Disallowance of fixed cost of Adani<br>Enterprises Limited (“AEL”) power<br>purchase for Jan–June 2016</td><td>Decided in favour of the Appellant.<br>Power Purchase Cost from AEL to be<br>allowed for April 2016- June 2016.<br>Issue Remanded to State<br>Commission.</td></tr><tr><td>2.</td><td>Imposition of 1% “deemed rebate” on<br>power purchase as non‑tariff income for<br>FY 2016-17.</td><td>Decided in favour of the Appellant.<br>Issue Remanded to State<br>Commission. Rebate actually availed<br>by Appellant as per audited accounts<br>to be considered in non-tariff Income</td></tr><tr><td>3</td><td>Treatment and disallowance of prior<br>period expenses.</td><td>Impugned Order upheld. However, the<br>Appellant is provided liberty to</td></tr></tbody></table><div><br /> Page <b>21</b> of <b>22</b><br /><br /> <i> Judgement in Appeal No. 48 of 2021 </i><br /></div><table><thead><tr><th></th><th></th><th>approach the State Commission with<br>requisite details for re-consideration<br>of the same</th></tr></thead><tbody><tr><td>4.</td><td>Apportionment of fixed versus variable<br>costs, especially PPA capacity charges,<br>in tariff design for FY 2018–19.</td><td>Impugned Orders Upheld</td></tr><tr><td>5.</td><td>Interest on Working Capital (IoWC) for FY<br>2016–17 and 2017–18.</td><td>Impugned Order interfered. Issue<br>remanded to the State Commission<br>on following :<br>FY 2016-17; In the one month power<br>purchase cost, disallowed cost not to<br>be included. Treatment of Govt<br>Subsidy, to be same as that<br>considered for FY 2018-19 in the<br>Impugned Order.<br>FY 2017-18 : working capital<br>requirement considering applicable<br>regulations pre and post 11.07.2017 in<br>prorate basis.</td></tr><tr><td>6.</td><td>Late Payment Surcharge (LPSC) for FY<br>2016–17.</td><td>Impugned Order Upheld</td></tr></tbody></table><div><br /> The captioned appeal is partly allowed. The State Commission, is directed to <br /> pass consequential order on the issues remanded, as expeditiously as possible, <br /> preferably within four months from the receipt of the judgement. Captioned <br /> Appeal and pending IAs, if any, are disposed of in above terms. <br /> <b>th </b><br /> <b>PRONOUNCED IN THE OPEN COURT ON THIS 13</b> <b> DAY OF APRIL, 2026. </b><br /> <b> (Virender Bhat) </b><br /> <b>Judicial Member</b><br /> <b>(Seema Gupta) </b><br /> <b>Officiating Chairperson</b><br /> <b>REPORTABLE / NON-REPORTABLE </b><br /> <i>tp/dk/as </i><br /> Page <b>22</b> of <b>22</b></div>