Mcd vs Anil Gupta And Ors

Court
Delhi High Court
Case type
Original Misc Petition
Decided on
06-04-2026
<div> <br /> $~ <br /> <b>* </b> <b>IN THE HIGH COURT OF DELHI AT NEW DELHI </b><br /> % <b><i>Judgment reserved on: 05.02.2026 </i></b><br /> <b><i> Judgment pronounced on: 06.04.2026 </i></b><br /> <b><i> </i></b><br /> + O.M.P. 709/2011 <br /> MCD .....Petitioner <br /> Through: Mr. Sunil Goel, Standing <br /> Counsel with Ms. Dimple <br /> Aggarwal, Mr. Himanshu Goel, <br /> Ms. Varsha, Advocates along <br /> with Bhanu Pratap AE, MCD <br /> <br /> versus <br /> <br /> ANIL GUPTA AND ORS .....Respondents <br /> Through: Mr Aditya Chhibber, Advocate. <br /> <br /> <b>CORAM:</b> <br /> <b>HON’BLE MR. JUSTICE HARISH VAIDYANATHAN </b><br /> <b> </b> <b>SHANKAR</b> <br /> <b> </b><br /> <b>J U D G M E N T </b><br /> <b>HARISH VAIDYANATHAN SHANKAR, J. </b><br /> 1. The present Petition has been instituted under Section 34 of the <br /> <b>1</b><br /> <b>Arbitration and Conciliation Act, 1996</b> , by the <b>Municipal </b><br /> <b>2</b><br /> <b>Corporation of Delhi</b> , seeking setting aside of the <b>Arbitral Award </b><br /> <b>3</b><br /> <b>dated 01.04.2011</b> rendered in the arbitration proceedings titled ― <i>Shri </i><br /> <i>Anil Gupta v. Municipal Corporation of Delhi</i> ‖. <br /> <br /> 1<br /> A&amp;C Act <br /> 2<br /> MCD/Petitioner <br /> 3<br /> Impugned Award <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 1 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 2. The Impugned Award arises out of disputes emanating from the <br /> <b>4</b><br /> <b>Work Order dated 28.08.2004</b> , awarded by the Petitioner to <br /> Respondent No.1 for execution of certain works. <br /> 3. At the outset, it is noted that the present Petition was earlier <br /> disposed of by a Judgment dated 12.12.2018. Subsequently, upon an <br /> application filed by the Petitioner seeking modification, the learned <br /> Coordinate Bench modified the said judgment <i>vide</i> Order dated <br /> 08.08.2019, whereby the learned Single Judge set aside the interest <br /> component awarded under the Impugned Award in <i>toto</i> . Aggrieved <br /> thereby, Respondent No. 1 preferred an appeal before the Division <br /> Bench of this Court, which, <i>vide</i> Judgment dated 30.11.2023, <br /> remanded the matter for fresh adjudication confined to the limited <br /> issue of grant of interest. Consequently, the present Petition is now <br /> listed before this Court for consideration on the said issue. <br /> 4. At this stage, the parties are <i>ad idem</i> that the controversy stands <br /> narrowed to the issue of interest, which remains the sole surviving <br /> point of contention between them. Accordingly, the present <br /> adjudication is confined to this aspect alone. <i> </i><br /> <i> </i><br /> <b><i>BRIEF FACTS:</i></b> <b> </b><br /> 5. The present proceedings arise out of disputes between the MCD <br /> and Respondent <b> </b> No. 1 <b> </b> in relation to a works contract awarded for the <br /> construction of the Zonal Building at Narela. The said work was <br /> originally awarded in the year 1998 to another contractor, <i>namely,</i> M/s <br /> Satish Chander Ramesh Kumar. <b> </b> However, the said contractor <br /> abandoned the work after completing only the basement structure. <br /> <br /> 4<br /> Work Order <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 2 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 6. Subsequently, the Petitioner invited fresh tenders for <br /> completion of the remaining work. Pursuant thereto, the Petitioner <br /> issued the Work Order in favour of Respondent <b> </b> No. 1 <b> </b> for the balance <br /> work of construction of the Zonal Office Building at Narela for a <br /> contractual value of ₹4,29,00,830/-, with a stipulated completion <br /> period of 24 months. The work was to commence shortly thereafter <br /> and the stipulated date of completion was 03.09.2006. <br /> 7. Disputes subsequently arose between the parties in relation to <br /> certain claims raised by Respondent <b> </b> No. 1, <b> </b> including, <i>inter alia</i> , <br /> escalation under Clause 10CC, watch and ward expenses, and interest. <br /> In view of the arbitration clause contained in the contract, the disputes <br /> were referred to arbitration and Shri Amrit Lal Agarwal, Chief <br /> Engineer (Retd.), MCD, was appointed as the Sole Arbitrator by <br /> Order dated 28.10.2009 passed by this Court in ARB. P. 120/2009. <br /> 8. Respondent <b> </b> No. 1 <b> </b> filed his Statement of Claims before the <br /> learned Arbitrator seeking various monetary claims, whereas the <br /> Petitioner herein filed its Statement of Defence and also preferred <br /> counter-claims. Upon completion of the arbitral proceedings, the <br /> learned Arbitrator rendered the Impugned Arbitral Award dated <br /> 01.04.2011, whereby certain claims of Respondent <b> </b> No. 1 <b> </b> were <br /> allowed, including a claim towards escalation under Clause 10CC and <br /> watch and ward charges, together with interest at the rate of 18% per <br /> annum <b> </b> and costs. <br /> 9. Aggrieved by the said Arbitral Award, the Petitioner instituted <br /> the present proceedings under Section 34 of the A&amp;C Act, before this <br /> Court, seeking the setting aside of the Impugned Award. <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 3 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 10. The present Petition was initially adjudicated by a learned <br /> Single Judge of this Court <i>vide</i> Judgment dated 12.12.2018, whereby <br /> the Impugned Arbitral Award was partially upheld. The learned Single <br /> Judge set aside the award in respect of Claim No. 2, which pertained <br /> to reimbursement of the amount expended on watch and ward <br /> arrangements after completion of the work. Further, the learned Single <br /> Judge modified the award of interest to a limited extent. <br /> 11. While the learned Arbitrator had granted interest at the rate of <br /> 18% per annum from the date of cause of action, i.e., 08.03.2004, the <br /> learned Single Judge held that interest would instead run only from <br /> the date of invocation of arbitration, i.e., 06.07.2008, till the date of <br /> the Award at the rate of 18% per annum. Additionally, for the period <br /> during which the Section 34 petition remained pending before this <br /> Court, the rate of interest was reduced to simple interest at 12% per <br /> annum on the awarded amount, applicable up to the date of the <br /> decision on the Section 34 petition. The learned Single Judge further <br /> held that if the entire payment is made within a period of eight weeks, <br /> no further interest shall be payable. However, in the event the <br /> payment is not made within the stipulated period of eight weeks, the <br /> entire outstanding amount shall carry simple interest at the rate of <br /> 18% per annum. <br /> 12. Subsequently, the Petitioner filed an Application being I.A. No. <br /> 2364/2019 seeking modification of the Judgment dated 12.12.2018, <br /> placing reliance upon certain documents relating to the tender <br /> negotiations which, according to the Petitioner, demonstrated that the <br /> condition pertaining to 24% interest mentioned in the tender had been <br /> withdrawn prior to the award of the contract. <b> </b><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 4 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 13. The learned Single Judge, upon consideration of the said <br /> application, <i>vide</i> the Judgement dated 08.08.2019, modified the earlier <br /> judgment and held that Respondent <b> </b> No. 1 would not be entitled to <br /> interest as well as the costs of the arbitral proceedings, and <br /> accordingly directed the Petitioner to pay only the principal amount <br /> awarded under Claim No. 1. <b> </b><br /> 14. Aggrieved by the Judgments dated 12.12.2018 <b> </b> and <b> </b> 08.08.2019, <br /> Respondent <b> </b> No. 1 preferred an appeal before the Division Bench of <br /> this Court being FAO(OS)(COMM) 315/2019 titled ― <i>Anil Kumar </i><br /> <i>Gupta v. Municipal Corporation of Delhi &amp; Anr.</i> ‖. <br /> 15. The Division Bench, upon hearing the parties on the issue of <br /> interest, rendered its Judgment dated 30.11.2023, whereby it set aside <br /> the aforesaid judgements passed by the learned Single Judge and <br /> restored the present Petition for fresh consideration in light of the <br /> observations contained in the said judgment. <br /> 16. In view of the aforesaid Judgment dated 30.11.2023, the present <br /> Petition stood restored to the file of this Court for fresh adjudication, <br /> confined to the issue of interest, in accordance with law. <br /> <i> </i><br /> <b><i>CONTENTIONS ON BEHALF OF THE PETITIONER:</i></b> <i> </i><br /> 17. Learned counsel appearing for the Petitioner would contend that <br /> the learned Arbitrator has erred in law in awarding interest at the rate <br /> of 18% per annum, which, according to the Petitioner, is excessive, <br /> arbitrary and contrary to the statutory framework governing the grant <br /> of interest. <br /> 18. Learned counsel for the Petitioner would further contend that <br /> the amounts awarded under Claim No. 1 (escalation under Clause <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 5 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 10CC) <b> </b> are essentially in the nature of compensation or damages, and <br /> therefore, the grant of interest upon such amounts is legally <br /> impermissible. It would be contended that interest itself constitutes a <br /> form of compensation and, therefore, awarding interest upon <br /> compensation effectively amounts to granting interest on interest, <br /> <b>5</b><br /> which is prohibited under Section 3(3)(c) of the <b> Interest Act, 1978</b> . <br /> 19. Learned counsel would further contend that the learned <br /> Arbitrator has awarded interest at the rate of 18% per annum without <br /> assigning any cogent or legally sustainable reasons, particularly when <br /> the prevailing bank rates during the relevant period were substantially <br /> lower. It would be contended that in terms of Section 3(1) of the <br /> Interest Act, interest ought not to exceed the ―current rate of interest‖, <br /> which broadly corresponds to the rates offered by scheduled banks, <br /> and which during the relevant period ranged around 6-7% per annum. <b> </b><br /> 20. Learned counsel would further contend that the learned <br /> Arbitrator has erroneously proceeded on the basis that Respondent <b> </b><br /> No. 1 <b> </b> had demanded interest at higher rates in certain communications <br /> and that such demands were not disputed by the Petitioner. It would <br /> be contended that the mere demand of interest by a claimant cannot <br /> justify the grant of such a rate by the learned Arbitral Tribunal without <br /> independently examining the reasonableness and legality of the rate so <br /> claimed. <br /> 21. Learned counsel would also contend that the learned Arbitrator <br /> has adopted an erroneous method of computation, which effectively <br /> results in the grant of interest upon amounts that already include <br /> <br /> 5<br /> Interest Act <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 6 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> previously calculated interest, thereby leading to interest on interest, <br /> which is impermissible in law. <br /> 22. Learned counsel would further contend that the learned <br /> Arbitrator has adopted an incorrect starting point for the computation <br /> of interest by treating 08.03.2004 as the date from which interest is <br /> payable. It would be contended that the said date corresponds to the <br /> issuance of the tender and not the accrual of any cause of action. <b> </b><br /> 23. Learned counsel would contend that the Work Order was issued <br /> subsequently on 25.08.2004, and therefore, the adoption of <br /> 08.03.2004 as the starting point for interest is factually erroneous. It <br /> would further be contended that, at the highest, interest could have <br /> been considered only from the date of invocation of arbitration, i.e., <br /> 06.07.2008 <b>. </b><br /> 24. Learned counsel would also contend that the Petitioner is a <br /> public authority discharging statutory functions under the Delhi <br /> Municipal Corporation Act, 1957, and the work in question was <br /> undertaken as part of its public duties and not as a commercial <br /> venture. It would therefore be contended that the grant of interest at <br /> such a high rate imposes an undue burden upon the public exchequer <br /> and is contrary to the settled principles governing the award of interest <br /> in matters involving public authorities. <br /> 25. On the aforesaid grounds, learned counsel for the Petitioner <br /> would contend that the award of interest at the rate of 18% per annum <br /> is patently illegal and excessive, and therefore, warrants interference <br /> by this Court within the limited parameters of Section 34 of the A&amp;C <br /> Act. <br /> <b><i> </i></b><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 7 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> <b><i>CONTENTIONS ON BEHALF OF RESPONDENT No. 1:</i></b> <i> </i><br /> 26. <b><i>Per contra</i></b> , learned counsel appearing on behalf of Respondent <b> </b><br /> No. 1 <b> </b> would contend that the challenge laid by the Petitioner to the <br /> grant of interest at the rate of 18% per annum is wholly misconceived <br /> and does not fall within the limited parameters of interference <br /> prescribed under Section 34 of the A&amp;C Act. <br /> 27. Learned counsel for Respondent <b> </b> No. 1 <b> </b> would contend that <br /> Respondent <b> </b> No. 1, in the Statement of Claim, had specifically claimed <br /> interest at the rate of 18% per annum. It would be contended that the <br /> learned Arbitrator has taken note of the fact that Respondent <b> </b> No. 1 <b> </b><br /> had, on multiple occasions, demanded interest at the said rate through <br /> various communications addressed to the Petitioner, and that the said <br /> demands were never disputed by the Petitioner. <br /> 28. Learned counsel for Respondent <b> </b> No. 1 <b> </b> would further contend <br /> that the award of interest at the rate of 18% per annum is fully in <br /> consonance with the statutory framework governing arbitral <br /> proceedings under the pre-amendment regime of the A&amp;C Act. <br /> 29. It would also be contended that, in terms of Section 31(7) of the <br /> A&amp;C Act, as it stood prior to the 2015 amendment, <b> </b> where the Arbitral <br /> Award does not otherwise specify the rate of post-award interest, the <br /> awarded sum shall carry interest at the rate of 18% per annum from <br /> the date of the award until payment. <br /> 30. Learned counsel would contend that the statutory recognition of <br /> 18% interest under Section 31(7) of the A&amp;C Act itself reflects the <br /> legislative benchmark as to what constitutes a reasonable rate of <br /> interest in arbitral proceedings governed by the unamended Act. It <br /> would thus be contended that the grant of 18% interest by the learned <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 8 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> Arbitrator cannot be characterised as excessive or unconscionable, <br /> particularly when the statute itself prescribes the said rate as the <br /> default rate of interest. <br /> 31. Learned counsel for Respondent <b> </b> No. 1 <b> </b> would further contend <br /> that the aforesaid position has been consistently recognised in judicial <br /> pronouncements, including the decision of the Hon‘ble Supreme <br /> <b><i>6</i></b><br /> Court in <b><i>Sayeed Ahmed &amp; Co. v. State of Uttar Pradesh &amp; Ors.</i></b> , <br /> wherein the Court observed that under the scheme of Section 31(7)(b) <br /> of the A&amp;C Act, an award would carry interest at the rate of 18% per <br /> annum in the absence of any contrary direction in the award. <br /> 32. Learned counsel for Respondent <b> </b> No. 1 <b> </b> would further contend <br /> that the learned Arbitrator has not granted interest solely on the basis <br /> of any condition relating to 24% interest in the tender document. It <br /> would be contended that the primary basis for the grant of interest was <br /> the consistent demand made by Respondent <b> </b> No. 1 <b> </b> in its <br /> communications and the failure of the Petitioner to dispute such <br /> demands at the relevant time. <br /> 33. Learned counsel for Respondent <b> </b> No. 1 <b> </b> would further contend <br /> that the documents relied upon by the Petitioner in the subsequent <br /> proceedings to contend that the condition relating to 24% interest <br /> stood withdrawn cannot be looked into for the purpose of deciding the <br /> present petition. It would be contended that the said documents were <br /> neither part of the Arbitral Record nor produced before the learned <br /> Arbitrator and were sought to be introduced at a belated stage after the <br /> disposal of the Section 34 petition. According to Respondent <b> </b> No. 1, <br /> <br /> 6<br /> (2009) 12 SCC 26 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 9 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> such material cannot be relied upon in proceedings under Section 34 <br /> of the A&amp;C Act. <br /> 34. Learned counsel would further contend that the Division Bench <br /> of this Court, <i>vide</i> Judgment dated 30.11.2023 in FAO(OS)(COMM) <br /> 315/2019, has already held that the Court exercising jurisdiction under <br /> Section 34 does not possess the power to modify or vary an arbitral <br /> award, and therefore, the scope of interference is extremely limited. <br /> 35. Learned counsel for Respondent <b> </b> No. 1 <b> </b> would thus contend that <br /> the award of interest at the rate of 18% per annum is a result of a <br /> reasoned exercise of discretion by the learned Arbitrator and does not <br /> disclose any patent illegality, perversity, or violation of public policy <br /> so as to warrant interference under Section 34 of the A&amp;C Act. <br /> <i> </i><br /> <b><i>ANALYSIS: </i></b><br /> 36. This Court has heard the learned counsel appearing on behalf of <br /> the parties at length and, with their able assistance, has carefully <br /> perused the paperbook and other material documents placed on record, <br /> including the record of the Arbitral Tribunal, as well as the written <br /> submissions filed by the respective parties. <br /> 37. At the outset, it is apposite to note that this Court is conscious <br /> of the limited scope of its jurisdiction while examining an objection <br /> petition under Section 34 of the A&amp;C Act. The contours of judicial <br /> intervention in such proceedings have been authoritatively delineated <br /> and settled by a consistent and evolving line of precedents of the <br /> Hon‘ble Supreme Court. <br /> 38. In this regard, a three-judge Bench of the Hon‘ble Supreme <br /> Court, after an exhaustive consideration of a catena of earlier <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 10 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> decisions, in <b><i>OPG Power Generation (P) Ltd. v. Enexio Power </i></b><br /> <b><i>7</i></b><br /> <b><i>Cooling Solutions (India) (P) Ltd.</i></b> , while dealing with the grounds of <br /> conflict with the public policy of India and perversity, grounds which <br /> have also been urged in the present case, made certain pertinent <br /> observations, which are reproduced hereunder: <br /> <i>“</i> <b><i>Relevant legal principles governing a challenge to an arbitral </i></b><br /> <b><i>award</i></b> <br /> <b>30.</b> Before we delve into the issue/sub-issues culled out above, it <br /> would be useful to have a look at the relevant legal principles <br /> governing a challenge to an arbitral award. Recourse to a court <br /> against an arbitral award may be made through an application for <br /> setting aside such award in accordance with sub-sections (2), (2-A) <br /> and (3) of Section 34 of the 1996 Act. Sub-section (2) of Section <br /> 34 has two clauses, ( <i>a</i> ) and ( <i>b</i> ). Clause ( <i>a</i> ) has five sub-clauses <br /> which are not relevant to the issues raised before us. Insofar as <br /> clause ( <i>b</i> ) is concerned, it has two sub-clauses, namely, ( <i>i</i> ) and ( <i>ii</i> ). <br /> Sub-clause ( <i>i</i> ) of clause ( <i>b</i> ) is not relevant to the controversy in <br /> hand. Sub-clause ( <i>ii</i> ) of clause ( <i>b</i> ) provides that if the Court finds <br /> that the arbitral award is in conflict with the public policy of India, <br /> it may set aside the award. <br /> <b><i>Public policy</i></b> <br /> <b>31.</b> ―Public policy‖ is a concept not statutorily defined, though it <br /> has been used in statutes, rules, notification, etc. since long, and is <br /> also a part of common law. Section 23 of the Contract Act, 1872 <br /> uses the expression by stating that the consideration or object of an <br /> agreement is lawful, unless, inter alia, opposed to public policy. <br /> That is, a contract which is opposed to public policy is void. <br /> <b></b>* <br /> <b>35.</b> In <b><i>Renusagar Power Co. Ltd.</i></b> <b> v. </b> <b><i>General Electric Co.</i></b> <b>, 1994 </b><br /> <b>Supp (1) SCC 644</b> , a three-Judge Bench of this Court observed <br /> that the doctrine of public policy is somewhat open—textured and <br /> flexible. By citing earlier decisions, it was observed that there are <br /> two conflicting positions which are referred to as the ―narrow <br /> view‖ and the ―broad view‖. According to the narrow view, courts <br /> cannot create new heads of public policy whereas the broad view <br /> countenances judicial law making in these areas. In the field of <br /> private international law, it was pointed out, courts refuse to apply <br /> a rule of foreign law or recognise a foreign judgment or a foreign <br /> arbitral award if it is found that the same is contrary to the public <br /> policy of the country in which it is sought to be invoked or <br /> enforced. However, it was clarified, a distinction is to be drawn <br /> <br /> 7<br /> (2025) 2 SCC 417 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 11 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> while applying the rule of public policy between a matter governed <br /> by domestic law and a matter involving conflict of laws. It was <br /> observed that the application of the doctrine of public policy in the <br /> field of conflict of laws is more limited than that in the domestic <br /> law and the courts are slower to invoke public policy in cases <br /> involving a foreign element than when a purely municipal legal <br /> issue is involved. It was held that contravention of law alone will <br /> not attract the bar of public policy, and something more than <br /> contravention of law is required. <br /> <b><i></i></b><i></i>* <br /> <b>37.</b> What is clear from above is that for an award to be against <br /> public policy of India a mere infraction of the municipal laws of <br /> India is not enough. There must be, inter alia, infraction of <br /> fundamental policy of Indian law including a law meant to serve <br /> public interest or public good. <br /> <b><i></i></b><i> </i>*<br /> <b>40.</b> In <b><i>ONGC Ltd.</i></b> <b> v. </b> <b><i>Western Geco International Ltd.</i></b> <b>, (2014) 9 </b><br /> <b>SCC 263, paras 35, 38 &amp; 39</b> , which also related to the period prior <br /> to the 2015 Amendment of Section 34(2)( <i>b</i> )( <i>ii</i> ), a three-Judge <br /> Bench of this Court, after considering the decision in <b><i>ONGC </i></b><br /> <b><i>Ltd.</i></b> <b> v. </b> <b><i>Saw Pipes Ltd.</i></b> <b>, (2003) 5 SCC 705</b> , without exhaustively <br /> enumerating the purport of the expression ―fundamental policy of <br /> Indian law‖, observed that it would include all such fundamental <br /> principles as providing a basis for administration of justice and <br /> enforcement of law in this country. The Court thereafter <br /> illustratively referred to three fundamental juristic principles, <br /> namely: <br /> ( <i>a</i> ) that in every determination that affects the rights of a citizen or <br /> leads to any civil consequences, the court or authority or quasi-<br /> judicial body must adopt a judicial approach, that is, it must act <br /> bona fide and deal with the subject in a fair, reasonable and <br /> objective manner and not actuated by any extraneous <br /> consideration; <br /> ( <i>b</i> ) that while determining the rights and obligations of parties the <br /> court or Tribunal or authority must act in accordance with the <br /> principles of natural justice and must apply its mind to the <br /> attendant facts and circumstances while taking a view one way <br /> or the other; and <br /> ( <i>c</i> ) that its decision must not be perverse or so irrational that no <br /> reasonable person would have arrived at the same. <br /> <b>41.</b> In <b><i>Associate Builders</i></b> <b> v. </b> <b><i>DDA</i></b> <b>, (2015) 3 SCC 49</b> , a two-Judge <br /> Bench of this Court, held that <i>audi alteram partem</i> principle is <br /> undoubtedly a fundamental juristic principle in Indian law and is <br /> enshrined in Sections 18 and 34(2)( <i>a</i> )( <i>iii</i> ) of the 1996 Act. In <br /> addition to the earlier recognised principles forming fundamental <br /> policy of Indian law, it was held that disregarding: <br /> ( <i>a</i> ) orders of superior courts in India; and <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 12 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> ( <i>b</i> ) the binding effect of the judgment of a superior court would <br /> also be regarded as being contrary to the fundamental policy of <br /> Indian law. <br /> Further, elaborating upon the third juristic principle (i.e. qua <br /> perversity), as laid down in <b><i>ONGC Ltd.</i></b> <b> v. </b> <b><i>Western Geco </i></b><br /> <b><i>International Ltd.</i></b> <b>, (2014) 9 SCC 263</b> , it was observed that where: <br /> ( <i>i</i> ) a finding is based on no evidence; or <br /> (ii) an Arbitral Tribunal takes into account something irrelevant to <br /> the decision which it arrives at; or <br /> (iii) ignores vital evidence in arriving at its decision, such decision <br /> would necessarily be perverse [ <b><i>Associate Builders case</i></b> <b>, </b><br /> <b>(2015) 3 SCC 49, para 31</b> ]. <br /> To this a caveat was added by observing that when a court applies <br /> the ―public policy test‖ to an arbitration award, it does not act as a <br /> court of appeal and, consequently, errors of fact cannot be <br /> corrected; and a possible view by the arbitrator on facts has <br /> necessarily to pass muster as the arbitrator is the ultimate master of <br /> the quantity and quality of evidence to be relied upon when he <br /> delivers his arbitral award. It was also observed that an award <br /> based on little evidence or on evidence which does not measure up <br /> in quality to a trained legal mind would not be held to be invalid on <br /> that score. Thus, once it is found that the arbitrator&#x27;s approach is <br /> not arbitrary or capricious, it is to be taken as the last word on <br /> facts. <br /> <b><i>The 2015 Amendment in Sections 34 and 48</i></b> <br /> <b>42.</b> The aforementioned judicial pronouncements were all prior to <br /> the 2015 Amendment. Notably, prior to the 2015 Amendment the <br /> expression ―in contravention with the fundamental policy of Indian <br /> law‖ was not used by the legislature in either Section 34(2)( <i>b</i> )( <i>ii</i> ) or <br /> Section 48(2)( <i>b</i> ). The pre-amended Section 34(2)( <i>b</i> )( <i>ii</i> ) and its <br /> Explanation read: <br /> <b></b>* <br /> <b>44.</b> By the 2015 Amendment, in place of the old Explanation to <br /> Section 34(2)( <i>b</i> )( <i>ii</i> ), <i>Explanations 1 and 2</i> were added to remove <br /> any doubt as to when an arbitral award is in conflict with the public <br /> policy of India. <br /> <b>45.</b> At this stage, it would be pertinent to note that we are dealing <br /> with a case where the application under Section 34 of the 1996 Act <br /> was filed after the 2015 Amendment, therefore the newly <br /> substituted/added Explanations would apply [ <b><i>SsangyongEngg. &amp; </i></b><br /> <b><i>Construction Co. Ltd.</i></b> <b> v. </b> <b><i>NHAI</i></b> <b>, (2019) 15 SCC 131</b> ]. <br /> <b>46.</b> The 2015 Amendment adds two Explanations to each of the <br /> two sections, namely, Section 34(2)( <i>b</i> )( <i>ii</i> ) and Section 48(2)( <i>b</i> ), in <br /> place of the earlier Explanation. The significance of the newly <br /> inserted <i>Explanation 1</i> in both the sections is two-fold. First, it does <br /> away with the use of words : ( <i>a</i> ) ― <i>without prejudice to the </i><br /> <i>generality of sub-clause (ii)</i> ‖ in the opening part of the pre-<br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 13 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> amended Explanation to Section 34(2)(b)(ii); and (b) ― <i>without </i><br /> <i>prejudice to the generality of clause (b) of this section</i> ‖ in the <br /> opening part of the pre-amended Explanation to Section 48(2)( <i>b</i> ); <br /> secondly, it limits the expanse of public policy of India to the three <br /> specified categories by using the words ― <i>only </i> <i>if</i> ‖. <br /> Whereas, <i>Explanation 2</i> lays down the standard for adjudging <br /> whether there is a contravention with the fundamental policy of <br /> Indian law by providing that a review on merits of the dispute shall <br /> not be done. This limits the scope of the enquiry on an application <br /> under either Section 34(2)( <i>b</i> )( <i>ii</i> ) or Section 48(2)( <i>b</i> ) of the 1996 <br /> Act. <br /> <b>47.</b> The 2015 Amendment by inserting sub-section (2-A) in Section <br /> 34, carves out an additional ground for annulment of an arbitral <br /> award arising out of arbitrations other than international <br /> commercial arbitrations. Sub-section (2-A) provides that the Court <br /> may also set aside an award if that is vitiated by patent illegality <br /> appearing on the face of the award. This power of the Court is, <br /> however, circumscribed by the proviso, which states that an award <br /> shall not be set aside merely on the ground of an erroneous <br /> application of the law or by reappreciation of evidence. <br /> <b>48. </b> <i>Explanation 1</i> to Section 34(2)( <i>b</i> )( <i>ii</i> ), specifies that an arbitral <br /> award is in conflict with the public policy of India, <i>only if</i> : <br /> ( <i>i</i> ) the making of the award was induced or affected by fraud or <br /> corruption or was in violation of Section 75 or Section 81; or <br /> ( <i>ii</i> ) it is in contravention with the fundamental policy of Indian law; <br /> or <br /> ( <i>iii</i> ) it is in conflict with the most basic notions of morality or <br /> justice. <br /> <b>49.</b> In the instant case, there is no allegation that the making of the <br /> award was induced or affected by fraud or corruption, or was in <br /> violation of Section 75 or Section 81. Therefore, we shall confine <br /> our exercise in assessing as to whether the arbitral award is in <br /> contravention with the fundamental policy of Indian law, and/or <br /> whether it conflicts with the most basic notions of morality or <br /> justice. Additionally, in the light of the provisions of sub-section <br /> (2-A) of Section 34, we shall examine whether there is any patent <br /> illegality on the face of the award. <br /> <b>50.</b> Before undertaking the aforesaid exercise, it would be apposite <br /> to consider as to how the expressions: <br /> ( <i>a</i> ) ―in contravention with the fundamental policy of Indian law‖; <br /> ( <i>b</i> ) ―in conflict with the most basic notions of morality or justice‖; <br /> and <br /> ( <i>c</i> ) ―patent illegality‖ have been construed. <br /> <b><i>In contravention with the fundamental policy of Indian law</i></b> <br /> <b>51.</b> As discussed above, till the 2015 Amendment the expression <br /> ―in contravention with the fundamental policy of Indian law‖ was <br /> not found in the 1996 Act. Yet, in <b><i>Renusagar Power Co. </i></b><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 14 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> <b><i>Ltd.</i></b> <b> v. </b> <b><i>General Electric Co.</i></b> <b>, 1994 Supp (1) SCC 644</b> , in the <br /> context of enforcement of a foreign award, while construing the <br /> phrase ―contrary to the public policy‖, this Court held that for a <br /> foreign award to be contrary to public policy mere contravention of <br /> law would not be enough rather it should be contrary to: <br /> ( <i>a</i> ) the fundamental policy of Indian law; and/or <br /> ( <i>b</i> ) the interest of India; and/or <br /> ( <i>c</i> ) justice or morality. <br /> <b><i></i></b><i> </i>*<br /> <b>55.</b> The legal position which emerges from the aforesaid discussion <br /> is that after ―the 2015 Amendments‖ in Section 34(2)( <i>b</i> )( <i>ii</i> ) and <br /> Section 48(2)( <i>b</i> ) of the 1996 Act, the phrase ―in conflict with the <br /> public policy of India‖ must be accorded a restricted meaning in <br /> terms of <i>Explanation 1</i> . The expression ―in contravention with the <br /> fundamental policy of Indian law‖ by use of the word <br /> ―fundamental‖ before the phrase ―policy of Indian law‖ makes the <br /> expression narrower in its application than the phrase ―in <br /> contravention with the policy of Indian law‖, which means mere <br /> contravention of law is not enough to make an award vulnerable. <br /> To bring the contravention within the fold of fundamental policy of <br /> Indian law, the award must contravene all or any of such <br /> fundamental principles that provide a basis for administration of <br /> justice and enforcement of law in this country. <br /> <b>56.</b> Without intending to exhaustively enumerate instances of such <br /> contravention, by way of illustration, it could be said that: <br /> ( <i>a</i> ) violation of the principles of natural justice; <br /> ( <i>b</i> ) disregarding orders of superior courts in India or the binding <br /> effect of the judgment of a superior court; and <br /> ( <i>c</i> ) violating law of India linked to public good or public interest, <br /> are considered contravention of the fundamental policy of <br /> Indian law. <br /> However, while assessing whether there has been a contravention <br /> of the fundamental policy of Indian law, the extent of judicial <br /> scrutiny must not exceed the limit as set out in <i>Explanation 2</i> to <br /> Section 34(2)( <i>b</i> )( <i>ii</i> ). <br /> <b><i></i></b>* <br /> <b><i>Patent illegality</i></b> <br /> <b>65.</b> Sub-section (2-A) of Section 34 of the 1996 Act, which was <br /> inserted by the 2015 Amendment, provides that an arbitral award <br /> not arising out of international commercial arbitrations, may also <br /> be set aside by the Court, if the Court finds that the award is visited <br /> by patent illegality appearing on the face of the award. The proviso <br /> to sub-section (2-A) states that an award shall not be set aside <br /> merely on the ground of an erroneous application of the law or by <br /> reappreciation of evidence. <br /> <b>66.</b> In <b><i>ONGC Ltd.</i></b> <b> v. </b> <b><i>Saw Pipes Ltd.</i></b> <b>, (2003) 5 SCC 705</b> , while <br /> dealing with the phrase ―public policy of India‖ as used in Section <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 15 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 34, this Court took the view that the concept of public policy <br /> connotes some matter which concerns public good and public <br /> interest. If the award, on the face of it, patently violates statutory <br /> provisions, it cannot be said to be in public interest. Thus, an award <br /> could also be set aside if it is patently illegal. It was, however, <br /> clarified that illegality must go to the root of the matter and if the <br /> illegality is of trivial nature, it cannot be held that award is against <br /> public policy. <br /> <b>67.</b> In <b><i>Associate Builders</i></b> <b> v. </b> <b><i>DDA</i></b> <b>, (2015) 3 SCC 49</b> , this Court <br /> held that an award would be patently illegal, if it is contrary to: <br /> ( <i>a</i> ) substantive provisions of law of India; <br /> ( <i>b</i> ) provisions of the 1996 Act; and <br /> ( <i>c</i> ) terms of the contract [See also three-Judge Bench decision of <br /> this Court in <b><i>State of Chhattisgarh</i></b> <b> v. </b> <b><i>SAL Udyog (P) Ltd.</i></b> <b>, </b><br /> <b>(2022) 2 SCC 275</b> ]. <br /> The Court clarified that if an award is contrary to the substantive <br /> provisions of law of India, in effect, it is in contravention of <br /> Section 28(1)( <i>a</i> ) of the 1996 Act. Similarly, violating terms of the <br /> contract, in effect, is in contravention of Section 28(3) of the 1996 <br /> Act. <br /> <b>68.</b> In <b><i>SsangyongEngg. &amp; Construction Co. Ltd.</i></b> <b> v. </b> <b><i>NHAI</i></b> <b>, (2019) </b><br /> <b>15 SCC 131</b> this Court specifically dealt with the 2015 <br /> Amendment which inserted sub-section (2-A) in Section 34 of the <br /> 1996 Act. It was held that ―patent illegality appearing on the face <br /> of the award‖ refers to such illegality as goes to the root of matter, <br /> but which does not amount to mere erroneous application of law. It <br /> was also clarified that what is not subsumed within ―the <br /> fundamental policy of Indian law‖, namely, the contravention of a <br /> statute not linked to ―public policy‖ or ―public interest‖, cannot be <br /> brought in by the backdoor when it comes to setting aside an award <br /> on the ground of patent illegality [See <b><i>SsangyongEngg. &amp; </i></b><br /> <b><i>Construction Co. Ltd.</i></b> <b> v. </b> <b><i>NHAI</i></b> <b>, (2019) 15 SCC 131</b> ]. Further, it <br /> was observed, reappreciation of evidence is not permissible under <br /> this category of challenge to an arbitral award <br /> [See <b><i>SsangyongEngg. &amp; Construction Co. Ltd.</i></b> <b> v. </b> <b><i>NHAI</i></b> <b>, (2019) </b><br /> <b>15 SCC 131</b> ]. <br /> <b><i>Perversity as a ground of challenge</i></b> <br /> <b>69.</b> Perversity as a ground for setting aside an arbitral award was <br /> recognised in <b><i>ONGC Ltd.</i></b> <b> v. </b> <b><i>Western Geco International Ltd.</i></b> <b>, </b><br /> <b>(2014) 9 SCC 263</b> . Therein it was observed that an arbitral <br /> decision must not be perverse or so irrational that no reasonable <br /> person would have arrived at the same. It was observed that if an <br /> award is perverse, it would be against the public policy of India. <br /> <b>70.</b> In <b><i>Associate Builders</i></b> <b> v. </b> <b><i>DDA</i></b> <b>, (2015) 3 SCC 49</b> certain tests <br /> were laid down to determine whether a decision of an Arbitral <br /> Tribunal could be considered perverse. In this context, it was <br /> observed that where: <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 16 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /></div><table><thead><tr><th>(i) a finding is based on no evidence; or</th><th></th><th></th></tr></thead><tbody><tr><td>(ii) an Arbitral Tribunal takes into account something irrelevant to</td><td></td><td></td></tr><tr><td>the decision which it arrives at; or</td><td></td><td></td></tr><tr><td>(iii) ignores vital evidence in arriving at its decision, such decision</td><td></td><td></td></tr><tr><td>would necessarily be perverse.</td><td></td><td></td></tr><tr><td>However, by way of a note of caution, it was observed that when a</td><td></td><td></td></tr><tr><td>court applies these tests it does not act as a court of appeal and,</td><td></td><td></td></tr><tr><td>consequently, errors of fact cannot be corrected. Though, a possible</td><td></td><td></td></tr><tr><td>view by the arbitrator on facts has necessarily to pass muster as the</td><td></td><td></td></tr><tr><td>arbitrator is the ultimate master of the quantity and quality of</td><td></td><td></td></tr><tr><td>evidence to be relied upon. It was also observed that an award</td><td></td><td></td></tr><tr><td>based on little evidence or on evidence which does not measure up</td><td></td><td></td></tr><tr><td>in quality to a trained legal mind would not be held to be invalid on</td><td></td><td></td></tr><tr><td>that score.</td><td></td><td></td></tr><tr><td>71. In SsangyongEngg. &amp; Construction Co. Ltd. v. NHAI, (2019)</td><td></td><td></td></tr><tr><td>15 SCC 131, which dealt with the legal position post the 2015</td><td></td><td></td></tr><tr><td>Amendment in Section 34 of the 1996 Act, it was observed that a</td><td></td><td></td></tr><tr><td>decision which is perverse, while no longer being a ground for</td><td></td><td></td></tr><tr><td>challenge under ―public policy of India‖, would certainly amount</td><td></td><td></td></tr><tr><td>to a patent illegality appearing on the face of the award. It was</td><td></td><td></td></tr><tr><td>pointed out that an award based on no evidence, or which ignores</td><td></td><td></td></tr><tr><td>vital evidence, would be perverse and thus patently illegal. It was</td><td></td><td></td></tr><tr><td>also observed that a finding based on documents taken behind the</td><td></td><td></td></tr><tr><td>back of the parties by the arbitrator would also qualify as a decision</td><td></td><td></td></tr><tr><td>based on no evidence inasmuch as such decision is not based on</td><td></td><td></td></tr><tr><td>evidence led by the parties, and therefore, would also have to be</td><td></td><td></td></tr><tr><td>characterised as perverse [See SsangyongEngg. &amp; Construction</td><td></td><td></td></tr><tr><td>Co. Ltd. v. NHAI, (2019) 15 SCC 131].</td><td></td><td></td></tr><tr><td>72. The tests laid down in Associate Builders v. DDA, (2015) 3</td><td></td><td></td></tr><tr><td>SCC 49 to determine perversity were followed in SsangyongEngg.</td><td></td><td></td></tr><tr><td>&amp; Construction Co. Ltd. v. NHAI, (2019) 15 SCC 131 and later</td><td></td><td></td></tr><tr><td>approved by a three-Judge Bench of this Court in Patel Engg.</td><td></td><td></td></tr><tr><td>Ltd. v. North Eastern Electric Power Corpn. Ltd., (2020) 7 SCC</td><td></td><td></td></tr><tr><td>167.</td><td></td><td></td></tr><tr><td>73. In a recent three-Judge Bench decision of this Court in DMRC</td><td></td><td></td></tr><tr><td>Ltd. v. Delhi Airport Metro Express (P) Ltd., (2024) 6 SCC 357,</td><td></td><td></td></tr><tr><td>the ground of patent illegality/perversity was delineated in the</td><td></td><td></td></tr><tr><td>following terms: (SCC p. 376, para 39)</td><td></td><td></td></tr><tr><td></td><td>―39. In essence, the ground of patent illegality is available</td><td></td></tr><tr><td></td><td>for setting aside a domestic award, if the decision of the</td><td></td></tr><tr><td></td><td>arbitrator is found to be perverse, or so irrational that no</td><td></td></tr><tr><td></td><td>reasonable person would have arrived at it; or the</td><td></td></tr><tr><td></td><td>construction of the contract is such that no fair or</td><td></td></tr><tr><td></td><td>reasonable person would take; or, that the view of the</td><td></td></tr><tr><td></td><td>arbitrator is not even a possible view. A finding based on</td><td></td></tr><tr><td></td><td>no evidence at all or an award which ignores vital</td><td></td></tr><tr><td></td><td>evidence in arriving at its decision would be perverse and</td><td></td></tr></tbody></table><div><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 17 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /></div><table><thead><tr><th></th><th>liable to be set aside under the head of ―patent illegality‖.</th><th></th></tr></thead><tbody><tr><td></td><td>An award without reasons would suffer from patent</td><td></td></tr><tr><td></td><td>illegality. The arbitrator commits a patent illegality by</td><td></td></tr><tr><td></td><td>deciding a matter not within its jurisdiction or violating a</td><td></td></tr><tr><td></td><td>fundamental principle of natural justice.‖</td><td></td></tr><tr><td>Scope of interference with an arbitral award</td><td></td><td></td></tr><tr><td>74. The aforesaid judicial precedents make it clear that while</td><td></td><td></td></tr><tr><td>exercising power under Section 34 of the 1996 Act the Court does</td><td></td><td></td></tr><tr><td>not sit in appeal over the arbitral award. Interference with an</td><td></td><td></td></tr><tr><td>arbitral award is only on limited grounds as set out in Section 34 of</td><td></td><td></td></tr><tr><td>the 1996 Act. A possible view by the arbitrator on facts is to be</td><td></td><td></td></tr><tr><td>respected as the arbitrator is the ultimate master of the quantity and</td><td></td><td></td></tr><tr><td>quality of evidence to be relied upon. It is only when an arbitral</td><td></td><td></td></tr><tr><td>award could be categorised as perverse, that on an error of fact an</td><td></td><td></td></tr><tr><td>arbitral award may be set aside. Further, a mere erroneous</td><td></td><td></td></tr><tr><td>application of the law or wrong appreciation of evidence by itself is</td><td></td><td></td></tr><tr><td>not a ground to set aside an award as is clear from the provisions of</td><td></td><td></td></tr><tr><td>sub-section (2-A) of Section 34 of the 1996 Act.</td><td></td><td></td></tr><tr><td>75. In Dyna Technologies (P) Ltd. v. Crompton Greaves Ltd.,</td><td></td><td></td></tr><tr><td>(2019) 20 SCC 1, paras 27-43, a three-Judge Bench of this Court</td><td></td><td></td></tr><tr><td>held that courts need to be cognizant of the fact that arbitral awards</td><td></td><td></td></tr><tr><td>are not to be interfered with in a casual and cavalier manner, unless</td><td></td><td></td></tr><tr><td>the court concludes that the perversity of the award goes to the root</td><td></td><td></td></tr><tr><td>of the matter and there is no possibility of an alternative</td><td></td><td></td></tr><tr><td>interpretation that may sustain the arbitral award. It was observed</td><td></td><td></td></tr><tr><td>that jurisdiction under Section 34 cannot be equated with the</td><td></td><td></td></tr><tr><td>normal appellate jurisdiction. Rather, the approach ought to be to</td><td></td><td></td></tr><tr><td>respect the finality of the arbitral award as well as party&#x27;s autonomy</td><td></td><td></td></tr><tr><td>to get their dispute adjudicated by an alternative forum as provided</td><td></td><td></td></tr><tr><td>under the law.</td><td></td><td></td></tr><tr><td>*****</td><td></td><td></td></tr><tr><td>Scope of interference with the interpretation/construction of a</td><td></td><td></td></tr><tr><td>contract accorded in an arbitral award</td><td></td><td></td></tr><tr><td>84. An Arbitral Tribunal must decide in accordance with the terms</td><td></td><td></td></tr><tr><td>of the contract. In a case where an Arbitral Tribunal passes an</td><td></td><td></td></tr><tr><td>award against the terms of the contract, the award would be</td><td></td><td></td></tr><tr><td>patently illegal. However, an Arbitral Tribunal has jurisdiction to</td><td></td><td></td></tr><tr><td>interpret a contract having regard to terms and conditions of the</td><td></td><td></td></tr><tr><td>contract, conduct of the parties including correspondences</td><td></td><td></td></tr><tr><td>exchanged, circumstances of the case and pleadings of the parties.</td><td></td><td></td></tr><tr><td>If the conclusion of the arbitrator is based on a possible view of the</td><td></td><td></td></tr><tr><td>matter, the Court should not intefere [See: SAIL v. Gupta Brother</td><td></td><td></td></tr><tr><td>Steel Tubes Ltd., (2009) 10 SCC 63; Pure Helium India (P)</td><td></td><td></td></tr><tr><td>Ltd. v. ONGC, (2003) 8 SCC 593; McDermott International</td><td></td><td></td></tr><tr><td>Inc. v. Burn Standard Co. Ltd., (2006) 11 SCC 181; MMTC</td><td></td><td></td></tr><tr><td>Ltd. v. Vedanta Ltd., (2019) 4 SCC 163]. But where, on a full</td><td></td><td></td></tr><tr><td>reading of the contract, the view of the Arbitral Tribunal on the</td><td></td><td></td></tr></tbody></table><div><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 18 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> terms of a contract is not a possible view, the award would be <br /> considered perverse and as such amenable to interference [ <i>South </i><br /> <b><i>East Asia Marine Engg. &amp; Constructions Ltd.</i></b> <b> v. </b> <b><i>Oil India Ltd.</i></b> <b>, </b><br /> <b>(2020) 5 SCC 164</b> ]. <br /> <b><i>Whether unexpressed term can be read into a contract as an </i></b><br /> <b><i>implied condition</i></b> <br /> <b>85.</b> Ordinarily, terms of the contract are to be understood in the <br /> way the parties wanted and intended them to be. In agreements of <br /> arbitration, where party autonomy is the <i>grund norm</i> , how the <br /> parties worked out the agreement, is one of the indicators to <br /> decipher the intention, apart from the plain or grammatical <br /> meaning of the expressions used [ <b><i>B</i></b> <b><i>ALCO</i></b> <b> v. </b> <b><i>Kaiser Aluminium </i></b><br /> <b><i>Technical Services Inc.</i></b> <b>, (2016) 4 SCC 126</b> ]. <br /> <b>86.</b> However, reading an unexpressed term in an agreement would <br /> be justified on the basis that such a term was always and obviously <br /> intended by the parties thereto. An unexpressed term can be <br /> implied if, and only if, the court finds that the parties must have <br /> intended that term to form part of their contract. It is not enough for <br /> the court to find that such a term would have been adopted by the <br /> parties as reasonable men if it had been suggested to them. Rather, <br /> it must have been a term that went without saying, a term necessary <br /> to give business efficacy to the contract, a term which, although <br /> tacit, forms part of the contract [ <b><i>Adani Power (Mundra) </i></b><br /> <b><i>Ltd.</i></b> <b> v. </b> <b><i>Gujarat ERC</i></b> <b>, (2019) 19 SCC 9</b> ]. <br /> <b>87.</b> But before an implied condition, not expressly found in the <br /> contract, is read into a contract, by invoking the business efficacy <br /> doctrine, it must satisfy the following five conditions: <br /> ( <i>a</i> ) it must be reasonable and equitable; <br /> ( <i>b</i> ) it must be necessary to give business efficacy to the contract, <br /> that is, a term will not be implied if the contract is effective <br /> without it; <br /> ( <i>c</i> ) it must be obvious that ―it goes without saying‖; <br /> ( <i>d</i> ) it must be capable of clear expression; <br /> ( <i>e</i> ) it must not contradict any terms of the contract [ <b><i>Nabha Power </i></b><br /> <b><i>Ltd.</i></b> <b> v. </b> <b><i>Punjab SPCL</i></b> <b>, (2018) 11 SCC 508</b> , followed in <b><i>Adani </i></b><br /> <b><i>Power case</i></b> <b>, (2019) 19 SCC 9</b> ]. <br /> <b><i>(emphasis supplied) </i></b><br /> <b><i> </i></b><br /> 39. The solitary issue that arises for consideration in the present <br /> Petition pertains to the legality and sustainability of the Award of <br /> interest at the rate of 18% per annum <b> </b> granted by the learned <br /> Arbitrator. <b> </b><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 19 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 40. At this stage, this Court finds it apposite, before adverting to the <br /> rival submissions advanced by the parties, to extract and examine the <br /> findings recorded by the learned Arbitrator in respect of Claim No. 4 <br /> in the Impugned Award pertaining to the award of interest. The <br /> relevant portion of the Impugned Award is reproduced herein below: <b> </b><br /> ― <b>Claim No.: 4 Interest @ 18% on Pre suit and pendente lite </b><br /> <b>and future </b><br /> The claimant in his claim no. 4 has stated that since the claimants <br /> genuine amount got block and could not be used or put to rotation. <br /> and became a bad debt as: such the claimant suffered loss and to <br /> compensate the loss, the payment of interest is a must. The <br /> claimant has sought interest @ 18% on all the above amount with <br /> effect from 01.01.2007 under 10 CC and for the delayed payment <br /> of running bills from the due date of payment to the date of actual <br /> payment. <br /> In this case the claimant vide his letters no C 13 dt. 02.02.2008, C <br /> 14 dt. 17.04.2008, C 15 dt. 05.06.2008 and C 16 dt. 06.07.2008 <br /> had been repeatedly requesting the respondent to the pay the <br /> amount as per clause 10 CC of the agreement with 18% interest per <br /> annum. But no action in respect of payments was taken by the <br /> respondent. The claimant in his reply has invoked clause 3 (1) a of <br /> the interest act which reads as under <br /> <b>CLAUSE 3 (1) A OF THE INTEREST ACT </b><br /> <b>3. Power of court to allow interest. -</b> (1) In any proceedings for <br /> the recovery of any debt or damages or in any proceedings in <br /> which a claim for interest in respect of any debt or damages <br /> already paid in made, the court may, If It thinks fit, allow interest <br /> to the-person entitled to the debt or damages or to the person <br /> making such claim, as the case may be, at a rate not exceeding the <br /> current rate of interest, for the whole or part of the following <br /> period, that is to. say- <br /> (a) If the proceedings, rebate to a debt payable by virtue of a <br /> written instrument at a certain time, then, from the date when the <br /> debt is payable to the date of institution of the proceedings. <br /> Comments (vi) In case of notice was sent by plaintiff demanding <br /> interest on amount advanced by him to defendant the plaintiff <br /> entitled to interest for period from date of service of notice on <br /> defendant to date of filing of suit; M.S. Rajput. V. M/s. The Cellar, <br /> AIR 1993 Kant 9. <br /> As per this clause interest not exceeding the current rate can be <br /> paid from the date when the debt is payable to the date of <br /> institution of proceedings i.e. up to 31.12.2009. When the <br /> proceedings started on 7.01.2010. The claimant in his reply has <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 20 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> also dragged the judgement of Delhi High Court, in the case of <br /> DDA V/s S.S. Jatley, where in the Hon&#x27;ble High Court has upheld <br /> pre-suit and pendente lite suit interest @12% awarded by the <br /> arbitrator on demand by the claimant and from the date of demand <br /> till the date of filing of suit and till the date of decree and future <br /> interest from the date of degree awarded:@.16% per annum. <br /> In another case referred by the claimant is of Hon&#x27;ble Andhra <br /> Pradesh High court in the case of Union of India V/s Satya <br /> Narayan. Construction Company where the High Court has upheld <br /> the interest of 12% per annum awarded by the arbitrator from the <br /> date of degree to the date of payment. <br /> The respondent has at no stage challenged the calculation <br /> submitted by the claimant. The respondent in their reply to claims <br /> has stated that the claimant did not serve any notice of interest to <br /> the respondent and there is not provision in the agreement for the <br /> payment of interest. In this regard it is pointed out that the <br /> respondent submitted copy of the agreement dt 25.08.2004 and <br /> copy of the work order dt: 8.03.2004. The perusal shows that the <br /> claimant laid down encircled condition at page R-18 that &quot;our rate <br /> are hold good for monthly payments. If monthly payments are not <br /> done then 24% interest will be charged. <br /> The cause of action arose on 8.03.2004, when the claimant gave in <br /> writing to have his right to claim interest @ 24% in case monthly <br /> payments are not made. The Hon&#x27;ble Supreme Court of India has <br /> upheld this version in the case of Major (Regd) Inder Singh Rekhi <br /> V/s DDA (Decision on 24.03.1988) <br /> This version has also been upheld by the Hon&#x27;ble Supreme court of <br /> India in the case of Union of India and other V/s L.K. Ahuja and <br /> Company decided on 05:04.1988. <br /> It is therefore concluded that the stand of the respondent has no <br /> standing and is turned down and the claim of the claiming for <br /> demand of interest @ 24% w.e.f. 8.03.2004 holds good without <br /> any shadow of doubt, for all intents and purchases and up to date <br /> of payment in the interest of justice. But at the time of submission <br /> of claim and in his correspondence, the claimant has stuck to <br /> interest @ 18% only. Therefore his claim of interest @ 18% w.e.f, <br /> the date of cause of action i.e. 08:03.2004 till the date of filing suit, <br /> date of degree and date of payment holds goods as per law. It will <br /> be worth pointing out that the respondent has never objected to the <br /> rate of interest of 18%, claimed by the claimant repeatedly almost <br /> in all letters. The details of the claim worked out is attached.‖ <br /> <b><i> (emphasis added) </i></b><br /> <b><i> </i></b><br /> 41. A careful perusal of the aforesaid findings recorded by the <br /> learned Arbitrator reveals that the grant of interest essentially was <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 21 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> neither mechanical nor arbitrary. On the contrary, the learned <br /> Arbitrator undertook an examination of the various factors, including <br /> the correspondence exchanged between the parties, and the conduct of <br /> the Petitioner during the subsistence of the dispute. The relevant <br /> portion of the Impugned Award indicates that the learned Arbitrator <br /> took into account the repeated communications addressed by <br /> Respondent No. 1/Claimant therein seeking payment of its dues along <br /> with interest at the rate of 18% per annum, which communications <br /> were not controverted by the Petitioner at the material time. <b> </b><br /> 42. The reasoning adopted by the learned Arbitrator further reflects <br /> that although Respondent No. 1 had, at an earlier stage, alluded to a <br /> higher rate of interest, the claim was consciously restricted before the <br /> learned Tribunal to interest at the rate of 18% per annum. The learned <br /> Arbitrator, therefore, proceeded to evaluate the claim on the basis of <br /> the rate actually pressed before the learned Tribunal and arrived at a <br /> finding that the said rate was justified. <br /> 43. Viewed in this light, the reasoning contained in the Impugned <br /> Award is cogent and reflects a clear and reasonable nexus between the <br /> factual findings recorded by the learned Arbitral Tribunal and the <br /> ultimate determination regarding the grant of interest. <br /> 44. Now turning to the principal plank of the challenge raised by <br /> the Petitioner, which is predicated upon the provisions of the Interest <br /> Act. It has been contended that in terms of Section 3(1) <b> </b> of the said <br /> Interest Act, interest cannot be awarded at a rate exceeding the <br /> ― <i>current rate of interest</i> ‖, which expression under Section 2(b) of the <br /> Interest Act is understood to mean the highest of the deposit rates <br /> offered by scheduled banks. The Petitioner, therefore, has submitted <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 22 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> that, given that the prevailing fixed deposit rates during the relevant <br /> period were in the vicinity of 6-7% per annum, the learned Arbitrator <br /> could not have granted interest at a rate as high as 18% per annum, <br /> and that the Impugned Award of interest is consequently contrary to <br /> the statutory framework governing the grant of interest. <br /> 45. At first blush, the submission advanced by the Petitioner <br /> appears attractive; however, upon a closer scrutiny of the statutory <br /> framework governing arbitral proceedings, the said contention does <br /> not withstand judicial examination. <b> </b><br /> 46. The arbitral proceedings in the present case are governed by the <br /> A&amp;C Act, which constitutes a special and self-contained legislative <br /> framework regulating arbitral adjudication, including the authority of <br /> the learned Arbitral Tribunal to award interest. Significantly, the <br /> arbitral proceedings were invoked on 06.07.2008, i.e., much prior to <br /> the amendment introduced to the A&amp;C Act by Act 3 of 2016 with <br /> effect from 23.10.2015. Consequently, the present dispute necessarily <br /> falls to be examined under the statutory regime prevailing prior to the <br /> 2015 amendment, and the issue pertaining to the grant of interest must <br /> therefore be determined in accordance with Section 31(7) of the A&amp;C <br /> Act as it stood prior to the said amendment. <b> </b> The pre-amended <br /> provision, which governed the field at the time the Arbitral Award in <br /> the present case came to be rendered, read as under: <b> </b><br /> <b>“Section 31(7)</b> – <br /> <b><i></i></b>* <br /> (7)(a) Unless otherwise agreed by the parties, where and in so far <br /> as an arbitral award is for the payment of money, the Arbitral <br /> Tribunal may include in the sum for which the award is made <br /> interest at such rate as it deems reasonable, on the whole or any <br /> part of the money, for the whole or any part of the period between <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 23 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> the date on which the cause of action arose and the date on which <br /> the award is made. <br /> (b) A sum directed to be paid by an arbitral award shall, unless the <br /> award otherwise directs, carry interest at the rate of eighteen per <br /> cent per annum from the date of the award to the date of payment.‖ <br /> <b><i> (emphasis added) </i></b><br /> <i> </i><br /> 47. Under the statutory framework prevailing prior to the 2015 <br /> amendment, Section 31(7)(a) of the the A&amp;C Act, conferred a wide <br /> and substantive discretion upon the learned Arbitral Tribunal to award <br /> pre-reference as well as <i>pendente lite</i> interest at such rate as it deemed <br /> reasonable, unless the parties had expressly agreed otherwise. The <br /> provision, in its plain terms, recognised the autonomy of the Arbitral <br /> forum to determine the appropriate rate of interest having regard to the <br /> factual matrix of the dispute, the conduct of the parties, and the period <br /> during which the claimant was deprived of monies found due. <br /> 48. In the present case, it is not in dispute that the Agreement <br /> executed between the parties is conspicuously silent with respect to <br /> the prohibition or restriction on the grant of interest. In the absence of <br /> such contractual embargo, the statutory discretion vested in the <br /> learned Arbitrator remained wholly unfettered. <br /> 49. Equally significant is the scheme embodied in Section 31(7)(b) <br /> in its pre-amendment form, which stipulated that a sum directed to be <br /> paid by an arbitral award shall, unless the award otherwise directs, <b> </b><br /> carry interest at the rate of 18% per annum from the date of the award <br /> until payment. The legislative prescription of 18% per annum as the <br /> statutory default rate of interest unmistakably indicates the benchmark <br /> contemplated by the Parliament within the arbitral framework. When <br /> the statute itself envisaged interest at the said rate as the normative <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 24 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> default, it would be wholly incongruous to characterise the grant of <br /> interest at 18% per annum as per se excessive or unconscionable. <br /> 50. Viewed through this statutory lens, the determination of the <br /> learned Arbitrator granting interest at the rate of 18% per annum <br /> cannot be regarded as aberrant or disproportionate. On the contrary, <br /> the rate awarded finds resonance with the legislative design of the <br /> A&amp;C Act as it stood at the relevant time. The power to award interest <br /> under Section 31(7) of the A&amp;C Act is intended to compensate a party <br /> for the deprivation of the legitimate use of money during the <br /> subsistence of the dispute. Interest, in such circumstances, operates <br /> not as a punitive device but as a restorative and compensatory <br /> mechanism, ensuring that the successful claimant is not left <br /> economically disadvantaged by the delay inherent in the adjudicatory <br /> process. <br /> 51. The jurisprudence on the subject consistently recognises that <br /> pre-award, <i>pendente lite</i> , and future interest serve the important <br /> purpose of placing the claimant, as far as monetary compensation can, <br /> in the position they would have been in, had the amounts due been <br /> paid on time. The statutory discretion vested in the Arbitral Tribunal <br /> is therefore to be respected unless the rate awarded is demonstrably <br /> arbitrary, capricious, or so unconscionable as to shock the judicial <br /> conscience. The legal position in this regard has been authoritatively <br /> clarified by the Hon‘ble Supreme Court in <b><i>North Delhi Municipal </i></b><br /> <b><i>8</i></b><br /> <b><i>Corporation v. S.A. Builders Ltd.</i></b> , wherein the Court elucidated the <br /> underlying rationale governing the grant of interest, observing as <br /> follows: <br /> <br /> 8<br /> (2025) 7 SCC 132 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 25 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> <b>“39.</b> Generally, going by the provisions contained in Section 31(7) <br /> of the 1996 Act, it is evident that an Arbitral Tribunal has the <br /> power to grant: (i) pre-award, (ii) pendente lite, and (iii) post- <br /> award interest. Intention behind awarding pre-award interest is <br /> primarily to compensate the claimant for the pecuniary loss <br /> suffered from the time the cause of action arose till passing of the <br /> arbitral award. Further, this is also to ensure that the arbitral <br /> proceeding is concluded within a reasonable period to minimise the <br /> impact of the pre-award interest as well as interest pendente lite; <br /> thereby promoting efficiency in the arbitration process. Similarly, <br /> grant of post-award interest also serves a salutary purpose. It <br /> primarily acts as a disincentive to the award debtor not to delay <br /> payment of the arbitral amount to the award-holder.‖ <br /> <b><i> (emphasis added) </i></b><br /> <i> </i><br /> 52. This Court now proceeds to consider the contention advanced <br /> on behalf of the Petitioner that the Impugned Award results in the <br /> grant of ― <i>interest upon interest</i> ‖, which, according to the Petitioner, is <br /> impermissible in law. <br /> 53. In the considered opinion of this Court, the aforesaid <br /> submission of the Petitioner is equally devoid of merit. The legal <br /> position on this aspect stands conclusively settled by the Hon‘ble <br /> Supreme Court in <b><i>Hyder Consulting (UK) Ltd. v. Governor, State of </i></b><br /> <b><i>9</i></b><br /> <b><i>Orissa</i></b> , wherein a three-Judge Bench authoritatively interpreted <br /> Section 31(7) of the A&amp;C Act. The Apex Court clarified that the <br /> expression <i>“sum directed to be paid by an arbitral award”</i> occurring <br /> in Section 31(7)(b) is not confined merely to the principal amount but <br /> would include the aggregate amount determined by the arbitral <br /> tribunal, including any interest awarded for the pre-award period <br /> under Section 31(7)(a). Consequently, where the arbitral tribunal <br /> includes pre-reference or <i>pendente lite</i> interest in the amount <br /> determined as payable, the composite sum so awarded constitutes the <br /> <br /> 9<br /> (2015) 2 SCC 189 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 26 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> ― <i>sum</i> ‖ for the purposes of Section 31(7)(b), and post-award interest <br /> may legitimately run on such amount. The grant of such interest <br /> therefore does not amount to impermissible ― <i>interest upon interest</i> ‖, <br /> but represents a statutorily recognised compensatory mechanism <br /> intended to account for the continued deprivation of money found due <br /> to the claimant. The relevant portions of <b><i>Hyder Consulting </i></b> <i>(supra)</i> <b><i> </i></b><br /> read as under: <br /></div><table><thead><tr><th>―66. Clause (a) of Sub-section (7) provides that where an Award is</th><th></th><th></th></tr></thead><tbody><tr><td>made for the payment of money, the Arbitral Tribunal may include</td><td></td><td></td></tr><tr><td>interest in the sum for which the Award is made. In plain terms,</td><td></td><td></td></tr><tr><td>this provision confers a power upon the Arbitral Tribunal while</td><td></td><td></td></tr><tr><td>making an Award for payment of money, to include interest in the</td><td></td><td></td></tr><tr><td>sum for which the Award is made on either the whole or any</td><td></td><td></td></tr><tr><td>part of the money and for the whole or any part of the period for</td><td></td><td></td></tr><tr><td>the entire pre-award period between the date on which the</td><td></td><td></td></tr><tr><td>cause of action arose and the date on which the Award is made. To</td><td></td><td></td></tr><tr><td>put it differently, Sub-section (7)(a) contemplates that an Award,</td><td></td><td></td></tr><tr><td>inclusive of interest for the pre-award period on the entire amount</td><td></td><td></td></tr><tr><td>directed to be paid or part thereof, may be passed. The ―sum‖</td><td></td><td></td></tr><tr><td>awarded may be principal amount and such interest as the Arbitral</td><td></td><td></td></tr><tr><td>Tribunal deems fit. If no interest is awarded, the ―sum‖ comprises</td><td></td><td></td></tr><tr><td>only the principal. The significant words occurring in Clause</td><td></td><td></td></tr><tr><td>(a) of Sub-section (7) of Section 31 of the Act are ―the sum for</td><td></td><td></td></tr><tr><td>which the award is made.‖ On a plain reading, this expression</td><td></td><td></td></tr><tr><td>refers to the total amount or sum for the payment for which the</td><td></td><td></td></tr><tr><td>Award is made. Parliament has not added a qualification like</td><td></td><td></td></tr><tr><td>―principal‖ to the word ―sum,‖ and therefore, the word ―sum‖ here</td><td></td><td></td></tr><tr><td>simply means ―a particular amount of money.‖ In Section 31(7),</td><td></td><td></td></tr><tr><td>this particular amount of money may include interest from the</td><td></td><td></td></tr><tr><td>date of cause of action to the date of the award.</td><td></td><td></td></tr><tr><td>67. The Oxford Dictionary gives the following meaning to the</td><td></td><td></td></tr><tr><td>word ―sum‖:</td><td></td><td></td></tr><tr><td></td><td>Sum, ‗if noun‘ : A particular amount of money.</td><td></td></tr><tr><td></td><td>Sum, ‗if verb‘ : The total amount resulting from the</td><td></td></tr><tr><td></td><td>addition of two or more numbers, amounts, or items.</td><td></td></tr><tr><td>68. In Black&#x27;s Law Dictionary, the word ―sum‖ is given the</td><td></td><td></td></tr><tr><td>following meaning:</td><td></td><td></td></tr><tr><td></td><td>SUM. In English law-A summary or abstract; a</td><td></td></tr><tr><td></td><td>compendium; a collection. Several of the old law treatises</td><td></td></tr><tr><td></td><td>are called ―sum.‖ Lord Hale applies the term to</td><td></td></tr><tr><td></td><td>summaries of statute law. Burrill. The sense in which the</td><td></td></tr><tr><td></td><td>term is most commonly used is ―money‖; a</td><td></td></tr></tbody></table><div><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 27 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /></div><table><thead><tr><th></th><th>quantity of money or currency; any amount indefinitely, a</th><th></th></tr></thead><tbody><tr><td></td><td>sum of money, a small sum, or a large sum. U.S. v. Van</td><td></td></tr><tr><td></td><td>Auken 96 US 366 (1877): 24 L.Ed. 852;</td><td></td></tr><tr><td></td><td>Donovan v. Jenkins 52 Mont. 124, 155 P. 972, 973.</td><td></td></tr><tr><td>69. Thus, when used as a noun, as it seems to have been used in</td><td></td><td></td></tr><tr><td>this provision, the word ―sum‖ simply means ―an</td><td></td><td></td></tr><tr><td>amount of money‖; whatever it may include- ―principal‖ and</td><td></td><td></td></tr><tr><td>―interest‖ or one of the two. Once the meaning of the word ―sum‖</td><td></td><td></td></tr><tr><td>is clear, the same meaning must be ascribed to the word in Clause</td><td></td><td></td></tr><tr><td>(b) of Sub-section (7) of Section 31 of the Act, where it provides</td><td></td><td></td></tr><tr><td>that a sum directed to be paid by an Arbitral Award ―shall carry</td><td></td><td></td></tr><tr><td>interest….‖ from the date of the Award to the date of the payment</td><td></td><td></td></tr><tr><td>i.e., post-award. In other words, what Clause (b) of Sub-section</td><td></td><td></td></tr><tr><td>(7) of Section 31 of the Act directs is that the ―sum,‖ which is</td><td></td><td></td></tr><tr><td>directed to be paid by the Award, whether inclusive or</td><td></td><td></td></tr><tr><td>exclusive of interest, shall carry interest at the rate of eighteen per</td><td></td><td></td></tr><tr><td>cent per annum for the post-award period, unless otherwise</td><td></td><td></td></tr><tr><td>ordered.</td><td></td><td></td></tr><tr><td>70. Thus, Sub-section (7) of Section 31 of the Act provides, firstly,</td><td></td><td></td></tr><tr><td>vide Clause (a) that the Arbitral Tribunal may include interest</td><td></td><td></td></tr><tr><td>while making an award for payment of money in the sum for</td><td></td><td></td></tr><tr><td>which the Award is made and further, vide Clause (b) that the sum</td><td></td><td></td></tr><tr><td>so directed to be made by the Award shall carry interest at a certain</td><td></td><td></td></tr><tr><td>rate for the post award period.</td><td></td><td></td></tr><tr><td>71. The purpose of enacting this provision is clear, namely, viz. to</td><td></td><td></td></tr><tr><td>encourage early payment of the awarded sum and to discourage the</td><td></td><td></td></tr><tr><td>usual delay, which accompanies the execution of the Award in the</td><td></td><td></td></tr><tr><td>same manner as if it were a decree of the court vide Section</td><td></td><td></td></tr><tr><td>36 of the Act.</td><td></td><td></td></tr><tr><td>72. In this view of the matter, it is clear that the interest, the sum</td><td></td><td></td></tr><tr><td>directed to be paid by the Arbitral Award under Clause (b) of Sub-</td><td></td><td></td></tr><tr><td>section (7) of Section 31 of the Act is inclusive of interest pendent</td><td></td><td></td></tr><tr><td>lite.</td><td></td><td></td></tr><tr><td>*****</td><td></td><td></td></tr><tr><td>77. In the result, I am of the view that S.L. Arora&#x27;s case is wrongly</td><td></td><td></td></tr><tr><td>decided in that it holds that a sum directed to be paid by an Arbitral</td><td></td><td></td></tr><tr><td>Tribunal and the reference to the Award on the substantive claim</td><td></td><td></td></tr><tr><td>does not refer to interest pendente lite awarded on the ―sum</td><td></td><td></td></tr><tr><td>directed to paid upon Award‖ and that in the absence of any</td><td></td><td></td></tr><tr><td>provision of interest upon interest in the contract, the Arbitral</td><td></td><td></td></tr><tr><td>Tribunal does not have the power to award interest upon interest,</td><td></td><td></td></tr><tr><td>or compound interest either for the pre-award period or for the</td><td></td><td></td></tr><tr><td>post-award period. Parliament has the undoubted power to legislate</td><td></td><td></td></tr><tr><td>on the subject and provide that the Arbitral Tribunal may award</td><td></td><td></td></tr><tr><td>interest on the sum directed to be paid by the Award, meaning a</td><td></td><td></td></tr><tr><td>sum inclusive of principal sum adjudged and the interest, and this</td><td></td><td></td></tr><tr><td></td><td></td><td></td></tr></tbody></table><div><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 28 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> has been done by Parliament in plain language.‖ <br /> <b><i>(emphasis added) </i></b><br /> <i> </i><br /> 54. At this juncture, this Court also deems it apposite to refer to the <br /> judgment of a Co-ordinate Bench of this Court in <b><i>Delhi Development </i></b><br /> <b><i>10</i></b><br /> <b><i>Authority v. MSJ Constructions Pvt. Ltd. </i></b> , wherein the Court had <br /> occasion to expound upon the legal position pertaining to the grant of <br /> interest upon interest. The relevant portions of the said judgment read <br /> as follows: <br /></div><table><thead><tr><th>17. In Oil &amp; Natural Gas Commission (supra), the Supreme Court</th><th></th><th></th></tr></thead><tbody><tr><td>was concerned with a case where the two main claims were</td><td></td><td></td></tr><tr><td>themselves relating to interest for delayed payment, and after</td><td></td><td></td></tr><tr><td>awarding the two main claims, the Arbitrator had awarded interest</td><td></td><td></td></tr><tr><td>at 12% per annum from the date of award till the date of award till</td><td></td><td></td></tr><tr><td>realization. On the question of whether, on the said interest</td><td></td><td></td></tr><tr><td>amount, further interest would be liable to be awarded from the</td><td></td><td></td></tr><tr><td>date ofaward till realization, the Supreme Court observed as under:</td><td></td><td></td></tr><tr><td></td><td>“3. Shri B. Datta, learned senior counsel for the</td><td></td></tr><tr><td></td><td>appellant, contended that what was awarded by the</td><td></td></tr><tr><td></td><td>Arbitrators in respect of the two claims referred to earlier</td><td></td></tr><tr><td></td><td>in the course of this order is itself interest for different</td><td></td></tr><tr><td></td><td>periods. He, therefore, submitted that Arbitrators could</td><td></td></tr><tr><td></td><td>not have further awarded interest on the claims awarded</td><td></td></tr><tr><td></td><td>at 12% per annum from the date of award till realisation,</td><td></td></tr><tr><td></td><td>He did not dispute, and very fairly and correctly, that the</td><td></td></tr><tr><td></td><td>Arbitrators do have the power to grant interest on the</td><td></td></tr><tr><td></td><td>amount claimed in the arbitration and the power of the</td><td></td></tr><tr><td></td><td>Arbitrators was very characteristically described by him</td><td></td></tr><tr><td></td><td>as „before, during and after‟ of the arbitration</td><td></td></tr><tr><td></td><td>proceedings. His point is that there cannot be interest</td><td></td></tr><tr><td></td><td>upon interest when the claim itself is one of interest and</td><td></td></tr><tr><td></td><td>interest upon that amount could not have been granted by</td><td></td></tr><tr><td></td><td>the Arbitrators and relied upon Section 3 of the Interest</td><td></td></tr><tr><td></td><td>Act.</td><td></td></tr><tr><td></td><td>4. There cannot be any doubt that the Arbitrators have</td><td></td></tr><tr><td></td><td>powers to grant interest akin to Section 34 of the CPC</td><td></td></tr><tr><td></td><td>which is the power of the court in view of Section 29 of the</td><td></td></tr><tr><td></td><td>Arbitration Act, 1940. It is clear that interest is not</td><td></td></tr><tr><td></td><td>granted upon interest awarded but upon the claim made.</td><td></td></tr><tr><td></td><td>The claim made in the proceedings is under two heads -</td><td></td></tr></tbody></table><div><br /> <br /> 10<br /> 2021 SCC OnLine Del 5166 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 29 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /></div><table><thead><tr><th></th><th>one is the balance of amount claimed under invoices and</th><th></th></tr></thead><tbody><tr><td></td><td>letter dated February 10, 1981 and the amount certified</td><td></td></tr><tr><td></td><td>and paid by the appellant and the second is the interest on</td><td></td></tr><tr><td></td><td>delayed payment. That is how the claim for interest on</td><td></td></tr><tr><td></td><td>delayed payment stood crystallized by the time the claim</td><td></td></tr><tr><td></td><td>was filed before the Arbitrators. Therefore, the power of</td><td></td></tr><tr><td></td><td>the Arbitrators to grant interest on the amount of interest</td><td></td></tr><tr><td></td><td>which may, in other words, be termed as interest on</td><td></td></tr><tr><td></td><td>damages or compensation for delayed payment which</td><td></td></tr><tr><td></td><td>would also become part of the principal. If that is the</td><td></td></tr><tr><td></td><td>correct position in law, we do not think that Section 3 of</td><td></td></tr><tr><td></td><td>the Interest Act has any relevance in the context ofthe</td><td></td></tr><tr><td></td><td>matter which we are dealing with in the present case.</td><td></td></tr><tr><td></td><td>Therefore, the first contention raised by Shri Datta,</td><td></td></tr><tr><td></td><td>though interesting, deserves to be and is rejected.”</td><td></td></tr><tr><td>18. In Three Circles (supra), the Supreme Court once again had the</td><td></td><td></td></tr><tr><td>occasion to examine the Arbitrator&#x27;s power to award interest upon</td><td></td><td></td></tr><tr><td>interest. In this regard, the Supreme Court relied upon the decision</td><td></td><td></td></tr><tr><td>in McDermott International Inc. v. Burn Standard Co. Ltd.,</td><td></td><td></td></tr><tr><td>[(2006) 11 SCC 181] and held that the same was permissible in</td><td></td><td></td></tr><tr><td>law, and observed as under:</td><td></td><td></td></tr><tr><td>15. Now the question comes which is related to&lt;br&gt;awarding of „interest on interest‟. According to the&lt;br&gt;appellant, they have to pay interest on an amount which&lt;br&gt;was inclusive of interest and the principal amount and,&lt;br&gt;therefore, this amounts to a liability to pay „interest on&lt;br&gt;interest. This question is no longer res integra at the&lt;br&gt;present point of time. This Court in McDermott&lt;br&gt;International Inc. v. Burn Standard Co. Ltd. (2006) 11&lt;br&gt;SCC 181 has settled this question in which it had observed&lt;br&gt;as follows:&lt;br&gt;The Arbitrator has awarded the principal&lt;br&gt;amount and interest thereon upto the date of&lt;br&gt;award and future interest thereupon which do&lt;br&gt;not amount to award on interest on interest as&lt;br&gt;interest awarded on the principal amount upto&lt;br&gt;the date of award became the principal&lt;br&gt;amount which is permissible in law.&lt;br&gt;16. The High Court on this question has also rightly relied&lt;br&gt;on a decision of this Court in the case of Oil and Natural&lt;br&gt;Gas Commission v. M.C. Clelland Engineers S.A. AIR&lt;br&gt;1999 SCW 1224. That being the position, we are unable to&lt;br&gt;find any ground to set aside the judgment of the Division&lt;br&gt;Bench of the High Court while considering the ground of&lt;br&gt;„interest on interest‟.&lt;br&gt;(emphasis added)</td><td></td><td></td></tr></tbody></table><div><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 30 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> 55. In the facts of the present case, the learned Arbitrator has <br /> awarded interest in exercise of the discretion vested under Section <br /> 31(7)(b) of the A&amp;C Act, on the sum determined as payable to <br /> Respondent <b> </b> No. 1. In view of the legal position noticed hereinabove, <br /> the grant of interest on the awarded sum cannot be construed as <br /> impermissible interest upon interest. The contention advanced by the <br /> Petitioner on this ground, therefore, does not merit acceptance. <br /> 56. At this juncture, this Court considers it apposite to advert to the <br /> judgment rendered by the three-Judge Bench of the Hon‘ble Supreme <br /> <b><i>11</i></b><br /> Court in <b><i>Shahi &amp; Associates v. State of U.P.</i></b> , wherein the factual <br /> matrix bore close resemblance to the circumstances obtaining in the <br /> present case. In the said decision, the Hon‘ble Supreme Court <br /> examined the issue relating to the grant of interest within the statutory <br /> framework prevailing prior to the 2015 amendment to the A&amp;C Act, <br /> and clarified the governing principles applicable to Arbitral Awards <br /> rendered during that period. The Apex Court noted that in the <br /> proceedings before the High Court, the rate of interest awarded by the <br /> Arbitral Tribunal had been reduced from 18% per annum to 6% per <br /> annum. <br /> 57. However, in the said decision, upon a detailed consideration of <br /> Section 31(7) of the A&amp;C Act as it then stood, the Hon‘ble Supreme <br /> Court reversed the said finding and restored the rate of interest to 18% <br /> per annum, holding that the determination of interest by the Arbitral <br /> Tribunal fell squarely within the statutory discretion conferred under <br /> the pre-amendment regime. The relevant portions of the said judgment <br /> are reproduced herein below: <br /> <br /> 11<br /> (2019) 8 SCC 329 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 31 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /></div><table><thead><tr><th>―9. The 1996 Act has come into force with effect from 22-8-1996.</th><th></th><th></th><th></th></tr></thead><tbody><tr><td>Section 85 of the 1996 Act expressly repeals the provisions of the</td><td></td><td></td><td></td></tr><tr><td>Arbitration Act, 1940. Thus, the 1996 Act would be applicable to</td><td></td><td></td><td></td></tr><tr><td>all arbitral proceedings which have commenced on or after the said</td><td></td><td></td><td></td></tr><tr><td>Act came into force. Para 7-A inserted by Section 24 of the U.P.</td><td></td><td></td><td></td></tr><tr><td>Amendment Act was an amendment to the First Schedule of the</td><td></td><td></td><td></td></tr><tr><td>Arbitration Act, 1940. This amendment was introduced by the U.P.</td><td></td><td></td><td></td></tr><tr><td>Act No. 57 of 1976. The provisions of the Arbitration Act, 1940</td><td></td><td></td><td></td></tr><tr><td>including the State amendment will have no application to the</td><td></td><td></td><td></td></tr><tr><td>proceedings commenced after coming into force of the 1996 Act.</td><td></td><td></td><td></td></tr><tr><td>10. Section 31(7)(b) of the 1996 Act, before its amendment by Act</td><td></td><td></td><td></td></tr><tr><td>3 of 2016, which has come into force with effect from 23-10-2015,</td><td></td><td></td><td></td></tr><tr><td>is relevant for the purpose of this case, empowers the arbitrator to</td><td></td><td></td><td></td></tr><tr><td>award pre-award and post-award interest. This section clearly</td><td></td><td></td><td></td></tr><tr><td>states that unless otherwise specified, the awarded sum would</td><td></td><td></td><td></td></tr><tr><td>carry an interest @ 18% p.a., as extracted below:</td><td></td><td></td><td></td></tr><tr><td></td><td>―31. Form and contents of arbitral award. - (1)-(6)</td><td></td><td></td></tr><tr><td></td><td>***</td><td></td><td></td></tr><tr><td></td><td>(7)(a) Unless otherwise agreed by the parties, where</td><td></td><td></td></tr><tr><td></td><td>and insofar as an arbitral award is for the payment of</td><td></td><td></td></tr><tr><td></td><td>money, the arbitral tribunal may include in the sum for</td><td></td><td></td></tr><tr><td></td><td>which the award is made interest, at such rate as it deems</td><td></td><td></td></tr><tr><td></td><td>reasonable, on the whole or any part of the money, for the</td><td></td><td></td></tr><tr><td></td><td>whole or any part of the period between the date on which</td><td></td><td></td></tr><tr><td></td><td>the cause of action arose and the date on which the award</td><td></td><td></td></tr><tr><td></td><td>is made.</td><td></td><td></td></tr><tr><td></td><td>(b) A sum directed to be paid by an arbitral award</td><td></td><td></td></tr><tr><td></td><td>shall, unless the award otherwise directs, carry interest at</td><td></td><td></td></tr><tr><td></td><td>the rate of eighteen per centum per annum from the date</td><td></td><td></td></tr><tr><td></td><td>of the award to the date of payment.‖</td><td></td><td></td></tr><tr><td></td><td>(emphasis supplied)</td><td></td><td></td></tr><tr><td>11. Section 31(7)(b) of the 1996 Act clearly mandates that, in the</td><td></td><td></td><td></td></tr><tr><td>event the arbitrator does not give any specific directions as regards</td><td></td><td></td><td></td></tr><tr><td>the rate of interest on the amount awarded, such amount ―shall‖</td><td></td><td></td><td></td></tr><tr><td>carry interest @ 18% p.a. from the date of award till the date of</td><td></td><td></td><td></td></tr><tr><td>payment. Since the Arbitration Act, 1940 has been repealed by</td><td></td><td></td><td></td></tr><tr><td>way of Section 85 of the 1996 Act, the Schedule to the Arbitration</td><td></td><td></td><td></td></tr><tr><td>Act, including the State amendment, also stands repealed. The only</td><td></td><td></td><td></td></tr><tr><td>exception is provided in sub-section (2)(a) of Section 85 where a</td><td></td><td></td><td></td></tr><tr><td>proceeding which had commenced when the Arbitration Act of</td><td></td><td></td><td></td></tr><tr><td>1940 was in force and continued even after coming into force of</td><td></td><td></td><td></td></tr><tr><td>the 1996 Act, and all parties thereto agreed for application of the</td><td></td><td></td><td></td></tr><tr><td>old Act of 1940. Therefore, the provisions of Arbitration Act, 1940</td><td></td><td></td><td></td></tr><tr><td>including the State amendment, namely, para 7-A inserted by</td><td></td><td></td><td></td></tr><tr><td>Section 24 of the U.P. Amendment Act will have no application to</td><td></td><td></td><td></td></tr><tr><td>the proceedings commenced after coming into force of the 1996</td><td></td><td></td><td></td></tr><tr><td>Act.</td><td></td><td></td><td></td></tr></tbody></table><div><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 32 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> <b>12.</b> In the instant case, though the agreement was earlier to the date <br /> of coming into force of the 1996 Act, the proceedings admittedly <br /> commenced on 27-10-1999 and were conducted in accordance with <br /> the 1996 Act. If that be so, para 7-A inserted by Section 24 of the <br /> U.P. Amendment Act has no application to the case at hand. Since <br /> the rate of interest granted by the arbitrator is in accordance with <br /> Section 31(7)( <i>b</i> ) of the 1996 Act, the High Court and the District <br /> Judge were not justified in reducing the rate of interest by <br /> following the U.P. Amendment Act.‖ <br /> <b><i>(emphasis added) </i></b><br /> <br /> 58. The aforesaid legal position has further been asserted by the <br /> Hon‘ble Supreme Court in <b><i>Larsen Air Conditioning &amp; Refrigeration </i></b><br /> <b><i>12</i></b><br /> <b><i>Co. v. Union of India</i></b> , wherein, following the reasoning in <b><i>Shahi &amp; </i></b><br /> <b><i>Associates </i></b> <i>(supra)</i> , the Apex Court observed that under Section 31(7) <br /> of the A&amp;C Act, as it stood prior to the 2015 amendment, the Arbitral <br /> Tribunal enjoys a wide discretion to award pre-reference and <i>pendente </i><br /> <i>lite</i> interest at such rate as it deems reasonable, and that such <br /> determination ought not to be interfered with by a court exercising <br /> jurisdiction under Section 34 of the A&amp;C Act, save in cases of patent <br /> illegality or manifest arbitrariness. The relevant portions of the said <br /> judgment are reproduced herein below: <br /></div><table><thead><tr><th>―11. Section 31(7)(b) of the 1996 Act, was amended by Act 3 of</th><th></th><th></th></tr></thead><tbody><tr><td>2016, w.e.f. 23-10-2015. The pre-amended provision, empowers</td><td></td><td></td></tr><tr><td>the arbitrator to award both pre-award and post-award interest, and</td><td></td><td></td></tr><tr><td>specifies that the awarded sum would carry an interest of 18% p.a.,</td><td></td><td></td></tr><tr><td>unless provided otherwise, from the date of award till the date of</td><td></td><td></td></tr><tr><td>payment. The pre-amended section, as it stood on the date of award</td><td></td><td></td></tr><tr><td>by the arbitrator (21-1-1999), read as follows:</td><td></td><td></td></tr><tr><td></td><td>*****</td><td></td></tr><tr><td>13. In the present case, given that the arbitration commenced in</td><td></td><td></td></tr><tr><td>1997 i.e. after the 1996 Act came into force on 22-8-1996, the</td><td></td><td></td></tr><tr><td>arbitrator, and the award passed by them, would be subject to this</td><td></td><td></td></tr><tr><td>statute. Under the enactment i.e. Section 31(7), the statutory rate of</td><td></td><td></td></tr><tr><td>interest itself is contemplated at 18% p.a. Of course, this is in the</td><td></td><td></td></tr><tr><td>event the award does not contain any direction towards the rate of</td><td></td><td></td></tr></tbody></table><div><br /> <br /> 12<br /> (2023) 15 SCC 472 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 33 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /></div><table><thead><tr><th>interest. Therefore, there is little to no reason, for the High Court to</th><th></th><th></th><th></th></tr></thead><tbody><tr><td>have interfered with the arbitrator&#x27;s finding on interest accrued and</td><td></td><td></td><td></td></tr><tr><td>payable. Unlike in the case of the old Act, the court is powerless to</td><td></td><td></td><td></td></tr><tr><td>modify the award and can only set aside partially, or wholly, an</td><td></td><td></td><td></td></tr><tr><td>award on a finding that the conditions spelt out under Section 34 of</td><td></td><td></td><td></td></tr><tr><td>the 1996 Act have been established. The scope of interference by</td><td></td><td></td><td></td></tr><tr><td>the court, is well defined and delineated [refer to Associate</td><td></td><td></td><td></td></tr><tr><td>Builders v. DDA, (2015) 3 SCC 49, Ssangyong Engg. &amp;</td><td></td><td></td><td></td></tr><tr><td>Construction Co. Ltd. v. NHAI, (2019) 15 SCC 131 and Delhi</td><td></td><td></td><td></td></tr><tr><td>Airport Metro Express (P) Ltd. v. DMRC, (2022) 1 SCC 131].</td><td></td><td></td><td></td></tr><tr><td>14. The reliance on Post Graduate Institute of Medical Education</td><td></td><td></td><td></td></tr><tr><td>&amp; Research v. Kalsi Construction Co., (2019) 8 SCC 726 by the</td><td></td><td></td><td></td></tr><tr><td>respondent State, is inapt, given that this Court had exercised its</td><td></td><td></td><td></td></tr><tr><td>Article 142 jurisdiction in light of three pertinent factors — the</td><td></td><td></td><td></td></tr><tr><td>award had been passed 20 years prior, related to construction of a</td><td></td><td></td><td></td></tr><tr><td>Paediatrics Centre in a medical institute, and that the parties in that</td><td></td><td></td><td></td></tr><tr><td>case had left the matter to the discretion of the court. Similarly, in</td><td></td><td></td><td></td></tr><tr><td>Oriental Structural Engineers (P) Ltd. v. State of Kerala, (2021)</td><td></td><td></td><td></td></tr><tr><td>6 SCC 150 this Court held that since the contract stipulated interest</td><td></td><td></td><td></td></tr><tr><td>entitlement on delayed payments, but contained no mention of the</td><td></td><td></td><td></td></tr><tr><td>rate of interest applicable — the Tribunal ought to have applied the</td><td></td><td></td><td></td></tr><tr><td>principles laid down in G.C. Roy [State of Orissa v. G.C. Roy,</td><td></td><td></td><td></td></tr><tr><td>(1992) 1 SCC 508] , and therefore, in exercise of Article 142, this</td><td></td><td></td><td></td></tr><tr><td>Court reduced the rate of interest awarded by the Tribunal on the</td><td></td><td></td><td></td></tr><tr><td>sum left unpaid. The judgment in Municipal Corpn. of Greater</td><td></td><td></td><td></td></tr><tr><td>Mumbai v. Pratibha Industries Ltd., (2019) 3 SCC 203, no doubt</td><td></td><td></td><td></td></tr><tr><td>discusses the inherent powers of the High Court as a superior court</td><td></td><td></td><td></td></tr><tr><td>of record, but relates specifically to the jurisdiction to recall its</td><td></td><td></td><td></td></tr><tr><td>own orders, and offers little assistance in the present dispute.</td><td></td><td></td><td></td></tr><tr><td>15. The limited and extremely circumscribed jurisdiction of the</td><td></td><td></td><td></td></tr><tr><td>court under Section 34 of the Act, permits the court to interfere</td><td></td><td></td><td></td></tr><tr><td>with an award, sans the grounds of patent illegality i.e. that</td><td></td><td></td><td></td></tr><tr><td>―illegality must go to the root of the matter and cannot be of a</td><td></td><td></td><td></td></tr><tr><td>trivial nature‖; and that the Tribunal ―must decide in accordance</td><td></td><td></td><td></td></tr><tr><td>with the terms of the contract, but if an arbitrator construes a term</td><td></td><td></td><td></td></tr><tr><td>of the contract in a reasonable manner, it will not mean that the</td><td></td><td></td><td></td></tr><tr><td>award can be set aside on this ground‖ [ref: Associate</td><td></td><td></td><td></td></tr><tr><td>Builders v. DDA, (2015) 3 SCC 49 : (2015) 2 SCC (Civ) 204],</td><td></td><td></td><td></td></tr><tr><td>SCC p. 81, para 42]. The other ground would be denial of natural</td><td></td><td></td><td></td></tr><tr><td>justice. In appeal, Section 37 of the Act grants narrower scope to</td><td></td><td></td><td></td></tr><tr><td>the appellate court to review the findings in an award, if it has been</td><td></td><td></td><td></td></tr><tr><td>upheld, or substantially upheld under Section 34.</td><td></td><td></td><td></td></tr><tr><td>16. It is important to notice that the old Act contained a provision</td><td></td><td></td><td></td></tr><tr><td>which enabled the court to modify an award. However, that power</td><td></td><td></td><td></td></tr><tr><td>has been consciously omitted by Parliament, while enacting the</td><td></td><td></td><td></td></tr><tr><td>1996 Act. This means that the Parliamentary intent was to exclude</td><td></td><td></td><td></td></tr><tr><td>power to modify an award, in any manner, to the court. This</td><td></td><td></td><td></td></tr></tbody></table><div><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 34 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /></div><table><thead><tr><th>position has been iterated decisively by this Court in NHAI v. M.</th><th></th><th></th><th></th><th></th></tr></thead><tbody><tr><td>Hakeem, (2021) 9 SCC 1: (SCC p. 28, para 42)</td><td></td><td></td><td></td><td></td></tr><tr><td></td><td>―42. It can therefore be said that this question has now</td><td></td><td></td><td></td></tr><tr><td></td><td>been settled finally by at least 3 decisions [McDermott</td><td></td><td></td><td></td></tr><tr><td></td><td>International Inc. v. Burn Standard Co. Ltd., (2006) 11</td><td></td><td></td><td></td></tr><tr><td></td><td>SCC 181], [Kinnari Mullick v. Ghanshyam Das Damani,</td><td></td><td></td><td></td></tr><tr><td></td><td>(2018) 11 SCC 328], [Dakshin Haryana Bijli Vitran</td><td></td><td></td><td></td></tr><tr><td></td><td>Nigam Ltd. v. Navigant Technologies (P) Ltd., (2021) 7</td><td></td><td></td><td></td></tr><tr><td></td><td>SCC 657] of this Court. Even otherwise, to state that the</td><td></td><td></td><td></td></tr><tr><td></td><td>judicial trend appears to favour an interpretation that</td><td></td><td></td><td></td></tr><tr><td></td><td>would read into Section 34 a power to modify, revise or</td><td></td><td></td><td></td></tr><tr><td></td><td>vary the award would be to ignore the previous law</td><td></td><td></td><td></td></tr><tr><td></td><td>contained in the 1940 Act; as also to ignore the fact that</td><td></td><td></td><td></td></tr><tr><td></td><td>the 1996 Act was enacted based on the UNCITRAL Model</td><td></td><td></td><td></td></tr><tr><td></td><td>Law on International Commercial Arbitration, 1985</td><td></td><td></td><td></td></tr><tr><td></td><td>which, as has been pointed out in Redfern and Hunter on</td><td></td><td></td><td></td></tr><tr><td></td><td>International Arbitration, makes it clear that, given the</td><td></td><td></td><td></td></tr><tr><td></td><td>limited judicial interference on extremely limited grounds</td><td></td><td></td><td></td></tr><tr><td></td><td>not dealing with the merits of an award, the ―limited</td><td></td><td></td><td></td></tr><tr><td></td><td>remedy‖ under Section 34 is coterminous with the</td><td></td><td></td><td></td></tr><tr><td></td><td>―limited right‖, namely, either to set aside an award or</td><td></td><td></td><td></td></tr><tr><td></td><td>remand the matter under the circumstances mentioned in</td><td></td><td></td><td></td></tr><tr><td></td><td>Section 34 of the Arbitration Act, 1996.‖</td><td></td><td></td><td></td></tr><tr><td>17. In view of the foregoing discussion, the impugned judgment</td><td></td><td></td><td></td><td></td></tr><tr><td>[Union of India v. Larsen Air Conditioning &amp; Refrigeration Co.,</td><td></td><td></td><td></td><td></td></tr><tr><td>2019 SCC OnLine All 7205] warrants interference and is hereby</td><td></td><td></td><td></td><td></td></tr><tr><td>set aside to the extent of modification of rate of interest for past,</td><td></td><td></td><td></td><td></td></tr><tr><td>pendente lite and future interest. The 18% p.a. rate of interest, as</td><td></td><td></td><td></td><td></td></tr><tr><td>awarded by the arbitrator on 21-1-1999 (in Claim 9) is reinstated.</td><td></td><td></td><td></td><td></td></tr><tr><td>The respondent State is hereby directed to accordingly pay the</td><td></td><td></td><td></td><td></td></tr><tr><td>dues within 8 weeks from the date of this judgment.‖</td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td>(emphasis added)</td><td></td><td></td></tr></tbody></table><div><br /> applied to the facts of the present case, leave no room for doubt. The <br /> arbitral proceedings herein were invoked on 06.07.2008, and the <br /> Impugned Award was rendered squarely within the pre-2015 statutory <br /> regime of the A&amp;C Act. Consequently, the determination relating to <br /> interest necessarily falls to be examined in the light of Section 31(7) <br /> of the A&amp;C Act as it stood prior to the amendment. Under the said <br /> framework, the Arbitral Tribunal was vested with a broad statutory <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 35 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> discretion to award pre-reference and <i>pendente lite</i> interest at such rate <br /> as it deemed reasonable, subject only to any contractual stipulation to <br /> the contrary. <br /> 60. In the present case, it is an undisputed fact that the Agreement <br /> between the parties does not contain any clause either prohibiting or <br /> regulating the grant of interest. The learned Arbitrator, upon <br /> consideration of the material placed on record, concluded that <br /> Respondent <b> </b> No. 1 <b> </b> was entitled to interest at the rate of 18% per <br /> annum. The reasoning adopted by the learned Arbitrator demonstrates <br /> a conscious exercise of the statutory discretion vested under Section <br /> 31(7) of the A&amp;C Act and cannot be said to suffer from any infirmity <br /> in law. <br /> <br /> 61. Viewed in this backdrop, the contention advanced by the <br /> Petitioner seeking a reduction of the rate of <i>pendente lite</i> interest is <br /> wholly unsustainable. The impugned determination does not disclose <br /> any patent illegality, perversity, or contravention of the fundamental <br /> policy of Indian law, nor does it transgress the terms of the contract <br /> between the parties. Interference by this Court would, in effect, <br /> amount to re-appreciating the merits of the arbitral determination and <br /> substituting the Court‘s view in place of the arbitrator‘s, an exercise <br /> which stands expressly proscribed within the narrow confines of <br /> jurisdiction under Section 34 of the A&amp;C Act. <b> </b><br /> 62. Accordingly, in the considered opinion of this Court, the award <br /> of interest at the rate of 18% per annum by the learned Arbitrator <br /> constitutes a lawful, justified, and reasoned exercise of arbitral <br /> discretion within the contours of the governing statutory framework. <br /> The challenge mounted by the Petitioner on this aspect is, therefore, <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 36 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> devoid of merit and does not warrant acceptance on any of the <br /> grounds urged hereinbefore. <br /> 63. However, at this stage, this Court considers it necessary to <br /> closely scrutinize the grant of interest by the learned Arbitrator in the <br /> Impugned Award insofar as it has been directed to run from the <br /> alleged date of cause of action, i.e., 08.03.2004. <br /> 64. In the considered opinion of this Court, the award of interest <br /> from the aforesaid date cannot be sustained for multiple, cogent <br /> reasons. At the outset, it is pertinent to note that it was not even the <br /> case of the Claimant therein/Respondent No. 1 herein to seek interest <br /> from 08.03.2004. On the contrary, a specific and conscious claim for <br /> interest was made only from a later date, <i>namely,</i> 01.01.2007. This <br /> position is not in dispute and, in fact, stands duly reflected in the <br /> Impugned Award itself. <br /> 65. In such circumstances, the learned Arbitrator could not have <br /> travelled beyond the scope of the claim as laid before it and granted <br /> interest from an anterior date which was neither prayed for nor <br /> pressed during the arbitral proceedings. Such a grant, being <i>dehors</i> the <br /> pleadings and the reliefs sought, is legally untenable and liable to be <br /> interfered with. <br /> 66. At this stage, this Court is guided by the judgment of the <br /> Constitution Bench of the Hon‘ble Supreme Court in <b><i>Gayatri </i></b><br /> <b><i>13</i></b><br /> <b><i>Balasamy v. M/s ISG Novasoft Technologies Limited</i></b> , which <br /> comprehensively delineates the principles governing the award of <br /> interest in arbitral proceedings, as well as the limited contours within <br /> <br /> 13<br /> 2025 SCC OnLine SC 986 <br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 37 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i><br /><br /> <br /> which modification thereof may be undertaken in proceedings under <br /> Section 34 of the A&amp;C Act. <i> </i><br /> 67. Having due regard to the ratio laid down therein, and in order to <br /> ensure that the grant of interest is in consonance with the statutory <br /> framework and settled legal principles, this Court considers it <br /> appropriate to recalibrate the operative period for which such interest <br /> is to be awarded. The exercise undertaken herein is not in the nature of <br /> a reappreciation of the merits of the award, but a limited correction to <br /> align the relief with the permissible legal parameters. <i> </i><br /> 68. Accordingly, while maintaining the rate of interest at 18% per <br /> annum as awarded by the learned Arbitrator, it is directed that the said <br /> interest shall run from the date of invocation of arbitration, i.e., <br /> 06.07.2008, and shall continue until the date of realization. <i> </i><br /> <i> </i><br /> <b><i>CONCLUSION:</i></b> <i> </i><br /> 69. In view of the foregoing discussion, the rate of interest at 18% <br /> per annum, as awarded in the Impugned Award, is upheld. However, <br /> the date of applicability of such interest is modified, and it shall now <br /> be computed from the date of invocation of arbitration, i.e., <br /> 06.07.2008, instead of 08.03.2004. <br /> 70. Accordingly, the present Petition, being <i>O.M.P. 709/2011</i> , <br /> insofar as it pertains to the issue of interest, stands disposed of in the <br /> above terms. <br /> 71. Pending application(s), if any, also stand disposed of. <br /> 72. No order as to costs. <br /> <b> </b><br /> <b>HARISH VAIDYANATHAN SHANKAR, J.</b> <br /> <b>APRIL 06, 2026/sm/kr </b><br /> <i> </i><br /> Signature Not Verified<br /> <i> O.M.P. 709/2011 </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> </i> <i> Page 38 of 38</i> <b><i> </i></b><br /> Digitally Signed<br /> By:NEERU<br /> Signing Date:08.04.2026<br /> 16:22:06<br /> <i> </i><br /> <i> </i></div>