M/S Mmb Hotel Private Limited Through Managing Director Mr. Giriraj Gupta vs The Inkdore Muncipal Corporation

Court
Madhya Pradesh High Court

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
1 WP-15272-2026
IN THE HIGH COURT OF MADHYA PRADESH
AT INDORE

BEFORE
HON'BLE SHRI JUSTICE SANDEEP N. BHATT
st
ON THE 1 OF OCTOBER, 2026
WRIT PETITION No. 15272 of 2026
CNR No.: MPHC020160852026
M/S MMB HOTEL PRIVATE LIMITED THROUGH MANAGING
DIRECTOR MR. GIRIRAJ GUPTA
Versus
THE INDORE MUNICIPAL CORPORATION AND OTHERS
Appearance:
Shri Romesh Dave, learned counsel for the petitioner .
Shri Rishi Tiwari - Advocate for the respondent/Indore Municipal
Corporation.
HEARD ON : 08.09.2026
PRONOUNCED ON : 01.10.2026
WHETHER REPORTABLE : YES
.....................................................................................................................................
ORDER
The present petition under Article 226 of the Constitution of India has
been filed praying for the following reliefs:
"7. RELIEF SOUGHT: -
The petitioner prays that an appropriate writ, order or direction may
kindly be issued and this Hon'ble Court may be pleased to allow this
petition with cost and the Respondent may kindly be restrained from
taking impugned action and be directed not to interfere with or
dispossess the Petitioner from the land/construction of the Petitioner.
The Petitioner also prays for quashment of impugned notice dated
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
2 WP-15272-2026
07.04.2026 (Annexure P-12)."

2. FACTS GIVING RISE TO THE PRESENT PETITION IN
NUTSHELL
The present writ petition challenges the arbitrary and illegal action of the
respondents in issuing the impugned notice/order dated 07.04.2026, whereby
the petitioner's duly sanctioned building situated at R.N.T. Marg, Indore is
sought to be partially demolished on the basis of an alleged road widening to
24 meters. The impugned action has been undertaken without following due
process of law and in complete disregard of the petitioner's vested rights
arising from valid building permissions granted by the competent authority,
i.e., the respondents themselves, in accordance with the prevailing Master
Plan at the relevant time. It is submitted that the petitioner's construction was
carried out strictly pursuant to such sanctioned permissions and in
conformity with applicable norms. Even under the Indore Development Plan
2021, the permissions granted under earlier Master Plans are expressly
recognized and protected, and therefore cannot be nullified or rendered
illegal by subsequent planning proposals. The respondents have failed to
appreciate this settled legal position and have proceeded on an erroneous
assumption that the proposed road width under the Development Plan can be
retrospectively enforced against existing sanctioned constructions. The
impugned action, therefore, is not only arbitrary but also contrary to the
Development Plan itself and liable to be set aside. The petitioner's
construction has been raised strictly in accordance with sanctioned plans
approved on 16.11.1987 and 06.04.1994, after due compliance of all
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
3 WP-15272-2026
statutory requirements, including payment of compounding fees. The

petitioner has also maintained the prescribed setback as per the sanctioned
map, and there exists encroachment on public land or road. Despite this,
respondents have mechanically and arbitrarily assumed a 24-meter road
width without without any lawful determination of central line or scientific
demarcation.The respondents have made a serious and baseless allegation,
that the petitioner has produced incorrect or doubtful building plans. The said
allegation is wholly unfounded, as all documents relied upon by the
petitioner are duly sanctioned records issued by the Municipal Corporation
itself. The respondents, instead of verifying their own records, have
proceeded to cast unwarranted aspersion on the petitioner, rendering the
impugned action mala fide and unsustainable in law. The respondents have
placed reliance upon Sections 305, 307, 322 and 325 of the M.P. Municipal
Corporation Act, 1956, which is wholly misconceived and legally untenable.
The scope of these provisions is confined to regulation or removal of minor
encroachments, projections, or unauthorized constructions within an existing
street line or in cases of statutory violations. These provisions do not
empower the respondents to take over or deprive a citizen of a substantial
portion of his privately owned and duly sanctioned property. In the present
case, the impugned action seeks to remove a significant part of the
petitioner's building, which is constructed strictly in accordance with
sanctioned plans issued by the Corporation itself. Such action, in effect,
amounts to compulsory acquisition of property. It is a settled position of law
that where substantial private land is required for public purpose such as road
widening, the only legally permissible course is to initiate acquisition
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
4 WP-15272-2026
proceedings in accordance with the provisions of the Right to Fair

Compensation and Transparency in Land Acquisition, Rehabilitation
and Resettlement Act, 2013[for short, referred to as the 'Act of 2013]. The
respondents, by invoking the provisions of the Municipal Corporation Act as
a substitute for acquisition are acting beyond their jurisdiction, thereby
rendering the impugned illegal, arbitrary and liable to be set aside. The
impugned action violates Articles 300A and 21 of the Constitution, as it
deprives the petitioner of property and livelihood without authority of law.
Furthermore, despite directions of this Hon'ble Court in W.P. No.
7366/2026, no reasoned speaking order has been passed by the respondent
authority.
3 . CONTENTIONS OF LEARNED COUNSEL FOR THE
PETITIONER
i. T he impugned notice is ex facie arbitrary and suffers from complete non-
application of mind. The respondents, instead of verifying their own official
records, have proceeded to cast unwarranted doubt upon the petitioner's
sanctioned building plans, as reflected in the notice. Such allegation is wholly
unfounded, in as much as the documents relied upon by the petitioner are
sanctioned plans issued by the Municipal Corporation itself. The authority, being
the custodian of these records, was duty-bound to verify the same before making
any adverse inference. The failure to undertake such verification and the act of
attributing irregularity to officially sanctioned documents reflect a predetermined
approach and renders the decision-making process mala fide in law. It is a settled
principle that administrative action affecting civil rights must be based on verified
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
5 WP-15272-2026
material and objective satisfaction. The impugned notice, however is based on

conjectures, assumptions and unsubstantiated allegations, thereby violating the
doctrine of fa gess and reasonableness under Article 14 of the Constitution. The
action is therefore liable to be set aside on this ground alone.
ii. It is submitted that there is no lawful determination of central line and
even the statutory information sought has not been supplied. It is submitted that
the petitioner, through counsel, had filed a detailed application under the Right to
Information Act on 17.02.2026, specifically seeking certified copies of (i)
historical layout plans, cadastral and British-era municipal maps relating to
R.N.T. Marg, (ii) relevant extracts of Development Plan 2021/2035 showing
approved road width, (iii) any notification/order determining the central line, (iv)
survey reports, total station survey data, GPS coordinates, demarcation reports
and measurement sheets, (v) notices issued to affected property owners, (vi)
administrative orders initiating road widening, and (vii) Medical basis such as
drain-to-drain alignment, if any. Despite such Specific acquisition, the
respondents, vide reply dated 10.04.2026, merely supplying photographs/extracts
of the Development Plan indicating a proposed width of 24 meters, and failed to
provide any of the foundational documents relating to central line determination
or demarcation. The non- supply of such critical records clearly establishes that
no lawful or scientific exercise has been undertaken. In absence of any survey
report, statutory notification or technical basis, the alleged central line is purely
assumed and arbitrary. The impugned notice, being founded on such non- existent
determination, is therefore legally unsustainable and liable to be quashed. True
copy of application under the Right to Information Act on 17.02.2026 is annexed
here in as Annexure P/13 and reply of respondents dated 10.04.2026 is annexed
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
6 WP-15272-2026
here in as Annexure P/14 respectively.

iii. It is submitted that petitioner's building has been constructed strictly in
accordance with sanctioned plans issued by the competent authority from time to
time. The site plan was approved on 16.11.1987, followed by building permission
dated 07.01.1987, and subsequent approvals including plan dated 06.04.1994
after payment of requisite compounding fees. The fourth floor was also
regularized upon due compliance. The petitioner has adhered to all conditions of
sanction, including leaving requisite setback area, and there exists no construction
on public land or beyond permissible limits. These approvals confer vested rights
upon the petitioner, which cannot be defeated by subsequent administrative action
without due process of law. It is well settled that a construction raised pursuant to
valid permission cannot be treated as unauthorized retrospectively. The impugned
notice, by ignoring these sanctioned plans and treating the structure as
obstructive, seeks to nullify long-standing approvals without any legal basis. Such
action is contrary to the principles of legitimate expectation and certainty in
administrative law, and is the unsustainable.
iv. It is further submitted that the reliance placed by the respondents on
Sections 305, 307 322 and 325 of the M.P. Municipal Corporation Act, 1956 is
wholly misconceived. These provisions are limited in scope and are intended to
deal with minor encroachments, projections, unauthorized constructions or
enforcement of municipal directions within an existing street line. They do not
empower the authority to appropriate or demolish substantial portions of a duly
sanctioned private property for the purpose of road widening. In the present case,
the impugned action seeks removal of significant parts of the petitioner's building
extending across the frontage, which cannot be equated with minor encroachment.
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
7 WP-15272-2026
The respondents are attempting to use these provisions as a substitute for

compulsory acquisition, which is impermissible in law. It is settled that where
substantial private property is required for public purpose, the only lawful course
is to initiate acquisition proceedings under the appropriate statute. The impugned
action, therefore, amounts to an exercise of power beyond jurisdiction and is
liable to be struck down.
v. It is also submitted that the effect of the impugned notice is to deprive the
petitioner of a substantial portion of its property for the purpose of road widening.
Such deprivation squarely falls within the ambit of compulsory acquisition.
However, no acquisition proceedings have been initiated, no compensation has
been determined, and no statutory safeguards have been followed. The
respondents are attempting to achieve indirectly what cannot be done directly,
namely acquisition of land without invoking the provisions of the Right to Fair
Compensation and Transparency in Land Acquisition Act, 2013. It is a settled
principle that when the substance of the action is acquisition, the procedure
prescribed for acquisition must be followed. Any attempt to bypass such
procedure renders the action illegal and unconstitutional. The impugned notice is
therefore a colourable exercise of power and liable to be set aside.
vi. It is contended that the impugned action seeks to deprive the petitioner of
its property without authority of law and without compensation, thereby violating
Article 300A of the Constitution. Further, the petitioner is running a long-
established business from the said premises, and the proposed demolition would
result in complete loss of livelihood. The right to livelihood is an integral part of
Article 21, and any action affecting the same must satisfy the test of
reasonableness and proportionality. In the present case, the respondents have
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
8 WP-15272-2026
neither considered the impact of their action on the petitioner's livelihood nor

explored any less intrusive alternatives. The action is thus disproportionate and
violative of fundamental rights. Additionally, the proposed demolition poses a
risk to structural safety and adjoining properties, thereby further infringing the
right to life and safety. The impugned notice is therefore unconstitutional.
vii. It is also contended that this Hon'ble Court in W.P. No. 7366/2026 had
directed the respondents to consider the petitioner's representation and pass a
reasoned order. However, the impugned notice fails to deal with the specific
objections raised by the petitioner, including sanctioned plans, absence of central
line determination, and legal in-applicability of municipal provisions. The order
merely records conclusions without providing reasons or analysis. A speaking
order is an essential requirement of administrative law, particularly when civil
consequences ensue. The absence of reasons deprives the petitioner of an
effective opportunity to challenge the decision and renders the action arbitrary.
The impugned notice is therefore liable to be set aside on this ground.
viii. It is contended that respondents have proceeded on the assumption of a
24. meter road width without considering the actual ground existing road width is
approximately 10 meters and the areas comprises. more than 350 existing
buildings. The locality is a pre-independence settlement with established building
lines and mixed land use. The imposition of a uniform 24-meter width without
considering feasibility and impact amounts to a mechanical and unrealistic
approach. Urban planning requires contextual decision-making, particularly in old
city areas.
ix. It is contended that the impugned notice proposes removal of substantial
portions of the petitioner's building measuring approximately 4.14 m × 20 m and
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
9 WP-15272-2026
3.5 mx 20 m, which constitutes demolition of a continuous front strip of a multi-

storeyed structure. Such demolition would significantly affect the structural
integrity of the building by altering load distribution and stability. The
respondents have not conducted any structural stability assessment or obtained
expert opinion to ascertain whether the remaining structure would remain safe. In
absence of such evaluation, the action is inherently unsafe and poses a serious risk
to life and property, including adjoining structures. The failure to consider
structural safety renders the action arbitrary, reckless and violative of Article 21.
x. It is also contended that pursuant to the directions issued by this Hon'ble
Court in the earlier round of litigation in 2014, the matter relating to road width
and alleged encroachment on R.N.T. Marg was placed before the competent
authority, i.e., the Commissioner/Additional Commissioner of the Indore
Municipal Corporation. In compliance thereof, the authority, after considering the
prevailing ground realities, existing constructions, and available records, had
observed and held that a road width of approximately 60 feet (18 meters) was
appropriate and sufficient. The said determination was made in the context of
balancing interest with existing rights of property holders and taking into account
the historical and structural nature of the locality.
xi. It is further submitted that the said finding, having been rendered by a
competent authority pursuant to judicial directions, attained finality and continues
to hold the field unless set aside in accordance with law. The respondents cannot,
by way of executive action, disregard or override such determination and
mechanically impose a 24-meter width under the Development Plan without any
fresh adjudication, scientific study, or lawful procedure. The impugned action,
therefore, amounts to an arbitrary departure from an earlier quasi-judicial
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
10 WP-15272-2026
determination and is violative of principles of certainty, fairness, and non-

arbitrariness under Article 14 of the Constitution. The respondents, having once
accepted and acted upon a 60 feet road width, are estopped from taking a contrary
stand without following due process of law. The impugned notice is thus liable to
be set aside on this ground alone.
xii. It is contended that the impugned action of the respondents is contrary
to the statutory framework contained in the M.P. Bhumi Vikas Niyam, 2012,
particularly Rule 13 (saving clause) read with Rule 4 (definition of existing
building). It is submitted that the petitioner's building is an "existing building"
within the meaning of Rule 4, having been constructed pursuant to valid
permissions granted prior to the coming into force of the 2012 Rules. By virtue of
Rule 13, such permissions continue to remain valid and effective, and the legality
of the construction stands fully protected. The respondents cannot, therefore,
retrospectively invalidate or treat the petitioner's building as unauthorized. It is
further submitted that while the law recognizes a distinction between "demolition"
and "removal" in the context of Section 305 of the M.P. Municipal Corporation
such removal is permissible only in respect of minor projections or Portion falling
within a lawfully determined "regular street line". In the present case, no such
street line has been determined in accordance with law which has any scientific
demarcation been carried out. On the contrary, the respondents themselves admit
that the proposed width of 24 meters is part of a future development plan, thereby
demonstrating that the present action is not a case of removal within an existing
street line but one of proposed widening. In such circumstances, the respondents
cannot invoke Section 305 to bypass the statutory protection granted under the
2012 Rules. The impugned action, in effect, seeks to demolish substantial
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
11 WP-15272-2026
portions of a duly sanctioned and protected building, which is impermissible in

law. The action is therefore arbitrary, ultra vires and liable to be set aside.
On all these grounds, it is submitted that t he impugned action is liable to
be quashed being illegal, constitutionally infirm and passed in gross
violation of binding judicial precedent. The respondents have failed to follow
the statutory framework governing road widening, ignored prior adjudication
by competent authority, and attempted to deprive the petitioner of valuable
property rights without initiating acquisition proceedings or providing
compensation. The action is in clear violation of Article 300A of the
Constitution, which mandates that no person shall be deprived of property
save by authority of law, and also infringes Article 14, being arbitrary and
discriminatory. Each of the aforesaid grounds independently renders the
impugned notice unsustainable; collectively, they establish a clear case of
arbitrary State action warranting interference by this Hon'ble Court under
Article 226 of the Constitution of India.
4. SUBMISSION OF COUNSEL FOR RESPONDENT/MUNICIPAL
CORPORATION
i. The present petition has been filed challenging the impugned notice
dated 07.04.2026 wherein after considering the objections raised by the
petitioner and the after granting due opportunity of hearing the petitioner was
informed regarding the obstructing portion of the building in the road widening
process and was directed to remove the same within a stipulated time frame.
ii. Learned counsel for the respondent/Municipal Corporation submitted
that by the impugned notice dated 07.04.2026, the petitioner has been directed to
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
12 WP-15272-2026
remove obstructing portion of the subject construction for the purpose of

widening of the road from Madhumilan Square to Chawani Bridge(Ravindranath
Tagore Marg). The importance of Madhumilan Square to Chavani Bridge Road
(R.N.T Marg)is as under-The aforementioned road runs parallel to the Old AB
Road/BRTS which passes through central and commercial area of the city
connecting several important places and markets. Lakhs of people and vehicles
commute everyday on the subject road. The subject Road connects several
important squares and areas of the city as mentioned below:
(i) Madhumilan Square (connecting Patel Bridge Square MY Hospital,
Regal Square, etc)
(ii) Chavani Square (connecting GPO square, Hathipala, etc)
(iii) Agrasen Square (connecting Sapna Sangeeta Road, Tower Square,
Loha Mandi, Navlakha Square, etc.)
Widening of the aforementioned road will provide an alternative of the old
AB Road to the commuters and will reduce traffic congestion on the old AB Road
as well as on all the aforementioned squares connecting various other roads,
thereby enabling smooth circulation of traffic on busy roads, reducing traffic
jams, reducing fuel consumption and pollution and will be a considerable relief to
the commuters. The road widening work is in larger public interest. Similarly, as
per Indore Development Plan, 2021, width of the road from GPO Square to
Sarvate Bus Stand is also 24 meters. The aforesaid road also passes through the
heart of city and connects important places i.e. GPO Square, Chawani Square,
Nasiya Road and Sarvate Bus Stand. Widening of the aforementioned road will
reduce traffic on Jawahar Marg and other surrounding roads.
iii. It is submitted that the contention that the Indore Development Plan, 2021
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
13 WP-15272-2026
has expired is totally misconstrued. The year 2021 mentioned in the Indore

Development Plan, 2021 does not mean that the year 2021 is it's expiry date.
There is neither any clause in the master plan nor any rule to suggest this
interpretation. From a perusal of the introduction to the Development Plan its
evident that, "2021" implies that the proposed development has been planned,
keeping in mind the requirement on the basis of population up to the year 2021.
Until the new master plan comes into force, the existing master plan continues.
iv. It is further submitted that the alignment of regular line of street, centre
line, etc-, the Corporation does not decide the alignment of roads of the Master
Plan. The regular line of street is already delineated in the Development Plan after
following the due process of law. On the basis of the Development Plan, only the
measurements and markings are done by the Corporation. In old localities the
city, Building Permissions on both side of the road are granted on the basis of the
Development Plan.
v. It is submitted regarding the contention of the petitioner that the alignment
was undertaken by the answering respondent is wholly misconstrued that as the
markings were done by the joint team is accordance with the development plan.
Moreover, it is imperative to bring to light that the regular line of street is already
delineated in the Development Plan, 2021, on the basis of which markings have
been done by a team of experts comprising i.e. T&CP, IMC & the Revenue
Department.
vi. It is also contended that the Corporation is not liable to pay
compensation before removal of the obstructing construction.
vii. It is also contended that Section 292 of the Act of 1956 Act restricts
the power of the Corporation to make a Town Planning Scheme under section 291
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
14 WP-15272-2026
of the Act of 1956. It mandates that, for an for which a "scheme" has been

sanctioned under the Town Improvement Act (Nagar Tatha Gram Nivesh
Adhiniyam, 1973), no Town Planning Scheme can be made by the Corporation.

viii. Learned counsel for the respondents also submitted that the
ground regarding violation of principle of natural justice has been raised by
the petitioner. However, from a bare perusal of the initial notice dated
14.02.2026, it is evident that the petitioner was directed to remain present for
personal hearing on 16.02.2026 and on the said date, the petitioner filed
objections through his Advocate. Concealing the order passed in W.P. no.
1499/2014, the petitioner with sole intention to mislead the respondent,
referred to the order dated 24.05.2014 of the Additional Commissioner and
stated that in compliance of the aforesaid order, the building was set-back by
12 feet and also stated that the said order of Additional Commissioner is still
in force. Thereafter, on 20.02.2026, after considering the objections raised in
the reply by the petitioner, another notice was issued to the petitioner
observing that the reliance placed by the petitioner on the order dated
24.05.2014 was misleading since the said order was not passed with respect
to the petitioner or his building and despite specific demand, the petitioner
failed to produce any building permission or revised building permission for
the alleged construction after setting back the building and the petitioner
was directed to remove the obstructing construction within further seven
days. Thus, the ground raised by the petitioner regarding violation of
principle of natural justice is misleading as the petitioner was given proper
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
15 WP-15272-2026
opportunity of hearing. The petitioner being aggrieved has filed W.P. No.

7366/2026 which was disposed off with a direction to the petitioner to appear
before the Building Officer for personal hearing and respondents were
directed to pass a reasoned and speaking order. The petitioner through the
authorized representative appeared before the respondent and submitted
detailed representation. On 06.04.2026, a joint inspection was conducted by
the officials of respondents alongwith authorized representative of the
petitioner and complete procedure regarding determination of centre line was
explained in detail . On 07.04.2026 a well reasoned and detailed order was
passed by the Building Officer after considering every objection and after
conducting spot inspection, notice was issued which reads as under:
" 7366/2026
उपरो  वषयां कत म म  लेख है क माननीय उ च यायाल ारा रट यािचका मांक के सापे !
01/04/2026
पा रत आदेश के पालन म  यािचकाकता % मेसस % एम.एम.बी होटल )ा. िल. क * ओर से दनांक को

अिधव ा .ी अिभषेक गु 2ा ारा उप 34थत होकर अिभभाषक .ी अ प%त गु 2ा का ह 4ता!रत अ 6यावेदन )4तुत
, 11/08/1987 ,
कया गया 3जसके साथ दनांक का नगर तथा 8ाम िनवेश का 4वीकृत मानिच : क * छाया )ित
06/04/1994 , 27/05/2014
दनांक का नगर िनगम ारा 4वीकृत मानिच : क छाया )ित आदेश दनांक क
23/03/2026
छाया )ित एंव रट यािचका म  पा रत आदेश दनांक क )ित संल <न क गई। अ 6यावेदन क * बदु
5, 6 7 ,
मांक एंव म  से ?ल लाईन के िनधा %रण विधवत सीमांकन ना होने एंव संयु  सीमांकन ना होने के संबंध म
04/04/2026 (
आप A )4तुत क * गई। उ  आप A का िनराकरण करते हुए दनांक के सूचना प : मांक
IMC/ZONE- 11/WARD-55/2026/2930/1) 06/04/2026 11:00
ारा दनांक को )ातः बजे के D संरेखण एवं
06/04/2026
बाधक भवन के िच हां कत भाग का संयु  िनर E!ण िनधा %रत कया गया। तदानुसार दनांक को मौके

पर भवन 4वामी पािचकाकता % क ओर से अिधव ा .ी अ प%त गु 2ा उप 34थत हुए। सडक क दूसर E ओर 34थत भवन
58
मांक आर.एन.ट E माग % के 4वामी आिधप Hय धार E .ी बंसत कुमार रावत भी उप 34थत हुए। िनगम क * ओर से
,
अधोह 4ता!रकता% योजना शाखा के उपयं :ी .ी वशाल राठौर एव योजना शाखा क तकिनक ट Eम उप 34थत रह E ।
2021
मौके पर उपरो  JययK क * उप 34थित म  सडक के म Lय बदु से इंदौर वकास योजना ारा िनधा %रत
24 12 12
सडक चौडाई मीटर के मान से म Lय बदु से दोनो ओर मीटर मीटर न 2ी कर बाधक िनमा %ण के िच हांकन
( ) 4.14 X 20
का स Hयापन कराया गया। भवन 4वामी को बताया गया क उनके मधुरावाला 4वीNस भवन का मीटर
3.5 X 20
मीटर व मीटर मीटर भाग सडक चौड Eकरण म  बाधक है।

अधोह 4ता!रकता% एंव उपयं :ी योजना शाखा ारा उपरो  JययK को समझाया गया क माग % के दोनो ओर िनगम

ारा 4वीकृ त मानिच :K अनुसार भूख PडK के !े:फल से उनके बीच 34थत वत %मान सडक के म Lय बदु से म Lय
,
रेखा अनुसार दोनो ओर भवन K क * िनयिमत पं  का िनधा %रण कर िच हांकन कया गया 3जससे वकास योजना

अनुसार सड़क चौड़ Eकरण कया जा सके। उ  काय %वाहE का पंचनामा बनाया गया 3जस पर यािचकाकता % के

अिभभाषक ारा यह उ Sले3खत कया गया क िनगम क ओर से िच हांकन क ) या तथा म Lय रेखा के िनधा %रण

क * ) या को समझाने हेतु समय चाहा गया जो क सह E नह Eं है। Tयो क उपरो ानुसार स Uपूण% काय %वाहE समझाई

गई एंव न 2ी कर स Hयापन कराया गया। अतः भवन 4वामी के अिभभाषक ारा उ  टVपणी उिचत ना होकर

अमा य क * जाती है। भवन 4वामी ारा )4तुत नगर तथा 8ाम िनवेश वभाग के किचत साईड Vलान पर लगी मुहर
VALID UP TO] MEMO NUMBER, DATE
म  आ द सम 4त जानकार E िनरंक है तथा संयु  संचालक के

ह 4ता!र भी नह Eं है। अतः उ  द 4तावेज वWसनीय ना होकर संदेहा 4पद )तीत होता है। भवन 4वामी ारा )4तुत
1516 06/04/1994 -1 ,
4वीकृत मानिच : मांक दनांक क शीट क छाया )ित संल <न क * है 3जसके Vलान म  सेलर
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
16 WP-15272-2026
G+1 +G+3 B+G+4
एंव से Tशन म  सेलस् का मानिच : )4तुत कया गया परंतु मौके पर का िनमा %ण होना पाया

गया। उ  मानिच : के साथ िनगम ारा आव Yयक Zप से जार E कये जाने वाला दाखला )4तुत नह Eं कया गया।

3जससे एक तल का अवैध िनमा %ण भी )थम [\या )तीत होता है। अ 6यावेदन म  भवन 4वामी ारा सेटबेक
24
छोडकर भवन िनमा %ण करने का उ Sलेख कया है। मौके पर वकास योजना अनुसार मीटर सड़क का िनमा %ण
18
कया जाना है जब क )4तुत ट E.एन.सी.पी मानिच : म  मीटर के मान से सेट बेक िनधा %रत करना )तीत होता
24 4.14 X 20 3.5
है। अतः मीटर क * बौडाई के मान से उपरो ानुसार िच हांकन करने पर भवन का मीटर मीटर व
X 20 4 11
मीटर मीटर भाग बाधक होकर िच 3हत कया के अ Lयाय के अंतग %त धारा अनुसार 4वीकृत िनमा %ण
18
संर 3!त रहने तथा धारा अनुसार )4तावत सडक चौड Eकरण वत %मान भवन K पर बा LयकारE नह Eं होने का कथन
, 2021 4
कया गया। उ Sलेखनीय है क इंदौर वकास योजना के अ Lयाय म  उपरोतानुसार कोई )ावधान नह Eं है।
8 202,
अतः उ  आप A अमा य क * जाती है। गया। अ 6यावेदन के बD मांक म  इंदौर वकास योजना
11
अ 6यावेदन के बदु मांक म  आधुिनक तकिनक * सव ]!ण ारा परंपरागत भवन रेखा के आधार पर प रवत%न

नह Eं करने का उ Sलेख है। सडक चौड Eकरण वकास योजना अनुसार कया जा रहा है जो सभी बंधनकार E है। अतः

यह आप A अमा य क * जाती है। जी.पी.एस. टोटल 4टेशन ारा सव ]!ण पर आप A के संबंध म  उ Sलेखनीय है क
,
िनगम ारा 4वीकृत मानिच :K अनुसार भूख PडK के !े:फल वत %मान सडक एंव वकास योजना अनुसार भवन क *

िनयिमत पं  का िच हांकन कया गया है। जो मौके पर भवन 4वामी के )ितिनिध को भी समझाया जा चुका ह ^ ।
9
अतः उ  आ प%A अमा य क जाती है। )_गत िनमा %ण के DEय रेखा से मी. क दूर E पर 34थत होने के संबंध म
2021 24 9
उ Sलेख है क वकास योजना अनुसार मीटर चौडाई िनधा %रत है एंव म Lय रेखा से मा : मी. क * चौडाई के
18
आधार पर केवल मीटर चौडाई का माग % बनाया जा सकता है। इस कारण बाधकं िनमा %ण को हटाकर ह E )4तावत
24 2013
मीटर सडक का िनमा %ण हो सकता है। मुआवजा िनधा %रण एंव भुगतान हेतु वष % के अिधिनयम का उ Sलेख
305
अ 4वीकाय% है। िनगम ारा धारा के अंतग %त क जा रह E काय %वाहE म  अिध 8हण क आव Yयकता नह Eं है।
27/05/2014 286/2014
माननीय यायालय ारा दनांक को )करण मांक के मा Lयम से माग % क * चौडाई का
60 60
िनधा %रण फ ट होना त `याHमक Zप से गलत है। माननीय यायालय ारा सडक क चौडाई का िनधा %रण फ *ट

नह Eं कया गया। अ पतु
1991 60
अपर आयु  नगर पािलक िनगम ारा वकस योजना म  उ  माग % फ *ट होने का उ Sलेख कया है। जब क
1991 80
वा 4तव म  वकास योजना अनुसार भी उ  माग % क चौडाई फ ट ह E थी। यह भी उ Sलेखनीय है क अपर
12
आयु  ारा उ  आदेश लगभग वष % पूव % उस समय के यातायात दवाब अनुसार पा रत कया गया था। उ 

आदेश से वकास योजना के )ावधािनत सडक चौडाई को नह Eं बदला जा सकता है। यह भी उ Sलेखनीय है क उ 

आदेश माननीय यायालय ारा भवन 4वामी के )करण म  पा रत नह Eं कया गया था।
1953/2014
मेसस % एम.एम.बी होटल )ा. िल. ारा उ च यायालय म  दायर रट यािचका मांक म  अपर आयु 

को ऐसा कोई िनद ]श ना होने से )_गत भवन के संबंध म  अपर आयु  ारा कोई आदेश पा रत नह Eं कया गया था।

अतः इस संबंध म  ली गई आप A अमा य क * जाती है। उपरो ानुसार भवन 4वामी ारा )4तुत अ 6यावेदन

अ 4वीकाय% कया जाता है।
2021 24
उपरो  सडक का िनमा %ण इंदौर वकास योजना अनुसार चौडाई मीटर म  कया जाना है। वकास योजना के
1956 305,
)ावधान नगर पािलक िनगम इदौर पर बंधनकार E है। म. ). नगर पािलक िनगम अिधिनियम क * धारा
306 2012 61 (1)
एंव म. ). भूिम वकास िनयम के िनयम के अंतग %त )4तावत माग % के िनमा %ण म  34थत आपके
,
4वािमHव क 3जतने !े:फल क )भावत भूिम नगर पािलक िनगम इंदौर ारा माग % के िनमा %ण म  स 3Uमिलत क *

जावेगी उसके दोगुना !े:फल के बराबर शेष रहे भूख Pड म  जोड़कर िनधा %रत एफ.ए. आर. के आधार पर भवन

िनमा %ण अनुमित )ा2 करने क * पा :ता !ितपूित% के Zप म  होगी। उपरो  !ितपूित% लाभ के िलये भवन भूख Pड के
-
मा : वत %मान वैधािनक भू 4वामी ह E पा : ह Kगे । उपरो ानुसार य द आपके ारा भवन िनमा %ण म  अित र

एफ.ए.आर !े:फल का लाभ नह Eं िलया जाता है तो शासन िनण %य के

अ Lयाधीन आपको ट E. ड E. आर. पॉिलसी के तहत हत लाभ क * पा :ता होगी।
4.14 X 20 3.5 X 20
अतः आपको सूिचत कया जाता है क सडक िनमा %ण म  बाधक मीटर मीटर व मीटर मीटर
07 ,
भाग को आप 4वंय से दवस म  हटाते हुए अधोह 4ता!रकता% को लेखी म  )4तुत कर  अ यथा क * 34थित म
1956 305, 307, 322, 325 2012
म. ). नगर पािलक िनगम अिधिनयम क * धारा तथा म. ). भूिम वकास िनयम के
"
िनयम K के अंतग %त काय %वाहE क जावेगी। 3जसक जवाबदार E आपक 4वयं क होगी।

Thus, it cannot be said that principle of natural justice is violated.
ix. Learned counsel for the respondents submits that the contention of
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
17 WP-15272-2026
petitioner regarding the impugned order being illegal, arbitrary and without

any authority of law is not acceptable and has relied upon the judgment
passed by the Hon'ble Supreme Court in the case of Ravindra Ramchandra
Waghmare Vs Indore Municipal Corporation and Others reported in (2017) 1
SCC 667 wherein it has observed that the Development Plan is binding upon
the Corporation and has to be implemented by the Corporation. Thus, the
impugned notice issued under sections 305 of the M.P. Municipal
Corporation Act, 1956 does not suffers from any illegality and was issued
within the jurisdiction.
x. It is the contention of learned counsel for the respondent by
referring to Section 305 that the subject construction is liable to be removed
as per section 305 of the 1956 Act, which states as under:
"305. Power to regulate line of buildings.-(1) If any part of a building projects beyond

the regular line of a public street, either as existing or as determined for the future or
beyond the front of immediately adjoining buildings the Corporation may-
(a) if the..........
(b) if the...................
require by notice either that the part or some portion of the part projecting beyond
the regular line or beyond the front of the adjoining building, shall be removed, or
that such building when being rebuilt shall be set back to or towards the said line
or front; and the portion of land added to the street by such setting back or removal
shall henceforth be deemed to be part of the public street and shall vest in the
Corporation: Provided............
(2)The.............
xi. It is further contended that the ground regarding violation of Article
14 of Constitution of India is misconceived. The Hon'ble Supreme Court in
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
18 WP-15272-2026
the matter of Ravindra Ramchandra Waghmare (supra) has held as under-

“72..............In our opinion, the provision of Section 305 when it deals with the
public streets and removal of building falling in regular line is a wholesome
one and being a special provision, based on classification made for the purpose
of Section 305 as to public street cannot be said to be suffering from vice or
discrimination and violative of Article 14.....”
xii. Learned counsel for the respondents has further relied on the
judgment of this Court passed in the case of Suresh Singh Kushwah Vs.
Municipal Corporation Gwalior and another reported in 2006 (3) MPLI 412,
wherein it has been held as under-
"once the Municipal Corporation has prepared a plan determining the regular
line of public street any portion of the building which is projected beyond this
line automatically vests in the Corporation in view of section 305 of the Act
and, therefore, the Corporation has right to demolish the portion of said
building and no proceedings under the Land Acquisition Act are required."

xiii. Learned counsel for the respondents has further pressed into
service the judgment passed by the Constitution Bench of the Hon'ble
Supreme Court in the case of Indore Municipality V/s K.N Palsikar reported
in AIR 1969 SC 579 wherein, it has been held as under:
"In fact it seems to us that there is automatic vesting of the land in the
Corporation under sec. 305 once the requisite conditions are satisfied."

xiv. As regard the ground raised regarding violation of Article 300-A of
the Constitution, it is submitted that the same is also misinterpreted in as
much as the respondent Corporation has initiated the process of widening of
the subject road as per the Indore Development Plan of 2021. The Division
Bench of this Court in W.A No. 873/2014 has held in this regard as under-
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
19 WP-15272-2026

"..........in view of clear provision contained in Section 305 of the Act vesting of
land being automatic and so long the said section is in the statute book, the
appellant's contention based upon Article 300-A of the Constitution cannot be
accepted." Thus, the petitioner's contention that there has been violation of
Article 300-A is misconstrued.

5. On all these grounds, the counsel for respondents submitted that
the present petition is bereft of merits and not maintainable, either in the law
or on facts and is liable to be dismissed in limine
6 . I have heard learned counsel for the parties and perused the
record.
7. The chronology of events involved in the present case is as
under:
DATE EVENT
As per the prior Indore Development Plan, width of the
subject road (Madhumilan Square to Chavani Bridge =
Ravindra Nath Tagore Marg) is 24 meter.
1975
1.

Indore Development Plan, 2021 came into existence, after
following the process under sections 18 and 19 of the Nagar
Tatha Gram Nivesh Adhiniyam, 1973. As per map No. 4.1 of
the Plan, the subject road i.e Madhumilan Square to Chavani
Bridge is 24 meter wide.
2. 01.01.2008
A notice was issued to the petitioner for removing the
obstructing construction. The aforesaid notice was
challenged by the petitioner in W.P. No. 1953 of 2014 (R/1),
which was disposed of by this Hon'ble Court on 06.03.2014
in the light of the decision passed in W.P. No. 1499 of
2014(by the Division Bench) whereby the Hon'ble Court had
set aside the notice and granted the liberty to the Corporation
to initiate fresh action with regard to the concerned structures
in accordance with law.
12.02.2014

3.

A notice was issued to the petitioner, mentioning the
dimensions of the obstructing construction, granting an
opportunity of hearing to the petitioner to appear before the
4.
14.02.2026
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
20 WP-15272-2026
Building Officer on 16.02.2026(P/6)
The petitioner through its Advocate submitted objections to
the notice dated 14.02.2026 (ANNEXURE-P/7). Concealing
the order passed in W.P. No. 1499/2014,

16.02.2026
5.

A notice was issued to the petitioner, whereby, the petitioner
was informed by the answering respondents that a joint
inspection will be conducted on 06.04.2026, for the purpose
of marking of obstructing construction in the road widening
and was further requested to remain present on spot at the
time of joint inspection
6. 04.04.2026
A joint inspection was conducted by the officials of the
respondent Corporation along with the lawyer/authorized
representative of the petitioner and the complete procedure
regarding determination of centre line was explained in
detail.
06.04.2026
7.

A well reasoned and detailed order has been passed by the
Building Officer Zone No. 11, after conducting spot
inspection in presence of the authorized representatives of
the petitioners and granting a due opportunity of hearing and
considering objections raised by the petitioner.
8. 07.04.2026
About 200 obstructing constructions were removed by the
Corporation for construction of 60 ft wide road in first phase.
Note: Even as per 60 ft width, 1.4 mtr (southern corner of
building) and 0.5 mtr (northern corner of building) of the
obstructing construction on the ground floor across the
frontage and the balconies on the first floor, second floor,
third floor and terrace hanging outside on the road, are also
required to be removed
9. 22.05.2026
8. The judgment which is relied on by the counsel for the respondent
rendered in the case of Ramchandra Waghmare(supra) is also worthy of
reference. Para 21,22,23,27, 28, 39, 55 , 56 and 71 of the judgment are as
under:
"21. It is apparent that the development plan once prepared is binding upon the
development authorities in the planning area as well as on the Municipal
Corporation and other local authorities as the case may be. They cannot modify
and permit the user in contravention thereof. In other words, restriction is
imposed upon the owners on enjoyment of the property in violation of the
development plan/regional plan, as the case may be.
22. Section 49 of the 1973 Act deals with the town development schemes.
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
21 WP-15272-2026
Same has to be prepared under the umbrella of the regional plan and
development plan. The town development scheme is prepared by the Town
and Country Development Authority established under the provisions of
Section 38. The same shall be a body corporate under the provisions of Section
39 and its constitution is provided in Section 40. Section 49 of the 1973 Act is
extracted hereunder:

"49. Town development schemes.—A town development scheme may make
provision for any of the following matters-
(i) acquisition, development and sale or leasing of land for the purpose of town
expansion;
(ii) acquisition, relaying out of, rebuilding, or relocating areas which have been
badly laid out or which has developed or degenerated into a slum;
(iii) acquisition and development of land for public purposes such as housing
development, development of shopping centres, cultural centres, administrative
centres;
(iv) acquisition and development of areas for commercial and industrial
purposes;
(v) undertaking of such building or construction work as may be necessary to
provide housing, shopping, commercial or other facilities;
vi) acquisition of land and its development for the purpose of laying out or
remodelling of road and street patterns;
(vii) acquisition and development of land for playgrounds, parks, recreation
centres and stadia;
(viii) reconstruction of plots for the purpose of buildings, roads, drains, sewage
lines and other similar amenities;
(ix) any other work of a nature such as would bring about environmental
improvements which may be taken up by the authority with the prior approval
of the State Government."
23. Section 50 of the 1973 Act provides for method of preparation of town
development schemes. The town development scheme may deal with the town
expansion, badly laid-out areas or slums, acquisition and development of land
for housing, shopping centres, cultural centres, administrative centres,
commercial and industrial purposes, remodelling of road and street patterns,
reconstruction of lands for building roads, drains, etc. Under Section 50 draft
plan has to be published, objections have to be invited, heard and decided.
Thereafter scheme is finalised, same has to be published in the Gazette. Section
55 provides that the land needed for town development scheme shall be
deemed to be a land required for public purpose within the meaning of the
Land Acquisition Act. Section 56 deals with acquisition of land for the Town
and Country Development Authority. Within 3 years of preparation of town
development scheme under Section 50, the authority may acquire the land by
agreement and in case that is not possible the State Government at the request
of the authority may proceed to acquire the land under the provisions of the
Land Acquisition Act. The town development scheme has to be executed by
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
22 WP-15272-2026
the authority within 3 years by acquiring the land in case it is necessary as per
the provisions contained in Section 56.

27. The 1960 Act provided for various improvement schemes under Section
30. Section 31 of the 1960 Act dealt with types of improvement schemes such
as general improvement schemes, re-building, re-housing, street, deferred
street schemes and development scheme. Ten types of schemes were provided
under Section 31. When scheme was proposed, consideration of b
representation was also provided. The State Government had the power to
sanction, reject or return the improvement scheme as provided in Section 51. In
case the State Government sanctioned the scheme it was required to be notified
under Section 52 of the 1960 Act. The 1960 Act has ceased to be operative in
the areas, once the 1973 Act has been made applicable by establishing the
authorities under the provisions of Sections 38 to 40. In our considered view,
the expression "scheme" in Section 292 has to be taken to mean the regional
plan, development plan and also to any scheme under Section 49 framed under
the 1973 Act. The provision is not confined to a scheme prepared under
Sections 49 and 50 of the 1973 Act. There cannot be two schemes for the same
area.
In re: Scope of power of the Corporation under Section 305
28. Before taking the question of vires of the provisions contained in Sections
305 and 306 of the 1956 Act, we consider it appropriate to deal with the
submissions raised on behalf of the appellants with respect to its interpretation
and ken of powers conferred upon the Municipal Corporation. Section 305 of
the 1956 Act is extracted hereunder:
"305. Power to regulate line of buildings. (1) If any part of a building
projects beyond the regular line of a public street, either as existing or as
determined for the future or beyond the front of immediately adjoining
buildings the Corporation may-
(a) if the projecting part is a verandah, step or some other structure
external to the main building, then at any time, or
(b) if the projecting part is not such external structure as aforesaid,
then whenever the greater portion of such building or whenever
any material portion of such projecting part has been taken down
or burned down or has fallen down,
require by notice either that the part of some portion of the part projecting
beyond the regular line or beyond the front of the immediate adjoining
building, shall be removed, or that such building when being rebuilt shall be set
back to or towards the said line or front; and the portion of land added to the
street by such setting back or removal shall henceforth be deemed to be part of
the public street and shall vest in the Corporation:
Provided that the Corporation shall make reasonable compensation to the
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
23 WP-15272-2026
owner for any damage or loss he may sustain in consequence of his building or
any part thereof being set back.
(2) The Corporation may, on such terms as it thinks fit, allow any building to
be set forward for the improvement of the line of the street."

In re: Possession/Deemed to be part of public street and vesting under Section
305 of the 1956 Act
39. Coming to question as to when vesting takes place. As soon as the building
or the projecting part has been removed or when the Corporation has issued a
notice when such re-building shall be set back or to the front line, the line
added by such action by setting back or removal, shall henceforth without any
further formalities, be deemed to be a part of public street and shall vest in the
Corporation. Vesting does not depend upon the volition of the owner.
Otherwise no public street can ever be brought in regular line. The Corporation
has the power to remove, as discussed hereinabove. As deemed vesting is
provided under Section 305, as such there is no requirement of separate
provision for taking possession. For removal there is specific provision and
adequate safeguards have been provided for fixing the regular line of a public
street while preparing the development plan or the town development scheme,
as the case may be.
55. Even assuming that public street is also a street, considering the special
provisions contained in Section 305, recourse can be had to the provision
without having adverting to the procedure prescribed under Sections 78 and 79
of the Act and the compensation in the case of action taken under Section 305
gis provided under the proviso to Section 305 and Section 306 read with
Section 387 to which the provisions of the Land Acquisition Act, 1894 have
been made applicable for determination. Section 387 provides for procedure in
case compensation determined under Section 306 is not acceptable, dissatisfied
claimants can have resort to Section 387 which require determination of dispute
by Panchayat/arbitration, and in case arbitration fails, parties can approach the
District Court which shall follow the procedure provided in the Land
Acquisition Act, 1894. The provision of Section 387 is very wide and covers
all the cases in which an agreement is not arrived at with respect to
compensation or damages which are under the Act directed to be paid. Section
387 would b cover the provisions of compensation payable under Sections 305
and 306 of the 1956 Act. Sections 305 and 306 use the expression "reasonable
compensation has to be paid" which would mean, reasonable on the principle
acceptable in accordance with law. It cannot be fanciful or arbitrary one as
suggested by the appellants.
56. The submission raised by the appellants that for acquisition of land,
Sections 78 and 79 should be resorted to for the purposes mentioned in Section
305 cannot be accepted for yet another reason, if the provision as to public
street is made dependent upon the acquisition of land, the very purpose behind
the provisions of Section 305 would be frustrated as well as the public interest,
there is already a regular line of public street fixed under the development plan
and is binding under Section 19(5) and Section 25 of d the 1973 Act. Various
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
24 WP-15272-2026
rights of ownership which ordinarily vest in an owner, are restricted by the
regional plan, development plan or the town development scheme, as the case
may be. User of the owner's land, property cannot be in derogation to any of
them. Development plan is binding upon the Corporation and local authorities
and all concerned including the owners. Though they can transfer the property
but subject to such restrictions which the property will carry with it. If the land
falls in a regular line of public street, no construction can be raised, no
projection can be made by owner whereas it can be removed or set back, as the
case may be. In case acquisition is resorted to under Sections 78 and 79, public
street can never be widened and the entire purpose of preparation of the
development plan shall stand defeated.

57. What can be achieved by procedural safeguards in case the property is
acquired under the provisions of the Land Acquisition Act, 1894 or the 2013
Act by way of holding inquiry, such exercise has already been taken care of
while preparing regional plan, development plan or the town improvement
scheme. The widening of the public street cannot brook any delay. The
provisions contained in Section 387(5) which empower the Corporation to take
possession after determination of compensation by arbitration or by the District
g Court, would be applicable only to the acquisition resorted to under Sections
78 and 79, particularly under the provisions of Section 79 and not to a case
which is covered by the special provisions contained in Section 305 where the
vesting is deemed to be by operation of law as soon as there is deemed vesting,
the area shall vest in the Corporation and it shall be deemed to be a part of
public street. Thus the provision of Section 387(5) is not attracted when it is
deemed to be part of the public street on vesting in the Corporation. The
process under Section for acquisition by the Town and Country Development
Authority for the purpose of any development scheme has to be laid down in
the zonal plan.
71. The appellants have also placed reliance on Rajendra Shankar Shukla v.
State of Chhattisgarh 48 to contend that the 1973 Act provides for
arrangement, the development plan is an umbrella which encompasses within
its fold a zonal plan which is implemented through Town Development
Scheme. This Court has laid down thus: (SCC pp. 440-42, paras 65-70 & 74-75
"65. As per the factual averments of this case, Respondent 2 RDA,
without any resolution of the Board, on its own motion, addressed a
Letter dated 31-7-2006 and approached the State Government for change
of land use because it had to propose the township in Tikrapara, Devpuri
and Boriakhurd Villages. Thereafter, KVTDS was also proposed,
published, finalised and approved before the land use was changed by
the State g Government. Under the provisions of the 1973 Act, the
development plan/ Raipur Master Plan (Revised) 2021 that is prevailing,
Respondent 2 RDA as well as the State Government gave primacy to
KVTDS and sought changes in the master plan to suit KVTDS. This is
impermissible in law. The finding recorded by the High Court of
Chhattisgarh, Bilaspur, in its judgment in this regard that no finality can
be attached to the master plan is an erroneous finding. Accordingly, we
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
25 WP-15272-2026
are of the opinion that the town development scheme which is KVTDS
in the present case, was not prepared in accordance with Section 50 of
the 1973 Act and we hold that KVTDS is ultra vires the 1973 Act.

Answer to Point (iii)
66. Though we have answered Point (ii) in favour of the appellant, we
intend to mention other grounds too, which render KVTDS as illegal.
The learned Senior Counsel on behalf of the appellants contended that in
the absence of a zonal plan, a town development scheme cannot be
framed by Respondent 2 RDA, and therefore, the acquisition
proceedings of the land of the appellants cannot be allowed to sustain.
67. The town development scheme is always subservient to the master
plan as well as the zonal plan, as provided under Section 17 of the 1973
Act, which reads as under:
17. Contents of development plan. A development plan shall take into
account any draft five year and annual development plan of the district
prepared under the Madhya Pradesh Zila Yojana Samiti Adhiniyam,
1995 (19 of 1995) in which the planning area is situated.....
68. Master plan falls within the category of broad development plans and
is prepared only after taking into account the Annual Development
Reports prepared by constitutionally elected bodies of local panchayats
and municipalities, etc. A zonal plan is mandated to be prepared only
after the publication of the development plan. Section 20 of the Act
reads thus:
20. Preparation of zonal plans. The local authority may on its own
motion at any time after the publication of the development plan, or
thereafter if so required by the State Government shall, within the next
six months of such requisition, prepare a zoning plan.'
Further, Section 21 of the Act reads thus:
21. Contents of zoning plan. The zoning plan shall enlarge the details of
the land use "as indicated in the development plan"....'
Thus, it is evident from the language of Sections 20 and 21 of the Act, that a
zonal plan can be prepared only in adherence to the development plan which in
the present case is the Raipur Master Plan of 2021.
69. Next, Section 49 of the Act which provides for the provisions for
which a town development scheme can be prepared, has to be read along
with Section 21 of the Act, which clearly mentions that the land required
70. Therefore, a combined reading of Sections 17, 21 and 49 lays down
that the development plan is the umbrella under which a zonal plan is
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
26 WP-15272-2026
made for the city. The zonal plan in turn allocates the land which could
be acquired for town development schemes.

74. In the case in hand, KVTDS has been prepared in the absence of a
zonal plan. It is not possible to define the utilisation of land under the
town development scheme unless the zonal plan formulated by the local
authority describes with sufficient particularity the details for which the
broadly indicated use of land in the development plan may be put.
Respondent 2 RDA is not permitted to either usurp or bypass the power
vested with the local authorities for preparing town development scheme
in the absence of zoning plan merely on the ground that the local
authority did not exercise its constitutional power in preparing the zonal
plan following the direction of Respondent 1 State Government under
Section 20 of the 1973 Act. A mere glance at the master plan would
clearly go to show that it does not set out the detailed land use with
sufficient particulars. Therefore, the framing of a zonal plan by local
authority in laying out a detailed plan of land use with sufficient
particulars is a sine qua non under the provisions of the Act.
75. The legal contention urged on behalf of the respondents that a town
development scheme can be framed pursuant to the development plan
without there being a zonal plan, is not sustainable. The learned Senior
Counsel, Ms Pinky Anand and Mr Prashant Desai on behalf of the
respondents relied upon the Act pari materia for the State of Gujarat
where the Town Planning Act does not contemplate a zonal plan, and
which contemplates "DP-TP"." (emphasis supplied)
There is no dispute with the law laid down by this Court and town planning
scheme has to be subservient to development plan/zonal plan. Development
plan which does not require micro planning is binding and can be
implemented."
9. Considering the facts and circumstances of the case and the settled
position of law, considering the submission made at the Bar, but without
repeating all the contentions which are recorded in detail in earlier portion, I
am of the view that that this is a fit case where Court should not entertain
petition under Article 226 of the Constitution as respondent authority has
acted by exercising power u/S 305 of the Act of 1956, which reads as under:
305. Power to regulate line of buildings.
(1) If any part of a building projects beyond the regular line of a public street,
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
27 WP-15272-2026
either as existing or as determined for the future or beyond the front of
immediately adjoining buildings the Corporation may-

(a) if the projecting part is a verandah, step or some other structure external to
the main building, then at any time; or
(b) if the projecting part is not such external structure as aforesaid, then
whenever the greater portion of such building or whenever any material portion
of such projecting part has been taken down or burned down or has fallen
down, require by notice either that the part or some portion of the part
projecting beyond the regular line or beyond the front of the immediate
adjoining building, shall be removed, or that such building when being rebuilt
shall be set back to or towards the said line or front; and the portion of land
added to the street by such selling back or removal shall henceforth be deemed
to be part of the public street and shall vest in the Corporation :
Provided that the Corporation shall make reasonable compensation to the
owner for any damage or loss he may sustain in consequence of his building or
any part thereof being setback.
(2) The Corporation may, on such term as it thinks lit, allow any building to be
set forward for the improvement of the line of the street.
10. Also considering the provisions of Section 17, 49, 50(7), 54 of
the Adhiniyam, 1973, which reads as under:
17 - [A development plan shall take into account any draft five-year and
Annual Development plan of the district prepared under the Madhya Pradesh
Zila Yojana Samiti Adhiniyam, 1995 (No. 19 of 1995) in which the planning
area is situated and shall.] [Substituted by M.P. Act No. 8 of 1996 (w.e.f. 17-4-
1996).](a)indicate broadly the land use proposed in the planning area;(b)
[allocate broadly areas or zones of land, keeping in view the regulations for
natural hazard prone areas, for-] [Substituted for 'allocate broadly areas or
zones of land for-' by M.P. Act No. 22 of 2005.](i)residential, industrial,
commercial or agricultural, purpose;(ii)open spaces, parks and gardens, green-
belts, zoological gardens and playgrounds;(iii)public institutions and offices;
(iv)such
special purposes as the Director may deem fit;(c)lay down the pattern of
National and State Highways connecting the planning area with the rest of the
region, ring roads, arterial roads and the major roads within the planning area;
(d)provide for the location of air-ports, railway stations, but terminus and
indicate the proposed extension and development of railways and canals;
(e)make proposals for general landscaping and preservation of natural areas;
(f)project the requirement of the planning area of such amenities and utilities as
water, drainage, electricity and suggest their fulfilment;(g)propose broad based
regulations for zoning, by way of guide lines, within each zone or sector of the
location, height, size of buildings and structures, open spaces, court yards and
the use to which such buildings and structures and land may be put;(h)lay
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
28 WP-15272-2026
down the broad-based traffic circulation patterns in a city;(i)suggest
architectural control features; elevation and frontages of buildings and
structures;(j)indicate measures for flood control, prevention of air and water
pollution, disposal of garbage and general environmental control.

In view of the above discussion and considering the material available on
record, more particularly, the procedure carried out by way of joint inspection,
by way of panchnama which clearly indicates that there is encroachment made
by the petitioner on the Government land on his site which is marked by
putting up construction on his land, neither there is violation of Article 14 nor
Article 300A of the Constitution. The provisions of Section 305 of the Act,
1956 mandates the Corporation to take action pursuant to the Indore Master
Plan, 2021.
49. Town Development Schemes.
- A town development scheme may make provision for any of the following
matters,-(i)acquisition, development and sale or leasing of land for the purpose
of town expansion;(ii)acquisition, relaying out of, rebuilding, or relocating
areas which have been badly laid out or which has developed or degenerated
into a slum;(iii)acquisition and development of land for public purposes such
as housing development, development of shopping centres, cultural centres,
administrative centres;(iv)acquisition and development of areas for commercial
and industrial purposes;(v)undertaking of such building or construction work as
may be necessary to provide housing, shopping, commercial or other facilities;
(vi)acquisition of land and its development for the
purpose of laying out or remodeling of road and street patterns;(vii)acquisition
and development of land for playgrounds, parks, recreation centres and stadia;
(viii)reconstruction of plots for the purpose of buildings, roads, drains, sewage
lines and other similar amenities;(xi)any other work of a nature such as would
bring about environmental improvements which may be taken up by the
authority with the prior approval of the State Government.
50. Preparation of Town Development Schemes.
(1)The Town and Country Development Authority may, at any time, declare its
intention to prepare a town development scheme.(2)Not later than thirty days
from the date of such declaration of intention to make a scheme, the Town and
Country Development Authority shall publish the declaration in the Gazette
and in such other manner as may be prescribed.(3)Not later than two years
from the date of publication of the declaration under sub-section (2) the Town
and Country Development Authority shall prepare a town development scheme
in draft form and publish it in such form and manner as may be prescribed
together with a notice inviting objections and suggestions from any person with
respect to the said draft development scheme before such date as may be
specified therein, such date being not earlier than thirty days from the date of
publication of such notice.(4)The Town and Country Development Authority
shall consider all the objections and suggestions as may be received within the
period specified in the notice under sub-section (3) and shall, after giving a
reasonable opportunity to such persons affected thereby as are desirous of
being heard, or after considering the report of the committee constituted under
sub-section (5) approve the draft scheme as published or make such
modifications therein as it may deed fit:[Provided that the final publication of
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
29 WP-15272-2026
such draft scheme shall be notified not later than one year from the date of
publication of the draft scheme failing which the draft scheme shall be deemed
to have lapsed.] [Inserted by M.P. Act No. 21 of 2004 (w.e.f. 24-12-2004).]
(5)Where the town development scheme relates to reconstitution of plots, the
Town and Country Development Authority shall, notwithstanding anything
contained in sub-section (4), constitute a committee consisting of the Chief
Executive Officer of the said authority and two other members of whom one
shall be representative of the Madhya Pradesh Housing Board and the other
shall be an officer of the Public Works Department not below the rank of an
Executive Engineer nominated by the Chief Engineer, Public Works
Department for the purpose of hearing objections and suggestions received
under sub-section (3).(6)The committee constituted under sub-section (5) shall
consider the objections and suggestions and give hearing to such persons as are
desirous of being heard and shall submit its report to the Town and Country
Development Authority within such time as it may fix along with proposals to,-
(i)define and demarcate the areas allotted to or reserved for public purpose;
(ii)demarcate the reconstituted plots;(iii)evaluate the value of the original and
the reconstituted plots;(iv)determine whether the areas reserved for public
purpose are wholly or partially beneficial to the residents within the area of the
scheme;(v)estimate and apportion the compensation to or contribution from the
beneficiaries of the scheme on account of the reconstitution of the plot and
reservation of portions for public purpose;(vi)evaluate the increment in value
of each reconstituted plot and assess the development contribution leviable on
the plot holder :Provided that the contribution shall not exceed half the accrued
increment in value;(vii)evaluate the reduction in value of any reconstituted plot
and assess the compensation payable therefor.(7)Immediately after the town
development scheme is approved under sub-section (4) with or without
modifications the Town and Country Development Authority shall publish in
the Gazette and in such other manner as may be prescribed a final town
development scheme and specify the date on which it shall come into
operation.

54. [ Lapse of scheme. [Substituted by M.P. Act No. 8 of 1996 (w.e.f.17-4-
1996).] - If the Town and Country Development Authority fails to commence
implementation of the town development scheme within a period of two years
or complete its implementation within a period of five years from the date of
notification of the final scheme under Section 50, it shall, on expiration of the
said period of two years or five years, as the case may be, lapse :Provided that,
if a dispute between the authority and parties, if any, aggrieved by such
scheme, is brought before a Court or Tribunal of competent jurisdiction, for
consideration, the period for which such dispute pending before such Court or
Tribunal shall not be reckoned for determination of the lapse of the scheme.]
11. Considering all these aspects and the fact that the larger public
interest is involved in the matter and there is no apparent illegality or
arbitrariness found in the action of respondent authority which is otherwise
found to be in accordance with law, I find that all the contentions raised in
Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59

NEUTRAL CITATION NO. 2026:MPHC-IND:27795
30 WP-15272-2026
the present petition by the petitioner though sounds to be attractive, but lacks

in merits in the facts and circumstances of the present petition and in view of
various judgments.
12. Considering all these grounds and the ration of law laid down
in the judgment of Ramchandra Waghmare(supra), petitioner is not entitled
to get any relief as prayed in the petition. In view of the above discussion, I
find no arbitrariness, illegality or found any action taken by the respondent
authority in unjust manner warranting interference by this Court by
exercising power under Article 226 of the Constitution of India.
13. Petition fails on various grounds and even lacks on merits for
grant of any relief under Article 226 of the Constitution of India and,
therefore, deserves to be and is hereby dismissed.
(SANDEEP N. BHATT)
JUDGE
sh

Signature Not Verified
Signed by: SEHAR HASEEN
Signing time: 01-10-2026
19:04:59