M/S. JSW STEEL LIMITED vs ELECTRICITY INSPECTOR AND ORS.
- Court
- Bombay High Court
- Case type
- Writ Petition
- Decided on
- 02-04-2026
<div> <b>2026:BHC-AS:16014-DB</b><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> <b>IN THE HIGH COURT OF JUDICATURE AT BOMBAY</b><br /> <b> CIVIL APPELLATE JURISDICTION </b><br /> <b> </b><br /> <br /> <b>WRIT PETITION NO. 12477 OF 2015 </b><br /> <b> </b><br /> <b> </b><br /> <b> </b> <b> </b><br /> <b> </b><br /> <br /> <b>M/s. JSW Steel Limited</b><br /> <br /> Formerly Known as Ispat Industries Ltd.<br /> <br /> A Company Incorporated under<br /> <br /> The Provisions of Companies Act,<br /> <br /> 1956, having its registered address<br /> <br /> at Geetapuram, Dolavi Village,<br /> <br /> Taluka Pen, District Raigad – 402 107.<br /> <br /> <br /> <br /> <br /> <b>…PETITIONER</b><br /> <b> </b> <b> </b> <b> </b><br /> <br /> <br /> <b> </b> <b>~ VERSUS ~</b> <b> </b><br /> <b> </b><br /> <b> </b> <b> </b> <b> </b><br /> <b>1. </b><br /> Electricity Inspector – Inspection Zone– I, <br /> th<br /> 11 Road, Wagle Estate, Thane (W) – 400 <br /> <br /> 604.<br /> <b> </b><br /> <b>2. </b> Managing Director, MSEDCL, <br /> Prakashgad, Anant Kane Marg, Bandra <br /> <br /> <br /> (E), Mumbai – 400 071.<br /> <b> </b><br /> <br /> <b>3.</b> The State of Maharashtra<br /> <br /> <b> </b> Through Principal Secretary (Energy)<br /> <br /> Industries, Energy & Labour<br /> <br /> Department, Mantralay, Mumbai.<br /> <b>…RESPONDENTS</b><br /> <b> </b> <b> </b> <b> </b><br /> <b> </b><br /> Digitally signed<br /> by ANJALI<br /> TUSHAR<br /> ASWALE<br /> Date: 2026.04.04<br /> 15:53:42 +0530<br /> ANJALI<br /> TUSHAR<br /> ASWALE<br /> <b> </b><br /> <br /> Page 1 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> <b>WITH</b><br /> <b> </b><br /> <b>WRIT PETITION NO. 13941 OF 2016 </b><br /> <b> </b><br /> <b>WITH </b><br /> <b> </b><br /> <b>INTERIM APPLICATION (ST) NO.40287 OF 2025 </b><br /> <b> </b><br /> <b> </b><br /> <b> </b> <b> </b> <b> </b><br /> <br /> <b>M/s. JSW Steel Limited</b><br /> <br /> A Company Incorporated under<br /> <br /> The Provisions of Companies Act,<br /> <br /> 1956, having its registered address<br /> <br /> at Geetapuram, Dolavi Village,<br /> <br /> Taluka Pen, District Raigad – 402107. <b>…PETITIONER</b><br /> <b> </b> <b> </b> <b> </b><br /> <br /> <br /> <b> </b> <b>~ VERSUS ~</b> <b> </b><br /> <b> </b><br /> <b> </b> <b> </b> <b> </b><br /> <br /> <b>1. </b> <b>Managing Director</b><br /> <br /> M.S.E.D.C.L., Prakashgad,<br /> <br /> Anant Kane Marg, Bandra (E),<br /> <br /> <br /> Mumbai – 400 071.<br /> <b> </b><br /> <br /> <b>2.</b> <b>Chief Engineer (Commercial),</b><br /> <br /> M.S.E.D.C.L., Prakashgad,<br /> <br /> Anant Kane Marg, Bandra (E),<br /> <br /> Mumbai – 400 071.<br /> <b> </b><br /> <br /> <b>3.</b> <b>The State of Maharashtra</b><br /> <br /> <b> </b> Through Principal Secretary (Energy)<br /> <br /> Industries, Energy & Labour<br /> <br /> Department, Mantralay, Mumbai.<br /> <br /> <b>…RESPONDENTS </b><br /> <b> </b> <b> </b> <b> </b><br /> <br /> Page 2 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <b> </b><br /> <br /> <b>PPEARANCES</b><br /> <b>A</b> <b>:</b><br /> <b> </b><br /> <b> </b><br /> <b> </b> <b> </b><br /> <br /> <b>for the Petitioner</b> <b>Mr. Janak Dwarkadas</b> <i> a/w. Chirag Kamdar </i><br /> <i>a/w. Vineet Unnikrishnan a/w. Ms. Sonu Bhasi </i><br /> <i>a/w. Veena Hari a/w. Karthika Sanjay i/b. Cyril </i><br /> <i>Amarchand Mangaldas, Advocates for the Petitioner </i><br /> <i>in both Writ Petitions and Applicant in </i><br /> <br /> <i>IA(ST)/40287/2025.</i><br /> <br /> <b> </b><br /> <br /> <b>for the Respondent</b> <b>Ms. </b> <b>Shruti </b> <b>D. </b> <b>Vyas, </b> <b>Additional </b><br /> <b>Government Pleader</b><br /> <i> a/w. Mr. M.M. Pabale, </i><br /> <i>AGP for State/Respondent in both Wps/IA. </i><br /> <i> </i><br /> <b>Mr. Harinder Toor</b> <i> i/b. M/s. Expletus Legal </i><br /> <i>for Respondent Nos. 1 & 2 in WP/13941/2016 </i><br /> <i>& IA. </i><br /> <b> </b> <i> </i><br /> <b>Mr. Uddhav Dahiphale</b> <i>, Joint Secretary Energy </i><br /> <i>Department – Present in Court. </i><br /> <i> </i><br /> <b>Mr. Sandip Patil</b> <i>, Chief Electrical Inspector, </i><br /> <i>And </i><br /> <i> </i><br /> <b>Ms. Kirti Deshmukh</b> <i>, Deputy Director, </i><br /> <i>Industries Department, Government of Maharashtra </i><br /> <i>– Present In Court. </i><br /> <b> </b><br /> <b> </b><br /> <b> </b><br /> <br /> <b>CORAM</b> <b>:</b> <b>B. P. COLABAWALLA &</b><br /> <br /> <b>AMIT S. JAMSANDEKAR, JJ.</b><br /> <b> </b> <b> </b> <b> </b><br /> <b>rd</b> <br /> <b>RESERVED ON</b> <b>:</b> <b>23</b> <b> December, 2025.</b><br /> <b>nd</b> <br /> <b>PRONOUNCED ON</b> <b>:</b> <b>2</b> <b> April 2026.</b><br /> <br /> Page 3 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> <b>JUDGMENT (</b> <i>Per Amit Satyavan Jamsandekar J.)</i> <b>:- </b><br /> <br /> 1. By the present petitions, the Petitioner has challenged the acts and decisions of the <br /> Respondents by which the Respondents have denied the Petitioner the exemption <br /> from payment of electricity duty. It is the case of the Petitioner that the Petitioner <br /> is entitled to exemption from payment of electricity duty for the period beginning <br /> th th<br /> from 6 August 2012 up to 5 August 2019. This exemption from payment of <br /> th<br /> electricity duty is sought by the Petitioner by virtue of Notification dated 29 <br /> December 1999 ( <b>the Notification</b> ) issued by the State of Maharashtra ( <b>the State</b> ) <br /> in exercise of its powers under Section 5A of the <i>Bombay Electricity Duty Act, 1958</i> <br /> <b>the BEDA, 1958</b><br /> ( ). <br /> <br /> 2. Rule. The service is waived by Ms. Vyas, the Learned AGP, on behalf of the State <br /> st nd<br /> and Mr. Toor, the Learned Counsel, on behalf of the 1 and 2 Respondents. The <br /> pleadings in the proceedings are complete. With the consent of parties, Rule is made <br /> returnable forthwith and heard finally. <br /> <br /> 3. The above captioned two Writ Petitions are in respect of the same subject matter. <br /> However, the subsequently filed Writ Petition No.13941 of 2016 covers all <br /> subsequent facts, circumstances, and actions of the Respondents arising from their <br /> <br /> Page 4 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> decision to deny the Petitioner the benefit of exemption from payment of electricity <br /> duty. The decision in Writ Petition No.13941 of 2016 would cover the entire subject <br /> matter in dispute. Therefore, Writ Petition No.13941 of 2016 is taken up for hearing <br /> first, by consent of the Learned Counsels appearing for the parties. <br /> <br /> <br /> 4. Before we proceed to decide the rival contentions of the parties, it would be <br /> apposite to set out the undisputed facts and the sequence of events. <br /> <br /> i) In 1964, the State, through its Industries, Energy and Labour Department, <br /> <i>Package of Incentive Scheme</i><br /> implemented a . The intention behind the scheme <br /> was to disperse industries outside the Bombay, Thane and Pune area of the <br /> State and to attract industry to the underdeveloped areas of the State. The <br /> scheme has been amended from time to time since the year 1964. The <br /> st<br /> amendment, which took effect in the year 1988, was operative from 1 <br /> th<br /> October 1988 to 30 September 1993. Thereafter, by its Resolution dated <br /> th<br /> 7 May 1993, the State modified the said scheme and extended it with effect <br /> st<br /> from 1 October 1993 ( <b>the Scheme</b> ). Under this extension, the unit holding <br /> an Eligibility Certificate issued by the implementing agency was entitled to <br /> claim the facilities in accordance with the guidelines laid down therein. The <br /> th<br /> Scheme was further amended by the State by its Resolution dated 20 June <br /> <br /> Page 5 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> 1997. As per the said Resolution, the projects having a fixed capital <br /> investment of a minimum of ₹ 1000 Crores were called ‘Mega Projects’. By <br /> this amendment, ‘Mega Projects’ were held to be eligible to avail certain <br /> incentives for a period of 14 years, with the option to extend the said period <br /> for a further seven years. It is undisputed that the Petitioner was eligible as <br /> rd<br /> a ‘Mega Unit’. Therefore, it applied under the Scheme and on 3 August <br /> 1998, and an Eligibility Certificate under the Scheme was issued to the <br /> Petitioner. The validity of the Eligibility Certificate issued to the Petitioner <br /> rd th th<br /> on 3 August 1998 was from 6 August 1998 to 5 August 2012 (i.e. for a <br /> period of 14 years). <br /> <br /> ii) Thereafter, the State issued a Notification by exercising its powers under <br /> Section 5A of the <i>Bombay Electricity Duty Act, 1958</i> ( <b>BEDA, 1958</b> ). By this <br /> Notification, the State granted exemption of energy utilized by the ‘Mega <br /> Project’ to which an Eligibility Certificate had been granted under the <br /> Scheme. By this Notification, the payment of the whole of the electricity <br /> duty payable under Part F of the Schedule to the BEDA, 1958 for the period <br /> of eligibility of the said project, as mentioned in the Eligibility Certificate, <br /> th<br /> came to be exempted. Thereafter, on 15 October 2001, the State amended <br /> th<br /> the earlier Notification dated 29 December 1999 issued under Section 5A <br /> <br /> Page 6 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> of the BEDA, 1958 and also extended the exemption from the payment of <br /> electricity duty payable under Clause (b) of Part G of the Schedule to the <br /> th<br /> BEDA, 1958. Consequently, on 25 May 2000, the Electricity Inspector <br /> directed the Chief Engineer (Electricity) to take note of the fact that the <br /> Petitioner has been exempted from payment of electricity duty under the <br /> exemption Scheme. <br /> <br /> th<br /> iii) On 18 November 2011, the Directorate of Industries, by Addenda II, <br /> amended the Eligibility Certificate issued in favour of the Petitioner. By this <br /> Addenda, the details regarding raw material, capital cost of the project, and <br /> th<br /> the maximum limit of sales-tax incentives were amended. Thereafter, on 6 <br /> October 2012, the Director of Industries, by Addenda III, further amended <br /> rd<br /> the Eligibility Certificate dated 3 August 1998 issued to the Petitioner. By <br /> the said amendment, the validity period of the Eligibility Certificate was <br /> th<br /> extended for a further period of 7 years i.e. up to 5 August 2019. <br /> <br /> th<br /> <br /> iv) On 19 October 2012, the Petitioner informed the Deputy Secretary, <br /> Industries, Energy and Labour Department, of the subsequent <br /> developments and the extension of the Eligibility Certificate. A request was <br /> made by the Petitioner to issue necessary instructions to the concerned <br /> <br /> Page 7 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> officials not to levy and/or demand electricity duty from the Petitioner in <br /> view of the extension granted to the Petitioner by Addenda III issued by the <br /> th<br /> Director of Industries on 6 October 2012. <br /> <br /> th<br /> <br /> v) Similarly, on 30 July 2015, the Petitioner addressed a letter to the Principal <br /> Secretary, Energy, Industries and Labour Departments and requested that <br /> necessary directions be issued regarding the exemption from the payment of <br /> electricity duty to the Petitioner. <br /> <br /> th<br /> <br /> vi) On 12 August 2015, the Department of Industry, Energy and Labour, by <br /> its letter informed the Deputy Secretary (Industries) that the Petitioner is <br /> eligible for exemption from payment of electricity duty and requested to take <br /> the decision at a higher level. <br /> <br /> <br /> vii) Consequently, the Deputy Secretary (Energy) Industries, Energy and Labour <br /> th<br /> Department, by its order dated 26 August 2015, clarified that the Petitioner <br /> is eligible for exemption from the payment of electricity duty for a period up <br /> th<br /> to 5 August 2019. <br /> <br /> th<br /> <br /> viii) Thereafter, on 14 October 2015, the Desk Officer at the Industries, Energy <br /> and Labour Department addressed a letter to the Chief Electricity Inspector <br /> th<br /> informing that the order dated 26 August 2015 passed by the Deputy <br /> <br /> Page 8 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> Secretary (Energy) Industries, Energy and Labour Department, has been <br /> th<br /> suspended. In view of the letter dated 14 October 2015, directions were <br /> issued to the Petitioner to make payment of the arrears of electricity duty for <br /> the period from August 2012 to June 2015. This action of the Respondents <br /> was challenged by the Petitioner by filing the Writ Petition No. 12477 of <br /> st<br /> 2015 (the 1 Writ Petition). <br /> <br /> ix) Subsequently, the State enacted the Maharashtra Electricity Duty Act 2016, <br /> st<br /> which came into force with effect from 1 September 2016. This Act <br /> introduced a new tariff category of consumers i.e. Open Access under <br /> Schedule C. The Petitioner also consumes electricity through open access <br /> and, therefore, became subject to an additional electricity duty at a rate of <br /> 9.3% of the consumption charges for open access. <br /> <br /> <br /> x) Accordingly, the Respondents made the demands, and the Petitioner was <br /> called upon to pay the electricity duty. Correspondences were exchanged <br /> between the Petitioner and the Respondents. Considering the threat given <br /> by the Respondent to disconnect the electricity connection of the Petitioner, <br /> the Petitioner made payment of the electricity duty as demanded by the <br /> Respondents under protest. The demand from the Respondent continued <br /> even after the interim orders passed in Writ Petition No. 12477 of 2015, as <br /> <br /> Page 9 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> nd<br /> well as the interim orders passed in Writ Petition No. 13941 of 2016 (the 2 <br /> Writ Petition). In view thereof, Writ Petition No. 13941 of 2016 was <br /> amended to bring on record subsequent facts and circumstances. <br /> <br /> xi) The Petitioner has so far paid a sum of Rs. 47,47,61,492/- towards the <br /> th<br /> electricity duty with effect from 6 August 2012. This payment is made by <br /> the Petitioner under protest. <br /> <br /> <br /> 5. In this factual backdrop, Mr. Dwarkadas, the Learned Senior Counsel appearing on <br /> behalf of the Petitioner, submitted that considering the object of the Scheme, and <br /> considering the fact that relying on the promise of the State, the Petitioner has <br /> invested a tremendous amount of money in its project, and hence, the denial of <br /> exemption from payment of electricity duty on the part of the Respondents is most <br /> arbitrary and unfair. He submitted that the Petitioner is entitled to the benefit of <br /> the exemption from payment of electricity duty by virtue of the Eligibility <br /> Certificate, and its subsequent extension. <br /> <br /> <br /> <br /> 6. He further submitted that it is not in dispute that the validity of the Eligibility <br /> th<br /> Certificate was extended up to 5 August 2019, and the Petitioner has availed the <br /> benefit of sales tax incentives by virtue of the extension of the Eligibility Certificate. <br /> It is submitted that the language of the Addenda III, as well as the fact that the <br /> <br /> Page 10 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> Eligibility Certificate is linked to the Notification [issued under Section 5A of <br /> BEDA, 1958], itself clearly establishes that the promise on behalf of the State was <br /> that the benefit of exemption from payment of electricity duty will be provided to <br /> the Petitioner during the lifetime of the Eligibility Certificate. He further submitted <br /> that in fact, the State and all its Departments have acted accordingly. Therefore, <br /> th<br /> after the extension of the Eligibility Certificate on 6 October 2012 <b> </b> the Department <br /> of Industry, Energy and Labour informed the Deputy Secretary (Industries) that the <br /> Petitioner is eligible for exemption from the payment of electricity duty and <br /> requested that the decision be taken at a higher level. It is in this light that an order <br /> th<br /> was issued on 26 August 2015 by the Deputy Secretary, (Energy) Industries, <br /> Energy and Labour Department, clarifying that the Petitioner is eligible for <br /> th<br /> exemption from payment of electricity duty for a period up to 5 August 2019. <br /> <br /> <br /> 7. Mr. Dwarkadas, relying upon the language of the Notification, the wordings of <br /> Addenda III, and the language of the Eligibility Certificate issued in favour of the <br /> Petitioner, submitted that the language of the Notification and that of Addenda III <br /> was clear and unambiguous to mean that the Petitioner is entitled to get the benefit <br /> of the exemption under the Notification issued under BEDA, 1958. Further, he <br /> submitted that the entire Scheme was framed by the State to disperse industries <br /> <br /> Page 11 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:12 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> outside the Bombay, Thane and Pune area of the State, and to attract industries to <br /> the underdeveloped areas of the State. The Petitioner invested its money in an <br /> underdeveloped area on the State's promise that it would be provided with <br /> incentives. The Notification was issued to fulfil the promise and assurance given by <br /> the State to the Industry. In these facts and circumstances, the Petitioner is entitled <br /> to get the benefit of the exemption from payment of electricity duty, so long as the <br /> Eligibility Certificate is valid. The language of Addenda III, the Notification read <br /> with the object of the Scheme, cannot be interpreted in a narrow manner. It was <br /> further submitted that the Scheme is intended for a beneficial purpose and that the <br /> Petitioner has invested more than a sum of Rs.7000 crores in in the project, relying <br /> on the State's promise. Therefore, the Scheme, the Eligibility Certificate and the <br /> Notifications issued under the Scheme ought to be read and interpreted in favour <br /> of the Petitioner and not against it. He further submitted that the acts and decisions <br /> of the State are most arbitrary and unfair, and are, in fact, contrary to the object of <br /> the Scheme itself. He further submitted that the acts of the State are contrary to the <br /> principles of legitimate expectation and promissory estoppel and hence inequitable. <br /> <br /> <br /> <br /> 8. Mr. Dwarkadas in support of his submissions, cited judgments of the Hon’ble <br /> Supreme Court in <b>Star Industries v. Commissioner of Customs (Imports), </b><br /> <b>Raigad, (2016) 2 SCC 362 [Para. 34]</b> ; <b>State of Haryana v. Bharti Teletech Ltd., </b><br /> <br /> Page 12 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <b>(2014) 3 SCC 556 [Paras. 14, 17, 20, 22 to 25]</b> ; <b> CST v. Industrial Coal </b><br /> <b>Enterprises</b> <b>(1999) 2 SCC 607 [Paras. 4, 6, 10 and 12]</b> <b> Bajaj Tempo Ltd. v. </b><br /> , ;<br /> <b>CIT, (1992) 3 SCC 78 [Paras. 4, 5, 9]</b> ; <b> Government of Kerala and Another v. </b><br /> <b>Mother Superior Adoration Convent, (2021) 5 SCC 602 [Paras. 19-26]</b> ; <b> State of </b><br /> <b>Punjab v. Nestle India Limited, (2004) 6 SCC 465 [Paras. 44 to 47]</b> ; <b> </b> and <b>The </b><br /> <b>State of Jharkhand v. Brahmputra Metallics Ltd., Ranchi and Anr.</b> , <b>2020 SCC </b><br /> <b>OnLine SC 968 [Paras. 29, 30, 35, 41, 49, 50 and 52]</b> . <br /> <br /> 9. On the other hand, Ms. Vyas, the Learned Additional Government Pleader, on <br /> behalf of the State, submitted that the entire controversy in the present petitions <br /> revolves around the interpretation of the Notification and the Eligibility Certificate <br /> th<br /> read with Addenda III dated 6 October 2012. She submitted that the Petitioner <br /> does not have any inherent right to claim continuation of the benefit of exemption <br /> from payment of electricity duty granted to the Petitioner by virtue of the <br /> Notification. She further submitted that exemption notifications are to be strictly <br /> interpreted. The plain and the literal meaning of the Notification has to be seen. <br /> According to Ms. Vyas, the language of the Notification is clear and unambiguous. <br /> There is no scope for any interpretation. The benefit is available to “Mega Projects” <br /> for the period of eligibility specified in the Eligibility Certificate. According to Ms. <br /> <br /> Page 13 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> Vyas, the period of ‘eligibility’ and the period of ‘validity’ are separately provided in <br /> the Certificate. <br /> <br /> <br /> <br /> 10. She further submitted that the electricity duty exemption is not a part of the <br /> Package Incentive Scheme. Therefore, any extension of exemption from payment <br /> of sales tax granted under the Scheme cannot automatically include exemption from <br /> payment of electricity duty as well. The Scheme contemplates a refund of the <br /> electricity duty, and not exemption from the payment of electricity duty. It is the <br /> contention of the State that in the present case, there is no further Notification <br /> issued by the State by which the period of exemption from the payment of electricity <br /> duty beyond the period of 14 years (as mentioned in the Eligibility Certificate) has <br /> been extended by issuing a fresh Notification under Section 5A of the BEDA, 1958. <br /> In fact, the State has taken a conscious decision not to extend the exemption benefit <br /> in respect of the electricity duty. <br /> <br /> <br /> 11. Ms. Vyas submitted that the Petitioner is seeking to take advantage of the <br /> Notification, which is no longer applicable to them. The electricity duty exemption <br /> is granted by the State by issuing a Notification under Section 5A of the BEDA, <br /> 1958, and not under the Scheme. Therefore, the extension of the period granted to <br /> the benefit for availing the balance of sales tax incentives under the Scheme, as <br /> <br /> Page 14 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> mentioned in the Eligibility Certificate, cannot be extended for the grant of <br /> exemption of electricity duty. Further, she submitted that the extension given under <br /> the Scheme would not lead to an automatic extension to the period of benefit under <br /> the Notification issued under Section 5A of BEDA, 1958. In view of the fact that <br /> there is no Notification issued under Section 5A of the BEDA, 1958 by which the <br /> period of exemption has been extended, means that the Petitioner is not entitled to <br /> claim any such exemption from the payment of electricity duty. It is the case of the <br /> State that Addenda III merely extends the period of sales tax incentives under the <br /> Scheme; it does not extend the period of exemption under the notification issued <br /> under Section 5A of the BEDA 1958. Addenda III only extends the period of <br /> validity of the Eligibility Certificate. In any case it is submitted that by virtue of the <br /> provisions of the Maharashtra Electricity Duty Act 2016, the Petitioner is not <br /> entitled to get any benefit of exemption of electricity duty. No separate notification <br /> has been issued under the Maharashtra Electricity Duty Act, 2016. <br /> <br /> <br /> <br /> 12. The State further submits that the departments involved in the subject matter have <br /> given different opinions on the subject matter. Ms. Vyas submitted that the Energy <br /> Department agreed that the proposal of the Petitioner should be accepted and the <br /> electricity exemption should be extended to the Petitioner by linking it to the <br /> Petitioner’s overall incentive package. The Finance Department took a different <br /> <br /> Page 15 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> view, stating that the Petitioner’s proposal cannot be accepted because the policy <br /> should be interpreted strictly. Therefore, the opinion of the Finance Department <br /> was finalized, and the exemption was not granted to the Petitioner. Further, no <br /> decision has been taken by the State under Section 5A of the BEDA, 1958 or the <br /> Maharashtra Electricity Duty Act, 2016 to approve the extension of the exemption <br /> from electricity duty to the Petitioner. <br /> <br /> <br /> 13. In this background, it is submitted on behalf of the State that it is a settled position <br /> of law that a Taxing Statute is to be strictly interpreted. <b> </b> In case of any ambiguity in <br /> the charging section of a Taxing Statute, it should be interpreted in favour of <br /> Assessee. Further, an Exemption Notification is also required to be strictly <br /> interpreted. However, if there is any ambiguity in an Exemption Notification, the <br /> interpretation that favours the Revenue must be preferred. Ms. Vyas relied upon <br /> the judgment of the Hon’ble Supreme Court in <b>Hansraj Gordhandas v. H. H. </b><br /> <b>Dave, Assistant Collector of Central Excise and Customs, Surat (1968) SCC </b><br /> <b>OnLine SC 50</b> ; <b>Commissioner of Customs v. Dilip Kumar & Co. (2018) 9 SCC </b><br /> . By citing the judgment in the case of <b>Kasinka Trading v. Union of </b><br /> <b>Para 52–54)</b><br /> <b> </b><br /> <b>India</b> <b>(1995) 1 SCC 274 (Para 21)</b> of the Hon’ble Supreme Court, Ms. Vyas <br /> submitted that an exemption notification issued under Section 5A of the BEDA, <br /> 1958 is in the nature of a concession or incentive which can be withdrawn at any <br /> <br /> Page 16 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> time by the Government in public interest. In the public interest, the State may <br /> <b>Shrijee Sales Corporation v. Union </b><br /> withdraw the exemption granted as held in <br /> <b>of India (1997) 3 SCC 398 (Para 7)</b> and <b>Unicorn Industries v. Union of India </b><br /> <b>(2019) 10 SCC 575</b> . She further submitted that as held in <b>Eagle Flask Industries </b><br /> <b>Ltd. v. Commissioner of Central Excise </b> <b>(2004) 7 SCC 377 (Para 8)</b> , the <br /> exemption notification has to be interpreted on the basis of the wording used <br /> therein, and not on any intendment <i>.</i> Consequently, she submitted that there was no <br /> merit in the above Writ Petitions and the same be dismissed. <br /> <br /> st nd<br /> <br /> 14. Mr. Toor, the Learned Counsel appearing for the 1 and 2 Respondents, <br /> submitted that the Petitioner is seeking the exemption beyond the scope and period <br /> expressly provided under the Eligibility Certificate and the statutory notifications <br /> <i>Maharashtra Electricity Duty Act, 2016 (</i> <b>the 2016 Act</b> <i>)</i><br /> issued under the for short , the <br /> st<br /> Act which came into force on 1 September 2016. He submitted that the electricity <br /> duty exemption derives exclusively from notifications issued by the Energy <br /> Department, not from the Package Scheme of Incentives administered by the <br /> Industries Department. In the absence of any corresponding notification by the <br /> th<br /> Energy Department post 5 August 2012, no Electricity Duty exemption could <br /> th<br /> lawfully subsist beyond 5 August 2012. Mr. Toor further submitted that the <br /> st nd<br /> Petitioner’s challenge, in effect, seeks to prevent the 1 and 2 Respondents from <br /> <br /> Page 17 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> discharging their statutory obligation under the Electricity Duty Act, which is <br /> impermissible in law. <br /> <br /> <br /> <br /> 15. We have heard the Learned Counsel for the parties at length, and have perused the <br /> paper and proceedings. We have also considered the written submissions filed on <br /> behalf of the parties. <br /> <br /> <br /> 16. After considering the rival submissions advanced by the parties, we find that two <br /> issues arise for our consideration. They are: <br /> <b> </b><br /> <b>i)</b> <b>Whether the language of the Notification issued by the State </b><br /> <b>under Section 5A of the Bombay Electricity Duty Act, 1958, is </b><br /> <b>linked to the Eligibility Certificate issued to the Petitioner? </b><br /> <b>ii)</b> <b> </b> <b>If the answer to issue (i) above is in the affirmative, would the </b><br /> <b>Petitioner be entitled to get the benefit of exemption from </b><br /> <b>payment of electricity duty even after the introduction of the </b><br /> <b>Maharashtra Electricity Duty Act, 2016, and in the absence of a </b><br /> <b>separate Notification under Section 4 of the 2016 Act extending </b><br /> <b>the benefit to the Petitioner?</b> <b> </b><br /> <br /> th<br /> <br /> 17. The Package Incentive Scheme was introduced on 7 May 1993 by the State <br /> through the Department of Industries, Energy and Labour. The said Scheme, <br /> <br /> Page 18 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <i>interalia</i> , provided that eligible industrial units that fulfil the conditions of the <br /> Scheme are entitled to an exemption/ deferral from the payment of sales tax, during <br /> th<br /> the period of eligibility. This Scheme was amended on 20 June 1997 to specifically <br /> include Mega Projects such as that of the Petitioner. Paragraph C of the 1997 <br /> amended Scheme provides for the benefit of sales tax incentives and reads as: <br /> <i>for a period of 14 years and without </i><br /> “ <i>…in the form of exemption or deferral</i><br /> <i>any monetary limit. If during this period, the eligible sales tax incentives availed </i><br /> <i>are less than the maximum limit, the sales tax incentives upto the above </i><br /> <i>th</i><br /> <i>maximum limit can be availed after the 14</i> <i> year also. </i> <b>However, the </b><br /> <b>period for availing the balance of such incentives shall be </b><br /> <b>limited to maximum 7 years</b> <i>.</i> ” <br /> <b> (</b> <b>emphasis supplied</b> <b>) </b><br /> <br /> rd<br /> 18. The Petitioner had applied for and was issued an Eligibility Certificate on 3 <br /> August 1998. The validity period of this 1998 Eligibility Certificate was for a period <br /> th th<br /> of 14 years from 6 August 1998 to 5 August 2012. <br /> <br /> th<br /> 19. Clause 12 of the Eligibility Certificate provided a validity of 14 years, viz., from 6 <br /> th<br /> August 1998 to 5 August 2012. This Clause, however further provided as follows: <br /> “ <i>The above period </i> <b>shall be extended</b> <i> if the amount mentioned at (11) above </i><br /> <i>is not fully availed during this period. However, the period for availing the </i><br /> <br /> Page 19 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <i>balance of such incentives shall be extended </i> <b>for maximum seven years or </b><br /> <b>till the entitlement amount is exhausted whichever is earlier</b><br /> .” <br /> <br /> <br /> <br /> <br /> ( <b>emphasis supplied</b> ) <br /> <br /> 20. Thus, above quoted Clause 12 of the Eligibility Certificate is in consonance with <br /> Paragraph C of the Scheme, giving an option of an extension for a maximum period <br /> of seven years or till the exhaustion of the entitlement amount, whichever is earlier. <br /> <br /> 21. Thereafter, the State exercised its power under Section 5A of the BEDA, 1958, and <br /> th<br /> on 29 December 1999 issued a Notification. By this Notification, the State granted <br /> an exemption from payment of electricity duty on energy utilised by Mega Projects <br /> to which an Eligibility Certificate had been granted under the Package Incentive <br /> Scheme. The exemption granted by the Notification was in respect of the payment <br /> of the whole of the electricity duty payable under Part F of the Schedule to the <br /> th<br /> BEDA, 1958. On 15 October 2001, the Notification was amended. By this <br /> amendment, the benefits of exemption from the payment of electricity duty was <br /> extended by the State to Clause (b) of Part G of the Schedule to the BEDA, 1958 <br /> as well. <br /> <br /> <br /> Page 20 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> th<br /> <br /> 22. Thereafter, on 11 May 2006, the Petitioner applied for, and was granted, a revised <br /> Eligibility Certificate bearing the same reference number as the Eligibility Certificate <br /> rd<br /> granted to the Petitioner on 3 August 1998 to provide, in Clause 11, for part <br /> st<br /> deferral of the sales tax incentives, from 1 May 2006 onwards. The validity period <br /> th th<br /> was from 6 August 1998 to 5 August 2012. Paragraph 12 thereof further provides <br /> that the period of validity could be extended if the maximum entitlement of sales <br /> tax incentives is not fully availed within the stipulated 14-year period; however, such <br /> extension would be for a maximum of 7 years. The Eligibility Certificate came to <br /> be amended on three occasions by three separate Addenda’s, the third of which – <br /> th<br /> Addenda III dated 6 October 2012 is relevant. Since the Petitioner admittedly had <br /> not exhausted the entire sales tax incentives that it was entitled to within the 14-<br /> year period originally contemplated in the Eligibility Certificate, the Petitioner <br /> sought the seven-year extension contemplated in Clause 12 thereof. <br /> 23. Clause 12, as revised by Addenda III to the Eligibility Certificate reads as follows: <br /> “ <i>In the Eligibility Certificate No. FINC[I] 1993/DEFERRAL/EC-3741, </i><br /> <i>dated 11/05/2006 and subsequent addenda dt. 10/08/2011 & 18/11/2011 </i><br /> <i>granted under the 1993 Package Scheme of Incentives to M/s. JSW Ispat Steel </i><br /> <i>Ltd. for their unit located at Village Dolvi, Tal. Pen, Dist. Raigad, stands </i><br /> <b>amended</b> <i> as follows:</i> <i> </i><br /></div><table><thead><tr><th>Ref. No. of<br>Eligibility</th><th>As per EC No.<br>3741, dated</th><th>As now revised</th></tr></thead><tbody></tbody></table><div><br /> <br /> Page 21 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /></div><table><thead><tr><th>Certificate,<br>Addenda I<br>and Addenda<br>II</th><th>03/08/1998,<br>Addenda I dated<br>10/08/2011<br>and Addenda II<br>dated<br>18/11/2011</th><th></th></tr></thead><tbody><tr><td>Page No. 2<br>Sr. No. 12 –<br>Validity<br>Period of<br>14 years</td><td>From<br>06/08/1998<br>To<br>05/08/2012<br>The above period<br>shall be extended<br>if the amount<br>mentioned at<br>[11] above is not<br>fully availed<br>during this<br>period. However,<br>the period for<br>availing the<br>balance of such<br>incentives shall be<br>extended for<br>maximum seven<br>years or till the<br>entitlement<br>amount is<br>exhausted<br>whichever is<br>earlier.</td><td>From<br>06/08/1998<br>To<br>05/08/2019<br>[As per the<br>provisions of<br>clause No. 1 [C]<br>of G. R. dt.<br>11/08/1998,<br>the period for<br>availing the<br>balance of<br>such<br>incentives<br>mentioned at<br>Page No. 2 Sr.<br>11 of the EC &<br>addends dt.<br>18/11/2011<br>has been<br>extended for<br>further 7<br>years i.e. up<br>to 05/08/2019<br>or till the<br>entitlement<br>amount is<br>exhausted,<br>whichever is<br>earlier].</td></tr></tbody></table><div><br /> <i>2] The addenda </i> <b>shall be kept attached to</b> <i> the Eligibility Certificate FINC[I] </i><br /> <i>1993/DEFERRAL/EC-3741, dated 11/05/2006, Addenda -1 No. </i><br /> <i>DI/PSI-1993/Addenda-I/EC-3741/Deferral/2011/B-15928,dated </i><br /> <i>10/08//2011 and Addenda-II No, DI/PSI-1993/Addenda-I/EC-</i><br /> <br /> Page 22 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <i>3741/Deferral 2011/C-11706, dated 18/11/2011</i> <b>and shall be read with </b><br /> <b>it</b> <i>. </i><br /> <i>3] </i> <b>Save and except for the aforesaid changes, the contents, terms </b><br /> <b>& conditions of the Eligibility Certificate remains unchanged</b> <i>.</i> ” <br /> <br /> <br /> ( <b>emphasis supplied</b> ) <br /> <br /> <br /> 24. Thus, admittedly, by virtue of the Addenda III and the Notification, the Petitioner <br /> enjoyed the benefit of both the sales tax incentive as well as the electricity duty <br /> th th<br /> exemption upto 5 August 2012. By Addenda III dated 6 October 2012, the <br /> th<br /> validity period of the Eligibility Certificate was extended up to 5 August 2019, and <br /> th<br /> admittedly, the Petitioner has availed the benefits of the sales tax incentive up to 5 <br /> August 2019. The dispute only pertains to the application of the Notification upto <br /> th<br /> 5 August 2019. In this background, we have considered the issues as narrated in <br /> paragraph 16 above. <br /> <br /> <br /> 25. <b>i) Whether the language of the Notification issued by the State under Section </b><br /> <b>5A of the Bombay Electricity Duty Act, 1958, is linked to the Eligibility </b><br /> <b>Certificate issued to the Petitioner? </b> <br /> <br /> <br /> Page 23 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> 26. As mentioned earlier, the State, by exercising powers under Section 5A of BEDA, <br /> th th<br /> 1958 issued a Notification dated 29 December 1999, which was amended on 15 <br /> October 2001. Section 5A of the BEDA 1958 reads as follows: <b> </b><br /> “ <b>Subject to such conditions as it may impose</b> <i>, the State Government </i><br /> <i>may, if it considers it </i> <b>necessary in the public interest</b> <i> so to do, by </i><br /> <i>notification in the Official Gazette, exempt whether prospectively or retrospectively, </i><br /> <i>the consumption of energy in the whole or any part of the State, </i> <b>in the respect </b><br /> <b>of any class of premises or purposes or in respect of energy </b><br /> <b>consumed upto a specified limit</b> <i>, from payment of the whole or any part </i><br /> <i>of the electricity duty payable under Part A, Part B or Part F or Part G of the </i><br /> <i>Schedule to this Act</i> .” <br /> ( <b>emphasis supplied</b> ) <br /> <br /> <br /> 27. Section 5A begins with the wording ‘ <b>Subject to such conditions as it may </b><br /> Therefore, by virtue of the provisions of Section 5A of the BEDA Act, <br /> <b>impose’. </b><br /> 1958 the State has wide powers to impose any conditions while granting the <br /> exemption from the payment of electricity duty. The conditions stipulated by <br /> Section 5A are in the public interest because the State exercises its powers under <br /> Section 5A only in public interest. The exemption from the payment of electricity <br /> duty can be prospective or retrospective and it can be in respect of any class of <br /> premises or purpose. It can be upto a specified limit, and it can also be from <br /> payment of the whole or any part of the electricity duty payable under Part A, Part <br /> <br /> Page 24 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> B or Part F or Part G of the Schedule to the BEDA Act, 1958. Depending on the <br /> nature of public interest, the conditions for exemption of electricity duty can be <br /> imposed by the State by virtue of the provisions of Section 5A of the BEDA Act, <br /> 1958. <br /> <br /> th<br /> <br /> 28. By exercising its powers under Section 5A, the State issued the Notification on 29 <br /> December 1999 which reads as follows: <br /> “… <i>the Government of Maharashtra having satisfied that it is necessary in the </i><br /> <i>public interest so to do,</i> <b>hereby exempts,</b> <b> </b> <b>the consumption of energy</b> <i> </i><br /> <i>by Mega Project to which an E eligibility Certificate has been granted by </i><br /> <i>SICOM Limited under the Package Scheme of Incentives, 1993, </i> <b>from </b><br /> <b>payment of whole of the Electricity Duty payable under Part F </b><br /> <b>of the Schedule to the said Act, for the period of Eligibility of </b><br /> <b>the said project as mentioned in the Eligibility Certificate</b> . <br /> <i>Explanation – For the purpose of this notification, Mega Project does not </i><br /> <i>include Mega Project situated in the Pune Metropolitan Region and Mumbai </i><br /> <i>Metropolitan Region. </i><br /> <b>(</b> <b>emphasis supplied</b> <b>) </b><br /> <b> </b><br /> <b> </b><br /> <br /> 29. A plain reading of the Notification issued by the State, in public interest, is made <br /> applicable to the Mega Project to which <b>an Eligibility Certificate has been </b><br /> <b>granted</b> <i> </i> by SICOM Limited under the Scheme. The exemption is <b>from payment </b><br /> <b>of the whole of the Electricity Duty payable under Part F</b> <i> </i> of the Schedule to <br /> <br /> Page 25 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> the BEDA, 1958. The application of the Notification was further extended by an <br /> th<br /> amendment dated 15 October 2001 and was made applicable even to Clause (b) <br /> of Part G of the Schedule to the Act. More importantly, the Notification in no <br /> uncertain words was made applicable <b>for the period of Eligibility of the said </b><br /> <b>project as mentioned in the Eligibility Certificate</b> . Initially, the Eligibility <br /> th<br /> Certificate issued to the Petitioner was valid for a period up to 5 August 2012. <br /> Admittedly, the Eligibility Certificate was amended by virtue of Addenda III, and <br /> th<br /> its validity was extended up to 5 August 2019. The plain language of the <br /> Notification, read with the language of the Addenda III and the language of the <br /> Eligibility Certificate, leaves no doubt that the exemption granted under Section 5A <br /> of the BEDA,1958 [by issuing the Notification], is directly linked to the Eligibility <br /> Certificate. In fact, the language of the Notification clearly suggests that the <br /> intention of the State was to directly link the benefit of the exemption under the <br /> Act with the Eligibility Certificate granted under the Scheme. Therefore, so long as <br /> <b>the period of Eligibility of the said project as </b><br /> the Eligibility Certificate was valid (<br /> <b>mentioned in the Eligibility Certificate),</b> the Notification was to operate. If that <br /> were not the case, as the State now seeks to argue, the language of the Notification <br /> would have been entirely different. The Notification would have clearly stated that <br /> the exemption from payment of electricity duty would be available upto a particular <br /> <br /> Page 26 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> date. It was within the powers of the State by virtue of the provisions of Section 5A <br /> th<br /> to limit the benefit of the Notification only upto a specific date i.e. 5 August 2012. <br /> The State chose not to put any other condition, which the State could have done <br /> by virtue of the provision of Section 5A. Instead, the State chose to use the language <br /> <b>for the period of Eligibility of the said project as mentioned in the Eligibility </b><br /> ‘<br /> in the Notification. <br /> <b>Certificate’ </b><br /> <br /> <br /> 30. <b>Star Industries v. Commissioner of Customs </b><br /> The Hon’ble Supreme Court in <br /> <b>(Imports), Raigad, [(2016) 2 SCC 362] </b> in Paragraph 34, has held that the <br /> eligibility criteria laid down for the exemption notification are required to be <br /> construed strictly, and once it is found that the applicant satisfies the same, the <br /> exemption notification should be construed liberally. Further, it is settled law that <br /> there can be cases where strict interpretation or understanding in respect of the <br /> exemption notification/clause would be permissible, but where the party plainly <br /> falls within the eligibility criteria, then the courts should adopt a liberal/purposive <br /> interpretation to the benefit of the party who claims the benefit under the <br /> exemption notification/clause. See <b>State of Haryana v. Bharti Teletech Ltd., </b><br /> <b>[(2014) 3 SCC 556]</b> <i> – Paras. 14, 17, 20, 22 to 25, </i> <b>CST v. Industrial Coal </b><br /> <br /> Page 27 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <b>Enterprises, [(1999) 2 SCC 607]</b> <i> – Paras. 4, 6, 10 and 12, </i> <b>Bajaj Tempo Ltd. v. </b><br /> <b>CIT, [(1992) 3 SCC 78]</b> <br /> <i> – Paras. 4, 5, 9.</i><br /> <br /> 31. We do not find any ambiguity in the language of the Notification. The language is <br /> plain and simple, and it does not require any interpretation. A simple reading of the <br /> Notification, along with the provisions of Section 5A of the BEDA Act, 1958 makes <br /> it abundantly clear that the benefit of the Notification is extended so long as the <br /> Eligibility Certificate remains valid. If we accept the argument made on behalf of <br /> the Respondents that there is no linkage between the Eligibility Certificate and the <br /> Notification, then we have to read the Notification by deleting the words ‘ <b>for the </b><br /> <b>period of Eligibility of the said project as mentioned in the Eligibility </b><br /> This is not permissible. The only condition the State chose to impose <br /> <b>Certificate’. </b><br /> under Section 5A was that the exemption would be available only for the project’s <br /> eligibility period, as mentioned in the Eligibility Certificate. We find that there is no <br /> ambiguity in the language of the Notification and therefore the judgments cited by <br /> Ms. Vyas of the Hon’ble Supreme Court in <b>Hansraj Gordhandas v. H. H. Dave, </b><br /> <b>Assistant Collector of Central Excise and Customs, Surat [(1969) 2 SCR 253]</b> ; <br /> <b>Commissioner of Customs v. Dilip Kumar & Co. [(2018) 9 SCC] </b> (Para 52–54) <br /> are not applicable to the facts and circumstances of the present case. <br /> <br /> Page 28 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> 32. The Notification was issued for a beneficial purpose, and therefore, it requires a <br /> liberal interpretation in favour of the exemptee/grantee as held by the Hon’ble <br /> Supreme Court in the case of <b>Government of Kerala and Another v. Mother </b><br /> <b>Superior Adoration Convent</b> <i>, </i> <b>[(2021) 5 SCC 602] (Paras. 19-26)</b> <i>. </i> Therefore, the <br /> provisions of Section 5A and the language used in the Notification will also have to <br /> be read in consonance with the object of the Scheme and the object of the <br /> provisions of Section 5A. The provisions of Section 5A can only be invoked by the <br /> State in public interest. By issuing the Notification, the State served the public <br /> interest by providing the benefit of an exemption from payment of electricity duty <br /> only to Mega Projects that have an Eligibility Certificate under the Scheme. After <br /> th<br /> the Addenda III dated 6<br /> October 2012, by which the Petitioner’s Eligibility <br /> th<br /> Certificate came to be extended for a period of seven years, i.e. till 5 August 2019, <br /> the State could have limited the application of the Notification by amending the <br /> Notification by exercising its powers under Section 5A. However, that was not done <br /> by the State. Therefore, the Eligibility Certificate granted to the Petitioner remains <br /> valid by virtue of Addenda III and consequently also the Notification. Therefore, <br /> the judgments <b>Shrijee Sales Corporation v. Union of India [(1997) 3 SCC 398]</b> <br /> (Para 7) and <b>Unicorn Industries v. Union of India [(2019) 10 SCC 575]</b> , cited by <br /> Ms. Vyas in support of her submission that the State may withdraw the exemption <br /> <br /> Page 29 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> granted at any time in the public interest, are not applicable to the facts and <br /> circumstances of the present case. The State has not issued any Notification <br /> th<br /> withdrawing the benefits extended under the Notification dated 29 December <br /> th<br /> 1999 read with the Notification dated 15 October 2001. In fact, it’s the case of the <br /> State that these Notifications were valid only during the initial period of the <br /> th<br /> Eligibility Certificate, namely, till 5 August 2012 and not thereafter. Hence, we fail <br /> to understand the logic of the argument of Ms. Vyas that the State has the power <br /> to withdraw the exemption granted at any time in the public interest. It indeed does. <br /> But that’s not what the State has done in the present case, and nor is it the case of <br /> the State that in public interest they have withdrawn the Notifications issued under <br /> Section 5A of the BEDA, 1958. <br /> <br /> <br /> 33. In light of our interpretation of the exemption Notifications, All related <br /> submissions made on behalf of the Respondents on the issue cannot survive. <br /> However, we are dealing with the other submissions of the Respondents for the <br /> sake of completeness. <br /> <br /> <br /> 34. The Respondents have a contention that there is a difference between the ‘validity <br /> period’ of the Eligibility Certificate and the ‘period of eligibility’ for the sales tax <br /> incentive. This contention is made on the basis that the Eligibility Certificate dated <br /> <br /> Page 30 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> rd<br /> 3 August 1998 issued to the Petitioner deals only with the Scheme. The <br /> Notification provides for exemption from consumption of energy by a Mega <br /> Project to which an eligibility has been granted under the Scheme from the payment <br /> of the whole of electricity duty payable under Part F of the Schedule of the said Act <br /> <b>for the period of eligibility of the said project as mentioned in the Eligibility </b><br /> <b>Certificate.</b> It is submitted on behalf of the Respondents that in the Eligibility <br /> rd<br /> Certificate dated 3 August 1998, and in particular the Clause and Part-ii reads as <br /> under:- <i> </i> <br /> <i>11. </i> <i>MAXIMUM ENTITLEMENT OF </i><br /> <i>SALES TAX INCENTIVES BY WAY </i><br /> <i>OF EXEMPTION NOT TO EXCEED </i><br /> <i>Rs. 430679.96 lacs (Rupees </i><br /> <i>four thousand three hundred </i><br /> <i>six crores seventy nine lacs </i><br /> <i>ninety six thousand only) </i><br /> <i> </i><br /> <i>12. </i> <b>VALIDITY PERIOD 14 YEARS </b> <b>From 6/8/1998 to </b><br /> <b>5/8/2012 </b><br /> <i> </i><br /> <i>(The above period shall be extended if the amount mentioned at (11) above is not fully </i><br /> <i>availed during this period. However, the period for availing the balance of such incentives </i><br /> <i>shall be extended for maximum seven years or till the entitlement amount is exhausted </i><br /> <i>whichever is earlier.) </i><br /> <i> </i><br /> <b>Period of Eligibility </b><br /> <b>Certificate </b><br /> <i> </i><br /> <i>Date of Effect: 6/8/1998 </i><br /> <i>From 6-8-1998 to 5-8-2012 </i> <i> </i><br /> <br /> <b> </b> <b>(</b> <b>emphasis supplied</b> <b>) </b><br /> <b> </b><br /> <br /> Page 31 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> 35. On the basis of the above Clause in the Eligibility Certificate it is submitted on <br /> behalf of the State that in the Eligibility Certificate, there is a separate reference to <br /> the <b>period of Eligibility</b> and further, there is a reference to the <b> period of validity</b> . <br /> th<br /> It is submitted that by the Addenda-III dated 6 October 2012 only <b>the validity of </b><br /> <b>12 years as mentioned from 06.08.1998 to 05.08.2012 is revised -to be read as </b><br /> <b>06.08.1998 to 05.08.2019.</b> The said Addenda further records that “ <b>save and </b><br /> <b>accept the aforesaid changes the contents terms and conditions of the </b><br /> <b>Eligibility of the certificate remains unchanged.</b> ” Therefore, Ms. Vyas <br /> th <br /> submitted that by way of the Addenda-III dated 6 October 2012 what is amended <br /> <b> the</b> <b>period of validity of the Eligibility Certificate </b> <b>the period of the </b><br /> is and not <br /> <b>Eligibility of the Certificate.</b> <br /> <br /> <br /> 36. We are not impressed with the arguments advanced on behalf of the Respondents <br /> on the basis of <b>the period of eligibility</b> and <b>the period of validity</b> . Firstly, it is <br /> plainly contrary to the provisions of the Scheme. A perusal of Clauses 3.11, 4.2, 5.1 <br /> [II] and 6.4 of the Scheme demonstrates that the sole purpose for the issuance of <br /> the Eligibility Certificate is to entitle the Petitioner to claim Sales Tax incentives. <br /> Once the extension of the <b>validity period</b> to claim this incentive is accepted, which <br /> even Respondent No. 3 does accept, then it would be incomprehensible to suggest <br /> that the period of eligibility does not also stand extended. To hold this would be <br /> <br /> Page 32 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> destructive of the provisions of the Scheme itself. Secondly, this contention is in <br /> fact contrary to the Affidavit in Reply filed by Respondent No. 3. In the affidavit in <br /> nd rd<br /> reply dated 2 March 2019 filed on behalf of the 3 Respondent in Paragraph 12, <br /> it is stated that: <br /> <i>th</i><br /> ‘ <i>I further say and submit that thereafter, on 6</i> <i> October, 2012, (Exhibit I) the </i><br /> <i>Directorate of Industries issued </i> <b>an Addenda III to the Eligibility </b><br /> <b>Certificate extending the last date of the ‘eligibility period’ </b><br /> <b>th</b> <b>th</b><br /> <b>from 6</b> <b> August 2012 to 5</b> <b> August, 2019</b> .’ <br /> <br /> <b> (</b> <b>emphasis supplied</b> <b>) </b><br /> <b> </b><br /> <br /> 37. In view of the statement in the affidavit in reply, it is clear that even the <br /> Respondents understood that the Addenda III extended the period of eligibility, <br /> and there is no such distinction between the period of validity and the period of <br /> eligibility as sought to be raised now, only during the arguments. The arguments are <br /> th<br /> contrary to the statements in the affidavit in reply. Further, Paragraph C of the 20 <br /> June 1997 Government Resolution always provided that the initial 14 year period <br /> of eligibility was extendable by a further period of 7 years in the event that the <br /> eligible Sales Tax Incentive was not exhausted within the initial period. The <br /> th<br /> Notification dated 29 December 1999, granting exemption from payment of <br /> electricity duty, and which was issued specifically and only for Mega Projects, has <br /> <br /> Page 33 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> nonetheless linked the grant of such exemption to the period of eligibility as <br /> mentioned in the Eligibility Certificate and not to any other period. <br /> <br /> <br /> 38. In any case, it is not in dispute that the period of validity of the project was <br /> <b>for the period </b><br /> extended by Addenda III. The plain language of the Notification is - ‘<br /> <b>of eligibility of the said project as mentioned in the Eligibility Certificate.’ </b><br /> Therefore, so long as the project remains eligible, the Notifications continue to <br /> operate. Therefore, we reject the contention of the Respondents that there is no <br /> extension of the period of eligibility. We, accordingly, answer issue (i) in the <br /> affirmative. <br /> <br /> 39. <b>ii) Would the Petitioner be entitled to get the benefit of exemption of </b><br /> <b>electricity duty even after the introduction of the Maharashtra Electricity </b><br /> <b>Duty Act, 2016, and in the absence of a separate Notification under Section </b><br /> <b>4 of the 2016 Act extending the benefit to the Petitioner?</b> <br /> <br /> 40. It is also the contention of the Respondents that the electricity exemption ceased <br /> on the Maharashtra Electricity Duty Act, 2016, coming into force, and there is no <br /> separate Notification issued under the Maharashtra Electricity Duty Act, 2016, after <br /> the issuance of the Addenda III. <br /> <br /> <br /> Page 34 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> 41. We find that this submission of the Respondents is without any basis and we reject <br /> th<br /> it because all acts, including issuance of the Notifications dated 29 December 1999 <br /> th<br /> and 15 October 2001 undertaken pursuant to the BEDA, 1958 are expressly saved <br /> by the Maharashtra Electricity Duty Act, 2016 by virtue of the proviso to Section 4 <br /> (Power to exempt electricity duty) thereof. The said proviso reads thus:- <br /> <br /> <br /> “ <b>Provided that, nothing contained in this Act shall affect any </b><br /> <b>order issued in this regard before the commencement of this </b><br /> <b>Act, and such order shall continue to be in force till the period </b><br /> <b>mentioned therein expires</b> <i>, and where such period is not mentioned, any </i><br /> <i>further order is issued in that respect under the provisions of this Act.</i><br /> ” <br /> <br /> <b> (</b> <b>emphasis supplied</b> <b>)</b> <br /> <br /> 42. Further, Section 16 (Repeals and Savings Clause) of the Maharashtra Electricity <br /> Duty Act, 2016 expressly saves all <b>notifications</b> issued under the BEDA Act, 1958 <br /> and also expressly saves any <b>right</b> or <b>privilege</b> acquired, accrued or incurred under <br /> the BEDA, 1958. The intent of enacting the Maharashtra Electricity Duty Act, 2016 <br /> was never to abrogate the steps taken under the BEDA Act, 1958. Since the <br /> Eligibility Certificate issued to the Petitioner under the Scheme continued to remain <br /> valid, the bringing into force of the Maharashtra Electricity Duty Act, 2016 is not <br /> <br /> Page 35 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> and cannot be a reason to deny the Petitioner the electricity exemption granted by <br /> the Notifications, which themselves remained valid. <br /> <br /> <br /> 43. After the issuance of Addenda III, the Notification was not required to be issued <br /> once again under Section 5A of the BEDA Act 1958 or under the Maharashtra <br /> Electricity Duty Act, 2016 because the Notification was always linked to the <br /> Eligibility Certificate. As held earlier, once the Eligibility Certificate is extended by <br /> the Addenda III, the Notification also gets extended. Therefore, we reject the <br /> Respondents' submission that the Petitioner is not entitled to get the benefit of the <br /> Notification because no separate notification was issued after Addenda III under <br /> the BEDA Act, 1958 or the Maharashtra Electricity Duty Act, 2016. <br /> <br /> <br /> 44. As set out earlier, Ms. Vyas submitted that there was a dilemma between various <br /> departments of the State and though the proposal was accepted by the Energy <br /> Department, it was rejected by the Finance Department, and therefore, the <br /> Petitioner is not entitled to get the benefit of the Notification. In view of the plain <br /> language of the Eligibility Certificate, the Addenda III and the Notification, as read <br /> by us herein above, the interpretation of the Finance Department of the State to <br /> reject the benefit to the Petitioner is untenable, arbitrary and contrary to the very <br /> object of the Scheme. Our view is also supported by the statement made on behalf <br /> <br /> Page 36 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> rd nd<br /> of the 3 Respondent in paragraph 12 of the Affidavit in reply filed on 2 March <br /> 2019 in the present proceedings. <br /> <br /> <br /> 45. In view of the factual position in the present matter and in view of the fact that the <br /> Notification is clearly linked to the Eligibility Certificate, the judgments cited on <br /> behalf of the Respondents are not of any assistance to the Respondents. <br /> <br /> <br /> 46. The language of the Notification, which is plain and without any ambiguity, was <br /> the promise and assurance given by the State to the Petitioner. The Petitioner has <br /> aligned its commercial position in accordance with the promise of the State. There <br /> is a huge investment made by the Petitioner relying on the promise of the State. <br /> Therefore, any interpretation of the Addenda III or the Notification by the Finance <br /> Department of the State not to give benefit to the Petitioner is arbitrary and not <br /> equitable. There is no justification at all for the decision of the Finance Department <br /> not to give the benefit of the Notification to the Petitioner. Therefore, it would be <br /> contrary to the well-established principles of promissory estoppel. Mr. Dwarkadas, <br /> the Learned Senior Counsel, is justified in relying on the judgments of the Hon’ble <br /> Supreme Court in the case of <b>State of Punjab v. Nestle India Limited</b> <b>[(2004) 6 </b><br /> <b>SCC 465]</b> ; <b>State of Jharkhand v. Brahmputra Mettalics Ltd., Ranchi and Anr</b> . <br /> <b>[2020 SCC OnLine SC 968]</b> . <br /> <br /> Page 37 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <br /> <br /> 47. Therefore, we agree with the submission of Mr. Dwarkadas, the Learned Senior <br /> Counsel, that by virtue of plain language of the Notification, the Petitioner is <br /> entitled to get the benefit of the Notification so long as the Eligibility Certificate <br /> granted to the Petitioner under the Scheme remains valid. The whole purpose of <br /> <b>for the period of Eligibility of the said project as mentioned </b><br /> using the words ‘<br /> in the Notification was to link it with the Eligibility <br /> <b>in the Eligibility Certificate’ </b><br /> Certificate. Therefore, we reject the submissions made on behalf of the <br /> Respondents that the Notification is not linked with the Eligibility Certificate. The <br /> Petitioner is certainly entitled to the benefit of exemption from payment of <br /> electricity duty so long as the Eligibility Certificate remains valid. <br /> <br /> <br /> 48. In view thereof, the Petition succeeds in terms of the prayer Clause (a), (b) and (c) <br /> of the petition, which reads as follows: <br /> <br /> “a. <i>This Hon’ble Court be pleased to declare that the action of Respondents </i><br /> <i>of non continuing the exemption of Petitioner in payment of electricity duty; and </i><br /> <i>charging the bill for the same is illegal. </i><br /> <i> </i><br /> <i>b. This Hon’ble Court be pleased to declare that in view of the Notifications </i><br /> <i>dated 29.12.1999 and 15.10.2001 r/w eligibility certificate dated </i><br /> <i>3.08.1998 as amended by Addenda No.3 dated 6.10.2012, the Petitioner is </i><br /> <i>th</i><br /> <i>entitled for exemption in the Electricity duty till 5</i> <i> August, 2019. </i><br /> <i> </i><br /> <br /> Page 38 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b><br /><br /> <i>M/s. JSW Steel Limited Vs. Managing Director M.S.E.D.C.L and ors. </i><br /> <br /> <i>WP NO.12477 OF 2015 a/w </i><br /> <i>WP NO.13941 of 2016. </i><br /> <i> </i><br /> <i>c. This Hon’ble Court be pleased to issue the appropriate writ and/or order </i><br /> <i>thereby restraining the Respondents from disconnecting the electricity supply to </i><br /> <i>the Petitioner having Consumer No.032949018554.” </i><br /> <i> </i><br /> 49. The Respondents are ordered and directed jointly and severally to refund a sum of <br /> Rs.47,47,61,492/- paid by the Petitioner to the Respondents since August 2012 to <br /> August 2019 towards the electricity duty. The amount of Rs.47,47,61,492/- shall be <br /> paid by the Respondents to the Petitioner within a period of 12 weeks from <br /> uploading of the judgment. <br /> <br /> <br /> 50. Rule is made absolute in the above terms, and Writ Petition No. 13941 of 2016 as <br /> well as Writ Petition No. 12477 of 2015 are disposed of in terms thereof. However, <br /> there shall be no order as to costs. <br /> <br /> <br /> 51. Interim Application/s, if any, are disposed of in both the petitions. <br /> <br /> 52. This Order will be digitally signed by the Private Secretary/Personal Assistant of <br /> this Court. All concerned will act on production by fax or email of a digitally signed <br /> copy of this order. <br /> <b> </b><br /> <b> </b><br /> <br /> <b>[AMIT S. JAMSANDEKAR, J.] </b> <b> [B. P. COLABAWALLA, J.]</b><br /> <br /> Page 39 of 39 <br /> nd <br /> 2 April, 2026<br /> <br /> <br /> <b><i>::: Uploaded on - 04/04/2026</i></b> <b><i>::: Downloaded on - 04/04/2026 16:15:13 :::</i></b></div>