M/S. ARUN INDIAN MOTORS, vs THE TAMIL NADU POWER DISTRIBUTION CORPORATION LIMT
- Court
- Madras High Court
WP No. 45530 of 2026
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATED: 10-11-2026
CORAM
THE HON'BLE MS. JUSTICE P.T. ASHA
WP No. 45530 of 2026
CNR: {HCMA012657932026}
and
WMP.No. 51108 of 2026
M/s. Arun Indian Motors
5, Gandhi Road, Salem-636 007
Rep. by its Authorised Signatory
Mr. K. Arumugam.
..Petitioner
Vs
1. The Tamil Nadu Power Distribution
Corporation Limited (TNPDCL)
Rep. by its Chairman and Managing Director
10th Floor, 144 Anna Salai, Chennai-600 002.
2. The Tamil Nadu Green Energy Corporation
Limited (TNGECL)
Rep. by its Managing Director
10th Floor, 144, Anna Salai,
Chennai - 600 002.
3. The Director (Technical)
Tamil Nadu Green Energy Corporation Limited
10th Floor, 144 Anna Salai, Chennai - 600 002.
4. The Chief Engineer /NCES (FAC)
Tamil Nadu Green Energy Corporation Limited
10th Floor, Western Wing, NPKRR Maaligai
144 Anna Salai, Chennai - 600 002.
5. The Superintending Engineer
Karur Electricity Distribution Circle,
TNPDCL,Karur.
..Respondents
__________
Page1 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )
WP No. 45530 of 2026
PRAYER : Writ Petition filed under Article 226 of the Constitution of India
praying to issue a Writ of Mandamus directing the 3rd and 4th respondents to
effect name transfer of the 3.3 MW Wind Mill (Regn. No.258(U.W)/25-26) at
S.F. No.43/3, 44/3, Venjamangudalur (West) Village, Aravakurichi Taluk,
Karur District to the petitioner, as per the petitioners application dated
26.03.2026 and consequently to issue the Noted for -Record approval for
energising the said Wind Mill to the 110/33 KV Renfra Malaikovilur Pooling
Sub-Station and pass orders.
For Petitioner : Mr.T.Mohan, Senior Counsel
for Mr.S.P.Parthasarathy
For Respondents: Mr.D.R.Raghunath, Standing Counsel
for R1 to R5
ORDER
The writ petition is filed seeking the following relief :
" To direct the 3rd and 4th respondents to effect name transfer of
the 3.3 MW Wind Mill (Regn. No.258(U.W)/25-26) at S.F. No.43/3, 44/3,
Venjamangudalur (West) Village, Aravakurichi Taluk, Karur District to
the petitioner, as per the petitioners application dated 26.03.2026 and
consequently to issue the Noted for -Record approval for energising the
said Wind Mill to the 110/33 KV Renfra Malaikovilur Pooling Sub-
Station.
2. The petitioner would submit that its renewable energy developer
namely M/s.Renfra Energy India Pvt. Ltd., (hereinafter referred to as
'Developer') had successfully commissioned and energised the new
__________
Page2 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )
WP No. 45530 of 2026
110/33 KV Pooling Sub Station on 11.09.2026. Thereafter, on 12.11.2025
the Developer had applied for 3.3 MW wind mill at S.F.No.43/3, 44/3,
Venjamangudalur (West) Village, Aravakurichi Taluk, Karur District with
connectivity to the said 110/33 KV Renfra Malaikovilur Pooling Sub
Station. Necessary registration charges was made to the fourth respondent
and the application was registered on 19.11.2025. Thereafter, the
Developer had approached the fourth respondent to split and transfer the
allotted capacity wind-mill wise to its clients, and one such client is the
petitioner. The arrangement relating to name transfer approval and
commissioning of wind / solar mill are devised in such a manner that upon
payment of charges, the fourth respondent would issue the name transfer
approval to the developer's clients and consequently the respondent-Board
would issue a Noted-for-Record letter, fixing a period of 12 months,
within which the individual wind or solar power has to be energized and
the evacuation of power through the pooling sub station to the
respondent's grid should commence.
3. The petitioner would submit that it had purchased the land and
wind mill commissioned in the aforementioned propertyfrom its
developer. Thereafter, on 26.03.2026, the petitioner had applied for name
transfer in its favour before the fourth respondent and had also paid the
necessary charges. The Developer had also issued a consent letter on
__________
Page3 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )
WP No. 45530 of 2026
26.03.2026. While so, on 27.05.2026, the fourth respondent issued a
circular-memo to the field officers directing them not to accord any
approval relating to solar and wind connectivity. Therefore, no further
action was taken on the petitioner's application and the same was kept in
abeyance.
4. The petitioner would also submit that several generators and
developers had challenged the circular memo of the fourth respondent dated
27.05.2026 in W.P.No.21524 of 2026, and this Court by order dated 19.08.2026
had disposed of the writ petition.
th
5. The petitioner would submit that the office of the 5 respondent had
inspected the site of petitioner's wind mill on 26.08.2026 and had confirmed that
the petitioner's wind mill is fit for commissioning. Thereafter, the petitioner had
approached the respondents 3 and 4 requesting them to effect name transfer and
to issue the Noted-for-Record letter. However, no orders have been passed to
date nor any reason was communicated to the petitioner for the delay. The
petitioner would also submit that upon issuance of Noted-for-Record letter by
the respondents, they have to enter into the Energy Wheeling Agreement with
the fifth respondent to wheel the energy generated under the open access
scheme for captive use/to its consumers. Since their application is kept in
__________
Page4 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )
WP No. 45530 of 2026
abeyance without any progress, the petitioner is constrained to approach this
Court seeking a mandamus.
6. Heard the learned Senior Counsel appearing for the petitioner and the
learned Standing Counsel appearing for the respondent-Board.
7. The learned counsel representing the respondent-Board would submit
that as and when the petitioner submits a consolidated application :
(a) for effecting name transfer of 3.3 MW Wind Mill (Regn.
No.258(U.W)/25-26) at S.F. No.43/3, 44/3, Venjamangudalur (West)
Village, Aravakurichi Taluk, Karur District in the name of the petitioner
(b) for the issue of Noted-for-Record approval for energising the said wind
mill to the 110/33 KV Renfra Malaikovilur Pooling Sub Station; and
(c) for executing the Energy Wheeling Agreement, the same shall be
considered.
8. In the light of the above submission, the petitioner is directed to submit
a consolidated application forthwith, and within three weeks from the date of
the receipt of the said application, all the three stages shall be completed by the
fourth respondent in consultation with the third respondent.
__________
Page5 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )
WP No. 45530 of 2026
9. With the above direction, the writ petition is disposed of. No costs.
Consequently, connected miscellaneous petition is closed.
10-11-2026
Index: Yes/No
Speaking/Non-speaking order
Neutral Citation: Yes/No
DS
__________
Page6 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )
WP No. 45530 of 2026
To :
1. The Chairman and Managing Director
Tamil Nadu Power Distribution Corporation Limited (TNPDCL)
10th Floor, 144 Anna Salai, Chennai-600 002.
2. The Managing Director
Tamil Nadu Green Energy Corporation Limited (TNGECL)
10th Floor, 144, Anna Salai,
Chennai - 600 002.
3. The Director (Technical)
Tamil Nadu Green Energy Corporation Limited
10th Floor, 144 Anna Salai, Chennai - 600 002.
4. The Chief Engineer /NCES (FAC)
Tamil Nadu Green Energy Corporation Limited
10th Floor, Western Wing, NPKRR Maaligai
144 Anna Salai, Chennai - 600 002.
5. The Superintending Engineer
Karur Electricity Distribution Circle,
TNPDCL,Karur.
__________
Page7 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )
WP No. 45530 of 2026
P.T.ASHA, J.
DS
WP No. 45530 of 2026
and
WMP.No. 51108 of 2026
10-11-2026
__________
Page8 of 8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 16/11/2026 08:16:40 pm )