Gauri Shankar Sah vs The State of Bihar
- Court
- Patna High Court
IN THE HIGH COURT OF JUDICATURE AT PATNA
Civil Writ Jurisdiction Case No.6067 of 2023
======================================================
Gauri Shankar Sah Son of Late Rajendra Sah, Resident of Mohalla - Tangaul,
Purani Gandak Pool Ghat Road, Police Station - Town Hajipur, District -
Vaishali.
... ... Petitioner
Versus
1. The State of Bihar through Secretary, Energy Department, Bihar, Patna.
2. The General Manager, North Bihar Power Electricity Company Ltd. Tirhut
Area, Muzaffarpur.
3. The Deputy General Manager, Electric Supply Zone, Tirhut Area,
Bhagwanpur Chowk, Muzaffarpur.
4. The Executive Engineer, Electric Supply Division, Vaishali, Hazipur.
5. The Sub Divisional Officer, Electric Supply Division, Hajipur, Vaishali.
6. The Junior Engineer, North Bihar Power Supply Sub Division, Hajipur.
... ... Respondents
======================================================
Appearance :
For the Petitioner : Mr. Mazharul Hassan, Advocate
For the Respondents : Mr. Abbas Haider, SC6
: Mr. Kunal Tiwary, Advocate
======================================================
CORAM: HONOURABLE JUSTICE SMT. G. ANUPAMA CHAKRAVARTHY
ORAL JUDGMENT
Date : 07-08-2026
1. The petitioner has filed the instant Writ
petition for the following relief:
“For commanding and directing
the Respondents and quash the Energy
Bill dated 01.11.2022 issued by the North
Bihar Power Distribution Company Ltd. In
the name of petitioner LEGACY No. H
6933 whereby and where under an
energy bill of Rs. 9,74,562/- (Rupees Nine
Lacs Seventy Four Thousand Five
Hundred Sixty Two only) has been issued
Patna High Court CWJC No.6067 of 2023 dt.07-08-2026
2/7
against the petitioner for the energy
supply against the LEGACY No. H6933 CA
No. 400003321 which has already been
disconnected by authority themselves the
Respondents far back on 07.11.1992
itself. Then Electric Company sent Bill on
09.03.2013 where under an energy bill of
Rs. 6,05,258/- thereafter petitioner filed
C.W.J.C. No. 10776 of 2013 before Hon'ble
High Court. Hon'ble High Court was
pleased to passed order dated
07.09.2015 petitioner thereafter filed
representation but electricity company
was not consider the case and sent Bill
dated 25.03.2022 there after 01.11.2022
with effect from the date of installation of
the Electric Meter i.e. 20.04.1990 to the
date of disconnection of electric line i.e.
on 07.11.1992.”
2. The brief facts, as culled out from the
Writ petition, are that the petitioner had applied for
a domestic electric connection of 1 K.W. for his
residential house situated at Maqsoodpur, Hajipur,
in the year 1990. After completing the due
formalities and depositing an installation charge of
Rs.150/-, an electric meter was installed at the
Patna High Court CWJC No.6067 of 2023 dt.07-08-2026
3/7
house of the petitioner on 20.04.1990.
3. It is the specific contention of the
Learned counsel for the petitioner that although the
electric meter was installed at the house of the
petitioner on 20.04.1990, the electric supply was
started only in the month of April, 1991, i.e., after
one year of installation. Due to a sudden
requirement, the petitioner sold his house and land
situated at Maqsoodpur for which he made an
application to the Electric Board for disconnection
of the electric meter on 07.11.1992. At the time of
disconnection, the petitioner requested the
Electricity Board to supply the electric energy bill.
Surprisingly, an electric consumption bill of
Rs.38,491.21 dated 28.09.2000 was sent to the
petitioner in the month of September, 2000. The
petitioner issued a legal notice dated 04.07.2001
for redressal of his grievance. However, no
response was received from the respondent. The
petitioner, therefore, awaited correction of the
energy bill. On 09.03.2013, subsequent energy bill
for Rs.6,05,258/- was issued in respect of the
Patna High Court CWJC No.6067 of 2023 dt.07-08-2026
4/7
disconnected meter. The petitioner submitted a
representation dated 26.04.2013 before the
Executive Engineer, Electric Supply Division, Hajipur
but no action was taken thereon. Being aggrieved,
the petitioner approached this Court by filing CWJC
No.10776 of 2013 and this Court, after hearing the
parties, disposed of the case vide order dated
07.09.2015, directing the petitioner to file a
representation before the Executive Engineer,
Electric Supply Division, Hajipur, who in turn was
directed to inspect the premises of the petitioner
and pass an appropriate order within four weeks
from the date of receipt of a copy of the said order.
Accordingly, the petitioner made a representation
before the Executive Engineer, Electric Supply
Division, Hajipur and after one month, the petitioner
again filed a representation before the Assistant
Engineer, North Bihar Power Distribution Company,
Hajipur. However, the respondents, without
considering the representation, issued electric bills
dated 25.03.2022 and 01.11.2022, for which the
petitioner was constrained to file present Writ
Patna High Court CWJC No.6067 of 2023 dt.07-08-2026
5/7
petition.
4. A detailed counter affidavit has been
filed on behalf of respondent Nos. 2 to 6. The
contents of the counter affidavit disclose that the
petitioner, Gauri Shankar Sah, son of Late Rajendra
Sah, applied for a DS-II connection on 20.04.1990
and the connection was provided vide Work Order
No.12/1990-91, and the meter was fixed on
26.06.1990. The counter affidavit further discloses
that the petitioner was always provided with the
bills and that the petitioner never filed any
representation stating that he had not received any
bill. However, a bill of Rs.26,054.62/- was issued to
the petitioner in the month of September, 2000.
Though it is contended that the petitioner had filed
a representation and no action was taken thereon,
the said representation could not be traced out due
to the lapse of a long period of time. The counter
affidavit further discloses that, pursuant to the
order of this Court in CWJC No.10198 of 2013, the
authorities passed an appropriate order revising the
bill amount to Rs.81,653.27/- and, prayed to
Patna High Court CWJC No.6067 of 2023 dt.07-08-2026
6/7
dismiss the Writ petition as it is devoid of merits.
5. Heard the Learned counsel for the
petitioner as well as the Learned counsel for the
respondents. Perused the records.
6. Considering the rival contentions of both
the parties and upon perusal of the record, it is
evident that this is the second round of litigation
and the petitioner is challenging the inaction of the
respondents in not passing any order in compliance
with the order of this Court in CWJC No.10198 of
2013.
7. The counter affidavit clearly discloses
that, in compliance with the order of this Court, the
petitioner’s bill was revised to Rs.81,653.27/-. If at
all the petitioner is aggrieved by the revised bill,
the appropriate remedy available to the petitioner
is to approach the CGRF in case of a dispute under
Section 42(6) of the Electricity Act.
8. As an alternative remedy is available to
the petitioner, this Court directs the petitioner to
approach the CGRF for redressal of his grievance.
Patna High Court CWJC No.6067 of 2023 dt.07-08-2026
7/7
9. With the aforesaid observation, the Writ
petition stands disposed of.
10. Interlocutory application, if any, shall
also stands disposed of.
(G. Anupama Chakravarthy, J)
Shanu/-
AFR/NAFR NAFR
CAV DATE NA
Uploading Date 14.08.2026.
Transmission Date NA