Msp Infrastructures Limited vs Madhya Pradesh Road Development Corporation Ltd

Court
Madhya Pradesh High Court

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
1 AC-53-2024
IN THE HIGH COURT OF MADHYA PRADESH
AT JABALPUR

BEFORE
HON'BLE SHRI JUSTICE DEEPAK KHOT
th
ON THE 9 OF JULY, 2026
ARBITRATION CASE No. 53 of 2024
MSP INFRASTRUCTURES LIMITED
Versus
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LTD
Appearance:
Shri Naman Nagrath - Senior Advocate with Shri Prabhanshu Chaturvedi -
Advocate for the petitioner.
Shri Manoj Munshi - Senior Advocate with Shri Akshay Jha - Advocate for
the respondent.
Shri Naveen Ahuja G.A. for the respondent/State.
ORDER
Heard on I.A.No.8804/2024, which is an application for exemption
from filing original agreement.
For the reasons mentioned in the application, the same is allowed.
Applicant is exempted from filing the original agreement.
The present application has been filed by the applicant under Section
11(6) of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as
'the Act of 1996' for the sake of brevity) for appointment of an arbitrator to
resolve the dispute arose pursuant to the concession agreement dated
4.4.2002 (Annexure A/1).
2. It is the case of the applicant that a concession agreement was
entered into between Applicant, the Special Purpose Vehicle, MSP
Infrastructures Ltd. (MSP) and the non-applicant, M.P. Road Development
Corporation Ltd. (MPRDCL) for Strengthening, Widening, Upgradation,
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
2 AC-53-2024
Operation and Maintenance of Raisen-Rahatgarh Road on 04.04.2002

(annexure A/1). The duration of contract was 5440 days (approx. 14.9 years)
and intended date of completion of construction was 18 months from the date
of handing over hindrance free site. The work could not progress
satisfactorily owing to the failure of the non-applicant MPRDCL in
providing hindrance free site. Despite all the constraints, breaches of
Contract terms & conditions by the non-applicant, the Applicant arranged
sanction of Debt and entered into an Agreement with SREI International
Finance Limited for Rs.17 Crores. The Applicant had intimated the non-
applicant about the financial closure by letter dated 31.12.2002. The non-
applicant accepted the financial closure and escrow account agreement was
signed 30.01.2003 between non-applicant, applicant and Punjab National
Bank, Habibganj Branch, Bhopal. Ignoring the defaults committed by it of
its obligations under the concession agreement, the non-applicant, MPRDCL
arbitrarily terminated the Concession Agreement on 22.03.2003. The
MPDRCL invited fresh bids. The financial bid was to be opened on
12.03.2003. After the aforesaid incident but before 11.03.2003 the applicant
had deposed on affidavit before Kolkata High Court that the non-applicant
would award the contract to the company of Mr. Khurana M/s. MSK Projects
Ltd. M/s. MSK Projects Ltd. was awarded the contract on 11.3.2003, i.e.
even prior to the scheduled date of opening of the financial bid i.e.
12.03.2003. A Civil Case No.63 of 2003 was filed by the applicant before
High Court at Calcutta under section 9 of the Arbitration & Conciliation Act,
1996. The said case was disposed of by order dated 22.05.2003 (annexure
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
3 AC-53-2024
A/3) in terms of Settlement Agreement dated 19.05.2003 entered into

between the Applicant and the non-applicant. On 06.06.2003, the dispute
between the parties was referred to the Indian Council of Arbitration (ICA)
under the Arbitration & Conciliation Act, 1996 as per the Concession
Agreement and as per terms of Settlement Agreement dated 19.05.2003
entered into between the parties. Three member Arbitral Tribunal was
constituted by Indian Council of Arbitration vide letter dated 07.05.2004
(annexure A/5). The Arbitral Tribunal partly allowed the claims putforth by
the applicant and awarded a sum of Rs.690.30 lacs plus future interest @
18% p.a. and directed the non-applicant to release the Fixed Deposit
amounting to Rs.115 lacs made by the applicant in terms of the settlement
agreement before High Court of Calcutta vide annexure A/6. Aggrieved by
the award, the non-applicant, MPRDCL filed an application before District
Judge, District Court, Bhopal u/s.34 of the Arbitration & Conciliation Act,
1996 seeking setting aside of the award passed by the Arbitral Tribunal. The
Commercial court, Bhopal passed the order rejecting the application of the
non-applicant for setting aside the Arbitral Award by order dated 05.12.2016
and upheld the Arbitration award dated 13.11.2006. The non-applicant’s
application regarding the Arbitration under Madhya Pradesh Madhyastham
Adhiniyam instead of Arbitration & Conciliation Act, 1996 was rejected by
the High Court of Madhya Pradesh, Principal seat at Jabalpur. The High
Court by order dated 24.10.2018 (annexure A/8) passed in A.A.No.8/2017
held that the Hon’ble Supreme court judgement in the case of MSP
Infrastructures Ltd vs MP Road Development Corporation Ltd [(2015) 13
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
4 AC-53-2024
SCC 713] was binding on the parties. Non-applicant MPRDCL preferred

Special Leave Petition No.695/2019 titled M.P. Road Development
Corporation Ltd vs MSP Infrastructures Ltd, against the order dated
24.10.2018, which was dismissed by the Hon’ble Supreme Court by order
dated 25.01.2019 (annexure A/9). However, vide order dated 24.11.2022
(annexure A/10) the learned Commercial Court Bhopal passed the order
setting aside the award dated 13.11.2006 extending liberty to applicant to
initiate arbitration afresh. The Applicant in furtherance of the order passed
by the Commercial Court Bhopal dated 24.11.2022 had first made a request
to the Indian Council of Arbitration to constitute an arbitral tribunal vide its
letter dated 25.01.2023 (annexure A/11). The Indian Council of Arbitration
having registered the case required the parties to deposit the fees for
arbitration vide its letter dated 19.04.2023. The non-applicant MPRDCL
through its counsel raised its objection dated 1.5.2023 (annexure A/14) to the
jurisdiction of the Indian Council of Arbitration. The Commercial Court,
Bhopal by order dated 02.05.2023 (annexure A/16) allowed the application
seeking review and clarified that the arbitration will be conducted as per
Rules of Indian Council of Arbitration, New Delhi. Non-applicant
MPRDCL filed an application (annexure P/20) in the Arbitration Appeal
seeking amendment to the memo of appeal by way of making challenge to
the order dated 02.05.2023 passed by the Commercial Court, Bhopal. The
Arbitration Appeal A.A. No. 26 /2023 filed by the non-applicant MPRDCL
against the order passed by the Commercial Court was decided on
02.01.2024 (annexure A/21) and this Court refused to interfere with the
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
5 AC-53-2024
order passed by the Commercial Court by observing that the liberty extended

to the Applicant to initiate arbitration afresh shall be in accordance with
law. The applicant vide its letter dated 07.03.2024 (annexure A/25)
requested the Indian Council of Arbitration to constitute the arbitral tribunal
failing which the applicant would be constrained to approach this Court
invoking its powers under Section 11 of the Act of 1996. Hence, the present
case.
3. It is contended by learned counsel for the applicant that it is not
disputed by the parties that the agreement is a work contract defined under
section 2(i) of the M.P. Madhyastham Adhikaran Adhiniyam, 1983
(hereinafter referred to as the Adhiniyam of 1983'). However, it is submitted
that it is being a special case has been adjudicated under the provisions of the
Act of 1996, as the parties have agreed to settle their dispute in accordance
with the said Act in the agreement. It is further submitted that earlier also the
non applicant had taken objection in regard to non maintainability of the
proceedings under the Act of 1996 in the light of dictum of Hon'ble Apex
Court in the case of M.P. Rural Road Development Authority v. L.G.
Chaudhary Engineers and Contractors, (2018) 10 SCC 826. It is submitted
that the learned Commercial Court vide order dated 24.11.2022 (annexure
A/10) has rejected the application under section 34 of the Act of 1996
finding it to be in conflict with the public policy of India and quashed the
award dated 13.11.2006 passed in Arbitration Case No.1380/2004 in favour
of the applicant with liberty to the parties that in case, parties are aggrieved
with the action/ inaction of the corresponding parties pursuant to agreement,
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
6 AC-53-2024
they are free to initiate proceedings of the arbitration. It is further submitted

that in the earlier round of arbitration, the arbitrator was appointed by the
Indian Council of Arbitration under the Act of 1996. On application
M.J.C.No.25/2023 being filed to review the said order for modifying the
liberty granted to parties to initiate arbitration proceedings, the Civil
Court/Commercial Court vide order dated 2.5.2023 (annexure A/16) has
allowed the application and replaced the word 'Arbitration Tribunal' with
'Indian Council of Arbitration New Delhi', with further observation that
observations made in the order would not influence the decision of the
Arbitration Tribunal.
4. It is the case of the applicant that once the objection raised by the
non applicant in respect of maintainability on the ground of Adhikaran
having the jurisdiction under the Act of 1983 has been rejected by this Court
in earlier round of litigation, which has been affirmed by the Hon'ble Apex
Court in the case of MSP Infrastructures Ltd vs MP Road Development
Corporation Ltd [(2015) 13 SCC 713], though has been diluted in the
subsequent judgment passed by Hon'ble Apex court in the case of Lion
Engg. Consultants v. State of M.P., (2018) 16 SCC 758 having the binding
effect interse between the parties. Once the Court has found that the
arbitration proceeding between the parties under the Act of 1996 is
maintainable then it is binding on all the parties. The said observation was
made by the High Court vide order dated 24.10.2018 passed in Arbitration
Appeal No.8/2017 (annexure A/8). It is submitted that the said order was
challenged before the Hon. Apex Court, but it was confirmed by dismissing
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
7 AC-53-2024
the SLP in limine. Therefore, it is prayed on the basis of the facts that as the

applicant has approached the Indian Council of Arbitration for appointment
of Arbitrator, the same has been objected by the non applicant vide objection
dated 1.5.2023 (annexure A/14) on the ground of jurisdiction, this court
under section 11(6) of the Act of 1996 issue mandate for appointment of
Arbitrator.
5. Per Contra, learned senior counsel for the non-applicant has
vehemently opposed the contention made by the applicant and submitted that
order dated 24.10.2018 earlier passed in Arbitration Appeal No.8/2017 is not
having the binding effect to the fresh proceedings as it was passed
considering the stage of the earlier proceeding when the objection in regard
to maintainability has been raised at the stage of section 34 of the Act of
1996. It is further submitted that non applicant had filed an appeal against
the order dated 24.11.2022 passed in MJC No.9/2007 and an order passed
under section 34 of the Act of 1996 against the liberty granted by the civil/
Commercial Court to proceed if occasion so arises, this court has disposed of
the appeal with direction that the liberty which has been granted by the court
shall be subject to rider that the said liberty can be invoked only in
accordance with law (statutory and case law) but not otherwise. Therefore,
now, at this stage, when the applicant is again seeking appointment of an
Arbitrator under the Act of 1996, the non applicant has got the backing of the
order to raise such objection on maintainability in accordance with law
(statutory and case law). Therefore, as the Hon'ble Apex Court in the case of
L.G. Chaudhary (supra) and thereafter in M/s Gayatri Project
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
8 AC-53-2024
Limited (supra) has categorically held that for adjudication of the dispute

arisen between the parties, pursuant to work contract to be adjudicated by
Madhyastham Adhikaran, can be raised at the stage of appointment of an
Arbitrator and, therefore, prayed for dismissal of the application. To bolster
his submission, counsel for the non-applicant has relied upon the judgment
of the Hon'ble Apex court in the case of M.P. Rural Road Development
Authority v. L.G. Chaudhary Engineers and Contractors, (2018) 10 SCC 826
a n d M/s Gayatri Project Limited Vs. MPRDC, Civil Appeal
No.6856/2025 and Umri Pooph Pratappur (UPP) Tollways Pvt. Ltd. Vs. M.P.
Road Development Corporation and another, in Civil Appeal No.9920/2025.
6. Heard learned counsel for the parties and perused the record.
7. It is not in dispute that the agreement which contains a dispute
redressal mechanism (Annexure A/1) is a concession agreement which falls
within the definition of work contract as defined under section 2(i) of the
Act of 1983. The Hon'ble Apex Court in the case of L.G. Chaudhary (supra)
and in several other matters, lastly in M/s Gayatri Project Limited (supra)
has held that the dispute arising out of a work contract is amenable to the
jurisdiction of Madhyastham Adhikaran under the Act of 1983. Either of the
party to a contract shall irrespective of the fact whether the agreement
contains agreement clause or not, refers in writing a dispute to the Tribunal.
Therefore, it is also not disputed that the agreement in question being a work
contract, any dispute arising out of such agreement would be referred to the
Tribunal. However, a distinguishable feature in the present case is that the
parties have agreed to resolve their dispute as per the provisions of the Act
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
9 AC-53-2024
of 1996, therefore, the applicant had earlier preferred an application to the

Indian Council of Arbitration for appointment of an arbitrator. It is also not
in dispute that the Arbitrator had passed an award vide award dated
13.11.2006. Being aggrieved by the said award, the non-applicant had
submitted an application under section 34 of the Act for setting aside the
award before the Commercial Court, Bhopal. The said application MJC
AV.No.9/2007 was allowed vide order dated 24.11.2022 by setting aside the
award finding it to be inconsistent with the public policy of India and
holding that it suffers from patent illegality, granted liberty that in case the
dispute persists between the parties then parties are free to take recourse of
arbitration. As the said order did not observe any forum of arbitration,
therefore, an application for review was filed, which came to be allowed vide
order dated 2.5.2023 in MJC AV No.25/2023 by commercial court Bhopal
(annexure A/16) by modifying the award and by substituting words
'Arbitration Tribunal' to 'Indian Council of Arbitration New Delhi'. The
original order dated 24.11.2022 was subject to challenge in Arbitration
Appeal No.26/2023 before this court which was disposed of vide order dated
2.1.2024 by observing that the liberty granted by the court should be
construed as in accordance with law (statutory and case law), but not
otherwise. Pursuant to said order, the applicant had filed an application for
appointment of an Arbitrator before Indian Council of Arbitration, New
Delhi vide its letter dated 25.1.2023 with further several communications and
deposited fees on 4.1.2024, however, no steps were taken for appointment of
Arbitrator. Thereafter, the applicant had filed the present application.
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
10 AC-53-2024
8. The non-applicant have filed objection on the maintainability of the

application on the ground that concession agreement falls within the
definition of work contract and any dispute arising out of said agreement is
amenable to jurisdiction of M.P. Madhyastham Adhikaran.
9. It is not in dispute that non-applicant earlier also had taken similar
objection before the commercial court in the proceedings filed for setting
aside of award under section 34 of the Act of 1996 by way of amendment,
which was rejected and then challenged before the High Court. The High
Court vide order dated 18.2.2010 has permitted the amendment to be
incorporated in the application under section 34, which was again challenged
before the Hon'ble Apex Court, which was decided by judgment and order
dated 5.12.2014 and also reported in (2015) 13 SCC 713, holding that
objection at the stage of section 34 cannot be taken. Thereafter, same
objection has been raised on the ground that the order passed by Hon'ble
Apex court in (2015) 13 SCC 713 has subsequently held not to be a good law
in C.A.No.8984-8985/2017 vide judgment dated 20.3.2018, therefore, the
proceedings were not maintainable under the Act of 1996. On appeal viz.
Arbitration Appeal No.8/2017 being filed, this court vide order dated
24.10.2018 has disposed of the said appeal by holding as under :-
"7. We find that the findings recorded by the Supreme Court in
M/s MSP Infrastructure Ltd. (supra) is binding inter-parties and
cannot be permitted to be disputed by the appellant in an appeal
against an order passed by the Commercial Court in a proceedings
under Section 34 of the Central Act. The judgment inter-parties is
binding between the parties, though if ceases to be a binding
precedent".
10. The said order was again put to challenge by filing an S.L.P. which
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
11 AC-53-2024
came to be dismissed in limine vide order dated 25.1.2019. As such, the

order passed by this court in Arbitration Appeal No.8/2017 has attained
finality. The matter before the Commercial Court proceeded and ultimately
culminated into setting aside of the award with liberty to the parties to
arbitrate if dispute persists.
11. Now, only question is that once this court has decided that the
question of maintainability for prosecuting the arbitration proceeding under
the Act of 1996 is maintainable, then whether at this stage of appointment of
an Arbitrator under the Act of 1996, said objection can be raised by the non
applicant and, if yes, then what would be its effect on the present application.
12. It is not in dispute that earlier proceedings initiated under the Act
of 1996 was arising out of same agreement for which the present application
has been filed to resolve the dispute. It happened due to mistake of the
parties in ignorance of law that they have agreed to resolve the dispute under
the Act of 1996 under the agreement, but as the nature of the agreement falls
within the definition of works contract, dispute arising out of it is amenable
to jurisdiction of Madhyastham Adhikaran in the light of judgment passed by
Hon'ble Apex court in the case of L.G. Chaudhary (supra) and thereafter in
M/s Gayatri Project Limited (supra). But, as, in the present case in hand, the
arbitrability of the dispute under the Act of 1996 has been maintained by this
court on the objection raised by the non applicant in the earlier round of
litigation, then for the same agreement raising the same objection is barred
by the principles of constructive resjudicata as well as estoppel. The
contention of the non-applicant that as it is a proceeding afresh, the non-
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
12 AC-53-2024
applicant can raise this objection in regard to maintainability is not tenable in

the present facts and circumstances of the case because in the light of order
passed by this court vide order dated 24.10.2018 in Arbitration Appeal
No.8/2017, the decision of the Hon'ble Apex Court is binding on the parties.
Even if subsequent law has diluted the principle of law laid down earlier by
the Hon'ble Apex Court which has settled the question of law, rights and
mode of litigation between the parties, cannot be reagitated.
13. The Hon'ble Apex court in the case of Makardhwaj Ram v. Jagdish
Rai, 2026 SCC OnLine SC 1112, has held as under :-

8. From a considered perusal of the above judgments, the
following aspect of constructive res judicata can be highlighted:
8.1 Constructive res judicata mandates that all grounds that might
and ought to have been employed in the proceedings, should be
employed to avoid multiplicity of proceedings.
8.2 It is a deeming fiction of law, but its application is not uniform
and instead is dependent on the facts and circumstances of a
particular case with ‘due regard to ambit of the earlier
proceedings’ and ‘the nexus which the matter bears to the nature
of the controversy’.
8.3 This principle is founded on public policy. It is a generally
acceptable rule that one person should not be “vexed twice over”
for the same kind of litigation. As such, it also applies to the
proceedings under Article 226/32 of the Constitution of India.
8.4 In respect of ‘ought’ referred above, the said word implies the
threshold to be above mere possibility.
8.5 The parties while conducting litigation are expected to apply
‘reasonable diligence’, ‘legitimate purview’. It is from this lens
that it shall be adjudicated whether all issues that were properly
arising to the litigation; which ought to have been raised; were
raised or not?
8.6 The principle applies with equal force in cases where the
ground that might and ought to have been raised was not done, on
account of negligence, inadvertence or accident. In other words,
might and ought to apply cumulatively with full force, without
exception. The party therefore commits these errors at their own
peril.

14. The Hon'ble Apex court in the case of B.L. Sreedhar v. K.M.
Munireddy, (2003) 2 SCC 355, has held as under :-
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
13 AC-53-2024

13. Estoppel is a rule of evidence and the general rule is enacted in
Section 115 of the Indian Evidence Act, 1872 (in short “the
Evidence Act”) which lays down that when one person has by his
declaration, act or omission caused or permitted another person to
believe a thing to be true and to act upon that belief, neither he nor
his representative shall be allowed in any suit or proceeding
between himself and such person or his representative to deny the
truth of that thing. (See Sunderabai v. Devaji Shankar
Deshpande [(1952) 2 SCC 92 : AIR 1954 SC 82] .)
14. “Estoppel is when one is concluded and forbidden in law to
speak against his own act or deed, yea, though it be to say the
truth” — Co Litt 352(a), cited in Ashpitel v. Bryan [(1863) 3 B &
S 474 : 122 ER 179 : 32 LJQB 91] B & S at p.
489; Simm v. Anglo American Telegraph Co. [(1879) 5 QBD 188
: 49 LJQB 392 : 42 LT 37 (CA)] , per Bramwell, L.J. at p.
202; Halsbury, Vol. 13, para 488. So there is said to be an
estoppel where a party is not allowed to say that a certain
statement of fact is untrue, whether in reality it be true or not.
Estoppel, or conclusion, as it is frequently called by the older
authorities, may therefore be defined as a disability whereby a
party is precluded from alleging or proving in legal proceedings
that a fact is otherwise than it has been made to appear by the
matter giving rise to that disability. (Halsbury, Vol. 13, para 448)
The rule on the subject is thus laid down by Lord Denman,
in Pickard v. Sears [(1837) 6 Ad & El 469 : 112 ER 179] Ad & E
at p. 474 : ER p. 181


“But the rule of law is clear, that, where one by his
words or conduct wilfully causes another to believe the
existence of a certain state of things, and induces him to
act on that belief, so as to alter his own previous
position, the former is concluded from averring against
the latter a different state of things as existing at the
same time;”
“The whole doctrine of estoppel of this kind, which is a
fictitious statement treated as true, might have been
founded in reason, but I am not sure that it was. There is
another kind of estoppel — estoppel by representation
— which is founded upon reason and it is founded upon
decision also.” Per Jessel, M.R. in General Finance &
Co. v. Liberator [(1878) 10 Ch D 15 : (1874-80) All ER
Rep Ext 1597 : 39 LT 600] , Ch D at p. 20.
See also in Simm v. Anglo American Telegraph Co. [(1879) 5
QBD 188 : 49 LJQB 392 : 42 LT 37 (CA)] , QBD at p. 202 where
Bramwell, L.J. said “An estoppel is said to exist where a person is
compelled to admit that to be true which is not true, and to act
upon a theory which is contrary to the truth.”
15. On the whole, an estoppel seems to be when, in consequences
of some previous act or statement to which he is either party or
privy, a person is precluded from showing the existence of a
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
14 AC-53-2024
particular state of facts. Estoppel is based on the maxim allegans
contraria non est audiendus (a party is not to be heard to allege the
contrary) and is that species of presumption juries et de
jure (absolute or conclusive or irrebuttable presumption), where
the fact presumed is taken to be true, not as against all the world,
but against a particular party, and that only by reason of some act
done, it is in truth a kind of argumentum ad hominem.

15. The Hon'ble Apex court in the case of Pratima Chowdhury v.
Kalpana Mukherjee, (2014) 4 SCC 196, has held as under :-

37. Insofar as the instant aspect of the matter is concerned, the
legal position declared by this Court fully supports the conclusion
drawn by us hereinabove. In this behalf, reference may be made,
firstly, to the judgment rendered by this Court in Kasinka
Trading v. Union of India [(1995) 1 SCC 274] , wherein this Court
noticed as under: (SCC p. 283, para 11)

“11. The doctrine of promissory estoppel or equitable
estoppel is well established in the administrative law of
the country. To put it simply, the doctrine represents a
principle evolved by equity to avoid injustice. The basis
of the doctrine is that where any party has by his word
or conduct made to the other party an unequivocal
promise or representation by word or conduct, which is
intended to create legal relations or effect a legal
relationship to arise in the future, knowing as well as
intending that the representation, assurance or the
promise would be acted upon by the other party to
whom it has been made and has in fact been so acted
upon by the other party, the promise, assurance or
representation should be binding on the party making it
and that party should not be permitted to go back upon
it, if it would be inequitable to allow him to do so,
having regard to the dealings, which have taken place
or are intended to take place between the parties.”
(emphasis supplied)
38. The above sentiment recorded in respect of the principle of
estoppel was noticed again by this Court in Monnet Ispat &
Energy Ltd. v. Union of India [(2012) 11 SCC 1] , wherein this
Court expressed its views in respect of the principle of estoppel as
under: (SCC p. 153, para 289)

Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
15 AC-53-2024

“289. As we have seen earlier, for invoking the
principle of promissory estoppel there has to be a
promise, and on that basis the party concerned must
have acted to its prejudice.”
(emphasis supplied)


39. The ingredients of the doctrine of estoppel in the manner
expressed above were also projected in H.R. Basavaraj v. Canara
Bank [(2010) 12 SCC 458 : (2010) 4 SCC (Civ) 659] , as under:
(SCC p. 469, para 30)

“30. In general words, estoppel is a principle applicable
when one person induces another or intentionally causes
the other person to believe something to be true and to
act upon such belief as to change his/her position. In
such a case, the former shall be estopped from going
back on the word given. The principle of estoppel is,
however, only applicable in cases where the other party
has changed his position relying upon the representation
thereby made.”
(emphasis supplied)
16. From the above enunciation of law, it is clear that if any
controversy in issue between the same parties has already been decided in
the earlier round of litigation, then all parties are bound by it and cannot
reopen it in the subsequent proceedings. Once the non applicant has
prosecuted section 34 application under the Act of 1996, wherein liberty has
been granted to the applicant to further arbitrate if dispute persists between
the parties, then, in such case, the non applicant cannot reopen the issue of
maintainability at the stage of appointment of an Arbitrator under the Act of
1996. It is true that this Court on challenge being made to the order granting
liberty to the applicant to further arbitrate has observed that the liberty has to
be construed in accordance with law (statutory as well as case law). It is not
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
16 AC-53-2024
in dispute that any dispute arising out of agreement in question is amenable

to the jurisdiction of Adhikaran, but as the court has observed that liberty is
to be construed in accordance with law as well as case law, the decision
rendered by the higher court at the earlier point of time and observed by this
court to be binding precedent cannot be overlooked, as that is also a case law
for the present case in hand.
17. The Hon'ble Apex court in the case of Aslam Ismail Khan
Deshmukh v. ASAP Fluids (P) Ltd., (2025) 1 SCC 502 has held as under :-
50. As evident from the aforesaid discussion and especially in
light of the observations made in Krish Spg. [SBI General
Insurance Co. Ltd. v. Krish Spg., (2024) 12 SCC 1 : 2024 SCC
OnLine SC 1754] , this Court cannot conduct an intricate
evidentiary enquiry into the question of when the cause of action
can be said to have arisen between the parties and whether the
claim raised by the petitioner is time-barred. This has to be strictly
left for the determination by the Arbitral Tribunal. All other
submissions made by the parties regarding the entitlement of the
petitioner to 4,00,000 and 2,00,010 equity shares in Respondent 1
company are concerned with the merits of the dispute which
squarely falls within the domain of the Arbitral Tribunal.
51. It is now well-settled law that, at the stage of Section 11
application, the referral Courts need only to examine whether the
arbitration agreement exists — nothing more, nothing less. This
approach upholds the intention of the parties, at the time of
entering into the agreement, to refer all disputes arising between
themselves to arbitration. However, some parties might take undue
advantage of such a limited scope of judicial interference of the
referral Courts and force other parties to the agreement into
participating in a time-consuming and costly arbitration
process.......
52. In order to balance such a limited scope of judicial
interference with the interests of the parties who might be
constrained to participate in the arbitration proceedings, the
Arbitral Tribunal may direct that the costs of the arbitration shall
be borne by the party which the Tribunal ultimately finds to have
abused the process of law and caused unnecessary harassment to
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
17 AC-53-2024
the other party to the arbitration.

18. The Hon. Apex Court in the case of Uttarakhand Purv Sainik
Kalyan Nigam Ltd. (supra), while over-ruling the order of this Court in the
case of Uttarakhand Purv Sainik Kalyan Nigam Limited Vs. Northern
Coalfield Limited, 2018 (4) MPLJ 45, has held that after the amendment in
the Act of 1996, section 6A has been inserted which provides that all the
questions in regard to jurisdiction, limitation or which goes to the root shall
be decided by the Arbitrator and those are not to be decided by this Court at
the referral stage. For ready reference the principle laid down in Para 7 is
reproduced here and below :-
"7. We have heard the learned counsel for the parties and perused
the pleadings.
7.1. Section 21 of the 1996 Act provides that arbitral proceedings
commence on the date on which a request for disputes to be
referred to arbitration is received by the respondent.
7.2. In the present case, the notice of arbitration was issued by the
petitioner Contractor to the respondent Company on 9-3-2016.
The invocation took place after Section 11 was amended by the
2015 Amendment Act, which came into force on 23-10-2015, the
amended provision would be applicable to the present case.
7.3. The 2015 Amendment Act brought about a significant change
in the appointment process under Section 11: first, the default
power of appointment shifted from the Chief Justice of the High
Court in arbitrations governed by Part I of the Act, to the High
Court; second, the scope of jurisdiction under sub-section (6-A) of
Section 11 was confined to the examination of the existence of the
arbitration agreement at the pre-reference stage.
7.4. Prior to the coming into force of the 2015 Amendment Act,
much controversy had surrounded the nature of the power of
appointment by the Chief Justice, or his designate under Section
11. A seven-Judge Constitution Bench of this Court in SBP & Co.
v. Patel Engg. Ltd. [SBP & Co. v. Patel Engg. Ltd., (2005) 8 SCC
618] defined the scope of power of the Chief Justice under Section
11. The Court held that the scope of power exercised under
Section 11 was to first decide:
(i) whether there was a valid arbitration agreement; and
(ii) whether the person who has made the request under Section
11, was a party to the arbitration agreement; and
(iii) whether the party making the motion had approached the
appropriate High Court.
7.5. Further, the Chief Justice was required to decide all threshold
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
18 AC-53-2024
issues with respect to jurisdiction, the existence of the agreement,
whether the claim was a dead one; or a time-barred claim sought
to be resurrected; or whether the parties had concluded the
transaction by recording satisfaction of their mutual rights and
obligations, and received the final payment without objection,
under Section 11, at the pre-reference stage. The decision in Patel
Engg. [SBP & Co. v. Patel Engg. Ltd., (2005) 8 SCC 618] was
followed by this Court in Boghara Polyfab [National Insurance
Co. Ltd. v. Boghara Polyfab (P) Ltd., (2009) 1 SCC 267 : (2009) 1
SCC (Civ) 117] , Master Construction [Union of India v. Master
Construction Co., (2011) 12 SCC 349 : (2012) 2 SCC (Civ) 582] ,
and other decisions.
7.6. The Law Commission in the 246th Report [ Amendments to
the Arbitration and Conciliation Act, 1996, Report No. 246, Law
Commission of India (August 2014), p. 20.] recommended that:
“33. … the Commission has recommended amendments to
Sections 8 and 11 of the Arbitration and Conciliation Act, 1996.
The scope of the judicial intervention is only restricted to
situations where the court/judicial authority finds that the
arbitration agreement does not exist or is null and void. Insofar as
the [Ed.: The matter between two asterisks has been emphasised in
original.] nature [Ed.: The matter between two asterisks has been
emphasised in original.] of intervention is concerned, it is
recommended that in the event the court/judicial authority is prima
facie satisfied against the argument challenging the arbitration
agreement, it shall appoint the arbitrator and/or refer the parties to
arbitration, as the case may be. The amendment envisages that the
judicial authority shall not refer the parties to arbitration only if it
finds that there does not exist an arbitration agreement or that it is
null and void. If the judicial authority is of the opinion that prima
facie the arbitration agreement exists, then it shall refer the dispute
to arbitration, and leave the existence of the arbitration agreement
to be finally determined by the Arbitral Tribunal.”
(emphasis supplied)
7.7. Based on the recommendations of the Law Commission,
Section 11 was substantially amended by the 2015 Amendment
Act, to overcome the effect of all previous judgments rendered on
the scope of power by a non obstante clause, and to reinforce the
kompetenz-kompetenz principle enshrined in Section 16 of the
1996 Act. The 2015 Amendment Act inserted sub-section (6-A) to
Section 11 which provides that:
“(6-A) The Supreme Court or, as the case may be, the High Court,
while considering any application under sub-section (4) or sub-
section (5) or sub-section (6), shall, notwithstanding any
judgment, decree or order of any court, confine to the examination
of the existence of an arbitration agreement.”
(emphasis supplied)
7.8. By virtue of the non obstante clause incorporated in Section
11(6-A), previous judgments rendered in Patel Engg. [SBP & Co.
v. Patel Engg. Ltd., (2005) 8 SCC 618] and Boghara Polyfab
[National Insurance Co. Ltd. v. Boghara Polyfab (P) Ltd., (2009) 1

Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
19 AC-53-2024
SCC 267 : (2009) 1 SCC (Civ) 117] , were legislatively overruled.
The scope of examination is now confined only to the existence of
the arbitration agreement at the Section 11 stage, and nothing
more.
7.9. Reliance is placed on the judgment in Duro Felguera S.A. v.
Gangavaram Port Ltd. [Duro Felguera S.A. v. Gangavaram Port
Ltd., (2017) 9 SCC 729 : (2017) 4 SCC (Civ) 764. Refer to TRF
Ltd. v. Energo Engg. Projects Ltd., (2017) 8 SCC 377 : (2017) 4
SCC (Civ) 72] , wherein this Court held that: (SCC p. 759, para
48)
“48. … From a reading of Section 11(6-A), the intention of the
legislature is crystal clear i.e. the court should and need only look
into one aspect—the existence of an arbitration agreement. What
are the factors for deciding as to whether there is an arbitration
agreement is the next question. The resolution to that is simple —
it needs to be seen if the agreement contains a clause which
provides for arbitration pertaining to the disputes which have
arisen between the parties to the agreement.”
(emphasis supplied)
7.10. In view of the legislative mandate contained in Section 11(6-
A), the Court is now required only to examine the existence of the
arbitration agreement. All other preliminary or threshold issues are
left to be decided by the arbitrator under Section 16, which
enshrines the kompetenz-kompetenz principle.
7.11. The doctrine of “kompetenz-kompetenz”, also referred to as
“compétence-compétence”, or “compétence de la recognized”,
implies that the Arbitral Tribunal is empowered and has the
competence to rule on its own jurisdiction, including determining
all jurisdictional issues, and the existence or validity of the
arbitration agreement. This doctrine is intended to minimise
judicial intervention, so that the arbitral process is not thwarted at
the threshold, when a preliminary objection is raised by one of the
parties. The doctrine of kompetenz-kompetenz is, however,
subject to the exception i.e. when the arbitration agreement itself
is impeached as being procured by fraud or deception. This
exception would also apply to cases where the parties in the
process of negotiation, may have entered into a draft agreement as
an antecedent step prior to executing the final contract. The draft
agreement would be a mere proposal to arbitrate, and not an
unequivocal acceptance of the terms of the agreement. Section 7
of the Contract Act, 1872 requires the acceptance of a contract to
be absolute and unqualified [Dresser Rand S.A. v. Bindal Agro
Chem Ltd., (2006) 1 SCC 751. See also BSNL v. Telephone
Cables Ltd., (2010) 5 SCC 213 : (2010) 2 SCC (Civ) 352. Refer
to PSA Mumbai Investments Pte. Ltd. v. Jawaharlal Nehru Port
Trust, (2018) 10 SCC 525 : (2019) 1 SCC (Civ) 1] . If an
arbitration agreement is not valid or non-existent, the Arbitral
Tribunal cannot assume jurisdiction to adjudicate upon the
disputes. Appointment of an arbitrator may be refused if the
arbitration agreement is not in writing, or the disputes are beyond
the scope of the arbitration agreement. Article V(1)(a) of the New

Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
20 AC-53-2024
York Convention states that recognition and enforcement of an
award may be refused if the arbitration agreement “is not valid
under the law to which the parties have subjected it or, failing any
indication thereon, under the law of the country where the award
was made”.
7.12. The legislative intent underlying the 1996 Act is party
autonomy and minimal judicial intervention in the arbitral process.
Under this regime, once the arbitrator is appointed, or the tribunal
is constituted, all issues and objections are to be decided by the
Arbitral Tribunal.
7.13. In view of the provisions of Section 16, and the legislative
policy to restrict judicial intervention at the pre-reference stage,
the issue of limitation would require to be decided by the
arbitrator. Sub-section (1) of Section 16 provides that the Arbitral
Tribunal may rule on its own jurisdiction, “including
any objections” with respect to the existence or validity of the
arbitration agreement. Section 16 is as an inclusive provision,
which would comprehend all preliminary issues touching upon the
jurisdiction of the Arbitral Tribunal. The issue of limitation is a
jurisdictional issue, which would be required to be decided by the
arbitrator under Section 16, and not the High Court at the pre-
reference stage under Section 11 of the Act. Once the existence of
the arbitration agreement is not disputed, all issues, including
jurisdictional objections are to be decided by the arbitrator.
7.14. In the present case, the issue of limitation was raised by the
respondent Company to oppose the appointment of the arbitrator
under Section 11 before the High Court. Limitation is a mixed
question of fact and law. In ITW Signode (India)
Ltd. v. CCE [ITW Signode (India) Ltd. v. CCE, (2004) 3 SCC 48]
a three-Judge Bench of this Court held that the question of
limitation involves a question of jurisdiction. The findings on the
issue of limitation would be a jurisdictional issue. Such a
jurisdictional issue is to be determined having regard to the facts
and the law. Reliance is also placed on the judgment of this Court
i n NTPC Ltd. v. Siemens Atkeingesellschaft [NTPC
Ltd. v. Siemens Atkeingesellschaft, (2007) 4 SCC 451] , wherein
it was held that the Arbitral Tribunal would deal with limitation
under Section 16 of the 1996 Act. If the tribunal finds that the
claim is a dead one, or that the claim was barred by limitation, the
adjudication of these issues would be on the merits of the claim.
Under sub-section (5) of Section 16, the tribunal has the obligation
to decide the plea; and if it rejects the plea, the arbitral proceedings
would continue, and the tribunal would make the award. Under
sub-section (6) a party aggrieved by such an arbitral award may
challenge the award under Section 34. In Iffco Ltd. v. Bhadra
Products [Iffco Ltd. v. Bhadra Products, (2018) 2 SCC 534 :
(2018) 2 SCC (Civ) 208] this Court held that the issue of
limitation being a jurisdictional issue, the same has to be decided
by the tribunal under Section 16, which is based on Article 16 of
the Uncitral Model Law which enshrines the kompetenz principle.

Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
21 AC-53-2024
19. This view has also been taken by the Larger Bench of the Hon'ble

Apex Court in the case of Central Organisation for Railway Electrification v.
ECI SPIC SMO MCML (JV), (2025) 4 SCC 641, wherein it is held that at
the stage of deciding an application for appointment of an Arbitrator, the
Court must not conduct an intricate enquiry into the matter, where the claim
raised by the applicant is time barred and should be left open for
determination by the Arbitrator. Such an approach gives true meaning to the
view taken in the case of Interplay Between Arbitration Agreements under
Arbitration, 1996 & Stamp Act, 1899, In re, (2024) 6 SCC 1.
20. It is not in dispute that the dispute arising out of an agreement
which falls within the definition which is termed as work contract under the
Act of 1983 shall be amenable to the jurisdiction of the Tribunal, but, as
discussed hereinabove, in the present case in hand as it is settled between the
parties that the arbitration shall be done between the parties as per the
provisions of the Act of 1996, which has been affirmed by this Court in
A.A.No.8/2017 and SLP filed against the said order has been dismissed.
Therefore, the case laws which have been relied by the non-applicant in the
case of L.G. Chaudhary (supra), M/s Gayatri Project Limited (supra) and
Umri Pooph Pratappur (supra) are not having any application in the present
case.
21. In view of the above enunciation of law as well as analysis of the
facts, to entertain the application for appointment of arbitrator this Court
prima facie finds that the present application is maintainable in the light of
the earlier decisions of this Court and the Hon'ble Apex Court coupled with a
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
22 AC-53-2024
fact that such objection as per the dictum of Hon'ble Apex Court in the case

of Altaf can be raised before the Arbitrator also. The parties are always free
to agitate the same question before the Arbitrator.
22. Accordingly, the present application is allowed.
23. Considering the list of empanelled Arbitrators issued by the M.P.
Arbitration Centre, Jabalpur, following order is passed:
(i) Shri Ved Prakash Sharma, Former Judge, High Court of M.P.,
Address - 9-D, Orchard Residency, B-Block, Palace Orchard, Kolar Road,
Bhopal (M.P.), Contact No.94251-15150, Email - [email protected],
who has consented in terms of Section 11(8) of the Act of 1996, is appointed
as sole Arbitrator to resolve the dispute between the parties in the case.
(ii) Arbitrator shall issue the notices and fix the date and suitable
venue for arbitration. Said arbitration will take place at Bhopal.
(iii) Parties are directed to deposit necessary charges and fees as per
M.P. Arbitration Center (Domestic and International) Rule, 2019.
(iv) Director of Madhya Pradesh Arbitration Centre, Domestic
and International, Jabalpur (M.P.D.I.A.C.) shall communicate the decision of
this Court to the Sole Arbitrator.
(v) Other provisions of Section 15(3)(4) of the Arbitration and
Conciliation Act, 1996 will apply to substitute Arbitrator.
21. With aforesaid directions, the Arbitration Case is disposed of.
(DEEPAK KHOT)
JUDGE
Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM

NEUTRAL CITATION NO. 2026:MPHC-JBP:50164
23 AC-53-2024
HS


Signature Not Verified
Signed by: HEMANT SARAF
Signing time: 7/13/2026
7:44:15 PM