Court On Its Own Motion vs Govt. Of Nct Of Delhi And Ors

Court
Delhi High Court

$~1(SDB) & 2(SDB)
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
Date of Decision: 24 August, 2026
th
Uploaded on: 25 August, 2026
# CNR No. DLHC011815012018
+ W.P.(C) 7594/2018 & CM APPLs.30022/2018, 41886/2024
42188/2024, 42189/2024, 47142/2024, 48597/2024, 57187/2024,
62545/2024, 69901/2024, 4825/2026, 35797/2026, 56748/2026,
56882/2026
COURT ON ITS OWN MOTION .....Petitioners
Through: Mr. Zain Haider and Mr. Tanvir Ali,
Advs.
versus
UNION OF INDIA & ORS. .....Respondents
Through: Mr. Ripudaman Bhardwaj, CGSC with
Mr. Kushagra Kansal and Mr. Amit
Kumar Rana, Advocates for UOI.
Mr. Rajesh Yadav Sr. Advocate with
Mr. V P Rana, Adv.
Mr. Subhashhand Budhiraja, Adv.
with Mr. Rajender Parrasad Jain,
Director, MSME, Advocates.
Ms. Prabhsahay Kaur (Standing
Counsel), Ms. Deeksha L. Kakar
(Panel Lawyer), Mr. Aditya Verma,
Ms. Sana Parveen advocates with mr.
Nakul (DD, plg. DDA)
Ms. Pratima N Lakra CGSC Mr
Shailendra Kumar Mishra, Advs.
Mr. Biraja Mahapatra, Mr. Abhay
Singh Advs. along with Mr. Dinesh
Jindal, Law officer DPCC.
Mr. Sanjeev Kumar Dubey, Senior
Advocate with Ms. Yamini Sharma,
W.P.(C)s 7594/2018 & 9617/2022 Page 1 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

Mr. Shah Rukh Khan, Ms Meghaa
Wadera and Mr. Ghanender Singh,
Advocates for (MIWAS).
Mr. Varsha Banerjee, Mr. Arjun
Katyal & Mr. Mahipal Singh, Advs.
for DSIIDC
Ms. Ayushi Musra, Advocate.
Mr. Deevanshu Sharma Advocate for
Confederation of Delhi CETPs.
Dr. S. K Goyal, Scientist G & Chair,
CSIR-NEERI, Delhi Regional Centre.
Mr. Kapil Midha Adv. for (Mondhaka
Udyog Nagar (south) welfare society.
Mr Tushar Sannu, Ms Rajbala, Ms
Payal Rajput Advocates, for MCD and
DJB.
Mr. VK singh, AE Mr. Manish Rajpa
Mr. Astik Jha , AE- DJB, Mr. Rajeev
Narang- Action Electrical -MCD Mr.
Gaurav Kumar AE, ENM and Mr.
Deepak Rohila- SC, ENM.
Mr. Dhruv Rohatgi Panel Counsel
GNCTD with Ms Chandrika Sachdeva
Mr Dhruv Kumar, Advs.
Mr. Vivek Kumar Tandon, Local
commissioner.
Mr. Hitesh Sharma (Plant Manager),
Mayapuri CETP, Mr. Sudhir Kumar
(Treasurer) Mayapuri CETP, Mr.
Ashok Kumar (Nangloi CETP), Mr.
Ravi Sood (Badli CETP), Mr. Sanjay
Vig (Mangol Puri CETP), Mr. K.D.
Sharma (Jhilmil CETP), Mr. R.N.
Sharma (Naraina CETP) and Mr.
Suresh Kumar (Okhla CETP)
Ms Varsha, Adv.
2(SDB)
# CNR No. DLHC010238512022
W.P.(C)s 7594/2018 & 9617/2022 Page 2 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

+ W.P.(C) 9617/2022
COURT ON ITS OWN MOTION .....Petitioner
Through: Mr. Zain Haider and Mr. Tanvir Ali,
Advs.
versus
GOVT. OF NCT OF DELHI AND ORS .....Respondents
Through: Mr. Ripudamn Bhardwaj, CGSC with
Mr. Kushagra Kansal, Advocate for
UOI.
Dr. S. K Goyal, Scientist G & Chair,
CSIR-NEERI, Delhi Regional Centre.
Mr. Kapil Midha Adv. for (Mondhaka
Udyog Nagar (south) welfare society.
Mr Tushar Sannu, Ms Rajbala, Ms
Payal Rajput Advocates, for MCD and
DJB.
Mr. VK singh, AE Mr. Manish Rajpa
Mr. Astik Jha , AE- DJB, Mr. Rajeev
Narang- Action Electrical -MCD Mr.
Gaurav Kumar AE, ENM and Mr.
Deepak Rohila- SC, ENM.
Mr. Vivek Kumar Tandon, Local
commissioner.
Mr. Dhruv Rohatgi Panel Counsel
GNCTD with Ms Chandrika Sachdeva
Mr Dhruv Kumar, Advs.
Ms. Nishi, Adv.
Ms. Pratima N Lakra CGSC Mr
Shailendra Kumar Mishra, Advs.
Mr. Shashi Pratap Singh, Ms.
Anamika Tyagi, Ms. Laqshyaa Saluja,
Advocates with Ms. Sulakshna Kholia
Coordinator for President, Swarna
Park Mundaka Industrial Area
Association.
CORAM:
JUSTICE PRATHIBA M. SINGH
JUSTICE MANMEET PRITAM SINGH ARORA
W.P.(C)s 7594/2018 & 9617/2022 Page 3 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

Prathiba M. Singh, J. (Oral)
1. This hearing has been done through hybrid mode.
Issue of Waterlogging in the Okhla Area i.e., Abul Fazal Drain (Re:e-
newspaper report dated 7th January, 2026)
th
2. On 28 March, 2026, this Court had directed the Municipal
Corporation of Delhi (hereinafter, ‘MCD’ ) to create a separator wall between
the drain and the road which has vehicular movement. It was also directed
that reflectors and some lights be installed so that the drain would be visible
to passers-by and drivers. The relevant portion of the said order reads as
under:
“4. Accordingly, Mr. Sannu, ld. Counsel for the
MCD has assured the Court that some kind of separator
wall would be created between the drain and the road
on which vehicular movement is there.
5. In addition, MCD shall ensure that the area is
not dark and is visible as a drain in the evening times.
Some reflectors and some lights should be installed in
this area so that the drain becomes visible to passersby
and drivers.”
3. Mr. Amit Mittal, Senior Assistant (Legal) from the Uttar Pradesh
Irrigation Department is present. Insofar as the extension of the Abul Fazal
Drain is concerned, Mr. Anil Mittal, ld. Counsel for the Uttar Pradesh
Irrigation Department submits that the sanction for the extension of the said
drain has already been applied for with the Namami Gange Authority
(National Mission for Clean Ganga-NMCG) and is likely to be issued soon.
th
Ld. Counsel further submits that by 15 September, 2026, the Uttar Pradesh
Irrigation Department intends to start the work for the extension of the Abul
W.P.(C)s 7594/2018 & 9617/2022 Page 4 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

Fazal Drain. The NMCG shall consider the application for the extension of
the Abul Fazal Drain and communicate the decision at the earliest.
4. Insofar as the creation of a separator wall and the installation of
reflectors is concerned, ld. Counsel appearing for the MCD submits that the
reflectors and lights have already been installed. Insofar as the separator wall
is concerned, Mr. Tushar Sannu, ld. Counsel submits that the Uttar Pradesh
Irrigation Department has not yet given the ‘No Objection Certificate’ and
hence, no work could be undertaken.
5. Mr. Mittal, ld. Counsel for the Uttar Pradesh Irrigation Department
seeks ten days’ time to give ‘No Objection Certificate’ to the MCD for
construction of the separator wall.
6. The Court has seen the images of the drain and is extremely concerned
with the manner in which the drain is running without any protection. Some
of the images are extracted below:
W.P.(C)s 7594/2018 & 9617/2022 Page 5 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

W.P.(C)s 7594/2018 & 9617/2022 Page 6 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

W.P.(C)s 7594/2018 & 9617/2022 Page 7 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

W.P.(C)s 7594/2018 & 9617/2022 Page 8 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

The open drain without any separator wall or covering can pose a serious
safety hazard for the residents and commuters of the area.
th th
7. The MCD has written repeated letters i.e., on 24 April, 2026, 12
rd
May, 2026 and 3 July, 2026 to the Executive Engineer, Head Works
Division, Agra Canal. Mr. Amit Mittal submits that one Mr. Vinod Kumar
Singh is the said Executive Engineer. Obviously, the said Engineer has not
cared to reply to the MCD and give the ‘No Objection Certificate’.
8. The MCD has already installed lights in the area to make the drain
visible to vehicular traffic and pedestrians. Mr. Sannu, ld. Counsel for the
MCD submits that the budget for the separator wall has already been
sanctioned and the only delay was because of the non-receipt of the ‘No
Objection Certificate’.
9. Considering the danger that the drain could pose to the local residents,
this Court directs the MCD to immediately construct the separator wall and
put slabs covering the open drain, without awaiting any further ‘No Objection
Certificate’ from the Uttar Pradesh Irrigation Department. The construction
of the separator wall and covering on the drain, if required as per law, be
commenced immediately by the MCD.
10. The concerned Executive Engineer Mr. Vinod Kumar Singh, from the
Uttar Pradesh Irrigation Department is at liberty to co-ordinate with the MCD,
if he so desires.
11. The MCD shall also undertake continuous desilting of the drain and the
cleaning of the area as well, since the photographs placed on record depicts
that there is a large quantum of litter and garbage which is in and around the
drain.
W.P.(C)s 7594/2018 & 9617/2022 Page 9 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

12. An updated status report shall be filed by the MCD by the next date of
hearing.
Upgradation of STPs and installation of new STPs.
13. The Court has perused the following status reports filed by the Delhi
Jal Board (hereinafter, ‘DJB’ ):
th
● Status report dated 17 December, 2025;
th
● Status report dated 30 April, 2026 ; and
th
● Status report dated 19 August, 2026.
14. A perusal of the said status reports would reveal that there were 11
STPs which required to be upgraded. The details of the said 11 STPs which
required upgradation is as under:
W.P.(C)s 7594/2018 & 9617/2022 Page 10 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

15. A perusal of the above would show that in respect of STPs at serial no.
1 and 2 the upgradation has been achieved and in the remaining nine, the work
orders are stated to have been issued for upgradation and the deadlines for
completion are between December, 2027 to May, 2028.
16. The details of the STPs which have already been upgraded and
achieved the latest parameters as per the National Green Tribunal’s
( hereinafter ‘NGT ’) guidelines are as under:
W.P.(C)s 7594/2018 & 9617/2022 Page 11 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

17. On an overall basis, there are various issues that need to be addressed
insofar as STPs are concerned which are:
i) Upgradation of existing STPs;
ii) Augmentation of existing STPs;
iii) Creation of new STPs to ensure that untreated sewage/water does
not flow directly into the river;
iv) Manner in which the treated water flows into the river without
again getting mixed with untreated sewage/water.
18. Mr. Sannu, ld. Counsel has also obtained instructions from the DJB and
the overall status of STPs has been placed before the Court in the following
table:
Sr.
No.
Description No. of
Plants
Capacity
(MGD)
Status Target
Date
1 Existing Upgraded
STPs
28 735.00 Operational at
10/10
2 Existing Under
upgradation STPs
9 78.86 Operational at
30/50
27-Dec
56.84 Augmentation
to be done
27-Dec
3 DSTPs (Outer areas
of Delhi)
29 170.00 works
awarded for
28 and 1 at
Tender stage
Jan-28
4 New DSTPs to be
established at Drains
outfalls and in the
cathmaent areas
13 328.00 1 DPRs
prepared and
sent to the
NMCG
Jan-28
132.00 Gap analysis
underway
1500.70
W.P.(C)s 7594/2018 & 9617/2022 Page 12 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

19. From the above table, insofar as the STPs at Serial No.1 is concerned,
the Court has been informed by the ld. Local Commissioners and the ld.
Counsel from the DJB that the 28 STPs which are operational at 10/10 are as
per NGT’s prescribed standards. The STPs at Serial No.2, there are 9 STPs
which are presently operational at 30/50 standard but are to be upgraded to
achieve the 10/10 standard. For the same, the deadline for completion is given
is December, 2027 to May, 2028.
20. At Serial No.3 are the DSTPs relating to the outer areas of Delhi. It is
submitted that the DJB has awarded the works for 28 of the said DSTPs and
for one of the DSTPs the same is at the stage of tendering. The target date for
completion of construction is January, 2028.
21. Insofar as the major issue which is highlighted by the ld. Local
Commissioners in their reports are concerned, i.e., that only some part of the
sewage is being treated and other parts of the sewage is in fact flowing into
the river without treatment. The same is sought to be addressed through
setting up of further 13 DSTPs with 328.00 MGD capacity for which the
detailed project reports are stated to have been prepared and sent to the
Namami Gange Project Authority. Let the same be looked into by the Director
General, NMCG.
22. Separately, insofar as some of the gaps which are yet to be filled up are
concerned, which could be a capacity of 132 MGD, the DJB is presently
th
undertaking the gap analysis. Overall, as per the DJB, the status as on 24
st
August, 2026 is that existing STPs a total capacity of 814.26 MGD. By 31
December, 2027, the DJB seeks to achieve 1041.10 MGD and depending
upon the project reports for the new DSTPs and the funds being received in
respect thereof, 13 further STPs are likely to be commissioned.
W.P.(C)s 7594/2018 & 9617/2022 Page 13 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

23. One of the concerns raised by the ld. Local Commissioners is that the
treated water is being again discharged and mixed with the untreated water.
Therefore, the drains would have to be laid in respect of the new STPs.
Accordingly, this aspect shall be given top priority for existing STPs and the
newly proposed DSTPs when the tenders are floated and the work shall be
supervised by DJB.
24. In respect thereof, a separate status report shall be filed by the DJB by
the next date of hearing. Let an updated status report regarding all STP works
be filed by the DJB by the next date of hearing.
27 Non- Confirming Areas
25. The work for re-development in these areas was to commence pursuant
to several orders passed by this Court. Various agencies, who had to draw up
the plans in these colonies have submitted plans in respect of 25 non-
conforming areas to the Delhi State Industrial and Infrastructure Development
Corporation (hereinafter, ‘DSIIDC’ ). DSIIDC has forwarded the same to the
MCD and the MCD has forwarded the same to the Delhi Development
Authority (hereinafter, ‘DDA’ ) with a request for relaxation of certain norms
from the Master Plan. However, the DDA has not replied to this which has
caused a complete stalemate in the work to be undertaken in these 25 non-
confirming areas.
26. Ld. Counsel appearing on behalf of the DDA submits that the matter
was earlier being dealt with under the old Master Plan-2021, however, now
the new Master Plan-2047 has been announced and hence, no work has been
undertaken.
27. On behalf of the Industries in these areas, the representatives, who are
present, express enormous anxiety and frustration in the manner in which
W.P.(C)s 7594/2018 & 9617/2022 Page 14 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

delays are being caused in the re-development. In our considered opinion, the
re-development of these areas is absolutely essential to ensure that untreated
sewage water does not flow into the Yamuna river and waterlogging is
eliminated. This fact has to be appreciated by all the authorities.
28. In order to fix the timelines for the approval of the plans and for
considering relaxation of certain norms etc., let Mr. Manish Verma,
st
Additional Commissioner (Planning), DDA hold a meeting on 31 August,
2026 with all the other authorities and come up with proper timelines as to the
manner in which the approvals shall be obtained/granted for the purpose of
inter-alia laying down the sewer line and sewage water drain in all these 25
non-confirming areas. While considering the issue of relaxation of norms it
shall be borne in mind by the DDA that these industrial clusters have come
up and are existing for several decades without any proper infrastructure or
planning. Thus, enforcing newly imposed conditions under fresh Master Plans
to these areas would be completely impractical. The DDA needs to take a
pragmatic approach to achieve the re-development with the existing
conditions in the best possible manner, as these industries need proper drains,
water pipes, sewage lines etc.,
29. Insofar the two non-conforming areas, in respect of which the plans are
stated to have not been submitted are:
● Samaypur Badli; and
● Phirni Road.
30. Insofar as Samaypur Badli is concerned, an application being CM
APPL. 56748/2026 has been moved on behalf of the Rural Area Manufactures
Association, located at Gali No.4, Samaypur Badli Industrial Area. Their
concern as submitted by Mr. Yadav ld. Senior counsel, is that the layout plan
W.P.(C)s 7594/2018 & 9617/2022 Page 15 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

had been prepared by the concerned agency namely M/s Square Designs only
based on a Layout Plan of 2001. Thereafter, the Zonal Development Plan
approved by Union of India on 08.03.2010 had modified and directed that the
green strip along with G.T. Karnal Road, Libaspur has been modified for
industrial use as per Master Plan-2021, however, the same has not been
th
considered by the said agency. He relies on Notification dated 19 July, 2012
issued by Ministry of Urban Development, notifying the modified boundaries
of Samaipur Badli. In addition, certain further areas were also changed to
industrial use.
31. Whenever any re-development of an area is to be considered, these
subsequent zonal plans and other notifications amending Master Plan which
have expanded the area ought to be considered, failing which these areas
would be left out from the re-development.
32. Accordingly, the DDA, the Ministry of Industries, GNCTD, the MCD
along with the DSIIDC shall consider the documents and the averments made
in CM APPL. 56748/2026 and demarcate the entire area of Samaypur Badli
so that the agency i.e., M/s Square Designs can prepare a fresh plan for this
area.
33. Let a said meeting for dealing with Samaypur Badli alone be chaired
by the Secretary, Ministry of Industries, GNCTD, who shall request officials
from all the authorities i.e., the DSIIDC, DDA, MCD, M/s Square Design or
any other authority, which may be required to participate in the said meeting.
Two representatives from the associations of the industries are also permitted
to attend the said meeting so that they can place their stand before the
Secretary, Ministry of Industries, GNCTD.
W.P.(C)s 7594/2018 & 9617/2022 Page 16 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

nd
34. The said meeting be held on 2 September, 2026 at 11:30 AM in the
office of Secretary, Ministry of Industries, GNCTD. The agency i.e., M/s
Square Design shall then start preparation of fresh plans for re-development
of Samaypur Badli within three months. The application CM APPL.
56748/2026 is disposed of in these terms.
35. Insofar as Phirni Road is concerned, the issue of two competing
associations continue to affect the development work in this area. Mr. Sanjeev
Kumar Dubey, ld. Sr. Counsel for the Mundka Industrial Area Welfare
Society submits that the comments have already been submitted for the plans
for this area to the MCD. Mr. Kapil Midha, ld. Counsel for the Mundka Udyog
Nagar South Side Welfare Society further submits that the comments have
already been submitted for the plans for this area. However, there is some
uncertainty regarding submission of comments by these two associations. If
the said societies wishes to give any comments about the said plan, they may
st
contact Mr. Kuldeep Singh from DSIIDC and give their comments by 31
st
August, 2026. It is made clear that after 31 August, 2026, no comments shall
be entertained.
36. In order to facilitate the same, let a meeting be held between both the
th
Societies and Mr. Kuldeep Singh from DSIIDC on 26 August, 2026 at
11:30 AM in Mr. Kuldeep Singh’s office. The agency preparing the plans for
this area shall also be present in the meeting. Once the comments are
st
submitted by the two societies by 31 August, the concerned Agency shall
th
finalise the plans for the Phirni area and submit the same to the MCD by 30
September 2026.
37. Let the updated status report be filed by the DSIIDC, DDA, MCD and
the Ministry of Industries, GNCTD by the next date of hearing.
W.P.(C)s 7594/2018 & 9617/2022 Page 17 of 18
Signature Not Verified
Digitally Signed
By:DEVANSHU JOSHI
Signing Date:25.08.2026
18:57:32

38. Mr. Ashutosh Lohia submits that the issue of CETPs is to be considered
by the Court. Ms. Vrinda Bhandari submits that she has filed a detailed note
regarding the interplay between water pollution and air pollution. These issues
th
shall be considered on the next date of hearing. List on 25 September, 2026
at 4:00 PM.
39. Registry to communicate today’s order to the Mr. Rajeev Kumar Mital,
Director General, National Mission for Clean Ganga, for compliance of
directions in paragraph 3 and 21, on the following email address:
[email protected]
40. Copy of today’s order be communicated by all ld. Counsels to their
respective authorities.
PRATHIBA M. SINGH
JUDGE
MANMEET PRITAM SINGH ARORA
JUDGE
Rahul/dk/Ck
AUGUST 24, 2026/
W.P.(C)s 7594/2018 & 9617/2022 Page 18 of 18