SRI U MALLESHAPPA S/O LATE NAGAPPA UDAGATTI vs THE STATE OF KARNATAKA
- Court
- Karnataka High Court
- 1 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
IN THE HIGH COURT OF KARNATAKA AT DHARWAD
TH
DATED THIS THE 7 DAY OF OCTOBER 2026
PRESENT
THE HON'BLE MR. JUSTICE M.NAGAPRASANNA
AND
THE HON'BLE MRS JUSTICE HEMA KULKARNI
WRIT PETITION NO.105934 OF 2023 (S-KAT)
C/W
WRIT PETITION NO.105931 OF 2023 (S-KAT)
IN WP NO.105934/2023:
BETWEEN:
1. SRI. S.R.PATIL S/O. RAMANAGOUDA PATIL
AGED ABOUT 66 YEARS,
OCC: RETD. EXECUTIVE OFFICER,
PANCHAYAT RAJ ENGINEERING,
SUB-DIVISION, SAVANUR TQ.,
RD
HAVERI DISTRICT,R/O. NO.30, 3 CROSS,
MANJUNATH NAGAR, HAVERI TQ AND DIST.-581110.
2. SRI. SYED MUSTAQ AHMED S/O. SYED NABI
AGED ABOUT 62 YEARS,
OCC: RETD. ASST. EXECUTIVE ENGINEER,
PANCHAYAT RAJ ENGINEERING,
SUB-DIVISION, SAVANUR TQ.
HAVERI DISTRICT, R/O. HAVERI,
HAVERI TQ. AND DIST.-581110.
…PETITIONERS
(BY SRI.SHARANABASAVARAJ C.S.,ADVOCATE)
AND:
1. THE STATE OF KARNATAKA
BY ITS PRINCIPAL SECRETARY,
DEPARTMENT OF RURAL DEVELOPMENT AND
PANCHAYAT RAJ, M.S.BUILDING,
DR. AMBEDKAR VEEDHI, BENGALURU-560001.
Digitally signed by
PRATIBHA M
PATIL
Location: HIGH
COURT OF
KARNATAKA
DHARWAD
BENCH
Date: 2026.10.15
14:30:09 +0530
2. THE STATE OF KARNATAKA
- 2 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
BY ITS UNDER SECRETARY (SERVISES-A),
DEPARTMENT OF RURAL DEVELOPMENT AND
PANCHAYAT RAJ DEPARTMENT,
M.S. BUILDING, DR. AMBEDKAR VEEDHI,
BENGALURU-560001.
3. THE KARNATAKA LOKAYUKTA
BY ITS REGISTRAR, M.S.BUILDING,
DR. AMBEDKAR VEEDHI,
BENGALURU-560001.
4. THE ADDITIONAL REGISTRAR OF ENQUIRIES,
KARNATAKA LOKAYUKTA, M.S.BUILDING,
DR. AMBEDKAR VEEDHI,
BENGALURU-560001.
…RESPONDENTS
(BY SMT.GIRIJA S.HIREMATH, HCGP FOR R1 AND R2;
SRI.SRINIVAS B.NAIK, ADVOCATE FOR R3 AND R4)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227
OF THE CONSTITUTION OF INDIA PRAYING TO ISSUE AN
APPROPRIATE WRIT, ORDER OR DIRECTION IN THE NATURE OF
CERTIORARI QUASHING THE IMPUGNED ORDER DATED 13.07.2023
IN APPLICATION NO.10178-79/2021 PASSED BY THE HON BLE
KARNATAKA STATE ADMINISTRATIVE TRIBUNAL BELAGAVI BENCH
AT BELAGAVI ANNEXURE-C AND CONSEQUENTLY ALLOW THE
APPLICATION.
IN WP NO.105931/2023:
BETWEEN:
SRI. U.MALLESHAPPA S/O. LATE NAGAPPA UDAGATTI
AGED ABOUT 67 YEARS,
OCC: RETD. JUNIOR ENGINEER,
PANCHYAT RAJ ENGINEERING,
SUB-DIVISION, SAVANUR TQ,
HAVERI DIST, R/O. VIDYA NAGAR WEST,
HAVERI TQ. AND DIST.-581110.
...PETITIONER
(BY SRI. SHARANABASAVARAJ C.S.,ADVOCATE)
- 3 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
AND:
1. THE STATE OF KARNATAKA
BY ITS PRINCIPAL SECRETARY,
DEPARTMENT OF RURAL DEVELOPMENT AND
PANCHAYAT RAJ, M.S.BUILDING,
DR. AMBEDKAR VEEDHI, BENGALURU-560001.
2. THE STATE OF KARNATAKA
BY ITS UNDER SECRETARY,
DEPARTMENT OF AGRICUTLURE,
(SERVICE AND CONDITION),
M.S.BUILDING, DR. AMBEDKAR VEEDHI,
BENGALURU-560001.
3. THE KARNATAKA LOKAYUKTA
BY ITS REGISRAR, M.S.BUILDING,
DR. AMBEDKAR VEEDHI,
BENGALURU-560001.
4. THE ADDITIONAL REGISTRAR OF
ENQUIRIES KARNATAKA LOKAYUKTA,
M.S.BUILDING, DR. AMBEDKAR VEEDHI,
BENGALURU-560001.
...RESPONDENTS
(BY SMT.GIRIJA S.HIREMATH, HCGP FOR R1 AND R2;
SRI.SRINIVAS B.NAIK, ADVOCATE FOR R3 AND R4)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227 OF
THE CONSTITUTION OF INDIA PRAYING TO ISSUE AN
APPROPRIATE WRIT, ORDER OR DIRECTION IN THE NATURE OF
CERTIORARI QUASHING THE IMPUGNED ORDER DATED
13.07.2023 IN APPLICATION NO.10178-79/2019 PASSED BY THE
HON’BLE KARNATAKA STATE ADMINISTRATIVE TRIBUNAL
BELAGAVI BENCH AT BELAGAVI ANNEXURE-C AND
CONSEQUENTLY ALLOW THE APPLICATION; AND ETC.
THESE WRIT PETITION COMING ON FOR FINAL HEARING,
THIS DAY, ORDER WAS MADE THEREIN AS UNDER:
- 4 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
CORAM: HON'BLE MR. JUSTICE M.NAGAPRASANNA
AND
HON'BLE MRS JUSTICE HEMA KULKARNI
ORAL ORDER
(PER: HON'BLE MR. JUSTICE M.NAGAPRASANNA )
The petitioners in both these cases are before this Court
calling in question the order dated 13.07.2023 passed in
Application No.10178-79/2019 by the Karnataka State
Administrative Tribunal, Belagavi (‘the Tribunal’ for short), as
well as the order dated 13.07.2023 passed in Application
No.10682/2021 by the Tribunal, whereby the Tribunal declines
to interfere with the order of penalty imposed upon these
petitioners at the hands of the Disciplinary Authority, which was
reduction of pension by 30% permanently.
2. Heard the learned counsel Sri. Sharanabasavaraj
C.S. appearing for the petitioners, learned High Court
Government Pleader Smt. Girija S. Hiremath appearing for
respondent Nos.1 and 2 and the learned counsel Sri. Srinivas B.
Naik appearing for respondent Nos.3 and 4.
- 5 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
3. The facts enumerated are as follows:
3.1. In W.P.No.105934/2023, the 1st petitioner was
working as an Executive Officer, Taluka Panchayat, Savanur,
and the 2nd petitioner was working as an Assistant Executive
Engineer, Taluka Panchayat, Savanur, while the petitioner in
W.P.No.1005931/2023 was working as a Junior Engineer at
Taluka Panchayat, Savanur, at the relevant point in time.
Owing to certain omissions and commissions, a show-cause
notice comes to be issued to the petitioners, which were replied
to by contending that the petitioners were not responsible for
any misappropriation of funds. The Lokayukta then sought
entrustment of the enquiry to its hands, and the enquiry was
entrusted to the hands of the Lokayukta as obtaining under
Rule 14-A of the Karnataka Civil Services (Classification,
Control and Appeal) Rules, 1957 (‘KCCA Rules’ for short). The
departmental enquiry was conducted by the Enquiry Officer
appointed by the Lokayukta, who holds the petitioners guilty of
the charges so framed and recommends imposition of certain
penalty.
- 6 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
3.2. The Disciplinary Authority imposed the penalty as
was directed by the Lokayukta, which led the petitioners to
approach the Tribunal in Application No.10178-79/2019 and
Application No.10682/2021. The Tribunal, by the order
impugned dated 13.07.2023, rejected the applications on the
score that the misconduct alleged against the petitioners were
grave and that there was misappropriation of funds, and the
Tribunal would not re-appreciate the evidence before the
Enquiry Officer and hold it otherwise. It is the rejection of the
applications by the Tribunal that has driven the petitioners to
this Court in the subject petitions.
4. Learned counsel, Sri. Sharanabasavaraj C.S.,
appearing for the petitioners, would reiterate the grounds that
were urged before the Tribunal that the Articles of Charge were
framed in a joint enquiry without making specific allegations
against each of the delinquent Government Servants and,
therefore, there was a violation of the principles of natural
justice. It is further submitted by the learned counsel for the
petitioners that there was no misappropriation of funds in the
- 7 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
case at hand, as is alleged, and therefore, he would submit that
throughout the proceedings before the Tribunal and before this
Court, from the date of its filing the petitions, the interim
orders staying the operation of the penalty have been operating
and now if the petitioners are not entertained, huge recoveries
would be initiated against the petitioners, as they have taken
complete pension on the strength of the interim orders.
[
5. Learned High Court Government Pleader, Smt. Girija
S. Hiremath, appearing for respondent Nos.1 and 2, would
however refute the submissions in contending that the
petitioners are guilty of misappropriation of funds, which should
not be shown lenience at the hands of this Court and would
seek to submit that the order of the Tribunal does not warrant
any interference. The learned High Court Government Pleader
would seek dismissal of the petitions.
6. Learned counsel, Sri. Srinivas B. Naik, appearing for
respondent Nos.3 and 4, would also toe the lines of the learned
High Court Government Pleader in taking this Court through the
particular paragraphs of the enquiry report and the orders
- 8 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
passed by the Tribunal contending that there is
misappropriation in the case at hand maybe of an amount that
is ₹5,00,000/- or otherwise. But the allegations are serious and
this Court should not interfere with the orders passed by the
Tribunal.
7. We have given our anxious consideration to the
respective submissions made by the learned counsel for the
parties and have perused the materials available on record.
8. The afore-narrated facts are not in dispute. They are,
in fact, a matter of record. The service of the petitioners at the
relevant point in time is as explained hereinabove. The
allegations against the petitioners spring from a charge sheet
issued on 31.01.2015 by the Lokayukta, after the enquiry being
entrusted to its hands. The statement of imputations of
misconduct against these petitioners is as follows:
ANNEXURE NO. II
STATEMENT OF IMPUTATIONS OF MISCONDUCT
2. One Sri. Rabbani A Savanur S/o Sri. Abdul Munaf
R/o Karadagi village of Savanur Taluk, Haveri
District, filed a complaint against you DGOs
alleging that you DGO, being Government servants
- 9 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
committed misconduct. You DGOs prepared the
bogus bills without actual execution of repair works
alleged to have been executed for Urdu Primary
School, Karadagi village in Savanur Taluk during
the year 2012-13 and also failed to make spot
inspection and verify whether the cement poles
were as per the contract agreement specification
erected around Anjuman Graveyard of Karadagi
village and whether fencing was as per the
specification and contract agreement. Without
verifying the same, on the basis of the estimated
amount, you cleared the bill which was more
amount than the work actually executed, thereby
caused loss of exchequer to the Government.
3. The Chief Executive Officer, Zilla Panchayath,
Haveri was asked to investigate and report. In turn
the CEO, reported holding that you DGOs 1 to 3
responsible for the financial irregularities with
regard to repair work taken at Urdu Primary School
and erection of cement poles and fencing around
Anjuman Graveyard at Karadagi. The complaint
copy and the IO report was sent to you DGOs for
your comments. You DGOs denied the allegations.
The material available on record show that:
a. As per the specification work sanctioned was to
adopt reapers of general wood of size
50mmx25mm of 140 R Meter instead of the said
sanctioned size in one room 6 rafters of size
1.40mx75mmx50mm and in corridor two rafters of
size 50mm x 25mm were found in place of
2.7mx75mmx50mm and that instead of making
payment for the work executed, payment was
made for 140 R meters rafters of size
50mmx25mm.
b. The work of fixing MS Ornamental Security grill
gate of size 4m x 1.8m weighing 151.20 kgs in
place of the same, the gate fixed was of size 2m x
1.8 m.
- 10 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
c. As per the sanction order 112 cement poles were to
be erected around Anjuman Graveyard of Karadagi
village, Savanur and barbed wire of-length
2121.6m but on inspection it was found only 67
poles were erected and the length of the barbed
wire was only 1122.25m
d. On going through the payment, payment was made
as per the estimated amount not on the actual
work executed as notedabove.
e. DGOs in collusion with each other made payment
as per the estimated amount instead of making
payment as per the work executed, thereby,
caused loss of exchequer to the Government and
misutilization of the funds with ulterior motive.
5. In view of the facts stated above and the material
on record, reply of you-DGOs have not been found
satisfactory to drop the proceedings. The facts
supported by the material on: record show that you
DGOs, being Government servants, have failed to
maintain absolute devotion to duty and also acted
in a manner, unbecoming of Government servants,
and thereby committed misconduct and made
yourselves liable for disciplinary action.
6. Since the said facts and material on record prima-
facie show that you-DGOs have repeatedly
committed misconduct as per Rule 3(1) of the KCS
(Conduct) Rules, 1966, а герort u/s 12(3) of
Karnataka Lokayukta Act, was sent to the
Competent Authority with a recommendation to
initiate disciplinary proceedings Under Rule 14-A of
Karnataka Civil Services (Classification, Control and
Appeals) Rules 1957. In turn Competent Authority
initiated disciplinary proceedings against you-DGOs
and entrusted the enquiry to this Institution vide
reference no. 1 and Hon'ble Lokayukta nominated
this enquiry Authority, to conduct enquiry and
report vide reference No. 2. Hence, this charge.”
- 11 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
The enquiry is conducted and recommendation springs from the
hands of the Lokayukta to the competent authority seeking
imposition or directing imposition of punishment of 30% of the
pension payable to the petitioners for a period of five years to
be withheld. The recommendation is as follows:
“It is useful to extract paragraph 10(b)(i), (ii) & (iii) of
the recommendation, which reads as hereunder:
"10. In the light of the discussion made above, I
make the recommendation as hereunder:
(b) So for as penalty is concerned to:
(i) DGO-1 deserves to be reverted to one
cadre below the rank of Executive
Engineer held on the date of the
initiation of the disciplinary proceedings
and the pay scale required to be fixed in
that position with further direction that
he will continue in that post/cadre for a
period of three years from the date of
reversion and he will not he eligible for
grant of any increments during the said
period of reversion from his position as
stated above. Further, if by that time the
penalty is imposed by the disciplinary
authority, the DGO-1 has been promoted
to the higher position/cadre, he may be
reverted to the immediate lower position
from the one held by him and he will
continue in that position/cadre for a
period of three years from the date of
reversion and during the said period of
reversion he will not be eligible for grant
of any increments. After the expiry of
three years of period fixed as stated
above he will be entitled to be promoted
to the original position/cadre held by
him and he will be entitled to earn
- 12 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
increments and other financial benefits
in the promoted cadre.
(ii) DGO-2 is concerned his pay scale may be
reduced to the lowest level in the cadre
of Junior Engineer and he may be denied
promotion for a period of three years.
(iii) Since, DGO-3 has already retired from
service, he may be denied fifty percent of
his pension."
2. Pursuant to the said recommendation made, the Under
Secretary to Government, Rural Development and
Panchayath Raj Department by means of his
communication dated 06-02-2018 has brought to the
notice of the Lokayukta that DGO-1 Sri S.R.Patil, the then
Executive Officer Taluk Panchayath, Savanur Taluk had
retired from service on 30th June 2017.It is necessary to
point out that, my recommendation was made on 16-05-
2017, when Sri S.R.Patil was in service. However, since
th
he had retired from service on30 June 2017, as
suggested by the government, it is necessary to modify
the recommendation made by me so far as the penalty
against DGO-1 Sri S.K.Patil is concerned. At paragraph 7,
8 & 9 of my recommendation, I have given reasons for
recommending the penalty earlier made. However,
since DGO-1 Sri S.K.Patil has already retired from
service, in my view, on the basis of the earlier
recommendation made by me for his reversion from
the post held by him, he may be denied 30% (thirty
percent) of the pension payable to him for a period
of five years. So far as DGO-2 Sri Malleshappa,
Junior Engineer is concerned, he is also retired from
service on 31-05-2016, he may also denied 30%
(thirty percent) of the pension payable to him for a
period of five years.
3. Since, it is stated that the DGO-3 Sri Syed
Musthaq, Assistant Executive Engineer is in service,
he may be denied three increments without
cumulative effect.
4. In the terms stated above, the original
recommendation made by me imposing the penalty at
- 13 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
paragraph 10(b)(i), (ii) & (iii) against (1) Sri S.R.Patil, the
then Executive Officer, Taluk Panchayath, Savanur Taluk,
Haveri District (2) Sri Malleshappa, Junior Engineer,
Panchayath Raj Engineering Sub Division, Savanur Taluk,
Haveri District and (3) Sri Syed Musthaq, Assistant
Executive Engineer, Panchayath Raj
Engineering Sub-Division, Savanur Taluk, Haveri District
is modified as stated above.
Accordingly, modified recommendation is made to the
Government.
Action taken in the matter be intimated to this Authority
within three months from the date of receipt of the
recommendation.”
The recommendation was on the strength of the report of the
Enquiry Officer. The relevant findings of the Enquiry Officer are
as follows:
“28. In the cross examination, DWs 1 to 3 have admitted
that on each and every stage, they had to verify the work
and only if the work is completed as per the estimated
plan, money has to be released, they have denied that
work was not done in accordance with action plan inspite
of it, money was paid the contractors and they have
caused loss to State Exchequer. Further DWs have
deposed that they do not know that the size of rafters
and reapers were less than specified size. DGOs have not
denied the suggestion. This fact clearly proves the
evidence of PWs 1 to 3 that DGOs did not provide
specified size of rafters and reapers to the school
building, they have denied that one side grill gate was
fixed and another grill gate was not found in the spot and
in the graveyard inspite of 112 cement poles only 67
cement poles were erected and instead of 2121.6m
barbed wire, the barbed wire measuring 1122.25 m was
fixed and inspite of it, they have made payment to the
contractor. Though the work was not executed as per the
estimate, DW3 has admitted that he prepared the
- 14 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
estimate and according to the estimate, contractors had
to execute the work.
29. As discussed above, the contractor instead of
providing 140 running m jungle wood reapers 50 mm x
25mm, in one room he provided 6 rafters measuring
1.40 m x 75 mm x 50 mm and in the corridor, he
provided only 2 rafters measuring 2.7m x 75 mm x 50
mm, one side ornamental grill gate was not properly,
fixed, and payment of Rs. 68440/ was paid to the
contractor towards this work, many of the roof tiles
were broken within 1 year and towards this work a sum
of Rs. 99,725/- was paid to the contractor. In anjuman
graveyard, a sum of Rs. 1,85,000/- was sanctioned for
erecting cement poles by digging 112 pits measuring
0.5m x 0.5m x0.6 m but the contractor had dug and
erected only 67 cement poles, fixed barbed wire
measuring 1122.25m length instead of 2121.6 min
length. DGO 2 has recorded the measurement book,
DGO 3 supervised the work and made payment of Rs.
1,84,899/-, In anganawadi instead of 2 cement beds,
only one cement bed work was carried out, but DGOs
have made full payment to the contractors.
30. Therefore I hold that DGO 1 Sri. S. R Patil, then
working as Executive Officer, Taluk Panchayath,
Savanur, DGO2 Malleshappa, the then Jr. Engineer and
DGO 3 Sri. Syed Musthaq, Sri. the then Assistant
Executive Engineer, PRE sub division Savanur Haveri
District committed irregularities in not properly
examining the spot of construction work executed for
Urdu Primary School, Karadagi village, Savanur taluk
and on the basis of bogus bills, without actually
execution of repair work and erection of poles
surrounding the anjuman graveyard and fencing, DGOs
passed the bills as per the estimated amount not on the
actual work executed by the contractor and caused
monitory loss to the Government. The charges made
against DGOs are very specific. Therefore I hold that
the DGOs, being the Government servants, failed to
maintain absolute integrity besides devotion to duty
and acted in a manner unbecoming of the Government
servants. Hence, I proceed to answer point No. 1 in the
affirmative.
- 15 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
31. Point No. 2: For the reasons discussed above, I
proceed to pass the following;
ORDER
Disciplinary Authority has proved the charges as framed
against the following DGOs:
1. Sri. S.R. Patil, the then Executive Officer,
Taluk Panchayath, Savanur Taluk, Haveri
District(presently Executive Officer, Taluk
Panchayath, Byadagi)
2. Sri. Malleshappa, Jr. Engineer, Panchayath
Raj Engineering Sub division, Savanur Taluk,
Haveri District and
3.Sri. Syed Musthaq, Assistant Executive
Engineer, Panchayath Raj Sub division,
Savanur Taluk, Haveri District
Hence, this report is submitted to Hon'ble Lokayukta for
kind consideration.
th
Dated this the 26 October, 2016”
This leads to the imposition of the penalty and the imposition of
the penalty leads the petitioners before the Tribunal. The
Tribunal, by the order impugned, answering every one of the
contentions that is advanced by the petitioners before it,
declines to accept any of the contentions. The reasons so
rendered by the Tribunal are as follows:
“7. The applicants have not undertaken any works
under the scheme, hence the question of
misappropriation of funds does not arise. When the
applicants have submitted their objections before
- 16 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
rd
submitting 12(3) report, the 3 respondent has not
considered the objections filed. Hence, there is total non-
application of mind in submitting the 12(3) report, as
such the impugned order cannot be sustained. The
applicants contend that the charges famed against the
applicants does not reflect the omission or commission of
each of the applicants and further the imputation
statement also does not reveal the same, hence the
charge does not reflect role of the applicants regarding
the irregularities committed, hence it is very vague. When
joint proceedings are initiated against more than one
employee, the charge must be specific, distinct and clear.
In support of the said contention they have relied on the
judgment rendered by the Hon’ble Apex Court in the case
of Union of India Vs. Gyan Chand Chatter reported in
(2009) 12 SCC 78 and in the case of Kumaon Mandal
Vikas Nigam Limited Vs. Girija Shankar Pant and
others reported in (2001) 1 SCC 182 and in the case of
Government of A.P Vs. A. Venkata Raidu reported in
(2007) 1 SCC 338 and in the case of State of A.P. Vs. N.
Radhakrshna reported in (1998) 4 SCC 154.
8.The learned Counsel appearing for the
respondent Nos. 3 & 4 by relying on the reply statement
contended that based on the complaint filed by the one
Sri Rabbani A. Svanur, regarding the irregularities
committed in the execution of works when explanation
was called from the applicants, admittedly the applicants
submitted their explanations which is reflected in 12 (3)
report submitted by the 2nd respondent. On the basis of
the documents collected during Preliminary Investigation
and the reply submitted by the applicants which was
found to be not convincing to drop the proceedings, the
3rd respondent sent report under Section 12 (3) of the
Lokayukta Act, 1985 and sought to entrust the matter to
hold enquiry against the applicants for the misconduct
committed. Hence, the applicants cannot contend that
there is violation of Section 9(3) (a) & (b) of the
Lokayukta Act. Since the copy of the complaint was
already furnished and the applicants admittedly submitted
their replies, the decision relied on by the applicants in
the case of N Gundappa referred to supra can’t be made
applicable to facts of the applicants’ case. The charge
framed against the applicants is that without holding spot
- 17 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
inspection and on the basis of bogus bills they have
passed the bills and thus, committed misconduct. Hence,
the charges levelled against the applicants are specific.
Based on the said charges on behalf of the Disciplinary
Authority three witnesses were examined, who have
supported the charges. The applicants in the cross
examination have admitted that on each and every stage,
after verifying the work and only if the work is completed
as per the estimate and plan money has to be released.
Further they have admitted that they don’t no the size of
raptors and reparse which were fixed, which are less than
the specified sizes. The Enquiry Officer after considering
the evidence lead on behalf of the Disciplinary Authority
as well as the applicants’ and the admission made by the
applicants has submitted the report holding that the
charges are proved. Hence, the contention taken by the
applicants that the enquiry report is perverse is
untenable. The 2nd respondent after considering the
enquiry report submitted and the replies submitted by the
applicants to the 2nd show cause notice, having arrived
at a finding that the charges are proved has imposed the
impugned penalty orders on the applicants which are just
and proper as such sought for dismissing the applications.
9.The learned AGA appearing for the respondent
Nos. 1 & 2 has filed reply statement and stated that he is
adopting the argument canvassed by the learned Counsel
for the respondents Nos. 3 & 4.
10.The contention raised in the applications is that
when a complaint was made by one Sri Rabbani A.
Savanur alleging misappropriation of funds and when the
3rd respondent proceeded against applicants under
Section9 of the Lokayukta Act, 1984, the copy of the
compliant was not made available to the applicants and
opportunity was not provided to have their say in the
matter, hence there is clear violation of provision of
Section 9(3) (a) & (b) and in support of the said
contentions they have relied on the judgment rendered
by the Hon’ble High Court in the case of N.Gundappa
(Supra). Per contra, the learned Counsel for the
respondent Nos. 3 & 4hascontended that, after filing the
complaint against the applicants regarding the
irregularities committed a preliminary investigation was
- 18 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
done and after submission of the report by the
Investigation Officer, the objections were called from the
applicants on the report filed by the Investigation Officer.
The applicants submitted their replies which were not
convincing and acceptable, hence report was sent under
Section 12(3) of the Lokayukta Act seeking entrustment
of the matter to hold regular enquiry against the
applicants. Hence, the applicants cannot contend that
there is violation of under Section 9(3) (a) & (b)
Lokayukta Act. Regarding the rival contentions raised its
after submission of Preliminary Investigation report, the
copy of the complaint as well as copy of the report of the
Investigation Officer was furnished to the applicant and
the applicants admittedly submitted their replies, hence
they cannot contend that there is violation of Section 9(3)
(a) & (b) of the Act. The judgment relied on by the
applicant in the case of Sri N. Gundappa will not come to
the rescue of the applicants.
11.The contention of the applicants is that the
Enquiry Officer has not considered the evidence adduced
by the applicants and has not assigned reasons for
brushing aside the defence put forth by them, hence the
findings of the Enquiry Officer are biased and it has to be
quashed. Per contra, the learned Counsel for respondent
Nos. 3 & 4 contended that sufficient opportunity was
provided to the applicants to defend their case before the
enquiry officer. The applicants in the cross examination in
categorical terms admitted that “on each and every state,
they have to verify the work and only if the work is
completed as per the estimate and plan, the money has
to be released”. Further, they have deposed that they do
not know the size of rafters and reapers fixed which are
less than specified size. This admission made proves the
fact that specified size of rafters and reapers is not
provided to the school building. The Investigation Officer
who conducted the investigation was examined as PW3
has categorically stated regarding the deficiency carried
out which was not denied by cross examining the said
witness. Hence, the contention of the applicants that the
report of the Enquiry Officers is based on no evidence is
without any basis. To consider the rival contentions we
have gone through evidence lead by the Investigation
Officer who was examined as PW3.In his examination
- 19 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
Chief, he has stated that when he inspected the repair
works done at Kardagi Urdu School building, he noticed
that the estimated cost was Rs. 70,000/- and the
contractor had to provide 50mm x 25mm jungle wood
reapers measuring 140 running meters, but the
contractor has fixed only 1.40 meters in the length of 75
mm x 50 mm rafters of 6 in numbers & in the corridor, he
has fixed 2.7 meters in length x 75 mm x 50 mm rafter 2
in numbers. Further, regarding the fixing of grill
measuring 4 meters x 1.8 meters, weighing 151.20 kgs,
the Contractor has supplied one gate measuring 2 meters
width and 1.8-meter height and the other side gate was
removed. When enquired it was informed that the other
part of the gate is kept inside the school. He also stated
that the applicant No.2 recorded the same in the MB
book, the applicant No.3 verified the measurement book
and the applicant No.1 has passed the bill for Rs.
68,440/-and in that regard he has produced exhibit P15.
Further, regarding the repair of the corridor of the
flooring of the school, laying Kadappa Slabs and supplying
1000 Mangalore 1st class special tiles for the ridges and
hips and applying roof tiles, he noticed that many roof
tiles were broken. In this regard, he has submitted a
report along with documents marked as Exhibit P16. He
has also stated that he inspected Anjuman Graveyard and
the estimated cost of Rs. 1,85,000/- was sanctioned for
erecting cement poles and to dig 112 pits, measuring 0.5
meters x 0.6 meters but he noticed only 67 cement poles
were erected by digging the pits and the Contractor has
not dug 45 pits but payment was made even for the
undue 45 pits. He has also noticed that the standard
height of cement poles is 2.7 meters but actual
measurement noticed was 2.2 meters. Further the steel
fabrication height is 2.2 meters above the earth level but
in the spot, the measurement of the steel fabrication was
1.70 meters height. Further, the Contractor was supposed
to fix 2121.6 meters of barbed wire to the fencing but
actually fixed 1122.25 meters of barbed wires. The 2nd
applicant has recorded the measurement book, the 3rd
applicant supervised the work and the 1st applicant made
the payment of Rs. 1,84,899/-. In this regard, he has
produced the document marked as Exabit P17. He also
stated that regarding the repair work of Anganawadi, the
estimated cost of Rs. 65000/- was sanctioned in the years
- 20 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
2012-2013 and in the entrance, contractor was supposed
to provide one bed concrete measuring 7.000 meters in
length x 2.00 meters in width x 0.10 meters in thickness
and another bed measuring 7.50 meters in length x 2
meters in width x 0.10 meters in thickness. But in the
spot, he noticed only one bed measuring 7.20 meters in
length x 2 meters in width and in that regard, he has
produced the document marked as Exabit P18. The
applicant No.2 has recorded the measurement in the
book, the applicant No.3 supervised the work and the
applicant No.1 made payment. Since, he noticed
discrepancies in the four works, he has produced the
documents to that effect. In the cross examination of the
said witness on behalf of the applicants only suggestion
made was that the Investigation Officer has not taken
documents from the Taluk Office and the applicant Nos.1
& 3 were not present when investigation was done and
except the applicant No.2 and his assistant no other
officials were present and he has not drawn mahazar in
the spot. The said suggestion was denied and the
Investigation Officer stated that he has prepared note in
the spot, but he has not taken signature of the applicant
No.2 on the said note. Further suggestion was made that
he has not taken measurement of jungle wood reapers &
rafters which was denied. When a suggestion was made
that he has not taken measurement of the gate, the
Investigation Officer has stated that he has taken
measurement of the gate but he has not taken the weight
of the gate. He has also stated that he has not counted
the tiles which were broken. He has also stated that he
has not verified who has broken the roof tiles. When a
suggestion was made that the estimate was modified for
erection of Cement pillars he denied the same. When a
suggestion was made that he has not taken the
measurement of the pillars the same was denied. A
further suggestion was made that without making proper
verification and without taking measurement a false
report was filed which was denied by the Investigation
Officer. From the evidence adduced by the Investigation
Officer, it clearly establishes the fact that regarding the
four works carried out the wood reapers were not in
accordance with actual measurements shown in the
estimate. Further, instead of two grill gates only one was
fixed and regarding erecting the cement poles to dig112
- 21 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
pits only 67 poles were erected by digging the pits and 45
pits were not dug and the poles are not erected. Further,
though barbed wire measuring 2121.6 meters was to be
fixed, but in the spot only 1122.25 meters of barbed wire
was fixed. Further, regarding the repair work for
Anganawadi, the contractor was supposed to provide two
bed concrete, but in the spot only one bed concrete was
found. For all the aforesaid discrepancies, it is the 2nd
applicant who recorded the measurements in the MB
book, the 3rd applicant who supervised the works and the
1st applicant who has sanctioned the payments. Since,
the evidence adduced along with the documents clearly
establishes the fact that applicants herein are involved in
sanctioning the amounts for the works which were not
done and further in the cross examination, the applicants
clearly admitted that on each and every stage they have
to verify the work and only if the work is completed as
per the estimates then the money has to be released, but
without inspecting the actual works carried out, since,
they have released the amounts to the contractor based
on the evidence adduced, the documents produced and
the admission made by the applicants in the cross
examination the enquiry officer has held that the charge
levelled in respect of four works has been proved. Hence,
the contention of the applicants that the evidence
adduced by the applicants are not considered is without
any basis. When the Enquiry Officer by relying on the
evidence adduced and the documents produced has
recorded a finding, that the charges are proved, which is
after evaluation of the evidence as well as the documents,
the scope of Judicial review in the departmental
proceedings by the Tribunal/Courts is very limited. The
Hon’ble Apex Court in the case of State of Tamil Nadu
and Others Vs. S. Subramani reported in 1996 (AIR
1232) and in the case of U.P.S.R.T.C and Others Vs.
Ram Chandra Yadav reported in JT 2000(8) SC 198 and
in the case of M.P State Agro Industries Development
Corporation Limited Vs. Jahan Khan reported in 2007
10 SCC 88 have held that “ the scope of the Judicial
review in departmental proceedings is limited and the
Tribunal/Court should ordinarily not interfere with them
by re-appreciating of the evidence adduced by the
enquiry officer and substitute their own findings or
- 22 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
conclusion, unless the findings and conclusion arrived are
based on no evidence.
12. The other contention raised by the applicants is
that in the charge framed role of each of the applicants is
not stated, hence the charges framed itself is vague. In
this regard, in the Articles of charge framed the role of
each of the applicant was mentioned and further
regarding the irregularities committed in each works, the
same was clearly mentioned in the statement of
imputation of misconduct. Based on the Articles of
charges, when enquiry was proceeded, the applicants
participated in the enquiry and when sufficient
opportunity was provided to defend their case, now they
cannot contend that the charges are vague. Hence, the
Judgments relied on by the applicants in the case of
Gyan Chand Chatter, Girija Shankar, A Venkata
Raidu and N.Radhakrishan referred to supra cannot be
made applicable to the facts of the present case.
13. The last contention raised by the applicant is
that the reply submitted by the applicants to the 2nd
show cause notice is not considered and no finding is
recorded, hence the impugned order cannot be sustained.
In this regard, we have perused impugned order passed
nd
by the 2 respondent. Based on the enquiry report and
the recommendation made by the Hon’ble Upa-
nd nd
Lokayukta, when the 2 respondent issued 2 show cause
nd
notice, the applicants by submitting replies to the 2 show
cause notice have not produced any fresh materials or
nd
documents to disprove the charges. Hence, the 2
respondent on considering the enquiry report, the
recommendation made by the Hon’ble UpaLokayukta and
nd
the replies submitted by the applicants to the 2 show
cause notice having noticed that the charges levelled are
substantially proved in the enquiry and no fresh materials
or documents are produced by the applicants along with
nd
the reply to the 2 show cause notice, has imposed the
impugned penalty order. Hence the contention of the
nd
applicants that reply to the 2 show cause notice is not
considered before passing the impugned penalty order is
untenable.
- 23 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
14. In view of the discussion made above, we are
of the opinion that the applicants have not made out a
case for our interference. Accordingly, the applications
being devoid of merits are dismissed.”
It is this that drives these petitioners to this Court in the
subject petition.
9. The issue now would be, in the teeth of the
aforesaid facts and the findings rendered right from the report
of the Enquiry Officer till the order of the Tribunal whether this
Court would sit in appeal and interfere with the findings of the
Tribunal. It becomes apposite to notice the recent judgment of
the Apex Court rendered in the case of STATE OF
JHARKHANDAND OTHERS v. RANJAN KUMAR AND
1
OTHERS , wherein it is held as follows:
“…. …. ….
19.The law is settled that the findings of fact
recorded by the disciplinary authority are not to be
interfered with by the Court as a matter of course,
particularly while exercising jurisdiction under
Article 226 of the Constitution of India. In
departmental proceedings, the standard of proof is
one of preponderance of probabilities. Where the
material on record reasonably supports the
departmental case, the High Court would not
reappreciate the evidence as if sitting in appeal. In
this regard, reference may be made to the decision
of this Court in Union of India v. Subrata Nath, in
1
2026 SCC Online SC 824
- 24 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
Civil Appeal Nos. 7939-7940 of 2022 decided on
22.11.2022, wherein the limits of judicial review in
service disciplinary matters have been
authoritatively reiterated. The following paragraphs
are pertinent:
“15. It is well settled that courts
ought to refrain from interfering with
findings of facts recorded in a departmental
inquiry except in circumstances where such
findings are patently perverse or grossly
incompatible with the evidence on record,
based on no evidence. However, if principles
of natural justice have been violated or the
statutory regulations have not been adhered
to or there are malafides attributable to the
Disciplinary Authority, then the courts can
certainly interfere.
16. In the above context, following
are the observations made by a three-Judge
Bench of this Court in B.C. Chaturvedi
(supra):
“12. Judicial review is not
an appeal from a decision but a
review of the manner in which the
decision is made. Power of judicial
review is meant to ensure that the
individual receives fair treatment
and not to ensure that the
conclusion which the authority
reaches is necessarily correct in
the eye of the court. When an
inquiry is conducted on charges of
misconduct by a public servant, the
Court/Tribunal is concerned to
determine whether the inquiry was
held by a competent officer or
whether rules of natural justice are
complied with. Whether the
findings or conclusions are based
on some evidence, the authority
entrusted with the power to hold
inquiry has jurisdiction, power and
authority to reach a finding of fact
or conclusion. But that finding
must be based on some evidence.
Neither the technical rules of
Evidence Act nor of proof of fact or
evidence as defined therein, apply
- 25 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
to disciplinary proceeding. When
the authority accepts that evidence
and conclusion receives support
therefrom, the disciplinary
authority is entitled to hold that
the delinquent officer is guilty of
the charge. The Court/Tribunal in
its power of judicial review does
not act as appellate authority to
reappreciate the evidence and to
arrive at its own independent
findings on the evidence. The
Court/Tribunal may interfere
where the authority held the
proceedings against the delinquent
officer in a manner inconsistent
with the rules of natural justice or
in violation of statutory rules
prescribing the mode of inquiry or
where the conclusion or finding
reached by the disciplinary
authority is based on no evidence.
If the conclusion or finding be such
as no reasonable person would
have ever reached, the
Court/Tribunal may interfere with
the conclusion or the finding, and
mould the relief so as to make it
appropriate to the facts of each
case.
13. The disciplinary
authority is the sole judge of facts.
Where appeal is presented, the
appellate authority has
coextensive power to reappreciate
the evidence or the nature of
punishment. In a disciplinary
inquiry, the strict proof of legal
evidence and findings on that
evidence are not relevant.
Adequacy of evidence or reliability
of evidence cannot be permitted to
be canvassed before the
Court/Tribunal. In Union of India
v. H.C. Goel 1963 SCC OnLine SC 16
: (1964) 4 SCR 718 this Court held
at p. 728 that if the conclusion,
upon consideration of the evidence
reached by the disciplinary
authority, is perverse or suffers
from patent error on the face of
the record or based on no evidence
- 26 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
at all, a writ of certiorari could be
issued.
xxx xxx xxx
xxx xxx xxx
18. A review of the above
legal position would establish that
the disciplinary authority, and on
appeal the appellate authority,
being fact-finding authorities have
exclusive power to consider the
evidence with a view to maintain
discipline. They are invested with
the discretion to impose
appropriate punishment keeping in
view the magnitude or gravity of
the misconduct. The High
Court/Tribunal, while exercising
the power of judicial review,
cannot normally substitute its own
conclusion on penalty and impose
some other penalty. If the
punishment imposed by the
disciplinary authority or the
appellate authority shocks the
conscience of the High
Court/Tribunal, it would
appropriately mould the relief,
either directing the
disciplinary/appellate authority to
reconsider the penalty imposed, or
to shorten the litigation, it may
itself, in exceptional and rare
cases, impose appropriate
punishment with cogent reasons in
support thereof.”
[Emphasis laid]
17. In State Bank of Bikaner and
Jaipur v. Nemi Chand Nalwaya (2011) 4 SCC
584, a two Judge Bench of this Court held as
below :
“7. It is now well settled
that the courts will not act as an
appellate court and reassess the
evidence led in the domestic
enquiry, nor interfere on the
ground that another view is
possible on the material on record.
If the enquiry has been fairly and
properly held and the findings are
- 27 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
based on evidence, the question of
adequacy of the evidence or the
reliable nature of the evidence will
not be grounds for interfering with
the findings in departmental
enquiries. Therefore, courts will
not interfere with findings of fact
recorded in departmental
enquiries, except where such
findings are based on no evidence
or where they are clearly perverse.
The test to find out perversity is to
see whether a tribunal acting
reasonably could have arrived at
such conclusion or finding, on the
material on record. The courts will
however interfere with the findings
in disciplinary matters, if principles
of natural justice or statutory
regulations have been violated or if
the order is found to be arbitrary,
capricious, mala fide or based on
extraneous considerations. (Vide
B.C. Chaturvedi v. Union of India
(1995) 6 SCC 749 , Union of India
v. G. Ganayutham (1997) 7 SCC
463 , Bank of India v. Degala
Suryanarayana (1999) 5 SCC 762,
and High Court of Judicature at
Bombay v. Shashikant S. Patil
(2000) 1 SCC 416).
[Emphasis laid]
18. In Chairman & Managing Director,
V.S.P. v. Goparaju Sri Prabhakara Hari Babu
(2008) 5 SCC 569, a two Judge Bench of this
Court referred to several precedents on the
Doctrine of Proportionality of the order of
punishment passed by the Disciplinary Authority
and held that :
“21. Once it is found that all
the procedural requirements have
been complied with, the courts
would not ordinarily interfere with
the quantum of punishment
imposed upon a delinquent
employee. The superior courts only
in some cases may invoke the
doctrine of proportionality. If the
decision of an employer is found to
be within the legal parameters, the
- 28 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
jurisdiction would ordinarily not be
invoked when the misconduct
stands proved.”
19. Laying down the broad
parameters within which the High Court
ought to exercise its powers under Article
226/227 of the Constitution of India and
matters relating to disciplinary proceedings,
a two Judge Bench of this Court in Union of
India v. P. Gunasekaran (2015) 2 SCC 610
held thus :
“12. Despite the well-
settled position, it is painfully
disturbing to note that the High
Court has acted as an appellate
authority in the disciplinary
proceedings, reappreciating even
the evidence before the enquiry
officer. The finding on Charge I
was accepted by the disciplinary
authority and was also endorsed
by the Central Administrative
Tribunal. In disciplinary
proceedings, the High Court is not
and cannot act as a second court of
first appeal. The High Court, in
exercise of its powers under
Articles 226/227 of the
Constitution of India, shall not
venture into reappreciation of the
evidence. The High Court can only
see whether:
(a) the enquiry is held by a
competent authority;
(b) the enquiry is held according
to the procedure prescribed in
that behalf;
(c) there is violation of the
principles of natural justice in
conducting the proceedings;
(d) the authorities have disabled
themselves from reaching a
fair conclusion by some
considerations extraneous to
the evidence and merits of the
case;
- 29 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
(e) the authorities have allowed
themselves to be influenced by
irrelevant or extraneous
considerations;
(f) the conclusion, on the very
face of it, is so wholly
arbitrary and capricious that
no reasonable person could
ever have arrived at such
conclusion;
(g) the disciplinary authority had
erroneously failed to admit the
admissible and material
evidence;
(h) the disciplinary authority had
erroneously admitted
inadmissible evidence which
influenced the finding;
(i) the finding of fact is based on
no evidence.
13. Under Articles 226/227
of the Constitution of India, the
High Court shall not:
(i) reappreciate the evidence;
(ii) interfere with the conclusions
in the enquiry, in case the
same has been conducted in
accordance with law;
(iii) go into the adequacy of the
evidence;
(iv) go into the reliability of the
evidence;
(v) interfere, if there be some
legal evidence on which
findings can be based.
(vi) correct the error of fact
however grave it may appear
to be;
(vii) go into the proportionality of
punishment unless it shocks
its conscience.”
- 30 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
20. In Union of India v. Ex. Constable
Ram Karan, (2022) 1 SCC 373, a two Judge
Bench of this Court made the following pertinent
observations :
“23. The well-ingrained
principle of law is that it is the
disciplinary authority, or the appellate
authority in appeal, which is to decide
the nature of punishment to be given
to the delinquent employee. Keeping in
view the seriousness of the misconduct
committed by such an employee, it is
not open for the courts to assume and
usurp the function of the disciplinary
authority.
24. Even in cases where the
punishment imposed by the
disciplinary authority is found to
be shocking to the conscience of
the court, normally the disciplinary
authority or the appellate authority
should be directed to reconsider
the question of imposition of
penalty. The scope of judicial
review on the quantum of
punishment is available but with a
limited scope. It is only when the
penalty imposed appears to be
shockingly disproportionate to the
nature of misconduct that the
courts would frown upon. Even in
such a case, after setting aside the
penalty order, it is to be left to the
disciplinary/appellate authority to
take a call and it is not for the
court to substitute its decision by
prescribing the quantum of
punishment. However, it is only in
rare and exceptional cases where
the court might to shorten the
litigation may think of substituting
its own view as to the quantum of
punishment in place of punishment
awarded by the competent
authority that too after assigning
cogent reasons.”
21. A Constitution Bench of this Court in
State of Orissa (supra) held that if the order of
dismissal is based on findings that establish the
- 31 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
prima facie guilt of great delinquency of the
respondent, then the High Court cannot direct
reconsideration of the punishment imposed. Once
the gravity of the misdemeanour is established
and the inquiry conducted is found to be
consistent with the prescribed rules and
reasonable opportunity contemplated under the
rules, has been afforded to the delinquent
employee, then the punishment imposed is not
open to judicial review by the Court. As long as
there was some evidence to arrive at a
conclusion that the Disciplinary Authority did,
such an order becomes unassailable and the High
Court ought to forebear from interfering. The
above view has been expressed in Union of India
v. Sardar Bahadur (1972) 4 SCC 618.
22. To sum up the legal position,
being fact finding authorities, both the
Disciplinary Authority and the Appellate
Authority are vested with the exclusive
power to examine the evidence forming part
of the inquiry report. On finding the
evidence to be adequate and reliable during
the departmental inquiry, the Disciplinary
Authority has the discretion to impose
appropriate punishment on the delinquent
employee keeping in mind the gravity of the
misconduct. However, in exercise of powers
of judicial review, the High Court or for that
matter, the Tribunal cannot ordinarily
reappreciate the evidence to arrive at its
own conclusion in respect of the penalty
imposed unless and until the punishment
imposed is so disproportionate to the
offence that it would shock the conscience
of the High Court/Tribunal or is found to be
flawed for other reasons, as enumerated in
P. Gunasekaran (supra). If the punishment
imposed on the delinquent employee is such
that shocks the conscience of the High Court
or the Tribunal, then the
Disciplinary/Appellate Authority may be
called upon to re-consider the penalty
imposed. Only in exceptional circumstances,
which need to be mentioned, should the
High Court/Tribunal decide to impose
appropriate punishment by itself, on
offering cogent reasons therefor.
- 32 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
23. Applying the law laid down above to
the instant case, we are of the view that the High
Court ought not to have interfered with the
findings of fact recorded by the Disciplinary
Authority.”
20. Applying the aforesaid principles to the facts of
the present case, we are of the considered opinion that
the learned Single Judge correctly appreciated the limited
scope of judicial review and declined to substitute judicial
opinion in place of the findings recorded in the disciplinary
proceedings. However, the Division Bench, while
exercising appellate jurisdiction in the Letters Patent
Appeal, clearly transgressed the settled parameters of
judicial review by reappreciating the evidence and
disturbing concurrent findings of fact recorded by the
disciplinary authority, the Appellate Authority and the
Revisional Authority. Such an approach cannot be
countenanced in law.”
9.1. The Apex Court in RANJAN KUMAR supra was
following its earlier judgments, particularly the judgment
rendered in the case of UNION OF INDIA AND OTHERS v. P.
2
GUNASEKARAN , wherein it is held as follows:
“…. …. ….
15. In State of A.P. v. Chitra Venkata Rao [(1975)
2 SCC 557 : 1975 SCC (L&S) 349 : AIR 1975 SC 2151] ,
the principles have been further discussed at paras 21-
24, which read as follows : (SCC pp. 561-63)
“ 21 . The scope of Article 226 in
dealing with departmental inquiries has
come up before this Court. Two propositions
were laid down by this Court in State of A.P.
v. S. Sree Rama Rao [AIR 1963 SC 1723] .
2
(2015) 2 SCC 610
- 33 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
First, there is no warrant for the view that in
considering whether a public officer is guilty
of misconduct charged against him, the rule
followed in criminal trials that an offence is
not established unless proved by evidence
beyond reasonable doubt to the satisfaction
of the Court must be applied. If that rule be
not applied by a domestic tribunal of inquiry
the High Court in a petition under Article
226 of the Constitution is not competent to
declare the order of the authorities holding
a departmental enquiry invalid. The High
Court is not a court of appeal under Article
226 over the decision of the authorities
holding a departmental enquiry against a
public servant. The Court is concerned to
determine whether the enquiry is held by an
authority competent in that behalf and
according to the procedure prescribed in
that behalf, and whether the rules of natural
justice are not violated. Second, where
there is some evidence which the authority
entrusted with the duty to hold the enquiry
has accepted and which evidence may
reasonably support the conclusion that the
delinquent officer is guilty of the charge, it
is not the function of the High Court to
review the evidence and to arrive at an
independent finding on the evidence. The
High Court may interfere where the
departmental authorities have held the
proceedings against the delinquent in a
manner inconsistent with the rules of
natural justice or in violation of the
statutory rules prescribing the mode of
enquiry or where the authorities have
disabled themselves from reaching a fair
decision by some considerations extraneous
to the evidence and the merits of the case or
by allowing themselves to be influenced by
irrelevant considerations or where the
conclusion on the very face of it is so wholly
arbitrary and capricious that no reasonable
person could ever have arrived at that
conclusion. The departmental authorities
are, if the enquiry is otherwise properly
held, the sole judges of facts and if there is
some legal evidence on which their findings
can be based, the adequacy or reliability of
- 34 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
that evidence is not a matter which can be
permitted to be canvassed before the High
Court in a proceeding for a writ under
Article 226.
22 . Again, this Court in Railway Board v.
Niranjan Singh [(1969) 1 SCC 502 : (1969) 3
SCR 548] said that the High Court does not
interfere with the conclusion of the disciplinary
authority unless the finding is not supported by
any evidence or it can be said that no reasonable
person could have reached such a finding. In
Niranjan Singh case [(1969) 1 SCC 502 : (1969)
3 SCR 548] this Court held that the High Court
exceeded its powers in interfering with the
findings of the disciplinary authority on the
charge that the respondent was instrumental in
compelling the shutdown of an air compressor at
about 8.15 a.m. on 31-5-1956. This Court said
that the Enquiry Committee felt that the evidence
of two persons that the respondent led a group of
strikers and compelled them to close down their
compressor could not be accepted at its face
value. The General Manager did not agree with
the Enquiry Committee on that point. The
General Manager accepted the evidence. This
Court said that it was open to the General
Manager to do so and he was not bound by the
conclusion reached by the committee. This Court
held that the conclusion reached by the
disciplinary authority should prevail and the High
Court should not have interfered with the
conclusion.
23 . The jurisdiction to issue a writ of
certiorari under Article 226 is a supervisory
jurisdiction. The Court exercises it not as an
appellate court. The findings of fact reached
by an inferior court or tribunal as a result of
the appreciation of evidence are not
reopened or questioned in writ proceedings.
An error of law which is apparent on the
face of the record can be corrected by a
writ, but not an error of fact, however grave
it may appear to be. In regard to a finding of
fact recorded by a tribunal, a writ can be
issued if it is shown that in recording the
said finding, the tribunal had erroneously
refused to admit admissible and material
- 35 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
evidence, or had erroneously admitted
inadmissible evidence which has influenced
the impugned finding. Again if a finding of
fact is based on no evidence, that would be
regarded as an error of law which can be
corrected by a writ of certiorari. A finding of
fact recorded by the Tribunal cannot be
challenged on the ground that the relevant
and material evidence adduced before the
Tribunal is insufficient or inadequate to
sustain a finding. The adequacy or
sufficiency of evidence led on a point and
the inference of fact to be drawn from the
said finding are within the exclusive
jurisdiction of the Tribunal. (See Syed
Yakoob v. K.S. Radhakrishnan [AIR 1964 SC
477] .)
24 . The High Court in the present case
assessed the entire evidence and came to
its own conclusion. The High Court was not
justified to do so. Apart from the aspect that
the High Court does not correct a finding of
fact on the ground that the evidence is not
sufficient or adequate, the evidence in the
present case which was considered by the
Tribunal cannot be scanned by the High
Court to justify the conclusion that there is
no evidence which would justify the finding
of the Tribunal that the respondent did not
make the journey. The Tribunal gave
reasons for its conclusions. It is not possible
for the High Court to say that no reasonable
person could have arrived at these
conclusions. The High Court reviewed the
evidence, reassessed the evidence and then
rejected the evidence as no evidence. That
is precisely what the High Court in
exercising jurisdiction to issue a writ of
certiorari should not do.”
16. These principles have been succinctly summed
up by the living legend and centenarian V.R. Krishna Iyer,
J. in State of Haryana v. Rattan Singh [(1977) 2 SCC 491
: 1977 SCC (L&S) 298] . To quote the unparalleled and
inimitable expressions : (SCC p. 493, para 4)
- 36 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
“ 4 . … in a domestic enquiry the strict and
sophisticated rules of evidence under the Indian
Evidence Act may not apply. All materials which
are logically probative for a prudent mind are
permissible. There is no allergy to hearsay
evidence provided it has reasonable nexus and
credibility. It is true that departmental authorities
and administrative tribunals must be careful in
evaluating such material and should not glibly
swallow what is strictly speaking not relevant
under the Indian Evidence Act. For this
proposition it is not necessary to cite decisions
nor textbooks, although we have been taken
through case law and other authorities by
counsel on both sides. The essence of a judicial
approach is objectivity, exclusion of extraneous
materials or considerations and observance of
rules of natural justice. Of course, fair play is the
basis and if perversity or arbitrariness, bias or
surrender of independence of judgment vitiate
the conclusions reached, such finding, even
though of a domestic tribunal, cannot be held
good.”
17. In all the subsequent decisions of this Court up
to the latest in Chennai Metropolitan Water Supply and
Sewerage Board v. T.T. Murali Babu [ Chennai
Metropolitan Water Supply and Sewerage Board v. T.T.
Murali Babu , (2014) 4 SCC 108 : (2014) 1 SCC (L&S) 38]
, these principles have been consistently followed adding
practically nothing more or altering anything.
18. On Article I, the disciplinary authority, while
imposing the punishment of compulsory retirement in the
impugned order dated 28-2-2000, had arrived at the
following findings:
“Article I was held as proved by the
inquiring authority after evaluating the evidence
adduced in the case. Under the circumstances of
the case, the evidence relied on viz. letter dated
11-12-1992 written by Shri P. Gunasekaran,
provides a reasonable nexus to the charge
framed against him and he did not controvert the
contents of the said letter dated 11-12-1992
during the time of inquiry. Nor did he produce
any defence witness during the inquiry to support
- 37 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
his claims including that on 23-11-1992 he left
the office on permission. There is nothing to
indicate that he was handicapped in producing
his defence witness. …”
19.The disciplinary authority, on scanning the
inquiry report and having accepted it, after
discussing the available and admissible evidence on
the charge, and the Central Administrative Tribunal
having endorsed the view of the disciplinary
authority, it was not at all open to the High Court to
reappreciate the evidence in exercise of its
jurisdiction under Articles 226/227 of the
Constitution of India.
20. Equally, it was not open to the High Court,
in exercise of its jurisdiction under Articles
226/227 of the Constitution of India, to go into the
proportionality of punishment so long as the
punishment does not shock the conscience of the
court. In the instant case, the disciplinary authority
has come to the conclusion that the respondent
lacked integrity. No doubt, there are no measurable
standards as to what is integrity in service
jurisprudence but certainly there are indicators for
such assessment. Integrity according to Oxford
Dictionary is “moral uprightness; honesty”. It takes
in its sweep, probity, innocence, trustfulness,
openness, sincerity, blamelessness, immaculacy,
rectitude, uprightness, virtuousness, righteousness,
goodness, cleanness, decency, honour, reputation,
nobility, irreproachability, purity, respectability,
genuineness, moral excellence, etc. In short, it
depicts sterling character with firm adherence to a
code of moral values.”
(Emphasis supplied at each instance)
The Apex Court in the afore-quoted judgments holds that a
Court examining the findings of the Enquiry Officer should not
- 38 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
sit in appeal unless it brood perversity. The order of the
Tribunal in our considered view does not brood any perversity
or otherwise for this Court to sit in appeal over the findings of
fact either before the Enquiring Authority or what is recorded
by the Tribunal. As the offence alleged against these petitioners
is one of clearing of bills without the work being carried out, the
amount of misappropriation or otherwise may be ₹5,00,000/-
collectively, put that would not mean that this Court would
interfere on the findings of fact and also the order of the
Tribunal, which considers every aspect of the matter.
Therefore, the petitions deserve to be rejected.
10. It is however observed that it is open to the
petitioners to submit such representation to the respondent-
State on the strength of the interim order, on the basis of
which the pension has been drawn, and the respondent-State
shall pass necessary orders in accordance with law.
- 39 -
HC-KAR
NC: 2026:KHC-D:16590-DB
WP No. 105934 of 2023
C/W WP No. 105931 of 2023
CNR: KAHC020143052023
11. With the aforesaid observation, the petitions stand
rejected .
Ordered accordingly.
Pending interlocutory applications, if any, stand disposed
as not calling for adjudication.
Sd/-
(M.NAGAPRASANNA)
JUDGE
Sd/-
(HEMA KULKARNI)
JUDGE
PMP
CT:VH
List No.: 1 Sl No.: 1