Executive Engineer, City Division (Central), M.P.M.K.V.V. Comp. Ltd. vs M/S Mahamaya Pisai Kendra,

Court
Madhya Pradesh High Court

NEUTRAL CITATION NO. 2026:MPHC-GWL:12750
1 WP-66-2012
IN THE HIGH COURT OF MADHYA PRADESH

AT GWALIOR
BEFORE
HON'BLE SHRI JUSTICE MILIND RAMESH PHADKE
th
ON THE 20 OF APRIL, 2026
WRIT PETITION No. 66 of 2012
EXECUTIVE ENGINEER, CITY DIVISION (CENTRAL), M.P.M.K.V.V.
COMP. LTD.
Versus
M/S MAHAMAYA PISAI KENDRA,
Appearance:
Shri Narottam Sharma - Advocate for the petitioner.
Shri Ashish Shrivastava - Advocate for the respondent.
ORDER
The present petition, under Article 226 of the Constitution of India, has been
filed by the petitioner seeking following reliefs:-
"i) That the impugned order annexure P/1 may kindly be
quashed and the bill annexure P/2 and other subsequent bills raised
on continuous basis thereafter may kindly be upheld,
ii) any other relief deemed fit in the facts and circumstances
of the case doing justice in the matter including costs be also
awarded."
Learned counsel for the petitioner submits that the petitioner is a duly
licensed electricity distribution company under the provisions of the Electricity
Act, 2003 and is engaged in the supply and distribution of electricity in the State
of Madhya Pradesh, including the Gwalior region. The respondent consumer was
granted an industrial electricity connection with a sanctioned load of 20 HP (14.92
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 4/22/2026
10:16:50 AM

NEUTRAL CITATION NO. 2026:MPHC-GWL:12750
2 WP-66-2012
kW) for operating a flour mill, and the billing was required to be strictly governed

in accordance with the applicable tariff provisions and regulations framed by the
competent authority.
It is further submitted that upon inspection of the respondent’s premises
conducted on 21.10.2008, the connected load was found to be substantially higher
than the sanctioned load, to the extent of approximately 44 HP (32.8 kW). The
said inspection report was duly prepared in accordance with prescribed procedure
and was signed by the representative of the respondent, thereby lending
authenticity and evidentiary value to the findings recorded therein. On the basis of
this inspection and subsequent data, the petitioner was justified in initiating billing
for excess load as per the tariff conditions.
Learned counsel emphasizes that the electronic meter installed at the
respondent’s premises consistently recorded Maximum Demand far exceeding the
sanctioned load and the meter reading diary, as well as the MRI data periodically
extracted from the meter, clearly demonstrated that the Maximum Demand ranged
significantly above 14.92 KW over an extended period. This continuous recording
of higher demand could not had been ignored as it constituted reliable technical
evidence establishing that the respondent was, in fact, using electricity in excess of
the sanctioned capacity.
It is also contended that under the applicable tariff, consumers drawing load
beyond the sanctioned limit were liable to be billed separately for such excess
demand, including higher tariff rates and fixed charges calculated on the basis of
load. The rationale behind such provisions was not merely penal but was
intrinsically linked to the operational and technical requirements of the distribution
system. The petitioner was under a statutory obligation to maintain and design its
infrastructure in accordance with the sanctioned load of consumers, as any
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 4/22/2026
10:16:50 AM

NEUTRAL CITATION NO. 2026:MPHC-GWL:12750
3 WP-66-2012
unauthorized increase in load leads to undue stress on the system, resulting in

inefficiencies, potential failures, and financial losses.
It is further submitted that the respondent never raised any objection
regarding excess billing or alleged meter defects for a considerable period and
only approached the authorities at a much later stage. Upon such complaint, the
meter was duly tested in the authorized laboratory, and although certain defects in
the RTC and MD recording were noted for a limited period, the consumption
recording was found to be correct. Moreover, even after replacement of the meter
on multiple occasions, the Maximum Demand continued to be recorded at levels
higher than the sanctioned load, which clearly negated the contention that the
earlier readings were erroneous due to meter defects.
It is also pointed out that there is no material on record to suggest that all the
meters installed at different points of time were defective, and therefore, the
consistent pattern of high Maximum Demand across multiple meters establishes
beyond doubt that the respondent was utilizing excess load. The Forum erred in
disregarding this material evidence and instead relied on irrelevant considerations
such as correlation between consumption units and connected load, which is not
determinative in cases relating to excess load.
It is further submitted that the Forum failed to appreciate the distinction
between cases of electricity theft and cases of excess connected load. In the present
case, the issue was not that of unauthorized abstraction of energy but was of
unauthorized use of load beyond the sanctioned capacity, and therefore, the
relevant consideration was the connected load and recorded demand, not merely
the units consumed.
It is further submitted that the Forum also committed an error in discarding
the inspection report on untenable grounds, despite the fact that it bore the
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 4/22/2026
10:16:50 AM

NEUTRAL CITATION NO. 2026:MPHC-GWL:12750
4 WP-66-2012
acknowledgment of the respondent’s representative. The findings recorded therein

were further corroborated by continuous meter readings, thereby forming a
consistent chain of evidence which ought to have been relied upon.
In light of the aforesaid submissions, it is contended that the billing raised
by the petitioner was strictly in accordance with the applicable tariff provisions
and supported by documentary and technical evidence. The impugned order
passed by the Forum is therefore arbitrary, contrary to the settled principles
governing electricity billing, and suffers from non-consideration of relevant
material. The petitioner, being aggrieved by the said order, has invoked the
jurisdiction of this Court seeking appropriate relief by way of issuance of writ to
set aside the impugned order and uphold the billing raised for excess load.
Per contra, learned counsel for the respondent submits that the billing raised
by the petitioner on the basis of alleged excess load is arbitrary and unsustainable,
as it is founded on unreliable and defective meter data and upon the respondent
raising a complaint, the petitioner itself got the meter tested and the test report
revealed defects in the RTC and Maximum Demand (MD) recording mechanism,
thereby rendering the recorded MD data doubtful and unfit to be relied upon for
raising excess load charges, and the fact that the meters were replaced multiple
times further indicates persistent defects in the metering system
It is further argued that the inspection report relied upon by the petitioner
does not conclusively established the connected load in absence of proper
technical verification and cannot override the actual consumption pattern, which
remained consistent with the sanctioned load, and therefore there is no cogent or
independent evidence to prove that the respondent was using electricity beyond the
sanctioned capacity. The Forum, after due appreciation of the material on record,
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 4/22/2026
10:16:50 AM

NEUTRAL CITATION NO. 2026:MPHC-GWL:12750
5 WP-66-2012
rightly concluded that the petitioner failed to substantiate its claim and

accordingly, quashed the impugned billing, and thus the order passed by the
Forum is legal, justified and does not warrant interference by this Court.
Heard counsel for the parties and perused the record.
It is evident from the material available on record that the respondent was
sanctioned an industrial connection of 20 HP (14.92 kW), whereas during
inspection dated 21.10.2008, the connected load was found to be 44 HP
(approximately 32.8 kW), which was more than double the sanctioned capacity.
This inspection report was duly prepared and signed by the representative of the
respondent, and there is no convincing material to discard its evidentiary value.
Further, the meter reading diary and MRI data consistently demonstrate that the
Maximum Demand (MD) recorded at the respondent’s premises remained
significantly above the sanctioned load over a long period. The data reflects that
MD readings were around 21.9 kW in October 2007, 25.8 kW during December
2007 to February 2008, rising to 33.06 kW in April 2008, 31 kW in May 2008,
27.05 kW in June 2008, and 35.4 kW in October 2008. Even thereafter, the MD
readings continued to remain in the range of approximately 22 kW to 32 kW for
most months, including 32.08 kW in December 2009, 32 kW in January and
February 2010, and 32.8 kW during April to June 2010.
It is also significant that despite replacement of meters on multiple
occasions; first on 26.07.2010, then on 02.11.2010, and again on 20.05.2011 the
MD continued to be recorded at levels exceeding the sanctioned 14.92 kW, such as
22.03 kW in September 2010, 24.56 kW in November 2010, 21.76 kW in
December 2010, 19.06 kW in January 2011, 21.84 kW in March 2011, and even
24.8 kW in July 2011. This consistent pattern across different meters rules out the
possibility that the excess demand was a result of any isolated meter defect.
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 4/22/2026
10:16:50 AM

NEUTRAL CITATION NO. 2026:MPHC-GWL:12750
6 WP-66-2012
Although the laboratory test report indicated certain defects in the RTC and MD

recording of one meter for a limited period, the same cannot invalidate the
overwhelming and continuous data recorded before and after such period,
particularly when subsequent meters also reflected similar trends. The Forum,
therefore, erred in discarding this consistent technical evidence on untenable
grounds.
This Court further finds that the Forum misdirected itself by placing reliance
on the consumption pattern of units rather than the concept of Maximum Demand
and connected load, which are determinative factors in cases relating to excess
load under the applicable tariff. The tariff provisions clearly stipulate that where
the actual load exceeds the sanctioned load, the excess demand is to be billed
separately at higher rates, including enhanced fixed charges, until such excess load
is either removed or duly sanctioned. The rationale behind such billing is to
account for the stress placed on the distribution system and the obligation of the
supplier to maintain infrastructure based on sanctioned loads. The respondent,
despite being aware of the excess load, neither reduced the load nor applied for
enhancement, and therefore cannot avoid liability arising from such continued
unauthorized usage.
In these circumstances, the findings recorded by the Forum are contrary to
the material on record and suffer from non-application of mind as well as
misinterpretation of the applicable tariff provisions. The impugned order dated
08.11.2011 passed in Case No. C-0088311 is accordingly set aside. The billing
raised by the petitioner towards excess load and the subsequent bills raised on the
same basis, is held to be valid and in accordance with law. The respondent is
directed to pay the outstanding dues, including the current bill amount if any,
failing which the petitioner shall be at liberty to proceed in accordance with law
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 4/22/2026
10:16:50 AM

NEUTRAL CITATION NO. 2026:MPHC-GWL:12750
7 WP-66-2012
for recovery of the dues and for taking consequential action.

Accordinlgy, the writ petition is allowed.
(MILIND RAMESH PHADKE)
JUDGE
pwn*

Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 4/22/2026
10:16:50 AM