National Power Training Institute vs Sunehari Bagh Builders Pvt. Ltd
- Court
- Delhi High Court
* IN THE HIGH COURT OF DELHI AT NEW DELHI
th
% Reserved on: 24 March, 2026
th
Pronounced on: 16 June, 2026
+ RFA 54/2022
NATIONAL POWER TRAINING INSTITUTE
Through its Principal Director
Northern Region, Badarpur, New Delhi. .....Appellant
Through: Mr. Prashant Shukla and Ms. Ojasvi,
Advocates.
versus
SUNEHARI BAGH BUILDERS PVT. LTD.
Engineers & Contractors, 306, Sunehari Bagh Apartments,
Sector-13, Rohini, New Delhi. ....Respondents
Through: Mr. Bharat Bhushan Dharmani,
Advocate.
CORAM:
HON'BLE MS. JUSTICE NEENA BANSAL KRISHNA
J U D G M E N T
NEENA BANSAL KRISHNA, J.
1. Present Regular First Appeal under Section 96 of the CPC, 1908,
has been preferred on behalf of the Appellant / National Power Training
Institute against Judgment and Decree dated 03.09.2021 passed by learned
ADJ-02, New Delhi, whereby Application filed by the Appellant/Defendant
under Order XXXVII Rule 3(5) CPC, seeking Leave to Defend, was
dismissed and the Suit was decreed for a sum of Rs.59,12,458/- along with
pendente lite and future interest @ 6% per annum.
RFA 54/2022 Page 1 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
2. The Plaintiff/Respondent had filed a Civil Suit bearing CS
No.11841/2016 , under Order XXXVII CPC seeking Recovery of
Rs.64,76,146/-, together with pendent lite and future interest.
3. The Appellant/National Power Training Institute (NPTI) is an
institute functioning under the Government of India. The
Respondent/Sunehari Bagh Builders Pvt. Ltd. is a private construction
company engaged in execution of civil works and infrastructure Projects.
4. The facts, in brief, are that the Defendant/Appellant floated Tender
No.7(1)/NPTI/NR/CIVIL/2010-11 dated 20.12.2010 for renovation of hostel
rooms and associated facilities, at NPTI-NR, Badarpur.
5. The Plaintiff/Respondent participated in the tender process and was
awarded the contract, for the tendered amount of Rs.61,72,140/-. A formal
Agreement dated 17.02.2011 was executed between the parties. The
stipulated date of commencement of work was 17.02.2011 and the duration
of completion was twelve months, ending on 16.02.2012.
6. According to the Plaintiff/Respondent , it commenced the
renovation work and executed the contractual obligations in terms of the
Agreement. It is asserted that measurements of the work executed, were
periodically recorded by the officials of NPTI, in the departmental
Measurement Books, maintained in the ordinary course of business.
7. The Plaintiff/Respondent relied upon Measurement Book No.2,
which contained measurements recorded during, April 2011 pertaining to
dismantling works, RCC works, plastering, wall tiling, GI pipe work, rain
water pipes, waterproofing and other civil renovation items, in respect of
various hostel rooms and toilet blocks. The measurements reflected in
RFA 54/2022 Page 2 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
Measurement Book No.2, formed the basis of the Second Running Account
Bill dated 28.05.2011.
8. The Respondent claimed that the value of work recorded therein
amounted to Rs.47,49,507/- and after adjustment of the secured advance and
amounts already released under the First Running Account Bill, a sum of
Rs.31,86,587/- became payable.
9. The Plaintiff/Respondent further relies upon Measurement Book
No.46 , wherein measurements were recorded in July, 2011 in respect of
additional rooms and toilet blocks. These measurements were subsequently
incorporated into Measurement Book No.4 8 which contains the abstract of
cost and valuation, prepared on the basis of quantities reflected in the earlier
Measurement Books.
10. The Plaintiff asserted that the Third Running Account Bill dated
01.08.2011 reflected a further payable amount of Rs.31,53,267/- .
11. The Plaintiff also claimed that apart from the aforesaid amounts, a
sum of Rs.1,36,292/- towards security deposit deducted from earlier
payments, also was refundable.
12. On the basis of the aforesaid documents, the Plaintiff/Respondent
asserted that an aggregate amount of Rs.64,76,146/-, had become payable
by the Appellant.
13. The Plaintiff/Respondent referred to various communications dated
22.09.2011, 11.10.2011, 17.01.2012 and 28.06.2012 seeking release of the
outstanding amount.
14. The Plaintiff/Respondent has also placed reliance upon the Internal
Working Committee Report dated 24.10.2011, constituted by NPTI.
According to the Plaintiff, the Committee undertook sample verification of
RFA 54/2022 Page 3 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
the measurements recorded in the departmental Measurement Books and
found no material discrepancy therein. The Committee consequently
recommended the release of payment in favour of the Plaintiff/Respondent-
contractor.
15. Since payment was not released, the Plaintiff/Respondent issued a
Notice under Section 80 CPC dated 31.05.2014, demanding payment of the
outstanding amount together with interest. The Defendant/Appellant sent a
reply dated 17.07.2014 disputing the Plaintiff’s entitlement and raising
objections regarding the measurements, valuation and amount claimed.
16. The Plaintiff thereafter, instituted the present suit under Order
XXXVII CPC seeking Recovery of Rs.64,76,146/- together with pendente
lite and future interest.
17. Upon service of summons, the Defendant/Appellant entered an
appearance and filed Application and sought Leave to Defend .
18. The Defendant/Appellant in its Application for Leave to Defend
alleged that while submitting the tender documents, the Plaintiff/Respondent
had declared “NIL” against the column requiring disclosure of
litigation/arbitration proceedings, during the preceding five years. According
to NPTI, the Plaintiff/Respondent had been involved in arbitration
proceedings relating to another construction project and the said non-
disclosure constituted suppression of material information relevant to the
tender process.
19. The principal defense raised by the Appellant was that the Suit was
barred by limitation, since the alleged cause of action arose in 2011,
whereas the suit was instituted only on 15.10.2014.
RFA 54/2022 Page 4 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
20. The second defence raised by the Defendant/Appellant was that the
Suit itself was not maintainable under Order XXXVII CPC, since the claim
arose out of disputed contractual obligations, disputed measurements,
disputed Running Account Bills and disputed valuation of work, all of which
required adjudication upon detailed evidence.
21. The Defendant/Appellant further contended that the alleged Running
Account Bills had not been produced, in the original form. It was asserted
that no duly prepared bills containing the requisite statutory particulars were
ever submitted in the manner alleged by the Plaintiff/Respondent. The
Defendant/Appellant maintained that the Plaintiff/Respondent had failed to
produce supporting records, including bill books, tax records and other
contemporaneous documents, which would ordinarily accompany and
substantiate such claims.
22. The Defendant/Appellant also asserted that the Plaintiff/Respondent
had deliberately failed to place on record the complete Tender document,
even though the rights and obligations of the parties emanated therefrom and
were governed by the terms and conditions contained therein.
23. The Defendant/Appellant, also questioned the legality of the
release of an advance payment amounting to Rs.9,00,000/-. According to
the Appellant, Clause 20 of the Tender conditions prohibited advance
payment. Nevertheless, an Application seeking advance payment was moved
by the Plaintiff/Respondent on 25.03.2011, and an amount of Rs.9,00,000/ -
was released on 31.03.2011 .
24. The Defendant/Appellant asserted that the said advance payment
was not disclosed in the plaint and constituted a material circumstance,
requiring adjudication.
RFA 54/2022 Page 5 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
25. The Defendant/Appellant further asserted that by letter dated
07.04.2011 , the Plaintiff/Respondent sought enhancement of rates and that
approval thereof, which was granted on the very same day, by Shri Vijender
Kumar, Deputy Director , but he lacked authority to accord such approval.
26. Similar allegations were raised in respect of the approval of extra
items. It was claimed that numerous extra items were approved without
following the prescribed procedure and without approval of the competent
authority.
27. The Appellant contended that these irregularities in the processing
of measurements, valuation and approvals, rendered the entries recorded in
the Measurement Books, were incapable of being treated as conclusive proof
of liability.
28. The Defendant/Appellant further alleged collusion between the
Plaintiff/Respondent and Shri Vijender Kumar, in the processing of
measurements, bills, rate enhancement and extra item approvals.
29. The Defendant/Appellant also challenged the correctness of the
measurements itself and asserted that the entries recorded in the
Measurement Books, did not correspond with the actual work executed at
site.
30. The Defendant/Appellant relied upon a departmental Report titled
“ Gist of Discrepancies/Anomalies in respect of Hostel Renovation Work”
prepared pursuant to Office Order dated 08.01.2015. The said Report
recorded that renovation work was found only in 22 rooms and that several
quantities reflected in the Measurement Books, were not found at the Site.
The Report recorded discrepancies relating to brick work, distempering
RFA 54/2022 Page 6 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
work, dismantled toilet blocks and duplicate claims under certain extra
items.
31. The Defendant/Appellant further relied upon a subsequent
Committee Report dated 27.01.2015, wherein it was recorded that hidden
and dismantled items could not be measured, approved rate documents were
unavailable, and quality assessment could not be undertaken. Nevertheless,
the Committee assessed the value of work at Rs.12,28,627.14/-.
32. The Defendant/Appellant further asserted that the Committee
valuation of Rs.12,28,627.14/- demonstrated that the Plaintiff/Respondent
had already received amounts substantially exceeding the value of work
actually executed. According to the Appellant, payment of Rs.21,26,608/-
had already been released, and therefore, no further amount remained
payable.
33. Prior to adjudication of the leave to defend Application , the
Appellant filed an Application under Order VII Rule 11 CPC seeking
rejection of the plaint, on the ground of limitation.
34. The Application was dismissed by the learned Single Judge of this
Court on 07.08.2015. Subsequently, in FAO(OS) No.595/2015, the Division
Bench observed that the limitation involved mixed questions of law and fact,
requiring proper examination.
35. The matter thereafter, went to the Supreme Court by way of
SLP(C) No.26359/2016. The Supreme Court clarified that neither the orders
passed in the earlier proceedings nor the dismissal of the SLP, would stand
in the way of the Application seeking leave to defend, being considered
independently on its own merits.
RFA 54/2022 Page 7 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
36. The leave to defend Application thereafter, was decided by the
learned ADJ, vide order dated 03.09.2021. T he learned ADJ relied
principally upon Measurement Book Nos.2, 46 and 48 and the Internal
Working Committee Report dated 24.10.2011. It was observed that
Measurement Book No.48 reflected work executed worth Rs.66,68,147/- and
material brought at site worth Rs.12,44,627/- , aggregating to Rs.79,02,775/-.
After adjustment of payments already released, amounting to Rs.21,26,608/-
and addition of the security deposit of Rs.1,36,292/-, the learned Trial Court
concluded that a sum of Rs.59,12,458/- remained payable to the
Respondent.
37. The learned ADJ further held that the Internal Working Committee
Report dated 24.10.2011 supported the correctness of the measurements
recorded in the Measurement Books and that the defence raised by NPTI,
did not disclose any substantial triable issue.
38. It was also observed that the Internal Working Committee, upon
conducting sample verification of the measurements recorded in the
Measurement Books, found the same to be in order and had recommended
release of payment in favour of the Plaintiff/Respondent-contractor.
39. The learned ADJ accepted that the liability of the Appellant stood
established from its own records. Reliance was placed upon Measurement
Book No.48 , wherein the value of work executed was reflected as
Rs.66,68,147/ - and the value of material brought to the site was reflected as
Rs.12,44,627/ -, aggregating to Rs.79,02,775/-. After adjustment of payments
already released and addition of the security deposit, the learned ADJ
concluded that a sum of Rs.59,12,458 /- remained payable to the Respondent.
RFA 54/2022 Page 8 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
40. Consequently, the Application for leave to defend was dismissed
and the Suit was decreed for Rs.59,12,458/- along with pendent lite and
future interest @ 6% per annum.
41. Aggrieved, the Appellant/Defendant has filed the present Appeal.
42. The grounds of challenge are that the learned ADJ failed to apply
the settled principles governing grant of leave to defend under Order
XXXVII Rule 3(5) CPC and proceeded to reject the defence, without
examining whether the material placed on record disclosed bona fide and
substantial triable issues requiring adjudication.
43. The learned ADJ erred in treating the Measurement Book Nos.2, 46
and 48 and the Internal Working Committee’s Report dated 24.10.2011, as
conclusive proof of liability while ignoring the subsequent departmental
records relied upon by the Appellant, including the Discrepancy Report
prepared pursuant to Office Order dated 08.01.2015 and the Committee’s
Report dated 27.01.2015, which questioned the correctness of the
measurements, valuation and extent of work allegedly executed by the
Respondent.
44. It was also not appreciated that the Appellant had raised substantial
disputes regarding the actual work executed at site, the correctness of the
measurements recorded in the Measurement Books, the valuation of such
work, and the quantum of amount allegedly payable; all of which required
adjudication upon evidence and could not be conclusively determined in
summary proceedings.
45. The Appellant has also assailed the impugned Judgment on the
ground that triable issues were raised regarding the legality of enhancement
of rates, approval of extra items, release of advance payment and the
RFA 54/2022 Page 9 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
authority of the officers who allegedly processed and sanctioned such
approvals, which constituted bona fide triable issues, warranting grant of
leave to defend.
46. It is further contended that the learned ADJ failed to adequately
consider the Appellant’s objection regarding the maintainability of the Suit
under Order XXXVII CPC, particularly in view of the disputed contractual
claims, disputed measurements and disputed valuation forming the basis of
the suit claim.
47. The reliance is placed on the case of Mechelec Engineers &
Manufacturers vs. Basic Equipment Corporation, (1976) 4 SCC 687 , to
contend that where the defendant discloses a substantial defence or raises
bona fide triable issues requiring adjudication, leave to defend ought to be
ordinarily granted and refusal thereof, is justified only where the defence is
frivolous, illusory or practically moonshine.
48. Further, reliance was placed upon Raj Duggal vs. Ramesh Kumar
Bansal, 1991 Supp (1) SCC 191 , wherein it was held that while considering
an Application for leave to defend, the Court is required to determine
whether the defence raises a real issue and not a sham one.
49. It was submitted that if the facts pleaded by the defendant, if
ultimately established, would constitute a plausible defence, leave to defend
cannot be denied.
50. Reliance was also placed upon IDBI Trusteeship Services Ltd. vs.
Hubtown Ltd., (2017) 1 SCC 568, to contend that where triable issues
indicating a fair, bona fide or reasonable defence arise, unconditional leave
to defend should ordinarily follow and refusal of leave remains confined to
cases where the defence is frivolous, vexatious or wholly untenable.
RFA 54/2022 Page 10 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
51. The Appellant has additionally challenged the impugned Judgment
on the ground that the plea of limitation raised by it disclosed a bona fide
and arguable issue requiring examination after evidence, especially in view
of the observations made in the earlier proceedings that the question of
limitation involved mixed questions of law and fact.
52. It was, therefore, contended that the defence raised by the Appellant
could not be characterised as sham, illusory or moonshine and that the
learned Trial Court erred in refusing leave to defend and decreeing the Suit
in Summary Proceedings, despite the existence of substantial and bona fide
triable issues.
Submissions heard and record perused .
53. Admittedly, the Work was awarded to the Plaintiff and a formal
Agreement dated 17.02.2011 was executed between the parties. The
stipulated date of commencement of work was 17.02.2011 and the duration
of completion was twelve months, ending on 16.02.2012.The Work was
executed and the plaintiff claimed an outstanding amount of Rs.64,76,146/-,
which according to him, was payable by the Appellant/Defendant.
54. The principal foundation of the Respondent's claim rests upon
Measurement Book Nos.2, 46 and 48 and the Internal Working Committee
Report dated 24.10.2011 . The Respondent has consistently asserted that the
measurements recorded in the said Measurement Books, formed the basis of
the Second and Third Running Account Bills . The Internal Working
Committee , after sample verification, found the measurements to be in order
and recommended release of payment.
55. There can be no dispute that the Measurement Books relied upon by
the Respondent are official departmental records maintained by the
RFA 54/2022 Page 11 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
Appellant. Equally, the Internal Working Committee Report dated
24.10.2011 records that sample measurements checked by the Committee
were found to be in order. These documents undoubtedly lend support to the
Respondent's claim and cannot be lightly disregarded.
56. However, the defence raised by the Appellant is not confined to a
bare denial of liability. The Appellant has asserted that the Plaintiff’s case is
founded upon Running Account Bills and measurements recorded in
Measurement Books, which are disputed and require evidence, to establish
their authenticity and correctness.
57. The Appellant has further disputed the legality of release of advance
payment amounting to Rs.9,00,000/-; challenges the enhancement of rates
and approval of extra items; and also disputed the authority of Shri Vijender
Kumar, Deputy Director , who allegedly processed such approvals.
Furthermore, the Report dated 24.10.2011 of the Committee recorded that
the internal quality measurements could not be done and recommended
release of only 70% of the amounts of the Bills raised.
58. Shri Vijender Kumar, Deputy Director, on account of his acts, was
transferred immediately vide Letter dated 03.11.2011. Serious issues had
been raised, not only on his competence, but also on the verification of the
Bills done by him. It was also pointed out that the revised rates had been
approved by him on 07.04.2011, i.e. barely after 1.5 month of awarding
work, which again reflected a question on the genuineness of his acts.
59. The Appellant has placed reliance upon subsequent departmental
records, which directly question the correctness of the measurements and
valuation, forming the basis of the Suit.
RFA 54/2022 Page 12 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
60. Appellants have placed on record various Letter since 2012 till
January, 2015, indicating that there were serious concerns about the quality
of the work and the quantity of times used and the same were being verified
by the Internal Committee and various Letters have been written to the
Plaintiff in respect of the Notice.
61. The Discrepancy Report titled “Gist of Discrepancies/Anomalies in
respect of Hostel Renovation Work” , was prepared pursuant to Office Order
dated 08.01.2015 , wherein it was recorded that renovation work was found
only in 22 rooms. It further noted that certain quantities reflected in the
Measurement Books, were not found at site. The Report also referred to
discrepancies relating to brickwork, distempering work, dismantled toilet
blocks and duplicate claims under certain extra items.
62. Equally significant is the subsequent Committee Report dated
27.01.2015. The Committee recorded that hidden and dismantled items
could not be physically measured, approved rates were unavailable, and
quality assessment could not be undertaken. Despite these limitations, the
Committee furnished a valuation statement and assessed the value of work at
Rs.12,28,627.14/-.
63. This valuation stands in stark contrast to the valuation forming the
basis of the Respondent's claim. While the Respondent seeks recovery based
on records reflecting work and material valued at more than Rs.79,00,000/- ,
the subsequent Committee Report reflects a valuation of approximately
Rs.12,28,000/-.
64. To determine whether the measurements reflected in the
Measurement Books correctly, represent the work executed at site or
whether the subsequent Departmental Reports furnish a more accurate
RFA 54/2022 Page 13 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
assessment thereof, necessarily fall within the domain of trial. The existence
of competing departmental records raises bona fide disputes, thus, giving
rise to triable issues, requiring adjudication after evidence.
65. The learned Trial Court discussed the Measurement Books and the
Internal Working Committee Report, in detail. However, the impugned
Judgment does not adequately address the effect of the subsequent
Discrepancy Report and the subsequent Committee Report, relied upon by
the Appellant.
66. Whether the observations recorded in the Discrepancy Report are
ultimately correct or not; is not a question which can be conclusively
determined at this stage. Nevertheless, the Report is a departmental
document and directly questions the correctness of the measurements and
valuation relied upon by the Respondent.
67. Another aspect which cannot be overlooked is the Plea of
Limitation. The Appellant has consistently maintained that the alleged cause
of action arose in the year 2011, whereas the Suit came to be instituted only
on 15.10.2014. Significantly, the issue was raised before the learned Single
Judge; thereafter, before the Division Bench and ultimately before the
Supreme Court in the Application under Order VII Rule 11 CPC .
68. The Division Bench specifically observed that the question of
limitation involved mixed questions of law and fact requiring proper
examination. The Supreme Court further clarified that neither the earlier
proceedings nor the dismissal of the Special Leave Petition would stand in
the way of the Application seeking leave to defend, being considered
independently on its own merits.
RFA 54/2022 Page 14 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
69. The Bills pertain to 2011, while the Suit has been filed on
15.10.2014. When did the cause of action arose in the light of disputed Bills
and measurements, are mixed question of fact and law, requiring evidence.
70. Viewed cumulatively, the defence raised by the Appellant cannot be
dismissed as a mere denial or a sham attempt, to evade liability. The
material placed on record discloses substantial and bona fide disputes
concerning the correctness of the measurements recorded in the
Measurement Books, the extent of work actually executed, the valuation of
such work, the legality of enhancement of rates, the approval of extra items,
and the authority of the officers who allegedly processed and sanctioned
such approvals. In addition, thereto, the Appellant has raised objections
regarding the maintainability of the Suit under Order XXXVII CPC as well
as the plea of limitation, which necessarily require evidence for
adjudication .
71. In these circumstances, it cannot be concluded that the plea of
limitation is sham, illusory or devoid of substance. The material placed on
record discloses bona fide and substantial triable issues, warranting the
grant of leave to defend.
72. Consequently, the Judgment and Decree dated 03.09.2021, is set
aside.
73. Application under Order XXXVII Rule 3(5) CPC, filed by the
Appellant, is allowed and Appellant is granted Leave to Defend.
74. Written Statement filed by the Appellant be taken on record.
75. The matter is remanded to the learned Trial Court for adjudication in
accordance with law, after affording both parties adequate opportunity to
lead evidence.
RFA 54/2022 Page 15 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30
76. Parties shall appear before the learned ADJ, South-East, Saket
Courts, New Delhi, on 09.07.2026.
77. Accordingly, the Appeal is allowed . The pending Applications, if
any, are disposed of, accordingly.
(NEENA BANSAL KRISHNA)
JUDGE
JUNE 16, 2026/ R
RFA 54/2022 Page 16 of 16
Signature Not Verified
Signed By:VIKAS
ARORA
Signing Date:16.06.2026
17:54:30