Pankaj Kumar Singh vs The State Of Madhya Pradesh

Court
Madhya Pradesh High Court
Decided on
11-03-2026

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
1 WP-19031-2025
IN THE HIGH COURT OF MADHYA PRADESH
AT GWALIOR

BEFORE
HON'BLE SHRI JUSTICE MILIND RAMESH PHADKE
th
ON THE 11 OF MARCH, 2026
WRIT PETITION No. 19031 of 2025
PANKAJ KUMAR SINGH
Versus
THE STATE OF MADHYA PRADESH AND OTHERS
Appearance:
Shri Amit Lahoti - Advocate for the petitioner.
Shri Manish Saxena - Public Prosecutor for the State.
ORDER
The present petition, under Article 226 of the Constitution of India has
been filed by the seeking following reliefs:-
i) That, the FIR dated 28.10.2021 bearing Crime No.
536/2021 at PS Chanderi, District Ashoknagar for the
offence U/s 420, 467, 468, 471 of IPC (Annexure P/1) may
kindly be quashed.
ii) That, any other anciliary proceedings arising out of
the FIR dated 28.10.2021 bearing Crime No. 536/2021 at PS
Chanderi, District Ashoknagar for the offence U/s 420, 467,
468, 471 of IPC (Annexure P/1) may also be declared as
nonest and same may be quashed.
iii) That, any other suitable direction which this
Hon'ble Court deems fit in the facts and circumstances of the
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
2 WP-19031-2025
case may kindly be passed.

2. Short facts as per prosecution story are that on 28.10.2021, the
complainant Naresh Kumar Yagnik, son of late Bhagwandas Yagnik, aged
about 53 years, resident of Ward No.10, SADA Colony, Chanderi, working
as Land Acquisition Clerk, appeared before the Police Station Chanderi and
submitted a complaint along with certain documents forwarded by the Land
Acquisition Officer and Sub-Divisional Officer (Revenue), Chanderi vide
letter No. K/Bhu Arjan/2021/124(3) dated 08.09.2021, requesting
registration of an FIR in connection with TL Case No. 514877. It was
alleged that land bearing Survey No. 63/2, area 2.000 hectares, situated at
village Khyavda, belonging to Mahesh, son of Gyasilal, was affected by the
Lower Orr Dam Project, and compensation amounting to Rs.20,00,000/- was
sanctioned in respect of the said land. Another person impersonating
Mahesh, son of Gyasilal, fraudulently opened a bank account in Punjab
National Bank, Chanderi Branch, and received the compensation amount in
the said account, which was thereafter withdrawn. During investigation,
statements of several witnesses were recorded who alleged that the accused
persons, including Balwant Bundela (clerk in the Irrigation Department) and
others, had acted in conspiracy and fraudulently withdrawn the compensation
amount. It was further alleged that co-accused Mahesh Dhanak, resident of
village Khatoli, District Sagar, in his memorandum statement disclosed that
the bank account was opened after modification of the Aadhaar card details
and the compensation amount was withdrawn and handed over to co-accused
Balwant Bundela, and he had received Rs.35,000/- for facilitating the
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
3 WP-19031-2025
transaction. The said co-accused Mahesh Dhanak was arrested on 10.03.2022

and produced before the competent court. However, other accused persons,
namely, Balwant Bundela, Ravindra Thakur and Mahesh Thakur could not
be apprehended despite efforts by the police and were declared absconding.
During investigation, offences under Sections 467, 468, 471 read with
Section 34 IPC were added. Thereafter, the police filed Charge-sheet No.
197/2022, dated 07.06.2022 against the arrested accused Mahesh Dhanak,
while investigation against the remaining accused persons was kept pending
under Section 173(8) Cr.P.C., with liberty to file a supplementary charge-
sheet upon completion of investigation. On the basis of the said complaint,
the police registered an FIR for offences punishable under Sections 420, 467,
468 and 471 of the Indian Penal Code. Hence, the present petition.
3. Learned counsel for the petitioner that the petitioner is presently
serving in the establishment of the Water Resources Department of the State
Government and he was initially appointed to the post of Assistant Engineer
on 30.07.2011 under the establishment of the Engineer-in-Chief, Water
Resources Department, Bhopal.
4. It is further submitted that a major irrigation project known as “Orr
Nadi Pariyojna Prabandhan Ekai Banmorkalan, District Shivpuri” was
undertaken by the State Government for the purposes of irrigation and water
resource management. For implementation of the said project, several private
agricultural lands situated in Village Khyawada, Tehsil Chanderi, were
required to be acquired, as they were coming under the zone of
submergence. Accordingly, a proposal for acquisition of land was forwarded
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
4 WP-19031-2025
to the competent authority as contemplated under the provisions of the Right

to Fair Compensation and Transparency in Land Acquisition, Rehabilitation
and Resettlement Act, 2013. Pursuant to the implementation of the said
project, land bearing Survey No. 63/2 admeasuring 2.000 hectares, owned by
one Mahesh S/o Gyarasilal, was also acquired after following the due process
of law as prescribed under the Act of 2013. For the purposes of disbursement
of compensation, the Collector, District Ashoknagar, directed the Land
Acquisition Officer to obtain the bank account details of the affected
landowners, including the IFSC code, Aadhaar Card details, mobile number
and photocopy of the bank passbook, so that the compensation amount could
be directly deposited into their respective bank accounts.
5. It is further submitted that the award passed by the Land Acquisition
Officer in respect of the acquired lands was duly approved by the Collector,
Ashoknagar on 28.07.2018, and a total compensation amount of
Rs.15,47,84,700/- was sanctioned for payment to the affected persons whose
lands had been acquired under the project. The award dated 28.07.2018,
along with Appendix VI and other appendices containing the names of all
beneficiaries, clearly reflects the name of Mahesh S/o Gyarasilal at Serial
No.104, to whom compensation of Rs.20,00,000/- was to be paid.
6. It is further submitted that the Collector, Ashoknagar, vide
communication dated 04.09.2018, directed the Project Director to furnish the
bank details of all 618 persons whose lands had been acquired pursuant to
the award. The said direction was issued to enable the Collector to deposit
the compensation amount directly in the bank accounts of the concerned
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
5 WP-19031-2025
beneficiaries. In compliance with the said direction, the requisite information

was collected after due verification from the concerned banks and thereafter
forwarded to the office of the Collector through a communication dated
21.02.2019.
7. It is further submitted that the statutory scheme of the Act of 2013
clearly defines the roles and responsibilities of the various authorities
involved in the process of land acquisition and disbursement of
compensation. Section 3 of the Act defines the term “Authority” as the Land
Acquisition, Rehabilitation and Resettlement Authority established under
Section 51 of the Act. The term “Collector” has also been defined to mean
the Collector of a revenue district, including any officer specially designated
by the appropriate Government to perform the functions of the Collector
under the Act. The term “Land Owner” as defined under Section 3(r)
includes any person whose name is recorded as the owner of the land or
building in the records of the concerned authority, or any person who has
been granted forest rights under the relevant law. Similarly, the expression
“Person Interested” has been defined under Section 3(x) of the Act, which
broadly corresponds to the definition of land owner.
8. It is further submitted that the Act provides a detailed statutory
framework governing the process of land acquisition and determination of
compensation. Section 23 provides for enquiry and land acquisition award by
the Collector, Section 26 prescribes the manner of determination of market
value of the land by the Collector, while Sections 27 and 28 provide for
determination of the amount of compensation and the parameters to be
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
6 WP-19031-2025
considered by the Collector while passing the award. The provisions relating

to payment of compensation are contained in Chapter X of the Act,
particularly Section 77, which clearly provides that the payment of
compensation determined under the award is to be made by the Collector to
the persons interested.
9. In view of the aforesaid statutory provisions, it is evident that the
entire responsibility with regard to acquisition of land, passing of award,
determination of compensation and payment of compensation to the entitled
persons squarely lies with the Collector of the concerned district and the
authorities functioning under him. The payment of compensation is required
to be made by the Collector by depositing the amount into the bank account
of the beneficiary after verification of the relevant documents.
10. It is further submitted that without considering the aforesaid
statutory provisions and in order to shift the burden of their own negligence,
the authorities of the Collectorate have attempted to fasten liability upon the
officers of the Water Resources Department, including the present petitioner.
The impugned communication has been issued requesting the Town
Inspector, Police Station Chanderi, to register an FIR against the Sub-
Divisional Officer and Clerk of the Irrigation Department merely on the
ground that the actual beneficiary Mahesh S/o Gyarasilal has allegedly not
received the compensation amount.
11. It is further submitted that in order to absolve themselves of their
statutory responsibility, the respondent No.3 issued a letter dated 08.09.2021
directing registration of an FIR against the petitioner and others. The said
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
7 WP-19031-2025
communication has been issued without conducting any preliminary enquiry

and without affording any opportunity of hearing to the petitioner.
12. It is further submitted that the said letter dated 08.09.2021 had
already been challenged before this Court in connected Writ Petition
No.19704 of 2021, wherein this Court was pleased to pass an interim order
dated 28.09.2021 directing that no coercive action shall be taken against the
petitioner in pursuance of the order dated 08.09.2021 issued by the Collector.
Despite the existence of the said order of protection, the authorities
proceeded to register the impugned FIR dated 28.10.2021 on the basis of the
very same communication dated 08.09.2021. Thus, the registration of the
FIR is in clear violation of the interim order passed by this Court and is
therefore wholly without jurisdiction.
13. It is further submitted that at the relevant point of time, the
petitioner was working as In-charge Sub-Divisional Officer while
substantially holding the post of Assistant Engineer in the Water Resources
Department. The charge of Project Administrator was earlier held by Shri
P.D. Kori, Executive Engineer, who had issued the communication dated
21.02.2019 forwarding the bank details of the affected farmers after
verification from the concerned banks. Subsequently, the charge of Project
Administrator was taken over by Shri Rajesh Shrivastava, Assistant Engineer
on 01.02.2021. Unfortunately, due to the Covid-19 pandemic he expired,
whereafter the charge was handed over to Shri R.C. Gupta, Assistant
Engineer on 16.04.2021. Thereafter, the petitioner was handed over the
charge of Project Administrator only on 30.07.2021, and since then he has
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
8 WP-19031-2025
been discharging his duties under the project.

14. It is further submitted that the entire process relating to collection
and forwarding of bank details of the beneficiaries had already been
completed much prior to the petitioner assuming charge as Project
Administrator. The petitioner had no role whatsoever in collecting the
documents of the concerned landowner, verifying the bank account, or
preparing the list of beneficiaries whose compensation was to be deposited
in their accounts.
15. It is further submitted that prior to issuing the direction to register
an FIR against the petitioner, neither any notice was served upon him nor
was he afforded any opportunity of hearing. No departmental enquiry or fact-
finding exercise was conducted to determine the alleged liability. The
impugned action has therefore been taken in gross violation of the principles
of natural justice.
16. It is also submitted that the responsibility of determining
compensation and making payment thereof lies exclusively with the
Collector, District Ashoknagar, under the statutory scheme of the Act of
2013. If there has been any irregularity in the payment of compensation in
respect of Award No.104 relating to Mahesh S/o Gyarasilal, the same cannot
be attributed to the petitioner, who has no role in the disbursement of
compensation. The role of the Water Resources Department was limited to
sending the proposal for acquisition of land and depositing the compensation
amount with the Land Acquisition Officer.
17. It is further submitted that the Water Resources Department had
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
9 WP-19031-2025
deposited the entire compensation amount of Rs.15,47,84,700/- in Case No.

/0002/A82/2017-18 with the Land Acquisition Officer for disbursement to
the affected persons. Once the amount had been deposited with the
competent authority, the responsibility for verifying the identity of the
beneficiaries and transferring the compensation amount into their bank
accounts rested solely with the Collector and the Land Acquisition Officer.
18. It is further submitted that all documents furnished by the
concerned farmer, including Aadhaar Card, bank passbook and Khasra
entries, were collected and forwarded to the office of the Land Acquisition
Officer after verification with the concerned banking authorities.
19. It is also noteworthy that no direction has been issued by the
authorities to lodge an FIR against the person who actually received the
compensation amount by impersonating Mahesh S/o Gyarasilal, although he
appears to be the real beneficiary of the alleged fraud. Instead of taking
action against the actual beneficiary, the authorities have sought to shift their
own negligence upon the petitioner, who had no role whatsoever in the
disbursement of compensation.
20. It is further submitted that immediately after issuing the direction
dated 08.09.2021 to lodge an FIR, another communication dated 09.09.2021
was issued calling for information regarding the names of officers and
employees who had prepared the list of affected farmers and collected their
bank account details for the purpose of conducting an enquiry. A bare
perusal of this communication clearly demonstrates that even before
determining the liability and without conducting any enquiry, the authorities
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
10 WP-19031-2025
hurriedly directed registration of an FIR against the petitioner. The impugned

action has thus been taken in a post-haste and arbitrary manner, merely to
shield the officers functioning under the Collector, District Ashoknagar and
the Land Acquisition Officer, Chanderi. It is therefore submitted that the
impugned FIR dated 28.10.2021 has been registered solely on the basis of
the letter dated 08.09.2021, which itself was the subject matter of challenge
before this Court and in respect of which an interim order of protection had
already been granted. The registration of the FIR in spite of the said order
amounts to a clear disregard of the directions issued by this Court.
21. In view of the above submissions, it is submitted that the
impugned FIR has been lodged on the basis of incorrect facts, vague
allegations and contradictory statements without there being any material to
establish the involvement of the petitioner. The continuation of the criminal
proceedings against the petitioner would therefore amount to an abuse of the
process of law and would cause grave prejudice to the petitioner, who has
been unnecessarily dragged into the present controversy despite having no
role in the alleged transaction. It is therefore prayed that this Court may be
pleased to exercise its extraordinary jurisdiction under Article 226 of the
Constitution of India and quash the impugned FIR dated 28.10.2021 insofar
as it relates to the present petitioner.
22. Per contra, leaned Government Advocate for the State opposed the
petition and prayed for its rejection submitting that this Court, vide order
dated 18.06.2025, has been pleased to direct that the present writ petition be
connected with the previously filed Writ Petition No. 19704/2021 and be
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
11 WP-19031-2025
heard together. In this background, it is submitted that the interim order

dated 28.09.2021 passed in Writ Petition No. 19704/2021, whereby
protection was granted to the petitioner, has seriously affected the progress
of investigation in the aforesaid crime.
23. It is further submitted that during the period from 23.04.2018 to
30.07.2024, the petitioner was discharging the duties of Assistant Engineer
and was also functioning in the capacity of Project Administrator/Assistant
Manager in connection with the River Project Management Unit, Bamorkala,
District Shivpuri. His duties included providing necessary information and
coordinating with the Land Acquisition Officer in relation to the land
acquisition proceedings of the project. During investigation, it has come on
record that the petitioner prepared and forwarded a list of affected farmers of
Village Khyawada whose lands were falling in the submergence area of the
project and were proposed for acquisition. The said list was forwarded to the
competent authority vide communication dated 21.02.2019 for further
necessary action in the matter of disbursement of compensation.
24. It is further submitted that in the said list, at Serial No. 104, the
petitioner mentioned the name of Mahesh S/o Gyasi along with bank account
number 9853000100045124 of Punjab National Bank, Chanderi, on the basis
of which the compensation amount sanctioned in respect of the said land was
subsequently transferred by the competent authority. It is the case of the
prosecution that on the basis of the list submitted by the petitioner, further
proceedings were carried out by the competent authority and the
compensation amount was transferred to the aforesaid bank account.
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
12 WP-19031-2025
However, it subsequently came to light that instead of the actual land holder

entitled to receive compensation, the details of another person had been
mentioned in the said list, due to which the compensation amount was not
received by the rightful landowner but was transferred to the account of
another person. On the basis of this discrepancy, the competent authority
lodged the impugned First Information Report dated 28.10.2021 in Crime
No. 536/2021 at Police Station Chanderi, District Ashoknagar, which is
correct.
25. In reply, learned counsel for the petitioner submits that the
contention raised on behalf of the State to the effect that the petitioner,
during the period from 23.04.2018 to 30.07.2024, was discharging the duties
of Assistant Engineer and was also functioning in the capacity of Project
Administrator/Assistant Manager in connection with the River Project
Management Unit, Bamorkala, District Shivpuri, is wholly unsubstantiated.
It is submitted that despite making such a categorical assertion in the reply,
the State has failed to place on record any documentary material whatsoever
to substantiate the said claim. No order of appointment, charge assignment
order, office memorandum, or any official record demonstrating that the
petitioner was entrusted with the duties of Project Administrator/Assistant
Manager for the said period has been filed along with the reply. In the
absence of any documentary evidence in support of the said allegation, the
bald assertion made by the State cannot be relied upon to attribute any
responsibility or liability upon the petitioner.
26. Having heard learned counsel for the parties at length and upon
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
13 WP-19031-2025
perusal of the record placed before this Court, it is evident that the present

writ petition has been filed seeking quashment of the First Information
Report registered for offences under Sections 420, 467, 468, 471 and 34 of
the Indian Penal Code in Crime No. 536/2021 at Police Station Chanderi,
District Ashoknagar, along with all consequential proceedings arising
therefrom. The principal contention of the petitioner is that he has been
falsely implicated in the matter without there being any material to indicate
his involvement in the alleged offence and the responsibility relating to
determination and disbursement of compensation under the land acquisition
proceedings vests exclusively with the Collector and the Land Acquisition
Officer under the statutory scheme governing the acquisition process.
27. From the record it appears that the land acquisition proceedings in
respect of lands falling in the submergence area of the project were
undertaken in accordance with the statutory framework governing
acquisition and payment of compensation. The material available before this
Court indicates that the award determining compensation was passed by the
competent authority and thereafter the responsibility for payment of
compensation to the beneficiaries vested with the Collector and the Land
Acquisition Officer in accordance with the provisions of the governing
statute. The role attributed to the petitioner in the entire process was limited
to forwarding certain information relating to affected farmers in connection
with the project. No document has been placed before this Court to
demonstrate that the petitioner was vested with any authority to determine
eligibility of beneficiaries, verify their identity, or direct the transfer of
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
14 WP-19031-2025
compensation amounts into the bank accounts of any person.

28. It is also necessary to examine the chronology of events relating to
the land acquisition proceedings. The record indicates that the award
determining the compensation payable to the affected landowners was
approved by the Collector, District Ashoknagar on 28.07.2018, wherein
compensation in respect of land bearing Survey No.63/2 belonging to
Mahesh S/o Gyarasilal was determined and reflected at Serial No.104 of the
list of beneficiaries. Thereafter, for the purpose of disbursement of
compensation, the bank account details and other documents of the affected
farmers were collected on the basis of records available with the Tehsil
Office and the revenue authorities. On the basis of the documents so
received, a list of beneficiaries along with their bank account details was
prepared and forwarded to the office of the Collector, Land Acquisition
Branch, District Ashoknagar vide communication dated 21.02.2019 for the
purpose of payment of compensation.
29. It is significant to note that Shri Panchamdas Kori, the earlier
Project Administrator, retired on 31.01.2021, and the petitioner was entrusted
with the charge of Project Administrator, Orr River Project Management
Unit, Bamorkalan, District Shivpuri on 01.02.2021, immediately thereafter.
This date is much subsequent to both the passing of the award and the
preparation and forwarding of the list of beneficiaries. Thus, the entire
process relating to identification of beneficiaries, verification of documents,
and forwarding of bank account details had already been completed prior to
the petitioner assuming charge of the said office. The preparation of such list
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
15 WP-19031-2025
and verification of land ownership details were matters falling exclusively

within the domain of the revenue authorities involved in the land acquisition
proceedings.
30. In these circumstances, the petitioner cannot prima facie be
attributed any role in the alleged discrepancy relating to Award No.104, as
he neither participated in the preparation of the list nor had any authority to
verify or approve the bank details of the beneficiaries whose names were
included therein. Any alleged irregularity, if at all, would relate solely to the
actions of the revenue authorities prior to the petitioner’s assumption of
office.
31. It is also important to note that under the stautory scheme
governing land acquisition and disbursement of compensation, the competent
authority responsible for determining and making payment of compensation
is the Collector of the concerned district and the Land Acquisition Officer
acting under him. The petitioner, being an officer of the Water Resources
Department associated with the project implementation, was neither the
authority empowered to sanction compensation nor the authority competent
to effect payment of the same. Consequently, even if any discrepancy
occurred in the disbursement of compensation to a particular beneficiary, the
petitioner cannot be held criminally liable for an act which was not within his
statutory domain or authority.
32. This Court also takes note of the fact that the impugned FIR
appears to have been registered merely on the basis of a communication
directing registration of the case without any proper preliminary enquiry
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
16 WP-19031-2025
being conducted to determine the role and responsibility of the concerned

officials. The record does not disclose any material establishing that the
petitioner was involved in preparation of any forged document, manipulation
of bank details, or receipt of any wrongful gain from the alleged transaction.
The allegations against the petitioner are general and omnibus in nature and
are not supported by any substantive evidence linking him to the alleged
offence
33. It is a settled principle of law that criminal proceedings cannot be
permitted to continue where the allegations made in the FIR, even if taken at
their face value, do not disclose the essential ingredients of the alleged
offences against the accused person. The inherent and extraordinary
jurisdiction of this Court is intended to prevent abuse of the process of law
and to secure the ends of justice. In the present case, permitting the
investigation and prosecution to continue against the petitioner despite the
absence of any material demonstrating his involvement would result in
unnecessary harassment and would amount to misuse of the criminal justice
process.
34. In view of the aforesaid analysis, this Court is of the considered
opinion that the petitioner was not the competent authority responsible for
determining or disbursing the compensation under the land acquisition
proceedings and no material has been brought on record to establish his
involvement in the alleged fraudulent transaction. The continuation of the
criminal proceedings against the petitioner is therefore wholly unwarranted
and amounts to an abuse of the process of law.
Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM

NEUTRAL CITATION NO. 2026:MPHC-GWL:8513
17 WP-19031-2025
35. Accordingly, the present writ petition deserves to be and is hereby

allowed. The First Information Report registered in Crime No. 536/2021 at
Police Station Chanderi, District Ashoknagar for offences under Sections
420, 467, 468, 471 and 34 of the Indian Penal Code, together with all
consequential proceedings arising therefrom insofar as they relate to the
present petitioner, are hereby quashed.
36. No order as to costs.
(MILIND RAMESH PHADKE)
JUDGE
pwn*

Signature Not Verified
Signed by: PAWAN KUMAR
Signing time: 3/13/2026
7:52:00 PM