SRI NIRMAL KANODIA & ORS. vs UMADEVI AGARWALLA & ANR.

Court
Calcutta High Court

IN THE HIGH COURT AT CALCUTTA
ORDINARY ORIGINAL CIVIL JURISDICTION
ORIGINAL SIDE
Present:
The Hon’ble Justice Sugato Majumdar
CS/124/2011
UMADEVI AGARWALLA & ORS.
VS
NIRMAL KANODIA & ORS.

CS/264/2012
SRI NIRMAL KANODIA & ORS.
VS
UMADEVI AGARWALLA & ANR.

For the Plaintiff in CS/124/2011
and for the Defendants in
CS/264/2012 : Mr. Sabyasachi Chowdhury, Sr. Adv.
Ms. Urmila Chakarborty, Adv.
Mr. Amit Meharia, Adv.
Ms. Paramita Banerjee, Adv.
Mr. Sayan Dey, Adv.

For the Plaintiff in CS/264/2012
and for the Defendants in
CS/124/2011 : Mr. Jishnu Saha, Sr. Adv.
Mr. Shiv Ratan Kakrania, Adv.
Mr. Sukrit Mukherjee, Adv.
Mr. Tanuj Kakrania, Adv.
Ms. Jiya Bose, Adv.
Ms. Shreya Goenka, Adv.

Hearing concluded on : 25/03/2026
Judgment on : 12/05/2026
Sugato Majumdar, J.:
Both the suits are taken up together since both are based on the same array
of facts but on different cause of actions. Both were heard together and disposed of
by this common judgment.


P a g e | 2

C.S. 124 of 2011:
Original Plaintiff of this suit was one Basudeo Agarwalla, since deceased and
his son Suresh Agarwalla. On death of the original Plaintiff no. 1 his wife Uma Devi
Agarwalla, his two daughters Kiran Buddhia and Usha Agarwalla and his another son
Deepak Agarwalla were substituted as Plaintiff no. 1A to 1D respectively.
Defendants of this suit are Nirmal Kanodia, Rajendra Kumar Singhania,
Mahendra Kumar Padia and M/s Bhoomi Minerals Ltd., the later being a company
registered under the Companies’ Act 1956, having its registered office at 40B,
Vivekananda Road, Kolkata – 700007 within jurisdiction of this Court. The later
company being the Defendant no. 4 is pro forma Defendant.
Plaint case in nutshell:
a) The original Plaintiff no. 1 & 2 are father and son. They floated a
company named as M/s Bhoomi Minerals Ltd., registered under the
Companies’ Act, 1956, having registered office at 40B, Vivekananda
Road, Kolkata-700007 (hereinafter referred to as “M/s Bhoomi”). M/s
Bhoomi is the pro-forma Defendant no. 4. The original Plaintiffs were
the directors of M/s Bhoomi and owned the controlling block of shares
either by themselves or through the family members. Among other
assets of M/s Bhoomi, the primary asset was a sponge iron unit with
installed capacity of 100 m.t. per day. The business of M/s Bhoomi
was hugely capital intensive and demanded massive investment of
fund. M/s Bhoomi borrowed money from various banks and financial
institutions including the Indian Overseas Bank. Repayment of loan
from this Indian Overseas Bank was secured by personal guarantees of
the original Plaintiff no. 1 and the Plaintiff no. 2 as well as by pledging
collateral and corporate securities.

P a g e | 3

b) M/s Bhoomi could not pay debt in time to the Indian Overseas Bank,
as a result of which the bank had been contemplating legal actions
under the SARFAESI Act to recover dues. At this juncture, the
Defendants approached the original Plaintiffs in the month of July,
2010 and evinced their interest to purchase M/s Bhoomi and take over
the management for a lump sum consideration. Several rounds of
discussions followed. The Defendants inspected the books and
accounts of M/s Bhoomi along with bank accounts maintained in
different branches of different banks; they also inspected the fixed
assets, debts and liabilities. Thereafter, the original Plaintiffs agreed to
acquire M/s Bhoomi on “as is where is” basis. A lump sum
consideration was agreed as Rs.28.01 crores. The consideration
amount was not the true value of M/s Bhoomi. But under compelling
circumstances being financial hurdle the original Plaintiffs agreed to
that consideration amount. The Defendants had full knowledge of the
financial condition of M/s Bhoomi and that the account may be
classified as non-performing asset. The Defendants were aware of
impending proceeding under the SARFESI Act against M/s Bhoomi.
c) In furtherance of the modalities of transfer, the parties executed a
Memorandum of Understanding dated 20/09/2010. Time was
considered as essence of the contract. The M.O.U envisaged that an
amount of Rs. 28.01 crores was to be paid by the Defendants to the
original Plaintiffs towards total consideration for share transfer as well
as satisfaction of loan advanced by Indian Overseas Bank. Upon
receipt of the payments from the Defendants, the original Plaintiffs, in
turn, would apportion the same towards satisfaction of loans advanced
by Indian Overseas Bank and simultaneously would carry out

P a g e | 4

necessary share transfer in the name of the Defendants. It was further
agreed that out of the total consideration, the Defendants would pay
immediately to the original Plaintiffs a sum of Rs.50,00,000/- as
earnest money and the balance consideration would be paid within
30/11/2010. Simultaneously, with payment of the entire
consideration, the original Plaintiffs would be obliged to transfer not
less than 51% of their total shareholdings to the Defendants and/or
would resign from the Board of Directors, inducting the Defendants or
nominees in the Board of Directors. In terms of the said M.O.U, the
Defendants undertook the entire responsibility of repayment of bank
loan, as on 21/09/2010. Apart from this consideration of Rs.28.01
crores, the Defendants undertook pay Rs.13 lakhs for two dumpers and
an additional sum of Rs.13.5 lakhs in case the Government of
Jharkhand consented to transfer the title of 7 acres of land in the name
of M/s Bhoomi. An application in this regard was made by the original
Plaintiffs and the same was pending. The Defendants also agreed to
pay a sum of Rs.43,80,000/- on account of iron ores which the
original Plaintiffs had obtained from a third party. The Defendants
assured to get release of all the collateral securities and the personal
guarantees given by the original Plaintiffs. The Defendants assured
the original Plaintiffs that they would get the pledged collateral
securities and personal guarantees of the original Plaintiffs released
from Indian Overseas Bank within 31/06/2011. It was agreed that the
original Plaintiffs would not retain more than 49% shareholding as
security unless the Defendants obtain release of the securities from
Indian Overseas Bank. In the event the Defendants fail to obtain
release of guarantees and securities furnished by the original Plaintiffs
within 31/03/2011, the Defendants would be liable to pay the balance

P a g e | 5

consideration to the Plaintiffs immediately without insisting on any
transfer of share. It was also agreed that time would be the essence of
the contract.
d) The Defendants paid a sum of Rs.1 crore by different installments to
the original Plaintiffs. This amount was utilized in part payment of the
debt of the Indian Overseas Bank to avoid proceedings under the
SARFAESI Act, 2002. But the Defendants neglected and failed to pay
the balance amount of consideration. They were obliged to pay the
entire consideration money by 30/11/2010 and to obtain release of the
pledged collateral securities and personal guarantees by 31/03/2011,
but they neglected and failed to do so. In the meantime the Indian
Overseas Bank sent a notice to the original Plaintiffs on 06/11/2010
demanding repayment of loan within 15 days. Again on 30/12/2010,
the Bank issued a separate demand notice under Section 13 of the
SARFAESI Act, 2002.
e) The Defendant no. 2, in terms of a letter dated 24/09/2010 declared
intention to withdraw from the M.O.U and also to treat the M.O.U as
cancelled. There was also a demand for refund of the earnest money.
f) Facing this situation, the original Plaintiffs, being debt trapped, were
compelled to sell their entire shareholdings to a third party for a
consideration of Rs.22.5 crores. But for this sale at a lower value, the
original Plaintiffs suffered loss of Rs.5.51 crores. It is pleaded that the
original Plaintiffs are entitled to forfeiture of the earnest money of Rs.1
crore, paid by the Defendants to them.
g) The instant suit was filed by the original Plaintiffs praying for,

P a g e | 6

1) Loss and damages – Rs.5.51 crores.
2) Interest on Rs.28.01 crores – Rs.1,10,50,520/- calculated
from November, 2010 to 31/03/2011 @ 12 % per annum.
3) Further interest pendent lite @ 12 % per annum from the
date of institution of the suit till realization.
4) Enquiry into loss and damages, alternatively, and to pass
decree, as may be found due and payable.
Written Statement:
The Defendants contested the suit by filing written statements. Three written
statements were filed by the Defendant no. 1, 2 & 3.
Written Statement on behalf of the Defendant No.1:
The written statement may be summarized as followed:
a) The suit is not maintainable; barred by the principles of waiver,
estoppel and acquiescence; the suit does not disclose any cause of
action and that the suit should be dismissed as it suffers from
suppression of material facts.
b) The original memorandum of understanding dated 20/09/2010 was
executed in the District of Dhanbad, outside the jurisdiction of this
Court. Therefore, this Court has no jurisdiction to entertain the suit
and leave granted under Clause 12 of the Letters Patent should be
revoked.
c) Next it is contended that before execution of the original M.O.U dated
20/09/2010, the Defendant no. 1 showed, along with the other

P a g e | 7

Defendants, bona fide , intentions, solvency and willingness by making
payment of a sum of Rs.75 lakhs to the original Plaintiffs. Particulars
are given in the written statement. In terms of Clause 6 the purchaser
being the Defendant no. 1 should pay the vendor a sum of Rs.50 lakhs
on execution of the M.O.U as earnest money and the balance should be
paid within 30/11/2010 positively. Between 06/09/2010 and
20/11/2010, the Defendants paid a sum of Rs.1 crore to the original
Plaintiffs in far excess of their obligation. At the time of execution of
the M.O.U dated 20/09/2010, the original Plaintiffs expressly
represented that the sponge iron unit, in question was not secured,
hypothecated, mortgaged or charged in favour of the bank. In the
Paragraph 8 of the M.O.U dated 20/09/2010 it was recorded that
possession of the Sponge Iron Unit had been made over to the
Defendant no. 1 jointly with the other Defendants.
d) After execution of the M.O.U when the Defendants went to the sponge
iron unit to take possession, they were surprised to learn that the same
had been mortgaged to the bank. It is contention of the Defendant no.
1 that the M.O.U had been executed on false representations, incorrect
and untrue statements. Therefore, the original M.O.U dated
20/09/2010 is void and not binding on the Defendants. The Original
Plaintiffs sought to renege, cancel and rescind and also tried to back
out from their commitment of transferring 51% shareholding of M/s
Bhoomi. For this, an amendment of the original M.O.U was sought.
The said amended M.O.U dated 21/09/2010 was signed by the original
Plaintiffs and forwarded to the Defendant no. 1 and other Defendants
for joint signatures. The Defendants refused to sign the amended
M.O.U. The Plaint suppressed the fact of this amended M.O.U dated

P a g e | 8

21/09/2010. In terms of the amended M.O.U, the original Plaintiffs
refused to transfer 51% shareholdings of M/s Bhoomi. The
Defendants terminated the original M.O.U. on 24/09/2010 and called
upon the original Plaintiffs to refund the earnest money of Rs.1 crore.
For abundant precaution, the Defendants confirmed the earlier
termination, in terms of a letter dated 30/04/2011.
e) The original Plaintiffs replied the letter dated 30/04/2011, sent by the
Defendants. From the reply letter dated 09/06/2011 the Defendants
came to learn that the sponge iron unit had already been sold to the
third parties for a sum of Rs.22.5 crores. Prior to selling to third party,
the original Plaintiffs did not send any notice to the Defendants. It is
further pleaded that time was not essence of the contract.
f) The original Plaintiffs never informed the Defendant no. 1 or any of the
other Defendants about any alleged action being taken by the Indian
Overseas Bank under the SARFAESI Act, 2002.
g) It was denied along with others that the original M.O.U. was executed
after due inspection of all the relevant books and accounts of M/s
Bhoomi.
h) It was also averred that the suit is barred by law of limitation.
i) In the premises of the pleadings in the written statement, the
Defendant no. 1 denied all the allegations made in the plaint and
stated that the suit is liable to be dismissed.
The written statements field on behalf of the Defendant nos. 2 & 3 contain the same
pleading and should not be repeated, for the sake of brevity.

P a g e | 9

C.S. 264 of 2012:
Plaint case, in nutshell, is as follow:
a) Plaintiff no. 4 is a private limited company registered under Companies
Act, 1956 having registered office at 2A, Ganesh Chandra Avenue, Kolkata-
700013. Plaintiff nos. 1 & 2 are directors of Plaintiff no. 4. Plaintiff nos. 1,
2 & 3 are business associates and have common business ventures,
dealings and transactions.
b) Defendant nos. 1 & 2 represented themselves to be directors and principal
shareholders of the pro-forma Defendant no. 3 which is a company
registered under Companies Act, 1956 having registered office at 40B,
Vivekananda Road, Kolkata-700007, now represented by the official
liquidator.
c) In the month of August 2010, the original Defendant nos. 1 & 2
approached the Plaintiff nos. 1, 2 & 3 with the following proposals:
i) The original Defendant nos. 1 & 2 were the directors and
principal shareholders of the Defendant no. 3.
ii) Defendant no. 3, namely, M/s Bhoomi was the owner of
a Sponge Iron Unit situated in the District of Dhanbad,
Jharkhand.
iii) The Defendant nos. 1 & 2 were interested and desirous of
selling their majority shareholding of 51% or more in
M/s Bhoomi.
iv) The said sponge iron unit had not been hypothecated,
mortgaged or charged to any bank or official institution.

P a g e | 10

v) On purchase of the shares of the original Defendant nos.
1 & 2 in M/s Bhoomi, the Plaintiff nos. 1, 2 & 3 would get
control and physical possession of the Sponge Iron Unit.
d) Relying on the representations, the Plaintiff nos. 1, 2 & 3 agreed to
purchase 51% of the shares of the original Defendant nos. 1 & 2 in M/s
Bhoomi. In order to show their readiness and willingness to buy
majority shares of the original Defendant nos. 1 & 2 in M/s Bhoomi,
the Plaintiff nos. 1, 2 & 3 paid a sum of Rs.75 lakhs to the Defendant
nos. 1 & 2 through the Plaintiff no. 4 by cheque as well as by RTGS
bank transfer. The original Defendant nos. 1 & 2 duly received the
amount of Rs.75 lakhs.
th
e) On 20 September, 2010, a memorandum of understanding
(hereinafter called original M.O.U) was executed between the Plaintiff
nos. 1, 2 & 3 as the purchasers and the original Defendant nos. 1 & 2 as
Vendors.
f) On execution of the original M.O.U on 20/09/2010 of a further sum of
Rs.25 lakhs were paid. Between 06/09/2010 and 20/09/2010 the
Plaintiff nos. 1, 2 & 3 through Plaintiff no. 4 made a payment of Rs.1
crore to the original Defendant nos. 1 & 2.
g) After execution of the original M.O.U dated 20/09/2010 when the
Plaintiff nos. 1, 2 & 3 went to the sponge iron unit to take possession
thereof, they are surprised to know that the sponge iron unit had also
been mortgaged to the bank. It was falsely represented in the M.O.U
that the Sponge Iron Unit had not been secured, hypothecated,
mortgaged or charged in favour of any bank.

P a g e | 11

h) Although the original M.O.U clearly provided that the original
Defendant nos. 1 & 2 would transfer 51% of the shareholding of M/s
Bhoomi to the Plaintiff nos. 1, 2 & 3, turning them to a majority
shareholder, the original Defendant nos. 1 & 2 on 22/09/2010 sought
to renege, cancel, rescind and/or sought to back out from their
commitment and forwarded one amended memorandum of
understanding bearing a date of 21/09/2010. One of the proposed
amended clause said that, out of the agreed sale amount, the
purchasers should pay to the vendors a sum of Rs.50 lakhs on
th
execution of the presence and the balance would be paid on 30
November, 2010 positively, however, subject to the proportion of
shares transferred by the vendors. In case, the purchasers failed to pay
the vendors the due amount within the due date the purchasers would
be liable to pay interest. The quantum of shares transferred should
remain restricted so as to allow the purchasers to hold 49% of the total
issue and subscribe share capital and the purchasers shall be entitled
to hold proportionate payment until transfer of balance share. There
was another clause whereby and assurance was sought to be procured
for the purchasers to get the pledged collateral securities and personal
guarantees of the vendors released from the Indian Overseas Bank
within 31st March and the vendors should retain not more than 51% of
the shares as security until release of the securities from the bank. The
vendors assured that on release of guarantee, the vendors would
transfer the balance share to the purchasers. Another amendment that
was sought to be imposed was that share capitals of M/s Bhoomi, if
raised in future shall be done subject to prior written consent of the
vendors and shareholding structures of 49% with the purchasers and

P a g e | 12

51% with the vendors should be maintained until release of the
collateral securities and personal guarantees.
i) The proposed amendments were signed by the Defendant nos. 1 & 2
only and forwarded to the Plaintiff nos. 1, 2 & 3 for signature.
However, the Plaintiff nos. 1, 2 & 3 did not accept the amendment and
did not sign the same. It is contended that by way of amendment the
original Defendant nos. 1 & 2 refused to transfer 51% shareholding of
the Plaintiff nos. 1, 2 & 3 and sought to retain control of the company
in breach of their primary obligations under the original memorandum
th
of understanding dated 20 September, 2010. Since the proposed
amendments were not acceptable the Plaintiff nos. 1, 2 & 3, on
24/09/2010 terminated the original MOU and called upon the original
Defendant nos. 1 & 2 to refund and return the amount of Rs.1 crore
which had already been paid to the Defendant nos. 1 & 2.
j) As a measure of abundant precaution, the Plaintiff nos. 1, 2 & 3 sent a
letter dated 30/04/2011 confirming the termination of the original
M.O.U on 24/09/2010. In reply, the original Defendant nos. 1, 2 & 3
intimated by a letter dated 09/06/2011 that M/s Bhoomi had already
been sold to the third parties for a sum of Rs.22.5 crores these two
persons at the third parties.
k) The Plaintiff, therefore, instituted the instant suit praying for recovery
of Rs.1 crore along with interest and particulars of which are given
below:

P a g e | 13

PARTICULARS
Principle Amount Due Interest @ 18% per Rs.1,00,00,000/-
Interest @ 18% per annum on and from the
date receipt of payment calculated
st
till 1 July 2012. Rs.32,05,480/-
-------------------------------
Total Rs.1,32,05,480/-
-------------------------------
Written Statement:
a) Defendant nos. 1 & 2 who were the directors of M/s Bhoomi filed a
common written statement contending that the suit is not
maintainable, does not disclose any cause of action, barred by the
principles of estoppel, waiver, acquiescence and principles analogous
thereto.
b) It is positive case of the Defendant Nos. 1 & 2 that they were directors
of M/s Bhoomi and owned the controlling block of the shares therein
either by themselves or through their family members and other
entities under their control. The Defendant nos. 1 & 2 were in
complete control and management of the Defendant no. 3. Among
other assets of the Defendant no.3, namely, M/s Bhoomi, the primary
asset is a sponge iron manufacturing unit situated at Village-Beliad,
P.O.-Chirkunda, District-Dhanbad, Jharkhand. The promoters made
huge investment towards installation and running of the said unit.
c) The business of M/s Bhoomi is capital intensive for which the
promoters availed huge loan from bank and financial institutions, one
of the prime lenders being Indian Overseas Bank. Repayment of loan
and advances taken from the Indian Overseas Bank were secured by

P a g e | 14

way of personal guarantees of Defendant nos. 1 & 2 and by pledging
collateral and corporate securities. The sponge iron unit too was
mortgaged with the Indian Overseas Bank for securing the credit
facility availed by the Defendant no.3.
d) M/s Bhoomi, being Defendant no. 3 was unable to timely service its
accounts with the Indian Overseas Bank and/or maintain the
prescribed limits of the bank as a reason of which the bank was in
contemplation to take steps against M/s Bhoomi in terms of the
SARFAESI Act, 2002 to recover dues. In such circumstances in the
month of July 2010, the Plaintiff nos. 1, 2 & 3 approached the
Defendants and showed their interest to purchase M/s Bhoomi and
take over the management at a lump sum consideration.
e) Several rounds of discussions, analysis, inspection of books and
accounts of M/s Bhoomi, inspection of bank accounts of M/s Bhoomi
maintained with different branches, inspection of fixed assets of M/s
Bhoomi and checking the debts and liabilities of M/s Bhoomi were
done. After exercising due-diligence the Plaintiff nos. 1 & 3 were fully
satisfied about the prospect of M/s Bhoomi and agreed to acquire the
management and control as a going concern, “as is where is basis” on
agreed terms for a lump sum consideration of Rs.28.01 crores. Though
that consideration amount did not reflect the true value of the M/s
Bhoomi, yet considering the financial condition of M/s Bhoomi and
apprehending that assets of the company may be classified as non-
performing asset the Defendant nos. 1 & 2 agreed to the proposal.
Execution of one memorandum of understanding was also conceived
and the same was subsequently executed on 20/09/2010. It was
contained in the memorandum of understanding that an amount of

P a g e | 15

Rs.28.01 crores would be paid by the Plaintiffs to the Defendants
towards total consideration for share transfer as well as satisfaction of
loan advanced by the Indian Overseas Bank. On receipt of the payment
from the Plaintiffs, the Defendants would apply the same towards
satisfaction of loans, advanced by Indian Overseas Bank and also
would simultaneously carry out the share transfer in the name of the
Plaintiffs. It is contended that on execution of the memorandum of
understanding the Plaintiffs had taken over the entire responsibility of
repayment of loans advanced by Indian Overseas Bank on 21/09/2010
a sum of Rs.50 lakhs was to be paid immediately on execution of the
memorandum of understanding as the earnest money and balance was
to be paid within 30/11/2010.
f) Apart from consideration money to be paid for share transfer, the
Plaintiffs agreed to pay Rs.13 lakhs to the Defendants for acquiring two
dumpers. The Plaintiffs also agreed to pay an additional sum of Rs.13.5
lakhs to the Defendants in case Government of Jharkhand consented to
transfer of title of 7 (5+2) acres of land in the name of M/s Bhoomi
application in respect of which had been pending before the Deputy
Commissioner, Dhanbad. The Plaintiffs also agreed to pay a sum of
Rs.43,80,000/- for and on account of price of 1460 tons of iron ores
which the Defendants had obtained on behalf of M/s Bhoomi. It is
contended in the written statement that the Plaintiffs assured the
Defendants to get the pledged collateral securities and personal
guarantees of the Defendants release from the Indian Overseas Bank
st
within 31 March 2011. It was also agreed that Defendants would not
retain more than 49% of the shareholding as security until the
Plaintiffs obtain release of the securities from Indian Overseas Bank.

P a g e | 16

In the event, the Plaintiffs failed to obtain release of the guarantees and
st
securities furnished by the Defendants within 31 March, 2011 the
Plaintiffs would be liable to pay the balance consideration to the
Defendants immediately without insisting on share transfer time in
respect of payment was agreed to the essence of the agreement.
g) The Plaintiffs, it is pleaded, neglected and failed to make payments to
the Defendants in terms of the memorandum of understanding though
the Plaintiffs paid a sum of Rs.1 crore in different installments as
earnest money to M/s Bhoomi. This was used had appropriated for
part payment of overdue amount in order to avoid consequences under
SARFAESI Act, 2002.
h) Since, in terms of M.O.U funds were guaranteed, M/s Bhoomi did not
look out for any other source of funding on 06/11/2010. A letter was
issued on behalf of Indian Overseas Bank classifying the assets as non-
performing assets. It was also intimated that outstanding amount, if
not paid within 15 days, Indian Overseas Bank would take legal
proceedings under SARFAESI Act, 2002. On 30/12/2010, another
demand notice under Section 13(2) of the SARFAESI Act, 2002 was
issued to the Defendant nos. 1 & 2 stating that the guarantee would be
invoked barring the Defendants from dealing with the secured assets
in case the amounts stated therein had not been paid within 60 days.
Although the Defendants informed the Plaintiffs about this scenario,
the Plaintiffs refused to perform in terms of M.O.U or pay any further
amount.

P a g e | 17

i) By a communication dated 24/09/2010, the Plaintiff no. 2 declared his
intention to withdraw from M.O.U and treated the same as cancelled
and also asked for refund of earnest money.
j) Because of compelling circumstances, the Defendants were forced to
sell the shareholdings of M/s Bhoomi to a third party at Rs.22.5 crores
in order to avoid legal action under SARFAESI Act, 2002. As a result,
the Defendants suffered damages to the tune of Rs.5.51 crores, the loss
being attributable to refusal of performance as well as repudiation of
the M.O.U by the Plaintiffs. The Defendants are also entitled to
forfeiture of earnest money. Therefore, the Defendants filed CS 124 of
2011.
k) Among others the Defendant nos. 1 & 2 denied that at the time of
executing of the memorandum of understanding on 20/09/2010 they
represented to the Plaintiffs that the sponge iron unit had not been
secured, hypothecated, mortgaged or charged. The Plaintiffs visited
the sponge iron unit on number of occasions before entering into the
M.O.U and were aware of the fact of mortgage. It was also denied that
nd
Defendant nos. 1 & 2 on 22 September, 2010 sought to renege or
cancel or rescind or back out from their commitment or forwarded to
st
the Plaintiffs the alleged memorandum of understanding dated 21
September, 2010. It was denied that such document was sent to the
Plaintiffs; the Defendants did not admit the contents of the said
st
M.O.U; in fact, the subsequent M.O.U dated 21 September, 2010 was
a result of concoction by the Plaintiffs. It was further stated that by a
letter dated 30/04/2011 i.e. after a lapse of more than 7 months from
the date of execution of the memorandum of understanding, the

P a g e | 18

Defendants had purported to terminate the MOU from the first time;
as such the question of confirmation of termination does not arrive.
All other allegations were denied.
On the basis of rival pleadings in the suits, the following common issues were
framed:
1. Is the suit maintainable in law and on facts?
2. Is the suit barred by the law of limitation?
3. Has the Court jurisdiction to try the suit and as to whether the
cause of action arose at a place within the jurisdiction of this
Court?
4. Is the suit bad for non-joinder of necessary parties?
5. Whether the Defendants are in breach of the memorandum of
understanding dated September 28, 2010?
6. Whether the Defendants are liable to pay damages to the
Plaintiffs as prayed for?
7. Is the Plaintiffs entitled to the decree for a sum of Rs.6.61,500/-
together with interest at the rate of 15% per annum as claimed
by the Plaintiffs?
8. Is the agreement dated September 28, 2010 legal, valid or
binding upon the parties?
9. To what other reliefs the Plaintiffs are entitled?
For the sake of convenience, the Plaintiffs in C.S. 124 of 2011 who are the Defendants
in C.S. 264 of 2012 shall be mentioned as “Agarwallas” and the Defendants of C.S. 124
of 2011 who are the Plaintiffs in C.S. 264 of 2012 as “Kanodias”.

P a g e | 19

Argument on behalf of Nirmal Kanodia & Ors.:
(Defendant in CS/124 of 2011 & Plaintiff in CS/264 of 2012)
1. The claim of the Kanodias was refund of the earnest money, paid to the
Agarwallas pursuant to the M.O.U. dated 20/09/2010 with interest @
18% per annum.
2. M.O.U. was executed on 20/09/2010. In terms of the M.O.U. earnest
money to be paid by the Kanodias was Rs.50,00,000/-; in return 51%
shares of the Defendant No. 3 was to be transferred to the Kanodias.
The Kanodias paid Rs.1 crore. On the very next day of execution of the
M.O.U., an amended M.O.U. was sent by the Agarwallas, modifying
Clause 6 whereunder, instead of 51% share they would transfer 49%
share only. It was argued that by this proposed amendment of the
M.O.U., the Agarwallas clearly manifested intention not to perform the
agreement as recorded in the M.O.U. Immediately thereafter, the
Kanodias terminated the agreement, by an SMS dated 24/09/2010;
and also asked for refund of the earnest money with interest.
It was argued that the M.O.U. was terminated anticipating breach of
contract. Section 54 of the Contract Act was referred to. According to
Mr. Saha, the Learned Senior Counsel, by sending the amended
M.O.U., the Agarwallas expressed intention not to perform their part
of the contract which goes to the root of the whole bargain and
contract. To substantiate the argument of anticipatory breach, the
Learned Senior Counsel referred to:
a) Manindra Chandra Nandy & Ors. Vs.
Aswini Kumar Acharjya [(1920) SCC
OnLine Cal 104]

P a g e | 20

b) Jawarlal Wadhwa & Anr. Vs. Haripada
Chakraborty [(1989) 1 SCC 76]
c) Maharashtra State Electricity Distribution
Company Ltd. Vs. Datar Switchgear Ltd. &
Ors. [(2018) 3 SCC 133]
3. The next limb of argument of Mr. Saha, the Learned Senior Counsel,
was that the Agarwallas refused to refund the earnest money of Rs.1
crore and continued to hold the same illegally. There was no forfeiture
clause in the M.O.U. In absence of forfeiture clause, earnest money
cannot be forfeited. Therefore, the Agarwallas are bound to refund the
earnest money with interest.
4. The next point argued by Mr. Saha was on damages. The Agarwallas
contended that because of breach committed by the Kanodias, there
are forced to sell the Defendant No. 3 company at Rs.22.5 crores to one
Banwari Lal Agarwalla and Gopal Agrwalla. It was argued by Mr. Saha
that burden of proof lies on the Plaintiff, in this case Agarwallas, to
prove such facts by adducing best evidence. But the Agarwallas failed
to prove any actual loss which is in sine qua non to maintain a claim
for damages. Even the witnesses for the Agarwallas did not give any
positive evidence that the purported agreement with the said Banwari
Lal Agarwalla and Gopal Agarwalla had been given effect to or had
been acted upon. In absence of evidence, actual damages could not be
proved and the claim should be dismissed. Mr. Saha referred to
Kailash Nath Associates Vs. DDA [(2015) 4 SCC 136], Maula
Bux Vs. Union of India [(1969) Vol II SCC 554], Hindustan
Petroleum Corporation Limited Vs. Offshore Infrastructure

P a g e | 21

Limited [(2015) SCC OnLine Bom 4146] and Sudershan
Kumar Bhayana Vs. Vinod Seth [(2023) SCC OnLine Del
6097].
Argument made by Agarwallas:
Mr. Chowdhury, the Learned Senior Counsel appearing for the Agarwallas
submitted firstly that the Kanodias cancelled the M.O.U. as the proposed
amendments were not acceptable to them. According to the Mr. Chowdhury, this
plea was taken subsequently and is an afterthought purported to justify their breach
of contract. In none of the communications made by the Kanodias such plea had
been taken. In fact, the amended M.O.U. had never been executed. The plea was
taken for the first time in the written statement. Since the amended M.O.U. was not
signed, liability under the original M.O.U. still remained and the Kanodias committed
breach of the original M.O.U. in not paying the full money and getting the shares
transferred or in other words in failure to discharge contractual obligation.
According to the Mr. Chowdhury there is no question of anticipatory breach but
rather it is the Kanodias who committed breach of the agreement in the form of
M.O.U. and are liable to damages.
Secondly, it was argued that the Kanodias tried to wriggle out from their
payment obligations by contending that the fact of mortgage of this sponge iron unit
to the bank had not been disclosed to them at the time of execution of M.O.U. Such
contention is completely false since the Kanodias being future purchasers had
recorded their satisfaction on inspection of the company, this factory unit, records,
documents and papers. Even it was specifically spelled out in the M.O.U. that the
Agarwallas had been facing financial problem in running the Defendant No. 3
company which compelled them to sell out the unit to the Kanodias. Clauses 2, 4, 14
and 15 of the M.O.U. recorded bank loan creation of security interest by such bank.

P a g e | 22

Knowing fully well of all the facts, the Kanodias agreed to invest Rs.28.01 crores for
purchase of the company. They now cannot backtrack and escape their liability for
breach of contract.
The third point argued by Mr. Chowdhury was on forfeiture of the earnest
money. The earnest money was received. It was argued that the earnest money was
rightly forfeited by the Agarwallas. There was no Clause in the M.O.U. for refund of
the amount received. In absence of a refund Clause forfeiture clauses implied. The
earnest money was paid by Khazana which company did not issue any demand notice
or institute any proceeding for refund of the amount. Therefore, according to the Mr.
Chowdhury, the earnest money is liable to be forfeited.
Mr. Chowhury referred to in Entrepreneurs Co-op. Group Housing
Society Ltd. v. Schindler India (P) Ltd. [2013 SCC OnLine Del 2514],
Naresh Chandra Guha v. Ram Chandra Samanta [1951 SCC OnLine Cal
239] and Fateh Chand v. Balkishan Dass [1963 SCC OnLine SC 49 ].
Issue No.1:
This issue shall be taken up with other substantive issues.
Issue Nos. 2 & 3:
None of the Counsels argued on the point of limitation. The memorandum of
th
understanding was executed on 20 September, 2010. The alleged breach took place
subsequently. Both the suits were filed within a period of three years. Therefore,
none of the suits are time barred.
CS 124 of 2011 was filed in this Court on the strength that the Defendant No. 2
resides within jurisdiction of this Court. C.S. 264 of 2012 was filed in this Court on
the strength that the Defendants carry on business within jurisdiction of this Court.

P a g e | 23

None of the Counsels challenged the territorial jurisdiction of this Court to try the
suits.
Therefore, this Court is of opinion that neither of the suits is barred by law of
limitation or territorial jurisdiction.
These issues are decided in favour of the respective Plaintiffs.
Issue No.4:
Neither of the Counsels praised this issue at the time of arguments.
Issue Nos. 1, 5, 6, 7 & 8:
Issue No. 8 is more foundational in nature, therefore, is taken up a priori.
Stand taken by the Kanodias was that the original agreement was void because
of suppression of material facts and misrepresentation. But for this ground they did
not backtrack. It was only when amendment was sought to be made, they cancelled
the agreement. It was averred in Para 15 (l) of the written statement that amendment
having not been accepted, the Defendants terminated the M.O.U. It was further
averred and alleged in Para. 15 (k) that by the proposed amendment the Defendants
committed breach of their basic obligations under the original M.O.U.
Misrepresentation or suppression of material facts makes an agreement
voidable. But, from the pleading itself it is manifest that the agreement was
“terminated” because of the proposed amendments which, according to the Kanodias,
are anticipatory breach of obligations. This pleading tacitly admits and pre-supposes
existing efficacy of the M.O.U. Therefore, although alleged as voidable, the M.O.U.
was not avoided, and the stood existing till termination by the Kanodias. This stand
was confirmed by Mr. Kanodia in examination-in-chief, that the M.O.U., therefore,

P a g e | 24

was not void ab initio . Conclusion, therefore, is that the M.O.U. is neither void ab
initio nor avoided, though terminated.
Issue No. 8 is decided in favour of the Agarwalas.
Mr. Saha, the Learned Senior Counsel, appearing for the Kanodias relied
heavily on the concept of anticipatory breach of contract. As noted above, it was
th
alleged that the memorandum of M.O.U. dated 20 September, 2010 was terminated
anticipating of future breach of contract manifested by the proposed amendments of
the said M.O.U.
Before further discussion, it is necessary to look into the provisions of Section
39 of the Indian Contract Act, 1872. Although this provision does not employ the
term anticipatory breach, it imports the same concept.
“39. Effect of refusal of party to perform promise wholly.—
When a party to a contract has refused to perform, or disabled
himself from performing, his promise in its entirety, the promisee
may put an end to the contract, unless he has signified, by words or
conduct, his acquiescence in its continuance. ”
The section applies to executory contracts where time of performance is yet to arrive.
The principle was discussed in Manindra Chandra Nandy Vs. Aswini Kumar
Acharjya [(1920) SCC OnLine Cal 104] . It was observed that where there is a
breach by an unqualified and positive refusal to perform a contract, though
performance thereof is not yet due, the injured party may bring an action at once for
recovery of damages. The damages for breach of a contract by renunciation thereof,
before performance in due, are measured by what the injured party would have
suffered by the continued breach of the other party down to the time of complete
performance, less any abatement by reason of circumstances of which he ought
reasonably to have availed himself. It was further observed and explained that the
doctrine of anticipatory breach takes effect as premature destruction of the contract

P a g e | 25

rather than failure to perform it in its terms. The damage caused by such premature
destruction is, to be sure, due to consequent failure to secure performance; but this is
a failure to secure performance according to the original terms, that is performance at
the time and place when performance was required, according to the terms of the
agreement. This judgment contemplated, for an effective anticipatory breach,
complete destruction of the contract which is a matter of paramount importance. In
Jawarlal Wadhwa & Anr. Vs. Haripada Chakraborty [(1989) 1 SCC 76],
three Judges Bench of the Supreme Court of India observed and held that it is settled
law that where a party to a contract commits anticipatory breach of the contract, the
other party to the contract may treat the breach as putting an end to the contract and
sue for damages but cannot ask for specific performance of the contract. The other
option open to the other party, namely, the aggrieved party, is that he may choose to
keep the contract alive till performance is due and can claim specific performance
showing his readiness and willingness to perform.
In an early decision Lord Esher M.R. in Johnstone Vs. Milling [16 Q.B.D.
460 (1886)] (considered in Manindara Chandra Nandy’s case) expressed that a
renunciation of a contract, or in other words, a total refusal to perform it by one party
before the time for performance arrives, does not, by itself amounts to a breach of
contract but maybe so acted upon and adopted by the other party as a recession of the
contract as to give rise to immediate right to action. When one party assumes to
renounce the contract, that is by anticipation refuses to perform it, he thereby, so far
as he is concerned, declares his intention then and there to rescind the contract.
Repudiation of contract was further considered by the Supreme Court of India in
Claude-Lila-Parulekar Vs. Sakal Papers Pvt. Ltd. [AIR 2005 SC 4074].
Referring to various authorities, it was expressed that to constitute a repudiation of
contract, it must be such an act as indicated to refuse to perform the contract and to

P a g e | 26

set the other party free from performing his part, an act by which the party renounced
all intention to perform his part of the contract and thereby set free the other party.
Section 39 of the Indian Contract Act, 1872 does not use the phrase
anticipatory breach, but contemplates refusal to perform an executory contract “in its
entirety”. Illustration (a) suggests and clarifies that the breach alleged must be in
totality. Refusal to perform a part of contract will not do. The section contemplates,
to borrow the term from Manindra Chandra Nandy’s decision, destruction of the
contract. Factual context is to be looked into in this pretext.
Clause 15 of the M.O.U. contended that the purchaser, meaning thereby the
Kanodias shall get the pledged collateral securities and personal guarantees of
st
vendors, namely, the Agarwalas released from Indian Overseas Bank within 31 Day
of March 2011. It contained further stipulation that the vendors should retain not
more than 49% of shares as security until release of their securities from the bank.
The M.O.U contemplated transfer of entire shareholding of the vendors to the
purchasers. At the initial stage, as contemplated in Clause 15, the vendors should
retain the shares not more than 49% as security. By proposed amendment, this 49%
was modified to 51%, meaning thereby that the majority share shall be retained by the
Agarwals as security until release of their securities from the bank. This proposed
amendment never indicated that the Agarwals detracted from transfer of cent percent
share. Only at the interregnum period, as a security, they intended to retain the
majority share. The proposed amendments did not indicate that the Agarwalas were
not in the frame of mind to flout their agreed stipulations, or to repudiate the
contract. Rather they sent a proposal. By that proposed amendment the Agarwalas
did not express intention of refusal to perform substantial or entirety of M.O.U. They
did not deny or refuse to perform their part in transferring the whole shares.
Therefore, the provisions of Section 39 of the Indian Contract Act, 1872 is not

P a g e | 27

attracted and there cannot be said to be any anticipatory breach of contract. The
Agarwalas’ proposed novation of contract by adding or modifying terms which was
refused by the Kanodias, on being refused left the original M.O.U subsisting which
th
Kanodias terminated on 24 September, 2010. It is rather the Kanodias who
committed the breach of commitment. After lapse of six months, the kanodias
responded and confirmed earlier termination with reasons, which reasons and
justifications were absent at the first instance.
As the amendment of the M.O.U. was refused and the original M.O.U.
remained subsisting, both the parties were under-contractual obligation to perform
their part. Now, the Kanodia suddenly terminated the agreement refusing thereby, to
perform their part. This is clearly a breach of contract for which they are liable to
damages.
It is the case of the Agarwalas that because of exigency of situation and
mounting debts and financial liabilities, they are forced to sell the unit at a lesser
price incurring thereby a loss of about six crores. Although, it was agued by Mr. Saha
that the actual sale price has not been proved and that the agreement for sale does
not discharge the burden of proof, the contention was refuted by Mr. Chowdhury on
the ground that neither the Kanodias disprove the sale nor produce any other
evidence to rebut the evidentiary burden discharged by the Agarwalas.
Deepak Agarwala deposing on behalf of the Agarwalas stated about the loss
suffered. He was subjected to cross-examination where he confirmed about this loss.
Let it be assumed for the time being that the Agarwala’s failed to prove and establish
that they were constrained to sell the unit at Rs.22 crores. In that case, in the
conspectus of facts, as discussed above and on established ground that the kanodia’s
committed breach of contract, the Agarwalas are entitled to damages and are to be
put in as good a position as money could do as if the contract had been performed.

P a g e | 28

This cardinal principle of law was considered in Maharashtra State Electricity
Distribution Company Ltd. Vs. Datar Switchgear Ltd. & Ors. [(2018) 3
SCC 133, Para. 63]. In that case the Kanodias should be liable to pay the entire
consideration money as contemplated in M.O.U. But the Agarwala’s renunciated
their claim in respect of about Rs.22 crores in view of partial mitigation of loss and
claimed the balance amount. The actual consideration amount of Rs.28 crore is not
in dispute. Therefore, undisputedly and admittedly, the Kanodias would have been
liable for the entire consideration money had not the Agarwalas renounced their
claim in respect of Rs.22 crore (app).
Thus one it is established that the Kanodias committed breach of the M.O.U. it
is the conclusion that the Agarwalas were entitled to damages to the tune of Rs.5.51
crores.
There is no dispute that Kanodia paid a sum of one crore pursuant to the
M.O.U. It was agreed by Deepak Agarwala that there is no provision of clause to
forfeit earnest money or deduct any liquidated damages. In Fateh Chand v.
Balkishan Dass [1963 SCC OnLine SC 49] , relied on by Mr. Chowdhury, the
Learned Senior Counsel, referring to Section 74 of the Indian Contract Act, 1872 the
Supreme Court of India observed that the expression “the contract contains any other
stipulation by way of penalty”, occurring in Section 74, comprehensively applies to
every covenant involving a penalty whether it is for payment on breach of contract of
money or delivery of property in future or for forfeiture of right to money or other
property already delivered. In all cases, therefore, where there is a stipulation in
nature of penalty for forfeiture of an amount deposited pursuant to the terms of
contract which expressly provides for forfeiture, the Court has jurisdiction to award
such sum only as it considers reasonable but not exceeding the amount specified in
the contract liable to forfeiture. This decision clarifies and reiterates the principle of
law that forfeiture of earnest money or advanced payment requires presence of

P a g e | 29

forfeiture clause in the contract. Again in Satish Batra v. Sudhir Rawal [(2013)
1 SCC], the Supreme Court of India observed:
“15. The law is, therefore, clear that to justify the forfeiture of
advance money being part of “earnest money” the terms of the
contract should be clear and explicit. Earnest money is paid or
given at the time when the contract is entered into and, as a pledge
for its due performance by the depositor to be forfeited in case of
non-performance by the depositor. There can be converse situation
also that if the seller fails to perform the contract the purchaser can
also get double the amount, if it is so stipulated. It is also the law
that part-payment of purchase price cannot be forfeited unless it is
a guarantee for the due performance of the contract. In other
words, if the payment is made only towards part-payment of
consideration and not intended as earnest money then the
forfeiture clause will not apply.”
Coming to the case in hand, the said M.O.U. did not contain any forfeiture clause, in
absence of which advanced money cannot be forfeited and the Agarwalas are liable to
refund the advance payment of one crore rupees.
Conclusions of the discussions abovenamed are that the Agarwalas are entitled
to and the Kanodias are liable to damages for breach of contract and the Kanodias are
entitled to and the Agarwalas are liable to refund the advanced money with interests
in both the cases. In terms of Section 3 of the Interest Act, 1978, damages payable
shall attract current rate of interest.
These issues are decided accordingly.

P a g e | 30

It is now ordered as follow:-
a) The Plaintiffs in C.S 124 of 2011 do get a decree of Rs.5.51 crores
which will bear interest at a rate of 7% per annum chargeable from
the date of institution of the suit till repayment. The principal
amount along with interest shall be paid within 60 days of drawing up
the decree in case of failure of which the Defendants of C.S 124 of
2011 shall be liable to pay penal interest at a rate of 5% per annum on
st
the capitalized interest from the 61 day; the Plaintiffs shall also be at
liberty to draw up execution proceeding.
b) The Plaintiffs of C.S. 264 of 2012 do get a decree of one crore rupees
which will bear interest from the date of institution of the suit, at a
rate of 7% per annum till repayment. This amount, the Defendants
shall pay within 60 days of drawing up the decree in case of failure of
which the Plaintiffs of C.S. 264 of 2012 shall be at liberty to draw up
execution proceeding. In case of failure to pay within the stipulated
period the Defendants shall be liable to pay additional interest at a
st
rate of 5% per annum from the 61 day onwards on the capitalized
interest.
c) The Plaintiffs in C.S. 124 of 2011 will be at liberty to deduct the
principal amount of rupees one crore along with accrued interest from
the decretal amount of C.S. 124 of 2011.
Let the decree be drawn up. Both the suits are disposed of.

(Sugato Majumdar, J.)