A V International & Anr. vs The Principal Commissioner Of Customs Import & Anr.
- Court
- Delhi High Court
$~
* IN THE HIGH COURT OF DELHI AT NEW DELHI
% Judgment reserved on: 27.07.2026
Judgment pronounced on: 07.08.2026
Judgment uploaded on: 07.08.2026
# CNR No. DLHC010524762023
+ W.P.(C) 16149/2023
A V INTERNATIONAL & ANR. .....Petitioners
Through: Mr. Prem Ranjan Kumar, Adv.
versus
ADDITIONAL DIRECTOR GENERAL DIRECTORATE OF
REVENUE INTELLIGENCE & ORS. .....Respondents
Through: Mr. Anurag Ojha, SSC with
Mr. Dipak Raj, Mr. Aryaman
Singh Chouhan, and Mr. Aditya
Chaudhary, Advs. for R-1.
Mr. Amit Gupta, SPC with Mr.
Vidur Dwivedi, Adv. for UOI.
Mr. Gibran Naushad, SSC with
Mr. Suraj Shekhar Singh, and
Mr. Hasan Haider, Advs. for R-
2-4.
# CNR No. DLHC010181002024
+ W.P.(C) 5024/2024 and CM APPL. 20542/2024
A V INTERNATIONAL & ANR. .....Petitioners
Through: Mr. Prem Ranjan Kumar, Adv.
versus
THE PRINCIPAL COMMISSIONER OF CUSTOMS
IMPORT & ANR. .....Respondents
Through: Mr. Anurag Ojha, SSC with
Mr. Dipak Raj, Mr. Aryaman
Singh Chouhan, and Mr. Aditya
Chaudhary, Advs. for R-2.
CORAM:
HON'BLE MR. JUSTICE ANIL KSHETARPAL
HON'BLE MS. JUSTICE SHAIL JAIN
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 1 of 17
J U D G M E N T
ANIL KSHETARPAL, J.:
1. The present Writ Petitions, filed under Article 226 of the
Constitution of India, arise out of a common investigation conducted
by the Directorate of Revenue Intelligence (hereinafter referred to as
‘DRI’) and involve interconnected questions of fact and law. While
W.P.(C.) No.16149/2023 challenges the continuation of adjudication
proceedings pursuant to Show Cause Notice No.16/2020 dated
11.05.2020 (hereinafter referred to as ‘Second SCN’), the connected
Writ Petition, W.P.(C) No.5024/2024, assails the Order-in-Original
dated 01.02.2024 (hereinafter referred to as ‘Impugned Order’) passed
in respect of Show Cause Notice No.11/2017 dated 27.03.2017
(hereinafter referred to as ‘First SCN’). Since both matters emanate
from the same investigation and involve overlapping issues, they were
heard together and are being disposed of by this common judgment.
2. The dispute traces its origin to an investigation initiated by the
DRI in the year 2016 in relation to the Petitioners’ imports. The
investigation led to the issuance of the First SCN in 2017 and,
subsequently, the Second SCN in 2020. The First SCN pertained to
the goods seized during the course of investigation, whereas the
Second SCN related to the Petitioners’ earlier imports and proposed
recovery of customs duty, interest and penalty under the Customs Act,
1962 (hereinafter referred to as ‘the Act’). Both SCNs were thereafter
assigned to the same adjudicating authority and taken up together for
adjudication.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 2 of 17
3. The Petitioners, by way of the present Writ Petitions, challenge
the continuation of adjudication proceedings pursuant to the Second
SCN, the Impugned Order passed in respect of the First SCN, and the
legality of the impugned proceedings on various grounds, including
the alleged violation of the principles of natural justice.
FACTUAL MATRIX:
4. The facts giving rise to the present Writ Petitions are, briefly, as
follows.
5. The Petitioners are engaged in the business of importing and
trading signage materials, principally from China and Taiwan. In the
year 2016, the DRI initiated an investigation on allegations of mis-
declaration of imported goods and undervaluation thereof. During the
course of investigation, searches were conducted at the residential and
business premises of the Petitioners, certain goods were seized,
statements of various persons were recorded and the seized goods
were thereafter provisionally released upon the Petitioners furnishing
the requisite bond and bank guarantee.
6. Upon completion of the investigation, the DRI issued two
SCNs. The First SCN was issued in 2017, which pertained to the
goods seized during the search and proposed confiscation of the goods
together with consequential penalties, and thereafter, after a gap of
three (03) years, the Second SCN was issued, which pertained to the
Petitioners’ earlier imports and proposed recovery of customs duty
along with interest and penalty under Section 28 of the Act.
7. On 13.10.2020, the Principal Commissioner of Customs
(Import), ICD, Tughlakabad, was appointed as the common
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 3 of 17
adjudicating authority in respect of both SCNs. Thereafter, common
notices of personal hearing came to be issued and the proceedings in
both matters were taken up together. According to the Petitioners,
during the course of adjudication they repeatedly sought supply of the
relied upon documents and also requested adjournments on account of
the serious medical condition of the proprietor of Petitioner No.1 and
the prevailing COVID-19 pandemic. It is their case that certain relied
upon documents were not furnished despite repeated requests.
8. It is also the Petitioners’ case that, following the decision of the
Supreme Court in Canon India Pvt. Ltd. v. Commissioner of
1
Customs , the Central Board of Indirect Taxes and Customs
(hereinafter referred to as ‘CBIC’) issued an Instruction dated
17.03.2021 directing that such matters be transferred to the Call Book.
Consequently, according to the Petitioners, adjudication proceedings
in respect of both SCNs remained pending for some time before being
resumed.
9. The Respondents, on the other hand, contend that the
adjudication proceedings were conducted strictly in accordance with
the statutory framework. It is their case that the Petitioners were
afforded several opportunities of personal hearing but repeatedly
sought adjournments and failed to participate in the proceedings. The
Respondents further assert that, pursuant to the matter being
withdrawn from the Call Book following the amendments introduced
by the Finance Act, 2022, the period available for adjudication
recommenced in terms of Section 28(9A) of the Act and, in view of
the volume of matters restored for adjudication, the competent
1
2021 (376) ELT 3 (SC)
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
Signature Not Verified
W.P.(C) 16149/2023 and connected matter Page 4 of 17
authority granted an extension of time on 06.03.2023 for completion
of the adjudication proceedings.
10. As no adjudication order had been passed in respect of Second
SCN, the Petitioners instituted W.P.(C.) No.16149/2023 before this
Court, raising various challenges to the continuation of adjudication
proceedings, including those founded on Section 28(9) of the Customs
Act. By order dated 14.12.2023, notice was issued in the said Writ
Petition and further proceedings pursuant to Second SCN were stayed.
11. Thereafter, notwithstanding the pendency of W.P.(C.)
No.16149/2023 and the interim order staying proceedings in Second
SCN passed therein, the Adjudicating Authority proceeded to
adjudicate the First SCN and passed the Impugned Order. Aggrieved
thereby, the Petitioners instituted the W.P.(C) No.5024/2024,
contending that, since both SCNs emanated from the same
investigation and were being adjudicated together by the same
authority, the Respondents could not have proceeded with
adjudication of the First SCN while proceedings pursuant to the
Second SCN remained stayed. The Petitioners have also assailed the
Impugned Order on independent grounds, including alleged violation
of the principles of natural justice and non-supply of relied upon
documents.
CONTENTIONS OF THE PARTIES:
12. Heard learned Senior Standing Counsel and learned Counsel
representing the parties at length and with their able assistance,
perused the paperbook.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 5 of 17
13. Learned Counsel representing the Petitioners has made the
following submissions:
i. Both the First SCN and the Second SCN emanate from
the same investigation conducted by the DRI, involve
substantially common allegations, were assigned to the same
Adjudicating Authority and were being heard together. Once this
Court had stayed further proceedings pursuant to the Second
SCN by order dated 14.12.2023, the Respondents could not have
proceeded to adjudicate the First SCN in isolation by passing the
Impugned Order dated 01.02.2024.
ii. The adjudication proceedings suffer from gross violation
of the principles of natural justice. Despite repeated requests, the
relied upon documents were not furnished to the Petitioners,
thereby depriving them of an effective opportunity to defend
themselves. Further, several adjournments became necessary on
account of the serious medical condition of the proprietor of
Petitioner No.1 and the prevailing COVID-19 pandemic, which
circumstances were not duly considered by the Adjudicating
Authority.
iii. Insofar as W.P.(C.) No.16149/2023 is concerned, the
continuation of adjudication proceedings pursuant to the Second
SCN is barred by Section 28(9) of the Act. The statutory period
prescribed for adjudication had expired and the subsequent
extension granted by the competent authority was neither valid in
law nor communicated to the Petitioners. Further, the failure to
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 6 of 17
communicate the extension order vitiates the continuation of the
proceedings.
iv. The Respondents cannot derive any benefit from placing
the matter in the Call Book pursuant to the CBIC Instruction
dated 17.03.2021. The statutory timelines prescribed under
Section 28 of the Act cannot be defeated by executive
instructions and that the proceedings had become time-barred
even otherwise.
v. The Respondents themselves had treated both SCNs as
constituting one composite adjudication by appointing a common
Adjudicating Authority and issuing common notices of hearing.
Having adopted such a course, it was not open to the
Respondents to segregate the proceedings after the stay granted
by this Court and adjudicate only one of the SCNs.
14. Per contra , Learned Senior Standing Counsel representing the
Respondents, whose submissions were substantially on similar lines,
contended as under:
i. Both Writ Petitions are misconceived and deserve to be
dismissed. The adjudication proceedings have been conducted
strictly in accordance with the statutory framework and that the
Petitioners themselves are responsible for the delay in conclusion
of the proceedings.
ii. Multiple opportunities of personal hearing were granted
to the Petitioners on different dates, however, the Petitioners
repeatedly sought adjournments and failed to participate in the
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 7 of 17
proceedings. The Petitioners have approached this Court without
disclosing their own conduct and, therefore, are not entitled to
any equitable relief in exercise of writ jurisdiction.
iii. The challenge founded upon Section 28(9) of the Act is
misconceived. After the matters were transferred to the Call
Book pursuant to the CBIC Instruction dated 17.03.2021 and
subsequently withdrawn therefrom following the amendments
introduced by the Finance Act, 2022, a fresh period for
adjudication became available under Section 28(9A) of the Act.
The competent authority validly extended the period for
adjudication on 06.03.2023 and, therefore, the proceedings
pursuant to the Second SCN remained well within the prescribed
statutory period.
iv. There is no statutory requirement under Section 28(9) of
the Act mandating communication of the order extending the
period of adjudication to the noticee. Reliance was placed upon
the decision of this Court in Pranij Heights India Pvt. Ltd. v.
2
Joint Commissioner of Customs , wherein it was held that mere
non-communication of the extension order does not invalidate
either the SCN or the adjudication proceedings. Reliance was
also placed upon the decision of the Punjab and Haryana High
Court in Shri Ram Agro Chemicals Pvt. Ltd. v. Union of India
3
& Ors. , which has been followed by this Court.
v. The Petitioners’ reliance upon the pending proceedings
before the Supreme Court in Union of India & Ors. v. GMR
2
2025:DHC:11343-DB
3
2019 SCC OnLine P&H 4918
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
Signature Not Verified
W.P.(C) 16149/2023 and connected matter Page 8 of 17
4
Airport Infrastructure Ltd. and the judgment in Vos
Technologies India Pvt. Ltd. v. The Principal Additional
5
Director General & Anr. is wholly misplaced. These matters
relate to the statutory framework existing prior to the
amendments introduced by the Finance Act, 2018, whereas the
present proceedings are governed by the amended provisions of
Section 28 and consequently stand on an entirely different
footing.
vi. Insofar as the challenge to the Impugned Order dated
01.02.2024 is concerned, the interim order passed by this Court
on 14.12.2023 was confined only to further proceedings pursuant
to the Second SCN and did not operate as a restraint upon
adjudication of the First SCN. The two SCNs are distinct
proceedings, notwithstanding that they originated from the same
investigation, and there existed no legal impediment to the
Adjudicating Authority proceeding with the First SCN.
15. No other submissions were advanced on behalf of the learned
Senior Standing Counsel and learned Counsel representing the parties.
ANALYSIS AND FINDINGS:
16. The controversy before this Court arises in somewhat peculiar
circumstances. Both the First SCN and the Second SCN admittedly
emanate from the same investigation undertaken by the DRI. Both
were assigned to the same Adjudicating Authority. They were also
taken up together for adjudication.
4
Special Leave Petition (Civil) No.5392/2025
5
2024:DHC:9493:DB
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
Signature Not Verified
W.P.(C) 16149/2023 and connected matter Page 9 of 17
17. It is not in dispute that the two SCNs were issued on different
dates. They relate to different subject matters. The First SCN concerns
the goods seized during the course of investigation and proposes
confiscation and consequential penalties. The Second SCN concerns
earlier imports and proposes recovery of customs duty, interest and
penalty under Section 28 of the Act. Each SCN, therefore, has an
independent statutory foundation and gives rise to a separate
adjudicatory proceeding.
18. Merely because both SCNs originate from the same
investigation, or because they were entrusted to a common
Adjudicating Authority and heard together for administrative
convenience, they do not lose their separate legal identity. No
provision of the Act has been brought to our notice which mandates
that such notices must necessarily culminate in one composite order or
that adjudication of one cannot proceed independently of the other.
19. Adverting to the principal submission urged on behalf of the
Petitioners in W.P.(C.) No.5024/2024. It was argued that once this
Court stayed further proceedings pursuant to the Second SCN by order
dated 14.12.2023, the Respondents were precluded from proceeding
with adjudication of the First SCN.
20. This Court is unable to accept the aforesaid submission. A plain
reading of the interim order dated 14.12.2023 shows that the stay
granted by this Court was confined to further proceedings pursuant to
the Second SCN. The order neither stayed the adjudication of the First
SCN nor restrained the Adjudicating Authority from proceeding in
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 10 of 17
respect thereof. An interim order has to be construed on its own terms.
It is not permissible to enlarge its scope by implication.
21. In the absence of any express restraint operating against the
adjudication of the First SCN, the mere pendency of W.P.(C.)
No.16149/2023 could not, by itself, prohibit the Adjudicating
Authority from proceeding with the First SCN.
22. Learned counsel representing the Petitioners also submitted that
the Respondents themselves had treated both SCNs as constituting one
composite adjudication and therefore could not subsequently
segregate the proceedings.
23. This Court is unable to agree. Administrative convenience in
conducting a common hearing cannot override the statutory character
of two independent proceedings. The appointment of a common
Adjudicating Authority or issuance of common notices of hearing
cannot create a legal bar against separate adjudication if otherwise
permissible under the statute.
24. The Petitioners have also assailed the Impugned Order on the
ground that the relied upon documents were not supplied despite
repeated requests and that adequate opportunity of hearing was
denied, particularly in view of the medical condition of the proprietor
of Petitioner No.1 and the prevailing COVID-19 pandemic.
25. The Respondents, however, dispute these assertions. According
to them, several opportunities of personal hearing were granted over a
considerable period and the Petitioners repeatedly sought
adjournments without participating in the proceedings.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 11 of 17
26. These rival assertions raise disputed questions relating to the
conduct of the adjudication proceedings. Whether all relied upon
documents were supplied, whether sufficient opportunity was granted,
whether the adjournments sought were justified and whether any
prejudice was occasioned thereby are matters which necessarily
require examination of the adjudication record.
27. Such questions are ordinarily examined by the statutory
appellate authority while considering the validity of the adjudication
order. They are not issues which persuade this Court to bypass the
statutory appellate mechanism provided under the Act.
28. This Court is equally unable to accept the submission that the
Impugned Order should be set aside solely because it was passed after
the interim order dated 14.12.2023. As noticed hereinabove, the
interim protection granted by this Court did not extend to the First
SCN.
29. Once the Impugned Order has been passed, the Act provides a
complete appellate mechanism against such order before the Customs,
Excise and Service Tax Appellate Tribunal (CESTAT). CESTAT is
competent to examine every contention available to the Petitioners,
including those relating to violation of the principles of natural justice,
non-supply of relied upon documents, appreciation of evidence and
legality of the findings recorded by the Adjudicating Authority.
30. It is well settled that where an effective and efficacious
statutory remedy is available, the writ jurisdiction under Article 226 of
the Constitution is ordinarily not exercised unless exceptional
circumstances are made out. No such exceptional circumstance has
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 12 of 17
been demonstrated in the facts of the present case insofar as the
challenge to the Impugned Order is concerned.
31. In view of the aforesaid discussion, this Court finds no ground
to entertain the challenge to the Impugned Order in exercise of our
extraordinary writ jurisdiction under Article 226 of the Constitution.
The grievances urged by the Petitioners, whether relating to the
legality of the adjudication, the alleged violation of the principles of
natural justice, non-supply of relied upon documents, or the findings
recorded in the Impugned Order, are all matters which can
appropriately be examined by the CESTAT in exercise of its appellate
jurisdiction. This Court, therefore, declines to interfere with the
Impugned Order in writ proceedings and leave it open to the
Petitioners to avail the statutory remedy available under the Act.
32. This Court now turns to the issues raised in W.P.(C.)
No.16149/2023.
33. The principal challenge therein is founded upon Section 28(9)
of the Act. According to the Petitioners, the proceedings pursuant to
the Second SCN have become time-barred. It is their contention that
the statutory period for adjudication expired and the matter could not
validly be kept pending in the Call Book. It is also argued that the
extension dated 06.03.2023 is contrary to law and that, in any event,
such extension having never been communicated to them cannot
sustain the proceedings.
34. The Respondents controvert each of these submissions.
According to them, the proceedings were validly transferred to the
Call Book pursuant to the CBIC Instruction dated 17.03.2021. After
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 13 of 17
the Finance Act, 2022, and the consequential notification, the
proceedings were withdrawn from the Call Book. Thereafter, the
period available for adjudication recommenced under Section 28(9A)
of the Act. Since a large number of matters stood revived
simultaneously, the competent authority validly granted extension on
06.03.2023. It is further submitted that there exists no statutory
requirement requiring communication of such extension to the
noticee.
35. The Respondents have also relied upon the decision of this
Court in Pranij Heights India (supra) as well as the decision of the
Punjab and Haryana High Court in Shri Ram Agro Chemicals (supra)
in support of the proposition that non-communication of the extension
order does not invalidate the proceedings. The Petitioners, on the other
hand, have relied upon the pendency of proceedings before the
Supreme Court in GMR Airport Infrastructure (supra) and other
connected matters.
36. In the considered opinion of this Court, it would not be
appropriate to render any conclusive finding on the aforesaid
questions in the present proceedings. This Court, therefore, refrains
from expressing any opinion on the merits of the rival contentions
advanced in relation to the Second SCN.
37. The issues raised by the Petitioners involve the interpretation of
the amended provisions of Section 28 of the Act, the scope and effect
of Section 28(9A), the legal consequences of transfer of matters to and
withdrawal from the Call Book, the validity of the extension granted
by the competent authority on 06.03.2023, and the effect, if any, of
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 14 of 17
non-communication of such extension. These questions arise directly
in the adjudication proceedings pursuant to the Second SCN and are
yet to be examined by the Adjudicating Authority.
38. Since the adjudication proceedings pursuant to the Second SCN
are yet to attain finality, any observation made by this Court on the
aforesaid issues may have a bearing on the decision to be rendered by
the Adjudicating Authority. This Court is, therefore, of the view that it
would be appropriate to permit the statutory proceedings to reach their
logical conclusion, leaving it open to the Petitioners to avail of such
remedies as may be available to them in law against the final
adjudication order, if occasion so arises.
39. This Court accordingly expresses no opinion on the merits of
the rival submissions concerning Section 28 of the Act, the Call Book
mechanism, the extension dated 06.03.2023, the requirement of
communication thereof, or the applicability of the decisions relied
upon by the respective parties. All questions of fact and law are kept
open to be urged before the appropriate forum in accordance with law.
CONCLUSION:
40. For the reasons aforesaid, W.P.(C.) No.5024/2024 is disposed
of without interference with the Impugned Order dated 01.02.2024 in
exercise of the writ jurisdiction under Article 226 of the Constitution
of India. The Petitioners are, however, granted liberty to avail the
statutory remedy of appeal before the CESTAT against the Impugned
Order, if so advised.
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 15 of 17
41. In the event such an appeal is preferred, it shall be open to the
Petitioners to urge all grounds available to them in law, including
those urged before this Court. It is expected that, if any application for
condonation of delay or for interim relief is filed, the same shall be
considered by the learned Tribunal on its own merits and in
accordance with law.
42. W.P.(C.) No. 16149/2023 is also disposed of. Consequently, the
interim order dated 14.12.2023 stands vacated and the Respondents
shall be at liberty to proceed with the adjudication of Show Cause
Notice No.16/2020 dated 11.05.2020 in accordance with law.
43. Before passing any final order pursuant to Show Cause Notice
No.16/2020 dated 11.05.2020, the Adjudicating Authority shall afford
the Petitioners an effective opportunity of hearing and shall ensure due
compliance with the principles of natural justice in accordance with
law.
44. It is clarified that all contentions of the parties on merits,
including those relating to limitation under Section 28 of the Customs
Act, 1962, the effect of placing the matter in the Call Book, the
extension granted under Section 28(9), the alleged non-supply of relie
-upon documents and all other questions arising in the adjudication
proceedings, are expressly kept open. The Adjudicating Authority
shall consider the same independently and in accordance with law,
uninfluenced by any observations contained in the present judgment.
45. It is further clarified that the observations made in the present
judgment are confined to the question of exercise of writ jurisdiction
and shall not be construed as an expression on the merits of the
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 16 of 17
controversy pending either before the Adjudicating Authority or, if
occasion so arises, before the CESTAT.
46. The pending application shall stand closed.
ANIL KSHETARPAL, J.
SHAIL JAIN, J.
AUGUST 07, 2026
s.godara/shah
Signature Not Verified
Signed By:SAVITA
PASRICHA
Signing Date:07.08.2026
15:52:14
W.P.(C) 16149/2023 and connected matter Page 17 of 17