SRI KALEESWARI STORES vs EQUITAS SMALL FINANCE BANK LTD

Court
Madras High Court

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
IN THE HIGH COURT OF JUDICATURE AT MADRAS
RESERVED ON
PRONOUNCED ON
13.08.2026
18.11.2026
CORAM
THE HON'BLE MR.JUSTICE K.KUMARESH BABU
Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
Arb O.P(COM.DIV.) No.370 & 373 of 2026
1.M/s.Sri Kaleeswari Stores
A Partnership Firm
Rep., by its Partners,
Mr.R.Venkateswaran & Mrs.V.Selvi,
No.133, TSR, Big Street,
Kumbakonam – 612 001.
2.Mr.R.Venkateswaran
3.Mrs.Selvi ... Petitioners in all cases
Vs.
Equitas Small Finance Bank Limited,
Rep., by its Authorised Signatory,
th
4 Floor, Phase-II, Spencer Plaza,
No.769, Anna Salai,
Chennai – 600 002. ... Respondent in all cases
Mr.A.Alexander
Authorised Officer,
Equitas Small Finance Bank Limited,
Rep., by its Authorised Signatory,
th
4 Floor, Phase-II, Spencer Plaza,
No.769, Anna Salai,
Chennai – 600 002. ... Respondent in Cont.P. &
Sub Appln (OS).No.705/2026
PRAYER in Arb O.P(COM.DIV.) No.329 of 2026:- Arbitration Original
Page 1 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
Petition filed under Section 34(2)(b)(ii) of the Arbitration and Conciliation Act,
1996 seeking to set aside the impugned arbitral award, dated 16.02.2026 passed
by the learned Sole Arbitrator and to direct the respondent Bank to pay the costs
of these proceedings.
PRAYER in A.No.2141 of 2026:- Application has been filed to stay all further
proceedings of the award passed by the learned Arbitrator, dated 16.02.2026 in
Arbitration Case No.1 of 2025 in Section 33 Application, pending disposal of
the above Arbitration OP and pass such other suitable orders.
PRAYER in A.No.2798 of 2026:- Application has been filed to issue an order
of interim direction to direct the respondent Bank, its men, agents, and officers
to immediately remove any seals, locks, or obstructions placed on the property
situated at T.S.No.2000, Door No.134/133, TSR Big Street, Kumbakonam and
restore the complete, physical possession of the said business premises to the
applicants pending final disposal of the main Arbitration O.P.
PRAYER in A.No.2799 of 2026:- Application has been filed to accept the
partial payment of Rs.50,00,000/- made via Demand Draft No.125763, dated
20.06.2026 drawn on Indian bank, Melacauvery Branch and consequently grant
an extension of time by eight (8) weeks to pay the remaining balance of
Rs.50,00,000/- as ordered in A.No.2141 of 2026 in O.P.No.329 of 2026, dated
14.05.2026.
Prayer in Cont.P.No.2320 of 2026:- Petition had been filed to punish the
respondent Bank for their Willful and deliberate disobedience of the interim
order, dated 14.05.2026, passed by this Court in A.No.2141 of 2026 in Arb.O.P.
(Com.Div) No.329 of 2026.
Page 2 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
Prayer in Sub Application No.705 of 2026 in Cont.P.No.2320 of 2026:-
Application had been filed to issue an interim direction to direct the respondent
to immediately restore the physical possession of the petitioner's Shop situate in
T.S.No.2000, Door No.134, Old Door No.133, TSR Big Street, Kumbakonam
to the petitioners herein by removing locksor seals placed thereon and to re-
establish the status quo ante that prevailed prior to 20.06.2026.
In both Arb.O.P.(COM.DIV.) & Applications:-
For Petitioners : Mr.P.J.Rishikesh
for Mr.B.Ram Kumar
For Respondent : Mr.Ravi, Sr., counsel
for Mr.S.Suresh
COMMON ORDER
The present Arbitration Original Petition have been filed seeking to set
aside the impugned Award dated 16.02.2026 passed by the Learned Sole
Arbitrator, Hon’ble Mr.Justice K.Kannan (Retd.) and further direct Respondent
Bank to pay the costs of the proceedings.
2. The present Contempt Petition has been filed seeking to punish the
Respondent Bank for their willful and deliberate disobedience of the Interim
Order dated 14.05.2026 passed by this court in the A.No.2141 of 2026 in
Arb.OP.(Com.Div)No.329 of 2026
3. The Application in A.No.2798 of 2026 have been filed seeking interim
direction directing the Respondent Bank, to immediately remove any seals,
Page 3 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
locks or obstructions placed on property situate at T.S.No.2000, Door
No.134/133, TSR Big Street, Kumbakonam and restore the complete, physical
possession of the said business premises to the applicants pending final disposal
of the main Arbitration OP.
4. The Application in A.No.2141 of 2026 have been filed seeking to stay
all further proceedings of the Award passed by the Learned Arbitrator dated
16.02.2026 in the Arbitration Case No.1 of 2025
5. The Application in A.No.2799 of 2026 have been filed seeking this
court may be pleased to accept the partial payment of Rs.50,00,000/- made via
Demand Draft No.125763 dated 20.06.2026 drawn on Indian Bank,
Melacauvery Branch, and consequently grant an extension of time by eight
weeks to pay the remaining balance of Rs.50,00,000/- as ordered in A.No.2141
of 2026 in OP.No.329 of 2026 dated 14.05.2026
6. Heard Mr.P.J.Rishikesh learned counsel appearing for Mr.B.Ram
Kumar learned counsel appearing on behalf of the petitioners and Mr.Ravi
learned Senior Counsel appearing for Mr.S.Suresh learned counsel appearing on
behalf of the respondent and the contemnor, in both the Arb.OP and the
Contempt Petition.
Page 4 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
7. For the ease of adjudication and understanding, the parties in the above
Contempt Petition and Applications are referred to by their respective ranks in
the Arbitration Original Petition.
8. Mr.P.J.Rishikesh the learned counsel appearing on behalf of the
petitioner submits that the facts giving arise to the present dispute, is that the
first petitioner is a partnership firm engaged in the retail business of utensils,
nd rd
furniture and home appliances with the 2 and 3 petitioners as its partners.
The petitioners had approached the Respondent Bank seeking credit facilities
aggregating to Rs.10 Crores, which were sanctioned vide the letter dated
28.11.2017 in form of a cash credit for amount of Rs.3,50,00,000 and two term
loans for Rs.1,53,00,000 and Rs.4,97,00,000. The 1st petitioner has
nd rd
hypothecated its stocks and movables, whereas the 2 and 3 petitioners
nd
executed Deeds of Gurantee dated 28.11.2017 and further the 2 petitioner
additionally created an equitable mortgage by deposit of the Title Deeds in
January 2018. He submits that the Petitioners have diligently repaid one of the
term loans amounting to ₹1,53,00,000/- in full, without a single default. He
further submits that, owing to the severe downturn in their business, aggravated
by the COVID-19 pandemic, the Petitioners were unable to timely discharge the
outstanding dues.
Page 5 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
9. The learned counsel submits that the respondent had initially chosen to
invoke the Arbitration clause in the loan agreement and had filed applications
under section 9 of the Arbitration and Conciliation Act, 1996 (hereinafter
referred to as the ‘Act’) in Arb Applns No.585 to 587 of 2024, seeking
appointment of the Advocate Commissioner, pursuant to which this court vide
its order dated 20.09.2024 had appointed an Advocate Commissioner to take
inventory of the hypothecated stocks. Thereafter the petitioners filed the
applications in A.Nos.1320 to 1322 of 2025 to vacate the aforesaid interim
order dated 20.09.2024. It is submitted that the petitioners had paid a sum of
Rs.1,00,00,000/- (Rupees One Crore Only) pursuant to the common order dated
13.03.2025 made in the aforesaid Arbitration applications and applications.
Further the Respondent had also filed an Arbitration Original petition in
Arb.OP.(Com.Div)No.147 of 2025 under section 11 of the Act, seeking for
appointment of an Arbitrator. He submits that thereafter this court vide its
common order dated 16.04.2025 had disposed the Applications and Original
Petition supra and had appointed Hon’ble Mr.Justice K.Kannan, Former Judge
of this court and Punjab and Haryana High court to adjudicate the disputes
between the parties. Subsequently the learned Sole Arbitrator had conducted the
Arbitration proceedings under the Arbitration Case No. 1 of 2025. The learned
counsel submits that, despite framing five issues, the learned Sole Arbitrator,
without duly appreciating the facts and circumstances of the case or the efforts
undertaken by the Petitioners to dispose of their properties and mobilise
Page 6 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
resources towards repayment of the outstanding dues, proceeded to pass the
impugned award dated 16.02.2026.
10. The learned counsel submits that, during the pendency of the
arbitration proceedings, the Respondent simultaneously invoked the SARFAESI
Act. Pursuant thereto, a Demand Notice under Section 13(2) and a Possession
Notice under Section 13(4) of the SARFAESI Act were issued. Thereafter, the
Petitioner challenged the legality of the aforesaid measures under the appal in
SA.No.15 of 2025 before the DRT. While the said proceedings were pending
along with the arbitration proceedings, the Respondent Bank instituted fresh
proceedings in Crl.MP.No.67 of 2025 under Section 14 of the SARFAESI Act,
before the Chief Judicial Magistrate Thanjavur @ Kumbakonnam, seeking
appointment of an Advocate Commissioner to take physical possession of the
secured assets, including by breaking open the locks with police assistance. The
said application came to be allowed vide order dated 22.04.2025.
11. Challenging the aforesaid order, the Petitioner filed a Writ Petition in
W.P.(MD).No.14527 of 2025 before the Madurai Bench of this Court.
Subsequently, by order dated 21.05.2025 this Court granted an interim stay of
the order passed in Crl.MP.No.67 of 2025 supra, subject to the condition that
the Petitioner to pay a sum of Rs.10,00,000/- to the Respondent, which
Page 7 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
condition was duly complied with. Thereafter, by order dated 25.08.2025 this
Court dismissed the Writ Petition, directing the Petitioner to avail the alternative
remedy available in law. The Respondent thereafter forthwith filed another
application under Section 14 of the SARFAESI Act for appointment of an
Advocate Commissioner in Crl.MP.No.835 of 2025 in Crl.MP.No.67 of 2025
before the Chief Judicial Magistrate, Thanjavur @ Kumbakonam, which came
to be allowed.
12. Aggrieved thereby, the Petitioner preferred an application under
Section 17 of the SARFAESI Act before the Tribunal, inter alia, seeking an
interim injunction restraining the Respondent Bank from taking physical
possession of the properties. The said application came to be dismissed by the
Tribunal vide order dated 04.10.2025. Subsequently, the Petitioner preferred an
Arbitration Appeal before the Division Bench of this Court in . Thereafter, this
Court passed an order granting an interim injunction restraining the Respondent
Bank from taking physical possession of the properties and directed the
Petitioner to pay a sum of Rs.25,00,000/- to the Respondent, which direction
was duly complied with by the Petitioner on 13.10.2025.
13. The Impugned Award dated 16.02.2026 inter alia had held that the
petitioners are jointly and severally liable to pay Rs.7,52,32,079 - (Rs.4,35,679
Page 8 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
+Rs.10,00,000+ Rs.25,00,000) as per the rate of interest as stipulated therein,
along with an additional cost of Rs.10,00,000/- payable to the Respondent
Bank.
14. It is submitted that the Petitioners had filed an Application under the
section 33 of the Act before the learned Sole Arbitrator, seeking correction of
the arithmetical correction in the Clause Nos.6.1.4 and 7.1(a) of the impugned
Award dated 16.02.2026, wherein the petitioners had specifically contended that
deduction formula in Clause No.7.1(a) of the award only subtracts the
difference of Rs.4,35,679/- (which being the difference between the admitted
payment of Rs.1,00,00,000/- and the credited amount of Rs.95,64,321/-), along
with the repaid sums of Rs.10,00,000/- and Rs.25,00,000/- pursuant to the
orders of this court from the Gross Claim of Rs.7,52,32,079/-. However in
contrary to the impugned Award the Principal Claim amount was
Rs.6,50,1092/- and the total amount repaid by the petitioners pursuant to the
orders of the court was Rs.1,35,00,000/-, which ought to deducted from the
principal claim. Further submitted that the failure to do such bonafide deduction
results in the “double-charge” of the Petitioners, wherein the petitioner are
being legally mandated to pay nearly Rs.1,00,00,000/- twice. However learned
sole Arbitrator without considering the facts and averments made by the
petitioners had dismissed the Section 33 Application vide his order dated
08.03.2026.
Page 9 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
15. The learned counsel contends that the Respondent Bank initiating
three separate proceedings namely, the Arbitration proceedings before the
Tribunal, the SARFAESI proceedings before the DRT and the Section 14
proceedings, for the same alleged debt, is vexatious and blatant abuse of the
process of law. He submits the Respondent Bank’s failure to proceed with the
arbitration proceedings even after getting the arbitrator appointed clearly shows
its mala fide intent is not to adjudicate the dispute but to harass the petitioners.
It is submitted that the petitioners in total have paid upto a sum of
Rs.1,35,00,000/- (Rs.1,00,00,000+ Rs.10,00,000 + Rs.25,00,000) pursuant to
the Orders of this court as stated supra . The learned counsel vehemently
contends that the aforesaid payments unequivocally demonstrate the Petitioners’
bona fide intention to discharge their repayment obligations. He submits that the
COVID-19 pandemic, being an unprecedented crisis and a force majeure event
had brought the Petitioners’ business to a standstill, rendering them unable to
service the EMI dues on time, consequent to which their loan accounts were
classified as Non-Performing Assets (NPAs).
16. The learned counsel submits that the petitioners have admittedly
repaid a sum of Rs.1,35,00,000/- in compliance to the orders made by this court,
however the Sole Arbitrator had failed to take the same into consideration and
had allowed only a deduction of sum of Rs.39,35,679/- while computing the
amount to be paid by the petitioners. Hence it is contended that the impugned
Page 10 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
Award dated 16.02.2026 is vitiated by the patent illegality in its operative
portion, namely Clause No.7.1(a) therein. He further submits that the Sole
Arbitrator had erred in Computational Calculation of the operative portion of
the impugned Award, which results in the “double charging”. The learned
counsel further contends that the Clause 7.1(d) of the Impugned Award which
supports to protect the right of recovery of enforcement of security under the
SARFAESI Act, which is extra-jurisdictional as the same is a distinct statutory
remedy which does not fall under the scope of the Claim statement. Therefore
the suo motu granting protection to the SARFAESI proceedings by the Sole
Arbitrator exceeds the scope of reference which was limited to the disputes
arising from the Facility and Guarantee Agreements, which renders the
impugned Award liable to be set aside under the section 34(2)(a)(iv).
17. It is further submitted that the Sole Arbitrator had committed a patent
illegality by holding that the Doctrine of Election is inapplicable to the present
case wherein the Respondent Bank having invoked the both the Arbitration
Process is legally estopped from pursuing the parallel recovery remedy under
the Section 14 of the SARFAESI Act. He submits that the impugned order
actively allows double jeopardy towards the petitioner, which is a clear abuse of
the process of law. The learned Counsel further submits that the learned Sole
Arbitrator erred in law by treating the force majeure plea as a claim for blanket
extinguishment of debt, when the petitioners had only sought mitigation and
Page 11 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
restructuring on account of the COVID-19 pandemic. It is contended that the
Arbitrator thereby mischaracterized the defence, violated the principles of
natural justice and failed to adjudicate the actual dispute.
18. He further submits that subsequent to the passing of the impugned
order dated 16.02.2026, the petitioners had further made a payment of
Rs.1,30,00,000/-, leading to a partial Release of the Mortgage
(Doc.No.1183/2026) by the Respondent Bank. Hence the total amount repaid by
the petitioners amounts to Rs.26,500,000/- (Rs.1,35,00,000/- +
Rs.1,30,00,000/-), therefore the Respondent Bank is estopped from proving that
the Final Award is now based on an obsolete financial reality and fails to reflect
the current state of the discharge of liability. He also contends that imposition
of the Rs.10,00,000/- as costs under the Clause 7.1(b) of the impugned Award is
wholly excessive and arbitrary, as per the Act the cost must be reasonable,
whereas the learned Sole Arbitrator had failed to provide any justification,
reasonings or breakdown for the aforesaid cost imposition. Hence the learned
counsel in view of the aforesaid facts seeks the impugned Award dated
16.02.2026 to be set aside.
19. Aggrieved by the passing of the impugned Award dated 16.02.2026
and the subsequent dismissal of the Section 33 Application vide order dated
08.03.2026, the petitioner has preferred the present Arbitration Original Petition
Page 12 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
under Section 34 of the Act. Along with the present Arbitration Original
Petition, the petitioner had moved a Stay Application before this court in
A.No.2141 of 2026 with respect to the impugned Award. An interim order
dated 14.05.2026 was passed in the aforesaid Application, wherein this court
was pleased to pass an order of interim stay under a condition subject to
payment of Rs.1,00,00,000/- by the petitioner/applicant, within eight weeks
from the date of order. It is submitted that the impugned Award dated
16.02.2026 bounds and limits the SARFAESI recovery mechanism under its
Clause 7.1(d) which stands stayed and any underlying recovery or possession
mechanism stands automatically suspended.
20. The learned Counsel submits that despite the eight weeks window
granted by this court for the compliance of the aforesaid order dated 14.05.2026
still being active and the Respondent Bank having full knowledge of the same,
under the color of the Chief Judicial Magistrate warrent dated 22.09.2025,
arbitrarily issued a Possession Notice dated 10.06.2026 through the Advocate
Commissioner. Upon receiving the said notice the Petitioners forthwith issued a
Contempt Notice dated 20.06.2026, explicitly stating the stay granted by this
court in its order dated 14.05.2026 in detail and called upon the Respondent to
cease and desist from taking the physical possession of the petitioners property
to avoid the wilful contempt. Despite the aforesaid facts the respondent willfully
and deliberately, with utter disregard to the order of this court dated 14.05.2026,
Page 13 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
had entered into the business premises of the Petitioners on 20.06.2026 and had
locked the premises, stating that respondent is only bound by the order issued
by the CJM. Therefore the Petitioners instituted the present Contempt
proceedings in Cont.P.No.2320 of 2026 against the Respondent Bank.
21. He submits that the forcible dispossession of the petitioners of the
property is completely unlawful, void ab initio and constitutes a wilful contempt
on the part of the contemnor. He further submits that the aforesaid aggressive
act committed by the Respondent bank had not only resulted in
material/financial loss to the petitioners but had also adversely affected the
reputation and brand of the Petitioners among the public. Aggrieved by the
unlawful action of the Respondent Bank/ Contemnor, the petitioners had further
filed the present Sub-Application in Sub Application No.705 of 2026, seeking
interim direction towards the Respondent to immediately restore the possession
of the petitioners’ property/ Shop and to remove the lock or seals placed
thereon. The petitioners had further explicitly filed an Application in A.No.2798
of 2026 seeking interim direction directing the Respondent Bank, to
immediately remove any seals, locks or obstructions in the Petitioner’s shop
property.
22. The petitioners had filed present Application in A.No.2799 of 2026,
with respect to the payment of sum of Rs.1,00,00,000/- to be made pursuant to
Page 14 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
the order dated 14.05.2026 issued in A.No.2141 of 2026. The said Application
has been made seeking this court to accept the partial payment of
Rs.50,00,000/- made via Demand Draft No.125763 dated 20.06.2026 drawn on
Indian Bank, Melacauvery Branch, and further consequently grant an extension
of time by eight weeks to pay the remaining balance of Rs.50,00,000/- as per
the order dated 14.05.2026.
23. Therefore, in view of the foregoing submissions and facts, the learned
counsel prays that this Court may be pleased to set aside the Impugned Arbitral
Award dated 16.02.2026 and allow the present Arbitration Original Petition,
along with the present Contempt Petition, Sub Application, and Applications.
24. Per contra , the learned Senior Counsel appearing for the
Respondent/Contemnor submits that the impugned Award dated 16.02.2026
passed by the learned Sole Arbitrator is well-founded, reasoned and in
accordance with the settled principles of law. He submits that the Respondent
has pursued the lawful remedies available to it for recovery of the amounts due
and payable by the Petitioners and the invocation of such remedies cannot, in
any manner, amount to double or triple jeopardy. The learned Senior Counsel
further submits that the COVID-19 pandemic, by itself, cannot be a ground for
extinguishing or absolving the Petitioners from their contractual and
Page 15 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
commercial obligations. He submits that the Doctrine of  force majeure  cannot
be invoked merely on the ground that a supervening event resulted in financial
hardship or impaired the Petitioners’ ability to perform their contractual
obligations.
25. He further submits that the Doctrine of Election has no application to
the facts of the present case, as the proceedings initiated under the Arbitration
and Conciliation Act and the remedies available under the SARFAESI Act
operate in distinct fields and can be pursued simultaneously. According to the
learned Senior Counsel, the invocation of remedies under the SARFAESI Act
does not prohibit the Respondent from pursuing the arbitral proceedings for
adjudication and recovery of the amounts due. The learned Senior Counsel
further submits that the learned Sole Arbitrator passed the impugned Award
only after hearing both parties and upon duly considering the pleadings, oral
and documentary evidence and the materials placed on record before the
Arbitral Tribunal. He therefore submits that there is no perversity, patent
illegality or violation of the principles of natural justice warranting interference
by this Court.
26. With regard to the Petitioners’ contention that the learned Sole
Arbitrator had committed a patent illegality in computing the operative portion
Page 16 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
of the Award, namely, Clause 7.1(a), the learned Senior Counsel submits that
the Petitioners have misconstrued the said clause and have fully omitted the
interest payable to the Respondent. He submits that the computation and
directions contained in the impugned Award are in accordance with the findings
rendered by the learned Sole Arbitrator and do not suffer from any patent
illegality, which warrents interference from this court.
27. Insofar as the contempt proceedings are concerned, the learned Senior
Counsel submits that the order dated 14.05.2026 passed in A.No.2141 of 2026
relates specifically to the impugned arbitral award dated 16.02.2026 and does
not operate in respect of the independent proceedings initiated under the
SARFAESI Act. He submits that the Possession Notice dated 10.06.2026 was
issued pursuant to the warrant dated 22.09.2025 arising out of the order passed
by the learned Chief Judicial Magistrate under Section 14 of the SARFAESI
Act, which pertains to the SARFAESI proceedings and not to the enforcement
of the impugned arbitral award. Consequently, the possession of the petitioners’
property under the proceedings of the SARFAESI Act, cannot be considered as
wilful disobedience of the order dated 14.05.2026 of this Court so as to
constitute contempt.
28. In view of the foregoing submissions, the learned Senior Counsel
Page 17 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
submits that the Petitioners have failed to establish any ground warranting
interference with the impugned Award or to make out a case of contempt
against the Respondent. He therefore prays that the Arbitration Original Petition
and the Contempt Petition, together with the connected Sub Applications and
other pending Applications to be dismissed.
29. I have considered the submissions made on either side and perused
the materials placed on record.
30. The Primordial contention of the petitioner is that the cause of action
for initiation of the arbitral proceedings has merged with the invocation of
SARFAESI Act and therefore, the Arbitrator ought not to have entered the
reference as initiated by the respondent. The contention has been raised upon
the doctrine of election and in that regard, it is to be noted that the Hon'ble Apex
Court had permitted proceedings to be initiated against the borrower under the
modes available simultaneously. The Hon'ble Apex Court in the case of
M.D.Frozen Foods Exports Private Limited & Ors., vs. Hero Fincorp Limited
reported in (2017) 16 SCC 741 , had held that the SARFAESI proceedings and
the arbitration proceedings can go hand in hand. In that regard, the contention
raised by the learned counsel appearing for the petitioner could not be sustained.
31. On the merits of the award under challenge, this Court finds no
Page 18 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
perversity that the award suffers from the vice of Wednesbury
unreasonableness. By an adjudicatory process in the arbitration proceedings,
the liability of the petitioner had been crystallized. The petitioners' claim for
moratorium and restructuring of the account on account of the COVID-19
pandemic as claimed by the petitioners cannot also help the petitioners. The
COVID-19 pandemic was long gone as early as in the year 2022 and the
initiation of the SARFAESI proceedings was in the month of August 2024 by
noting that the accounts of the petitioners had become NPA. The learned
Arbitrator had rightly rejected the claim of the petitioner in passing an award in
favour of the respondent. In that regard, this Court does not find any grounds to
interfere with the award under Section 34 of the Arbitration and Conciliation
Act.

32. As regards to the claim of violation of the orders of this Court, it is to
be noted that the Arbitrator had held that the right of recovery under the
SARFAESI proceedings was limited to the amount as quantified under the
award. This Court by order dated 14.05.2026, had stayed the operation of the
award on a condition that the petitioners deposit a sum of Rs.1,00,00,000/-,
within eight (8) weeks from the date of receipt of copy of the order. Pursuant to
the order passed in Section 14 of the SARFAESI Act, made on 22.04.2025,
which was followed up with an appointment of Advocate Commissioner on
19.09.2025 possession of the secured assets was taken by the respondent on
Page 19 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
20.06.2026. Such taking of possession under the SARFAESI Act was
complained to be in violation of the interim orders passed by this Court.
SARFAESI proceedings were held to be proceedings in nature of an
enforcement proceedings while arbitral proceedings was held to be an
adjudicatory process by the Hon'ble Apex Court in the case of M.D.Frozen
Foods Exports Private Limited & Ors., (referred supra ). In the very same
judgment, the Hon'ble Apex Court has also held that the proceedings initiated
under the SARFAESI Act is to protect the value of the asset vis-a-vis the
amount liable to be paid by the borrower. The Hon'ble Apex Court in the case
of Transcore vs. Union of India & Ors., reported in (2008) 1 SCC 125, had
held that taking of possession of a secured assets by the secured creditor under
the provisions of the SARFAESI Act is akin to a Receiver being appointed for
protection of the assets. A grant of interim protection in challenge to the
arbitral award would only mean that the award could not be enforced as against
the petitioners. The property that was taken possession would have to be
subjected to further proceedings under the SARFAESI Act to recover the dues
that had been determined under the arbitral proceedings. In that regard, this
Court is of the view that when under the arbitral proceedings amount had been
determined then the enforcement proceedings under the SARFAESI Act would
have to be limited to the amount that had been determined under the award, as
rightly done so by the learned Arbitrator.

Page 20 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
33. The interim order could only protect the petitioners from recovery of
the award amount alone pending the Original Petition and not the authority with
the respondent to take possession of the property under the provisions of the
SARFAESI Act. This Court is of the further view that the interim protection
granted by this Court on 14.05.2026 can only put a bar against the respondent
from taking further proceedings under the SARFAESI Act for enforcing the
award by dealing with the security so repossessed towards the recovery of the
dues under the award. In that regard, this Court finds that there has been no
violation of the order dated 14.05.2026 as complained of by the petitioners.
34. In fine, Arbitration Original Petition as well as the Contempt Petition
stands dismissed and consequently connected applications stand closed.
Considering the fact that an interim protection was granted from enforcement of
the award, such interim protection can be continued for a further period of two
months to enable the petitioner to work out its remedies and hence, till such
time, the respondents are directed not to proceed further by bringing the assets
so re-possessed to sale. However, there shall be no order as to costs.

18.11.2026
Index: Yes/No
Speaking/Non-speaking order
Neutral Citation: Yes/No
Pbn
Page 21 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )

Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
K.KUMARESH BABU J.
Pbn
A Pre-delivery order made in
Arb O.P(COM.DIV.) No.329 of 2026 &
A.Nos.2798, 2799 & 2141 of 2026
Cont.P.2320 of 2026 & Sub Appln.No.705 of 2026
18.11.2026
Page 22 of 22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 19/11/2026 05:49:06 pm )