Modern Asset vs Knk Constructions Private Limited
- Court
- Supreme Court
2026 INSC 1103
Non-Reportable
IN THE SUPREME COURT OF INDIA
CIVILL APPELLATE JURISDICTION
Civil Appeal No………...of 2026
[@ Special Leave Petition (C) No.25068 of 2026]
Modern Asset
…. Appellant
Versus
KNK Construction Private Limited.
…. Respondent
J U D G M E N T
K. VINOD CHANDRAN, J.
Leave granted.
2. The instant appeal raises an interesting question, apropos
the Insolvency and Bankruptcy Code, 2016 (IBC for short) as to
whether an Operational Creditor (OC) who suffered a major
haircut in the Corporate Insolvency Resolution Process (CIRP) can
be proceeded against by the Successful Resolution Applicant
(SRA) for pre-CIRP dues due from the OC, to the entity which had
fallen into CIRP.
Signature Not Verified
3. On background facts, we have to notice that the appellant
Digitally signed by
CHANDRESH
Date: 2026.10.08
19:00:23 IST
Reason:
and the respondent entered into a contract for civil and structural
Page 1 of 24
CA@SLP (C) No. 25068 of 2026
work of construction of an office building by an agreement dated
09.07.2018, in which Clause 19.13 provided for arbitration with
respect to disputes or differences in relation to or arising out of or
touching the said contract; the total contract amount of which was
Rs.133.68 Crores. The appellant paid the mobilisation advance
and the respondent furnished bank guarantee of Rs.1,56,13,250/-
towards successful completion of work. The respondent claims
that the work was commenced on 01.06.2018 with the timeline
extended once, till 31.12.2019 and 95% of the work was
completed, when the appellant threatened termination; if the
defects pointed out were not rectified within 14 days without just
cause. The appellant on the other hand stands by its termination
notice and subsequent termination effected on 25.02.2020 by
which time admittedly the respondent had been admitted into
CIRP as on 11.12.2019. It was after admission into CIRP that an
application was made to register the respondent as a small
enterprise with the Ministry of Micro, Small and Medium
Enterprises (MSME).
4. The appellant approached the Resolution Professional (RP)
with a claim of Rs.12,26,30,840/- of which only 0.72% was
Page 2 of 24
CA@SLP (C) No. 25068 of 2026
admitted after a major haircut, in the resolution plan submitted by
the erstwhile promoter; on the strength of the CD being an MSME,
by virtue of Section 240A(1) of the IBC. The resolution plan
obtained the majority of the Committee of Creditors (CoC) and
the appellant’s claim was allowed to the extent of Rs.8,82,942/-
with interest. The National Company Law Tribunal (NCLT)
approved the resolution plan on 05.04.2022 and the erstwhile
promoters of the CD came into the saddle of management, as the
SRA. Subsequent to this, though not strictly related to the dispute
raised for arbitration, the appellant lodged an FIR in Crime No.20
of 2023 against the Directors of the respondent under Sections
420, 468, 471 of the Indian Penal Code, 1860 (IPC). The allegation
was that the respondent had furnished a work completion
certificate on the letter head of the appellant, with a forged
signature to the Karnataka State Road Transport Corporation. It is
the contention of the appellant that as a counterblast, the
respondent invoked arbitration by notice dated 13.03.2023. The
respondent also filed a complaint bearing Crime No.77 of 2023
alleging misappropriation against the appellant, which was later
quashed by the High Court on 25.07.2025. Admittedly the
Page 3 of 24
CA@SLP (C) No. 25068 of 2026
payment under the resolution plan was also commenced on
15.06.2023 by the respondent to the appellant and is fully satisfied
as on today.
5. On 20.06.2023, the respondent filed an application under
Section 11 before the High Court of Karnataka raising a plea for
arbitration, comprising of amounts allegedly payable to the
respondent arising from the very same contract on which the
appellant raised a claim before the RP and received a paltry
amount after a major haircut. The High Court elaborately
considered the issue, by the impugned judgment and appointed
an Arbitrator, but eventually directed the parties to approach the
Karnataka Mediation Centre initially and on failure of mediation,
the Director of the Mediation Centre was directed to inform the
Director, Bengaluru International Arbitration and Conciliation
Centre so as to take necessary action. The appellant is aggrieved
by the impugned order passed enabling the arbitration of a
dispute in which the appellant’s claim submitted before the RP,
was accepted in toto , but the amounts considerably reduced for
payment, as would be enabled on liquidation of the assets of the
CD. The R.P. had not raised any counterclaim on behalf of the CD.
Page 4 of 24
CA@SLP (C) No. 25068 of 2026
6. Sri Shyam Divan, learned Senior Counsel appeared for the
appellant and pointed out the gross inequity in the respondent
being let off completely from the claims raised by the appellant,
against the respondent, by virtue only of the CIRP proceedings in
which the appellant suffered a major haircut. It is with respect to
the very same contract on which the claim was raised by the
appellant before the RP that the respondent is now raising their
claim. It is pointed out that being an MSME, the very same
promoters of the CD, which pushed the enterprise into CIRP, has
been resumed to its management by virtue of the CIRP, in the
garb of a SRA and has now raised the claim against the applicant.
It is the argument of the appellant that the claim as per the
contract having been raised before the RP and the same having
been settled for a paltry amount, there is no question of any
further amount being claimed by the SRA on the very same
contract. The agreement has worked itself out in the CIRP process
and there is no subsisting agreement or an arbitration clause, is
the compelling argument.
7. If the arbitration is allowed at this point then it would be a
one way street and the appellant would be restricted from raising
Page 5 of 24
CA@SLP (C) No. 25068 of 2026
any counterclaim on the ‘clean slate’ principle under the IBC. The
agreement is bipartite and the arbitration clause also enables
settlement of the disputes between the parties, which permits
claims and counterclaims. Insofar as the appellant is concerned,
his claim stands extinguished by statute, in which event, there can
be no further claim made by the SRA who came into the saddle of
the CD. This is especially so, in the present case, where the
erstwhile promoters have come back to the management of the
CD as an SRA, which is only by reason of the benefit conferred on
a MSME. The RP very well could have raised the claim on behalf
of the CD and the respondent also, in the resolution plan was
aware of the claim made, which could have been countered with
a counterclaim at that stage itself. The resolution plan submitted
by the erstwhile promotors ought to have taken into account, the
counterclaim if at all surviving on the CD, either by themselves or
through the RP. The same having not been done there is no
surviving claim for arbitration. In conclusion, it is submitted that
there is no agreement itself subsisting between the parties and so
has the arbitration clause suffered a natural death. There cannot
be a one way reference to arbitration to settle the claim raised by
Page 6 of 24
CA@SLP (C) No. 25068 of 2026
the respondent against the appellant, while the monetary claim of
the appellant against the respondent has already been settled in
the CIRP, for a paltry amount, thus extinguishing the entire
balance due to it as an OC.
8. Sri Nikhil Nayyar, learned Senior Counsel who appeared for
the respondent, first requested us to disabuse ourselves of the
angst regarding the erstwhile promoters having come back to the
management of the CD as an SRA, which the law permits for a
MSME. Whether it be the erstwhile promoters or a completely
new one, the status of the SRA remains the same and is entitled to
proceed against the debtors of the erstwhile CD, if the RP had not
initiated proceedings against such debtors of the CD while the
CIRP was in progress.
9. The scope of Section 11 is confined to prima facie existence
of an arbitration agreement as has been laid down by this Court
1
in SBI General Insurance v. Krish Spinning and In Re: Interplay
between Arbitration Agreements under the Arbitration and
2
Conciliation Act 1996 and the Indian Stamp Act, 1899 . Section
31 of the IBC does not extinguish the arbitration agreement or the
1
(2024) 12 SCC 1
2
(2024) 6 SCC 1
Page 7 of 24
CA@SLP (C) No. 25068 of 2026
claim of the respondent against the appellant. The arbitration
agreement is a separate and independent contract, as held by this
Court in the above cited decisions. After the CIRP is admitted, the
erstwhile Directors of the CD have no role to play and because
the RP failed to raise a counterclaim, it cannot disable the SRA
from realizing the dues to the CD, which is also permissible as per
Section 31. It is vehemently argued relying on Swiss Ribbons Pvt.
3
Ltd. v. Union of India , that the RP does not carry out an
adjudication of the claim raised by the OC and it is only an
administrative measure. Section 30(2) enables the resolution plan
to provide for payment of amounts to OCs, which is not less than
what they would be entitled in a liquidation. The insertion of
Section 31(6) w.e.f. 26.05.2026 clarifies the ‘clean slate’ principle
and all claims against the CD prior to the approval of the
resolution plan would stand extinguished; which clarificatory
amendment enables retrospective effect to the said provision.
Reference is made to a number of decisions including
Ghanshyam Mishra & Sons (P) Ltd. v. Edelweiss Asset
4
Reconstruction Co. Ltd. to canvas the complete extinguishment
3
(2019) 3 SCC 17
4
(2021) 9 SCC 657
Page 8 of 24
CA@SLP (C) No. 25068 of 2026
of the claim of an OC after participating in the CIRP raising a
claim, which has been allowed to the extent possible, as would be
permissible in a liquidation process and the resolution plan
having been approved by the adjudicating authority, which is the
NCLT. The fact remains that the claim of the appellant has been
settled and the claim of the SRA survives because the law intends
that every endeavour should be made to ensure that an enterprise
is not liquidated at the first instance and an effort be made to
revive the same. The IBC is aimed at timely resolution of a CD,
with preservation of its assets. The resolution process also
ensures that the SRA is able to pursue the claims left with the CD,
which again is in preservation of its assets. The application of
Section 31, which extinguishes debts due to the FCs and OCs but
keeps alive that due to the CD is by a statutory imprimatur; a
device employed to avoid liquidation and enable revival. In fact,
all questions have been left open by the impugned order, which
requires no interference at this point, the Arbitrator being
entitled to resolve all such disputes.
Page 9 of 24
CA@SLP (C) No. 25068 of 2026
10. Insofar as limitation is concerned reliance is placed on New
5
Delhi Municipal Council v. Minosha India Limited , wherein
the order allowing Section 11 petition under the Arbitration and
Conciliation Act was upheld finding the limitation to be computed
excluding the date on which the CIRP commenced and the NCLT
approved the resolution plan. The said decision is also an
authority for enabling an SRA to pursue the claims of the CD in
arbitration even after conclusion of CIRP; especially when the
‘clean slate;’ principle is not made applicable to the CD’s debts,
when limitation to proceed for realisation of subsisting debts of
the CD by the SRA is extended, by exclusion of the moratorium
period under Section 14, by Section 60(6).
11. The impugned order framed six questions and answered
them in the following manner: -
i) Clause 19.13 of the contract dated
09.07.2018 constitutes a valid arbitration
agreement within the meaning of Section 7 of the
Arbitration and Conciliation Act and by virtue of
the doctrine of separability survives the
termination of the contract and subsists,
notwithstanding the approval of the resolution
plan under Section 31(1) of the IBC.
5
(2022) 8 SCC 384
Page 10 of 24
CA@SLP (C) No. 25068 of 2026
ii) The inquiry under Section 11(6-A) of the
Arbitration and Conciliation Act contemplates
only a prima facie examination of the existence of
an arbitration agreement, whereas the
consequences flowing from the approval of
resolution plan and the ‘clean slate’ principle
doctrine are to be appropriately left to be
determined by the Arbitral Tribunal under Section
16 of the Act.
iii) The extinguishment of the claims under
Section 31(1) of the IBC operates as against the CD
and the claims of the CD including those asserted
by the SRA would not be automatically
extinguished by the approval of the resolution
plan and survives as has been held by this Court
in a catena of decisions; the final determination of
the effect of the resolution plan, being left to the
Arbitral Tribunal.
iv) The question of extinguishment of the claim
of the petitioner (here, the respondent) by
operation of law or on account of satisfaction,
waiver or estoppel; again are disputed questions
of law, which has to be decided by the Arbitral
Tribunal; but still the disputes sought to be raised
by the petitioner constitute, a live and arbitral
dispute.
v) The doctrine of competence-competence
under Section 16 of the Arbitration and
Conciliation Act, mandates that a prima facie
arbitration agreement being shown, the
objections related to the substantive effect of the
resolution plan should be left to the Tribunal. The
statutory consequences of approval of the
resolution plan does not constitute a threshold
Page 11 of 24
CA@SLP (C) No. 25068 of 2026
jurisdictional bar required to be examined under
Section 11.
vi) Live and subsisting arbitral disputes prima
facie survive between the parties warranting
exercise of jurisdiction under Section 11 of the
Arbitration and Conciliation Act by appointment
of an Arbitrator. The question raised on law and on
facts are left to be considered by the Arbitral
Tribunal, wherein both parties could raise all their
contentions.
12. Effectively there is only appointment of an Arbitration
Tribunal, and all questions have been left for consideration
before that Tribunal. The only twist would be insofar as the
appellant having raised a claim of more than Rs.12 crores, it stood
extinguished in the CIRP by virtue of only 0.72% of the claim
being paid as per the resolution plan, which stood approved by
the adjudicating authority, the NCLT. The resolution plan having
become final, there is no question of a claim being raised against
the SRA, insofar as those which were raised before the RP stands
settled by way of the successful resolution plan. In fact even if
such a claim was not raised before the RP, it would have stood
extinguished on a resolution plan being approved by the NCLT
and the SRA taking charge.
Page 12 of 24
CA@SLP (C) No. 25068 of 2026
13. We are also of the opinion that merely because the erstwhile
directors/promoters of the CD came back into the management
as a SRA, that cannot permit any deviance from the essential law
on the point, which permits the SRA to proceed with the claims as
available to the CD against its debtors. Insofar as limitation is
concerned, the termination of the contract was on 26.02.2020 and
the CIRP proceedings were pending between 11.12.2019, when
the Section 9 petition was admitted and it was on 05.04.2022 the
NCLT approved the resolution plan. The termination of the
contract was after the CIRP commenced and the notice was issued
within the limitation period on 13.03.2023; excluding the period
of moratorium. The application under Section 11 was moved
before the High Court also within the limitation period, on
20.06.2023.
14. The ‘clean slate’ principle as coming forth from Section
31(1) of the IBC, is too well entrenched by the decisions of this
Court for us to attempt to upset it or even ponder over it, more so,
by introduction of sub-section (6) of Section 31. The Arbitration
Tribunal also cannot deviate from the established principle of
law. However, the inequities insofar as this case, which concerns
Page 13 of 24
CA@SLP (C) No. 25068 of 2026
itself with the same transaction between the CD and the OC,
wherein both have claims against each other, commend us to
issue directions, which would not in any manner interfere with the
‘clean slate’ principle but also would ensure an equitable
consideration of the conflicting claims; especially in the context
of the OC having suffered a massive haircut in having to contend
with 0.72% of its claim. We cannot also find fault with the erstwhile
promoters of the CD having come back into the saddle in the garb
of the SRA; which as submitted by learned Senior Counsel
appearing for the respondent, is permissible in law.
15. Be that as it may, the aspects of; (i) the massive haircut
suffered by the appellant resulting in total extinguishment of its
claim, (ii) the erstwhile promoters having come back into the
saddle of the CD as a SRA and (iii) the claims of both parties
arising from the very same contract, assume relevance in
adjusting equities, especially, in an arbitration, which, as
submitted by the learned Senior Counsel for the appellant, is a
two-way street. As we would presently notice, these aspects are
pertinent even when viewed in the perspective of the various
Page 14 of 24
CA@SLP (C) No. 25068 of 2026
provisions of the IBC, regulating the CIRP; particularly those
leading to a resolution plan being approved by the NCLT.
16. In this context, we notice the provisions of the IBC, which
after initiation of the proceedings by admission of an application
under Sections 7/9/10, leads to the approval of the Resolution
Plan submitted by an SRA, first by a majority of the CoC and then
by the NCLT. After admission of an application under Sections
7/9/10, the Adjudicating Authority as per Section 13, declares a
moratorium to be enforced as per Section 14. It makes a public
announcement of the initiation of CIRP, together with a call for
submission of claims under Section 15 and appoints an Interim
Resolution Professional (IRP) as provided under Section 16. The
duties of the IRP are enumerated under Section 18; who takes over
the management of the operations of the CD as a going concern
under Section 20 and after collation of all claims, constitutes a
CoC under Section 21. It is the CoC who appoints the RP; either
by continuing the IRP or by making an application for replacing
the IRP before the Adjudicating Authority, the NCLT, who
appoints the RP, as proposed by the CoC. It is the RP who
Page 15 of 24
CA@SLP (C) No. 25068 of 2026
conducts the Corporate Insolvency Resolution Process (CIRP) and
the duties of the RP are almost akin to that of IRP.
17. The IRP, on appointment, is duty bound to collect all the
information of the assets, finances and operations of the CD for
determining the financial position of the CD, receive and collate
all the claims submitted and such other matters specified in
Section 18. The Resolution Professional, likewise, takes the
custody and control of all the assets and then on, represents and
acts on behalf of the CD and exercises rights for the benefit of the
CD as against third parties. In collating the information relating to
the assets, finances and operations of the CD, Section 19 provides
for the personnel of the CD; its promoters or other persons
associated with the management of the CD to extend co-operation
to the IRP; which is made available to the RP. The RP is also
enjoined upon to prepare an Information Memorandum under
Section 29 in addition to providing, to any Resolution Applicant,
access to all the information in physical and electronic form;
which relevant information includes the financial position of the
CD and all the information related to disputes by or against the
Page 16 of 24
CA@SLP (C) No. 25068 of 2026
CD and any other matter pertaining to the CD as per the
Explanation to Section 29.
18. Hence, the erstwhile promoters are not completely alien to
the proceedings in the CIRP and their active participation at the
time when the IRP collates every information with respect to the
CD, including the claims, so as to constitute the CoC is statutorily
provided. The Information Memorandum, as prepared by the RP,
should contain the entire financial position of the CD, including
those related to disputes by or against the CD. The claim of the
OC having been received by the RP and revealed in the
Information Memorandum, the erstwhile promoters, who was a
Resolution Applicant, were aware of the claim raised by the OC
and by the plan submitted, provided for 0.72% payment, which
necessarily is deemed to be acceptance of the claim. It is with
respect to the very same transaction on which the OC raised the
claim that the SRA now proposes to raise a claim seeking
reference to arbitration.
19. The High Court’s observation that the liberty to decide as to
whether the ‘clean slate’ principle would apply equally to the
SRA, is left to the Arbitrator, cannot be accepted in view of the
Page 17 of 24
CA@SLP (C) No. 25068 of 2026
clear legal position; that, as against the SRA, the ‘clean slate’
principle applies, while the SRA could proceed for the dues of the
CD. Nothing remains to be considered by the Arbitrator on those
aspects. We would only enable a measure which would not
interfere with the clean slate principle, but at the same time
ensure an equitable consideration of the claims of both parties to
the contract. While finding no grounds to interfere with the
appointment of an Arbitration Tribunal by the impugned order
with respect to the extinguishment of claim of a creditor as against
the CD and the right of the SRA to proceed against any debtor of
the CD, we came across a decision of this Court, the principle in
which applies squarely to this case.
20. Ujaas Energy Ltd. v. West Bengal Power Development
6
Corporation Ltd. though specifically observed to be on the
peculiar facts of that case, we find the same to be almost similar
insofar as the equitable directions sought in this case. Therein,
the appellant was registered as a MSME, engaged in installation
of Solar PV power plants. The respondent-Corporation entered
into a contract for supply, installation and commissioning of Solar
6
2026 SCC OnLine SC 453
Page 18 of 24
CA@SLP (C) No. 25068 of 2026
power plants at various locations in West Bengal. Three years
later the appellant was admitted into a CIRP. While the CIRP was
pending, the RP on behalf of the appellant, invoked the arbitration
clause, on disputes with respect to the agreement with the
Corporation. On the claim statement being filed by the RP, there
was a counter claim made by the respondent-Corporation.
However, the respondent-Corporation did not pursue the counter
claim before the RP during the CIRP. After the resolution plan was
approved, the appellant, SRA, moved the Tribunal pointing out
that all claims against the appellant would stand extinguished,
which stood allowed. The respondent, unsuccessful under Section
34 before a Single Judge, challenged it before the Division Bench
which directed the Tribunal to continue the arbitral proceedings;
against which the appellant/SRA had approached this Court.
21. This Court relying on Ghanashyam Mishra & Sons (P)
4
Ltd. , held that once a resolution plan is duly approved by the
adjudicating authority under Section 31 (1), then the claims as
provided in the resolution plan would be frozen and would be
binding on all and sundry, including the CD its employees,
members, creditors and so on. Further, all such claims, which are
Page 19 of 24
CA@SLP (C) No. 25068 of 2026
not a part of the resolution plan, on the date of its approval, shall
stand extinguished and no person would be entitled to initiate or
continue any proceedings in respect of a claim, which is not part
of the resolution plan.
6
22. Though, this Court, in Ujaas Energy Ltd. was convinced
that the claim of the respondent would stand extinguished,
especially since it had not raised a counter claim before the RP,
three important aspects were noticed. That, the respondent had
raised its counter claim in the arbitration initiated by the RP, prior
to the approval of the resolution plan. That, hence, the RP was
aware of the counter claim and yet the same was not made part of
the resolution plan. That, the resolution plan bars all future
payments or settlements, in respect of claims which were not
raised before it. Finding also that the definition of ‘claim’ as
provided under Section 3 (6) of the IBC encompassing ‘a right to
payment’ and ‘right to remedy for breach of contract under any
law’ irrespective of whether such right is reduced to an order of
Court, disputed or undisputed, secured or unsecured, legal or
equitable; the provisions of the resolution plan were also
pertinently noticed. It was found that the resolution plan does not
Page 20 of 24
CA@SLP (C) No. 25068 of 2026
bar a plea of set-off being raised as a defence in any pending
arbitral proceedings, although such claims, including that of a
counter claim, not included in the resolution plan would not be
recoverable. On a cumulative consideration of the relevant
factors, as an equitable measure, it was directed that the Arbitral
Tribunal would consider the counter claim for the purpose of set-
off alone without the respondent deriving any positive or
affirmative relief of recovery, based on the said counter claim.
23. The circumstances or aspects, this Court found compelling
in the above cited decision, resulting in permitting set-off to be
considered, according to us, applies with more force in the
present case. Therein, despite the respondent having raised a
counterclaim in an arbitration initiated by the RP, the respondent
did not think it fit to approach the RP as an Operational Creditor
(OC). The RP also, in spite of being aware of the counter-claim
raised in the arbitration initiated by the RP itself; failed to make it
a part of the resolution plan. In the present case, it was after the
CIRP was initiated that the appellant terminated the contract and
moved the RP as an OC with a claim of Rs.12 crores and odd,
which was settled in the resolution plan at 0.72%. The RP did not,
Page 21 of 24
CA@SLP (C) No. 25068 of 2026
even as an administrative measure, bring the counterclaim as
available to the CD, in the Information Memorandum before the
resolution plans were invited. The SRA, being the erstwhile
Directors/Promoters of the CD also did not reckon this
counterclaim when the resolution plan was submitted for
consideration of the COC and then later approved by the NCLT.
In fact in admitting 0.72% of the claim, the SRA had accepted the
entire claim and provided for a major haircut @ 99.28%, and the
balance amounts were agreed to be paid by the SRA in the
resolution plan submitted by itself. The claim raised for
arbitration arises from the very same contract on which a claim
was raised by the appellant, as an OC during the CIRP process;
which claim, by the offer made in the resolution plan to pay
0.72%, is deemed to have been accepted in toto by the SRA, but
restricting the payability to the offer made, which would be the
amount receivable by the OC, if the CD had been liquidated.
24. In the above circumstances, we are of the opinion that just
6
as in the decision in Ujaas Energy Ltd. , the appellant should be
permitted to raise a counterclaim for the sole purpose of claiming
set-off and the appellant would not derive any positive or
Page 22 of 24
CA@SLP (C) No. 25068 of 2026
affirmative relief of recovery on the basis of the counterclaim.
However, in the more compelling circumstance of the SRA, being
the very erstwhile promoters of the CD, who accepted the claim
of the OC, in the CIRP with a major haircut by a Resolution Plan,
the SRA is deemed to have accepted the entire claim of the
appellant/OC. In the arbitration constituted, after considering the
monetary claim raised by the respondent/SRA, the Arbitration
Tribunal shall allow set-off to the extent of the entire claim raised
by the appellant, before the RP in the CIRP, accepted in toto by
the SRA in its resolution plan, favoured with a majority of the CoC
and approved by the NCLT.
25. The impugned order is sustained with only the above
modification that the appellant would be entitled to raise the
counterclaim as specified above only for the purpose of set-off. If
any amounts are found due by the Arbitration Tribunal to be paid
by the appellant to the respondent then there shall be a set-off to
the extent of the entire counterclaim as put forth by the appellant.
Even in the extreme event of the claim of the respondent being
found untenable in toto the appellant cannot seek any payment on
the basis of such award since his claim stands extinguished as
Page 23 of 24
CA@SLP (C) No. 25068 of 2026
against the CD and the SRA. The benefit granted of the set-off, is
only to ensure equity and further the process of preservation of
assets of CD in the hands of the SRA, within the contours of the
IBC. Needless to observe that the issue raised by the respondent
regarding the encashment of the bank guarantee furnished by the
respondent, whether it was proper or improper, shall also be
considered by the Arbitration Tribunal.
26. The appeal stands disposed of with the above modification.
27. Pending application(s), if any, shall stand rejected.
.……………………………... J.
(J. B. PARDIWALA)
..………….…………………. J.
(K. VINOD CHANDRAN)
NEW DELHI;
OCTOBER 08, 2026.
Page 24 of 24
CA@SLP (C) No. 25068 of 2026