SMC INFRASTRUCTURES PRIVATE LIMITED .....Petitioner
Through: Mr. Ankit Jain, Sr. Advocate with Mr.
Rahul Dhawan, Mr. Vishesh Issar,
Mr. Krishna Parkhani, Mr. Himanshu
Chakravarty, Ms. Vaishali Singh, Mr.
Vardan Sharma, Ms. Apurva Tyagi
and Mr. Procheto Das, Advocates.
versus
MUNICIPAL CORPORATION OF
DELHI AND ANR .....Respondents
Through: Mr. Tushar Sannu, SC MCD with Mr.
Vaibhav Tripathi, Mr. Fajallu
Rehman and Mr. Hardik Saxena,
Advocates
CORAM:
HON'BLE MR. JUSTICE V. KAMESWAR RAO
HON'BLE MS. JUSTICE MANMEET PRITAM SINGH ARORA
V. KAMESWAR RAO, J. ( ORAL )
1. This petition has been filed with the following prayers:-
“A. Issue a Writ, in the nature of Mandamus or any
other appropriate Writ, order or direction directing the
Respondent No.1 and 2 to accept the physical copy of
the EMD of the Petitioner, along with the bids of other
participants, while opening the technical bids for
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 1 of 18
tender dated 24.07.2026;
B. Allow the present petition and direct the
Respondents to consider the technical/financial
evaluation of the bid submitted by the Petitioner along
with those of other bidders;”
2. The challenge in this petition is primarily to the exclusion of the
petitioner in the bidding process on the ground that it has not submitted the
physical bank guarantee towards Earnest Money Deposit (“EMD”) after the
cut-off time of 1500 hours on 07.08.2026.
3. On 24.07.2026, the respondent no. 2 floated a Notice Inviting Tender
(“NIT”) for replacement of existing public lights along with the
comprehensive operation and maintenance for six zones under jurisdiction
of the Municipal Corporation of Delhi (“MCD”) including unauthorized
areas, for a period of 10 years.
4. The NIT dated 24.07.2026 prescribed that a total EMD of Rs.
13,87,50,520/-, of which Rs. 20,00,000/- was payable online and the balance
was payable by way of bank guarantee to be deposited in the tender box at
the office of Executive Engineer (Electrical), CLZ, Lucknow Road,
Timarpur, Delhi before the cut-off time of 1500 hours on 07.08.2026. On
07.07.2026, a corrigendum was issued revising the total EMD as
Rs.13,77,50,520/-.
5. It is the case of the petitioner as contended by Mr. Ankit Jain, learned
Senior Counsel that on 06.08.2026 in the evening, the petitioner received the
Bank Guarantee document from IDBI Bank Limited. He states that the
petitioner successfully uploaded its complete technical and financial bids on
the e-procurement portal at 02:45 PM on 07.08.2026, transferred the online
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 2 of 18
EMD component of Rs.20,00,000/- and uploaded a scanned copy of the
valid Bank Guarantee for the balance amount and completed SFMS bank
verification, all before the cut off-time of 1500 hours on 07.08.2026.
6. He states that owing to severe weather and transit disruption in Delhi
NCR, the petitioner’s representative reached the office of the respondent no.
2 with the original Bank Guarantee on 07.08.2026 shortly after the cut-off
time. By then the tender box containing EMD Bank Guarantee has already
been opened. He states that on 08.08.2026, when the representative of the
petitioner called respondent no. 2, the officer refused to accept physical
delivery of the Bank Guarantee and advised the petitioner to send its
representation by email, the day being a holiday. It follows that the
petitioner on 08.08.2026 made its first written representation to respondent
nos.1 & 2 explaining the circumstances of non-submission of the original
Bank Guarantee within time on 07.08.2026 and demonstrating pre-verified
compliance.
7. On 10.08.2026, which was a Monday, the petitioner submitted a
second representation to the respondent nos. 1 & 2, enclosing promised
additional document- the bank's SFMS confirmation/undertaking and
reiterating pre-verified compliance.
8. He states that however no action has been taken by the respondents.
On 13.08.2026, the respondents began opening the online technical bids.
The petitioner’s bid is seen in this opening along with name of four other
bidders. His submission is that the exclusion of the petitioner from the
bidding process is only for the reason that physical copy of the EMD as
Bank Guarantee was not submitted before 1500 hours on 07.08.2026.
According to him, the submission of the physical copy of the Bank
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 3 of 18
Guarantee, which was ready in all respect on 06.08.2026 and the bid having
been submitted on 07.08.2026 at 02:45 PM, could not have been refused by
the respondents. He states that accepting the hard copy of the bank guarantee
at this stage does not alter the commercial ranking, financial terms, or
technical scope of petitioner’s submission; rather it completes the formal
verification record of an active, pre-verified financial guarantee in full
accordance with administrative equity and fair procurement practices. That
apart it is his submission that public interest is paramount in a tender process
and this cannot be compromised. Condoning a minor delay in physical
delivery causes no prejudice to other bidders because the petitioner's
financial and technical bids were already “frozen” on the portal before any
bids were opened. Conversely, disqualifying a compliant bidder artificially
restricts competition, which harms public exchequer by potentially losing a
more competitive offer for a critical 10- year municipal project.
9. He has, during the course of submissions, filed an affidavit of Mr.
Manish Kumar Doshi, representative of the petitioner, who had gone to the
office of respondent no. 2 to physically submit the Bank Guarantee on
07.08.2026 to highlight the fact that he had reached the office of respondent
no. 2 at Timarpur only at 1630 hours. He has also drawn our attention to the
affidavit to state that the representative got delayed due to severe water
logging and extreme traffic gridlocks and transit disruptions in Delhi NCR
because of heavy rainfall. He states that the same shows the bona fide
conduct of the petitioner in not being able to submit the physical copy of the
Bank Guarantee as stipulated in the NIT.
10. Mr. Jain has relied upon two judgments in the cases of Poddar Steel
Corporation v. Ganesh Engineering Works and Others, (1991) 3 SCC 273
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 4 of 18
and Roadway Solutions India Infra Ltd. v. Union of India & Others,
W.P.(C) 8524/2026 , decided on 03.07.2026, in support of his plea that the
submission of physical copy of the Bank Guarantee is not an essential
condition of eligibility, as soft copy of the same was already frozen in the
tender submitted by the petitioner online. He presses for the prayers as made
in the petition.
11. On the other hand, Mr. Tushar Sannu, learned counsel for the
respondents would vehemently contest the writ petition to state that every
stipulation in the NIT is sacrosanct and the timeline prescribed therein need
to be strictly followed. He states that the physical copy of the Bank
Guarantee was not deposited before 1500 hours on 07.08.2026 and as such,
the petitioner’s bid was excluded for consideration.
12. He states that it is not only the petitioner, but three other bidders were
also disqualified primarily on the same/related grounds. He also states that
the affidavit filed by Mr. Manish Kumar Doshi does not inspire confidence.
He stated that Mr. Doshi has not disclosed the name of the officer whom he
met on 07.08.2026 after he allegedly reached the office of respondent no. 2.
Hence, it is doubtful whether the representative had actually reached the
place at all to submit the physical copy of the Bank Guarantee. That apart,
he also states that the it appears from the WhatsApp chats that the petitioner
had actually woken up from slumber only on Saturday, 08.08.2026, when he
sought details from the Executive Engineer in respect of the email ID and
also as to when the technical bid would open.
13. In other words, it is his submission that there is nothing on record that
the representative of the petitioner had actually reached the office of
respondent no. 2 on 07.08.2026 before 1500 hours and even after that and
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 5 of 18
met any officer of the respondent no. 2. He also states that the process of
opening the box where bank guarantees are deposited is videographed to be
seen by all the bidders to ensure that there are no allegations of bias. He
states that this procedure has duly followed on 07.08.2026. He has relied
upon the judgment of the Supreme Court in the case of Central Coalfields
Limited and Another v. SLL-SML (Joint Venture Consortium) and Others
and related civil appeals, (2016) 8 SCC 622 to contend that the
requirements of the tender is obligated to be adhered to by every bidder and
consequently, failure to comply with any requirement is sufficient cause to
reject a bid.
14. The respondent has submitted that like the petitioner herein, there are
a couple of other bidders who could not comply with the bank guarantee
condition for different reasons and have approached the respondent for a
waiver/relaxation. It is stated that any relaxation granted to the petitioner, by
the respondent shall lead to allegations of bias against the respondent and
therefore, the respondent has decided not to condone the non-compliance.
15. Having heard the learned counsel for the parties, the short issue which
arises for consideration in this petition is whether the petitioner was rightly
excluded from the bid process for not submitting the physical copy of the
EMD by way of the Bank Guarantee before 1500 hours on 07.08.2026. The
relevant part of the affidavit filed by the representative of the petitioner
reads as under:-
“3. I state that since the Petitioner has its registered
office at 101, SMC Square, LBS Marg, Khopat, Thane
(W), Maharashtra. The officials at the Maharashtra
office couriered the Bank Guarantee on 06.08.2026 at
7:45 PM to Crompton Greaves Consumer Electrical
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 6 of 18
Ltd.'s Delhi office, as it being one of the consortium
partners, for the purpose of physical submission of the
bid. The said shipment was booked and picked up by
the courier agency on August 6, 2026, at 19:44 hours.
The shipment was issued Waybill No. 21085685784.
The copy of the consignment booked on August 6,
2026, at 19:44 hours is marked and annexed hereto as
Annexure A-1.
4. The said Bank Guarantee duly stood delivered on
07.08.2026 at 11:05 Am at Crompton Greaves
Consumer Electrical Ltd.'s office situated at 3rd Floor,
Express Building, 9-10, Bahadur Shah Zafar Marg,
Near ITO Crossing, New Delhi. The copy of the
tracking details reflecting date of delivery on
07.08.2026 at 11:05Am is marked and annexed hereto
as Annexure A-2.
5. That I, having residence in Ghitorni, had planned
my travel from Ghitorni to Ghaziabad for a personal
errand in the first half of the day. While returning
back, I had planned to collect the Bank Guarantee
from Crompton Greaves Consumer Electrical Ltd.'s
office and submit the same in the Tender Box at the
office of EE (Elect.) CLZ. Lucknow Road, Timarpur,
New Delhi.
6. I. left my residence at 10:00 AM for Ghaziabad, it
was not raining heavily at that time. But while I was on
my way, the rain picked up and I decided to cancel the
work so that I can reach on time for depositing the
Bank NOTAR /Guarantee. I took a U-turn at 11:45 AM
near Ghazipur Sabzi Mandi. hereafter, I reached
Crompton Greaves Consumer Electrical Lid. 's office
at ITO at 14:45 hours and collected the envelope
containing the Bank Guarantee.
7. However, due to the severe waterlogging, and
extreme traffic gridlocks and transit disruptions in
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 7 of 18
NCR, rainfall, I was strained and could not reach the
office of the Respondent No.2 at Lucknow Road,
Timarpur, New Delhi, with the original Bank
Guarantee by the cut-off time i.e., 15:00 Pm. The copy
of the News reports of severe rainfall in NCR dated
07.08.2026 is marked and annexed hereto as Annexure
A-3.
8. That I reached the office of Respondent No.2 at
Timarpur at 16:30 hours, parked my car and while I
was entering the office of the Respondent No.2, I got to
know that the Bank Guarantee cannot not be deposited
as the Tender box had already been opened. I
immediately informed the Petitioner's Maharashtra
office and thereafter returned back to my residence.
That the original Bank Guarantee is still with me.
9. That the Technical Bids have not opened until now
and the Petitioner herein only prays that the
Petitioner's Bid be considered along with the other
submissions and is ready and willing to submit the
same before this Hon'ble Court.
10. I state that the facts stated herein are true and
correct and nothing material has been concealed
therefrom.”
16. From paragraph 8, it is clear that the representative is said to have
reached the office of the respondent no. 2 at 1630 hours. It is also stated that
he came to know that the Bank Guarantee cannot be deposited as the tender
box had already been opened but he does not disclose the name of the
officer/employee, who has informed him in that regard. He also states that
he had informed the petitioner’s Maharashtra office and returned back to his
residence. The affidavit does not reveal that any officer from the
Maharashtra office had spoken to respondent no.2 on 07.08.2026 to accept
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 8 of 18
the physical copy of the Bank Guarantee. It is only on 08.08.2026, as
revealed from the WhatsApp messages filed by Mr. Sannu, that the
representative of the petitioner has asked for the email ID of the Executive
Engineer from the officer of the respondent, and also as to when the tender
shall be opened.
17. No doubt, in the representation submitted by the petitioner at
08.08.2026 at 03:14 PM, i.e., after expiry of 24 hours from 1500 hours of
07.08.2026, it is stated that due to unprecedented heavy downpours across
the Delhi NCR on 07.08.2026 resulting in severe water logging and extreme
traffic gridlocks, the representative was physically prevented from reaching
the office prior to 1500 hours. However, the fact remains whether an attempt
was made by the representative on 07.08.2026 before/after 1500 hours is not
borne out from the affidavit. Mr. Manish Kumar Doshi does not disclose the
name of the officer whom he had supposedly met at the office of the
respondent no.2. No attempt was made by the Maharashtra office of the
petitioner to get in touch with the concerned officer of the respondent
requesting acceptance of the Bank Guarantee on 07.08.2026 immediately on
the representative reaching the office of the respondent no. 2.
18. Mr. Jain has submitted that the soft copy of the Bank Guarantee
having already been uploaded along with tender at 1445 hours, the
submission of the physical copy of the Bank Guarantee is not a
mandatory/material requirement, and cannot be the reason to
disqualify/exclude the petitioner from consideration. Though the said
submission looks appealing on a first blush, the fact remains that there is a
clear stipulation in the tender contemplating deposit of the physical Bank
Guarantee on or before 1500 hours on 07.08.2026. Concedingly, the said
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 9 of 18
stipulation has not been adhered to by the petitioner. That apart, it is the
submission of Mr. Sannu that three more bidders were excluded on the
same/related grounds. If that be so, this is not a case of pick and choose by
the respondents. We fail to understand as to why no attempt was made by
the petitioner to set out to deposit the physical copy of the bank guarantee at
11.00 AM, when it was received at Delhi, instead of waiting close to 03.00
PM.
19. Having failed to deposit the physical copy of the Bank Guarantee on
or before the stipulated time of 1500 hours on 07.08.2026, the petitioner has
not adhered to the express conditions of the NIT, resulting in its exclusion.
The Supreme Court in the judgment relied upon by Mr. Sannu i.e., Central
Coalfields Limited (supra) has in paragraphs 54 and 55 held as under:-
“54. In this context, and in the present times, it is
important to note that the World Bank has ranked
India extremely low in matters relating to enforcement
of contracts and ease of doing business. Out of 189
countries worldwide, India is ranked 178 in the matter
of enforcement of contracts and 130 in the matter of
ease of doing business
[<www.doingbusiness.org/rankings> (World Bank
Group).]. One of the possible reasons for this
extremely low ranking given to our country is the
failure of all parties concerned in strictly adhering to
the terms of documents such as NIT and the GTC.
Insofar as the present case is concerned, NIT was
floated on 5-8-2015 and one year later, we are still
struggling with the issue of acceptance of a bank
guarantee for a contract of about Rs 2000 crores —
certainly not a small sum.
55. On the basis of the available case law, we are of
the view that since CCL had not relaxed or deviated
from the requirement of furnishing a bank guarantee in
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 10 of 18
the prescribed format, insofar as the present appeals
are concerned every bidder was obliged to adhere to
the prescribed format of the bank guarantee.
Consequently, the failure of JVC to furnish the bank
guarantee in the prescribed format was sufficient
reason for CCL to reject its bid.”
20. Insofar as the judgment relied upon by Mr. Jain i.e., Poddar Steel
Corporation (supra) is concerned, the Supreme Court in paragraph 6 has
held as under:-
“6. It is true that in submitting its tender accompanied
by a cheque of the Union Bank of India and not of the
State Bank clause 6 of the tender notice was not obeyed
literally, but the question is as to whether the said non-
compliance deprived the Diesel Locomotive Works of
the authority to accept the bid. As a matter of general
proposition it cannot be held that an authority inviting
tenders is bound to give effect to every term mentioned
in the notice in meticulous detail, and is not entitled to
waive even a technical irregularity of little or no
significance. The requirements in a tender notice can
be classified into two categories — those which lay
down the essential conditions of eligibility and the
others which are merely ancillary or subsidiary with
the main object to be achieved by the condition. In the
first case the authority issuing the tender may be
required to enforce them rigidly. In the other cases it
must be open to the authority to deviate from and not
to insist upon the strict literal compliance of the
condition in appropriate cases. This aspect was
examined by this Court in C.J. Fernandez v. State of
Karnataka [(1990) 2 SCC 488] a case dealing with
tenders. Although not in an entirely identical situation
as the present one, the observations in the judgment
support our view. The High Court has, in the impugned
decision, relied upon Ramana Dayaram
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 11 of 18
Shetty v. International Airport Authority of
India [(1979) 3 SCC 489] but has failed to appreciate
that the reported case belonged to the first category
where the strict compliance of the condition could be
insisted upon. The authority in that case, by not
insisting upon the requirement in the tender notice
which was an essential condition of eligibility,
bestowed a favour on one of the bidders, which
amounted to illegal discrimination. The judgment
indicates that the court closely examined the nature of
the condition which had been relaxed and its impact
before answering the question whether it could have
validly condoned the shortcoming in the tender in
question. This part of the judgment demonstrates the
difference between the two categories of the conditions
discussed above. However it remains to be seen as to
which of the two clauses, the present case belongs.”
(Emphasis added)
21. Similarly, in the judgment in Roadways Solutions India Infra
Limited (supra) , in paragraph 20 to 22, this Court has held as under:-
“20. We may note that the format of the Experience
Certificate at Annexure IX at Appendix IA is a detailed
format running into three pages where the client of the
bidder is required to provide detailed information of
the work executed by the bidder. The details sought by
the respondent no. 2 in the format of the Experience
Certificate in the RFP is far in excess of the
information which the client ordinarily provides in the
PCC or CC. It is apparent that the details sought in the
Experience Certificate are required by the respondent
no. 2 to assess the technical capacity of the bidder and
this format has been tailor made for the subject RFP.
The Experience Certificate is required to be obtained
by the bidder from its client contemporaneously, in the
present date, for submission with the bid. As per the
RFP, PCC is required to be ‘enclosed’ with the
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 12 of 18
Experience Certificate. The effect of the enclosure is
that it corroborates the information furnished by the
client in the Experience Certificate.
21. We note that there is no dispute with respect to the
veracity of the Experience Certificate issued by
MSRDC. Pertinently, the author of the Experience
Certificate is the client i.e., MSRDC and it is not a self-
declaration by the petitioner. The contents of the PCC
now produced by the petitioner are identical to the
contents of the Experience Certificate, which already
stands filed with the respondent no. 2. Thus, all the
information required by the respondent no. 2 for
assessing the technical capacity of the petitioner as per
Clause 2.2.2.2(ii) of the RFP stood filed with
Experience Certificate. In view of the evident
duplication of the information, we had enquired from
the respondent no.2 with respect to the necessity of
having the PCC, when the Experience Certificate was
issued by the client itself and already contained the
precise information given in the PCC. The
respondent’s counsel had no answer to this query and
submitted that since there is no challenge to this
condition of the RFP requiring a PCC in addition to
the Experience Certificate, and thus a bidder who fails
to provide the PCC is liable to have its bid rejected.
The aforesaid answer of the respondent no. 2 shows
that there is no dispute that the information sought in
the Experience Certificate and the PCC is same and
the information provided in the PCC does not in any
manner enhance the information provided to the
respondent no. 2 for evaluation of the technical
capacity of the bidder.
22. In our considered opinion, had the Experience
Certificate been a self-declaration by the bidder, the
requirement of furnishing a PCC issued by the client
would have served a legitimate purpose of
corroborating the information disclosed in the
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 13 of 18
Experience Certificate. However, in the present case,
the Experience Certificate itself has been issued by the
client, namely MSRDC, and its authenticity is not in
dispute. In such circumstances, insistence upon
submission of a separate PCC issued by the same
authority amounts to an unduly technical approach,
particularly when the PCC does not furnish any
additional or superior information beyond what is
already contained in the Experience Certificate and,
therefore, does not materially aid the assessment of the
bidder’s technical capacity.”
22. The judgment in Poddar Steel Corporation (supra) was considered
by the Supreme Court while deciding Central Coal Field Limited (supra) ,
wherein paragraphs 46 to 48 and 50 to 53 it was held as under:-
“46. It is true that in Poddar Steel [Poddar Steel
Corpn. v. Ganesh Engg. Works, (1991) 3 SCC 273]
and in Rashmi Metaliks [Rashmi Metaliks
Ltd. v. Kolkata Metropolitan Development Authority,
(2013) 10 SCC 95 : (2013) 4 SCC (Civ) 650 : (2014) 1
SCC (Cri) 43 : (2013) 2 SCC (L&S) 858] a distinction
has been drawn by this Court between essential and
ancillary and subsidiary conditions in the bid
documents. A similar distinction was adverted to more
recently in Bakshi Security and Personnel Services (P)
Ltd. v. Devkishan Computed (P) Ltd. [Bakshi Security
and Personnel Services (P) Ltd. v. Devkishan
Computed (P) Ltd., (2016) 8 SCC 446 : (2016) 7 Scale
425] through a reference made to Poddar
Steel [Poddar Steel Corpn. v. Ganesh Engg. Works,
(1991) 3 SCC 273] . In that case, this Court held a
particular term of NIT as essential (confirming the
view of the employer) and also referred to the
“admonition” given in Jagdish Mandal [Jagdish
Mandal v. State of Orissa, (2007) 14 SCC 517]
followed in Michigan Rubber (India) Ltd. v. State of
Karnataka [Michigan Rubber (India) Ltd. v. State of
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 14 of 18
Karnataka, (2012) 8 SCC 216] . Thereafter, this Court
rejected the challenge to the employer's decision
holding Bakshi Security and Personnel Services
ineligible to participate in the tender.
47. The result of this discussion is that the issue of the
acceptance or rejection of a bid or a bidder should be
looked at not only from the point of view of the
unsuccessful party but also from the point of view of
the employer. As held in Ramana Dayaram
Shetty [Ramana Dayaram Shetty v. International
Airport Authority of India, (1979) 3 SCC 489] the
terms of NIT cannot be ignored as being redundant or
superfluous. They must be given a meaning and the
necessary significance. As pointed out in Tata
Cellular [Tata Cellular v. Union of India, (1994) 6
SCC 651] there must be judicial restraint in interfering
with administrative action. Ordinarily, the soundness
of the decision taken by the employer ought not to be
questioned but the decision-making process can
certainly be subject to judicial review. The soundness
of the decision may be questioned if it is irrational or
mala fide or intended to favour someone or a decision
“that no responsible authority acting reasonably and
in accordance with relevant law could have reached”
as held in Jagdish Mandal [Jagdish Mandal v. State of
Orissa, (2007) 14 SCC 517] followed in Michigan
Rubber [Michigan Rubber (India) Ltd. v. State of
Karnataka, (2012) 8 SCC 216].
48. Therefore, whether a term of NIT is essential or not
is a decision taken by the employer which should be
respected. Even if the term is essential, the employer
has the inherent authority to deviate from it provided
the deviation is made applicable to all bidders and
potential bidders as held in Ramana Dayaram
Shetty [Ramana Dayaram Shetty v. International
Airport Authority of India, (1979) 3 SCC 489] .
However, if the term is held by the employer to be
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 15 of 18
ancillary or subsidiary, even that decision should be
respected. The lawfulness of that decision can be
questioned on very limited grounds, as mentioned in
the various decisions discussed above, but the
soundness of the decision cannot be questioned,
otherwise this Court would be taking over the function
of the tender issuing authority, which it cannot.
xxx xxx xxx
50. Yet another problem could be faced by an employer
(such as CCL) if the language used in the terms of NIT
or the GTC is not adhered to and its plain meaning
discarded. A problem could be faced by an employer if
every bidder furnishes a bank guarantee in a different
format or one that it is comfortable with. In such a
situation, CCL would have to scrutinise each bank
guarantee to ascertain whether it meets with its
requirements and NIT and the GTC. Apart from the
text of the bank guarantee, minor changes could be
made by a bidder such as enforceability in a place
other than Ranchi (but in Jharkhand), etc. This would
place an avoidable and undue burden on the employer
particularly if there are a large number of bidders.
51. Not only this, any decision taken by the employer in
accepting or rejecting a particular bank guarantee in a
format not prescribed by it could lead to (avoidable)
litigation requiring the employer to justify the rejection
or acceptance of each bank guarantee. This is hardly
conducive to a smooth and hassle-free bidding process.
52. There is a wholesome principle that the courts have
been following for a very long time and which was
articulated in Nazir Ahmad v. King Emperor14,
namely: (SCC OnLine PC)
"... where a power is given to do a certain thing in
a certain way the thing must be done in that way
or not at all. Other methods of performance are
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 16 of 18
necessarily forbidden."
There is no valid reason to give up this salutary
principle or not to apply it mutatis mutandis to bid
documents. This principle deserves to be applied in
contractual disputes, particularly in commercial
contracts or bids leading up to commercial contracts,
where there is stiff competition. It must follow from the
application of the principle laid down in Nazir
Ahmad14 that if the employer prescribes a particular
format of the bank guarantee to be furnished, then a
bidder ought to submit the bank guarantee in that
particular format only and not in any other format.
However, as mentioned above, there is no inflexibility
in this regard and an employer could deviate from the
terms of the bid document but only within the
parameters mentioned above.
53. Nazir Ahmad has been followed in dozens of
decisions rendered by this Court and by other
constitutional courts in the country. The Central
Vigilance Commission has accepted this principle in a
modified form as a guiding principle in its circular
dated 31-12-2007 wherein it is mentioned that all
organisations ought to evolve a procedure for
acceptance of bank guarantees that is compatible with
the guidelines of banks and Reserve Bank of India. One
such requirement is that the bank guarantee should be
in a proper prescribed format and should be verified
verbatim on receipt with the original. Adherence to this
principle of verbatim verification would not only avoid
undue problems for the employer but would also
virtually eliminate subjectivity on the part of the
employer.”
(Emphasis added)
23. As we find that it is the case of the respondents that the stipulation in
the NIT has to be scrupulously followed, the issue which falls for
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 17 of 18
consideration is covered by the judgment in Central Coalfields Limited
(supra).
24. We also note the submission of the respondents that no relaxation or
deviation from this clause of the NIT has been extended by the respondents
to any other bidder and their stand has been consistent with respect to strict
compliance to this condition.
25. In view of the settled legal position, we are of the view that no
interference can be called for in the impugned action of the respondent in
excluding the petitioner from the tender process. We do not see any merit in
the petition. Accordingly, the same is dismissed, along with pending
application.
V. KAMESWAR RAO, J
MANMEET PRITAM SINGH ARORA, J
AUGUST 20, 2026/ sr
Signature Not Verified
Signed By:PRADEEP
SHARMA
Signing Date:20.08.2026
16:05:19
W.P. (C) 11866/2026 Page 18 of 18