Indian Sugar Exim Corporation Limited vs Sakuma Exports Limited
- Court
- Delhi High Court
* IN THE HIGH COURTOF DELHI AT NEW DELHI
% Judgment reserved on: 09.04.2026
Judgment pronounced on: 20.04.2026
+ O.M.P. (COMM) 416/2023 & I.A. 19782/2023
INDIAN SUGAR EXIM CORPORATION
LIMITED .....Petitioner
Through: Mr. Jayant Mehta, Sr. Adv.
with Ms. Shruti Sabharwal, Ms.
AvlokitaRajvi, Mr. Lakshya
Khanna, Mr. Bakhshind Singh
and Ms. SidhikaNagrath, Advs.
versus
SAKUMA EXPORTS LIMITED .....Respondent
Through: Mr. Rajeeve Mehra, Sr. Adv.
with Mr. V AnushRaajan, Ms.
Shreya V Mehra and Mr.
Pradyumn Yadav, Advs.
CORAM:
HON'BLE MR. JUSTICE AVNEESH JHINGAN
J U D G M E N T
1. The petition under Section 34 of the Arbitration and
Conciliation Act, 1996 (for short ‘the Act’) is filed challenging the
arbitral award dated 09.06.2023.
2. The brief facts are that the petitioner is engaged in the export of
sugar. The respondent/claimant is in the business of commodity
trading. Vide notification dated 28.09.2018 minimum export quota in
respect of each sugar mill was notified, including the sugar mills of
Uttar Pradesh. Thirteen contracts were executed between the parties to
the lis . The present dispute germane from contract dated 10.05.2019
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 1 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
(hereinafter referred to as ‘Morna Contract’), whereunder the
petitioner had to supply 8,419 MT (+/- 5% on seller’s option) of
Indian white sugar from the quota of Morna Sugar Mill. The delivery
was to be completed before 31.05.2019. The respondent on
13.05.2019 entered into a contract with a foreign buyer-R&R
Foodstuff Trading LLP, UAE for supply of 8,600 MT of sugar
(hereinafter ‘export contract’) and shipment was to be completed by
30.06.2019.
2.1 It is the case of the respondent that due to failure of the
petitioner to supply sugar the export contract could not be performed.
The foreign buyer vide notice dated 08.07.2019 claimed damages of
USD 645,000 for non-supply of sugar, which after negotiations were
reduced to USD 498,800. The foreign buyer issued a debit note dated
25.07.2019 on the respondent. Vide communication dated 02.08.2019,
the respondent requested the petitioner to supply the sugar within
seven days. On failure of the petitioner to supply sugar, the damages
claimed by the foreign buyer from the respondent were passed to the
petitioner by issuing a debit note dated 08.08.2019 to the tune of
Rs.3,61,20,000/-. The petitioner issued credit note no.21 dated
17.03.2020 for rupees two crores but it was withdrawn on 18.03.2020.
2.2 The contract between the parties provided for dispute resolution
through arbitration and the respondent invoked arbitration on
14.12.2020 by issuing notice under Section 21 of the Act. The
proceedings culminated in the impugned award. The arbitral tribunal
(for short ‘tribunal’) held that the Morna Contract was neither novated
nor substituted and that the petitioner failed to supply 8,419 MT of
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 2 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
sugar. The respondent under Section 73 of the Indian Contract Act,
1872 (for short ‘Contract Act’) was awarded damages of
Rs.1,40,00,000/- for loss of profit and rupees two crores towards the
claim raised by the foreign buyer against the respondent due to the
non-performance of the export contract. Interest at the rate of nine
percent per annum was granted.
3. Learned senior counsel for the petitioner contends that there
was no co-relation between the Morna Contract and the export
contract. In the alternative it is argued that no steps were taken by the
respondent to mitigate the losses. The quantification of losses by the
tribunal on guess work by deducting 50% towards expenses is in
violation of Section 73 of the Contract Act. Reliance is placed upon
the decision of the Supreme Court in Unibros v. All India Radio 2023
SCC OnLine SC 1366, the decisions of Division Bench of this Court
in Delhi Transco Limited v. KEC International Limited 2025 SCC
OnLine Del 3736, Union of India v. Ahluwalia Contracts (India)
Limited 2025 SCC OnLine Del 4066, Nandi Infratech Pvt. Ltd. v.
R.K. Bararia & Ors. 2024 SCC OnLine Del 4287 and the decisions of
Single Bench of this court in Steel Authority of India Ltd. v. Great
Eastern Shipping Company Ltd . 2017 SCC OnLine Del 7269, GTM
Builders & Promoters Pvt. Ltd. v. Sneh Developers Pvt. Ltd . 2018
SCC OnLine Del 9653, India Yahama Motor Pvt. Ltd. v. Divya
Ashish Jamwal 2019 SCC OnLine Del 6912 to contend that damages
including loss of profit is not to be awarded in the absence of proof of
actual loss and cannot be based on assumptions.
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 3 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
3.1 With regard to the damages of rupees two crores, it is submitted
that the export contract was never disclosed to the petitioner. It is
contended that no evidence was produced to show that the export
order was implemented and that the foreign buyer had paid mandatory
10% advance in pursuance thereof. The contention is that the issuance
of a debit note by the foreign buyer by itself is not proof of loss and
the respondent failed to prove that the amount claimed by the foreign
buyer was either paid or adjusted against due payments. The grievance
is that the tribunal ignored relevant evidence in concluding that the
petitioner by issuing credit note no.21 agreed to compensate damages
to the tune of rupees two crores. The submission is that the respondent
despite twice being asked for, failed to produce documents to
substantiate the damages claimed of Rs.3,61,20,000/-. The emphasis is
that the credit note dated 17.03.2020 was issued under a mistaken
belief and was withdrawn on 18.03.2020 upon realising that the claim
made by the respondent was not backed by supporting documents.
3.2 It is canvassed that the tribunal erred in holding that the credit
note no.21 was issued with regard to the Morna Contract. The cross-
examination of CW-1 is relied upon wherein it was stated that the
debit note of Rs.3,61,20,000/- was for all losses. The contention is that
‘all losses’included the claim for loss of profit as well as defaults in
supply, yet two separate claims were made.
3.3 Lastly, it is argued that from the email of the petitioner dated
20.05.2019 and the reply of the respondent thereto asking for factory
wise quota proved that the Morna Contract was novated. The
submission is that as per the terms of the contract the respondent had
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 4 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
to make 100% advance payment for the supplies but the needful was
not done and the contract was a non-starter.
4. Per contra, the respondent is not disputing the breach of the
Morna Contract or the liability to pay damages but the challenge is
confined to the quantification of the damages to Rs.1.40 crore. The
submission is that for assessment of damages some degree of
guesswork has to be there. It is contended that albeit, the tribunal
recorded deduction of 50% towards expenses but in effect damages to
the tune of 35% of the difference between purchase price and export
price were awarded and is reasonable. Reliance is upon a decision of
this Court in Cobra Instalaciones Y Servicios, S.A. & Shyam Indus
Power Solution Pvt. Ltd. v. Haryana Vidyut Prasaran Nigam Ltd.
(HVPNL) 2024 SCC OnLine Del 2755 to argue that the arbitrator is
permitted to employ guesswork for awarding damages.
4.1 It is argued that the notice and the debit note of USD 498,800
issued by the foreign buyer proved that the respondent suffered loss
due to non-supply of the sugar to be exported. The cross-examination
of CW-1 (question nos. 42 and 47) is relied upon to show that by
issuance of debit and credit notes payments and adjustment are made
in export transactions and that the debit note amount was withheld by
the foreign buyer. The contention that the export contract was not in
knowledge of the petitioner is refuted by submitting that the Morna
Contract specified that the sugar was meant for export purposes. The
contention is that communications between the petitioner and the
Principal Secretary, Sugar Industry and Cane Development
Department, UP substantiate that the petitioner was aware that the
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 5 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
supplies from the sugar mills were meant for export and
communications included details of docking of ships for loading of the
vessel. The submission is that from the email dated 02.08.2019, it is
evident that the petitioner lifted 4,819 MT of sugar from Morna Sugar
Mill but with a dishonest intent did not supply it to the respondent.
The finding of the tribunal that there was an admission of the
petitioner to compensate rupees two crores towards the loss is
defended by stating that the conclusion is based on the material on
record and there cannot be re-appreciation of evidence under Section
34 of the Act. It is argued that the award is reasoned and the view
taken by the arbitrator is plausible one.
4.2 It is submitted that the challenge to finding that there was no
novation of the Morna Contract is an attempt that the court should re-
appreciate the evidence which is not permissible under Section 34 of
the Act. Reliance is placed upon the decisions of the Supreme Court in
Associate Builders v. Delhi Development Authority (2015) 3 SCC 49,
Ssangyong Engineering & Construction Co. Ltd. v. National
Highways Authority of India (2019) 15 SCC 131, Delhi Airport
Metro Express Pvt. Ltd. v. Delhi Metro Rail Corporation Ltd . (2022)
1 SCC 131 and Indian Oil Corporation Ltd. v. Shree Ganesh
Petroleum, Rajgurunagar (2022) 4 SCC 463 to buttress the
contention that the court u/s 34 of the Act can interfere only on
grounds of patent illegality, perversity or if the award is against the
public policy of India. Reliance is placed on The State of Jharkhand
& Ors. v. HSS Integrated SDN & Ors . 2019 9 SCC 798 , UHL Power
Company Ltd. V. State of Himachal Pradesh 2022 4 SCC 116,
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 6 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
Konkan Railway Corporation Limited v. Chenab Birdge Project
Undertaking 2023 9 SCC 85 and S.V. Samudram v. State of
Karnataka & Ors . 2024 SCC OnLine SC19 to submit that where two
views are possible the court cannot interfere with the plausible view
taken by the arbitrator. The decisions in Anglo American
Metallurgical Coal Pty. Ltd. v. MMTC Ltd. 2021 3 SCC 308 and
Reliance Infrastructure Ltd. v. State of Goa 2024 1 SCC 479 are
relied to contend that the arbitrator is the master of the quantity and
quality of evidence.
5. Heard learned senior counsel for the parties at length and
perused the relevant record with their able assistance.
6. The parties to the lis entered into a contract for supply of 8,419
MT of white sugar from the quota of Morna Sugar Mill. The source of
supply was subsequently changed and supplies were to be made from
Gajraula, Baghpat and Ramala (hereinafter referred to as ‘three
mills’). The tribunal examined emails dated 20.05.2019, 21.05.2019
and 23.05.2019 and concluded that the Morna Contract was not
novated. The Morna Contract was for supply of 8,419 MT of sugar
whereas the supply from the three mills was only of 5,321 MT and no
evidence was produced to show reduction of quantity of Morna
Contract. Further that the emails relied upon were not indicating
novation of the Morna Contract.
7. The tribunal relied upon Ex. RW-1/C10, RW-1/C15 and RW-
1/C10 to conclude that the subsequent three contracts for supply of
5,321 MT of sugar from three mills were independent contracts with
no reference to the Morna Contract or that the supplies was in
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 7 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
pursuance thereof. The subsequent contracts were of different dates
and had no proximity of time with each other. The tribunal rightly
held that mill-wise details sought by the respondent in response to the
email of the petitioner stating that the supply for the Morna Contract
shall be made from other three sugar mills is not an evidence of
novation of the Morna Contract. The tribunal concluded that non-
payment of 100% advance was not helping the case of the petitioner.
CW-1 in cross-examination stated that advance payment was not
made in view of the ongoing payment flows across contracts. The
petitioner failed to discredit the deposition of the witness by placing
on record that advance payment was being insisted upon in respect of
other contracts.
8. Be that as it may, under Section 34 of the Act the award cannot
be set aside for every factual or legal error. The view arrived at by the
tribunal is a plausible one and does not suffer from perversity or
patent illegality.
9. The respondent claimed that the difference between the
purchase price and the export price was the loss suffered. The tribunal
rightly took note of the fact that the difference between the two prices
shall include the cost of freight and other expenses. The Morna
Contract was at ex-mill rate whereas the export contract was on CNF
basis and there was no quantification of expenses by the respondent.
On failure of respondent to prove the net loss figure the claim for
damages of Rs.3,80,79,137/- cannot be awarded.
10. The tribunal on considering the lack of evidence to prove the
actual loss proceeded to quantify the loss by deducting 50% from the
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 8 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
gross profit, though it is the case of the respondent that in fact the
deduction of 65% was made. The present is not a case where the
expenses could not have been proved, more so when the respondent
was engaged in export business and was exporting sugar in pursuance
of other contracts. No books of accounts were produced to prove the
percentage of expenses incurred for exporting sugar. There cannot be
a quarrel with the proposition that for quantification of damages
certain degree of guesswork is involved but it cannot be stretched to
the extent that in the absence of evidence damages can be assessed
solely on conjecture. The reliance by the respondent on decision of
this court in case of Cobra Intalaciones Y Servicios, S.A. & Shyam
Indus Power Solution Pvt. Ltd. (supra) is of no avail. In that case,
loss suffered was not in issue but exact contribution of loss
attributable to each contract was not possible and it was held that so
long as there is material on record that damage was suffered the
arbitrator has leeway to employ honest guesswork.
11. The law is well settled that for claiming damages under Section
73 of the Contract Act, actual loss or damage suffered is to be proved
and only in cases where such proof is not possible, a honest genuine
estimate may be made. In the case in hand, neither the actual damages
were proved nor it was a case where damages/loss cannot be proved
yet damages were awarded on sheer guesswork. The award of
damages is vitiated being contrary to public policy and is set aside.
12. Having upheld that the Morna Contract was not novated, the
fact remains that the petitioner failed to supply 8,419 MT of sugar to
the respondent. The case of the respondent is that for failure to comply
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 9 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
with the export order the foreign buyer issued a debit note of
Rs.3,61,20,000/- and this figure was arrived at after negotiations with
the foreign buyer thereby reflecting an attempt by the respondent to
mitigate the losses. Further that the debit note (Ex.CW-1/14) for
Rs.3,61,20,000/- was raised on the petitioner pursuant to the debit note
of the foreign buyer. After negotiations the petitioner issued three
credit notes aggregating to Rs.3.83 crores but on the next day the
credit notes were withdrawn. The tribunal held that the credit note
no.21 of rupees two crores was issued against the debit note of
Rs.3,61,20,000/- and other two credit notes were not related to the
Morna Contract. The contention of the learned senior counsel for the
petitioner that the credit note no.21 was not for the Morna Contract is
substantiated by the email dated 16.03.2020. The relevant portion is
reproduced below:
“To,
Saurabh Sir
As discussed on phone, we agree to give you credit notes of
Rs. 3.83 Crores as per details given below;
1. UP default: 2 Cr.
2. Sakuma Interest: 1.59 Cr.
3. UP Shipment Interest: 0.23 Cr
______________________________
Total: Rs. 3.83 Cr.
Please note we have yet to receive from you Rs. 4.84 Cr. As
per account statement sent to Hiral Madam on 13.03.2020,
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 10 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
copy attached. There are other 2 points for which reco is
pending as per statement enclosed.”
13. It is evident that rupees two crores was attributed to ‘UP
default’ and not specifically to the Morna Contract. It cannot be
overlooked that there were thirteen contracts between the parties
including Gajraula, Sarsawa, Najibabad, Morna, Belrayan, Budaun,
Semikhera, Bilaspur, Puranpur, Nanauta and Sathiaon which pertained
to sugar mills in Uttar Pradesh.
14. The credit note no.21 refers to ‘Sugar Export Claim being the
amount payable for non-delivery of sugar from UP Federation Mills to
Sakuma Exports Limited’. It is relevant to note that the credit note
refers to non-supply of sugar by the mills of Uttar Pradesh and not to a
mill i.e., Morna Sugar Mill. Moreover, in the arbitration a failed
attempt was made by the respondent to raise the issue of short supply
of sugar under other contracts.
15. Another aspect is that the tribunal relied upon the gap of seven
months between the issuance of the debit note dated 08.08.2019 and
the credit note dated 17.03.2020, to hold that the decision to issue
credit note cannot be said to have been taken in haste. The relevant
evidence on record was not considered by the tribunal that on the very
next day of issuance of the credit note it was cancelled. The
communication cancelling the credit note stated that perusal of the
record revealed that the documents or relevant material forming the
basis of the claim were not provided by the respondent and it would
not be possible to honour the credit note no.21 dated 17.03.2020. The
letters on record dated 18.03.2020 and 16.07.2020 also demonstrate
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 11 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
that the petitioner consistently sought supporting documents and it is
admitted by the respondent that the documents were not furnished till
June, 2020. It would be relevant to note that the tribunal has not
recorded a finding that the documents supplied in July, 2020 even
prima facie proved the basis for issuance of a debit note.
16. CW-1 in cross-examination stated that payments and
adjustments in export transactions as per practice are made through
debit and credit notes and that the foreign buyer had withheld the
amount of debit note. It would be pertinent to note that in a double
entry accounting system, every debit note corresponds with a credit
note for payment or adjustment of the amount. There is nothing on
record to prove that the respondent by issuing credit note had paid the
amount of the debit note issued by the foreign buyer or was adjusted
against due amount and thereby suffered the loss.
17. The finding of the tribunal that the respondent is not entitled to
damages of Rs.3,61,20,000/- and only to rupees two crores is
unchallenged. It is relevant to note that in the arbitral award the
reduction of the claim from Rs.3,61,20,000/- to rupees two crores is
not on the basis of proof of actual loss but by holding that the
petitioner by issuing credit note no.21 admitted the claim of rupees
two crore and the respondent accepted the credit note no.21 without
protest. The conclusion recorded by the tribunal that there was an
admission by the petitioner to compensate rupees two crores towards
damages is perverse and as discussed above is recorded ignoring the
relevant evidence on record.
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 12 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13
18. There is no quarrel with the propositions that scope of
interference under Section 34 of the Act is limited and that where two
views are possible the court cannot interfere with the plausible view
taken by the tribunal for which judgments are cited by the respondent.
However, in the case in hand for reasons mentioned above the award
suffers from patent illegality and perversity.
19. The petition is allowed. The award is set aside. Pending
applications stand disposed of.
AVNEESH JHINGAN, J
APRIL 20, 2026/Ch
Reportable:- Yes
Signature Not Verified
O.M.P. (COMM) 416/2023 Page 13 of 13
Signed By:CHANCHAL
Signing Date:20.04.2026
18:51:13