Jsw Steel Ltd. Formerly Known As Ispat Industries Ltd. vs The Board Trustees Of The Mumbai Port Trust
- Court
- Bombay High Court
- Case type
- WP
- Decided on
- 10-04-2026
<div> <b>2026:BHC-OS:9094-DB</b><br /> WP_2127_96.doc<br /> <br /> IN THE HIGH COURT OF JUDICATURE AT BOMBAY<br /> ORDINARY ORIGINAL CIVIL JURISDICTION<br /> WRIT PETITION NO. 2127 OF 1996<br /> JSW Steel Limited formerly known as ISPAT<br /> Industries Limited … Petitioner<br /> vs.<br /> The Board of Trustees of the Mumbai Port Trust<br /> and others … Respondents<br /> WITH<br /> INTERIM APPLICATION (L) NO.17073 OF 2025<br /> WITH<br /> INTERIM APPLICATION (L) NO.29912 OF 2025<br /> WITH<br /> INTERIM APPLICATION (L) NO.13670 OF 2025<br /> IN<br /> WRIT PETITION NO.2127 OF 1996<br /> ---<br /> Mr. Surel Shah, Senior Advocate a/w. Ms. Fatema Kachwalla and Ms.Meher <br /> Mistri, i/b. J. Sagar Associates for petitioner and for applicant in <br /> IAL/17073/2025 and IAL/29912/2025.<br /> Mr. Venkatesh Dhond, Senior Advocate a/w. Mr. Dhruva Gandhi and Ms. <br /> Heenal Wadhwa, i/b. The Law Point for respondent No.1.<br /> Mr. S. Shamim a/w. Mr. Murtuza Slatewala, i/b. S. Shamim and Co. for <br /> respondent No.2.<br /> Mr. Shyam Kapadia a/w. Mr. Vikas V. Warekar and Mr. Shamant Satia, i/b. <br /> Warekar and Warekar for respondent No.3 and for applicant in <br /> IAL/13670/2025.<br /> CORAM : MANISH PITALE &<br /> SHREERAM V. SHIRSAT, JJ.<br /> Reserved on : FEBRUARY 17, 2026<br /> Pronounced on : APRIL 10, 2026<br /> JUDGEMENT : ( Per Justice Manish Pitale )<br /> . The proceedings in this petition were remitted by the Supreme <br /> Court by its order dated 14.02.2025, after setting aside order dated <br /> <b>1/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> 13.08.2021 passed by a Division Bench of this Court, disposing of the <br /> writ petition as infructuous, on the basis of the events that took place <br /> during the pendency of the petition. The Supreme Court found that <br /> the writ petition could not have been disposed of, as a pure question <br /> of law was required to be decided in the light of Section 14 of the <br /> Indian Ports Act, 1908 (for short ‘the said Act’) and that in that <br /> context, the lis between the parties was very much alive. The <br /> Supreme Court requested this Court to give priority to the matter for <br /> disposing it of expeditiously. In this backdrop, the writ petition was <br /> taken up for hearing and disposal.<br /> 2. The petitioner, formerly known as ISPAT Industries Limited, <br /> was engaged in the business of manufacturing steel at its plant <br /> located at Dolvi, Dharamatar, Raigad and for the said purpose, it was <br /> required to import large quantities of iron ore. The petitioner <br /> constructed a private jetty at Dharamatar and it’s cargo was being <br /> transported through the jetty to the said plant from waters upon <br /> which the respondent No.1 - Mumbai Port Trust (MPT), formerly <br /> known as Bombay Port Trust, was having control. As large vessels <br /> could not directly access the jetty, the cargo was required to be <br /> discharged at anchorage outside the port limits of respondent No.1 – <br /> MPT and it had to be transported to the petitioner’s jetty through the <br /> waters of the port in small barges. During monsoon season, the <br /> petitioner had to conduct its lighterage operations from Jawaharlal <br /> Nehru Port Trust (JNPT) anchorage to a jetty at Dharamatar.<br /> 3. A number of communications were exchanged between the <br /> petitioner and the respondent No.1 - MPT for permission to the <br /> petitioner to use the said waters for transporting cargo in barges <br /> from larger vessels outside the port limit to the petitioner’s jetty on <br /> payment of applicable charges. In this context, on 27.09.1994, the <br /> <b>2/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> petitioner executed a contract with the respondent No.2 - N. S. <br /> Guzder & Co., under which the said respondent No.2 was responsible <br /> for providing barges for transporting the said cargo of the petitioner. <br /> Respondent No.3 - Shivam Engineers executed a memorandum of <br /> understanding (for short, ‘MOU’) with the respondent No.2 to <br /> provide barges, including a barge called M. V. Satyam on a time <br /> charter basis. On 09.01.1995, requisite permission was granted to <br /> the said barge M. V. Satyam under the provisions of the said Act to <br /> move in the said waters under the control of the respondent No.1 - <br /> MPT. <br /> 4. On 11.04.1995, the said barge M. V. Satyam, carrying iron ore <br /> from a larger vessel M. V. Aditya Gaurav to the petitioner’s jetty, sank <br /> in the harbour at anchorage W-1. In this backdrop, on 19.04.1995, <br /> the respondent No.1, through its Deputy Conservator, issued a notice <br /> addressed to the petitioner and respondent Nos.2 and 3 under <br /> Section 14(1) of the said Act, calling upon them to raise and remove <br /> the wreck of the said barge M. V. Satyam within 30 days from the <br /> date it sank, so that the wreck impeding navigation of vessels <br /> entering or leaving the port of Mumbai and the Jawaharlal Nehru <br /> Port, would be removed. The respondent No.1 - MPT further called <br /> upon the noticees to deposit a sum of ₹ 70 lakhs as security, to <br /> ensure that the said wreck was raised or removed within the <br /> stipulated period of time. <br /> 5. A number of communications were exchanged between the <br /> parties and meetings were held in the context of the situation created <br /> by sinking of barge M. V. Satyam. On 30.09.1996, the petitioner sent <br /> a communication to the Deputy Conservator of respondent No.1 - <br /> MPT that in the light of the fact that under Section 14 of the said Act, <br /> only the ‘owner’ of the barge could be held responsible for removal of <br /> <b>3/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> such wreckage, the petitioner could not be held responsible and that <br /> the demand made by the respondent No.1 – MPT for making <br /> financial contribution towards removal of the wreckage, was not <br /> acceptable.<br /> 6. In this backdrop, on 14.10.1996, the Deputy Conservator of <br /> the respondent No.1 - MPT sent a communication to the petitioner <br /> referring to the sinking of barge M. V. Satyam and the failure on the <br /> part of the petitioner to deposit ₹ 70 lakhs, in terms of the notice <br /> dated 19.04.1995. Thereupon, it was stated that since the petitioner <br /> had refused to participate in the tender process for salvaging the <br /> wreck, the permission granted to the petitioner for transit of barges <br /> for lighterage operations at the Mumbai harbour, stood suspended <br /> with immediate effect.<br /> 7. Since this had an adverse impact on the very business of the <br /> petitioner, it was constrained to file the instant Writ Petition No.2127 <br /> of 1996, before this Court. The petitioner prayed for a writ against <br /> the respondent No.1, prohibiting it from insisting on the petitioner <br /> removing the said wreck of barge M. V. Satyam or depositing amount <br /> in that context and also prayed for restraining the respondent No.1 <br /> from preventing the petitioner from availing the services of the MPT <br /> and its waters. The petitioner also prayed for interim stay of the <br /> aforesaid communication dated 14.10.1996.<br /> 8. On 31.10.1996, this Court, while admitting the writ petition, <br /> granted ad-interim relief in terms of prayer clause (c), thereby <br /> staying the operation of the impugned communication dated <br /> 14.10.1996, subject to the petitioner depositing a sum of ₹ 70 lakhs <br /> in this Court. It is to be noted that prior to the aforesaid <br /> communication dated 14.10.1996 being issued by the respondent <br /> <b>4/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> No.1 - MPT, a number of communications were exchanged between <br /> the parties, with regard to raising or removing of the wreckage. The <br /> respondent No.1 - MPT specifically relies upon such communications <br /> in support of its contentions raised before this Court during the <br /> course of hearing.<br /> 9. It is the matter of record that the respondent No.1 - MPT called <br /> for tenders for removing the wreckage and for undertaking salvage <br /> operations. After initial tenders failed, eventually, one Madgavkar <br /> Salvage was awarded the contract on ‘no cure - no pay’ basis for a <br /> sum of ₹ 87 lakhs. On 29.01.1998, the said contractor - Madgavkar <br /> Salvage completed the salvage operations and raised a bill with <br /> regard to the same. Respondent No.1 - MPT cleared the bill.<br /> 10. This writ petition came up for hearing on 13.08.2021, when a <br /> Division Bench of this Court took into consideration the aforesaid <br /> fact of the salvage operations being completed. It was noted that the <br /> respondent No.1 - MPT had already paid the amount to Madgavkar <br /> Salvage for the said salvage operations and that a notice of motion <br /> was filed on behalf of the said respondent for withdrawing the <br /> amount deposited by the petitioner. <br /> 11. Having taken into consideration the events that took place <br /> during the pendency of the writ petition, the Division Bench of this <br /> Court held that the petition was rendered infructuous and disposed <br /> of the same, as well as the notice of motion filed by the said <br /> respondent for withdrawal of the amount by permitting the said <br /> respondent to withdraw the amount deposited in this Court along <br /> with accrued interest, without prejudice to the rights and contentions <br /> of the parties. It was further held that since disputed questions of <br /> facts were involved and in the backdrop of the writ petition having <br /> <b>5/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> been rendered infructuous, it was open for the petitioner to file a suit <br /> against the respondents for refund / recovery of ₹ 70 lakhs along <br /> with accrued interest, if so advised. The remedies of the respondent <br /> No.1 to recover further amounts, if any, were also kept open.<br /> 12. Aggrieved by the said order of this Court, the petitioner filed <br /> Special Leave Petition (C) No.15490 of 2021. On 14.02.2025, the <br /> Supreme Court found the approach adopted by this Court, while <br /> disposing of the writ petition by the order dated 13.08.2021, as <br /> erroneous, holding that the lis between the parties was very much <br /> alive. It was held that a pure question of law i.e. on whom the <br /> liability for clearing the wreckage was to be fastened, was raised and <br /> that it ought to have been decided by this Court, as the petitioner <br /> had raised a legal objection giving rise to the pure legal issue, which <br /> ought to have been answered. On this basis, the said order dated <br /> 13.08.2021 passed by this Court, was set aside and the matter was <br /> remanded to this Court with a request for expeditious disposal.<br /> 13. Mr. Surel Shah, the learned senior counsel appearing for the <br /> petitioner submitted that notice dated 19.04.1995 issued under <br /> Section 14 of the said Act, although addressed to the petitioner also, <br /> could not be the basis to foist liability on the petitioner for raising or <br /> removing the wreckage of barge M. V. Satyam, as the petitioner was <br /> not the owner of the said barge. It was submitted that the said barge <br /> M. V. Satyam qualified to be a ‘vessel’ under Section 3(7) of the said <br /> Act and since only the ‘owner’ of the vessel could be held liable <br /> under Section 14 thereof, there was no question of the petitioner <br /> being held liable, in the facts and circumstances of present case. <br /> Attention of this Court was specifically invited to the order dated <br /> 14.02.2025, whereby the Supreme Court had remitted the present <br /> matter to this Court. It was submitted that the Supreme Court <br /> <b>6/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> specifically held that the lis between the parties was very much alive <br /> and that a pure question of law arose in the matter, pertaining to the <br /> issue as to on whom the liability for clearing the wreckage, was to be <br /> fastened. By referring to the contents of Section 14 of the said Act, it <br /> was submitted that apart from the said provision specifically <br /> requiring notice to be issued to the ‘owner’ of the vessel, a <br /> mechanism was provided as to in what manner the expenses for <br /> raising, removal or destroying the wreckage were to be fastened.<br /> 14. It was submitted that the petitioner had specifically denied its <br /> liability on the ground that it was not the owner of the barge M. V. <br /> Satyam. It was submitted that the documents on record clearly <br /> demonstrated that the respondent No.3 was the owner of the said <br /> barge and therefore, the petitioner could not be held liable. It was <br /> submitted that the emphasis placed on behalf of respondent No.1 - <br /> MPT on communications exchanged with the petitioner was <br /> misplaced and the ownership of the vessel cannot be fastened on the <br /> petitioner merely on the basis of such exchange of communications. <br /> It was submitted that the petitioner had only engaged the services of <br /> the said barge owned by respondent No.3, through respondent No.2 <br /> and that the MOU executed between respondent Nos.2 and 3 <br /> demonstrated that the barge was hired on a time charter basis, <br /> wherein the petitioner had no commercial control over the barge. <br /> 15. Attention of this Court was also invited to the letter dated <br /> 09.01.1995 issued by the Deputy Conservator of respondent No.1 - <br /> MPT, addressed to respondent No.2, granting permission for the said <br /> barge M. V. Satyam to move in Bombay harbour and its waters. On <br /> this basis, it was submitted that the proceeding under Section 14 of <br /> the said Act could be undertaken only in respect of the owner of the <br /> barge and not the petitioner and that the notice was wrongly issued <br /> <b>7/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> to the petitioner.<br /> 16. The learned senior counsel appearing for the petitioner further <br /> referred to the contents of the affidavit filed on behalf of respondent <br /> No.1 - MPT in Notice of Motion No.374 of 1998 filed in the present <br /> petition, wherein it was specifically stated that respondent Nos.2 and <br /> 3 were the owners of the barge and that they were liable to secure <br /> respondent No.1 - MPT for the expenses incurred for removal of <br /> salvage. It was submitted that therefore, respondent No.1 - MPT <br /> itself conceded that the petitioner was not the owner of the barge.<br /> 17. Reliance was placed on the judgement of the Supreme Court in <br /> the case of The Union of India vs. Gosalia Shipping (Pvt.) Ltd. , <br /> (1978) 3 SCC 23, to elaborate as to what could be said to be a ‘time <br /> charter party’ as opposed to a ‘voyage charter party’. It was submitted <br /> that the instant case pertained to a time charter party, wherein the <br /> ownership and possession of the vessel (in this case, M. V. Satyam) <br /> remained with the owner i.e. respondent No.3. It was emphasized <br /> that the petitioner was never in commercial control of the said barge <br /> and that it could never be said to be a disponent owner. On this <br /> basis, it was submitted that respondent No.1 - MPT cannot rely upon <br /> judgement of this Court in the case of Liverpool and London <br /> Steamship Protection and Indemnity Association Ltd. vs. m. t. <br /> Symphony and others , (2003) 4 Mh.L.J. 708, judgement of the Delhi <br /> High Court in the case of Sara International Ltd. vs. Arab Shipping <br /> Co. (P) Ltd. , 2009 (113) DRJ 717 and judgement of the Karnataka <br /> High Court in the case of Zurbagan Shipping LLC vs. C. S. Flourish <br /> and others (judgement and order dated 31.10.2025 passed in <br /> Original Side Appeal No.4 of 2025).<br /> <b>8/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> 18. The learned senior counsel appearing for the petitioner relied <br /> upon judgements of the Calcutta High Court in the cases of Lee <br /> Young Sang and another vs. The Board of Trustees for the Port of <br /> Calcutta , 1997 SCC OnLine Cal 231 and Sri Maharshi Shipping <br /> Private Limited and another vs. Syama Prasad Mookerjee Port, <br /> Kolkata and others , 2023 SCC OnLine Cal 5602, to submit that <br /> Section 14 of the said Act required the ‘owner’ of the vessel to clear <br /> the salvage and this supported the contentions raised on behalf of <br /> the petitioner in this petition. Reliance was also placed on the <br /> judgement of this Court, in the case of Oil and Natural Gas <br /> Corporation Ltd. vs. Osprey Underwriting Agencies Ltd. and others , <br /> (1998) 3 All MR 713, to contend that the liability of removing the <br /> wreckage and salvage could not be foisted on the petitioner, in the <br /> facts and circumstances of the present case.<br /> 19. Since respondent No.1 - MPT sought to justify its stand on <br /> materials other than the contents of the said notice issued under <br /> Section 14 of the said Act and reliance was sought to be placed on <br /> Sections 10 to 12 thereof, it was submitted that the correctness or <br /> otherwise of the said notice, could be tested only on the basis of the <br /> contents thereof and not any other extraneous material. It was <br /> further submitted that this was not a case of a wrong provision being <br /> quoted or the source of power being available elsewhere for <br /> respondent No.1 - MPT.<br /> 20. Reliance was placed on the judgements of the Supreme Court <br /> in the cases of Commissioner of Police, Bombay vs. Gordhandas <br /> Bhanji , 1951 SCC 1088 and Mohinder Singh Gill and another vs. The <br /> Chief Election Commissioner, New Delhi and others , (1978) 1 SCC <br /> 405. It was also submitted that respondent No.1 - MPT was not <br /> justified in relying upon the judgement of this Court in the case of <br /> <b>9/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> Adani Ports and Special Economic Zone Limited vs. Board of Trustees <br /> of Jawaharlal Nehru Port Authority and others , 2022 SCC OnLine <br /> Bom 1326 and judgements of the Supreme Court in the cases of <br /> Assistant General Manager, State Bank of India and another vs. Tanya <br /> Energy Enterprises, Through its Managing Partner Shri Alluri <br /> Lakshmi Narasimha Varma (judgement and order dated 15.09.2025 <br /> passed in Civil Appeal No.11134 of 2025) and Chairman, All India <br /> Railway Recruitment Board and another vs. K. Shyam Kumar and <br /> others , (2010) 6 SCC 614, for the reason that in the said cases, the <br /> Courts found that there was sufficient material in the pleadings and <br /> documents to test the contentions raised by the petitioner, <br /> challenging action undertaken by instrumentalities of the State. <br /> 21. In the said cases, the Courts found that such pleadings and <br /> material could certainly be taken into account, even if the position of <br /> law laid down by the Supreme Court in the aforesaid cases of <br /> Commissioner of Police, Bombay vs. Gordhandas Bhanji ( supra ) and <br /> Mohinder Singh Gill and another vs. The Chief Election <br /> Commissioner, New Delhi and others ( supra ), was to be taken into <br /> consideration. But, in the present case, there are no pleadings or any <br /> documents on record to show as to how respondent No.1 - MPT can <br /> now seek to rely upon Sections 10 to 12 of the said Act, to justify the <br /> notice specifically issued under Section 14 thereof. It was submitted <br /> that in this regard, reliance placed on a plethora of other judgements <br /> on behalf of respondent No.1 - MPT, is also not justified.<br /> 22. It was further submitted that the contention raised on behalf of <br /> respondent No.1 - MPT by relying upon the provisions of the <br /> Merchant Shipping Act, 1958 (for short, Merchant Shipping Act), is <br /> also not justified, as the aforesaid point has been raised in the <br /> written submissions at the time of final hearing, with no basis for the <br /> <b>10/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> same in the pleadings in the writ petition. It was submitted that the <br /> said respondent was trying to justify its actions against the petitioner <br /> by taking recourse to the said statute, which does not find mention <br /> either in the said notice dated 19.04.1995 issued under Section 14 of <br /> the said Act, or in any other affidavit or documents on record. <br /> Without prejudice to the said submission, it was submitted that a <br /> proper reading of the provisions of the Merchant Shipping Act, <br /> including Section 402 thereof, on which reliance was placed by <br /> respondent No.1 - MPT, would show that the same cannot apply to <br /> the facts and circumstances of the present case.<br /> 23. Section 402 of the Merchant Shipping Act pertains to services <br /> rendered for recovering salvage, cargo or wreck and it provides for a <br /> specific mechanism for the same. It has to be read with the Merchant <br /> Shipping (Wrecks and Salvage) Rules, 1974 (for short, the Merchant <br /> Shipping Rules) that provide a further elaborate mechanism to deal <br /> with such situations. Any action thereunder presupposes certain steps <br /> to be taken, which admittedly were not taken by respondent No.1 - <br /> MPT and therefore, at this belated stage of hearing of the writ <br /> petition, the said respondent cannot be allowed to rely upon the said <br /> provisions to justify its action against the petitioner.<br /> 24. In this regard also, reliance was placed on the aforementioned <br /> contention that the action of respondent No.1 - MPT could not be <br /> justified on the basis of provisions of law not relied upon and the <br /> pleadings, affidavit or material on record, making no reference to the <br /> same. It was further submitted that even in the cases where this <br /> Court and Supreme Court looked at pleadings, affidavit and material <br /> available on record to test the correctness or otherwise of the <br /> impugned action, a measure of public interest was involved, while in <br /> the present case, the only question was regarding the identification <br /> <b>11/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> of the party liable under Section 14 of the said Act.<br /> 25. The learned senior counsel appearing for the petitioner further <br /> submitted that respondent No.1 - MPT could certainly not rely upon <br /> the principles of Quantum Meruit and Polluter Pays, as the said <br /> principles are wholly inapplicable to the facts of the present case. It <br /> was nowhere the case of the said respondent that any pollution was <br /> caused by the incident in question and that action in that regard was <br /> contemplated, when notice was issued under Section 14 of the said <br /> Act. Similarly, respondent No.1 - MPT was not providing any service <br /> in respect of removal of wreckage of barge M. V. Satyam to invoke <br /> the Quantum Meruit principle.<br /> 26. It was further submitted that while remanding the matter, the <br /> Supreme Court had also clearly indicated that the petitioner was <br /> liable to be compensated in the event the petition succeeded, as the <br /> respondent No.1 - MPT had already withdrawn the amount <br /> deposited by the petitioner as per order passed by this Court. It was <br /> submitted that after the writ petition was dismissed as per the earlier <br /> order passed by this Court, which was set aside by the Supreme <br /> Court in appeal, the said respondent MPT had withdrawn the <br /> <br /> amount deposited by the petitioner along with interest i.e. ₹<br /> 4,09,25,764. It was submitted that in the event, this Court accepts <br /> the contentions of the petitioner and sets aside the impugned order, <br /> thereby allowing the present petition, the said respondent ought to <br /> be directed to pay the said amount to the petitioner.<br /> 27. On the other hand, Mr. Venkatesh Dhond, learned senior <br /> counsel appearing for respondent No.1 - MPT submitted that the <br /> communications exchanged between the petitioner and the said <br /> respondent show that at every stage, the petitioner referred to the <br /> <b>12/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> barges used for lighterage operations, as ‘our barges’. These included <br /> the barge M. V. Satyam that sank, leading to the controversy between <br /> the parties. It was emphasized that permission was also granted for <br /> the said barge M. V. Satyam to be used in the waters under the <br /> control of the said respondent, on applications made by the <br /> petitioner in that regard. The conduct of the petitioner, immediately <br /> after the incident of sinking of the said barge, is also significant, as it <br /> demonstrates that in a series of meetings held with the said <br /> respondent, the petitioner represented itself as the owner of the <br /> barge and also accepted to bear the liability of costs to be incurred <br /> for removal of wreckage of the said barge. In principle, the petitioner <br /> agreed to bear the expenses for removal of the cargo also and this <br /> was without any reservation. <br /> 28. In this regard, it was submitted that in its reply to the Notice of <br /> Motion No.374 of 1998 filed by respondent No.3, the petitioner <br /> adopted a new stand of foisting liability on the ‘owner’ of the barge, <br /> only in order to wriggle out of its responsibility and liability. It was <br /> further submitted that when communications were exchanged <br /> between the petitioner and respondent No.1 MPT, in respect of <br /> services of salvage companies sought to be engaged, the petitioner <br /> accepted its liability. Although the initial attempts to enter into <br /> contract with salvage companies, failed, eventually Madgavkar <br /> Salvage Company was engaged, which successfully removed the <br /> salvage and raised a bill on the respondent No.1 MPT. In the facts <br /> and circumstances of the present case, the petitioner ought to have <br /> borne the entire liability.<br /> 29. It was submitted that the petitioner was deliberately <br /> interpreting Section 14 of the said Act in a hyper-technical manner, <br /> to claim that it would foist liability only on the ‘registered owner’ of <br /> <b>13/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> the vessel. Reliance was placed on the judgement of this Court in the <br /> case of Liverpool and London Steamship Protection and Indemnity <br /> Association Ltd. vs. m. t. Symphony and others ( supra ), judgement of <br /> the Delhi High Court in the case of Sara International Ltd. vs. Arab <br /> Shipping Co. (P) Ltd. ( supra ) and judgement of the Karnataka High <br /> Court in the case of Zurbagan Shipping LLC vs. C. S. Flourish and <br /> others ( supra ), to contend that the petitioner was the disponent <br /> owner, as it had engaged the services of the barge M. V. Satyam for <br /> transporting its cargo of iron ore between the mother ship to its jetty. <br /> This clearly demonstrated the commercial control over the said barge <br /> being exercised by the petitioner and therefore, as a disponent <br /> owner, it was liable to bear the expenses for removal of the vessel <br /> along with the cargo, under Section 14 of the said Act.<br /> 30. It was further submitted that the petitioner cannot escape <br /> liability on the ground that the subject notice dated 19.04.1995 <br /> mentioned only Section 14 of the said Act. Merely mentioning of a <br /> wrong provision would not lead to a conclusion that respondent No.1 <br /> - MPT did not have any source of power to call upon the petitioner to <br /> bear the liability of removal of wreckage of the said vessel. <br /> 31. It was submitted that the petitioner cannot be allowed to <br /> interpret the law laid down by the Supreme Court in the cases of <br /> Commissioner of Police, Bombay vs. Gordhandas Bhanji ( supra ) and <br /> Mohinder Singh Gill and another vs. The Chief Election <br /> Commissioner, New Delhi and others ( supra ), to contend that other <br /> than the contents of the said notice dated 19.04.1995, this Court <br /> cannot look at any other material. Much emphasis was placed on the <br /> judgement of this Court in the case of Adani Ports and Special <br /> Economic Zone Limited vs. Board of Trustees of Jawaharlal Nehru <br /> Port Authority and others ( supra ) and judgement of the Supreme <br /> <b>14/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> Court in the case of Assistant General Manager, State Bank of India <br /> and another vs. Tanya Energy Enterprises, Through its Managing <br /> Partner Shri Alluri Lakshmi Narasimha Varma ( supra ), to contend <br /> that this Court could indeed look at all the material and documents <br /> on record, in order to test whether the respondent No.1 - MPT was <br /> justified in calling upon the petitioner to bear the liability of removal <br /> of wreckage. <br /> 32. In support of the said propositions, reliance was placed on <br /> further judgements of the Supreme Court in the cases of N. Mani vs. <br /> Sangeetha Theatre and others, (2004) 12 SCC 278, P. K. Palanisamy <br /> vs. N. Arunmugham and another , (2009) 9 SCC 173 and <br /> Commissioner of Customs & Central Excise, Goa vs. Pankaj Jaju , <br /> 2013 SCC OnLine Bom 2063. Reliance was also placed on the <br /> judgment of the Supreme Court in the case of Union of India and <br /> another vs. Mohit Minerals Private Limited, (2022) 10 SCC 700, to <br /> contend that non-reference to the source of power cannot vitiate its <br /> exercise and application, so long as such source of power legally <br /> exists.<br /> 33. The learned senior counsel appearing for respondent No.1 - <br /> MPT relied upon Sections 10 to 12 of the said Act, to contend that <br /> the source of power for the said respondent to foist liability on the <br /> petitioner, was clearly available under the said provisions. The <br /> material on record demonstrated that the cargo i.e. the iron ore <br /> belonging to the petitioner along with the said vessel i.e. barge M. V. <br /> Satyam, had created obstruction within the limits of the port and <br /> therefore, the said respondent was well within its rights to call upon <br /> the petitioner to make good the costs for removal of such <br /> obstruction. <br /> <b>15/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> 34. It was further submitted that the petitioner was also liable <br /> under the Merchant Shipping Act, particularly Section 402 thereof, <br /> for the liability of removal of wreckage. It was submitted that when <br /> services were provided for removal of vessel or cargo or equipment <br /> of a wrecked vessel, the owner of the vessel was liable to pay <br /> reasonable sum for salvage to the salvor. In the present case, since <br /> the petitioner refused to bear the liability, the respondent No.1 - MPT <br /> had to remove the wreckage by engaging the services of Madgavkar <br /> Salvage. The amount charged by the said company was liable to be <br /> paid by the petitioner and therefore, the source of power for the said <br /> respondent, could also be located in the Merchant Shipping Act. It <br /> was submitted that even if the petitioner claims that only respondent <br /> No.3 can be treated as the owner of the vessel, the petitioner <br /> continued to be the owner of the cargo i.e. the iron ore and <br /> therefore, Section 402 of the Merchant Shipping Act clearly applies <br /> to the facts of the present case. This was particularly so, as the <br /> charges raised by the said Madgavkar Salvage pertained mainly to <br /> the removal of the cargo, apart from removal of wreckage of the <br /> vessel to remove the obstruction in the port.<br /> 35. The learned senior counsel for the respondent No.1 - MPT <br /> further invoked the principles of Quantum Meruit and Polluter Pays, <br /> to contend that these were additional grounds on which the <br /> petitioner ought to be held liable. On these aspects of the matter, <br /> reliance was placed on the judgements of the Supreme Court in the <br /> cases of Alopi Parshad & Sons Ltd. vs. Union of India (AIR 1960 SC <br /> 588) and Delhi Pollution Control Committee vs. Lodhi Property Co. <br /> Ltd. (2025 SCC OnLine SC 1601). <br /> 36. Mr. S. Shamim, learned counsel appeared on behalf of <br /> respondent No.2 and submitted that the said respondent could not <br /> <b>16/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> be held liable in any manner. <br /> 37. Mr. Shyam Kapadia, learned counsel appeared on behalf of <br /> respondent No.3 and submitted that sub-sections (1A), (1B), 2, 3 <br /> and 4 of Section 14 of the said Act lay down a stepwise mechanism, <br /> with regard to the manner in which action is to be undertaken for <br /> raising or removing the wrecked vessel, which is impeding <br /> navigation. Such mechanism was never followed by respondent No.1 <br /> and therefore, there was no question of foisting any liability on <br /> respondent No.3. Even with regard to the provisions of Merchant <br /> Shipping Act and the Rules framed thereunder, it was submitted that <br /> appropriate steps were required to be taken, wherein there was a <br /> mechanism for dispute resolution and only upon undertaking such <br /> steps, the liability could be foisted. It was submitted that therefore, in <br /> the present petition filed by the petitioner, the respondent No.1 - <br /> MPT cannot be permitted to make any claim against respondent <br /> No.3. On this basis, it was submitted that this Court may consider <br /> passing appropriate orders in the writ petition.<br /> 38. Having heard the learned counsel for the parties and in the <br /> light of the present matter having been remitted by the Supreme <br /> Court, it would be appropriate to first refer to the order dated <br /> 14.02.2025 passed by the Supreme Court in Appeal arising out of <br /> Special Leave Petition (C) No.15490 of 2021. The Supreme Court, <br /> while setting aside the earlier order dated 13.08.2021 passed by this <br /> Court, disposing of this writ petition, observed as follows:<br /> ‘6. Having considered the matter, we find merit in the <br /> submissions put forth by the appellant. The way the <br /> High Court approached the issue appears to be <br /> erroneous for the simple reason that the lis was very <br /> much alive, as a pure question of law stood raised i.e., <br /> on whom the liability for clearing the wreckage was to <br /> <b>17/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> be fastened. The Impugned Order has not dealt with this <br /> fundamental issue. When on a purely legal issue, the <br /> appellant raised a legal objection, and also deposited the <br /> amount demanded by respondent no.1 in the High <br /> Court, in our considered view, the High Court was <br /> required to answer the question of law. In this analysis, <br /> no exercise was required involving disputed factual <br /> questions. Moreover, the efflux of time is a result of <br /> systemic delay, not due to any laches on the part of the <br /> appellant.<br /> 7. xxx xxx xxx<br /> 8. In the above circumstances, we are unable to sustain the <br /> order impugned. Accordingly, the same is set aside. WP <br /> No.2127/1996 is revived. The matter is remanded to the <br /> High Court to consider all issues on merits as raised in <br /> the writ petition. As the monies deposited by the <br /> appellant are stated to have already been withdrawn by <br /> respondent no.1, were the appellant to eventually <br /> succeed in the writ petition, the appellant would be <br /> suitably compensated on this score.’<br /> 39. Thus, it is evident that this Court is required to consider a <br /> specific question of law as to on whom the liability of clearing the <br /> wreckage was to be fastened, under Section 14 of the said Act and if <br /> the finding thereon is in favour of the petitioner, then it is to be <br /> suitably compensated. This is particularly in the backdrop of the fact <br /> ₹<br /> that respondent No.1 - MPT withdrew the amount of 70 lakhs <br /> deposited by the petitioner, after the present writ petition was <br /> disposed of as per order dated 13.08.2021. It is undisputed that the <br /> said amount with interest came to ₹ 4,09,25,764, which the <br /> respondent No.1 - MPT had withdrawn.<br /> 40. Thus, the fundamental question for consideration in this writ <br /> petition is, as to whether the challenge raised by the petitioner is <br /> sustainable and whether the petitioner is justified in contending that <br /> as per Section 14 of the said Act, it is not liable for removal of <br /> <b>18/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> wreckage and consequently, for bearing the costs for the same. In <br /> other words, the petitioner contends that the notice dated <br /> 19.04.1995 sent by the respondent No.1 - MPT was maintainable <br /> only against the ‘owner’ of the barge M. V. Satyam i.e. the vessel <br /> which sank and whose wreckage was to be removed. <br /> 41. On the basis of the documents on record, it is asserted that the <br /> petitioner is not covered under the expression ‘owner’ and therefore, <br /> on this very ground, the said notice is rendered unsustainable. <br /> Consequently, the letter dated 14.10.1996 withdrawing the <br /> permission granted to the petitioner to use waters under the <br /> supervision and control of the respondent No.1 - MPT, is also <br /> rendered unsustainable. The respondent No.1 has refuted the said <br /> claim and it is asserted that in the facts and circumstances of the <br /> present case, the petitioner stood covered under the expression <br /> ‘owner’ and that the hyper-technical contention raised on behalf of <br /> the petitioner that the ‘owner’ has to be the ‘registered owner’, ought <br /> not to be accepted.<br /> 42. In this context, it is necessary to refer to Section 14 of the said <br /> Act, which reads as follows:<br /> ‘14. Raising or removal or wreck impeding navigation within limits <br /> of Port:<br /> ( 1 ) If any vessel is wrecked, stranded or sunk in any port in such a <br /> manner as to impede or likely to impede any navigation <br /> thereof, the conservator shall give notice to the owner of the <br /> vessel to raise, remove or destroy the vessel within such period <br /> as may be specified in the notice and to furnish such adequate <br /> security to the satisfaction of the conservator to ensure that the <br /> vessel shall be raised, removed or destroyed within the said <br /> period:<br /> Provided that the conservator may extend such period to such <br /> further period as he may consider necessary having regard to <br /> <b>19/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> the circumstances of such case and the extent of its <br /> impediment to navigation.<br /> ( 1A ) Where the owner of any vessel to whom a notice has <br /> been issued under sub-section ( 1 ) fails to raise, remove <br /> or destroy such vessel within the period specified in the <br /> notice or the extended period or fails to furnish the <br /> security required of him, the conservator may cause the <br /> vessel to be raised, removed or destroyed.<br /> ( 1B ) Notwithstanding anything contained in the foregoing <br /> sub-sections, if the conservator is of the opinion that any <br /> vessel which is wrecked, stranded or sunk in any port is <br /> required to be immediately raised, removed or destroyed <br /> for the purpose of uninterrupted navigation in such port, <br /> he may, without giving any notice under sub-section ( 1 ), <br /> cause the vessel to be raised, removed or destroyed.<br /> ( 2 ) If any property recovered by a conservator acting under sub-<br /> section ( 1A ) or sub-section ( 1B ) is unclaimed or the person <br /> claiming it fails to pay the reasonable expenses incurred by the <br /> conservator under that sub-section and a further sum of <br /> twenty per cent. of the amount of such expenses, the <br /> conservator may sell the property by public auction, if the <br /> property is of a perishable nature, forthwith, and, if it is not of <br /> a perishable nature, at any time not less than thirty days after <br /> the recovery thereof.<br /> ( 3 ) The expenses and further sum aforesaid shall be payable to the <br /> conservator out of the sale-proceeds of the property, and the <br /> balance shall be paid to the person entitled to the property <br /> recovered, or, if no such person appears and claims the <br /> balance, shall be held in deposit for payment, without interest, <br /> to any person thereafter establishing his right thereto:<br /> Provided that the person makes his claim within three years <br /> from the date of the sale.<br /> ( 4 ) Where the sale proceeds of the property are not sufficient to <br /> meet the expenses and further sum aforesaid, the owner of the <br /> vessel at the time the vessel was wrecked, stranded or sunk <br /> shall be liable to pay the deficiency to the conservator on <br /> demand, and if the deficiency be not paid within one month of <br /> such demand the conservator may recover the deficiency from <br /> such owner in the manner laid down in sub-section ( 2 ) of <br /> section 57 for recovery of expenses and damages or in any <br /> <b>20/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> other manner according as the deficiency does not or does <br /> exceed one thousand rupees.’<br /> 43. There can be no dispute about the fact that the above-quoted <br /> provision specifically uses the word ‘owner’. The said word is not <br /> defined in the said Act. There can also be no dispute about the fact <br /> that the definition of ‘vessel’ in Section 3(7) thereof, indeed covers <br /> the said barge M. V. Satyam, which sank in the port waters, leading <br /> to the controversy between the parties.<br /> 44. As to whether the petitioner can be said to be the owner of the <br /> barge M. V. Satyam, will have to be decided on the basis of the <br /> documents and material on record, which are undisputed. <br /> Respondent No.1 - MPT has placed much reliance on letters dated <br /> 25.11.1993, 07.02.1994 and 16.03.1994, sent by the petitioner to <br /> the said respondent, while seeking permission for operating barges, <br /> in order to transport its cargo i.e. the iron ore from the mother vessel <br /> to the jetty, for further transport to the plant of the petitioner. It was <br /> emphasized that in each of such communications, the petitioner used <br /> the expression ‘our barges’. According to respondent No.1 - MPT, this <br /> demonstrates that even according to the petitioner, it was the owner <br /> of the barges. The said argument is stated only to be rejected. Merely <br /> because the petitioner used the expression ‘our barges’ in such <br /> communications, while seeking permission for operation of barges in <br /> the waters under the control of respondent No.1, would not foist <br /> ownership in the petitioner in respect of the barges so used, <br /> including the barge M. V. Satyam. The word ‘owner’ has a specific <br /> connotation in law and reference to such letters/communications <br /> cannot take the case of the said respondent any further.<br /> 45. The documents on record also show that the petitioner had <br /> engaged the services of respondent No.2, an international freight <br /> <b>21/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> forwarders company, for hiring barges in order to transport the cargo <br /> from the mother vessel to the jetty. Respondent No.2 entered into the <br /> aforesaid MOU with respondent No.3, which was the owner of the <br /> barges, including the barge M. V. Satyam. The document granting <br /> permission for operation of the barges dated 09.01.1995, shows that <br /> the Deputy Conservator of respondent No.1 - MPT addressed the said <br /> permission letter to respondent No.2, marking copies to its other <br /> officers, including the Senior Dock Master and Chief Signalman at <br /> the Port Signal Station. <br /> 46. Respondent No.3, in its affidavit filed in Notice of Motion <br /> No.62 of 1997 filed in this writ petition, specifically stated that it <br /> ‘owned’ the barge M. V. Satyam and it was given on time charter to <br /> respondent No.2 for a specific period of time and that the petitioner <br /> had merely employed the services of respondent No.2. Such <br /> statements were repeated by respondent No.3 in its affidavit in <br /> Notice of Motion No.374 of 1998 filed in this writ petition, <br /> specifically stating that it was true that respondent No.2 had <br /> chartered the said barge M. V. Satyam, which was ‘owned’ by <br /> respondent No.3 and that during one of its trips, the said barge sank. <br /> 47. Apart from this, the affidavit filed by respondent No.1 itself in <br /> Notice of Motion No.62 of 1997 filed in this writ petition, also <br /> specifically stated that respondent Nos.2 and 3 were ‘owners’ of the <br /> barge M. V. Satyam and hence, they were liable. Such statements <br /> make it abundantly clear that it was an admitted position that <br /> respondent No.3 was the owner of the barge M. V. Satyam and it was <br /> treated so by respondent No.1 - MPT itself. As a matter of fact, in the <br /> notice dated 19.04.1995 issued by respondent No.1 in the context of <br /> sinking of barge M. V. Satyam, the respondent No.3 was stated to be <br /> the owner of the said barge and respondent No.2 was stated to be <br /> <b>22/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> the charterer, while the petitioner was specifically stated to be the <br /> ‘principal employer’. Thus, it becomes clear that even as per <br /> respondent No.1 - MPT, the owner of the barge M. V. Satyam was <br /> respondent No.3 and there is no disputed question of fact regarding <br /> the same.<br /> 48. Faced with this situation, it was claimed on behalf of <br /> respondent No.1 - MPT that the petitioner was the ‘disponent owner’ <br /> of the barge M. V. Satyam and therefore, it cannot escape liability. In <br /> the first place, there is no support for the proposition that the word <br /> ‘owner’ used in Section 14 of the said Act has to be read as a <br /> ‘disponent owner’. So long as the words used in the provision are <br /> specific, their literal meaning is to be adopted, unless such an <br /> approach leads to illogical and unsustainable consequences. This <br /> Court does not find any reason to depart from adopting the literal <br /> meaning of the word ‘owner’ used in Section 14 of the said Act.<br /> 49. Yet, even if the said contention raised on behalf of respondent <br /> No.1 - MPT is to be considered in the facts and circumstances of the <br /> present case, it will have to be examined as to what is the purport of <br /> the expression ‘disponent owner’ and whether it can apply to the <br /> petitioner in the present case.<br /> 50. In the case of Liverpool and London Steamship Protection and <br /> Indemnity Association Ltd. vs. m. t. Symphony and others ( supra ), a <br /> Division Bench of this Court had an occasion to consider the said <br /> aspect of the matter and it was held that a disponent owner means a <br /> person or a company that controls the commercial operation of a <br /> ship and very often, such a disponent owner is a shipping line, which <br /> time charters the ship and issues liner bills of lading to its owner.<br /> 51. In this context, a reference to the judgement of the Supreme <br /> <b>23/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> Court in the case of Epoch Enterrepots vs. M. V. Won FU , (2003) 1 <br /> SCC 305, would be relevant. In the said case, the Supreme Court <br /> considered the said aspect of a disponent owner and observed as <br /> follows:<br /> ‘36. Even, however, assuming the agreement has in fact <br /> been entered into by the disponent owner, unless <br /> sufficient evidence is laid that the charter was by <br /> demise, whereby the possession and control of the <br /> vessel was given to the disponent owner, question of <br /> pursuing the cause of action against the vessel <br /> would not arise. Needless to add that charter parties <br /> are of three kinds: (a) demise charter; (b) voyage <br /> charter; and (c) time charter. Whereas in demise <br /> charter, the vessel is given to the charterer who <br /> thereafter takes complete control of the vessel <br /> including manning the same, in both voyage charter <br /> and time charter, master and crew are engaged by <br /> the owner who act under the owner's instructions <br /> but under the charterer's directions. Simply put, <br /> voyage charter is making available the vessel for use <br /> of carriage for a particular voyage and the time <br /> charter correspondingly is where the vessel is made <br /> available for carriage of cargo for a fixed period of <br /> time. In the contextual facts, apart from the fixture <br /> note, no other documentary support is available as <br /> to whether ownership arose through a charter by <br /> demise and possession and control of the vessel has <br /> already been given to the disponent owner. The <br /> facts disclose that the disponent was an intending <br /> charterer of the vessel from the owner and it is on <br /> expectancy of such a contract, the fixture note was <br /> issued. There was as a matter of fact no charter <br /> party or agreement with the charterer and some <br /> eventuality in future is stated to be the basis of the <br /> cause of action. It is on this score we think it <br /> expedient to record that even upon assumption of <br /> the appellant's case at its highest, no credence can <br /> be attached thereto. The disponent owner was not a <br /> demise charterer but it is on the happening of such <br /> an event in future that such a fixture note has been <br /> issued. In our view there is no sufficient evidence <br /> available as regards the action in rem making the <br /> <b>24/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> vessel liable in the contract said to have been <br /> entered into, as recorded in the fixture note. It is in <br /> the nature of a breach of contract and liability of the <br /> vessel would not arise, though however, we are not <br /> expressing any opinion as regards the <br /> maintainability of an action in personam or its a <br /> eventual success.’<br /> 52. In the instant case, the MOU on record shows that respondent <br /> No.2 had chartered the barge M. V. Satyam belonging to respondent <br /> No.3. It was a time charter, wherein respondent No.3, as the owner <br /> of the barge M. V. Satyam, had chartered the same to respondent <br /> No.2. In the above-quoted paragraph in the judgement of the <br /> Supreme Court in the case of Epoch Enterrepots vs. M. V. Won FU <br /> ( supra ), a distinction has been drawn between a demise charter, a <br /> voyage charter and a time charter. It is specifically observed that in <br /> demise charter, the vessel is given to the charterer, who thereafter <br /> takes complete control of the vessel, including manning the same, <br /> while in voyage charter and time charter, the master and crew are <br /> engaged by the owner and they act under the instructions of the <br /> owner, but the directions of the charterer.<br /> 53. In the light of the said MOU placed on record and the <br /> permission letter dated 09.01.1995 issued by respondent No.1 - MPT, <br /> we find that respondent No.2 was the charterer, who had taken the <br /> vessel i.e. barge M. V. Satyam on time charter from respondent No.3, <br /> who was the owner of the same. The contents of the MOU show that <br /> the master was provided by respondent No.3 and the charges of hire <br /> were payable by respondent No.2 as the charterer. Thus, by no <br /> stretch of imagination, can the petitioner be covered under the <br /> expression ‘disponent owner’. It cannot be said that the petitioner <br /> had complete control over the commercial operations of the vessel <br /> i.e. barge M. V. Satyam. <br /> <b>25/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> 54. In this context, the petitioner is justified in relying upon the <br /> judgement of the Supreme Court in the case of The Union of India vs. <br /> Gosalia Shipping (Pvt.) Ltd. ( supra ), wherein the Supreme Court <br /> referred to the position that in a time charter, the ownership and <br /> possession of the ship remain with the original owner.<br /> 55. Therefore, reliance placed on behalf of respondent No.1 - MPT <br /> on the judgement of this Court in the case of Liverpool and London <br /> Steamship Protection and Indemnity Association Ltd. vs. m. t. <br /> Symphony and others ( supra ), judgement of the Delhi High Court in <br /> the case of Sara International Ltd. vs. Arab Shipping Co. (P) Ltd. <br /> ( supra ) and judgement of the Karnataka High Court in the case of <br /> Zurbagan Shipping LLC vs. C. S. Flourish and others ( supra ), is found <br /> to be unsustainable. Hence, on this score also, the contentions raised <br /> on behalf of the said respondent cannot be accepted. This is quite <br /> apart from the fact that Section 14 of the said Act concerns only the <br /> ‘owner’ of the vessel. We also find in this context that the petitioner is <br /> justified in relying upon the judgements of the Calcutta High Court in <br /> the cases of Lee Young Sang and another vs. The Board of Trustees <br /> for the Port of Calcutta ( supra ) and Sri Maharshi Shipping Private <br /> Limited and another vs. Syama Prasad Mookerjee Port, Kolkata and <br /> others ( supra ) and judgement of this Court in Oil and Natural Gas <br /> Corporation Ltd. vs. Osprey Underwriting Agencies Ltd. and others <br /> ( supra ).<br /> 56. We also find that Section 14 of the said Act lays down an <br /> elaborate stepwise mechanism in which the Conservator, like <br /> respondent No.1 - MPT in the present case, is required to proceed in <br /> situations where the vessel is wrecked, stranded or it sinks in the port <br /> in such a manner that it impedes or is likely to impede any <br /> navigation. As per the said provision, in such a situation, the <br /> <b>26/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> Conservator, like respondent No.1 – MPT herein, is required to issue <br /> notice to the owner of the vessel for providing adequate security for <br /> ensuring that the vessel is raised, removed or destroyed within the <br /> time specified in the notice, with a provision for the time period to be <br /> extended. If the owner of the vessel fails to raise, remove or destroy <br /> the vessel within the period specified in the notice or in the extended <br /> period, or fails to furnish security, the Conservator, like respondent <br /> No.1 – MPT herein, can raise, remove or destroy the vessel. In cases <br /> where such step is required to be taken urgently, the Conservator, <br /> like respondent No.1 - MPT herein, can raise, remove or destroy the <br /> vessel immediately for uninterrupted navigation of the port, without <br /> waiting for giving notice to the owner of the vessel. <br /> 57. It is further specified that while taking such action, if any <br /> property is recovered and it remains unclaimed or a person claiming <br /> it, fails to pay reasonable expenses incurred by the Conservator for <br /> raising, removing or destroying the vessel along with a further sum <br /> of 20% of the amount of such expenses, the Conservator can sell the <br /> property by public auction. The sale proceeds are to be utilized <br /> towards the expenses and the further sum and the balance is to be <br /> paid to the person entitled to the property so recovered. If no such <br /> person appears to claim the balance, it is required to be deposited for <br /> payment without interest to any person thereafter who establishes <br /> his right, provided such a claim is made within 3 years of sale of such <br /> property by public auction. It is further specified that where the sale <br /> proceeds are not sufficient to meet the expenses and the further sum, <br /> the ‘owner’ of the vessel at the time when it was wrecked, stranded <br /> or sank, is liable to make good the deficiency and if such deficient <br /> amount is not paid within one month of demand, the Conservator, <br /> like respondent No.1 – MPT herein, can recover such deficient <br /> amount as per the procedure laid down in Section 57(2) of the said <br /> <b>27/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> Act.<br /> 58. In this context, Section 57 of the said Act is relevant, which <br /> reads as follows:<br /> 57. Ascertainment and recovery of expenses and <br /> damages payable under this Act.—<br /> (1) If any dispute arises as to the sum to be paid in <br /> any case as expenses or damages under this Act, it shall <br /> be determined by a Magistrate upon application made to <br /> him for that purpose by either of the disputing parties.<br /> (2) Whenever any person is liable to pay any sum, not <br /> exceeding one thousand rupees, as expenses or damages <br /> under this Act, any Magistrate, upon application made to <br /> him by the authority to whom the sum is payable, may, <br /> in addition to or instead of any other means for <br /> enforcing payment, recover the sum as if it were a fine.’<br /> 59. It is relevant to note that sub-section (1) of Section 57 of the <br /> said Act lays down that if a dispute arises with regard to the said <br /> amount, it shall be determined by a Magistrate upon an application <br /> made by either of the disputing parties. Thus, there is an elaborate <br /> stepwise mechanism and procedure prescribed under Section 14 read <br /> with Section 57 of the said Act, under which the Conservator, like <br /> respondent No.1 – MPT herein, is required to proceed, in the event <br /> the wrecked, stranded or sunk vessel impedes navigation in the port. <br /> 60. In the present case, this Court finds that respondent No.1 - <br /> MPT failed to proceed in the stepwise manner prescribed under the <br /> said statutory provisions. After certain meetings and exchange of <br /> communications with the petitioner and respondent Nos.2 and 3, the <br /> respondent No.1 - MPT simply proceeded to issue the letter dated <br /> 14.10.1996 to the petitioner, referring to the sinking of the barge <br /> M.V. Satyam, the aforesaid notice dated 19.04.1995 issued to the <br /> petitioner, respondent Nos.2 and 3 and further stated that since the <br /> <b>28/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> petitioner had shown disinclination in participating in the tender <br /> process for salvaging the wreck, the permission granted to the <br /> petitioner for transit of barges for lighterage operations in the <br /> harbour, stood suspended with immediate effect. The said approach <br /> of respondent No.1 - MPT demonstrates that it failed to proceed as <br /> per the stepwise mechanism given in Section 14 read with Section 57 <br /> of the said Act. <br /> 61. As a matter of fact, since the petitioner was not the owner of <br /> the vessel i.e. barge M. V. Satyam, in the first place, the respondent <br /> No.1 – MPT could not have issued the said notice to the petitioner <br /> under Section 14 of the said Act. The failure on the part of <br /> respondent No.1 - MPT, as the Conservator, to proceed strictly in <br /> terms of the statutory provisions, deprived the parties to invoke <br /> Section 57(1) of the said Act to raise any dispute before the <br /> competent Magistrate, thereby showing the arbitrary and <br /> unsustainable approach adopted by the said respondent. Thus, the <br /> aforesaid action undertaken by the said respondent against the <br /> petitioner, cannot be sustained and the petitioner, not being the <br /> owner of the vessel i.e. barge M. V. Satyam, could not be held liable <br /> under Section 14 of the said Act.<br /> 62. In this situation, in order to sustain its action against the <br /> petitioner, during the course of hearing, respondent No.1 - MPT <br /> sought to place reliance on Sections 10 to 12 of the said Act. The said <br /> contention was based on the assertion that, as long as the source of <br /> power was available to the said respondent to proceed against the <br /> petitioner, mere reference to a wrong provision would not vitiate its <br /> action. It was also contended that the petitioner could not rely upon <br /> the position of law, clarified by the Supreme Court in the cases of <br /> Commissioner of Police, Bombay vs. Gordhandas Bhanji ( supra ) and <br /> <b>29/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> Mohinder Singh Gill and another vs. The Chief Election <br /> Commissioner, New Delhi and others ( supra ), for the reason that <br /> only the contents of the said notice dated 19.04.1995 issued by <br /> respondent No.1 - MPT under Section 14 of the said Act, could not <br /> be the basis to test the veracity of the action undertaken by the said <br /> respondent. It was submitted that the position of law clarified in <br /> subsequent judgments clearly indicated that the Court could look at <br /> pleadings and other material on record to examine as to whether the <br /> action could be sustained.<br /> 63. On the aspect of wrong provision being quoted and source of <br /> power still being available to the authority, reliance was placed on <br /> the judgments of the Supreme Court, in the cases of N. Mani vs. <br /> Sangeetha Theatre and others ( supra ), P. K. Palanisamy vs. N. <br /> Arunmugham and another ( supra ) and Union of India and another <br /> vs. Mohit Minerals Private Limited ( supra ), as also judgment of this <br /> Court in the case of Commissioner of Customs & Central Excise, Goa <br /> vs. Pankaj Jaju ( supra ). There can be no quarrel with the said <br /> proposition and it is well-settled that only because a wrong provision <br /> is mentioned, the action undertaken by an authority, which otherwise <br /> has a source of power to justify its action, cannot be held to be <br /> unsustainable. But, in the present case, the respondent No.1 -MPT <br /> chose to undertake action specifically under Section 14 of the said <br /> Act. <br /> 64. On pointed queries put to the learned senior counsel appearing <br /> for respondent No.1 - MPT as to whether reference to Section 14 of <br /> the said Act in the notice dated 19.04.1995, could be said to be a <br /> reference to a ‘wrong provision’, it was conceded that such was not <br /> the case. In other words, the respondent No.1 - MPT proceeded to <br /> exercise statutory power under the correct provision, while issuing <br /> <b>30/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> notice dated 19.04.1995. Therefore, respondent No.1 - MPT is <br /> required to justify recourse to the said correct provision invoked by <br /> it, in order to proceed against the petitioner, in the fact and <br /> circumstances of the present case. It is already concluded <br /> hereinabove that respondent No.1 - MPT could not have issued <br /> notice and proceeded against the petitioner under Section 14 of the <br /> said Act, as the petitioner was not the owner of the vessel i.e. barge <br /> M. V. Satyam.<br /> 65. It was in order to get over the said situation, that respondent <br /> No.1 - MPT, at the stage of final hearing of this writ petition, sought <br /> to rely upon Sections 10 to 12 of the said Act. It was sought to be <br /> contended that even if this Court were to hold that the notice dated <br /> 19.04.1995 could not have been issued to the petitioner under <br /> Section 14 of the said Act, the action intended to be taken by the said <br /> respondent against the petitioner, could be treated as an action under <br /> Sections 10 to 12 thereof. The said contention of respondent No.1 - <br /> MPT can also not be sustained. A perusal of Sections 10 to 12 of the <br /> said Act shows that while they pertain to removal of obstructions <br /> within the limits of the ports and recovery of such expenses for <br /> removal, the said provisions also specify a specific mechanism to be <br /> followed by the Conservator, like respondent No.1 – MPT herein.<br /> 66. At this stage, a reference to Sections 10 to 12 of the said Act is <br /> necessary and they read as follows:<br /> ‘10. Removal of obstructions within limits of port.—<br /> (1) The conservator may remove, or cause to be removed, <br /> any timber, raft or other thing, floating or being in any <br /> part of any such port, which in his opinion obstructs or <br /> impedes the free navigation thereof or the lawful use of <br /> any pier, jetty, landing-place, wharf, quary, dock, <br /> mooring or other work on any part of the shore or bank <br /> <b>31/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> which has been declared to be within the limits of the <br /> port and is not private property.<br /> (2) The owner of any such timber, raft or other thing shall <br /> be liable to pay the reasonable expenses of the removal <br /> thereof, and if such owner or any other person has <br /> without lawful excuse caused any such obstruction or <br /> impediment, or causes any public nuisance affecting or <br /> likely to affect such free navigation or lawful use, he <br /> shall also be punishable with fine which may extend to <br /> one hundred rupees.<br /> (3) The conservator or any Magistrate having jurisdiction <br /> over the offence may cause any such nuisance to be <br /> abated.<br /> 11. Recovery of expenses of removal.—<br /> If the owner of any such timber, raft or other thing, or <br /> the person who has caused any such obstruction, <br /> impediment or public nuisance as is mentioned in the <br /> last foregoing section, neglects to pay the reasonable <br /> expenses incurred in the removal thereof, within one <br /> week after demand, or within fourteen days after such <br /> removal has been notified in the Official Gazette or in <br /> such other manner as the Government by general or <br /> special order directs, the conservator may cause such <br /> timber, raft or other thing, or the materials of any public <br /> nuisance so removed, or so much thereof as may be <br /> necessary, to be sold by public auction; <br /> and may retain all the expenses of such removal and sale <br /> out of the proceeds of the sale, and shall pay the surplus <br /> of such proceeds, or deliver so much of the thing or <br /> materials as may remain unsold, to the person entitled <br /> to receive the same; <br /> and, if no such person appears, shall cause the same to <br /> be kept and deposited in such manner as the <br /> Government directs; <br /> and may, if necessary, from time to time, realise the <br /> expenses of keeping the same, together with the <br /> expenses of sale, by a further sale of so much of the <br /> thing or materials as may remain unsold.<br /> <b>32/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> 12. Removal of lawful obstructions.—<br /> (1) If any obstruction or impediment to the navigation of <br /> any port subject to this Act has been lawfully made, or <br /> has become lawful by reason of the long continuance of <br /> such obstruction or impediment, or otherwise, the <br /> conservator shall report the same for the information of <br /> the Government, and shall, with the sanction of the <br /> Government, cause the same to be removed or altered, <br /> making reasonable compensation to the person suffering <br /> damage by such removal or alteration. <br /> (2) Any dispute arising concerning such compensation shall <br /> be determined according to the law relating to like <br /> disputes in the case of land required for public purposes.’<br /> 67. A perusal of the above-quoted provisions shows that the <br /> Conservator, like respondent No.1 - MPT herein, can remove timber, <br /> raft or other thing floating, which in its opinion, is obstructing or <br /> impeding free navigation and that the owner of such timber, raft or <br /> other thing would be liable to pay reasonable expenses for removal <br /> thereof. It is further specified that the owner of such timber, raft or <br /> other thing shall be punishable with fine extending upto one <br /> hundred rupees, if public nuisance is caused and that the <br /> Conservator or any Magistrate having jurisdiction over the offence, <br /> can cause any such nuisance to be abated.<br /> 68. As regards recovery of expenses for removal, if the owner of <br /> such timber, raft or other thing causing obstruction or impediment, <br /> fails to pay reasonable expenses within one week after demand or <br /> within 14 days after such removal, the Conservator, like respondent <br /> No.1 - MPT herein, can sell such timber, raft or other thing by public <br /> auction and retain the amount towards expenses from the proceeds, <br /> with the surplus being delivered to the person entitled for the same. <br /> Thus, Sections 10 to 12 of the said Act again lay down a stepwise <br /> mechanism in which the Conservator, like respondent No.1 - MPT <br /> <b>33/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> herein, is required to proceed and it cannot be said that the notice <br /> dated 19.04.1995 issued by respondent No.1 - MPT invoking Section <br /> 14 thereof, should now be read as action taken under Sections 10 <br /> and 11 thereof. <br /> 69. The respondent No.1 is not justified in now contending that <br /> the source of power should be read under Sections 10 and 11 of the <br /> said Act, to sustain its action against the petitioner. In any case, it is <br /> difficult to understand how the said respondent is now insisting upon <br /> treating the iron ore of the petitioner being transported in the vessel <br /> i.e. barge M. V. Satyam to be treated as ‘timber, raft or other thing <br /> floating or being in any part of the port’. The iron ore admittedly <br /> sank with the barge, further demonstrating the fallacy in the <br /> argument.<br /> 70. As regards Section 12 of the said Act, a plain reading of the <br /> same shows that it cannot be applicable to the controversy arising in <br /> the present petition. It is not even the case of the respondent No.1 -<br /> MPT that the obstruction or impediment to navigation in the port, <br /> subject to this Act, has become lawful by reason of long continuance <br /> or otherwise. Hence, reliance on the said provision is also not <br /> sustainable. It is found that reliance placed on the judgements on the <br /> part of the said respondent to claim that merely a wrong provision of <br /> law was quoted, cannot be sustained and hence, the said contention <br /> is also rejected.<br /> 71. As regards respondent No.1 - MPT being entitled to rely upon <br /> material other than the contents of the notice dated 19.04.1995 <br /> issued under Section 14 of the said Act, even if the judgements relied <br /> upon by respondent No.1 are to be taken into consideration i.e. in <br /> the cases of Adani Ports and Special Economic Zone Limited vs. <br /> <b>34/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> Board of Trustees of Jawaharlal Nehru Port Authority and others <br /> ( supra ) and Assistant General Manager, State Bank of India and <br /> another vs. Tanya Energy Enterprises, Through its Managing Partner <br /> Shri Alluri Lakshmi Narasimha Varma ( supra ) and Chairman, All <br /> India Railway Recruitment Board and another vs. K. Shyam Kumar <br /> and others ( supra ), this Court finds that there is total lack of any <br /> pleading or material on record to sustain the said contention. A <br /> perusal of the aforementioned judgements of the Supreme Court and <br /> this Court shows that apart from the contents of the notice/order, a <br /> Writ Court can take into consideration the documents and pleadings <br /> that could sustain the notice/order, which is the subject matter of <br /> examination. In the present case, there is absolutely nothing in the <br /> affidavits filed on behalf of respondent No.1 or in any of the <br /> documents, to justify the stand taken by the said respondent that its <br /> source of power could be located in Sections 10 to 12 of the said Act <br /> or that any other source could be said to be available.<br /> 72. It is also relevant to note that in both the aforesaid cases <br /> before the Supreme Court i.e. Assistant General Manager, State Bank <br /> of India and another vs. Tanya Energy Enterprises, Through its <br /> Managing Partner Shri Alluri Lakshmi Narasimha Varma ( supra ) and <br /> Chairman, All India Railway Recruitment Board and another vs. K. <br /> Shyam Kumar and others ( supra ) as also judgement of this Court in <br /> the case of Adani Ports and Special Economic Zone Limited vs. Board <br /> of Trustees of Jawaharlal Nehru Port Authority and others ( supra ), <br /> the Courts specifically came to the conclusion that public interest and <br /> larger public good were involved. The cases concerned issues of mass <br /> copying during the examinations, black-listing of a contractor and <br /> action being bona fide taken by a secured creditor against a <br /> defaulting borrower. Such are not the facts in the present case, as the <br /> only question herein concerns the liability of a particular party for <br /> <b>35/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> raising, removing or destroying a vessel/wreckage, which impedes <br /> navigation in a port, in terms of the provisions of the said Act and in <br /> the light of the contractual obligations between the parties inter se . <br /> In the facts and circumstances of the present case, it cannot be said <br /> that the said principle can be invoked in public interest or for larger <br /> public good. Hence, the said contention raised on behalf of <br /> respondent No.1 also fails.<br /> 73. It is to be noted that respondent No.1 further claimed at the <br /> stage of final hearing and only in the written submissions tendered at <br /> the stage of final hearing, for the first time, that the source of power <br /> can be located even in the Merchant Shipping Act. In this context, <br /> Section 402 thereof was invoked. The said provision reads as follows:<br /> ―<br /> ‘402. Salvage payable for saving life, cargo or wreck.<br /> ―<br /> (1) Where services are rendered<br /> (a) wholly or in part within the territorial waters of <br /> India in saving life from any vessel, or elsewhere in <br /> saving life from a vessel registered In India; or<br /> (b) in assisting a vessel or saving the cargo or <br /> equipment of a vessel which is wrecked, stranded or <br /> in distress at any place on or near the coasts of <br /> India; or<br /> (c) by any person other than the receiver of wreck in <br /> saving any wreck; <br /> there shall be payable to the salvor by the owner of the <br /> vessel, cargo, equipment or wreck, a reasonable sum for <br /> salvage having regard to all the circumstances of the case.<br /> (2) Salvage in respect of the preservation of life when <br /> payable by the owner of the vessel shall be payable in <br /> priority to all other claims for salvage.<br /> (3) Where salvage services are rendered by or on behalf of <br /> the Government or by a vessel of the Indian Navy or of <br /> <b>36/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> the Coast Guard or the commander or crew of any such <br /> vessel, the Government, the commander or the crew, as <br /> the case may be, shall be entitled to salvage and shall <br /> have the same rights and remedies in respect of those <br /> services as any other salvor.<br /> (4) Any dispute arising concerning the amount due under <br /> this section shall be determined upon application made <br /> ―<br /> by either of the disputing parties<br /> (a) to a Judicial Magistrate of the first class or <br /> Metropolitan Magistrate, as the case may be, where <br /> the amount claimed does not exceed ten thousand <br /> rupees; or<br /> (b) to the High Court, where the amount claimed <br /> exceeds ten thousand rupees.<br /> (5) Where there is any dispute as to the persons who are <br /> entitled to the salvage amount under this section, the <br /> the Judicial Magistrate of the first class or the <br /> Metropolitan Magistrate or the High Court as the case <br /> may be, shall decide the dispute and if the are more <br /> persons than one entitled to such amount, such <br /> magistrate or the High Court shall apportion the amount <br /> thereof among such persons.<br /> (6) The costs of and incidental to all proceedings before a <br /> Judicial Magistrate of the first class or Metropolitan <br /> Magistrate or the High Court under this section shall be <br /> in the discretion of such magistrate or the High Court, <br /> and such magistrate or the High Court shall have full <br /> power to determine by whom or out of what property <br /> and to what extent such costs are to be paid and to give <br /> all necessary directions for the purpose aforesaid.’<br /> 74. A perusal of the above-quoted provision shows that it applies <br /> where services are rendered for saving life from any vessel or <br /> assisting the vessel or saving cargo of a vessel, which is wrecked, <br /> stranded or is in distress at any place on or near the coasts of India <br /> by any person other than the receiver of the wreck. Such a person or <br /> salvor is required to be paid in terms of the above-quoted provision. <br /> Respondent No.1 has invoked the said provision on the basis that <br /> <b>37/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> eventually, it had to engage the services of Madgavkar Salvage for <br /> removing the salvage of the wreck. It is relevant to note that while <br /> respondent No.1 - MPT itself invoked Section 14 of the said Act by <br /> issuing notice dated 19.04.1995, it did not take recourse to the <br /> aforementioned stepwise mechanism specified in the said provision <br /> read with Section 57 thereof. Even with regard to the removal of <br /> salvage of the wreck by Madgavkar Salvage, it is an admitted <br /> position that the said action was completed on 29.01.1998, which <br /> was almost 2 years and 9 months after the incident of sinking of the <br /> barge M. V. Satyam and almost 15 months after the interim order <br /> was passed by this Court while admitting the writ petition.<br /> 75. The aforesaid timelines further demonstrate that respondent <br /> No.1 - MPT cannot take recourse to Section 402 of the Merchant <br /> Shipping Act as the source of its power to take action against the <br /> petitioner in the context of salvage of wreck of barge M. V. Satyam. <br /> Even otherwise, a perusal of the above-quoted Section 402 of the <br /> Merchant Shipping Act shows that if a dispute arises with regard to <br /> the amount under the said provision, it is to be determined on the <br /> basis of an application made by either of the disputing parties to the <br /> Judicial Magistrate First Class or Metropolitan Magistrate, where the <br /> amount claimed does not exceed ₹ 10,000 or before this Court, <br /> where the amount exceeds ₹ 10,000. The said mechanism of <br /> resolving the dispute was again not made available to either party, if <br /> at all the respondent No.1 - MPT could have taken recourse to the <br /> said provision. <br /> 76. We also find substance in the contention raised on behalf of <br /> the petitioner that the Merchant Shipping Rules framed under the <br /> provisions of the Merchant Shipping Act further provide an elaborate <br /> procedure about the manner in which steps are to be taken in the <br /> <b>38/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> context of wreckage of a vessel, claims concerning wreck, sale of <br /> such wreck and how the amount due for the salvage is to be <br /> determined and paid. No such procedure was resorted to or even <br /> relied upon by respondent No.1 and now at the stage of final hearing <br /> of the writ petition, without any basis in the affidavits or pleadings <br /> and by making reference merely in the written submissions tendered <br /> at the time of final hearing, obviously the respondent No.1 cannot be <br /> permitted to take recourse to the Merchant Shipping Act and the <br /> aforementioned Rules framed thereunder.<br /> 77. It is interesting to note that as per Section 3(23) of the <br /> Merchant Shipping Act, the word ‘owner’ is defined in the context of <br /> a sailing ship to mean a person to whom the sailing ship belongs. <br /> This is another indicator about the fact that the petitioner could not <br /> be termed as an ‘owner’ of the vessel i.e. barge M. V. Satyam.<br /> 78. As regards the contentions raised on behalf of respondent No.1 <br /> – MPT about invoking the principles of Quantum Meruit and Polluter <br /> Pays, suffice it to say that the said contentions were again being <br /> raised without any basis in the material placed on record before this <br /> Court. At the stage of final hearing, the said contentions were raised <br /> for the first time and reliance was sought to be placed on the <br /> judgement of the Supreme Court in the case of Alopi Parshad & Sons <br /> Ltd. vs. Union of India ( supra ). We find that respondent No.1 did not <br /> render any services to the petitioner on implication to a contract to <br /> remunerate. The principle of Quantum Meruit could be invoked only <br /> when the price has not been fixed by contract for work done or <br /> services rendered. We find the said contention of the respondent <br /> No.1 to be wholly misplaced in the facts and circumstances of the <br /> present case. As a matter of fact, the respondent No.1 – MPT could <br /> justify its actions only under the provisions of the said Act.<br /> <b>39/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> 79. As regards reliance placed on the judgement of the Supreme <br /> Court in the case of Delhi Pollution Control Committee vs. Lodhi <br /> Property Co. Ltd. ( supra ), we find that the principles laid down in <br /> the said judgement are wholly inapplicable to the facts and <br /> circumstances of the present case. In the first place, nowhere in the <br /> affidavits, documents and other material placed in this writ petition, <br /> did the respondent No.1 – MPT ever claim that the cargo of the <br /> petitioner discharged any pollutant in the waters of the port or there <br /> was any resultant environmental damage. There is also nothing <br /> discernible in the material concerning the present petition to indicate <br /> any such aspect of potential risk or environmental damage. Hence, <br /> the principle of Polluter Pays cannot be invoked by the said <br /> respondent to foist any liability upon the petitioner.<br /> 80. It is also relevant to note that the respondent No.1 – MPT <br /> nowhere referred to the steps taken in respect of the material that <br /> was recovered eventually in January 1998, when the wreckage was <br /> removed. There is nothing demonstrated by the said respondent that <br /> the material which was recovered, was in any manner put to sale by <br /> auction or as to what happened to the proceeds thereof. In such a <br /> situation, it cannot lie in the mouth of the said respondent to claim <br /> that the petitioner can be said to be liable, in the facts and <br /> circumstances of the present case and as per the action sought to be <br /> undertaken by the said respondent under the provisions of the said <br /> Act.<br /> 81. Hence, it is held that the petitioner could not be held liable in <br /> pursuance of notice dated 19.04.1995 under Section 14 of the said <br /> Act. The consequent action of issuing letter/order dated 14.10.1996, <br /> suspending the permission to the petitioner for transit of barges and <br /> for lighterage operations, is also found to be unsustainable. As a <br /> <b>40/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> matter of fact, the said letter/order dated 14.10.1996 was stayed by <br /> this Court by its order dated 31.10.1996, subject to deposit of ₹ 70 <br /> lakhs in this Court. Therefore, the said letter/order dated 14.10.1996 <br /> is found to be unsustainable and it is set aside.<br /> 82. The Supreme Court in the above quoted paragraph No.8 of its <br /> order dated 14.02.2025, specifically held that the petitioner would <br /> be entitled to be suitably compensated, if it succeeds in the writ <br /> petition.<br /> 83. In view of the above, the writ petition is allowed in the above <br /> terms. We find that respondent No.1 – MPT had withdrawn an <br /> amount of ₹ 4,09,25,764 ( ₹ 70 lakhs deposited by the petitioner <br /> along with accrued interest), after this writ petition was earlier <br /> disposed of by this Court on 13.08.2021. As a consequence of this <br /> writ petition being allowed in above terms, the respondent No.1 – <br /> MPT is directed to pay the said amount to the petitioner within a <br /> period of six weeks from today.<br /> 84. It is made clear that this Court has decided the question as to <br /> whether the petitioner could be held liable in terms of notice dated <br /> 19.04.1995 issued under Section 14 of the said Act. We find <br /> substance in the contention raised on behalf of respondent No.3 that <br /> in the absence of the stepwise mechanism to be undertaken under <br /> the said provision, the said respondent was deprived of raising any <br /> dispute, as contemplated under Section 57 thereof. Hence, even if <br /> the respondent No.1 decides to proceed against respondent No.3 <br /> under Section 14 of the said Act, as the owner of the vessel, all the <br /> rights and contentions of respondent No.3, are kept open.<br /> <b>41/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b><br /><br /> WP_2127_96.doc<br /> <br /> 85. In view of the writ petition being allowed in the above terms, <br /> all pending notices of motion and interim applications are also <br /> disposed of.<br /> (SHREERAM V. SHIRSAT, J.) (MANISH PITALE, J.)<br /> <b><i>Priya Kambli</i></b><br /> PRIYA<br /> KAMBLI<br /> Digitally signed by<br /> PRIYA KAMBLI<br /> Date: 2026.04.10<br /> 14:32:02 +0530<br /> <b>42/42</b><br /> <b><i>::: Uploaded on - 10/04/2026</i></b> <b><i>::: Downloaded on - 10/04/2026 15:04:09 :::</i></b></div>