01Facts
The applicant, Senior Section Engineer (P.Way) and instructor at the Divisional Engineering Training School, Ranchi, undertook visits to gang locations, work sites and level-crossing gates for safety counselling from 2019, which he claims was approved by the Assistant Divisional Engineer (ADEN) on 29.08.2019.
¶ 2After he issued a contempt notice dated 22.09.2021 against the then Senior Divisional Engineer (Co-ordination) (SDE(Co-ord)), a show-cause notice followed on 27.09.2021/29.09.2021.
¶ 2A minor penalty charge memorandum (SF-11) dated 24.02.2022 alleged frequent departures from headquarters without prior permission and claims of travelling allowance (TA) for non-duty visits, based on TA journals for July and August 2021.
¶ 3 · ¶ 5.1The Disciplinary Authority withheld his next increment for one year with non-cumulative effect. The statutory appeal and revision were rejected, the revisional order being dated 03.10.2023.
¶ 2 · ¶ 5.12The respondents state that no corresponding entries existed in the inspection registers of the locations claimed.
¶ 3 · ¶ 5.3The applicant, appearing in person, alleged vagueness, bias, mala fides, non-speaking orders, and the introduction of an extraneous TA allegation.
¶ 2(i)–(vii) · ¶ 402Issues
i.1. Whether the applicant was authorised by the competent authority to undertake the frequent journeys reflected in his TA journals, or whether the ADEN's alleged concurrence of 29.08.2019 sufficed.
¶ 5.5 · ¶ 5.6 · ¶ 5.7ii.2. Whether the absence of entries in the Gang Diary or Gang Chart, under the Indian Railway Permanent Way Manual, answers the charge of unauthorised movement.
¶ 5.8iii.3. Whether the TA-related allegation, allegedly not part of the charge memorandum, vitiates the proceedings for want of prejudice or natural justice.
¶ 5.9iv.4. Whether the disciplinary action was actuated by mala fides or retaliation for the contempt notice.
¶ 5.10v.5. Whether the SDE(Co-ord) acting as both complainant and Disciplinary Authority vitiates the proceedings on the ground of bias.
¶ 5.11vi.6. Whether the appellate and revisional orders, and the procedure as a whole, suffer from illegality warranting judicial interference.
¶ 5.12 · ¶ 5.13 · ¶ 5.1403Law Applied
The Tribunal's jurisdiction arises under Section 19 of the Administrative Tribunals Act, 1985.
¶ 1The disciplinary action was governed by the Railway Servants (Discipline and Appeal) Rules, 1968, including the appellate framework under Rule 22, which the applicant invoked.
¶ 2(vi)The usefulness of an activity and the authority to undertake it in the course of official duty are distinct; the latter lies with the designated competent authority, and an employee cannot self-assign such a role.
¶ 5.7A non-speaking order or irregularity must be shown to cause prejudice before it vitiates proceedings.
¶ 5.9On mala fides, mere proximity of events is insufficient without substantive material showing personal vendetta or extraneous consideration.
¶ 5.10On bias, the applicant must establish that the authority was disqualified or had a personal interest.
¶ 5.11Judicial review is confined to legality, procedural irregularity, perversity and arbitrariness, and does not extend to substituting the Tribunal's assessment for that of departmental authorities.
¶ 5.13The judgment cites no reported precedents.
Provisions in the judgment · 1 · Linked ones open on LawLens
Administrative Tribunals Act, 1985 Section 19
04Reasoning
The ADEN's alleged concurrence of 29.08.2019 was disputed as to authority and did not amount to a general authorisation for individual journeys, nor dispense with prior approval from the SDE(Co-ord), the applicant's controlling authority.
¶ 5.6The applicant's claim that field staff requested his services was unsupported by any requisition.
¶ 5.7The Gang Diary argument was held beside the point, since the charge concerned prior authorisation, not record-keeping.
¶ 5.8The TA issue was treated as part of the principal charge, which was built on the TA journals, so no prejudice was shown.
¶ 5.9The timing of the show-cause notice, five days after the contempt notice, was noted but not held sufficient to prove mala fides, as the respondents explained the initiation by scrutiny of the TA journals.
¶ 5.10The bias plea failed for want of material showing disqualification or personal interest.
¶ 5.11The applicant was given and used the opportunity to reply on 07.03.2022, and the Tribunal found no proven procedural breach.
¶ 5.12Disagreement with the departmental outcome did not warrant interference absent illegality or perversity.
¶ 5.1305Holding
The applicant had not shown that the journeys were authorised by the competent authority, and the ADEN's concurrence did not displace the requirement of prior approval. The disciplinary action was not shown to be mala fide, biased, or procedurally defective, and the Disciplinary, Appellate and Revisional orders did not warrant interference.
¶ 5.6 · ¶ 5.14The Original Application is dismissed as devoid of merit, with no order as to costs. The one-year withholding of the applicant's next increment, with non-cumulative effect, stands. The relief sought for setting aside the orders and for arrears and restoration of increments is refused.
¶ 1 · ¶ 6Original Court PDF
MANOJ KUMARvsSOUTH EASTERN RAILWAY
Click to open original judgment
Original judgment, available to read, download and summarize on LawLens.in
![Railway Engineer Loses Challenge to Increment Cut Over Safety Visits Made Without Prior Approval. MANOJ KUMAR vs SOUTH EASTERN RAILWAY. CAT - ['Patna']. LawLens](/stories/thumbnails/railway-engineer-loses-challenge-to-increment-cut-over-safety-visits-made-without-prior-ap-bdfd19b548b3483c844a02906afa949a.webp)