Facts
The petitioner school challenged a communication dated 8 September 2026 from the Assistant Engineer, Water Resources Department (WRD), concerning a culvert constructed by the school across the Thaiyur surplus course.
Source reference: para. 1; p. 2The WRD stated that the culvert was only 6 metres wide, compared with the channel’s stated width of 20 metres, and that its capacity obstructed the flow of floodwater; it requested the school to coordinate with other institutions and layout developers to mobilise funds for additional vents.
Source reference: paras. 5, 8; pp. 4–6The school argued that other institutions and developers also used the culvert and should contribute to its reconstruction.
Source reference: para. 6; p. 4It sought to quash the communication and obtain directions to desilt the canal and remove garbage while retaining the existing bridge and culvert.
Source reference: p. 2Issues
1. Whether the WRD’s communication requesting coordination and mobilisation of funds for widening the culvert was legally challengeable in a writ petition.
Source reference: para. 11; p. 72. Whether public authorities could require the school and other stakeholders to cooperate in widening or reconstructing the culvert to protect the watercourse and reduce flooding risks.
Source reference: paras. 9–12; pp. 6–8Law Applied
The Court relied on the public-interest principle that private interests cannot prevail over the protection and maintenance of water bodies or measures needed to prevent flooding.
Source reference: para. 10; p. 7It referred to the Tamil Nadu Protection of Tanks and Eviction of Encroachments Act, 2007, as a statutory means available to the authorities if necessary to address obstruction of the watercourse.
Source reference: paras. 3, 9; pp. 3, 6–7Reasoning
The Court accepted the WRD’s account that the undersized culvert obstructed a surplus course carrying substantial floodwater and could contribute to flooding in the locality.
Source reference: para. 8; pp. 5–6It treated the impugned communication as a request to coordinate with other stakeholders and mobilise funds—not as a decision that, by itself, gave the school a cause to institute writ proceedings.
Source reference: para. 11; p. 7Given the stated flood risk, the Court considered stakeholder coordination and provision for additional vents consistent with the public interest, while observing that the authorities remained responsible for protecting residents and property if cooperation failed.
Source reference: paras. 9–12; pp. 6–8Holding
The Court held that the communication did not warrant writ intervention and dismissed the petition without costs.
It observed that the school, other institutions, layout developers and departmental authorities should coordinate to find a solution for constructing additional vents to match the channel width.
Source reference: paras. 9, 12; pp. 6, 8It further noted that the authorities could act under the 2007 Act if cooperation failed and flood-protection measures were not implemented.
Source reference: paras. 9, 12; pp. 6, 8Original Court PDF
D.A.V. SM Fomra SchoolvsTHE DISTRICT COLLECTOR
Click to open original judgment
Original judgment, available to read, download and summarize on LawLens.in