01Facts
The petitioners are tenants/occupiers of Commercial Unit No. 16 in "Krishna Dyeing & Printing Works," a structure on City Survey Nos. 160 and 160/1–160/10, Andheri (East).
¶ 4–5In 2024 the K/East Ward issued a notice under Section 353B of the Mumbai Municipal Corporation Act, 1888 ("MMC Act").
¶ 7Five structural audit reports (SARs) were filed with conflicting categorisations: Avon Consulting (owner's consultant), C-1; Aarch Consultants (tenants), C-3; Tech-Resurgo (tenant), C-2A; B.J. Mehta (petitioners' consultant), C-2A; and Sardar Patel College of Engineering ("SPCE," appointed by the owner), C-1.
¶ 7–8, 10, 12On 25 August 2025 the file was referred to the Technical Advisory Committee ("TAC") under the 2014 guidelines and 2018 BMC policy.
¶ 6, 10On 29 October 2025 the TAC directed a third-party structural audit, which SPCE conducted and reported on 18 December 2025 as C-1.
¶ 11–12, 22–24The TAC site inspection took place on 17 February 2026, attended by representatives of all five consultants, including B.J. Mehta.
¶ 35Before the TAC's order, the petitioners sought a copy of the SPCE SAR on 20 February 2026.
¶ 14On 20 May 2026 the TAC accepted the SPCE report and categorised the building as C-1.
¶ 13, 33On 29 May 2026 the BMC issued a notice under Section 354 of the MMC Act directing evacuation and demolition.
¶ 4, 1302Issues
i.1. Whether the TAC order dated 20 May 2026 is vitiated by violation of natural justice, because the SPCE SAR dated 18 December 2025 was not supplied to the petitioners before the order was passed.
¶ 14, 36–38ii.2. Whether the TAC order is non-speaking and arbitrary for failing to give reasons for rejecting the C-2A findings of the petitioners' consultant, B.J. Mehta.
¶ 15, 17, 37–38iii.3. Whether the High Court, exercising writ jurisdiction under Article 226, may interfere with the TAC's expert categorisation of the building as C-1.
¶ 42–45iv.4. Whether the impugned TAC order and the consequential Section 354 notice are legal and within the four corners of law.
¶ 46–4703Law Applied
Sections 353B and 354 of the MMC Act empower the Corporation to require structural stability certificates and to order evacuation and demolition of dangerous structures.
¶ 4, 7, 29Section 354(5) of the MMC Act and the Maharashtra Rent Control Act, 1999 protect tenancy rights notwithstanding demolition.
¶ 29, 44The procedural framework derives from the Co-ordinate Bench order in Municipal Corporation of Greater Mumbai v. State of Maharashtra, WP(L) No. 1135 of 2014 (23 June 2014), which required conflicting reports to be referred to a TAC, and from the BMC guidelines of 2018.
¶ 6, 39–41The Court applied Shaha Ratanshi Khimji & Sons v. Kumbhar Sons Hotel Pvt. Ltd., (2014) 14 SCC 1, and followed Khimjibhai Harjivanbhai Patadia v. MCGM, 2024 SCC OnLine Bom 3709 and Vivek Shantaram Kokate v. MCGM, WP No. 931 of 2019.
¶ 30, 42, 44The Court adopted the principles in Andheri Purab Paschim CHS Ltd. v. MCGM, 2023 SCC OnLine Bom 2522, and the summary of principles in Tushar Ranglidas Notaria as quoted therein.
¶ 43–44A writ court does not decide whether a structure is dilapidated, does not substitute its view for that of technical experts, and does not prefer one expert over another.
¶ 44–45Relief lies only for Wednesbury unreasonableness, gross perversity, fraud, or complete non-application of mind; mala fides must be proved with particulars, and a TAC report is not invalid merely because a rival report exists.
¶ 44–45Provisions in the judgment · 2 · Linked ones open on LawLens
Mumbai Municipal Corporation Act. Section 354
Maharashtra Rent Control Act, 1999 Section 14
04Reasoning
The TAC considered all five SARs in detail, including the SPCE report and the B.J. Mehta report, and recorded reasoned critical observations on each.
¶ 37–38The petitioners' consultant was represented at the 17 February 2026 site inspection and meeting, which weakened the claim of prejudice, and the Court was not persuaded that natural justice was violated.
¶ 35, 38The Court found the TAC's reasons sufficient, since the Committee examined each SAR, including the reasons for preferring SPCE's C-1 categorisation.
¶ 37–38Because the TAC is an expert body, the Court declined to reassess the structural condition of the building.
¶ 42, 44–45The Court found no fraud, gross perversity, or non-application of mind, and held that the TAC did not adopt an absolutist approach in preferring a report recommending demolition over one recommending repair.
¶ 45Tenants' rights are protected by Section 354(5) and rent legislation, and the public-safety risk of collapse outweighed the individual claim.
¶ 29, 4405Holding
The TAC order dated 20 May 2026, which accepted the SPCE SAR and categorised the building as C-1, was not vitiated by natural justice violations or arbitrariness, and was within the four corners of law.
¶ 38, 45–46The Section 354 notice dated 29 May 2026 is sustained.
¶ 45–46The Court declined to interfere under Article 226 and dismissed all three writ petitions, discharging the rule with no order as to costs.
¶ 47–48Original Court PDF
Nilay Colour Industries Through Its Proprietor Nilay Jitendra Kapasi Legar Heir Of Jitendra KapasivsThe Assistant Commissioner (K/E Ward) Bmc
Click to open original judgment
Original judgment, available to read, download and summarize on LawLens.in