01Facts
The petitioner, daughter of the deceased consumer named on the electricity connection at the subject premises, applied for a separate connection on 4 June 2026.
¶ 4–6, 9The existing connection had been disconnected on 23 March 2026 after inspection access was not provided; the earlier proceedings also concerned the uncompleted transfer of the connection from the deceased consumer’s name.
¶ 4–6, 9The petitioner alleged that WBSEDCL had not acted on her application. WBSEDCL disputed her entitlement to an independent connection while the earlier consumer relationship and its consequences remained unresolved, but stated that it was willing to provide a connection subject to compliance with applicable requirements.
¶ 3–7The petitioner then sought relief under Article 226.
¶ 102Issues
i.1. Whether the petitioner’s application for a new connection at the same premises could be treated as independent of the earlier connection, notwithstanding her relationship to the original consumer and the unresolved circumstances surrounding that connection.
¶ 10–14ii.2. Whether the application could be granted before expiry of the 180-day period for deemed termination, and without addressing any outstanding liabilities or applicable statutory and technical requirements.
¶ 8, 12–15iii.3. What directions should be made regarding inspection, determination of liabilities and consideration of the petitioner’s application.
¶ 15–1603Law Applied
Section 43 of the Electricity Act, 2003 recognises an owner’s or occupier’s entitlement to seek supply, but that entitlement must be considered alongside the applicable contractual and regulatory framework for the same premises.
¶ 11Regulation 4.6.1 of the West Bengal Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012 provides for deemed termination of the supply agreement after 180 days of continuous disconnection effected in accordance with law; until then, the agreement has not terminated under that provision.
¶ 12Regulation 4.6.4 requires clearance of outstanding dues and applicable late-payment surcharge before a new connection is provided in the same premises following deemed termination.
¶ 13The Court relied on K.C. Ninan v. Kerala State Electricity Board, (2023) 14 SCC 431, including paragraphs 316–321, for the need to give effect to the relevant Supply Code provisions.
¶ 13A fresh-connection application cannot be used to circumvent the consequences of an existing consumer relationship or an earlier judicial adjudication; at the same time, liability cannot be imposed without establishing the statutory basis for it.
¶ 11, 15Section 163 of the Electricity Act and Clause 8 of WBERC Regulations No. 55 were also noted in relation to the licensee’s access to premises for authorised purposes.
¶ 9Provisions in the judgment · 2 · Linked ones open on LawLens
Electricity Act, 2003 Section 163Section 43
04Reasoning
The petitioner was not an unrelated subsequent occupier: she was the original consumer’s daughter, lived at the same premises, had benefited from the earlier supply and was involved in prior proceedings concerning that connection.
¶ 11, 14Her application was made only about 73 days after disconnection, before the 180-day period under Regulation 4.6.1 had elapsed.
¶ 12In these circumstances, the Court held that the application could not be considered in isolation or used to bypass the unresolved position concerning the earlier connection.
¶ 13–15However, it did not treat Regulation 4.6.4 as already operative or conclusively determine that the petitioner owed any amount; WBSEDCL had to establish any liability under the applicable provisions.
¶ 13–15Inspection and a lawful determination of the relevant facts and liabilities were therefore required before the application could be decided.
¶ 15–1605Holding
The Court disposed of the writ petition without directing immediate grant of a connection.
¶ 15WBSEDCL was permitted to inspect the premises, meter and board after notice; the occupiers were required to provide access, and the authority could seek police assistance if access was obstructed, with the cost recoverable from the petitioner.
¶ 15Following inspection, WBSEDCL was directed to take appropriate steps in accordance with law, including deciding the petitioner’s application and any properly established liabilities, and to complete the exercise within 12 weeks.
¶ 15–17Original Court PDF
LAKSHMI SHAWvsTHE STATION MANAGER,WBSEDCL AND ORS
Click to open original judgment
Original judgment, available to read, download and summarize on LawLens.in