Patna High CourtAdministrative and Public LawCriminal Law

Writ Court Declines Merits Review, Directs Final Assessment Order, and Leaves Section 127 Electricity Act Appeal Available

Rakesh Kumar Jaiswal,v.The State of Bihar

Writ Court Declines Merits Review, Directs Final Assessment Order, and Leaves Section 127 Electricity Act Appeal Available. Rakesh Kumar Jaiswal, vs The State of Bihar. Patna High Court. LawLens
The LawLens card for this judgmentXLinkedInWhatsApp

In brief

The question

1. Whether the Junior Electrical Engineer was authorized under Section 135(1A) of the Electricity Act, 2003 to disconnect the electricity supply of the petitioner's premises.

The court held

The court did not decide whether the JE was authorized under Section 135(1A) to disconnect supply; that issue was left open.

It also directed

On the pending representation, the court held that, if not already done, the final assessment order must be passed by respondent nos. 4 and 5, preferably within two weeks of the date of judgment, and communicated to the petitioner so that he may challenge it under Section 127.

The petitioner's grounds remain available before the appropriate forum, and the writ petition was disposed of accordingly, without any direction for restoration of electricity supply.

01Facts

The petitioner, a Government Teacher, let out the front portion of his premises to a tenant running a video and photography studio.

¶ 2

The tenant undertook to obtain a separate electricity connection in his own name and to bear sole responsibility for any unlawful act in the tenanted portion.

¶ 2

A Junior Electrical Engineer (JE), Electric Supply Section, Digha, conducted an inspection and submitted a report, following which the electricity supply to the premises (Consumer No. 102339858) was disconnected on 04.02.2026.

¶ 2–3

The petitioner filed a representation dated 09.02.2026 seeking reassessment by a reasoned, speaking order after a hearing; it had not been disposed of as of the date of the judgment.

¶ 4

The petitioner sought a direction for restoration of supply.

¶ 3

For the South Bihar Power Distribution Company Limited (SBPDCL), it was submitted that the Bihar Electricity Regulatory Commission had authorized JEs in Electricity Supply Sections to disconnect supply where theft is detected in premises of low tension consumers with connected load up to 7 KW, relying on a notification dated 31.05.2013.

¶ 5

It was further stated for the SBPDCL that a final assessment order would be passed, preferably within two weeks, if not already passed.

¶ 5

02Issues

i.1. Whether the Junior Electrical Engineer was authorized under Section 135(1A) of the Electricity Act, 2003 to disconnect the electricity supply of the petitioner's premises.

¶ 4–5

ii.2. Whether the respondents are required to dispose of the petitioner's representation dated 09.02.2026 seeking reassessment by a reasoned and speaking order after affording a hearing.

¶ 4, 6

03Law Applied

Section 135(1A) of the Electricity Act, 2003, as invoked by the respondents, empowers the State Commission to authorize specified officers to disconnect supply where theft is detected.

¶ 4–5

The Bihar Electricity Regulatory Commission's authorization of JEs (low tension consumers up to 7 KW) under a notification dated 31.05.2013 was relied upon by the SBPDCL.

¶ 4–5

Section 127 of the Electricity Act, 2003, under which the aggrieved consumer may challenge the final assessment order before the appropriate forum, underpins the court's directions.

¶ 6

A writ court may decline to examine merits where an alternative statutory remedy exists and may direct the authority to decide a pending representation, without itself deciding the dispute.

¶ 6–7

No precedent was cited.

Provisions in the judgment · 2 · Linked ones open on LawLens

Electricity Act, 2003 Section 135Section 127

04Reasoning

The court expressly declined to examine the merits of the dispute.

¶ 6

The court did not record a finding on whether the JE was authorized under Section 135(1A), and the question was left unresolved, though the respondents' notification was placed on record in support of the authorization.

¶ 5

On the second issue, the court noted that the final assessment order had not been passed and directed respondent nos. 4 and 5 to pass it within two weeks, if not already done, and to communicate it to the petitioner.

¶ 6

This direction routes the petitioner's grievance into the statutory appellate mechanism under Section 127, which is the forum for contesting the assessment, and the court expressly preserved the grounds raised in the writ for that forum.

¶ 6–7

Because the court did not decide the merits, the petitioner's claim for restoration of supply was not adjudicated.

¶ 3, 6

05Holding

The court did not decide whether the JE was authorized under Section 135(1A) to disconnect supply; that issue was left open.

¶ 4–6

On the pending representation, the court held that, if not already done, the final assessment order must be passed by respondent nos. 4 and 5, preferably within two weeks of the date of judgment, and communicated to the petitioner so that he may challenge it under Section 127.

¶ 6

The petitioner's grounds remain available before the appropriate forum, and the writ petition was disposed of accordingly, without any direction for restoration of electricity supply.

¶ 7–8
Patna High Court

Original Court PDF

Rakesh Kumar Jaiswal,vsThe State of Bihar

Patna High Court · November 23, 2026

Click to open original judgment

Original judgment, available to read, download and summarize on LawLens.in