01Facts
The petitioner, a resident and agriculturist of Nangali village, alleged that construction and widening of National Highway-75 obstructed a natural storm-water drain (Rajakaluve) adjoining specified survey numbers, causing recurring flooding of agricultural land, residential property, roads and part of the highway.
pp. 3–6He sought production of project records, a joint inspection, acquisition of land if required, and restoration or provision of an alternative drain.
pp. 3–6The NHAI stated that an Independent Engineer’s site visit and report found the highway’s drainage facilities adequate.
p. 7The State submitted that, following its requests to the NHAI, the Tahsildar had directed officials to reopen the existing Rajakaluve; it asserted that the drain had been restored and produced photographs in support.
pp. 8–9The Court disposed of the petition on that basis.
p. 1002Issues
i.1. Whether the respondents should be directed to inspect and restore or provide an alternative storm-water drain in light of the alleged obstruction and flooding.
pp. 3–6ii.2. Whether further relief was required after the State submitted that the existing Rajakaluve had been restored and produced supporting photographs.
pp. 9–1003Law Applied
The petition invoked Articles 226 and 227 of the Constitution and sought relief concerning land acquisition under the National Highways Act, 1956, and the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.
pp. 2–4However, the Court did not interpret or apply those provisions, cite precedent, or articulate a substantive legal test. Its decision rested on the State’s submission and the photographs indicating restoration of the drain.
pp. 9–1004Reasoning
The Court considered the State’s submission that the Rajakaluve had been reopened to ensure free flow of storm water and reviewed the photographs tendered in support.
pp. 9–10On that record, it concluded that the petitioner’s grievance did not call for further consideration; it did not determine the competing factual accounts through a separate finding on the NHAI’s drainage report or the alleged obstruction.
pp. 7, 9–1005Holding
The Court treated the asserted restoration of the existing Rajakaluve as resolving the matter and disposed of the writ petition without granting further directions.
p. 10Pending interlocutory applications, if any, were also disposed of.
p. 10Original Court PDF