01Facts
The petitioners challenged the proposed routing of transmission lines for a 110/11 KV electricity sub-station through their lands in Sy. Nos. 159/1A, 159/3 and 157/1 at Banavasi.
¶ 1–4, 6–8 · pp. 3–8In earlier proceedings, the High Court had directed consideration of whether an alternative route was feasible.
¶ 1–4, 6–8 · pp. 3–8The Deputy Commissioner rejected the petitioners’ request, relying on the Executive Engineer’s report concerning cost, delay and forest-clearance requirements, without determining whether alternative land was available.
¶ 1–4, 6–8 · pp. 3–8The petitioners then identified Sy. No. 165, north of their lands, as a possible alternative and disputed whether it was notified forest land.
¶ 1–4, 6–8 · pp. 3–802Issues
i.1. Whether the Deputy Commissioner’s order was sustainable when the authority had not independently examined the availability of alternative land or the feasibility of realigning the electric line.
¶ 7, 12 · p. 7, 9ii.2. Whether the Deputy Commissioner was required to verify the status and availability of Sy. No. 165, including whether it was notified forest land, before deciding the petitioners’ request.
¶ 8, 12–13 · pp. 7–1003Law Applied
The earlier proceedings referred to Sections 10, 11 and 16 of the Indian Telegraph Act, 1885, in considering the authorities’ powers concerning the electric line and the petitioners’ ability to object to its route.
¶ 3 · pp. 4–5In the present proceeding, the Court’s operative reasoning rested on the prior direction to consider a feasible alternative route and on the requirement that the Deputy Commissioner verify the relevant facts—including alternative land availability and the asserted forest status—before deciding the request.
¶ 12–14 · pp. 9–10The Court did not set out or apply a separate statutory test in its final order.
¶ 12–14 · pp. 9–10Provisions in the judgment · 3 · Linked ones open on LawLens
Indian Telegraph Act, 1885 Section 10Section 11Section 16
04Reasoning
The Deputy Commissioner’s order relied on the Executive Engineer’s report but did not show that the Deputy Commissioner had inspected the site, assessed alternative land, or examined the feasibility of realignment, as contemplated by the earlier proceedings.
¶ 7–13 · pp. 7–10The petitioners specifically raised the possibility of using Sy. No. 165 and disputed that it was notified forest land; KPTCL’s senior counsel acknowledged that this aspect had not been ascertained.
¶ 7–13 · pp. 7–10In those circumstances, the Court held that the matter required factual verification and reconsideration rather than acceptance of the existing report alone.
¶ 7–13 · pp. 7–1005Holding
The Court disposed of the petition by remitting the matter to the Deputy Commissioner for reconsideration.
¶ 13–15 · p. 10The Deputy Commissioner must verify the status and availability of Sy. No. 165, examine the feasibility of realigning the line with the Executive Engineer of KPTCL, give the parties an opportunity to be heard and, if necessary, inspect the site.
¶ 13–15 · p. 10An appropriate order must be passed within four weeks of receipt of the certified copy.
¶ 13–15 · p. 10All contentions were kept open.
¶ 13–15 · p. 10Original Court PDF