01Facts
The Notice Inviting Tender for a five-year Performance-Based Maintenance Contract (PBMC) for stretches of NH-39 (New NH-129) under the PWD, Golaghat NH Division, was issued on 21.02.2026.
¶ 2, 4The petitioner's technical bid was declared non-responsive on 11.06.2026 under Clause 20.8(viii) of the RFP, on the ground that it had failed to maintain highways satisfactorily despite two rectification notices relating to earlier works.
¶ 4The petitioner's representation dated 13.06.2026 alleged that Respondent No. 4 (M/s M.P. Agarwalla) had not disclosed two ongoing works worth about Rs. 56.07 Crore.
¶ 5On 19.06.2026 the Bid Evaluation Committee (BEC) rejected the representation, sought clarification from Respondent No. 4, recomputed its bid capacity, and declared it L1.
¶ 6The petitioner's earlier writ petition (WP(C) No. 3593/2026) was withdrawn on 22.07.2026 with liberty to refile.
¶ 7The petitioner contended that it had carried out maintenance work and that the materials relied upon were internal, unserved, and unacted upon.
¶ 8-11The respondents relied on a MoRTH letter dated 18.05.2026 sanctioning a rectification estimate of Rs. 15.62 Lakhs under Clause 14.7, and an Executive Engineer's letter dated 25.05.2026 recording that only granular filling had been done and directing bituminous surfacing.
¶ 10, 15, 16, 30, 31, 38Respondent No. 4's bid capacity, even after including the two omitted works, was approximately Rs. 304.28 Crore against a requirement of Rs. 57.41 Crore.
¶ 17, 4302Issues
i.1. Whether the BEC's decision declaring the petitioner's technical bid non-responsive under Clause 20.8(viii) of the RFP, based on departmental communications regarding maintenance deficiencies, is arbitrary, irrational, or otherwise amenable to interference under Article 226.
¶ 8-11, 25-39ii.2. Whether the petitioner's technical acceptance in a subsequent PBMC tender (Rangiya NH Division) renders the impugned decision discriminatory under Article 14.
¶ 12, 41iii.3. Whether the BEC erred in accepting the technical bid of Respondent No. 4 despite the alleged non-disclosure of existing commitments under Clause 4.11.
¶ 13, 42-4303Law Applied
The settled limits of judicial review in tender matters, as laid down in Tata Cellular v. Union of India (1995) 1 SCC 478, Jagdish Mandal v. State of Orissa (2007) 14 SCC 517, and Michigan Rubber (India) Ltd. v. State of Karnataka (2012) 8 SCC 216, apply. Courts do not act as appellate authorities over technical evaluation and interfere only where the process is mala fide, arbitrary, irrational, or violative of tender conditions, and where public interest is affected.
¶ 21-23Clause 20.8(viii) of the RFP, which bars a bidder with two rectification notices for non-maintenance from being treated as responsive, is construed in light of its purpose of ensuring satisfactory past performance. A "rectification notice" is any written communication from the Authority or its Engineer identifying maintenance deficiencies and calling for rectification, irrespective of nomenclature.
¶ 27-28, 36Bachhittar Singh v. State of Punjab (1962 SCC OnLine SC 11) holds that an uncommunicated government order remains provisional and binds no one; the Court held it inapplicable to the use of departmental records in tender evaluation.
¶ 40Article 14 guarantees equality before law but does not compel a uniform view across different procurements.
¶ 41Tata Motors Ltd. v. BEST (2023 SCC OnLine SC 671) holds that once a bidder is disqualified, a writ court need not examine the eligibility of the successful bidder absent a demonstrated public interest, and that courts should show restraint in contractual matters.
¶ 19, 24, 4204Reasoning
The BEC's recorded finding of two rectification notices, based on the Executive Engineer's report and departmental records, was a finding of fact within the tendering authority's domain.
¶ 37The MoRTH letter of 18.05.2026 and the Executive Engineer's letter of 25.05.2026 both concerned the petitioner's maintenance performance. The 25.05.2026 letter was a reply to the petitioner's own letter and called for bituminous surfacing, which the Court treated as a communication of the kind contemplated by Clause 20.8(viii).
¶ 38The petitioner's own admission of granular filling on 21.05.2026 showed that the deficiency had been brought to its notice.
¶ 38The petitioner did not show that the notices were withdrawn or the defects cured before the BEC meetings or any Letter of Acceptance, so the BEC was entitled to treat it as a non-performing party under Clause 20.8.
¶ 39The absence of a formal Clause 14.7 notice, recovery, or third-party execution did not negate the departmental record of non-performance.
¶ 32-34The Court declined to re-evaluate the adequacy of the maintenance work, which is a technical question.
¶ 35, 38The Rangiya tender was a separate procurement, issued after the impugned decision, with a separate evaluation, so it did not bind the present authority.
¶ 41The BEC sought clarification, recomputed capacity, and found eligibility intact even after including the omitted works (Rs. 304.28 Crore against Rs. 57.41 Crore). No material showed deliberate omission to secure eligibility.
¶ 43Following BEST, the Court found no public interest warranting examination of the successful bidder's eligibility once the petitioner was disqualified.
¶ 4205Holding
The BEC's decision declaring the petitioner's technical bid non-responsive under Clause 20.8(viii) was founded on relevant departmental materials and bore a rational connection with the eligibility condition. It was not arbitrary, irrational, or illegal, and no interference under Article 226 was warranted.
¶ 44The plea of Article 14 discrimination failed.
¶ 41The challenge to Respondent No. 4's technical acceptance also failed, since the omission did not affect eligibility and no public interest was shown.
¶ 42-43The writ petition was dismissed, the interim order (if any) was vacated, and the respondents were permitted to proceed with the tender in accordance with law. No costs were awarded.
¶ 45-46Original Court PDF
Purbanchal Buildtech Pvt LtdvsThe State Of Assam And 6 Ors
Click to open original judgment
Original judgment, available to read, download and summarize on LawLens.in
