Post-2016 interconnection regulations displaced seven-year lock-ins, defeating claims for premature-delinking compensation.
The Petitioner, a Multi System Operator (MSO), entered into an Interconnection Agreement with the Respondent, a Local Cable Operator (LCO), on 1 December 2014.
4 MIN READ→