Madras High CourtAdministrative and Public LawProperty and Real Estate Law

Pending representation on transmission line alignment, authorities must decide within four weeks and halt private-land work meanwhile

C.PONNUSAMYv.The District collector

Pending representation on transmission line alignment, authorities must decide within four weeks and halt private-land work meanwhile. C.PONNUSAMY vs The District collector. Madras High Court. LawLens
The LawLens card for this judgmentXLinkedInWhatsApp

In brief

The question

1. Whether the Court should direct the District Collector (R1) to consider and pass orders on the petitioner's representation seeking realignment of the HT line through the adjacent poromboke land in Survey No. 104.

The court held

The Court did not decide whether the transmission line must be realigned. It held that the petitioner's representation must be considered, and it disposed of the writ petition accordingly.

It also directed

Direction (i): R1 (District Collector) shall consider and pass orders on the petitioner's representation within four weeks from receipt of a copy of the order, specifically on whether the lines can be drawn by fixing a tower in the adjacent poromboke land in Survey No. 104.

Direction (ii): Until the representation is decided, the drawing of lines from the petitioner's land shall not be proceeded with.

No costs were awarded, and the connected miscellaneous petition (WMP No. 51389 of 2026) was closed.

01Facts

The petitioner and his son jointly own a 2.69-acre patta property in Survey No. 103/3D, Molipalli Village, Tiruchengode Taluk, Namakkal District, on which about 65 coconut trees are grown.

¶ 2 · p. 2

The petitioner states that his livelihood depends on this plantation.

¶ 2 · p. 2

TANTRANSCO (R2) proposed a 230 kV HT transmission line from Unjanai to Nallur, involving 51 towers over about 17 km, and towers S.Nos. 18 and 19 were proposed on lands adjacent to the petitioner's property.

¶ 2 · pp. 2–3

The petitioner objected. R3 and R4 allegedly proceeded to site the towers on the front and rear portions of his land, which would require cutting about 35 coconut trees and closing a borewell beneath the corridor.

¶ 2 · p. 3

On 03.10.2024 the petitioner proposed an alternative alignment with a tower on adjacent poromboke land in Survey No. 104. R4 rejected this by letter dated 05.10.2024.

¶ 2 · p. 3

Further representations dated 17.10.2024 and 06.11.2025 were unanswered.

¶ 2 · p. 3

A fresh representation dated 06.07.2026, copied to other officials, repeated the request.

¶ 3 · pp. 3–4

By letter dated 17.09.2026 the RDO, Tiruchengode, summoned the petitioner. He appeared on 28.09.2026, but no order had been passed.

¶ 4 · p. 4

The respondents submitted, on instructions, that the representation was under consideration, the District Collector having called for an RDO report which was awaited.

¶ 5 · p. 4

02Issues

i.1. Whether the Court should direct the District Collector (R1) to consider and pass orders on the petitioner's representation seeking realignment of the HT line through the adjacent poromboke land in Survey No. 104.

¶ 7 · pp. 4–5 · ¶ 8 · p. 5

ii.2. Whether, pending consideration of the representation, the respondents should be restrained from drawing transmission lines across the petitioner's patta land.

¶ 8 · p. 5

03Law Applied

The petition was filed under Article 226 of the Constitution, seeking a writ of mandamus to compel the first respondent to alter the alignment of the transmission corridor.

p. 2, prayer

A writ of mandamus may direct a public authority to consider and decide a pending representation within a fixed time, without expressing any view on the merits.

¶ 8 · p. 5

Interim protection may be granted to preserve the status quo until the representation is decided.

¶ 8 · p. 5

The judgment cites no statute (such as the Electricity Act, 2003, or any Tamil Nadu transmission-related enactment) and no precedent.

04Reasoning

The Court accepted the respondents' statement that the representation was under active consideration, with the RDO's report awaited.

¶ 5 · p. 4

Because the merits of the realignment were not yet decided by the authority, the Court declined to adjudicate the petitioner's contention that adjacent poromboke land was available for towers.

¶ 7 · pp. 4–5

The Court disposed of the writ with a mandamus directing R1 to decide the representation within four weeks of receipt of the order, expressly limited to whether the lines could be drawn by fixing a tower on Survey No. 104.

¶ 8 · p. 5

The Court refused to allow the drawing of lines across the petitioner's land until the representation was decided, to prevent the alleged harm to coconut trees and the borewell from occurring before the authority considered the objection.

¶ 8 · p. 5

The petitioner's delay-related grievance, namely that representations of 2024 and 2025 went unanswered, was not separately addressed.

¶ 2 · p. 3

The order does not record the statutory basis for the corridor selection or the cost, technical, or safety reasons, if any, for rejecting the alternative alignment.

05Holding

The Court did not decide whether the transmission line must be realigned. It held that the petitioner's representation must be considered, and it disposed of the writ petition accordingly.

¶ 8 · p. 5

Direction (i): R1 (District Collector) shall consider and pass orders on the petitioner's representation within four weeks from receipt of a copy of the order, specifically on whether the lines can be drawn by fixing a tower in the adjacent poromboke land in Survey No. 104.

¶ 8 · p. 5

Direction (ii): Until the representation is decided, the drawing of lines from the petitioner's land shall not be proceeded with.

¶ 8 · p. 5

No costs were awarded, and the connected miscellaneous petition (WMP No. 51389 of 2026) was closed.

¶ 8 · p. 5
Madras High Court

Original Court PDF

C.PONNUSAMYvsThe District collector

Madras High Court · November 23, 2026

Click to open original judgment

Original judgment, available to read, download and summarize on LawLens.in