01Facts
The State Food Controller's office (Basti Division) invited a very short-term e-tender (single-stage door-step delivery) on 08.09.2026 for transporting food grains to public distribution points in Block Bansi, District Siddharth Nagar.
¶ 3.7 · ¶ 4Three bidders participated: M/s Hamara Pump (L-1), the petitioner (L-2), and M/s Om Traders (L-3).
¶ 3.8 · ¶ 3.9The technical bids were found responsive, but the petitioner objected that Hamara Pump's vehicle was a registered tanker used for petroleum products, not a food-grain carrier, which contravened Appendix-1 of the tender.
¶ 3.9 · ¶ 38A work order was issued to Hamara Pump on 23.09.2026, and was later cancelled on the technical-bid complaint.
¶ 3.10–3.11The Court notes the cancellation date is stated as 26.09.2026 in one place and 24.09.2026 in the State's pleading.
¶ 3.11 · ¶ 6On 26.09.2026, the Department asked L-2 and L-3 to consent to perform at L-1's rate.
¶ 3.12 · ¶ 5The petitioner refused, insisting that as L-2 he was effectively L-1 and should receive the contract at his own rate.
¶ 9 · ¶ 13–14On 29.09.2026, the Department cancelled the earlier tender (Letter No. 1387) and issued a fresh tender (Letter No. 1386), both dated the same day, with the letter numbers apparently interchanged.
¶ 30–31The petitioner sought parity with Block Nath Nagar, where the L-1 bidder was disqualified and the L-2 bidder (M/s Pratap Enterprises) accepted the L-1 rate and was awarded the work.
¶ 7–8 · ¶ 27–28 · ¶ 32The petitioner challenged both orders and sought a direction to award him the contract at his rate.
¶ 202Issues
i.1. Whether the petitioner, as L-2 bidder whose L-1 rival was found technically non-responsive, acquired an enforceable right to be awarded the contract at his own quoted rate.
¶ 38–41ii.2. Whether the cancellation of the earlier tender and issuance of a fresh tender were arbitrary, mala fide, or violative of Article 14 of the Constitution.
¶ 13 · ¶ 30–33 · ¶ 36–37iii.3. Whether the petitioner is entitled to parity with the Block Nath Nagar tender process.
¶ 27–2903Law Applied
Article 14 of the Constitution requires the State to act fairly, transparently, and without arbitrariness even in contractual dealings.
¶ 36–37The Uttar Pradesh Procurement Manual (Procurement of Goods), Chapters 13 and 14, permit rejection of unresponsive bids, require reasons for annulling a bidding process, and restrict post-tender negotiation with L-1.
¶ 10 · ¶ 14.22Under U.P. Avas Evam Vikas Parishad v. Om Prakash Sharma (2013) 5 SCC 182, drawing on Meerut Development Authority and Rajasthan Housing Board, a bidder has only a right to equality and fair treatment, the authority may decline the highest bid, and no vested right arises until the bid is accepted.
¶ 35Under State of Orissa v. Harinarayan Jaiswal (1972) 2 SCC 36, the State may validly reject a bid in protection of public revenue.
¶ 35Under Section 4 of the Indian Contract Act, a contract is not concluded until acceptance is communicated.
¶ 40Under Save Mon Region Federation v. State of Arunachal Pradesh, 2026 SCC OnLine SC 526, public procurement must be transparent and non-arbitrary.
¶ 26The authorities relied on by the petitioner (Inderjit Mehta, S.B. Transport, and West Bengal Electricity Board v. Patel Engineering) were cited, but the Court did not expressly adopt them in its reasoning.
¶ 17–19Provisions in the judgment · 1 · Linked ones open on LawLens
Indian Contract Act, 1872 Section 4
04Reasoning
The Court accepted that the petitioner could be treated as the de facto highest bidder once Hamara Pump's technical bid was found flawed, but held that this status conferred no indefeasible right to the contract, since no order accepting the bid had been passed and no concluded contract existed.
¶ 38 · ¶ 40The petitioner's remaining entitlement was limited to equality and fair treatment, together with the opportunity to negotiate, which the Department offered on 26.09.2026 and the petitioner refused.
¶ 38–39The Court found no mala fides, since none was alleged or evident from the record, and cancellation was justified because no bidder would perform at the L-1 rate, with the Department acting in the public interest and to protect revenue.
¶ 38The Court treated the Block Nath Nagar parity claim as factually distinct: there the L-2 bidder accepted the L-1 rate and the contract was awarded in accordance with the rules, whereas here the petitioner declined.
¶ 27–28 · ¶ 32The same-day issuance of the cancellation and fresh-tender orders, with interchanged letter numbers, was treated as an inadvertent error that did not prejudice the petitioner, and the authorities were cautioned to take greater care in future.
¶ 30–31Because the technical bids under the fresh tender had not yet been opened, no rights had crystallised for any bidder.
¶ 34 · ¶ 4105Holding
The petitioner, even if treated as the highest bidder, has no indefeasible right to the contract, and the writ petition, as framed, fails.
¶ 41The cancellation of the earlier tender and the fresh tender were neither arbitrary nor mala fide, and the Block Nath Nagar case provides no parity.
¶ 30–33 · ¶ 38The petitioner was granted liberty to file a fresh representation consenting to execute the work at the L-1 rate offered by M/s Hamara Pump within one week, and the State authorities were directed to honour such consent and execute the work order promptly, if there is no other legal impediment.
¶ 42–43The writ petition was disposed of, and costs were made easy.
¶ 44 · ¶ 45Original Court PDF
M/S Shiv Anant EnterprisesvsState Of U.P. And 3 Others
Click to open original judgment
Original judgment, available to read, download and summarize on LawLens.in
