01Facts
The petitioner claims absolute title and possession over agricultural lands in Survey Nos. 59/1A2, 59/1A3, 81/1 and 81/2, Marakkalankulam Village, V.K. Pudur Taluk, Tenkasi District, and held an agricultural electricity connection (SC No. 015-002-163) for them.
¶ 3 · pp. 3–4While the petitioner was working in Kerala, his wife was implicated in WLOR No. 5 of 2026, registered on 17-3-2026 by the Forest Range Officer (R2).
¶ 3 · pp. 3–4The complaint alleged that a Sambar Deer, a Scheduled Animal under the Wildlife (Protection) Act, 1972, was found dead and buried on 16-3-2026 after apparent contact with an electric fence around the land.
¶ 3 · pp. 3–4The petitioner was later also implicated, and both have been enlarged on bail.
¶ 3 · p. 4The Assistant Engineer (R1) disconnected the agricultural connection by order Ku.Aa.No.535 dated 17.03.2026.
prayer · pp. 1–2The petitioner alleges that the disconnection occurred without notice, hearing or enquiry.
¶ 4 · p. 4The petitioner's representation dated 19.06.2026 went unconsidered, and WP(MD) No. 18521 of 2026 was dismissed on 02.07.2026 with liberty to challenge the 17.03.2026 order.
¶ 4 · p. 4The Executive Engineer, DDCL/Rural (R3), was impleaded suo motu.
¶ 2 · p. 302Issues
i.1. Whether the disconnection of an agricultural electricity connection, based on a pending wildlife offence and without site inspection, notice or hearing, violates principles of natural justice and is sustainable.
¶ 5 · pp. 4–5ii.2. Whether the connection should be restored, and on what conditions, where no electric fencing is found on the subject lands.
¶ 9 · pp. 5–603Law Applied
The Court's jurisdiction is invoked under Article 226 of the Constitution of India, seeking certiorarified mandamus to quash the impugned order and restore the connection.
prayer · pp. 1–2The petitioner's challenge rests on the principles of natural justice, namely notice and opportunity of hearing before adverse action, and on the requirement of an inspection before the order was passed.
¶ 4–5 · pp. 4–5The Wildlife (Protection) Act, 1972 is referenced only to describe the offence alleged against the petitioner's wife.
¶ 3 · pp. 3–4The judgment cites no statutory provision or precedent for its reasoning, and the Court did not state or apply any specific legal doctrine.
04Reasoning
The Court did not adjudicate the legality of the 17.03.2026 order or determine whether the natural justice objection succeeds.
¶ 5, 9 · pp. 4–6The respondents justified the disconnection by pointing to the criminal case and the bail orders, and R2 asserted there was no infirmity in the order.
¶ 6–7 · p. 5The Court found that the decisive question, whether electric fencing actually exists on the petitioner's lands, had not been verified before the order was passed.
¶ 5, 9 · pp. 4–6The Court directed a joint inspection by R2 and R3 to determine the presence of any electric fencing, and made the restoration relief conditional on the outcome.
¶ 9 · pp. 5–6The order does not state what follows if fencing is found, and it does not expressly quash the impugned order. The reasoning thus turns on factual verification rather than a stated legal standard.
¶ 9 · p. 605Holding
The Court did not decide the natural justice challenge in terms. It held that a joint inspection by the Forest Range Officer and the Executive Engineer must verify whether electric fencing exists on the subject lands.
¶ 9 · pp. 5–6If no electric fencing is found and the petitioner files an affidavit undertaking not to install electric fencing in future, the agricultural connection (SC No. 015-002-163) which was disconnected must be restored.
¶ 9 · p. 6The Writ Petition is disposed of with no costs, and the connected miscellaneous petitions (WMP(MD) Nos. 24783 and 24784 of 2026) are closed.
¶ 10 · p. 6Original Court PDF
ParamasivanvsThe Assistant Engineer